Attachment_C__-_NFPA_25_Inspection_Table.pdf

PDF 122 KB Posted

Attached to
Fire System and Suppression Maintenance and Repair
Solicitation number
75N99025R00029
Issued by

About this file

Attachment C is a comprehensive document detailing the required tests and inspections for fire suppression and sprinkler systems at the National Institute of Environmental Health Sciences (NIEHS). The document outlines specific inspection and testing requirements for two primary systems: Pre-Action and Dry Pipe Sprinkler Systems (following NFPA 25 standards) and Sapphire Clean Agent Suppression Systems (following NFPA 2001 standards), with inspection frequencies ranging from quarterly to five-year intervals.

The inspection schedule covers multiple locations, including Building 101 Cafeteria and Building 104 CCR, and includes detailed testing protocols such as examining supervisory devices, testing waterflow switches, checking system batteries, conducting full flow trip tests, replacing sprinkler heads, and performing visual inspections of agent cylinders. Each system has a prescribed set of tests at different intervals, with specific actions noted for quarterly, semi-annual, annual, 3-year, and 5-year inspection cycles, all to be accomplished during a designated option year of the contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment C

Contractor Required Tests and Inspections

Quarterly Inspections / Tests

SYSTEM INSPECTION / TEST

Pre-Action and Dry

Pipe Sprinkler

Systems

(NFPA 25)

Inspect and test supervisory devices, tamper devices, water motor gongs, valves, low air pressure alarms, and high temperature devices.

Accomplish main drain test for systems with backflow preventers.

Inspect and test vane type waterflow switches

Inspect and test pressure type waterflow switches

Inspect and test valves and valves supervisory switches

Inspect and test dry system priming water level and quick opening devices.

Semi-Annual Inspections / Tests

SYSTEM INSPECTION / TEST

Hood Suppression

System

(NFPA 17A and 96)

Building 101 Cafeteria - Test the operation of detection systems and releasing devices.

Replace fusible links. Perform a certified technician’s inspection.

Sapphire

Clean Agent

Suppression

(NFPA 2001)

Building 104 CCR Saphire System - Measure agent quantity and check cylinder pressure.

Fill out cylinder tags.

Annual Inspections / Tests

SYSTEM INSPECTION / TEST

Pre-Action and Dry

Pipe Sprinkler

Systems

(NFPA 25)

Ensure valve/signage is accurate and legible.

Internally clean and inspect dry pipe valves per NFPA 2023 13.4.5.1.3

Inspect sprinklers, exposed pipe, and fittings from floor level.

Inspect hangers and bracing.

Test control valves.

Confirm proper number and type of spare sprinkler heads and proper wrenches.

Confirm hydraulic design information signs for each system.

Conduct partial flow test of pressure regulating or pressure reducing valves.

Conduct partial trip test of dry and pre-action.

Sapphire

Clean Agent

Suppression

(NFPA 2001)

Building 104 CCR Saphire System - Test all system devices, including detectors, pull stations, abort stations, discharge circuits, and audible and visual devices. Ensure agent quantity and pressure align with the design specifications. Verify the integrity of the agent distribution piping network. Perform a functional test of all detection, actuating inputs, alarm-sounding or displaying devices, remote annunciators as per the original design.

3-Year Inspections / Tests

SYSTEM INSPECTION / TEST SCHEDULE

Pre-Action and Dry

Pipe Sprinkler

Systems

(NFPA 25)

Replace System Batteries This shall be accomplished once during the duration of this contract during option year XX.

Conduct a dry and pre-action system full flow trip test and air leakage test.

Sapphire

Clean Agent

Suppression

(NFPA 2001)

Replace System Batteries

This shall be accomplished once during the duration of this contract during option year XX.

5-Year Inspections / Tests

SYSTEM INSPECTION / TEST SCHEDULE

Pre-Action and Dry

Pipe Sprinkler

Systems

(NFPA 25)

Test and replace sprinkler heads as required by NFPA 25 section

5.3.1.1.1.

This shall be accomplished once during the duration of this contract during option year

XX.

Replace all gauges.

Internally inspect alarm valves, check valves, alarm/check valves, filters, piping and strainers, as well as externally resettable pre-action and deluge valves for MIC, obstructions and scale.

Sapphire

Clean Agent

Suppression

(NFPA 2001)

Building 104 CCR Saphire System - Replace all discharge hoses. Test all system check valves. Conduct a visual external inspection on all agent cylinders following CGA-C6.

This shall be accomplished once during the duration of this contract during option year

XX.

File details come from the government source that posted it. Updated .