This document is a fire protection system inspections, testing, and maintenance checklist based on NFPA 25 standards, provided by USA Fire Protection as a reference guide for facility owners and managers.

The checklist outlines a comprehensive preventive maintenance schedule for fire sprinkler and suppression systems across multiple time intervals: weekly inspections of control valves, temperature verification, and pressure gauges; monthly examinations of valve exteriors and air compressor conditions; quarterly visualizations of fire department connections and testing of relief valves; semi-annual testing of waterflow switches and nitrogen concentration verification; and annual operational tests of hose valves, control valves, partial trip tests of deluge systems, and lubrication of valve stems. Extended intervals include three-year operational testing of Class II hose valves and full flow trip tests; five-year internal inspections of pipe, deluge valves, and strainers, plus gauge replacement and hydrostatic testing; twenty-year sample testing of dry sprinkler heads and ESFR/CMSA units; twenty-five-year testing of fast-response sprinkler heads; and fifty and seventy-five-year testing protocols for all sprinkler heads with specified retesting intervals. The document includes a disclaimer that the checklist serves as a guide only and does not guarantee code compliance, recommending consultation with a fire and life safety professional and USA Fire Protection for jurisdiction-specific compliance assurance.

View the file

Other versions and copies of NFPA 25

File Revision Posted Attached to
04 Semi-Annual NFPA 25 Inspection Test and Maintenance July 2022.pdf Jul 2022 Annual/Semi-Annual testing and inspection of fire alarm panels and interfaces of fire alarm system - Hollings Marine Laboratory, Charleston, SC
03 SEMI-ANNUAL NFPA 25 INSPECTION TEST AND MAINT July 2022.pdf Jul 2022 Annual/Semi-Annual testing and inspection of fire alarm panels and interfaces of fire alarm system - Hollings Marine Laboratory, Charleston, SC
05 Semi-Annual NFPA 25 Visual and Functional Inspection July 2022.pdf Jul 2022 Annual/Semi-Annual testing and inspection of fire alarm panels and interfaces of fire alarm system - Hollings Marine Laboratory, Charleston, SC
Attachment_C__-_NFPA_25_Inspection_Table.pdf Revision not stated Fire System and Suppression Maintenance and Repair
NSCC Lynn FP NFPA 25.pdf Revision not stated Service Agreement for Fire Alarm & Fire Protection Inspection/ Testing/ Programming
NSCC NFPA 25 report.pdf Revision not stated Service Agreement for Fire Alarm & Fire Protection Inspection/ Testing/ Programming
NSCC Danvers NFPA 25.pdf Revision not stated Service Agreement for Fire Alarm & Fire Protection Inspection/ Testing/ Programming
5-Year Internal Inspection Per NFPA 25.pdf Revision not stated Desert Visions Check Valve Replacement/Inspections
NFPA_25_Attachment_2 (1).pdf Revision not stated Annual Fire Suppression Systems Maintenance
REVISED NFPA 25 5 year inspection scope of work.docx Revision not stated NFPA 25 Five-Year Fire Sprinkler Inspection
NFPA_25_Attachment_2.pdf Revision not stated Annual Fire Suppression Systems Maintenance
Show all 11

Who attaches NFPA 25

State Files
Massachusetts 3
Illinois 1

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment: E - Another Example

USAFP’S NFPA 25 INSPECTIONS, TESTING, & MAINTENANCE CHECKLIST

WEEKLY ITEMS

Ensure all control valves are in proper position

Verify temperature >40°F in valve enclosures

Verify RPZ relief is not constantly discharging

Check gauges to ensure the static water supply pressure & air pressure are normal

MONTHLY ITEMS

Examine the exterior of dry, preaction, deluge, & alarm check valves

Inspect the condition of the air compressors, wiring, air lines, & oil level

QUARTERLY ITEMS

Visualize Fire Department Connections (FDC)

Examine electronically supervised control valves

Check sprinkler system pressure reducing & relief valves

Visualize hose valves

Inspect supervisory signal devices & waterflow alarm devices

Main drain test for systems with backflow preventers

Test mechanical water motor gong if present

Test priming water level & quick opening devices on dry systems

SEMI-ANNUAL ITEMS

Test vane type waterflow switches

Test pressure type waterflow switches

Test valve supervisory switches

Verify nitrogen concentration in dry systems equipped with N2 generators

ANNUAL ITEMS

Inspect sprinklers, exposed pipe, & fittings from floor level

Inspect hose, hose cabinets, hose connections, nozzles, storage devices & stapipe piping

Inspect hangers & bracing

Inspect & flow hydrants

Interior inspection of dry valves

Verify proper signage is present

Confirm proper number & type of spare sprinklers & proper wrenches

Clean dry pipe valve internals

Empty low point drains

Operational test of Class I & Class III hose valves

Test control valves

Test any other supervisory signal devices

Partial trip test of dry, preaction, and/or deluge valves

Partial flow test of pressure regulating or pressure reducing valves

Lubricate stems of OS&Y valves

Lubricate hydrant stems, caps, plugs, & threads

3-YEAR ITEMS

Operational test of Class II hose valves

Full flow trip test of dry, preaction, &/or deluge valves

Air leakage test on dry &/or preaction systems

5-YEAR ITEMS

Internal inspection of pipe Internal inspection of non-externally resettable deluge, preaction, & check valves

Internal inspection of strainers, filters, & orifices

Test/Replace gauges Sample testing of extra high temperature heads exposed to maximum allowable temperature

Sample testing of heads in harsh environments

Full flow testing of private main hydrants Hydrostatic test of FDC piping

Hydrostatic test of manual & semiautomatic dry stapipe systems

Full flow of automatic stapipe systems

20-YEAR ITEMS

Sample testing of dry sprinkler heads Sample testing of ESFR & CMSA with fast-response elements (Retest every 10 years)

25-YEAR ITEMS

Sample testing of fast response sprinkler heads except ESFR & CMSA (Retest every 10 years)

50-YEAR ITEMS

Sample testing of all sprinkler heads (Retest every 10 years until the system is 75 years old)

75-YEAR ITEMS

Sample testing of all sprinkler heads (Retest every 5 years)

USA FIRE PROTECTION IS YOUR ALL-INCLUSIVE FIRE AND LIFE SAFETY SOLUTION!

CONTACT US

IL: (847) 816-0050 | SE WI: (262) 782-3311 | NE WI: (920) 836-3344

VISIT US ONLINE

usafireprotectioninc.com

This checklist serves as a guide & reference only. Per applicable NFPA provisions, it may not be comprehensive & cannot guarantee code compliance. Please consult a fire & life safety professional to ensure compliance in your jurisdiction. USA Fire Protection disclaims liability for any losses from reliance on this document & recommends contacting USA Fire Protection for compliance.

File details come from the government source that posted it. Updated .