Attachment A Form A-2 Pricing Form 2-6-2025 - Addendum 3~1.xlsx

XLSX spreadsheet 39 KB Posted

Attached to
12279 Fort Stevens Campground Improvements Project
Solicitation number
S-63400-00011896
Issued by
Benton County, Oregon

About this file

This is a pricing submittal form for ITB #12279 from the Oregon Parks and Recreation Department (OPRD) for the Fort Stevens State Park Campground Improvements Project. The project involves comprehensive infrastructure upgrades across multiple campground loops including utility improvements in Loops L, M, N, and O, electrical retrofitting of the South Camp Lift Station, Day Use Area Restroom grading upgrades, and replacement of an existing restroom in Loop C. The work requires substantial completion of the restroom building by June 30, 2025, with all other work completed by November 30, 2025, and final completion by December 30, 2025. Key project components include extensive civil improvements, landscape work, electrical systems, and site development across 55 detailed line items.

The pricing form requires bidders to provide unit costs and total costs for all line items, with quantities specified for major components like 118,247 SF of asphalt paving, 20,793 LF of trench excavation, and various utility installations. Two bid alternates are included: a 2,000 LF sanitary sewer pressure main replacement and a manhole pump station replacement. The form emphasizes that all work not specifically itemized is considered incidental to the project, and contractors must furnish all temporary facilities at no additional charge. OPRD reserves the right to adjust quantities or delete items as needed, with payment based on actual measured quantities.

View the file

Other files

File Type Posted
Attachment C Plans and Drawings Part B, 01-13-2025-Addendum 1.pdf PDF
Attachment C Plans and Drawings Part B.pdf PDF
Question and Answer ITB 12279 FINAL_.docx DOCX document
Attachment C Plans and Drawings Part B Revised 2-6-2025 - Addendum 3.pdf PDF
Attachment B Technical Specifications Part B.pdf PDF
Attachment B Technical Specifications Part A, 01-10-2025-Addendum 1.pdf PDF
ITB 12279 Fort Stevens SP Bid Tabulation Preliminary.pdf PDF
Intent to Award_OreognBuys~1.docx DOCX document
Bid Tabulation and Responsive PW PI.xlsx XLSX spreadsheet
Attachment C Plans and Drawings Part C OPRD Prototype Electrical Kiosk Drawings.pdf PDF
Attachment B Technical Specifications Part A.pdf PDF
Attachment C Plans and Drawings Part A 2-6-2025 - Addendum 3.pdf PDF
Attachment B Technial Specifications Part B, 01-9-2025-Addendum 1.pdf PDF
Addendum 2 ITB 12279.pdf PDF
Addendum 3 to ITB 12279.pdf PDF
ITB 12279~1.docx DOCX document
Addendum 1 to ITB 12279.pdf PDF
Attachment C Plans and Drawings Part A.pdf PDF
Addendum 4 ITB 12279 FINAL .docx DOCX document
12279 JAN21-25 Pre-Bid Conference Agenda_Roster.pdf PDF
Attachment A Form A-2 Pricing Form Final.xlsx XLSX spreadsheet
Attachment A Form A-2 Pricing Form Revised Format - Addendum 1.xlsx XLSX spreadsheet
Attachment B Technial Specifications Part A 020625 Addendum.pdf PDF
Att. G Responsibility Inquiry .pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Submittal Form - Full

ATTACHMENT A

FORM A-2 PRICING FORM REVISED 2-6-2025

PRICING SUBMITTAL FORM
ITB# 12279 OregonBuys Bid# S-63400-00011896
FORT STEVENS STATE PARK CAMPGROUND IMPROVEMENTS PROJECT
PRICING SUBMITTAL INSTRUCTIONS:
Bidder shall enter pricing and other required information for all Bid Items listed in this Pricing Form. If this Pricing Form is replaced by Addendum, Bidders shall use the Addendum form to provide pricing and other required information. If the Pricing Form is only modified by Addendum, Bidders shall follow the instructions in the Addendum for making modifications to the Pricing Form. Failure to supply the required information in the Pricing Form, as modified by subsequent Addenda, may result in Bid rejection as nonresponsive.

All Work described in the Contract Documents but not specifically itemized in the Pricing below is considered incidental to the Work, and Bidder agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, and perform all incidental Work at no additional cost to the Agency. Contractor shall furnish all temporary facilities such as power, lights, heat, telephone, potable water, portable toilets, and job office as needed to perform the Work at no additional charge to the Agency.

The quantities listed in Pricing Submittal Form are intended to serve only as a guide to Bidders and are not to be construed as a guarantee. All quantities are estimated and are for Bid purposes only. All quantities are "in place" or "installed". OPRD reserves the right to adjust quantities or delete items as needed. Payment will be made based on actual, measured quantities.

The quantities listed in Pricing Submittal Form are intended to serve only as a guide to Bidders and are not to be construed as a guarantee. All quantities are estimated and are for Bid purposes only. All quantities are "in place" or "installed". OPRD reserves the right to adjust quantities or delete items as needed. Payment will be made based on actual, measured quantities.
#Line ItemsQuantityUnitUnit CostTotal Cost
1Permits & Mobilization1LS$ - 0$ - 0
PermitsLS$ - 0
MobilizationLS$ - 0
Temporary facilitiesLS$ - 0
Type B ScheduleLS$ - 0
2Erosion Control1LS$ - 0$ - 0
Day Use: Site Clearing - Construction EntranceEach$ - 0
Day Use: Site Clearing - Construction FenceLF$ - 0
Day Use: Site Clearing - Erosion control w/ catchbasin filters, monitoringSF$ - 0
Loop C: Site Clearing - Construction EntranceEach$ - 0
Loop C: Site Clearing - Construction FenceLF$ - 0
Loop C: Site Clearing - Erosion control w/ catchbasin filters, monitoringSF$ - 0
Loops L & M: Site Clearing - Construction EntranceEach$ - 0
Loops L & M: Site Clearing - Construction FenceLF$ - 0
Loops L & M: Site Clearing - Site protection incl. utilities to remain, allowSF$ - 0
Loops N & O: Site Clearing - Construction EntranceEach$ - 0
Loops N & O: Site Clearing - Construction FenceLF$ - 0
Loops N & O: Site Clearing - Erosion control w/ catchbasin filters, monitoringSF$ - 0
South Lift Station: Site Clearing - Construction EntranceEach$ - 0
South Lift Station: Site Clearing - Construction FenceLF$ - 0
South Lift Station: Site Clearing - Site protect. incl. utilities to remain, allowLS$ - 0
3Tree Salvage, Removal, Protection and Signage1LS$ - 0$ - 0
Loop C: Tree Protection, including signageLF$ - 0
Loop C: Salvage - treeEach$ - 0
Loops L & M: Tree Protection, including signageLF$ - 0
Loops L & M: Demo - treeEach$ - 0
Loops L & M: tree salvageEach$ - 0
Loops N & O: Tree Protection, including signageLF$ - 0
Loops N & O: Demo - treeEach$ - 0
4Traffic Control1LS$ - 0$ - 0
Day Use: Traffic ControlLS$ - 0
Loop C: Traffic ControlLS$ - 0
Loops L & M: Traffic ControlLS$ - 0
Loops N & O: Traffic ControlLS$ - 0
- Civil Improvements -
5General Survey, Excavation & Earthwork1LS$ - 0$ - 0
Day Use: SurveyLS$ - 0
Day Use: Mass ExcavationCY$ - 0
Day Use: StockpileCY$ - 0
Day Use: GradingSF$ - 0
Loop C: SurveyLS$ - 0
Loop C: Demo - GravelSF$ - 0
Loop C: Mass ExcavationCY$ - 0
Loop C: StockpileCY$ - 0
Loop C: GradingSF$ - 0
Loops L & M: SurveyLS$ - 0
Loops L & M: Mass ExcavationCY$ - 0
Loops L & M: StockpileCY$ - 0
Loops L & M: GradingSF$ - 0
Loops L & M: Level and Compact Native SoilsSF$ - 0
Loops N & O: SurveyLS$ - 0
Loops N & O: Mass ExcavationCY$ - 0
Loops N & O: StockpileCY$ - 0
Loops N & O: GradingSF$ - 0
6Clearing and Grubbing38,219SF$ - 0$ - 0
Loops L & M: Clear and GrubSF$ - 0
Loops N & O: Clear and GrubSF$ - 0
7Asphalt Demolition1LS$ - 0$ - 0
Day Use: Demo - HardscapeSF$ - 0
Day Use: Demo - SawcutLF$ - 0
Loop C: Demo - AC PavementSF$ - 0
Loop C: Demo - SawcutLF$ - 0
Loops L & M: Demo - HardscapeSF$ - 0
Loops L & M: Demo - SawcutLF$ - 0
Loops N & O: Demo - HardscapeSF$ - 0
Loops N & O: Demo - SawcutLF$ - 0
8Concrete Demolition1LS$ - 0$ - 0
Loop C: Demo - ConcreteSF$ - 0
9Utilities Salvage, Demolition and Site Protection1LS$ - 0$ - 0
Day Use: Site Clearing - Site protection incl. utilities to remain, allowSF$ - 0
Loop C: Site Clearing - Site protection incl. utilities to remain, allowSF$ - 0
Trench SafetyLS$ - 0
Loops L & M: Site Clearing - Site protection incl. utilities to remain, allowSF$ - 0
Loops L & M: Site Demo - Demo - campsite hose bibb, cleanout and elec pedestalEach$ - 0
Loops L & M: Site Demo - Demo - utility lineLF$ - 0
Loops L & M: Demo - Lift StationLS$ - 0
Loops L & M: Coordinate Electrical de-energizing with utility provider, safe-off conductors, etcLS$ - 0
Loops N & O: Site Clearing - Site protection incl. utilities to remainSF$ - 0
Loops N & O: Site Demo - Salvage - campsite hose bibb and elec pedestalLOC$ - 0
Loops N & O: Coordinate Electrical de-energizing with utility provider, safe-off conductors, etcLS$ - 0
Loops N & O: Site Demolition - Demo - manholeEach$ - 0
10Salvage Site Markers, Fire Pits, and Tables32Each$ - 0$ - 0
Loops L & M: Salvage Site Markers, Fire Pits, and TablesEach$ - 0
Loops N & O: Salvage Site Markers, Fire Pits, and TablesEach$ - 0
11Trench Excavation and Backfill - Water, Electrical and Joint Trenching20,793LF$ - 0$ - 0
Loops L & M: Trench Excavation and Backfill - Electrical Service6,227LF
Loops L & M: Trench Excavation and Backfill - Electrical Main5,466LF
Loops L, M, N, & O: Trench Excavation and Backfill - Water Lateral5,370LF$ - 0
Loops L, M, N, & O: Trench Excavation and Backfill - Water Main3,730LF$ - 0
12NOT USED$ - 0$ - 0
$ - 0
13NOT USED$ - 0$ - 0
$ - 0
$ - 0
$ - 0
14Base or Shoulder Rock1LS$ - 0$ - 0
Day Use: Base AggregatesCY$ - 0
Loop C: Base AggregatesCY$ - 0
Loop C: Gravel Shoulder / Flow SpreaderSF$ - 0
Loops L & M: Base AggregatesCY$ - 0
Loops N & O: Base AggregatesCY$ - 0
15Asphalt Paving118,247SF$ - 0$ - 0
Day Use: AsphaltSF$ - 0
Loop C: AsphaltSF$ - 0
Loops L & M: AsphaltSF$ - 0
Loops N & O: AsphaltSF
Loops L, M, N, & O: Repaving at Utility TrenchesSF$ - 0
16Pavement Markings1,764SF$ - 0$ - 0
Day Use: StripingSF$ - 0
Loop C: StripingSF$ - 0
17Wheelstops (OFCI)39Each$ - 0$ - 0
Day Use: Site Development - Wheel Stops - OFCIEach$ - 0
Loop C: Site Development - Wheel Stops - OFCIEach$ - 0
Loops L & M: Site Development - Wheel Stops - OFCIEach$ - 0
Loops N & O: Site Development - Wheel Stops - OFCIEach$ - 0
18Signage4Each$ - 0$ - 0
Day Use: Site Development - SignageEach$ - 0
Loop C: Site Development - SignageEach$ - 0
19Concrete Sidewalk Paving564SF$ - 0$ - 0
Loop C: Pedestrian Paving - Conc., CIPSF$ - 0
20Concrete Vehicular Paving1,764SF$ - 0$ - 0
Day Use: Vehicular Paving - Conc.SF$ - 0
Loop C: Vehicular Paving - Conc.SF$ - 0
21Concrete Pads for Utilities657SF$ - 0$ - 0
Loops L & M: Concrete Pads for RV Pedestals, Buss Gutters, and SwitchgearSF$ - 0
Loops L & M: Kiosk Concrete PadSF$ - 0
South Lift Station: Concrete PadSF$ - 0
South Lift Station: Kiosk Concrete PadSF$ - 0
22Aggregate Paving32,524SF$ - 0$ - 0
Loop C: 2" Aggregate paving, 1/4 minus incl. separation fabricSF$ - 0
Loops L & M: 3" Aggregate paving, 1/4 minus incl. separation fabricSF$ - 0
Loops N & O: 3" Aggregate paving, 1/4 minus incl. separation fabricSF$ - 0
23Site Drainage System1LS$ - 0$ - 0
Loop C: Storm Sewer - SD - 4"LF$ - 0
Loop C: Storm Sewer - OutfallsEach$ - 0
Loop C: Storm Sewer - SD - stub-2Each$ - 0
Loop C: Storm Sewer - SD - Filter stripSF$ - 0
24Site Sewer System1LS$ - 0$ - 0
Loop C: Sewer System - Reconnect (E) Sewer to Restroom StructureLS$ - 0
Loops L & M: Sanitary Sewer - Connection to ExistingEach$ - 0
Loops L & M: Sanitary Sewer - CleanoutEach$ - 0
Loops L & M: Sanitary Sewer - Dishwasher Cone (w/ sewer connection)Each$ - 0
Loops N & O: Sanitary Sewer - Connection to ExistingEach$ - 0
Loops N & O: Sanitary Sewer - CleanoutEach$ - 0
South Lift Station: Sanitary Sewer - Sewer ConnectionsEach$ - 0
25Gravity Sewerline - 4"6,260LF$ - 0$ - 0
Loops L & M: Sanitary Sewer - Main 4"LF$ - 0
Loops N & O: Sanitary Sewer - Main 4" LateralsLF$ - 0
26Gravity Sewerline - 6"2,334LF$ - 0$ - 0
Loops L & M: Sanitary Sewer - Main 6"LF$ - 0
Loops N & O: Sanitary Sewer - Main 6"LF$ - 0
27Gravity Sewerline - 8"2,854LF$ - 0$ - 0
Loops N & O: Sanitary Sewer - Main 8"LF$ - 0
28Gravity Sewerline - 10"462LF$ - 0$ - 0
Loops N & O: Sanitary Sewer - Main 10"LF$ - 0
2948" Manhole33Each$ - 0$ - 0
Loops L & M: Sanitary Sewer - ManholeEach$ - 0
Loops N & O: Sanitary Sewer - ManholeEach$ - 0
30Lift Station Retrofit1LS$ - 0$ - 0
South Lift Station: Sanitary Sewer - Pumps, controls, etc. - allowLS$ - 0
South Lift Station: Sanitary Sewer - Repair Pump StructureLS$ - 0
South Lift Station: Sanitary Sewer - Valves, allowLS$ - 0
31Site Water System1LS$ - 0$ - 0
Loop C: Water Supply - Reconnect (E) Water Supply to Restroom StructureLS$ - 0
Loops L & M: Water Supply - Connection to existingEach$ - 0
Loops L & M: Water Supply - Campsite utility pedestalEach$ - 0
Loops L & M: Water Supply - Water lateral shutoff valveEach$ - 0
Loops N & O: Water Supply - Water line - relocate, allowLS$ - 0
Loops N & O: Reinstall campsite hose bibb at pedestalEach$ - 0
32Waterline - 3/4"5,315LF$ - 0$ - 0
Loops L & M: Water Supply - Lateral 3/4"LF$ - 0
33Waterline - 3"4,510LF$ - 0$ - 0
Loops L & M: Water Supply - Main 3"LF$ - 0
34Propane Site Work1LS$ - 0$ - 0
Loop C: Propane Supply - Reconnect (E) Propane Tank to Restroom StructureLS$ - 0
- Landscape Improvements -
35Landscape - Soil Preparation1LS$ - 0$ - 0
Loop C: Landscape - Top soil - 24" at planting pit onlyCY$ - 0
Loop C: Landscape - Mulch - 3"CY$ - 0
Loops L & M: Landscape - Top soil 12"CY$ - 0
Loops L & M: Native Plant Restoration - Top Soil 24" at planting pit onlyCY$ - 0
Loops L & M: Native Plant Restoration - Mulch 3"CY$ - 0
Loops N & O: Landscape - Native Plant Restoration - Topsoil 24" at planting pit onlyCY$ - 0
Loops N & O: Landscape - Native Plant Restoration - Mulch 3"CY$ - 0
South Lift Station: Site Development - Landscape restoration - allowSF$ - 0
36Landscape - Seeding12,128SF$ - 0$ - 0
Loops L & M: HydroseedSF$ - 0
37Landscape - Plants and Planting1LS$ - 0$ - 0
Loop C: Site Development - Log, nurseEach$ - 0
Loop C: Landscape - Shrubs - California wax myrtle - 5 gal.Each$ - 0
Loop C: Landscape - Shrubs - Creeping mahonia - 1 gal.Each$ - 0
Loop C: Landscape - Shrubs - Salal - 1 gal.Each$ - 0
Loops L & M: Landscape - Trees - Serviceberry, 10 gal.Each$ - 0
Loops L & M: Landscape - Trees - Shorepine, 6' ht.Each$ - 0
Loops L & M: Landscape - Trees - Sitka Spruce, 6' ht.Each$ - 0
Loops L & M: Landscape - Trees - Gator BagEach$ - 0
Loops L & M: Landscape - Native Shrub - Salal - 1 gal. 4' O.C.Each$ - 0
Loops L & M: Landscape - Native Shrub - Creeping Mahonia - 1 gal. 3' O.C.Each$ - 0
Loops L & M: Landscape - Native Shrub - California Wax Myrtle - 5 gal. 6' O.C.Each$ - 0
Loops L & M: Landscape - Native Shrub - Red Flowering Currant - 1 gal. 5' O.C.Each$ - 0
Loops L & M: Landscape - Native Shrub - Evergreen Huckleberry - 1 gal. 6' O.C.Each$ - 0
Loops L & M: Landscape - Native Shrub - Oceanspray - 1 gal. 10' O.C.Each$ - 0
Loops L & M: Landscape - Garden Mat BagEach$ - 0
Loops N & O: Landscape - Trees - Serviceberry, 10 gal.Each$ - 0
Loops N & O: Landscape - Trees - Shorepine, 6' ht.Each$ - 0
Loops N & O: Landscape - Trees - Sitka Spruce, 6' ht.Each$ - 0
Loops N & O: Landscape - Trees - Gator BagEach$ - 0
Loops N & O: Landscape - Native Shrub - Salal - 1 gal. 4' O.C.Each$ - 0
Loops N & O: Landscape - Native Shrub - Creeping Mahonia - 1 gal. 3' O.C.Each$ - 0
Loops N & O: Landscape - Native Shrub - California Wax Myrtle - 5 gal. 6' O.C.Each$ - 0
Loops N & O: Landscape - Native Shrub - Red Flowering Currant - 1 gal. 5' O.C.Each$ - 0
Loops N & O: Landscape - Native Shrub - Red Elderberry - 1 gal. 6' O.C.Each$ - 0
Loops N & O: Landscape - Garden Mat BagEach$ - 0
38Landscape - Warranty and Maintenance1LS$ - 0$ - 0
Loop C: Landscape - Warranty and MaintenanceLS$ - 0
Loops L & M: Landscape - Warranty and MaintenanceLS$ - 0
Loops N & O: Landscape - Warranty and MaintenanceLS$ - 0
39Removable Bollards and Fire Pits (OFCI)1LS$ - 0$ - 0
Loops L & M: Site Development - Bollard - OFCIEach$ - 0
Loops L & M: Site Development - Fire Pit - OFCIEach$ - 0
Loops N & O: Site Development - Bollard - OFCIEach$ - 0
Loops N & O: Site Development - Fire Pit - OFCIEach$ - 0
40Grading Monuments95Each$ - 0$ - 0
Loops L & M: Site Development - Grading MonumentEach$ - 0
Loops N & O: Site Development - Grading MonumentEach$ - 0
41Site Bicycle Racks1Each$ - 0$ - 0
Loop C: Site Development - Bike rack - customEach$ - 0
42Wattle Screen158LF$ - 0$ - 0
Loops L & M: Site Development - Wattle fence/screen 6' tall (L & M kiosk and lift station)LF$ - 0
43Chain Link Fencing and Gates1LS$ - 0$ - 0
Loops L & M: Site Development - Chain Link Fence (Lift Station Generator)LF$ - 0
Loops L & M: Site Development - Chain Link Gate, Double (Lift Station Generator)Each$ - 0
44Boulder Retaining Wall140LF$ - 0$ - 0
Loops L & M: Site Development - Boulder Retaining WallLF$ - 0
45Kiosk for Electrical Switchgear1LS$ - 0$ - 0
Loops L & M: Site Development - Kiosk - Materials and DeliveryEach$ - 0
Loops L & M: Site Development - Kiosk - InstallationEach$ - 0
Loops L & M: Site Development - Kiosk - Seismic Engineering and RestraintLS$ - 0
South Lift Station: Site Development - Kiosk - materials & deliveryEach$ - 0
South Lift Station: Site Development - Kiosk - installationEach$ - 0
South Lift Station: Site Development - Kiosk - Seismic Engineering and RestraintLS$ - 0
- Electrical Improvements -
46Loop C Electrical1LS$ - 0$ - 0
Loop C: Electrical circuit breaker disconnectEach$ - 0
Loop C: ConduitLF$ - 0
Loop C: ConductorsLF$ - 0
Loop C: Electrical Distribution System Studies specification requirementsLS$ - 0
47Loops L & M Electrical1LS$ - 0$ - 0
Loops L & M: Seismic Bracing of Electrical Equipment (incl. stamped engineered drawings)LS$ - 0
Loops L & M: ConduitLF$ - 0
Loops L & M: ConductorsLF$ - 0
Loops L & M: Buss GuttersLOC$ - 0
Loops L & M: Reconnect (E) Circuits in RR Building & from L Loop Lift Station to (N) panelboardsLS$ - 0
Loops L & M: Primary and secondary utility conduits to main electrical distribution boardLF$ - 0
Loops L & M: Elec. Distribution System Studies specification requirementsLS$ - 0
Loops L & M: Distribution Board - 1200 Amp incl. Nema EnclosureEach$ - 0
Loops L & M: Pedestal 50 Amp incl. receptacleLOC$ - 0
Loops L & M: Restroom - Panelboard, 100AEach$ - 0
Loops L & M: Restroom - Panelboard, 125AEach$ - 0
Loops L & M: Transformers, utilityEach$ - 0
Loops L & M: MTS - 30 Amp and breakers incl. Nema enclosureLOC$ - 0
48Loops N & O Electrical1LS$ - 0$ - 0
Loops N & O: ConduitLF$ - 0
Loops N & O: ConductorsLF$ - 0
Loops N & O: Splice BoxEach$ - 0
Loops N & O: Relocate existing pedestals; electricalEach
49South Camp Lift Station Electrical1LS$ - 0$ - 0
SCLS: Main Electrical Distribution Board - 400 amp incl. Nema 4x enclosureEach$ - 0
SCLS: Seismic Bracing of Electrical Equipment (incl. stamped engineered drawings)LS$ - 0
SCLS: ConduitLF$ - 0
SCLS: ConductorsLF$ - 0
SCLS: Generator - 30 KW, incl. enclosure and Belly TankLS$ - 0
SCLS: Utility Transformer, allowEach$ - 0
SCLS: Primary and secondary utility conduits to main electrical distribution boardLF$ - 0
SCLS: Electrical distribution system studies specification requirementsLS$ - 0
SCLS: Interconnect wiring as required from lift station pump manufacturerLS$ - 0
SCLS: Panel board - 125 amp incl. Nema 4x enclosureEach$ - 0
SCLS: ATS - 125 amp, including Nema 4x enclosureEach$ - 0
- C Loop Restroom Building -
50Building Demolition1LS$ - 0$ - 0
Loop C: Site Demolition - Demo Existing Loop C Restroom StructureLS$ - 0
51Building Electrical Connection1LS$ - 0$ - 0
Loop C: Electrical - Connection to RestroomLS$ - 0
- Incidental Work -
52Disposal Fees0N/A$0$0
No separate measurement and payment: this is incidental to other Bid ItemsN/A
53Other Work0N/A$0$0
No separate measurement and payment: this is incidental to other Bid ItemsN/A
TOTAL BID, BEFORE MARKUPS (Lines 1-53)$ -
Bid Alternates
54Sanitary Sewer Pressure Main Replacement2,000LF$ - 0$ - 0
South Lift Station - Force main, 4" - replace, allow (bid alternate)LF$ - 0
55Manhole Pump Station Replacement1LS$ - 0$ - 0
South Lift Station - Wetwell - replace, allow (bid alternate)LS$ - 0
TOTAL BID ALTERNATES, BEFORE MARKUPS (Lines 54-55)$ -

NOTE: Bid price is total contract price including contractor’s profit and overhead. Items not explicitly listed in the bid schedule above are considered incidental.

The undersigned understands that the State reserves the right to increase or decrease the above quantities at the same unit prices as shown or to remove items as necessary to meet budgetary constraints. The undersigned has carefully examined the Contract Documents and the site of the work, and agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, and perform all operations shown and specified in accordance with the Contract Documents for the price(s) set herein.

By (Bidder Name) Date

Pricing Submittal Form - Short

ATTACHMENT A

FORM A-2 PRICING FORM REVISED 2-6-2025

PRICING SUBMITTAL FORM
ITB# 12279 OregonBuys Bid# S-63400-00011896
FORT STEVENS STATE PARK CAMPGROUND IMPROVEMENTS PROJECT
PRICING SUBMITTAL INSTRUCTIONS:
Bidder shall enter pricing and other required information for all Bid Items listed in this Pricing Form. If this Pricing Form is replaced by Addendum, Bidders shall use the Addendum form to provide pricing and other required information. If the Pricing Form is only modified by Addendum, Bidders shall follow the instructions in the Addendum for making modifications to the Pricing Form. Failure to supply the required information in the Pricing Form, as modified by subsequent Addenda, may result in Bid rejection as nonresponsive.

All Work described in the Contract Documents but not specifically itemized in the Pricing below is considered incidental to the Work, and Bidder agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, and perform all incidental Work at no additional cost to the Agency. Contractor shall furnish all temporary facilities such as power, lights, heat, telephone, potable water, portable toilets, and job office as needed to perform the Work at no additional charge to the Agency.

The quantities listed in Pricing Submittal Form are intended to serve only as a guide to Bidders and are not to be construed as a guarantee. All quantities are estimated and are for Bid purposes only. All quantities are "in place" or "installed". OPRD reserves the right to adjust quantities or delete items as needed. Payment will be made based on actual, measured quantities.

The quantities listed in Pricing Submittal Form are intended to serve only as a guide to Bidders and are not to be construed as a guarantee. All quantities are estimated and are for Bid purposes only. All quantities are "in place" or "installed". OPRD reserves the right to adjust quantities or delete items as needed. Payment will be made based on actual, measured quantities.
#Line ItemsQuantityUnitUnit CostTotal Cost
1Permits & Mobilization1LS$ - 0$ - 0
2Erosion Control1LS$ - 0$ - 0
3Tree Salvage, Removal, Protection and Signage1LS$ - 0$ - 0
4Traffic Control1LS$ - 0$ - 0
- Civil Improvements -
5General Survey, Excavation & Earthwork1LS$ - 0$ - 0
6Clearing and Grubbing38,219SF$ - 0$ - 0
7Asphalt Demolition1LS$ - 0$ - 0
8Concrete Demolition1LS$ - 0$ - 0
9Utilities Salvage, Demolition and Site Protection1LS$ - 0$ - 0
10Salvage Site Markers, Fire Pits, and Tables32Each$ - 0$ - 0
11Trench Excavation and Backfill - Water, Electrical and Joint Trenching20,793LF- 0- 0
12NOT USED- 0- 0- 0- 0
13NOT USED- 0- 0- 0- 0
14Base or Shoulder Rock1LS$ - 0$ - 0
15Asphalt Paving118,247SF$ - 0$ - 0
16Pavement Markings1,764SF$ - 0$ - 0
17Wheelstops (OFCI)39Each$ - 0$ - 0
18Signage4Each$ - 0$ - 0
19Concrete Sidewalk Paving564SF$ - 0$ - 0
20Concrete Vehicular Paving1,764SF$ - 0$ - 0
21Concrete Pads for Utilities657SF- 0- 0
22Aggregate Paving32,524SF$ - 0$ - 0
23Site Drainage System1LS$ - 0$ - 0
24Site Sewer System1LS$ - 0$ - 0
25Gravity Sewerline - 4"6,260LF$ - 0$ - 0
26Gravity Sewerline - 6"2,334LF$ - 0$ - 0
27Gravity Sewerline - 8"2,854LF$ - 0$ - 0
28Gravity Sewerline - 10"462LF$ - 0$ - 0
2948" Manhole33Each$ - 0$ - 0
30Lift Station Retrofit1LS$ - 0$ - 0
31Site Water System1LS$ - 0$ - 0
32Waterline - 3/4"5,315LF$ - 0$ - 0
33Waterline - 3"4,510LF$ - 0$ - 0
34Propane Site Work1LS$ - 0$ - 0
- Landscape Improvements -
35Landscape - Soil Preparation1LS$ - 0$ - 0
36Landscape - Seeding12,128SF$ - 0$ - 0
37Landscape - Plants and Planting1LS$ - 0$ - 0
38Landscape - Warranty and Maintenance1LS$ - 0$ - 0
39Removable Bollards and Fire Pits (OFCI)1LS$ - 0$ - 0
40Grading Monuments95Each$ - 0$ - 0
41Site Bicycle Racks1Each$ - 0$ - 0
42Wattle Screen158LF$ - 0$ - 0
43Chain Link Fencing and Gates1LS$ - 0$ - 0
44Boulder Retaining Wall140LF$ - 0$ - 0
45Kiosk for Electrical Switchgear1LS$ - 0$ - 0
- Electrical Improvements -
46Loop C Electrical1LS$ - 0$ - 0
47Loops L & M Electrical1LS$ - 0$ - 0
48Loops N & O Electrical1LS$ - 0$ - 0
49South Camp Lift Station Electrical1LS$ - 0$ - 0
- C Loop Restroom Building Site Improvements -
50Building Demolition1LS$ - 0$ - 0
51Building Electrical Connection1LS$ - 0$ - 0
- Incidental Work -
52Disposal Fees0N/A$0$0
53Other Work0N/A$0$0
TOTAL BID, BEFORE MARKUPS (Lines 1-53)$ -
Bid Alternates
54Sanitary Sewer Pressure Main Replacement2,000LF$ - 0$ - 0
55Manhole Pump Station Replacement1LS$ - 0$ - 0
TOTAL BID ALTERNATES, BEFORE MARKUPS (Lines 54-55)$ -
NOTE: Bid price is total contract price including contractor’s profit and overhead. Items not explicitly listed in the bid schedule above are considered incidental.

The undersigned understands that the State reserves the right to increase or decrease the above quantities at the same unit prices as shown or to remove items as necessary to meet budgetary constraints. The undersigned has carefully examined the Contract Documents and the site of the work, and agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, and perform all operations shown and specified in accordance with the Contract Documents for the price(s) set herein.

By (Bidder Name) Date