Attachment A Form A-2 Pricing Form 2-6-2025 - Addendum 3~1.xlsx
XLSX spreadsheet 39 KB Posted
- Solicitation number
- S-63400-00011896
- Issued by
- Benton County, Oregon
About this file
This is a pricing submittal form for ITB #12279 from the Oregon Parks and Recreation Department (OPRD) for the Fort Stevens State Park Campground Improvements Project. The project involves comprehensive infrastructure upgrades across multiple campground loops including utility improvements in Loops L, M, N, and O, electrical retrofitting of the South Camp Lift Station, Day Use Area Restroom grading upgrades, and replacement of an existing restroom in Loop C. The work requires substantial completion of the restroom building by June 30, 2025, with all other work completed by November 30, 2025, and final completion by December 30, 2025. Key project components include extensive civil improvements, landscape work, electrical systems, and site development across 55 detailed line items.
The pricing form requires bidders to provide unit costs and total costs for all line items, with quantities specified for major components like 118,247 SF of asphalt paving, 20,793 LF of trench excavation, and various utility installations. Two bid alternates are included: a 2,000 LF sanitary sewer pressure main replacement and a manhole pump station replacement. The form emphasizes that all work not specifically itemized is considered incidental to the project, and contractors must furnish all temporary facilities at no additional charge. OPRD reserves the right to adjust quantities or delete items as needed, with payment based on actual measured quantities.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Submittal Form - Full
ATTACHMENT A
FORM A-2 PRICING FORM REVISED 2-6-2025
| PRICING SUBMITTAL FORM |
| ITB# 12279 OregonBuys Bid# S-63400-00011896 |
| FORT STEVENS STATE PARK CAMPGROUND IMPROVEMENTS PROJECT |
| PRICING SUBMITTAL INSTRUCTIONS: |
| Bidder shall enter pricing and other required information for all Bid Items listed in this Pricing Form. If this Pricing Form is replaced by Addendum, Bidders shall use the Addendum form to provide pricing and other required information. If the Pricing Form is only modified by Addendum, Bidders shall follow the instructions in the Addendum for making modifications to the Pricing Form. Failure to supply the required information in the Pricing Form, as modified by subsequent Addenda, may result in Bid rejection as nonresponsive. |
All Work described in the Contract Documents but not specifically itemized in the Pricing below is considered incidental to the Work, and Bidder agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, and perform all incidental Work at no additional cost to the Agency. Contractor shall furnish all temporary facilities such as power, lights, heat, telephone, potable water, portable toilets, and job office as needed to perform the Work at no additional charge to the Agency.
The quantities listed in Pricing Submittal Form are intended to serve only as a guide to Bidders and are not to be construed as a guarantee. All quantities are estimated and are for Bid purposes only. All quantities are "in place" or "installed". OPRD reserves the right to adjust quantities or delete items as needed. Payment will be made based on actual, measured quantities.
| The quantities listed in Pricing Submittal Form are intended to serve only as a guide to Bidders and are not to be construed as a guarantee. All quantities are estimated and are for Bid purposes only. All quantities are "in place" or "installed". OPRD reserves the right to adjust quantities or delete items as needed. Payment will be made based on actual, measured quantities. | |||||
| # | Line Items | Quantity | Unit | Unit Cost | Total Cost |
| 1 | Permits & Mobilization | 1 | LS | $ - 0 | $ - 0 |
| Permits | LS | $ - 0 | |||
| Mobilization | LS | $ - 0 | |||
| Temporary facilities | LS | $ - 0 | |||
| Type B Schedule | LS | $ - 0 | |||
| 2 | Erosion Control | 1 | LS | $ - 0 | $ - 0 |
| Day Use: Site Clearing - Construction Entrance | Each | $ - 0 | |||
| Day Use: Site Clearing - Construction Fence | LF | $ - 0 | |||
| Day Use: Site Clearing - Erosion control w/ catchbasin filters, monitoring | SF | $ - 0 | |||
| Loop C: Site Clearing - Construction Entrance | Each | $ - 0 | |||
| Loop C: Site Clearing - Construction Fence | LF | $ - 0 | |||
| Loop C: Site Clearing - Erosion control w/ catchbasin filters, monitoring | SF | $ - 0 | |||
| Loops L & M: Site Clearing - Construction Entrance | Each | $ - 0 | |||
| Loops L & M: Site Clearing - Construction Fence | LF | $ - 0 | |||
| Loops L & M: Site Clearing - Site protection incl. utilities to remain, allow | SF | $ - 0 | |||
| Loops N & O: Site Clearing - Construction Entrance | Each | $ - 0 | |||
| Loops N & O: Site Clearing - Construction Fence | LF | $ - 0 | |||
| Loops N & O: Site Clearing - Erosion control w/ catchbasin filters, monitoring | SF | $ - 0 | |||
| South Lift Station: Site Clearing - Construction Entrance | Each | $ - 0 | |||
| South Lift Station: Site Clearing - Construction Fence | LF | $ - 0 | |||
| South Lift Station: Site Clearing - Site protect. incl. utilities to remain, allow | LS | $ - 0 | |||
| 3 | Tree Salvage, Removal, Protection and Signage | 1 | LS | $ - 0 | $ - 0 |
| Loop C: Tree Protection, including signage | LF | $ - 0 | |||
| Loop C: Salvage - tree | Each | $ - 0 | |||
| Loops L & M: Tree Protection, including signage | LF | $ - 0 | |||
| Loops L & M: Demo - tree | Each | $ - 0 | |||
| Loops L & M: tree salvage | Each | $ - 0 | |||
| Loops N & O: Tree Protection, including signage | LF | $ - 0 | |||
| Loops N & O: Demo - tree | Each | $ - 0 | |||
| 4 | Traffic Control | 1 | LS | $ - 0 | $ - 0 |
| Day Use: Traffic Control | LS | $ - 0 | |||
| Loop C: Traffic Control | LS | $ - 0 | |||
| Loops L & M: Traffic Control | LS | $ - 0 | |||
| Loops N & O: Traffic Control | LS | $ - 0 | |||
| - Civil Improvements - | |||||
| 5 | General Survey, Excavation & Earthwork | 1 | LS | $ - 0 | $ - 0 |
| Day Use: Survey | LS | $ - 0 | |||
| Day Use: Mass Excavation | CY | $ - 0 | |||
| Day Use: Stockpile | CY | $ - 0 | |||
| Day Use: Grading | SF | $ - 0 | |||
| Loop C: Survey | LS | $ - 0 | |||
| Loop C: Demo - Gravel | SF | $ - 0 | |||
| Loop C: Mass Excavation | CY | $ - 0 | |||
| Loop C: Stockpile | CY | $ - 0 | |||
| Loop C: Grading | SF | $ - 0 | |||
| Loops L & M: Survey | LS | $ - 0 | |||
| Loops L & M: Mass Excavation | CY | $ - 0 | |||
| Loops L & M: Stockpile | CY | $ - 0 | |||
| Loops L & M: Grading | SF | $ - 0 | |||
| Loops L & M: Level and Compact Native Soils | SF | $ - 0 | |||
| Loops N & O: Survey | LS | $ - 0 | |||
| Loops N & O: Mass Excavation | CY | $ - 0 | |||
| Loops N & O: Stockpile | CY | $ - 0 | |||
| Loops N & O: Grading | SF | $ - 0 | |||
| 6 | Clearing and Grubbing | 38,219 | SF | $ - 0 | $ - 0 |
| Loops L & M: Clear and Grub | SF | $ - 0 | |||
| Loops N & O: Clear and Grub | SF | $ - 0 | |||
| 7 | Asphalt Demolition | 1 | LS | $ - 0 | $ - 0 |
| Day Use: Demo - Hardscape | SF | $ - 0 | |||
| Day Use: Demo - Sawcut | LF | $ - 0 | |||
| Loop C: Demo - AC Pavement | SF | $ - 0 | |||
| Loop C: Demo - Sawcut | LF | $ - 0 | |||
| Loops L & M: Demo - Hardscape | SF | $ - 0 | |||
| Loops L & M: Demo - Sawcut | LF | $ - 0 | |||
| Loops N & O: Demo - Hardscape | SF | $ - 0 | |||
| Loops N & O: Demo - Sawcut | LF | $ - 0 | |||
| 8 | Concrete Demolition | 1 | LS | $ - 0 | $ - 0 |
| Loop C: Demo - Concrete | SF | $ - 0 | |||
| 9 | Utilities Salvage, Demolition and Site Protection | 1 | LS | $ - 0 | $ - 0 |
| Day Use: Site Clearing - Site protection incl. utilities to remain, allow | SF | $ - 0 | |||
| Loop C: Site Clearing - Site protection incl. utilities to remain, allow | SF | $ - 0 | |||
| Trench Safety | LS | $ - 0 | |||
| Loops L & M: Site Clearing - Site protection incl. utilities to remain, allow | SF | $ - 0 | |||
| Loops L & M: Site Demo - Demo - campsite hose bibb, cleanout and elec pedestal | Each | $ - 0 | |||
| Loops L & M: Site Demo - Demo - utility line | LF | $ - 0 | |||
| Loops L & M: Demo - Lift Station | LS | $ - 0 | |||
| Loops L & M: Coordinate Electrical de-energizing with utility provider, safe-off conductors, etc | LS | $ - 0 | |||
| Loops N & O: Site Clearing - Site protection incl. utilities to remain | SF | $ - 0 | |||
| Loops N & O: Site Demo - Salvage - campsite hose bibb and elec pedestal | LOC | $ - 0 | |||
| Loops N & O: Coordinate Electrical de-energizing with utility provider, safe-off conductors, etc | LS | $ - 0 | |||
| Loops N & O: Site Demolition - Demo - manhole | Each | $ - 0 | |||
| 10 | Salvage Site Markers, Fire Pits, and Tables | 32 | Each | $ - 0 | $ - 0 |
| Loops L & M: Salvage Site Markers, Fire Pits, and Tables | Each | $ - 0 | |||
| Loops N & O: Salvage Site Markers, Fire Pits, and Tables | Each | $ - 0 | |||
| 11 | Trench Excavation and Backfill - Water, Electrical and Joint Trenching | 20,793 | LF | $ - 0 | $ - 0 |
| Loops L & M: Trench Excavation and Backfill - Electrical Service | 6,227 | LF | |||
| Loops L & M: Trench Excavation and Backfill - Electrical Main | 5,466 | LF | |||
| Loops L, M, N, & O: Trench Excavation and Backfill - Water Lateral | 5,370 | LF | $ - 0 | ||
| Loops L, M, N, & O: Trench Excavation and Backfill - Water Main | 3,730 | LF | $ - 0 | ||
| 12 | NOT USED | $ - 0 | $ - 0 | ||
| $ - 0 | |||||
| 13 | NOT USED | $ - 0 | $ - 0 | ||
| $ - 0 | |||||
| $ - 0 | |||||
| $ - 0 | |||||
| 14 | Base or Shoulder Rock | 1 | LS | $ - 0 | $ - 0 |
| Day Use: Base Aggregates | CY | $ - 0 | |||
| Loop C: Base Aggregates | CY | $ - 0 | |||
| Loop C: Gravel Shoulder / Flow Spreader | SF | $ - 0 | |||
| Loops L & M: Base Aggregates | CY | $ - 0 | |||
| Loops N & O: Base Aggregates | CY | $ - 0 | |||
| 15 | Asphalt Paving | 118,247 | SF | $ - 0 | $ - 0 |
| Day Use: Asphalt | SF | $ - 0 | |||
| Loop C: Asphalt | SF | $ - 0 | |||
| Loops L & M: Asphalt | SF | $ - 0 | |||
| Loops N & O: Asphalt | SF | ||||
| Loops L, M, N, & O: Repaving at Utility Trenches | SF | $ - 0 | |||
| 16 | Pavement Markings | 1,764 | SF | $ - 0 | $ - 0 |
| Day Use: Striping | SF | $ - 0 | |||
| Loop C: Striping | SF | $ - 0 | |||
| 17 | Wheelstops (OFCI) | 39 | Each | $ - 0 | $ - 0 |
| Day Use: Site Development - Wheel Stops - OFCI | Each | $ - 0 | |||
| Loop C: Site Development - Wheel Stops - OFCI | Each | $ - 0 | |||
| Loops L & M: Site Development - Wheel Stops - OFCI | Each | $ - 0 | |||
| Loops N & O: Site Development - Wheel Stops - OFCI | Each | $ - 0 | |||
| 18 | Signage | 4 | Each | $ - 0 | $ - 0 |
| Day Use: Site Development - Signage | Each | $ - 0 | |||
| Loop C: Site Development - Signage | Each | $ - 0 | |||
| 19 | Concrete Sidewalk Paving | 564 | SF | $ - 0 | $ - 0 |
| Loop C: Pedestrian Paving - Conc., CIP | SF | $ - 0 | |||
| 20 | Concrete Vehicular Paving | 1,764 | SF | $ - 0 | $ - 0 |
| Day Use: Vehicular Paving - Conc. | SF | $ - 0 | |||
| Loop C: Vehicular Paving - Conc. | SF | $ - 0 | |||
| 21 | Concrete Pads for Utilities | 657 | SF | $ - 0 | $ - 0 |
| Loops L & M: Concrete Pads for RV Pedestals, Buss Gutters, and Switchgear | SF | $ - 0 | |||
| Loops L & M: Kiosk Concrete Pad | SF | $ - 0 | |||
| South Lift Station: Concrete Pad | SF | $ - 0 | |||
| South Lift Station: Kiosk Concrete Pad | SF | $ - 0 | |||
| 22 | Aggregate Paving | 32,524 | SF | $ - 0 | $ - 0 |
| Loop C: 2" Aggregate paving, 1/4 minus incl. separation fabric | SF | $ - 0 | |||
| Loops L & M: 3" Aggregate paving, 1/4 minus incl. separation fabric | SF | $ - 0 | |||
| Loops N & O: 3" Aggregate paving, 1/4 minus incl. separation fabric | SF | $ - 0 | |||
| 23 | Site Drainage System | 1 | LS | $ - 0 | $ - 0 |
| Loop C: Storm Sewer - SD - 4" | LF | $ - 0 | |||
| Loop C: Storm Sewer - Outfalls | Each | $ - 0 | |||
| Loop C: Storm Sewer - SD - stub-2 | Each | $ - 0 | |||
| Loop C: Storm Sewer - SD - Filter strip | SF | $ - 0 | |||
| 24 | Site Sewer System | 1 | LS | $ - 0 | $ - 0 |
| Loop C: Sewer System - Reconnect (E) Sewer to Restroom Structure | LS | $ - 0 | |||
| Loops L & M: Sanitary Sewer - Connection to Existing | Each | $ - 0 | |||
| Loops L & M: Sanitary Sewer - Cleanout | Each | $ - 0 | |||
| Loops L & M: Sanitary Sewer - Dishwasher Cone (w/ sewer connection) | Each | $ - 0 | |||
| Loops N & O: Sanitary Sewer - Connection to Existing | Each | $ - 0 | |||
| Loops N & O: Sanitary Sewer - Cleanout | Each | $ - 0 | |||
| South Lift Station: Sanitary Sewer - Sewer Connections | Each | $ - 0 | |||
| 25 | Gravity Sewerline - 4" | 6,260 | LF | $ - 0 | $ - 0 |
| Loops L & M: Sanitary Sewer - Main 4" | LF | $ - 0 | |||
| Loops N & O: Sanitary Sewer - Main 4" Laterals | LF | $ - 0 | |||
| 26 | Gravity Sewerline - 6" | 2,334 | LF | $ - 0 | $ - 0 |
| Loops L & M: Sanitary Sewer - Main 6" | LF | $ - 0 | |||
| Loops N & O: Sanitary Sewer - Main 6" | LF | $ - 0 | |||
| 27 | Gravity Sewerline - 8" | 2,854 | LF | $ - 0 | $ - 0 |
| Loops N & O: Sanitary Sewer - Main 8" | LF | $ - 0 | |||
| 28 | Gravity Sewerline - 10" | 462 | LF | $ - 0 | $ - 0 |
| Loops N & O: Sanitary Sewer - Main 10" | LF | $ - 0 | |||
| 29 | 48" Manhole | 33 | Each | $ - 0 | $ - 0 |
| Loops L & M: Sanitary Sewer - Manhole | Each | $ - 0 | |||
| Loops N & O: Sanitary Sewer - Manhole | Each | $ - 0 | |||
| 30 | Lift Station Retrofit | 1 | LS | $ - 0 | $ - 0 |
| South Lift Station: Sanitary Sewer - Pumps, controls, etc. - allow | LS | $ - 0 | |||
| South Lift Station: Sanitary Sewer - Repair Pump Structure | LS | $ - 0 | |||
| South Lift Station: Sanitary Sewer - Valves, allow | LS | $ - 0 | |||
| 31 | Site Water System | 1 | LS | $ - 0 | $ - 0 |
| Loop C: Water Supply - Reconnect (E) Water Supply to Restroom Structure | LS | $ - 0 | |||
| Loops L & M: Water Supply - Connection to existing | Each | $ - 0 | |||
| Loops L & M: Water Supply - Campsite utility pedestal | Each | $ - 0 | |||
| Loops L & M: Water Supply - Water lateral shutoff valve | Each | $ - 0 | |||
| Loops N & O: Water Supply - Water line - relocate, allow | LS | $ - 0 | |||
| Loops N & O: Reinstall campsite hose bibb at pedestal | Each | $ - 0 | |||
| 32 | Waterline - 3/4" | 5,315 | LF | $ - 0 | $ - 0 |
| Loops L & M: Water Supply - Lateral 3/4" | LF | $ - 0 | |||
| 33 | Waterline - 3" | 4,510 | LF | $ - 0 | $ - 0 |
| Loops L & M: Water Supply - Main 3" | LF | $ - 0 | |||
| 34 | Propane Site Work | 1 | LS | $ - 0 | $ - 0 |
| Loop C: Propane Supply - Reconnect (E) Propane Tank to Restroom Structure | LS | $ - 0 | |||
| - Landscape Improvements - | |||||
| 35 | Landscape - Soil Preparation | 1 | LS | $ - 0 | $ - 0 |
| Loop C: Landscape - Top soil - 24" at planting pit only | CY | $ - 0 | |||
| Loop C: Landscape - Mulch - 3" | CY | $ - 0 | |||
| Loops L & M: Landscape - Top soil 12" | CY | $ - 0 | |||
| Loops L & M: Native Plant Restoration - Top Soil 24" at planting pit only | CY | $ - 0 | |||
| Loops L & M: Native Plant Restoration - Mulch 3" | CY | $ - 0 | |||
| Loops N & O: Landscape - Native Plant Restoration - Topsoil 24" at planting pit only | CY | $ - 0 | |||
| Loops N & O: Landscape - Native Plant Restoration - Mulch 3" | CY | $ - 0 | |||
| South Lift Station: Site Development - Landscape restoration - allow | SF | $ - 0 | |||
| 36 | Landscape - Seeding | 12,128 | SF | $ - 0 | $ - 0 |
| Loops L & M: Hydroseed | SF | $ - 0 | |||
| 37 | Landscape - Plants and Planting | 1 | LS | $ - 0 | $ - 0 |
| Loop C: Site Development - Log, nurse | Each | $ - 0 | |||
| Loop C: Landscape - Shrubs - California wax myrtle - 5 gal. | Each | $ - 0 | |||
| Loop C: Landscape - Shrubs - Creeping mahonia - 1 gal. | Each | $ - 0 | |||
| Loop C: Landscape - Shrubs - Salal - 1 gal. | Each | $ - 0 | |||
| Loops L & M: Landscape - Trees - Serviceberry, 10 gal. | Each | $ - 0 | |||
| Loops L & M: Landscape - Trees - Shorepine, 6' ht. | Each | $ - 0 | |||
| Loops L & M: Landscape - Trees - Sitka Spruce, 6' ht. | Each | $ - 0 | |||
| Loops L & M: Landscape - Trees - Gator Bag | Each | $ - 0 | |||
| Loops L & M: Landscape - Native Shrub - Salal - 1 gal. 4' O.C. | Each | $ - 0 | |||
| Loops L & M: Landscape - Native Shrub - Creeping Mahonia - 1 gal. 3' O.C. | Each | $ - 0 | |||
| Loops L & M: Landscape - Native Shrub - California Wax Myrtle - 5 gal. 6' O.C. | Each | $ - 0 | |||
| Loops L & M: Landscape - Native Shrub - Red Flowering Currant - 1 gal. 5' O.C. | Each | $ - 0 | |||
| Loops L & M: Landscape - Native Shrub - Evergreen Huckleberry - 1 gal. 6' O.C. | Each | $ - 0 | |||
| Loops L & M: Landscape - Native Shrub - Oceanspray - 1 gal. 10' O.C. | Each | $ - 0 | |||
| Loops L & M: Landscape - Garden Mat Bag | Each | $ - 0 | |||
| Loops N & O: Landscape - Trees - Serviceberry, 10 gal. | Each | $ - 0 | |||
| Loops N & O: Landscape - Trees - Shorepine, 6' ht. | Each | $ - 0 | |||
| Loops N & O: Landscape - Trees - Sitka Spruce, 6' ht. | Each | $ - 0 | |||
| Loops N & O: Landscape - Trees - Gator Bag | Each | $ - 0 | |||
| Loops N & O: Landscape - Native Shrub - Salal - 1 gal. 4' O.C. | Each | $ - 0 | |||
| Loops N & O: Landscape - Native Shrub - Creeping Mahonia - 1 gal. 3' O.C. | Each | $ - 0 | |||
| Loops N & O: Landscape - Native Shrub - California Wax Myrtle - 5 gal. 6' O.C. | Each | $ - 0 | |||
| Loops N & O: Landscape - Native Shrub - Red Flowering Currant - 1 gal. 5' O.C. | Each | $ - 0 | |||
| Loops N & O: Landscape - Native Shrub - Red Elderberry - 1 gal. 6' O.C. | Each | $ - 0 | |||
| Loops N & O: Landscape - Garden Mat Bag | Each | $ - 0 | |||
| 38 | Landscape - Warranty and Maintenance | 1 | LS | $ - 0 | $ - 0 |
| Loop C: Landscape - Warranty and Maintenance | LS | $ - 0 | |||
| Loops L & M: Landscape - Warranty and Maintenance | LS | $ - 0 | |||
| Loops N & O: Landscape - Warranty and Maintenance | LS | $ - 0 | |||
| 39 | Removable Bollards and Fire Pits (OFCI) | 1 | LS | $ - 0 | $ - 0 |
| Loops L & M: Site Development - Bollard - OFCI | Each | $ - 0 | |||
| Loops L & M: Site Development - Fire Pit - OFCI | Each | $ - 0 | |||
| Loops N & O: Site Development - Bollard - OFCI | Each | $ - 0 | |||
| Loops N & O: Site Development - Fire Pit - OFCI | Each | $ - 0 | |||
| 40 | Grading Monuments | 95 | Each | $ - 0 | $ - 0 |
| Loops L & M: Site Development - Grading Monument | Each | $ - 0 | |||
| Loops N & O: Site Development - Grading Monument | Each | $ - 0 | |||
| 41 | Site Bicycle Racks | 1 | Each | $ - 0 | $ - 0 |
| Loop C: Site Development - Bike rack - custom | Each | $ - 0 | |||
| 42 | Wattle Screen | 158 | LF | $ - 0 | $ - 0 |
| Loops L & M: Site Development - Wattle fence/screen 6' tall (L & M kiosk and lift station) | LF | $ - 0 | |||
| 43 | Chain Link Fencing and Gates | 1 | LS | $ - 0 | $ - 0 |
| Loops L & M: Site Development - Chain Link Fence (Lift Station Generator) | LF | $ - 0 | |||
| Loops L & M: Site Development - Chain Link Gate, Double (Lift Station Generator) | Each | $ - 0 | |||
| 44 | Boulder Retaining Wall | 140 | LF | $ - 0 | $ - 0 |
| Loops L & M: Site Development - Boulder Retaining Wall | LF | $ - 0 | |||
| 45 | Kiosk for Electrical Switchgear | 1 | LS | $ - 0 | $ - 0 |
| Loops L & M: Site Development - Kiosk - Materials and Delivery | Each | $ - 0 | |||
| Loops L & M: Site Development - Kiosk - Installation | Each | $ - 0 | |||
| Loops L & M: Site Development - Kiosk - Seismic Engineering and Restraint | LS | $ - 0 | |||
| South Lift Station: Site Development - Kiosk - materials & delivery | Each | $ - 0 | |||
| South Lift Station: Site Development - Kiosk - installation | Each | $ - 0 | |||
| South Lift Station: Site Development - Kiosk - Seismic Engineering and Restraint | LS | $ - 0 | |||
| - Electrical Improvements - | |||||
| 46 | Loop C Electrical | 1 | LS | $ - 0 | $ - 0 |
| Loop C: Electrical circuit breaker disconnect | Each | $ - 0 | |||
| Loop C: Conduit | LF | $ - 0 | |||
| Loop C: Conductors | LF | $ - 0 | |||
| Loop C: Electrical Distribution System Studies specification requirements | LS | $ - 0 | |||
| 47 | Loops L & M Electrical | 1 | LS | $ - 0 | $ - 0 |
| Loops L & M: Seismic Bracing of Electrical Equipment (incl. stamped engineered drawings) | LS | $ - 0 | |||
| Loops L & M: Conduit | LF | $ - 0 | |||
| Loops L & M: Conductors | LF | $ - 0 | |||
| Loops L & M: Buss Gutters | LOC | $ - 0 | |||
| Loops L & M: Reconnect (E) Circuits in RR Building & from L Loop Lift Station to (N) panelboards | LS | $ - 0 | |||
| Loops L & M: Primary and secondary utility conduits to main electrical distribution board | LF | $ - 0 | |||
| Loops L & M: Elec. Distribution System Studies specification requirements | LS | $ - 0 | |||
| Loops L & M: Distribution Board - 1200 Amp incl. Nema Enclosure | Each | $ - 0 | |||
| Loops L & M: Pedestal 50 Amp incl. receptacle | LOC | $ - 0 | |||
| Loops L & M: Restroom - Panelboard, 100A | Each | $ - 0 | |||
| Loops L & M: Restroom - Panelboard, 125A | Each | $ - 0 | |||
| Loops L & M: Transformers, utility | Each | $ - 0 | |||
| Loops L & M: MTS - 30 Amp and breakers incl. Nema enclosure | LOC | $ - 0 | |||
| 48 | Loops N & O Electrical | 1 | LS | $ - 0 | $ - 0 |
| Loops N & O: Conduit | LF | $ - 0 | |||
| Loops N & O: Conductors | LF | $ - 0 | |||
| Loops N & O: Splice Box | Each | $ - 0 | |||
| Loops N & O: Relocate existing pedestals; electrical | Each | ||||
| 49 | South Camp Lift Station Electrical | 1 | LS | $ - 0 | $ - 0 |
| SCLS: Main Electrical Distribution Board - 400 amp incl. Nema 4x enclosure | Each | $ - 0 | |||
| SCLS: Seismic Bracing of Electrical Equipment (incl. stamped engineered drawings) | LS | $ - 0 | |||
| SCLS: Conduit | LF | $ - 0 | |||
| SCLS: Conductors | LF | $ - 0 | |||
| SCLS: Generator - 30 KW, incl. enclosure and Belly Tank | LS | $ - 0 | |||
| SCLS: Utility Transformer, allow | Each | $ - 0 | |||
| SCLS: Primary and secondary utility conduits to main electrical distribution board | LF | $ - 0 | |||
| SCLS: Electrical distribution system studies specification requirements | LS | $ - 0 | |||
| SCLS: Interconnect wiring as required from lift station pump manufacturer | LS | $ - 0 | |||
| SCLS: Panel board - 125 amp incl. Nema 4x enclosure | Each | $ - 0 | |||
| SCLS: ATS - 125 amp, including Nema 4x enclosure | Each | $ - 0 | |||
| - C Loop Restroom Building - | |||||
| 50 | Building Demolition | 1 | LS | $ - 0 | $ - 0 |
| Loop C: Site Demolition - Demo Existing Loop C Restroom Structure | LS | $ - 0 | |||
| 51 | Building Electrical Connection | 1 | LS | $ - 0 | $ - 0 |
| Loop C: Electrical - Connection to Restroom | LS | $ - 0 | |||
| - Incidental Work - | |||||
| 52 | Disposal Fees | 0 | N/A | $0 | $0 |
| No separate measurement and payment: this is incidental to other Bid Items | N/A | ||||
| 53 | Other Work | 0 | N/A | $0 | $0 |
| No separate measurement and payment: this is incidental to other Bid Items | N/A | ||||
| TOTAL BID, BEFORE MARKUPS (Lines 1-53) | $ - |
| Bid Alternates | |||||
| 54 | Sanitary Sewer Pressure Main Replacement | 2,000 | LF | $ - 0 | $ - 0 |
| South Lift Station - Force main, 4" - replace, allow (bid alternate) | LF | $ - 0 | |||
| 55 | Manhole Pump Station Replacement | 1 | LS | $ - 0 | $ - 0 |
| South Lift Station - Wetwell - replace, allow (bid alternate) | LS | $ - 0 | |||
| TOTAL BID ALTERNATES, BEFORE MARKUPS (Lines 54-55) | $ - |
NOTE: Bid price is total contract price including contractor’s profit and overhead. Items not explicitly listed in the bid schedule above are considered incidental.
The undersigned understands that the State reserves the right to increase or decrease the above quantities at the same unit prices as shown or to remove items as necessary to meet budgetary constraints. The undersigned has carefully examined the Contract Documents and the site of the work, and agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, and perform all operations shown and specified in accordance with the Contract Documents for the price(s) set herein.
By (Bidder Name) Date
Pricing Submittal Form - Short
ATTACHMENT A
FORM A-2 PRICING FORM REVISED 2-6-2025
| PRICING SUBMITTAL FORM |
| ITB# 12279 OregonBuys Bid# S-63400-00011896 |
| FORT STEVENS STATE PARK CAMPGROUND IMPROVEMENTS PROJECT |
| PRICING SUBMITTAL INSTRUCTIONS: |
| Bidder shall enter pricing and other required information for all Bid Items listed in this Pricing Form. If this Pricing Form is replaced by Addendum, Bidders shall use the Addendum form to provide pricing and other required information. If the Pricing Form is only modified by Addendum, Bidders shall follow the instructions in the Addendum for making modifications to the Pricing Form. Failure to supply the required information in the Pricing Form, as modified by subsequent Addenda, may result in Bid rejection as nonresponsive. |
All Work described in the Contract Documents but not specifically itemized in the Pricing below is considered incidental to the Work, and Bidder agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, and perform all incidental Work at no additional cost to the Agency. Contractor shall furnish all temporary facilities such as power, lights, heat, telephone, potable water, portable toilets, and job office as needed to perform the Work at no additional charge to the Agency.
The quantities listed in Pricing Submittal Form are intended to serve only as a guide to Bidders and are not to be construed as a guarantee. All quantities are estimated and are for Bid purposes only. All quantities are "in place" or "installed". OPRD reserves the right to adjust quantities or delete items as needed. Payment will be made based on actual, measured quantities.
| The quantities listed in Pricing Submittal Form are intended to serve only as a guide to Bidders and are not to be construed as a guarantee. All quantities are estimated and are for Bid purposes only. All quantities are "in place" or "installed". OPRD reserves the right to adjust quantities or delete items as needed. Payment will be made based on actual, measured quantities. | |||||
| # | Line Items | Quantity | Unit | Unit Cost | Total Cost |
| 1 | Permits & Mobilization | 1 | LS | $ - 0 | $ - 0 |
| 2 | Erosion Control | 1 | LS | $ - 0 | $ - 0 |
| 3 | Tree Salvage, Removal, Protection and Signage | 1 | LS | $ - 0 | $ - 0 |
| 4 | Traffic Control | 1 | LS | $ - 0 | $ - 0 |
| - Civil Improvements - | |||||
| 5 | General Survey, Excavation & Earthwork | 1 | LS | $ - 0 | $ - 0 |
| 6 | Clearing and Grubbing | 38,219 | SF | $ - 0 | $ - 0 |
| 7 | Asphalt Demolition | 1 | LS | $ - 0 | $ - 0 |
| 8 | Concrete Demolition | 1 | LS | $ - 0 | $ - 0 |
| 9 | Utilities Salvage, Demolition and Site Protection | 1 | LS | $ - 0 | $ - 0 |
| 10 | Salvage Site Markers, Fire Pits, and Tables | 32 | Each | $ - 0 | $ - 0 |
| 11 | Trench Excavation and Backfill - Water, Electrical and Joint Trenching | 20,793 | LF | - 0 | - 0 |
| 12 | NOT USED | - 0 | - 0 | - 0 | - 0 |
| 13 | NOT USED | - 0 | - 0 | - 0 | - 0 |
| 14 | Base or Shoulder Rock | 1 | LS | $ - 0 | $ - 0 |
| 15 | Asphalt Paving | 118,247 | SF | $ - 0 | $ - 0 |
| 16 | Pavement Markings | 1,764 | SF | $ - 0 | $ - 0 |
| 17 | Wheelstops (OFCI) | 39 | Each | $ - 0 | $ - 0 |
| 18 | Signage | 4 | Each | $ - 0 | $ - 0 |
| 19 | Concrete Sidewalk Paving | 564 | SF | $ - 0 | $ - 0 |
| 20 | Concrete Vehicular Paving | 1,764 | SF | $ - 0 | $ - 0 |
| 21 | Concrete Pads for Utilities | 657 | SF | - 0 | - 0 |
| 22 | Aggregate Paving | 32,524 | SF | $ - 0 | $ - 0 |
| 23 | Site Drainage System | 1 | LS | $ - 0 | $ - 0 |
| 24 | Site Sewer System | 1 | LS | $ - 0 | $ - 0 |
| 25 | Gravity Sewerline - 4" | 6,260 | LF | $ - 0 | $ - 0 |
| 26 | Gravity Sewerline - 6" | 2,334 | LF | $ - 0 | $ - 0 |
| 27 | Gravity Sewerline - 8" | 2,854 | LF | $ - 0 | $ - 0 |
| 28 | Gravity Sewerline - 10" | 462 | LF | $ - 0 | $ - 0 |
| 29 | 48" Manhole | 33 | Each | $ - 0 | $ - 0 |
| 30 | Lift Station Retrofit | 1 | LS | $ - 0 | $ - 0 |
| 31 | Site Water System | 1 | LS | $ - 0 | $ - 0 |
| 32 | Waterline - 3/4" | 5,315 | LF | $ - 0 | $ - 0 |
| 33 | Waterline - 3" | 4,510 | LF | $ - 0 | $ - 0 |
| 34 | Propane Site Work | 1 | LS | $ - 0 | $ - 0 |
| - Landscape Improvements - | |||||
| 35 | Landscape - Soil Preparation | 1 | LS | $ - 0 | $ - 0 |
| 36 | Landscape - Seeding | 12,128 | SF | $ - 0 | $ - 0 |
| 37 | Landscape - Plants and Planting | 1 | LS | $ - 0 | $ - 0 |
| 38 | Landscape - Warranty and Maintenance | 1 | LS | $ - 0 | $ - 0 |
| 39 | Removable Bollards and Fire Pits (OFCI) | 1 | LS | $ - 0 | $ - 0 |
| 40 | Grading Monuments | 95 | Each | $ - 0 | $ - 0 |
| 41 | Site Bicycle Racks | 1 | Each | $ - 0 | $ - 0 |
| 42 | Wattle Screen | 158 | LF | $ - 0 | $ - 0 |
| 43 | Chain Link Fencing and Gates | 1 | LS | $ - 0 | $ - 0 |
| 44 | Boulder Retaining Wall | 140 | LF | $ - 0 | $ - 0 |
| 45 | Kiosk for Electrical Switchgear | 1 | LS | $ - 0 | $ - 0 |
| - Electrical Improvements - | |||||
| 46 | Loop C Electrical | 1 | LS | $ - 0 | $ - 0 |
| 47 | Loops L & M Electrical | 1 | LS | $ - 0 | $ - 0 |
| 48 | Loops N & O Electrical | 1 | LS | $ - 0 | $ - 0 |
| 49 | South Camp Lift Station Electrical | 1 | LS | $ - 0 | $ - 0 |
| - C Loop Restroom Building Site Improvements - | |||||
| 50 | Building Demolition | 1 | LS | $ - 0 | $ - 0 |
| 51 | Building Electrical Connection | 1 | LS | $ - 0 | $ - 0 |
| - Incidental Work - | |||||
| 52 | Disposal Fees | 0 | N/A | $0 | $0 |
| 53 | Other Work | 0 | N/A | $0 | $0 |
| TOTAL BID, BEFORE MARKUPS (Lines 1-53) | $ - |
| Bid Alternates | |||||
| 54 | Sanitary Sewer Pressure Main Replacement | 2,000 | LF | $ - 0 | $ - 0 |
| 55 | Manhole Pump Station Replacement | 1 | LS | $ - 0 | $ - 0 |
| TOTAL BID ALTERNATES, BEFORE MARKUPS (Lines 54-55) | $ - | ||||
| NOTE: Bid price is total contract price including contractor’s profit and overhead. Items not explicitly listed in the bid schedule above are considered incidental. |
The undersigned understands that the State reserves the right to increase or decrease the above quantities at the same unit prices as shown or to remove items as necessary to meet budgetary constraints. The undersigned has carefully examined the Contract Documents and the site of the work, and agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, and perform all operations shown and specified in accordance with the Contract Documents for the price(s) set herein.
By (Bidder Name) Date
File details come from the government source that posted it. Updated .