ATTACHMENT 9 - JAMA IV Part Quanities_Destinations_CDRLs_Workbook 07 MAR 2025.xlsx
XLSX spreadsheet 73 KB Posted
- Attached to
- JAMA IV IDIQ Pilot Parts Program Federal contract opportunity
- Solicitation number
- SP4701-25-R-0001
- Issued by
- Defense Logistics Agency
About this file
This document is an Excel spreadsheet (Attachment 9) detailing parts quantities, destinations, and Contract Data Requirements Lists (CDRLs) for the JAMA IV Task Order #1 (TO1) Additive Manufacturing (AM) pilot parts program. The spreadsheet includes 11 unique parts for various military services, specifically the U.S. Army, U.S. Air Force, U.S. Marine Corps, and U.S. Navy, with quantities ranging from 1 to 20 parts per component. Parts include specialized items like a Finger Guard, Intake Caps, Fuel Sample Collection Device, M320 Boresight, C-5 Handle-Seal, Dust Cap, Cease Fire Alarm Horn Cover, Helo Hangar Door Proximity Switch Bracket, and Ventilation Louver.
The document contains 12 detailed Contract Data Requirements Lists (CDRLs) specifying various documentation requirements, including Production Technical Interchange Meeting Briefing Packages, Meeting Minutes, Engineering Changes, Deviation Requests, Process Operation Sheets, Material Certifications, Acceptance Test Procedures and Reports, First Article Inspection Reports, Inspection Results, and DD250 Packages. Each CDRL outlines specific submission guidelines, such as electronic file formats (PDF or Microsoft accessible), distribution instructions, and review timelines. The parts are to be delivered to multiple military locations across the United States, including facilities in Alabama, Illinois, New Jersey, Georgia, California, Florida, and Pennsylvania.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JAMA IV TO1 PARTS SUMMARY
| Parts Projected to be Included in Task Order #1 (TO1) | |||||||||
| Part Name | AM NSN | MILSVC | Material | Mode | Consequence of Failure Category | SAR Required? | Site Survey / AM Accr.? | Quantity | Delivery Destination(s) |
| Finger Guard | 5930-01-723-0663 | Army (AvMC) | ABS or Other | FDM or SLA | Level 0 | ESA not recommended; PM Decision | N/A | 6 | U.S. ARMY AVIATION AND MISSILE COMMAND |
ATTN: FCC-AMR-ST
BLDG 5400, Room S240
REDSTONE ARSENAL, ALABAMA 35898
Intake Cap, 4-pin (BAWS) 5340-01-604-3811 Army (CBC) Nylon 12 Multi-Jet Fusion Level 0 ESA not recommended N/A 3 U.S. ARMY DEVCOM CHEMICAL BIOLOGICAL CENTER
ATTN: SPENCER PHELPS
3157 RODMAN AVE
ROCK ISLAND, IL 61299
Intake Cap, 3-pin (Collector) 5340-01-604-3814 Army (CBC) Nylon 12 Multi-Jet Fusion Level 0 ESA not recommended N/A 3 U.S. ARMY DEVCOM CHEMICAL BIOLOGICAL CENTER
ATTN: SPENCER PHELPS
3157 RODMAN AVE
ROCK ISLAND, IL 61299
Fuel Sample Collection Device 4920-01-723-0645 Army (AvMC) 316L Stainless Steel LPBF Level 0 ESA not recommended; PM Decision N/A 6 U.S. ARMY AVIATION AND MISSILE COMMAND
ATTN: FCC-AMR-ST
BLDG 5400, Room S240
REDSTONE ARSENAL, ALABAMA 35898
M320 Boresight 3460- 01-724-5451 Army (DEVCOM AC) Nylon 12 / FDM Nylon 12CF Multi-Jet Fusion Level 0 ESA not recommended N/A 20 U.S. Army Combat Capabilities Development Command (DEVCOM) Armaments ATTN: Jorge Ruiz Building 2 Phipps Road Picatinny Arsenal, NJ 07806
180 W1A8 DLA DIST SAN JOAQUIN
25600 S CHRISMAN ROAD
REC WHSE 57
TRACY CA 95304-5000
US
C-5 HANDLE-SEAL, AFT PRESSURE DOOR 1680-01-720-9278 USAF AlSi10Mg LPBF Level 1 Yes - in MQR Yes 11 C-5 Program Office Attn: Cody Sargent Robins Air Force Base
GA 31098
Dust Cap 5340-01-722-8508 USMC AlSi10Mg LPBF Level 0 No N/A 10 ATTN: Michael Miller 700 Ammunition Road Bldg 103 RS40R Fallbrook, CA 92028
| Cease Fire Alarm Horn Cover | 5340-01-725-1451 | NAVSEA | ASA/ABS | FDM | Level 0 | No | N/A | 10 | Southeast Regional Maintenance Center (SERMC), 1488 Massey Ave, BLDG 1488, ATTN: Tone D’Addario, Code 205E, Mayport Naval Station, FL 32227 |
| 1 | ATTN Scott Storms, c326 NSWC Philadelphia 1601 Langley Ave., Bldg 77L, Philadelphia, PA 19112 | ||||||||
| Helo Hangar Door Proximity Switch Bracket | 5340-01-724-1760 | NAVSEA | 316L Stainless Steel | LPBF or DED | Level 0 | Yes – NAVSUP SAR | N/A | 1 | ATTN Scott Storms, c326 NSWC Philadelphia 1601 Langley Ave., Bldg 77L, Philadelphia, PA 19112 |
| 12 | ATTN Randy Kern, 3455 Senn St, Bldg 71 Rm 109, San Diego, CA 92136 | ||||||||
| 4 | ATTN Andrew Neilson c/255 MARMC, 9727 Avionics Loop, Norfolk, VA 23511 | ||||||||
| Ventilation Louver / AC Diffuser | 4520-01-724-8283 | NAVSEA | AlSi10Mg | LPBF | Level 0 | No | N/A | 30 | TBD |
| 1 | ATTN Scott Storms, c326 NSWC Philadelphia 1601 Langley Ave., Bldg 77L, Philadelphia, PA 19112 |
CDRL Summary Table
| Part Name (Task Order 1) | ||||||||||||||||
| AM NSN | ||||||||||||||||
| CDRL | Title | DID | Action | Reference | Finger Guard | Intake Cap, 4-pin (BAWS) | Intake Cap, 3-pin (Collector) | Fuel Sample Collection Device | M320 Boresight | C-5 HANDLE-SEAL, AFT PRESSURE DOOR | Dust Cap | Cease Fire Alarm Horn Cover | Helo Hangar Door Proximity Switch Bracket | Ventilation Louver / AC Diffuser | ||
| 5930-01-723-0663 | 5340-01-604-3811 | 5340-01-604-3814 | 4920-01-723-0645 | 3460- 01-724-5451 | 1680-01-720-9278 | 5340-01-722-8508 | 5340-01-725-1451 | 5340-01-724-1760 | 4520-01-724-8283 | |||||||
| A001 | Production Technical Interchange Meeting Briefing Package | DI-MGMT-81605 | If required | 2.2 | X | X | X | X | X | X | X | X | X | X | ||
| A002 | TIM Meeting Minutes | DI-ADMN-81250C | If required | 2.2 | X | X | X | X | X | X | X | X | X | X | ||
| A003 | Miscellaneous Reports | DI-MGMT-82165 | If required | 2.3 | X | X | X | X | X | X | X | X | X | X | ||
| A004 | Engineering Changes | DD1692 or contractor format | If required | 2.4.2 | ||||||||||||
| 2.4.4 | X | X | X | X | X | X | X | X | X | X | ||||||
| A005 | Request for Deviation | DI-SAFT-80104/ DD1694 | If required | 2.4.3 | X | X | X | X | X | X | X | X | X | X | ||
| A006 | Completed Process/Operation Sheets | DI-MISC-82386/T1 | Info | 2.4.5 | ||||||||||||
| 2.4.7 | X | X | X | X | X | X | X | X | X | X | ||||||
| A007 | Process & Material Certifications | DI-MISC-82386/T3 | Approval | 2.4.5 | ||||||||||||
| 2.4.7 | X | X | X | X | ||||||||||||
| A008 | Acceptance Test Procedures | DI-NDTI-80603A | Info | 2.4.5 | ||||||||||||
| 2.4.6 | X | X | X | X | X | X | X | X | X | |||||||
| A009 | Acceptance Test Report | DI-QCIC-81891 | Info | 2.4.5 | X | X | X | X | X | X | X | X | X | |||
| A010 | First Article Inspection (FAI) Report | DI-NDTI-82327 | Info | 2.4.5 | ||||||||||||
| 2.4.7 | X | X | X | X | X | X | X | X | X | |||||||
| A011 | Inspection Reports | DI-NDTI-80809 | Info | 2.4.5 | ||||||||||||
| 2.4.7 | X | X | X | X | X | X | X | X | X | X | ||||||
| A012 | DD250 Packages | DD250 | Approval | 2.4.7 | X | X | X | X | X | X | X | X | X | X |
CDRL A001
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | ||
| (1 Data Item) | OMB No. 0704-0188 | ||
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | |||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | |
| CLIN 001 | A | TDP________ TM ___X______ OTHER: ________ |
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE |
| A001 | Production Technical Interchange Meeting (TIM) Briefing Package | TIM Briefing Package |
| 4. AUTHORITY (Data Acquisition Documentation No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | |||||||
| DI-MGMT-81605 | SOW: 2.2 | ||||||||
| 7. DD Form 250 | 9. DIST STMNT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | |||||
| C | See block 16. | See block 16. | See block 16. | ||||||
| a. ADDRESSEE | b. COPIES | ||||||||
| 8. APP CODE | 11. AS OF DATE | 13. DATE OF NEXT SUBMISSION | Draft | Final | 17. PRICE GROUP | ||||
| N/A | See block 16. | Reg | Repro |
| 16. Remarks | JAMA Designee | 1 | 1 | 18. ESTIMATED TOTAL PRICE |
| Blocks 10, 12, 13: If Production Tehcnical Interchange Meetings (TIM) are deemed necessary per the offeror or Government, electronic copies of the briefing packages (in portable document format (pdf) or other microsoft accessible file) are due 3 days prior to the scheduled TIM meeting. Briefing contents should align with content described in SOW 2.2 or may cover separate topics deemded necessary by the offeror or Government. The frequency of this CDRL may be exercised as many times as deemed necessary by the Government. |
Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1
| 15. TOTAL | 2 | 2 | |||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | ||
| JAMA IV Program Team | 3-Mar-25 |
DD Form 1423-2 Jun 90 Previous editions are obsolete
CDRL A002
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | ||
| (1 Data Item) | OMB No. 0704-0188 | ||
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | |||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | |
| CLIN 001 | A | TDP________ TM ___X______ OTHER: ________ |
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE |
| A002 | Technical Interchange Meeting (TIM) Meeting Minutes | TIM Meeting Minutes |
| 4. AUTHORITY (Data Acquisition Documentation No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | |||||||
| DI-ADMN-81250C | SOW: 2.2 | ||||||||
| 7. DD Form 250 | 9. DIST STMNT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | |||||
| C | See block 16. | See block 16. | See block 16. | ||||||
| a. ADDRESSEE | b. COPIES | ||||||||
| 8. APP CODE | 11. AS OF DATE | 13. DATE OF NEXT SUBMISSION | Draft | Final | 17. PRICE GROUP | ||||
| N/A | See block 16. | Reg | Repro |
| 16. Remarks | JAMA Designee | 1 | 1 | 18. ESTIMATED TOTAL PRICE |
| Blocks 10, 12, 13: If a Production Technical Interchange Meeting (TIM) is deemed necessary per the offeror or Government, electronic copies of the meeting minutes (in portable document format (pdf) or other Microsoft accessible file) are due 7 business after the scheduled TIM meeting. |
Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1
| 15. TOTAL | 2 | 2 | |||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | ||
| JAMA IV Program Team | 3-Mar-25 |
DD Form 1423-2 Jun 90 Previous editions are obsolete
CDRL A003
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | ||
| (1 Data Item) | OMB No. 0704-0188 | ||
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | |||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | |
| CLIN 001 | A | TDP________ TM _________ OTHER: Engineering Data |
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE |
| A003 | Miscellaneous Reports | Miscellaneous Reports |
| 4. AUTHORITY (Data Acquisition Documentation No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | |||||||
| DI-MGMT-82165 | SOW: 2.3 | ||||||||
| 7. DD Form 250 | 9. DIST STMNT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | |||||
| C | See block 16. | See block 16. | See block 16. | ||||||
| a. ADDRESSEE | b. COPIES | ||||||||
| 8. APP CODE | 11. AS OF DATE | 13. DATE OF NEXT SUBMISSION | Draft | Final | 17. PRICE GROUP | ||||
| N/A | See block 16. | Reg | Repro |
| 16. Remarks | JAMA Designee | 1 | 1 | 18. ESTIMATED TOTAL PRICE |
| Blocks 10, 12, 13: If either the offeror or Government believe a technical or adminstrative report is required for successful contract completion, electronic copies (in portable document format (pdf) or other microsoft accessible file) are to be delivered as requested. |
Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1
| 15. TOTAL | 2 | 2 | |||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | ||
| JAMA IV Program Team | 3-Mar-25 |
DD Form 1423-2 Jun 90 Previous editions are obsolete
CDRL A004
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | ||
| (1 Data Item) | OMB No. 0704-0188 | ||
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | |||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | |
| CLIN 001 | A | TDP________ TM _________ OTHER: Engineering Data |
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE |
| A004 | Engineering Changes | Engineering Changes |
| 4. AUTHORITY (Data Acquisition Documentation No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | |||||||
| DD1692 or contractor format | SOW: 2.4.2 & 2.4.4 | ||||||||
| 7. DD Form 250 | 9. DIST STMNT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | |||||
| N | C | See block 16. | See block 16. | See block 16. | |||||
| a. ADDRESSEE | s | ||||||||
| 8. APP CODE | 11. AS OF DATE | 13. DATE OF NEXT SUBMISSION | Draft | Final | 17. PRICE GROUP | ||||
| NO | N/A | See block 16. | Reg | Repro |
| 16. Remarks | JAMA Designee | 1 | 1 | 18. ESTIMATED TOTAL PRICE |
| Block 1: If the component is designated a United States Air Force (USAF) component. block 1 shall be replaced with DI-SESS-80639E for engineering changes to the ECP or DI-SESS-80642E for engineering changes to the NOR. |
Blocks 10, 12, 13: If the Government agrees that an engineering change is required for successful contract completion, electronic copies (in portable document format (pdf) or other microsoft accessible file) are to be delivered as requested.
Block 14: Provide files to JAMA program designee and appointed Military Service designee.
Military Service Designee 1 1
| 15. TOTAL | 2 | 2 | |||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | ||
| JAMA IV Program Team | 3-Mar-25 |
DD Form 1423-2 Jun 90 Previous editions are obsolete
CDRL A005
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | ||
| (1 Data Item) | OMB No. 0704-0188 | ||
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | |||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | |
| CLIN 001 | A | TDP________ TM _________ OTHER: Engineering Data |
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE |
| A005 | Request for Deviation | Request for Deviation |
| 4. AUTHORITY (Data Acquisition Documentation No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | |||||||
| DI-SAFT-80104/ DD1694 | SOW: 2.4.3 | ||||||||
| 7. DD Form 250 | 9. DIST STMNT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | |||||
| N | C | See block 16. | See block 16. | See block 16. | |||||
| a. ADDRESSEE | s | ||||||||
| 8. APP CODE | 11. AS OF DATE | 13. DATE OF NEXT SUBMISSION | Draft | Final | 17. PRICE GROUP | ||||
| YES | N/A | See block 16. | Reg | Repro |
| 16. Remarks | JAMA Designee | 1 | 1 | 18. ESTIMATED TOTAL PRICE |
| Block 1: If the component is designated a United States Air Force (USAF) component. block 1 shall be replaced with DI-SESS-80640. |
Blocks 10, 12, 13: If offeror seeks a deviation request, they must submit a formal request for deviation for approval at least 30 days prior to delivery. The format shall be in .pdf or other microsoft accessible files format.
Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1
| 15. TOTAL | 2 | 2 | |||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | ||
| JAMA IV Program Team | 3-Mar-25 |
DD Form 1423-2 Jun 90 Previous editions are obsolete
CDRL A006
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | ||
| (1 Data Item) | OMB No. 0704-0188 | ||
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | |||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | |
| CLIN 001 | A | TDP________ TM _________ OTHER: Engineering Data |
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE |
| A006 | Completed Process Operation Sheets | Completed Process Operation Sheets |
| 4. AUTHORITY (Data Acquisition Documentation No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | |||||||
| DI-MISC-82386/T1 | SOW: 2.4.5 and 2.4.7 | ||||||||
| 7. DD Form 250 | 9. DIST STMNT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | |||||
| Y | B | See block 16. | See block 16. | See block 16. | |||||
| a. ADDRESSEE | s | ||||||||
| 8. APP CODE | 11. AS OF DATE | 13. DATE OF NEXT SUBMISSION | Draft | Final | 17. PRICE GROUP | ||||
| NO | N/A | See block 16. | Reg | Repro |
| 16. Remarks | JAMA Designee | 1 | 1 | 18. ESTIMATED TOTAL PRICE |
| Blocks 10, 12, 13: Completed process operation sheets documenting the process controls leveraged for the qualified manufacturing process are required to be delievered by an electronic copy (in portable document format (pdf) or other microsoft accessible file) 30 days prior to final part delivery. |
Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1
| 15. TOTAL | 2 | 2 | |||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | ||
| JAMA IV Program Team | 3-Mar-25 |
DD Form 1423-2 Jun 90 Previous editions are obsolete
CDRL A007
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | ||
| (1 Data Item) | OMB No. 0704-0188 | ||
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | |||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | |
| CLIN 001 | A | TDP________ TM _________ OTHER: Engineering Data |
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE |
| A007 | Process & Material Certifications | Process & Material Certifications |
| 4. AUTHORITY (Data Acquisition Documentation No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | |||||||
| DI-MISC-82386/T3 | SOW: 2.4.5 and 2.4.7 | ||||||||
| 7. DD Form 250 | 9. DIST STMNT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | |||||
| Y | B | See block 16. | See block 16. | See block 16. | |||||
| a. ADDRESSEE | s | ||||||||
| 8. APP CODE | 11. AS OF DATE | 13. DATE OF NEXT SUBMISSION | Draft | Final | 17. PRICE GROUP | ||||
| YES | N/A | See block 16. | Reg | Repro |
| 16. Remarks | JAMA Designee | 1 | 1 | 18. ESTIMATED TOTAL PRICE |
| Blocks 10, 12, 13: Electronic copy of a report (in portable document format (pdf) or other microsoft accessible file format) supporting operational qualification, as defined within the Technical Data Package, is due prior to the initiation of production part manufacturing. The USG shall have up to 30 days for review and approval of the acceptability of the operational qualificiation data. No production part manufacturing shall begin prior to USG review and acceptance. |
Block 14: Provide files to JAMA program designee and appointed Military Service designee.
Military Service Designee 1 1
| 15. TOTAL | 2 | 2 | |||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | ||
| JAMA IV Program Team | 3-Mar-25 |
DD Form 1423-2 Jun 90 Previous editions are obsolete
CDRL A008
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | ||
| (1 Data Item) | OMB No. 0704-0188 | ||
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | |||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | |
| CLIN 001 | A | TDP________ TM _________ OTHER: Engineering Data |
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE |
| A008 | Acceptance Test Procedures | Acceptance Test Procedures |
| 4. AUTHORITY (Data Acquisition Documentation No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | |||||||
| DI-NDTI-80603A | SOW: 2.4.5 and 2.4.6 | ||||||||
| 7. DD Form 250 | 9. DIST STMNT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | |||||
| N | C | See block 16. | See block 16. | See block 16. | |||||
| a. ADDRESSEE | s | ||||||||
| 8. APP CODE | 11. AS OF DATE | 13. DATE OF NEXT SUBMISSION | Draft | Final | 17. PRICE GROUP | ||||
| NO | N/A | See block 16. | Reg | Repro |
| 16. Remarks | JAMA Designee | 1 | 1 | 18. ESTIMATED TOTAL PRICE |
| Blocks 10, 12, 13: Electronic copy of a report (in portable document format (pdf) or other microsoft accessible format) documenting the acceptance test procedures as defined within the Technical Data Package shall be delievered. |
Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1
| 15. TOTAL | 2 | 2 | |||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | ||
| JAMA IV Program Team | 3-Mar-25 |
DD Form 1423-2 Jun 90 Previous editions are obsolete
CDRL A009
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | ||
| (1 Data Item) | OMB No. 0704-0188 | ||
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | |||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | |
| CLIN 001 | A | TDP________ TM _________ OTHER: Engineering Data |
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE |
| A009 | Acceptance Test Report | Acceptance Test Report |
| 4. AUTHORITY (Data Acquisition Documentation No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | |||||||
| DI-QCIC-81891 | SOW: 2.4.5 | ||||||||
| 7. DD Form 250 | 9. DIST STMNT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | |||||
| Y | C | See block 16. | See block 16. | See block 16. | |||||
| a. ADDRESSEE | s | ||||||||
| 8. APP CODE | 11. AS OF DATE | 13. DATE OF NEXT SUBMISSION | Draft | Final | 17. PRICE GROUP | ||||
| NO | N/A | See block 16. | Reg | Repro |
| 16. Remarks | JAMA Designee | 1 | 1 | 18. ESTIMATED TOTAL PRICE |
| Blocks 10, 12, 13: Electronic copy of a report (in portable document format (pdf) or other microsoft accessible format) documenting all required acceptance test results shall (as defined within the Technical Data Package) be delievered. |
Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1
| 15. TOTAL | 2 | 2 | |||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | ||
| JAMA IV Program Team | 3-Mar-25 |
DD Form 1423-2 Jun 90 Previous editions are obsolete
CDRL A010
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | ||
| (1 Data Item) | OMB No. 0704-0188 | ||
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | |||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | |
| CLIN 001 | A | TDP________ TM _________ OTHER: Engineering Data |
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE |
| A010 | First Article Inspection (FAI) Report | First Article Inspection (FAI) Report |
| 4. AUTHORITY (Data Acquisition Documentation No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | |||||||
| DI-NDTI-82327 | SOW: 2.4.5 and 2.4.7 | ||||||||
| 7. DD Form 250 | 9. DIST STMNT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | |||||
| Y | C | See block 16. | See block 16. | See block 16. | |||||
| a. ADDRESSEE | s | ||||||||
| 8. APP CODE | 11. AS OF DATE | 13. DATE OF NEXT SUBMISSION | Draft | Final | 17. PRICE GROUP | ||||
| NO | N/A | See block 16. | Reg | Repro |
| 16. Remarks | JAMA Designee | 1 | 1 | 18. ESTIMATED TOTAL PRICE |
| Blocks 10, 12, 13: Electronic copy of FAI Results (in portable document format (pdf) or other word accessible format) shall be delievered. The FAI shall meet all requirements as defined within the Technical Data Package. |
Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1
| 15. TOTAL | 2 | 2 | |||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | ||
| JAMA IV Program Team | 3-Mar-25 |
DD Form 1423-2 Jun 90 Previous editions are obsolete
CDRL A011
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | ||
| (1 Data Item) | OMB No. 0704-0188 | ||
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | |||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | |
| CLIN 001 | A | TDP________ TM _________ OTHER: Engineering Data |
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE |
| A011 | Inspection Results | Inspection Results |
| 4. AUTHORITY (Data Acquisition Documentation No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | |||||||
| DI-NDTI-80809 | SOW: 2.4.5 and 2.4.7 | ||||||||
| 7. DD Form 250 | 9. DIST STMNT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | |||||
| Y | C | See block 16. | See block 16. | See block 16. | |||||
| a. ADDRESSEE | s | ||||||||
| 8. APP CODE | 11. AS OF DATE | 13. DATE OF NEXT SUBMISSION | Draft | Final | 17. PRICE GROUP | ||||
| NO | N/A | See block 16. | Reg | Repro |
| 16. Remarks | JAMA Designee | 1 | 1 | 18. ESTIMATED TOTAL PRICE |
| Blocks 10, 12, 13: A paper copy as well as an electronic copy (in portable document format (pdf) or other microsoft accessible format) of an inspection report that provides inspection results for all requirements as defined within the Technical Data Package is due with the delivery of of each production item. |
Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1
| 15. TOTAL | 2 | 2 | |||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | ||
| JAMA IV Program Team | 3-Mar-25 |
DD Form 1423-2 Jun 90 Previous editions are obsolete
CDRL A012
| CONTRACT DATA REQUIREMENTS LIST | Form Approved | ||
| (1 Data Item) | OMB No. 0704-0188 | ||
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. | |||
| A. CONTRACT LINE ITEM NO. | B. EXHIBIT | C. CATEGORY | |
| CLIN 001 | A | TDP________ TM _________ OTHER: Engineering Data |
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | 3. SUBTITLE |
| A012 | DD250 Packages | DD250 Packages |
| 4. AUTHORITY (Data Acquisition Documentation No.) | 5. CONTRACT REFERENCE | 6. REQUIRING OFFICE | |||||||
| DD250 | SOW: 2.4.7 | ||||||||
| 7. DD Form 250 | 9. DIST STMNT | 10. FREQUENCY | 12. DATE OF FIRST SUBMISSION | 14. DISTRIBUTION | |||||
| Y | C | See block 16. | See block 16. | See block 16. | |||||
| a. ADDRESSEE | s | ||||||||
| 8. APP CODE | 11. AS OF DATE | 13. DATE OF NEXT SUBMISSION | Draft | Final | 17. PRICE GROUP | ||||
| YES | N/A | See block 16. | Reg | Repro |
| 16. Remarks | JAMA Designee | 1 | 1 | 18. ESTIMATED TOTAL PRICE |
| Blocks 10, 12, 13: Electronic copy (in portable document format (pdf) or other word accessible format) of a completed DD250 shall be delievered within 5 business days of acceptance or receipt of materials by the government. |
DD250 package shall contain, as required by the Technical Data Package:
Completed Process/Operational Sheets (to include Production Control Documents), Process and Material Certifications (to include Operational Qualification), First Article Inspection Results, Inspection Results for total quantity dictated by contract specifications.
The DD250 shall contain certifications that the ordered quanity of components have all been inspected, accepted and are in compliane with contractual and Technical Data Package requirements.
Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1
| 15. TOTAL | 2 | 2 | |||
| G. PREPARED BY | H. DATE | I. APPROVED BY | J. DATE | ||
| JAMA IV Program Team | 3-Mar-25 |
DD Form 1423-2 Jun 90 Previous editions are obsolete
File details come from the government source that posted it. Updated .