ATTACHMENT 9 - JAMA IV Part Quanities_Destinations_CDRLs_Workbook 07 MAR 2025.xlsx

XLSX spreadsheet 73 KB Posted

Attached to
JAMA IV IDIQ Pilot Parts Program Federal contract opportunity
Solicitation number
SP4701-25-R-0001
Issued by
Defense Logistics Agency

About this file

This document is an Excel spreadsheet (Attachment 9) detailing parts quantities, destinations, and Contract Data Requirements Lists (CDRLs) for the JAMA IV Task Order #1 (TO1) Additive Manufacturing (AM) pilot parts program. The spreadsheet includes 11 unique parts for various military services, specifically the U.S. Army, U.S. Air Force, U.S. Marine Corps, and U.S. Navy, with quantities ranging from 1 to 20 parts per component. Parts include specialized items like a Finger Guard, Intake Caps, Fuel Sample Collection Device, M320 Boresight, C-5 Handle-Seal, Dust Cap, Cease Fire Alarm Horn Cover, Helo Hangar Door Proximity Switch Bracket, and Ventilation Louver.

The document contains 12 detailed Contract Data Requirements Lists (CDRLs) specifying various documentation requirements, including Production Technical Interchange Meeting Briefing Packages, Meeting Minutes, Engineering Changes, Deviation Requests, Process Operation Sheets, Material Certifications, Acceptance Test Procedures and Reports, First Article Inspection Reports, Inspection Results, and DD250 Packages. Each CDRL outlines specific submission guidelines, such as electronic file formats (PDF or Microsoft accessible), distribution instructions, and review timelines. The parts are to be delivered to multiple military locations across the United States, including facilities in Alabama, Illinois, New Jersey, Georgia, California, Florida, and Pennsylvania.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JAMA IV TO1 PARTS SUMMARY

Parts Projected to be Included in Task Order #1 (TO1)
Part NameAM NSNMILSVCMaterialModeConsequence of Failure CategorySAR Required?Site Survey / AM Accr.?QuantityDelivery Destination(s)
Finger Guard5930-01-723-0663Army (AvMC)ABS or OtherFDM or SLALevel 0ESA not recommended; PM DecisionN/A6U.S. ARMY AVIATION AND MISSILE COMMAND

ATTN: FCC-AMR-ST

BLDG 5400, Room S240

REDSTONE ARSENAL, ALABAMA 35898

Intake Cap, 4-pin (BAWS) 5340-01-604-3811 Army (CBC) Nylon 12 Multi-Jet Fusion Level 0 ESA not recommended N/A 3 U.S. ARMY DEVCOM CHEMICAL BIOLOGICAL CENTER

ATTN: SPENCER PHELPS

3157 RODMAN AVE

ROCK ISLAND, IL 61299

Intake Cap, 3-pin (Collector) 5340-01-604-3814 Army (CBC) Nylon 12 Multi-Jet Fusion Level 0 ESA not recommended N/A 3 U.S. ARMY DEVCOM CHEMICAL BIOLOGICAL CENTER

ATTN: SPENCER PHELPS

3157 RODMAN AVE

ROCK ISLAND, IL 61299

Fuel Sample Collection Device 4920-01-723-0645 Army (AvMC) 316L Stainless Steel LPBF Level 0 ESA not recommended; PM Decision N/A 6 U.S. ARMY AVIATION AND MISSILE COMMAND

ATTN: FCC-AMR-ST

BLDG 5400, Room S240

REDSTONE ARSENAL, ALABAMA 35898

M320 Boresight 3460- 01-724-5451 Army (DEVCOM AC) Nylon 12 / FDM Nylon 12CF Multi-Jet Fusion Level 0 ESA not recommended N/A 20 U.S. Army Combat Capabilities Development Command (DEVCOM) Armaments ATTN: Jorge Ruiz Building 2 Phipps Road Picatinny Arsenal, NJ 07806

180 W1A8 DLA DIST SAN JOAQUIN

25600 S CHRISMAN ROAD

REC WHSE 57

TRACY CA 95304-5000

US

C-5 HANDLE-SEAL, AFT PRESSURE DOOR 1680-01-720-9278 USAF AlSi10Mg LPBF Level 1 Yes - in MQR Yes 11 C-5 Program Office Attn: Cody Sargent Robins Air Force Base

GA 31098

Dust Cap 5340-01-722-8508 USMC AlSi10Mg LPBF Level 0 No N/A 10 ATTN: Michael Miller 700 Ammunition Road Bldg 103 RS40R Fallbrook, CA 92028

Cease Fire Alarm Horn Cover5340-01-725-1451NAVSEAASA/ABSFDMLevel 0NoN/A10Southeast Regional Maintenance Center (SERMC), 1488 Massey Ave, BLDG 1488, ATTN: Tone D’Addario, Code 205E, Mayport Naval Station, FL 32227
1ATTN Scott Storms, c326 NSWC Philadelphia 1601 Langley Ave., Bldg 77L, Philadelphia, PA 19112
Helo Hangar Door Proximity Switch Bracket5340-01-724-1760NAVSEA316L Stainless SteelLPBF or DEDLevel 0Yes – NAVSUP SARN/A1ATTN Scott Storms, c326 NSWC Philadelphia 1601 Langley Ave., Bldg 77L, Philadelphia, PA 19112
12ATTN Randy Kern, 3455 Senn St, Bldg 71 Rm 109, San Diego, CA 92136
4ATTN Andrew Neilson c/255 MARMC, 9727 Avionics Loop, Norfolk, VA 23511
Ventilation Louver / AC Diffuser4520-01-724-8283NAVSEAAlSi10MgLPBFLevel 0NoN/A30TBD
1ATTN Scott Storms, c326 NSWC Philadelphia 1601 Langley Ave., Bldg 77L, Philadelphia, PA 19112

CDRL Summary Table

Part Name (Task Order 1)
AM NSN
CDRLTitleDIDActionReferenceFinger GuardIntake Cap, 4-pin (BAWS)Intake Cap, 3-pin (Collector)Fuel Sample Collection DeviceM320 BoresightC-5 HANDLE-SEAL, AFT PRESSURE DOORDust CapCease Fire Alarm Horn CoverHelo Hangar Door Proximity Switch BracketVentilation Louver / AC Diffuser
5930-01-723-06635340-01-604-38115340-01-604-38144920-01-723-06453460- 01-724-54511680-01-720-92785340-01-722-85085340-01-725-14515340-01-724-17604520-01-724-8283
A001Production Technical Interchange Meeting Briefing PackageDI-MGMT-81605If required2.2XXXXXXXXXX
A002TIM Meeting MinutesDI-ADMN-81250CIf required2.2XXXXXXXXXX
A003Miscellaneous ReportsDI-MGMT-82165If required2.3XXXXXXXXXX
A004Engineering ChangesDD1692 or contractor formatIf required2.4.2
2.4.4XXXXXXXXXX
A005Request for DeviationDI-SAFT-80104/ DD1694If required2.4.3XXXXXXXXXX
A006Completed Process/Operation SheetsDI-MISC-82386/T1Info2.4.5
2.4.7XXXXXXXXXX
A007Process & Material CertificationsDI-MISC-82386/T3Approval2.4.5
2.4.7XXXX
A008Acceptance Test ProceduresDI-NDTI-80603AInfo2.4.5
2.4.6XXXXXXXXX
A009Acceptance Test ReportDI-QCIC-81891Info2.4.5XXXXXXXXX
A010First Article Inspection (FAI) ReportDI-NDTI-82327Info2.4.5
2.4.7XXXXXXXXX
A011Inspection ReportsDI-NDTI-80809Info2.4.5
2.4.7XXXXXXXXXX
A012DD250 PackagesDD250Approval2.4.7XXXXXXXXXX

CDRL A001

CONTRACT DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
CLIN 001ATDP________ TM ___X______ OTHER: ________

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A001Production Technical Interchange Meeting (TIM) Briefing PackageTIM Briefing Package
4. AUTHORITY (Data Acquisition Documentation No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MGMT-81605SOW: 2.2
7. DD Form 2509. DIST STMNT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
CSee block 16.See block 16.See block 16.
a. ADDRESSEEb. COPIES
8. APP CODE11. AS OF DATE13. DATE OF NEXT SUBMISSIONDraftFinal17. PRICE GROUP
N/ASee block 16.RegRepro
16. RemarksJAMA Designee1118. ESTIMATED TOTAL PRICE
Blocks 10, 12, 13: If Production Tehcnical Interchange Meetings (TIM) are deemed necessary per the offeror or Government, electronic copies of the briefing packages (in portable document format (pdf) or other microsoft accessible file) are due 3 days prior to the scheduled TIM meeting. Briefing contents should align with content described in SOW 2.2 or may cover separate topics deemded necessary by the offeror or Government. The frequency of this CDRL may be exercised as many times as deemed necessary by the Government.

Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1

15. TOTAL22
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
JAMA IV Program Team3-Mar-25

DD Form 1423-2 Jun 90 Previous editions are obsolete

CDRL A002

CONTRACT DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
CLIN 001ATDP________ TM ___X______ OTHER: ________

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A002Technical Interchange Meeting (TIM) Meeting MinutesTIM Meeting Minutes
4. AUTHORITY (Data Acquisition Documentation No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-ADMN-81250CSOW: 2.2
7. DD Form 2509. DIST STMNT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
CSee block 16.See block 16.See block 16.
a. ADDRESSEEb. COPIES
8. APP CODE11. AS OF DATE13. DATE OF NEXT SUBMISSIONDraftFinal17. PRICE GROUP
N/ASee block 16.RegRepro
16. RemarksJAMA Designee1118. ESTIMATED TOTAL PRICE
Blocks 10, 12, 13: If a Production Technical Interchange Meeting (TIM) is deemed necessary per the offeror or Government, electronic copies of the meeting minutes (in portable document format (pdf) or other Microsoft accessible file) are due 7 business after the scheduled TIM meeting.

Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1

15. TOTAL22
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
JAMA IV Program Team3-Mar-25

DD Form 1423-2 Jun 90 Previous editions are obsolete

CDRL A003

CONTRACT DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
CLIN 001ATDP________ TM _________ OTHER: Engineering Data

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A003Miscellaneous ReportsMiscellaneous Reports
4. AUTHORITY (Data Acquisition Documentation No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MGMT-82165SOW: 2.3
7. DD Form 2509. DIST STMNT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
CSee block 16.See block 16.See block 16.
a. ADDRESSEEb. COPIES
8. APP CODE11. AS OF DATE13. DATE OF NEXT SUBMISSIONDraftFinal17. PRICE GROUP
N/ASee block 16.RegRepro
16. RemarksJAMA Designee1118. ESTIMATED TOTAL PRICE
Blocks 10, 12, 13: If either the offeror or Government believe a technical or adminstrative report is required for successful contract completion, electronic copies (in portable document format (pdf) or other microsoft accessible file) are to be delivered as requested.

Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1

15. TOTAL22
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
JAMA IV Program Team3-Mar-25

DD Form 1423-2 Jun 90 Previous editions are obsolete

CDRL A004

CONTRACT DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
CLIN 001ATDP________ TM _________ OTHER: Engineering Data

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A004Engineering ChangesEngineering Changes
4. AUTHORITY (Data Acquisition Documentation No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DD1692 or contractor formatSOW: 2.4.2 & 2.4.4
7. DD Form 2509. DIST STMNT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
NCSee block 16.See block 16.See block 16.
a. ADDRESSEEs
8. APP CODE11. AS OF DATE13. DATE OF NEXT SUBMISSIONDraftFinal17. PRICE GROUP
NON/ASee block 16.RegRepro
16. RemarksJAMA Designee1118. ESTIMATED TOTAL PRICE
Block 1: If the component is designated a United States Air Force (USAF) component. block 1 shall be replaced with DI-SESS-80639E for engineering changes to the ECP or DI-SESS-80642E for engineering changes to the NOR.

Blocks 10, 12, 13: If the Government agrees that an engineering change is required for successful contract completion, electronic copies (in portable document format (pdf) or other microsoft accessible file) are to be delivered as requested.

Block 14: Provide files to JAMA program designee and appointed Military Service designee.

Military Service Designee 1 1

15. TOTAL22
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
JAMA IV Program Team3-Mar-25

DD Form 1423-2 Jun 90 Previous editions are obsolete

CDRL A005

CONTRACT DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
CLIN 001ATDP________ TM _________ OTHER: Engineering Data

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A005Request for DeviationRequest for Deviation
4. AUTHORITY (Data Acquisition Documentation No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-SAFT-80104/ DD1694SOW: 2.4.3
7. DD Form 2509. DIST STMNT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
NCSee block 16.See block 16.See block 16.
a. ADDRESSEEs
8. APP CODE11. AS OF DATE13. DATE OF NEXT SUBMISSIONDraftFinal17. PRICE GROUP
YESN/ASee block 16.RegRepro
16. RemarksJAMA Designee1118. ESTIMATED TOTAL PRICE
Block 1: If the component is designated a United States Air Force (USAF) component. block 1 shall be replaced with DI-SESS-80640.

Blocks 10, 12, 13: If offeror seeks a deviation request, they must submit a formal request for deviation for approval at least 30 days prior to delivery. The format shall be in .pdf or other microsoft accessible files format.

Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1

15. TOTAL22
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
JAMA IV Program Team3-Mar-25

DD Form 1423-2 Jun 90 Previous editions are obsolete

CDRL A006

CONTRACT DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
CLIN 001ATDP________ TM _________ OTHER: Engineering Data

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A006Completed Process Operation SheetsCompleted Process Operation Sheets
4. AUTHORITY (Data Acquisition Documentation No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MISC-82386/T1SOW: 2.4.5 and 2.4.7
7. DD Form 2509. DIST STMNT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
YBSee block 16.See block 16.See block 16.
a. ADDRESSEEs
8. APP CODE11. AS OF DATE13. DATE OF NEXT SUBMISSIONDraftFinal17. PRICE GROUP
NON/ASee block 16.RegRepro
16. RemarksJAMA Designee1118. ESTIMATED TOTAL PRICE
Blocks 10, 12, 13: Completed process operation sheets documenting the process controls leveraged for the qualified manufacturing process are required to be delievered by an electronic copy (in portable document format (pdf) or other microsoft accessible file) 30 days prior to final part delivery.

Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1

15. TOTAL22
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
JAMA IV Program Team3-Mar-25

DD Form 1423-2 Jun 90 Previous editions are obsolete

CDRL A007

CONTRACT DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
CLIN 001ATDP________ TM _________ OTHER: Engineering Data

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A007Process & Material CertificationsProcess & Material Certifications
4. AUTHORITY (Data Acquisition Documentation No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MISC-82386/T3SOW: 2.4.5 and 2.4.7
7. DD Form 2509. DIST STMNT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
YBSee block 16.See block 16.See block 16.
a. ADDRESSEEs
8. APP CODE11. AS OF DATE13. DATE OF NEXT SUBMISSIONDraftFinal17. PRICE GROUP
YESN/ASee block 16.RegRepro
16. RemarksJAMA Designee1118. ESTIMATED TOTAL PRICE
Blocks 10, 12, 13: Electronic copy of a report (in portable document format (pdf) or other microsoft accessible file format) supporting operational qualification, as defined within the Technical Data Package, is due prior to the initiation of production part manufacturing. The USG shall have up to 30 days for review and approval of the acceptability of the operational qualificiation data. No production part manufacturing shall begin prior to USG review and acceptance.

Block 14: Provide files to JAMA program designee and appointed Military Service designee.

Military Service Designee 1 1

15. TOTAL22
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
JAMA IV Program Team3-Mar-25

DD Form 1423-2 Jun 90 Previous editions are obsolete

CDRL A008

CONTRACT DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
CLIN 001ATDP________ TM _________ OTHER: Engineering Data

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A008Acceptance Test ProceduresAcceptance Test Procedures
4. AUTHORITY (Data Acquisition Documentation No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-NDTI-80603ASOW: 2.4.5 and 2.4.6
7. DD Form 2509. DIST STMNT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
NCSee block 16.See block 16.See block 16.
a. ADDRESSEEs
8. APP CODE11. AS OF DATE13. DATE OF NEXT SUBMISSIONDraftFinal17. PRICE GROUP
NON/ASee block 16.RegRepro
16. RemarksJAMA Designee1118. ESTIMATED TOTAL PRICE
Blocks 10, 12, 13: Electronic copy of a report (in portable document format (pdf) or other microsoft accessible format) documenting the acceptance test procedures as defined within the Technical Data Package shall be delievered.

Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1

15. TOTAL22
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
JAMA IV Program Team3-Mar-25

DD Form 1423-2 Jun 90 Previous editions are obsolete

CDRL A009

CONTRACT DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
CLIN 001ATDP________ TM _________ OTHER: Engineering Data

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A009Acceptance Test ReportAcceptance Test Report
4. AUTHORITY (Data Acquisition Documentation No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-QCIC-81891SOW: 2.4.5
7. DD Form 2509. DIST STMNT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
YCSee block 16.See block 16.See block 16.
a. ADDRESSEEs
8. APP CODE11. AS OF DATE13. DATE OF NEXT SUBMISSIONDraftFinal17. PRICE GROUP
NON/ASee block 16.RegRepro
16. RemarksJAMA Designee1118. ESTIMATED TOTAL PRICE
Blocks 10, 12, 13: Electronic copy of a report (in portable document format (pdf) or other microsoft accessible format) documenting all required acceptance test results shall (as defined within the Technical Data Package) be delievered.

Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1

15. TOTAL22
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
JAMA IV Program Team3-Mar-25

DD Form 1423-2 Jun 90 Previous editions are obsolete

CDRL A010

CONTRACT DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
CLIN 001ATDP________ TM _________ OTHER: Engineering Data

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A010First Article Inspection (FAI) ReportFirst Article Inspection (FAI) Report
4. AUTHORITY (Data Acquisition Documentation No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-NDTI-82327SOW: 2.4.5 and 2.4.7
7. DD Form 2509. DIST STMNT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
YCSee block 16.See block 16.See block 16.
a. ADDRESSEEs
8. APP CODE11. AS OF DATE13. DATE OF NEXT SUBMISSIONDraftFinal17. PRICE GROUP
NON/ASee block 16.RegRepro
16. RemarksJAMA Designee1118. ESTIMATED TOTAL PRICE
Blocks 10, 12, 13: Electronic copy of FAI Results (in portable document format (pdf) or other word accessible format) shall be delievered. The FAI shall meet all requirements as defined within the Technical Data Package.

Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1

15. TOTAL22
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
JAMA IV Program Team3-Mar-25

DD Form 1423-2 Jun 90 Previous editions are obsolete

CDRL A011

CONTRACT DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
CLIN 001ATDP________ TM _________ OTHER: Engineering Data

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A011Inspection ResultsInspection Results
4. AUTHORITY (Data Acquisition Documentation No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-NDTI-80809SOW: 2.4.5 and 2.4.7
7. DD Form 2509. DIST STMNT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
YCSee block 16.See block 16.See block 16.
a. ADDRESSEEs
8. APP CODE11. AS OF DATE13. DATE OF NEXT SUBMISSIONDraftFinal17. PRICE GROUP
NON/ASee block 16.RegRepro
16. RemarksJAMA Designee1118. ESTIMATED TOTAL PRICE
Blocks 10, 12, 13: A paper copy as well as an electronic copy (in portable document format (pdf) or other microsoft accessible format) of an inspection report that provides inspection results for all requirements as defined within the Technical Data Package is due with the delivery of of each production item.

Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1

15. TOTAL22
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
JAMA IV Program Team3-Mar-25

DD Form 1423-2 Jun 90 Previous editions are obsolete

CDRL A012

CONTRACT DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
CLIN 001ATDP________ TM _________ OTHER: Engineering Data

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A012DD250 PackagesDD250 Packages
4. AUTHORITY (Data Acquisition Documentation No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DD250SOW: 2.4.7
7. DD Form 2509. DIST STMNT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
YCSee block 16.See block 16.See block 16.
a. ADDRESSEEs
8. APP CODE11. AS OF DATE13. DATE OF NEXT SUBMISSIONDraftFinal17. PRICE GROUP
YESN/ASee block 16.RegRepro
16. RemarksJAMA Designee1118. ESTIMATED TOTAL PRICE
Blocks 10, 12, 13: Electronic copy (in portable document format (pdf) or other word accessible format) of a completed DD250 shall be delievered within 5 business days of acceptance or receipt of materials by the government.

DD250 package shall contain, as required by the Technical Data Package:

Completed Process/Operational Sheets (to include Production Control Documents), Process and Material Certifications (to include Operational Qualification), First Article Inspection Results, Inspection Results for total quantity dictated by contract specifications.

The DD250 shall contain certifications that the ordered quanity of components have all been inspected, accepted and are in compliane with contractual and Technical Data Package requirements.

Block 14: Provide files to JAMA program designee and appointed Military Service designee. Military Service Designee 1 1

15. TOTAL22
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
JAMA IV Program Team3-Mar-25

DD Form 1423-2 Jun 90 Previous editions are obsolete

File details come from the government source that posted it. Updated .