ATTACHMENT 3 - IDIQCDRL 4124AS1137-1.xlsx

XLSX spreadsheet 46 KB Posted

Attached to
JAMA IV IDIQ Pilot Parts Program Federal contract opportunity
Solicitation number
SP4701-25-R-0001
Issued by
Defense Logistics Agency

About this file

This document is a Contract Data Requirements List (CDRL) for a Fuel Cell Interconnector project (PIN 4124AS1137-1) with the Naval Air Warfare Center (NAVAIR). The CDRL outlines multiple required documentation submissions, including Initial Material Qualification (IMQ), Installation Qualification (IQ), Operational Qualification (OQ), Process Control Document (PCD), and First Article Test (FAT) reports. These electronic PDF reports must be submitted at specific intervals after contract award, ranging from 15 to 60 days, and will be sent to Joshua Moser at the BL41200 email address.

The documentation requirements are part of a comprehensive quality and process certification effort, with each submission focusing on different aspects of manufacturing and testing for the fuel cell interconnector. Submissions include process and material certifications, qualification reports, and inspection documentation. All reports are to be submitted electronically in PDF format, with some requiring multiple copies, and are associated with specific sections of the Statement of Work (SOW), particularly sections 3.3.5 and 3.3.7 related to quality inspection, testing, and process certifications.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IMQ

ATTACHMENT 3: IDIQCDRL 4124AS1137-1.XLSXForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
ATDP________ TM _________ OTHER: Engineering Data
D. SYSTEM/ITEME. CONTRACT / PR NO.F. CONTRACTOR
Fuel Cell Interconnector

PIN 4124AS1137-1

1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
DI-MISC-82386/T3Process & Material CertificationsInitial Material Qualification (IMQ)
4. AUTHORITY (Data Acquisition Documentation No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
NAWCADLKE-BL41200-DDR-001 Section 5.1SOW: 3.3.7 Process & Material CertificationsNAVAIRLKE BL41200
7. DD Form 2509. DIST STMNT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTDSee block 16.See block 16.See block 16.
a. ADDRESSEEb. COPIES
8. APP CODE11. AS OF DATE13. DATE OF NEXT SUBMISSIONDraftFinal17. PRICE GROUP
N/ASee block 16.RegRepro
16. RemarksNAVAIRLKE18. ESTIMATED TOTAL PRICE
Blocks 10, 12, 13: Only required if deviating from Additive Manufactuing Process Description indentified in NAVAIR Drawing package for PIN 4124AS137-1 Electronic copy of a report in portible document format (pdf) supporting Initial Material Qualification (IMQ) is due 60 days after contract award

Block 14: BL41200 email address is Joshua.a.Moser6.civ@us.navy.mil.

Joshus Moser BL41200 1

15. TOTAL11
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
John Schmelzle, Code BL2000021-Feb-25John Schmelzle, Code BL2000021-Feb-25

DD Form 1423-2 Jun 90 Previous editions are obsolete

I-Qual

CONTRACT DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
ATDP________ TM _________ OTHER: Engineering Data
D. SYSTEM/ITEME. CONTRACT / PR NO.F. CONTRACTOR
Fuel Cell Interconnector

PIN 4124AS1137-1

1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
DI-MISC-82386/T3Process & Material CertificationsInstallation Qualification (IQ)
4. AUTHORITY (Data Acquisition Documentation No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
NAWCADLKE-BL41200-DDR-001 Section 5.2.1SOW: 3.3.7 Process & Material CertificationsNAVAIRLKE BL41200
7. DD Form 2509. DIST STMNT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTDSee block 16.See block 16.See block 16.
a. ADDRESSEEb. COPIES
8. APP CODE11. AS OF DATE13. DATE OF NEXT SUBMISSIONDraftFinal17. PRICE GROUP
N/ASee block 16.RegRepro
16. RemarksNAVAIRLKE18. ESTIMATED TOTAL PRICE
Blocks 10, 12, 13: 3 Electronic copy of a report in portible document format (pdf) supporting IQ is due 15 days after contract award.

Joshus Moser BL41200 1

15. TOTAL11
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
John Schmelzle, Code BL2000021-Feb-25John Schmelzle, Code BL2000021-Feb-25

DD Form 1423-2 Jun 90 Previous editions are obsolete

O-Qual (A003-1)

CONTRACT DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
ATDP________ TM _________ OTHER: Engineering Data
D. SYSTEM/ITEME. CONTRACT / PR NO.F. CONTRACTOR
Fuel Cell Interconnector

PIN 4124AS1137-1

1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
DI-MISC-82386/T3Process & Material CertificationsOperational Qualification (OQ)
4. AUTHORITY (Data Acquisition Documentation No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
NAWCADLKE-BL41200-DDR-001 Section 5.2.2SOW: 3.3.7 Process & Material CertificationsNAVAIRLKE BL41200
7. DD Form 2509. DIST STMNT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTDSee block 16.See block 16.See block 16.
a. ADDRESSEEb. COPIES
8. APP CODE11. AS OF DATE13. DATE OF NEXT SUBMISSIONDraftFinal17. PRICE GROUP
N/ASee block 16.RegRepro
16. RemarksNAVAIRLKE18. ESTIMATED TOTAL PRICE
Blocks 10, 12, 13: 3 Electronic copy of a report in portible document format (pdf) supportingOQ is due 15 days after contract award.

Joshus Moser BL41200 1

15. TOTAL11
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
John Schmelzle, Code BL2000021-Feb-25John Schmelzle, Code BL2000021-Feb-25

DD Form 1423-2 Jun 90 Previous editions are obsolete

SOURCE SELECTION SENSITIVE

PCD (A003-2)

CONTRACT DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
ATDP________ TM _________ OTHER: Engineering Data
D. SYSTEM/ITEME. CONTRACT / PR NO.F. CONTRACTOR
Fuel Cell Interconnector

PIN 4124AS1137-1

1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
DI-MISC-82386/T3Process & Material CertificationsProcess Control Document (PCD)
4. AUTHORITY (Data Acquisition Documentation No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
NAWCADLKE-BL41200-DDR-001 Section 5.3SOW: 3.3.7 Process & Material CertificationsNAVAIRLKE BL41200
7. DD Form 2509. DIST STMNT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTDSee block 16.See block 16.See block 16.
a. ADDRESSEEb. COPIES
8. APP CODE11. AS OF DATE13. DATE OF NEXT SUBMISSIONDraftFinal17. PRICE GROUP
N/ASee block 16.RegRepro
16. RemarksNAVAIRLKE18. ESTIMATED TOTAL PRICE
Blocks 10, 12, 13: 3 Electronic copy of the PCD in portible document format (pdf) is due 15 days after approval of the First Article Test Inspection.

Joshus Moser BL41200 1

15. TOTAL11
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
John Schmelzle, Code BL2000021-Feb-25John Schmelzle, Code BL2000021-Feb-25

DD Form 1423-2 Jun 90 Previous editions are obsolete

FAT (A008)

CONTRACT DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
ATDP________ TM _________ OTHER: Engineering Data
D. SYSTEM/ITEME. CONTRACT / PR NO.F. CONTRACTOR
Fuel Cell Interconnector

PIN 4124AS1137-1

1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
DI-NDTI-82327First Article Inspection reportFAT/Performance Qualification (PQ)
4. AUTHORITY (Data Acquisition Documentation No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
NAWCADLKE-BL41200-DDR-001 Section 5.2.3SOW: 3.3.5 Quality Inspection and TestingNAVAIRLKE BL41200
7. DD Form 2509. DIST STMNT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTDSee block 16.See block 16.See block 16.
a. ADDRESSEEb. COPIES
8. APP CODE11. AS OF DATE13. DATE OF NEXT SUBMISSIONDraftFinal17. PRICE GROUP
N/ASee block 16.RegRepro
16. RemarksNAVAIRLKE18. ESTIMATED TOTAL PRICE
Blocks 10, 12, 13: 3 Electronic copy of the FAT report in portible document format (pdf) is due 60 days after contract award

Joshus Moser BL41200 1

15. TOTAL11
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
John Schmelzle, Code BL2000021-Feb-25John Schmelzle, Code BL2000021-Feb-25

DD Form 1423-2 Jun 90 Previous editions are obsolete

SOURCE SELECTION SENSITIVE

Inspection (A009)

CONTRACT DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY
ATDP________ TM _________ OTHER: Engineering Data
D. SYSTEM/ITEME. CONTRACT / PR NO.F. CONTRACTOR
Fuel Cell Interconnector

PIN 4124AS1137-1

1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
DI-NDTI-80809Inspection report
4. AUTHORITY (Data Acquisition Documentation No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
NAVAIR PDDSs
4124AS1117, 4124AS1127, 4124AS1137SOW: 3.3.5. Quality Inspection and TestingNAVAIRLKE BL41200
7. DD Form 2509. DIST STMNT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTDSee block 16.See block 16.See block 16.
a. ADDRESSEEb. COPIES
8. APP CODE11. AS OF DATE13. DATE OF NEXT SUBMISSIONDraftFinal17. PRICE GROUP
N/ASee block 16.RegRepro
16. RemarksNAVAIRLKE18. ESTIMATED TOTAL PRICE
Blocks 10, 12, 13: 3 A paper copy as well as an electronic copy in portible document format (pdf) of an inspection report is due with the delivery of of each production item.

Joshus Moser BL41200 1

15. TOTAL11
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
John Schmelzle, Code BL2000010-Feb-25John Schmelzle, Code BL2000021-Feb-25

DD Form 1423-2 Jun 90 Previous editions are obsolete

File details come from the government source that posted it. Updated .