This is a 100% Design Analysis submittal for a water line repair project at Offutt Air Force Base in Nebraska, prepared by HGM Associates (Project No. 740122) under Contract No. FA4600-22-D-0003. The project involves replacing an existing 10-inch water main crossing SAC Boulevard between Buildings B462 and B500 that was damaged during storm sewer installation in 2020.
The design scope includes installing a new 10-inch ductile iron push-joint water main using dry bore and jack method under SAC Boulevard, installing three new gate valves with bends and appurtenances, chlorination and pressure testing of the new main, cathodic protection, and pavement removal/replacement at the B462 driveway. The base bid is estimated at $307,237 while an alternate using PVC water main is estimated at $285,194. Multiple field investigations were conducted between 2022-2023 to locate existing utilities and verify water main depths, which were found to range from 6 to 12 feet deep. The design underwent 35%, 65% and 90% reviews with various comments addressing traffic control, utility coordination, abandoned line removal, and connection details.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN ANALYSIS
100% Submittal
REPAIR WATER LINE, B462 & B500
Offutt A.F.B., Nebraska
OAFB Project No. SGBP 21-0048 Contract No. FA4600-22-D-0003
HGM Project No. 740122
April 29, 2024
FA460025R0002
Attachment 8
OFFUTT AFB REPAIR WATER LINE, B462 & B500
SGBP 21-0048
TABLE OF CONTENTS
I. PROJECT DESCRIPTION
II. DESIGN ANALYSIS
III. COST ESTIMATE
IV. MEETING MINUTES
V. 35% REVIEW COMMENTS & RESPONSES
VI. 65% REVIEW COMMENTS & RESPONSES
VII. 90% REVIEW COMMENTS & RESPONSES
FA460025R0002
I. PROJECT DESCRIPTION
PROJECT DESCRIPTION
The project consists of all labor and materials in performing all work required to replace the existing 10” water main crossing SAC Blvd between B462 & B500. This existing 10” water main has been unused since it was damaged during storm sewer installation in 2020. The method of installation across SAC Blvd will be dry bore and jack.
Design shall include 3 new gate valves, bends, and other appurtenances required for the water main installation.
Installation shall include chlorination and pressure testing of the new water main. Water main shall have adequate cathodic protection.
Design shall include pavement removal and replacement in the drive of B462.
II. DESIGN ANALYSIS
CIVIL
CRITERIA
Unified Facilities Criteria (UFC) UFC 1-200-01 DoD Building Code UFC 3-201-01 Civil Engineering UFC 3-220-05 Dewatering and Groundwater Control UFC 3-230-01 Water Storage and Distribution UFC 3-250-01 Pavement Design for Roads and Parking Areas UFC 3-420-01 Plumbing Systems
This project will install a new 10” Ductile Iron Push Joint water main across SAC Blvd from the active main at B500 to the main running north/south in front of B462. This project will also include the abandonment of the existing 10” water main under SAC Blvd. which was damaged when a storm sewer was constructed and has been out of service since. All work is located between buildings B462 and B500. This project will also include the installation of 3 new gate valves. 2 new gate valves will be located at the west connection (east and north of the connection), and 1 will be located at the east connection (south of the connection).
The method of installation under SAC Blvd will be bore and jack. This will allow for continued use of SAC Blvd during installation of the new water main.
The connection to the west side will require about 80SY of driveway removal and replacement.
This is not expected to greatly impact access to building B462 as there are other parking lot entrances. Due to the expected depth of the existing 8” water main (west connection), dewatering has been included in the cost estimate.
An initial field investigation had been completed by HGM prior to the 35% Submittal. Badger Daylighting had been hired to pothole to find actual locations of the existing utilities in the project area using field markings provided by 811 and Offutt AFB. The potholing contractor was able to find some fiber and power lines that are be in the project area. The contractor was unable to verify location of the existing water main on the west side of SAC Blvd due to the expected depth below the pavement. Their machine was only able to reach 6’ deep without tearing out a panel of pavement. The water main that runs east/west across SAC Blvd was also unable to be located west of SAC Blvd. The contractor dug an 8’ wide, 16’ deep hole near the field markings just east of the drive to B462. This water main was located east of SAC Blvd and just east of the landscaping near the brick wall, but was not located again until the far east side of the project near the stop sign.
A second field investigation was performed in March 2023. The drive pavement in front of B462 was removed at the existing water valves and the area was excavated to locate the water
FA460025R0002
main. The water main running north/south and the main running east across SAC Blvd. were located and found to be approximately 8.5 feet deep.
During a pre-65% meeting to discuss the findings and proposed alignment with Base personnel, it was determined that the PVC water main installed around 2016 on the NE corner of SAC Blvd.
and Apollo Dr. had not been located.
A new excavation was performed in November 2023 to locate the 10” PVC water main on the NE corner pf SAC Blvd. and Apollo Dr. that was installed in 2016. The PVC main was located at 6 feet deep running east/west 8 feet south of the water valve and the PVC line turned north to the valve and dropped down to 12 foot deep to tie into the original ductile iron line.
III. COST ESTIMATE
B
A
SE
IN
C
H D
U C
TI
LE
IR
O
N W
A
TE
R
M
IN
Pa ve m en t R em ov al
SY
$4
$4
,8
8"
P C
C on cr et e Pa ve m en t
SY
$2
$3
0, Se ed
, F er til iz e, a nd M ul ch
LS
$7 ,0
$7
,0
C ut a nd C on ne ct to
E xi st in g
" W at er M ai n
EA
$1 2, $1 2, C ut a nd C on ne ct to
E xi st in g 8"
W at er M ai n
EA
$8 ,0
$8
,0
" R es tra in ed J oi nt
D uc til e
Iro n
W at er M ai n
LF
$2
$4
4, 8" D uc til e Iro n W at er
M ai n
LF
$1
$3
,0
" B or e an d Ja ck
LF
$5
$6 0, Bo re P its , A pp ro x.
.0 ' D ee p
EA
$1 5, $3 0, 8" x8 "x
8" M
J Te e
EA
$1
,8
$1 ,8
" M
J G at e
Va lv e w
/C C
B ox
EA
$5 ,5
$5
,5
8"
M J
G at e Va lv e w /C
C B ox
EA
$4
,0
$8 ,0
"x
8" M
J R ed uc er
EA
$1
,6
$1 ,6
" M
J Sl ee ve
EA
$9
$2 ,7
8" M
J Sl ee ve
EA
$5
$1 ,0
" M
J Be nd , 1
1.
D eg re e
EA
$1 ,3
$5
,2
" M J
Be nd
, 9
D eg re e
EA
$1 ,5
$1
,5
" M J
Be nd
, 4
D eg re e
EA
$1 ,4
$2
,8
" P lu g
EA
$1
,2
$3 ,6
D ew at er in g
LS
$1 0, $1 0, T ot al D ire ct
C os ts $2
,8
O ve rh ea d
$3 6, Su bt al
$2
,3
Pr of it
$2 7, TO
TA
L
PR
IC
E
$3
,2
C O
N
TR
A C
TO
dd re ss
C O
N
TR
A C
T
FO
R (W or k to b e pe rfo rm ed
RE
PA
IR
W
AT
ER
LI
N E, B
B
P
R O
P O
S E
D T
O
TA
L C
O N
TR
A
C T
P R
IC
E
P U
R C
H A
S E
R E
Q U
E S
T N
U M
B E
R
P R
O
JE
C T
N U
M B
E R
-0
W O
R K
L O
C A
TI
O
N O
FF
U
TT
A
FB
, N
E
C O
N S
TR
U
C
TI
O N
C O
S T
E S
TI
M
A
TE
B R
E A
K D
O W
N
LI
N
E N
O
IT
E
M
(1
U N
IT
O
F M
E A
S U
R E
(2
(4
(5
TO
TA
L U
N
IT
C O
S T
(8
U N
IT
C
O S
T
(9
LI
N
E
TO
TA
L
(1 0)
Q
TY (3
(7
TO
TA
L C
O S
TS
(6
Pa ge
FA460025R0002
LT
ER
N A
TE
PV
C W
A
TE
R M
A
IN
Pa ve m en t R em ov al
SY
$4
$4 ,8
8" P
C C on cr et e
Pa ve m en t
SY
$2
$3 0, Se ed , F er til iz e, a nd
M ul ch
LS
$7
,0
$7 ,0
C ut a nd
C on ne ct to E xi st in g
" W at er
M ai n
EA
$1
2, $1
2, C ut a nd
C on ne ct to E xi st in g
8" W at er
M ai n
EA
$8
,0
$8 ,0
" R es tra in ed
J oi nt P
VC
W at er
M ai n
LF
$1
$3 5, 8"
D uc til e
Iro n
W at er M ai n
LF
$1
$3 ,0
" T re nc hl es s Bo re
LF
$4
$5 1, Bo re P its , A pp ro x.
.0 ' D ee p
EA
$1 5, $3 0, 8" x8 "x
8" M
J Te e
EA
$1
,8
$1 ,8
" M
J G at e
Va lv e w
/C C
B ox
EA
$5 ,5
$5
,5
8"
M J
G at e Va lv e w /C
C B ox
EA
$4
,0
$8 ,0
"x
8" M
J R ed uc er
EA
$1
,6
$1 ,6
" M
J Sl ee ve
EA
$9
$2 ,7
8" M
J Sl ee ve
EA
$5
$1 ,0
" M
J Be nd , 1
1.
D eg re e
EA
$1 ,3
$5
,2
" M J
Be nd
, 9
D eg re e
EA
$1 ,5
$1
,5
" M J
Be nd
, 4
D eg re e
EA
$1 ,4
$2
,8
" P lu g
EA
$1
,2
$3 ,6
D ew at er in g
LS
$1 0, $1 0, T al D ire ct
C os ts $2
,4
O ve rh ea d
$3 3, Su bt al
$2
,2
Pr of it
$2 5, TO
TA
L
PR
IC
E
$2
,1
C O
N
TR
A C
TO
dd re ss
C O
N
TR
A C
T
FO
R (W or k to b e pe rfo rm ed
RE
PA
IR
W
AT
ER
LI
N E, B
B
P
R O
P O
S E
D T
O
TA
L C
O N
TR
A
C T
P R
IC
E
P U
R C
H A
S E
R E
Q U
E S
T N
U M
B E
R
P R
O
JE
C T
N U
M B
E R
-0
W O
R K
L O
C A
TI
O
N O
FF
U
TT
A
FB
, N
E
C O
N S
TR
U
C
TI
O N
C O
S T
E S
TI
M
A
TE
B R
E A
K D
O W
N
LI
N
E N
O
IT
E
M
(1
U N
IT
O
F M
E A
S U
R E
(2
(4
(5
TO
TA
L U
N
IT
C O
S T
(8
U N
IT
C
O S
T
(9
LI
N
E
TO
TA
L
(1 0)
Q
TY (3
(7
TO
TA
L C
O S
TS
(6
Pa ge
FA460025R0002
IV. MEETING MINUTES
MEETING MINUTES
65% REVIEW
PROJECT:
OFFUTT AFB
REPAIR WATER LINE, B462 & B500
SGBP-21-0048
HGM PROJECT NO: 740122
DATE: January 25, 2024 TIME: 2:00 PM
LOCATION: B301 Glassblock Conference Room
ATTENDEES: Camille Hussmann, CEN
Anna Mosier, CEOER Dave Lott Justin Kobza, CEN Bill Glismann, HGM Associates
ITEMS DISCUSSED:
1. Attendees went through Review Comments received from the 35% review. Comment and
Response sheets are attached.
Please submit comments, additions, or corrections to this memo within five (5) days of issuance.
If no comments are received this memo will be assumed accurate.
COPY TO: All attendees.
REPORT BY: Bill Glismann, P.E.
Field Locates Review
DATE: April 12, 2023 TIME: 10:00 AM
LOCATION: Meeting held via Microsoft Teams
ATTENDEES:
Offutt: Brec Wilhusen
Camille Hussman
Justin Kobza
Jason Teem
Laci Fox
Anna Mosier
HGM: Bill Glismann
Ryan Wood
1. HGM summarized the field locates and potholing process. Noted that Offutt marked the location of the water main and utilities in the field. These marks were utilized by HGM and
Badger to determine pothole locations. In many areas, the water main did not match the field markings.
2. Offutt noted that the geobase that the field markings would have been based on has been unreliable in the past.
3. Offutt pointed out that the line east of the gate that HGM had shown as existing is likely the abandoned line. The project to abandon this line was completed in 2016. Offutt to provide the plans for this project to HGM.
Review Meeting Minutes
Offutt AFB Repair Water Line, B462 & B500
April 12, 2023
4. Offutt noted they would like to remove as much of the abandoned water main as possible to avoid future confusion. HGM will add as much removal of the abandoned pipe as feasible while keeping the budget the same.
5. Offutt noted that bore pit locations should be shown on the design.
6. Offutt noted that a straight connection would be preferred if possible.
7. Offutt noted they’d prefer another exploratory hole to be dug to determine the water main alignment on the east side of SAC Blvd, west of the retaining wall/gate. This work would need to be completed prior to continuing the design. HGM will get quotes from contractors to complete this work.
8. Laci Fox noted that a contract modification should be attained prior to doing more work if the additional scope is needed by HGM.
COPY TO: All attendees.
REPORT BY: Ryan Wood, P.E.
35% REVIEW
DATE: September 22, 2022 TIME: 2:00 PM
LOCATION: B323 C Room 321 55 CONS/PKA
ATTENDEES: See Attached Sign In Sheet
1. Attendees went through Review Comments received from the 35% review. Comment and
Response sheets are attached.
2. Discussed that the scope of services appears to include full replacement of 2 water services to B462 (1.5” and 2”). HGM asked Offutt for clarification based on Anna’s comment regarding services. Justin plans to ask Anna for clarification.
3. Discussed location of the existing water main. HGM shared the TOPO exhibit and noted that the existing main per Offutt’s records does not appear to be in line with what was marked in the field. Justin and Camille plan to look into the discrepancy to see if they can track down as-builts from a previous project.
4. Potholing investigation could not locate the water main as it crosses SAC Blvd. and the line going north south on the west side of SAC Blvd. The line is either not located as indicated or deeper than excavated. Additional field investigation would be needed to locate the water main. Locating it during design would eliminate issues of contractor not finding it during construction. Additional potholing would require removal of at least one concrete panel in the parking lot/driveway on the west side of SAC Blvd. The original contract had 2 days of potholing which has been completed. HGM noted that if Offutt requests going forward with further field locates, a contract amendment would be required.
Review Meeting Minutes Offutt AFB Repair Water Line, B462 & B500 September 22, 2022
5. SSgt Hupten noted that HGM shall track design delays for the contract amendment.
COPY TO: All attendees.
REPORT BY: Ryan Wood, P.E.
FA460025R0002
Repair Waterline B462 & B500
35% Review Meeting Sept 15, 2022
Name Company Phone Email Camille Hussmann CEN 402-294-5369 Camille.hussmann@us.af.mil
Justin Kobza CEN 402-294-5369 Justin.kobza.ctr@us.af.mil
SSgt Hupten, Casey CONS 402-232-1475 Casey.hupten@us.af.mil
Laci Fox CONS 402-232-8657 Laci.fox.3@us.af.mil
Bill Glismann HGM 402-346-7559 bglismann@hgmonline.com
Ryan Wood HGM 402-504-8077 rwood@hgmonline.com mailto:Camille.hussmann@us.af.mil mailto:Justin.kobza.ctr@us.af.mil mailto:Casey.hupten@us.af.mil mailto:Laci.fox.3@us.af.mil mailto:bglismann@hgmonline.com mailto:rwood@hgmonline.com
V. 35% REVIEW COMMENTS & RESPONSES
OF FORM 1
DRAWING or
PARAGRAPH # CMT # COMMENTS RESPONSE
DSN: COM:
IFB
NAME OF REVIEWER ORGANIZATION / SECTION PHONE NUMBER FTS:
DD FORM 1391 DRAFT RFP INT RFP 35% SUBMITTAL 60% SUBMITTAL 90% SUBMITTAL
PAGES
BASE
FY
Offutt AFB, NE
PROJECT TITLE PROJECT NUMBER
ENGINEERING REVIEW COMMENTS DATE
PAGE of
FA460025R0002
PARAGRAPH # CMT # COMMENTS RESPONSE
DSN: COM:
IFB
NAME OF REVIEWER ORGANIZATION / SECTION PHONE NUMBER FTS:
DD FORM 1391 35% SUBMITTAL 60% SUBMITTAL 90% SUBMITTAL
PAGES
BASE
FY
Offutt AFB, NE
PROJECT TITLE PROJECT NUMBER
ENGINEERING REVIEW COMMENTS DATE
PAGE of8/31/22
Rpr Waterline B462 to B500 (F627) SGBP 21-0048 22
Anna Mosier CEOER
C1.3
C1.3
Service line to B462 representation does not make sense. This seems to be leaving the existing service line and adding two new ones. There is no reason for this. There is only one existing service line to B462, and it does not need to be fully replaced to acomodate this work.
Tie-in to water main on east side of road is not great.
The current representation of the existing line seems to show it continuing along the route of an abandoned water line, when the in-service line jogs south and continues east. If abandoning the current line and coring a new one just south of it, the new line should tie into the existing line at the existing south elbow, not jog north just to job south again. The abandoned water line should be shown.
1 1
232-5725
FA460025R0002
Attachment 8 raw Text Box We will call out to abandon the existing service in place. The scope of services calls out 2 lines, 1.5" & 2". Does Offutt know which is correct? We will show as a reconnection of the service, instead of a replacement.
raw Text Box Discussion of existing conditions.
ENGINEERING REVIEW COMMENTS
DATE
1 SEP 2022
PAGE 1 OF X PAGES
BASE
Offutt AFB NE
PROJECT TITLE
REPAIR WATER LINE, B462 B500
PROJECT NUMBER
21-0048
FY
DD FORM 1391 PROJECT BOOK CONCEPT 35% SUBMITTAL 60% SUBMITTAL 90% SUBMITTAL IFB
NAME OF REVIEWER
Larry Rock
ORGANIZATION/SECTION
55 CES/CENMP
PHONE NUMBER FTS
402-294-4213 DSN
COM
DRAWING OR
PARAGRAPH #
CMT
COMMENTS RESPONSE
DWG #1
I believe we call it “STRATCOM GATE” It is labeled as “CAPEHART ROAD GATE”. Maybe get a new drawing as new STRATCOM building is not shown.
Attachment 8 raw Text Box HGM has received a new GIS drawing and will update the map and the gate name for the next submittal.
VI. 65% REVIEW COMMENTS & RESPONSES
VII. 90% REVIEW COMMENTS & RESPONSES
PARAGRAPH # CMT # COMMENTS RESPONSE
DSN: COM:
IFB
NAME OF REVIEWER ORGANIZATION / SECTION PHONE NUMBER FTS:
DD FORM 1391 35% SUBMITTAL 60% SUBMITTAL 90% SUBMITTAL
PAGES
BASE
FY
Offutt AFB, NE
PROJECT TITLE PROJECT NUMBER
ENGINEERING REVIEW COMMENTS DATE
PAGE of03/25/24
Rpr Waterline B462 to B500 (F627) SGBP 21-0048 22
Anna Mosier CEOER
C0.3
C1.1
The northmost water line on the east side of the intersection needs to be shown as AIP shortly east of the tee & valve box like it is on C1.1
Comments on the existing 8" water main south of the cut to remain in service need to be clarified - Maintenance shop has stated an outage will be needed for this work for all facilities south of this point.
It will be labeled as abandoned, A note will be added for the contractor to provide the Base 48 hour notice before doing connection.
1 1
232-5725
FA460025R0002
| DESIGN ANALYSIS |
| 02 F267 TOC.pdf |
| IV. Meeting Minutes |
| V. 35% Review Comments & Responses |
| VI. 65% Review Comments & Responses |
| VII. 90% Review Comments & Responses |
| 07 Divider - Cost Estimate (3).pdf |
| III. Cost Estimate |
| 09 Divider - Meeting Minutes.pdf |
| IV. Meeting Minutes |
| 10 SGBP-21-0048 Repair Water line 65% Review Mtg Minutes 1-25-24.pdf |
| COPY TO: All attendees. |
| REPORT BY: Bill Glismann, P.E. |
| 12 SGBP-21-0048 Repair Water line 35% Review Mtg Minutes 9-22-22.pdf |
| COPY TO: All attendees. |
| REPORT BY: Ryan Wood, P.E. |
| 13 Divider - 35 Review Comments (4).pdf |
| V. 35% Review Comments & Responses |
| 14 35% Review Comments.pdf |
| IV. 35% Review Comments & Responses |
| 21-0048 OF1 Dsgn Rvw 55 CYS Comments.pdf |
| 90% REVIEW (2) |
| 15 Divider - 65 Review Comments.pdf |
| VI. 65% Review Comments & Responses |
| 17 Divider - 90 Review Comments.pdf |
| VII. 90% Review Comments & Responses |
| DATE: 8 Sep 22 |
| PROJECT TITLE: Rpr Waterline B462 to B500 (F627) |
| PROJECT NUMBER: SGBP 21-0048 |
| FY: 22 |
| NAME OF REVIEWER: SSgt Joseph Mayer |
| ORGANIZATION SECTION: 55 CYS CYEPP |
| FTS PHONE #: |
| DRAWING or PARAGRAPH Row1: OFF0B-6487 |
| CMT Row1: 1 |
| COMMENTSRow1: 55 CYS has several communications lines within the area this work is going to be taking place. we require the contractor to call 811 for cable locates before breaking ground in any of these locations. Please see accompanying CIPS snapshot for rough estimate of cable locations. |
| RESPONSERow1: We will note this on the plans and compare CIPS snapshot with surveyed information. |
| Page #: 1 |
| Total Pages: 1 |
| COM PHONE #: |
| DSN PHONE #: 232 9116 |
| Group4: Choice4 |
File details come from the government source that posted it. Updated .