Attachment 6_SOW_21-0048 Repair Water Line_F627.pdf

PDF 648 KB Posted

Attached to
Offutt AFB Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA4600-25-R-0002
Issued by
Department of the Air Force Air Combat Command

About this file

This is a Statement of Work (SOW) for repairing a broken 10" Transite water line connecting to Building B500, under NextGen Work Task #6005693. The project involves re-routing the water line around a recently installed storm drain line and boring under SAC Blvd to reconnect to the existing pipe.

The technical specifications include precise coordinates of the break (N 492469.537 sft, E 2764127.133 sft) at elevation 971.640 sft, approximately 12' below ground level. The new pipe routing must maintain at least 60" of cover from the outer diameter to the pavement underdrain system when passing under the road. The contractor must provide all labor, materials, and equipment, conform to NFPA, IMC, IPC, AFI, ETL, and Unified Facility Criteria Standards, and follow ISO 9001 quality management processes. The period of performance is 90 calendar days, with key requirements including digging/boring new pipe routing, coordinating with CE shop personnel for system operations, performing post-maintenance testing, filling in the dig area, and notifying Government Bio group for downstream water sampling. The contractor must provide 15 days advance notice for any utility interruptions.

View the file

Other files for this federal contract opportunity

Other files attached to Offutt AFB Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Sol Amendment FA460025R00020004.pdf PDF
Attachment 17_230700_THERMAL INSULATION FOR MECHANICAL SYSTEMS 2025-04-03.pdf PDF
MACC QnA_11Apr25_F.xlsx XLSX spreadsheet
Attachment 5_Offutt AFB MACC SOW_r1.pdf PDF
Amendment FA460025R00020003.pdf PDF
Sol Amendment 25R00020002.pdf PDF
MACC Site Visit_18March2025.pdf PDF
Amendment FA460025R00020001.pdf PDF
MACC Site Visit_06March2025.pdf PDF
Attachment 1_Division 0 - 00 10 00 Section 1A_Mar22.pdf PDF
Attachment 5_Offutt AFB MACC SOW.pdf PDF
Attachment 7_21-0048 Project Diagram.pdf PDF
Attachment 8_21-0048 Repair Water Line Design Analysis.pdf PDF
Attachment 12_SGBP 22-0041 Repair HVAC B1226 Drawings.pdf PDF
Attachment 15_SGBP 22-0041 Repair HVAC B1226_Design Analysis.pdf PDF
Attachment 16_WD_NE20250059.pdf PDF
MACC_55 SFS Contractor Vendor NCIC Screening Pass Request.pdf PDF
Attachment 2_Division 1 - 01 33 00 Section 1B_Jan21.pdf PDF
Attachment 14_SGBP 22-0041 Repair HVAC B1226_Cut Sheets.pdf PDF
Solicitation - FA460025R0002.pdf PDF
Attachment 3_Division 1 - 01 33 01 AF66.pdf PDF
Attachment 4_Env Spec Conditions_Division 1_01 57 19_Nov24.pdf PDF
Attachment 10_21-0048 Repair Water Line Specifications.pdf PDF
Attachment 11_SOW_B1226 HVAC Renovation.pdf PDF
Attachment 13_SGBP 22-0041 Repair HVAC B1226 Specifications.pdf PDF
AF3052_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
Attachment 9_21-0048 Repair Water Line Drawings.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Project Title: Repair of 10# Water Main to B500

NextGen Work Task #: 6005693

1. Objectives:

This scope of work is for re-routing of a broken 10” Transite water line connecting to B500.

Technical requirements are as follows: The coordinates of the break are N 492469.537 sft, E

2764127.133 sft. The elevation is 971.640 sft. The ground is elevation 983’ so the depth is approximately 12’. On the attached map the red square indicates the location of the break, while the red circles indicate the location of isolation valves. The intended scope is for the new water line to route around the recently installed storm drain line, then bore under SAC Blvd and reconnect to the existing pipe. The pipe route underneath the road must maintain at least 60” of cover from the outer diameter of the pipe to the pavement underdrain system.

The contractor shall furnish all labor, transportation, equipment, materials, special tools, expertise, supervision, and services requested to fulfill the requirements of this contract. All task specifications of this Statement of Work will herein be referred to as “requirements”. The work shall conform to the most current applicable NFPA, IMC, IPC, and AFI, ETL, and Unified Facility Criteria Standards. Work shall be completed in a neat, substantial, and competent manner.

The contractor shall perform quality assurance activities that conform to the quality assurance processes outlined in International organization of Standards (ISO) 9001, Quality Management Systems. The

Contractor shall use SOW requirements, ESE-SIT-0001, AFI 31-101, and Original Equipment manufacturer (OEM) guidelines to evaluate whether or not the equipment and systems are being installed and integrated properly.

During construction the Government will utilize the existing facilities. The contractor shall not restrict nearby pedestrian or vehicular traffic and shall coordinate with the Contracting Officer’s

Representatives to facilitate usage. The Contracting Officer’s Representatives shall be notified not less than 15 calendar days in advance of any interruptions in building utilities / services, which will be described in writing.

Period of Performance: 90 Calendar Days

2. Requirements

1. The Contractor shall dig and bore new pipe routing, and route / connect new piping.

2. CE shop personnel will coordinate and assist with any needed operations of the system to ensure proper installation and testing.

3. The Contractor shall perform post maintenance testing of the new pipe and connections.

4. The Contractor shall fill in and cover the dig / bore area.

5. The Contractor shall notify Government Bio group when work is complete so that they may take downstream water samples.

FA460025R0002

Attachment 6

File details come from the government source that posted it. Updated .