Attachment 12_SGBP 22-0041 Repair HVAC B1226 Drawings.pdf
PDF 14 MB Posted
- Solicitation number
- FA4600-25-R-0002
About this file
This file contains mechanical HVAC technical drawings and schematics for Building 1226 at Offutt Air Force Base in Nebraska, under Project No. SGBP 22-0041.
The drawings detail repair work for the HVAC system in Building 1226, which contains a chapel facility. Key components include new heat pumps, air-cooled chillers, boilers, and associated piping and ductwork modifications. Specific elements shown include demolition plans for existing equipment, new equipment installation details, mechanical piping plans, and control schematics. The drawings indicate locations of new heat pump units (HP-1 through HP-21), air-cooled chiller (ACCH-1), boiler (B-1), and associated pumps and piping systems. The plans cover basement, first floor and balcony levels, with detailed mechanical room layouts showing equipment placement, piping connections, and control system integration. Supporting schedules provide equipment specifications, including capacity ratings, electrical requirements, and performance criteria for the new HVAC components.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA460025R0002
Attachment 12
AutoCAD SHX Text
REPAIR HVAC, B1226 OFFUTT AIR FORCE BASE, NEBRASKA PROJECT NO. SGBP 22-0041
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
INDEX OF SHEETS
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
AutoCAD SHX Text COVER SHEET & LOCATION PLAN C0.1 CONTRACTOR ACCESS & STAGING PLAN CONTRACTOR ACCESS & STAGING PLAN C1.0 SITE PLAN MD1.0 HVAC DEMOLITION PLANS - BASEMENT MD1.1 HVAC DEMOLITION PLANS - FIRST FLOOR AND BALCONY MD2.0 MECHANICAL PIPING DEMOLITION PLANS - BASEMENT MD2.1 MECHANICAL PIPING DEMOLITIONS PLANS - FIRST FLOOR AND BALCONY M1.0 HVAC PLANS - BASEMENT M1.1 HVAC PLANS - FIRST FLOOR AND BALCONY M2.0 MECHANICAL PIPING PLANS - BASEMENT M2.1 MECHANICAL PIPING PLANS - FIRST FLOOR AND BALCONY M2.2 ENLARGED PLUMBING PLANS ENLARGED PLUMBING PLANS M3.0 MECHANICAL DETAILS M3.1 MECHANICAL DEMOLITION PIPING SCHEMATIC MECHANICAL DEMOLITION PIPING SCHEMATIC M3.2 MECHANICAL PIPING SCHEMATIC MECHANICAL PIPING SCHEMATIC M4.0 MECHANICAL SCHEDULES M4.1 MECHANICAL SCHEDULES M4.2 MECHANICAL CONTROLS SCHEMATICS MECHANICAL CONTROLS SCHEMATICS ED1.0 ELECTRICAL DEMOLITION PLANS - BASEMENT ED1.1 ELECTRICAL DEMOLITION PLANS - FIRST FLOOR E1.0 ELECTRICAL PLANS - BASEMENT E1.1 ELECTRICAL PLANS - FIRST FLOOR
AutoCAD SHX Text
COVER SHEET & LOCATION PLAN
AutoCAD SHX Text
AutoCAD SHX Text
SOUTH 25TH STREET
AutoCAD SHX Text
CAPEHART ROAD
AutoCAD SHX Text
CONTRACTOR ACCESS ROUTE
AutoCAD SHX Text
WJG
AutoCAD SHX Text
TLS2
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
BY/DATE
AutoCAD SHX Text
DESIGN FIRM
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Facility Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drafter
AutoCAD SHX Text Designer
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Date
AutoCAD SHX Text
COORDINATION
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text Offutt
AutoCAD SHX Text Air Force Base
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
"SIGNING OF THE COVER SHEET
AutoCAD SHX Text
CONSTITUTES COORDINATION OF
AutoCAD SHX Text
ALL DRAWINGS IN THIS PROJECT;
AutoCAD SHX Text
SUBSEQUENT SHEETS NEED NOT
AutoCAD SHX Text
BE SIGNED."
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text
SURVEYING
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text S S I T E S
AutoCAD SHX Text
ARCHITECTURE
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text council bluffs omaha
AutoCAD SHX Text
BASE CIVIL ENGINEER
AutoCAD SHX Text
CHIEF OF ENGINEERING
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
FIRE DEPARTMENT
AutoCAD SHX Text
ENVIRONMENTAL (CEA)
AutoCAD SHX Text
SAFTY
AutoCAD SHX Text
COMMUNICATION
AutoCAD SHX Text
USING AGENCY
AutoCAD SHX Text
CHIEF OF DESIGN
AutoCAD SHX Text
FORCE PROTECTION
AutoCAD SHX Text
REPAIR HVAC, B1226
AutoCAD SHX Text
WJG
AutoCAD SHX Text 7-17-24
AutoCAD SHX Text B1226
AutoCAD SHX Text
SGBP-22-0041
AutoCAD SHX Text
OFF-B-6499
AutoCAD SHX Text E-6947
AutoCAD SHX Text
GLISMANN
AutoCAD SHX Text
WILLIAM J.
AutoCAD SHX Text
7-17-24 HGM COA NE CA-0065
AutoCAD SHX Text
AutoCAD SHX Text
SOUTH 25TH STREET
AutoCAD SHX Text
CAPEHART ROAD
AutoCAD SHX Text
2500 CAPEHART ROAD PROJECT LOCATION
AutoCAD SHX Text
OMAHA NEBRASKA
AutoCAD SHX Text
DODGE STREET
AutoCAD SHX Text
INTERSTATE 80
AutoCAD SHX Text
BELLEVUE NEBRASKA
AutoCAD SHX Text
MISSOURI RIVER
AutoCAD SHX Text
OFFUTT AIR FORCE BASE
AutoCAD SHX Text 25th STREET
AutoCAD SHX Text
CAPEHART ROAD
AutoCAD SHX Text
CAPEHART HSNG
AutoCAD SHX Text
HIGHWAY 370
AutoCAD SHX Text
CORNHUSKER ROAD
AutoCAD SHX Text
HIGHWAY 75
AutoCAD SHX Text
OMAHA NEBRASKA
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text N
AutoCAD SHX Text
FORT CROOK ROAD
AutoCAD SHX Text
KENNEDY FRWY
AutoCAD SHX Text
CONTRACTOR STAGING AREA
AutoCAD SHX Text
CONTRACTOR ACCESS ROUTE
AutoCAD SHX Text
NEW GAS SERVICE & METER TO BE PROVIDED BY BLACK HILLS ENERGY (NOT IN CONTRACT)
AutoCAD SHX Text
BUILDING 1226 - EXTERIOR PLAN
AutoCAD SHX Text
C0.1 CONTRACTOR ACCESS & STAGING PLAN
AutoCAD SHX Text
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
BY/DATE
AutoCAD SHX Text
DESIGN FIRM
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Facility Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drafter
AutoCAD SHX Text Designer
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Date
AutoCAD SHX Text
COORDINATION
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text Offutt
AutoCAD SHX Text Air Force Base
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
"SIGNING OF THE COVER SHEET
AutoCAD SHX Text
CONSTITUTES COORDINATION OF
AutoCAD SHX Text
ALL DRAWINGS IN THIS PROJECT;
AutoCAD SHX Text
SUBSEQUENT SHEETS NEED NOT
AutoCAD SHX Text
BE SIGNED."
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text
SURVEYING
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text S S I T E S
AutoCAD SHX Text
ARCHITECTURE
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text council bluffs omaha
AutoCAD SHX Text
BASE CIVIL ENGINEER
AutoCAD SHX Text
CHIEF OF ENGINEERING
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
FIRE DEPARTMENT
AutoCAD SHX Text
ENVIRONMENTAL (CEA)
AutoCAD SHX Text
SAFTY
AutoCAD SHX Text
COMMUNICATION
AutoCAD SHX Text
USING AGENCY
AutoCAD SHX Text
CHIEF OF DESIGN
AutoCAD SHX Text
FORCE PROTECTION
AutoCAD SHX Text
REPAIR HVAC, B1226
AutoCAD SHX Text
WJG
AutoCAD SHX Text 7-17-24
AutoCAD SHX Text B1226
AutoCAD SHX Text
SGBP-22-0041
AutoCAD SHX Text
OFF-B-6499
AutoCAD SHX Text E-6947
AutoCAD SHX Text
GLISMANN
AutoCAD SHX Text
WILLIAM J.
AutoCAD SHX Text
7-17-24 HGM COA NE CA-0065
AutoCAD SHX Text
AutoCAD SHX Text
WJG
AutoCAD SHX Text
TLS2
AutoCAD SHX Text
CAPEHART ROAD
AutoCAD SHX Text
SOUTH 25TH STREET
B1226
AutoCAD SHX Text
CHAPEL (B1226)
AutoCAD SHX Text
EXISTING SANITARY SEWER
AutoCAD SHX Text
EXISTING YARD HYDRANT
AutoCAD SHX Text
EXISTING SANITARY MANHOLE
AutoCAD SHX Text
EXISTING POWER POLE
AutoCAD SHX Text
SHED
AutoCAD SHX Text
PICNIC AREA
AutoCAD SHX Text
GUY WIRE
AutoCAD SHX Text
PROPOSED CHILLER SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text NOTE ALL GRASS AREAS DISTURBED BY CONSTRUCTION OPERATIONS SHALL BE SEEDED AND COVERED WITH AN EROSION CONTROL BLANKET
AutoCAD SHX Text
GUY WIRE
AutoCAD SHX Text
EXISTING SANITARY MANHOLE
AutoCAD SHX Text
PROPOSED UNDERGROUND CHILLER PIPING SEE SHT M2.1
AutoCAD SHX Text 20.67'
AutoCAD SHX Text 7.58'
AutoCAD SHX Text
SITE PLAN
AutoCAD SHX Text
C1.0 SITE PLAN
AutoCAD SHX Text
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
BY/DATE
AutoCAD SHX Text
DESIGN FIRM
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Facility Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drafter
AutoCAD SHX Text Designer
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Date
AutoCAD SHX Text
COORDINATION
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text Offutt
AutoCAD SHX Text Air Force Base
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
"SIGNING OF THE COVER SHEET
AutoCAD SHX Text
CONSTITUTES COORDINATION OF
AutoCAD SHX Text
ALL DRAWINGS IN THIS PROJECT;
AutoCAD SHX Text
SUBSEQUENT SHEETS NEED NOT
AutoCAD SHX Text
BE SIGNED."
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text
SURVEYING
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text S S I T E S
AutoCAD SHX Text
ARCHITECTURE
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text council bluffs omaha
AutoCAD SHX Text
BASE CIVIL ENGINEER
AutoCAD SHX Text
CHIEF OF ENGINEERING
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
FIRE DEPARTMENT
AutoCAD SHX Text
ENVIRONMENTAL (CEA)
AutoCAD SHX Text
SAFTY
AutoCAD SHX Text
COMMUNICATION
AutoCAD SHX Text
USING AGENCY
AutoCAD SHX Text
CHIEF OF DESIGN
AutoCAD SHX Text
FORCE PROTECTION
AutoCAD SHX Text
REPAIR HVAC, B1226
AutoCAD SHX Text
WJG
AutoCAD SHX Text 7-17-24
AutoCAD SHX Text B1226
AutoCAD SHX Text
SGBP-22-0041
AutoCAD SHX Text
OFF-B-6499
AutoCAD SHX Text E-6947
AutoCAD SHX Text
GLISMANN
AutoCAD SHX Text
WILLIAM J.
AutoCAD SHX Text
7-17-24 HGM COA NE CA-0065
AutoCAD SHX Text
AutoCAD SHX Text
WJG
TLS2
001A - BASEMENT NORTH
001 B - BASEMENT SOUTH
002 - RR
003 - CLOSET
004 - KITCHEN
D (E)
G (E)
(TYP 2)
30x10 SA (E) AND 30x10 RA (E) UP
16x12 SA (E) AND 16x12 RA (E) UP
G (E)
(TYP 3)
D (E
D (E)
D (E)
(TYP 2)
D (E)
D (E)
SA (E) UP
SA (E) UP
HP-10A (D)
HP-10C (D)
HP-10E (D)
HP-10B (D)
HP-10D (D)
30x20 EA (E) UP
P (D)
CONTROL PANEL (D)
STACK (E)
P (D)
EF (E)
4(TYP)
1 (TYP)2
T
T
5(TYP)
D (E
D (E
D (E
D (E
D (E
D (E)
D (E)
D (E)
D (E) D (E)
D (E)
(TYP 2)
D (E) D (E)
D (E)
G (E) G (E)
G (E)G (E)G (E)
G (E) G (E) G (E) G (E)
G (E)
400 CFM
D (E)D (E)D (E)D (E)
125 CFM (E)
D (E)
190 CFM (E)
16x12 SA (E)
16x12 RA (E)
30x10 SA (E)
30x10 RA (E)
SA (E) SA (E)
SA (E)SA (E)
SA (E)
RA (E)
RF (E)
SUPPLY AIR TUNNEL
SUPPLY AIR TUNNEL
SUPPLY AIR TUNNEL
210 CFM 240 CFM 240 CFM 240 CFM
240 CFM
210 CFM
480 CFM 480 CFM
620 CFM300 CFM
365 CFM
510 CFM
400 CFM456 CFM456 CFM446 CFM
0 C
FM
0 C
FM
0 C
FM
0 C
FM
2 C
FM
2 C
FM
368 CFM
D (E)
460 CFM
D (E)
460 CFM
D (E)
460 CFM
D (E)
460 CFM
D (E)
460 CFM
415 CFM
(TYP 4)
415 CFM
(TYP 3)
340 CFM
190 CFM170 CFM170 CFM
GENERAL DEMOLITION NOTES
1. ALL MECHANICAL ITEMS SHOWN LIGHT AND/OR INDICATED WITH (E) ARE
EXISTING. NOT ALL EXISTING MECHANICAL ITEMS ARE SHOWN. ITEMS
MARKED (E) SHALL REMAIN AS IS UNLESS OTHERWISE NOTED. REMOVE
ITEMS HATCHED AND/OR MARKED (D).
2. EXISTING DRAWINGS ARE BASED ON APPROXIMATIONS FROM FIELD
OBSERVATIONS AND EXISTING DRAWINGS (FURNISHED BY OTHERS).
DRAWINGS ARE SCHEMATIC IN NATURE. FIELD VERIFY EXACT LOCATION OF
ALL EXISTING EQUIPMENT, DUCTWORK AND PIPING. EQUIPMENT,
DUCTWORK AND PIPING DISCOVERED ON SITE TO BE REMOVED BUT NOT
INDICATED ON PLANS TO BE IDENTIFIED BY CONTRACTOR AND REMOVED AS
DIRECTED BY ENGINEER.
3. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO
PROVIDING NEW WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR
ADJUSTING REMOVAL AS REQUIRED TO ACCOMMODATE ACTUAL
CONDITIONS.
4. COORDINATE ALL REQUIRED UTILITY SHUT-DOWNS WITH GOVERNMENT
REPRESENTATIVE.
5. HOLES CUT IN WALLS, FLOORS AND CEILINGS TO PERMIT THE REMOVAL OF
EXISTING EQUIPMENT, PIPING, ETC. SHALL BE CAREFULLY MADE AND
RESTRICTED TO THE SMALLEST PRACTICAL SIZE. PATCH ALL HOLES NOT
REQUIRED FOR NEW WORK TO MATCH EXISTING.
6. THE GOVERNMENT RESERVES THE FIRST RIGHT OF SALVAGE OF ANY ITEMS
REMOVED. CONTRACTOR SHALL REMOVE ALL UNWANTED MATERIALS FROM
THE SITE. DISTRICT'S DUMPSTER OR OTHER TRASH RECEPTACLES ARE NOT
TO BE UTILIZED.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND
REPLACEMENT OF ANY AND ALL BUILDING COMPONENTS AS REQUIRED TO
REMOVE AND REPLACE HEAT PUMPS. BUILDING COMPONENTS INCLUDE
BUT ARE NOT LIMITED TO: DUCTWORK, PIPING, LINE VOLTAGE WIRING, LOW
VOLTAGE WIRING, FIRE SPRINKLERS PIPING/DEVICES, LIGHT FIXTURES, A/V
DEVICES, FIRE ALARM WIRING/DEVICES, EQUIPMENT SUPPORTS,
STRUCTURAL SUPPORTS, ETC.
8. WHERE APPLICABLE, COORDINATE EXTENT OF DEMOLITION WITH NEW
WORK.
T.A.B. NOTES
1. MEASURE AND RECORD EXISTING AIR FLOW PRIOR TO DEMOLITION. AIRFLOW
INDICATED ON PLANS ARE FROM EXISTING DRAWINGS. NOTIFY ENGINEER IF
ACTUAL AIRFLOW DIFFERS MORE THAN 10% FROM INDICATED.
DEMOLITION FLAG NOTES
1 REMOVE EXISTING HEAT PUMP SHOWN HATCHED COMPLETE.
CONTRACTOR OPTION TO REUSE EXISTING HEAT PUMP SUPPORTS
WHERE APPLICABLE. SEE NEW WORK.
2 EXISTING SA/RA DUCT AND DIFFUSER/GRILLES TO REMAIN. PREPARE
EXISTING DUCT FOR CONNECTION TO NEW HEAT PUMP.
3 EXISTING 36x28 SA MAIN OPEN TO SUPPLY AIR TUNNEL.
4 REMOVE EXISTING HEAT PUMP LOOP PUMP. EXISTING EQUIPMENT
PAD TO REMAIN. SEE SCHEMATIC 1 ON SHEET M3.1 FOR EXTENTS OF
DEMOLITION. COORDINATION EXTENT OF DEMOLITION WITH NEW
WORK.
5 REMOVE EXISTING CONTROL PANEL AND ASSOCIATED WIRING
COMPLETE.
6 REMOVE EXISTING THERMOSTAT AND ASSOCIATED WIRING
COMPLETE.
7 EXISTING 26x24 RA DUCT OPEN TO MECHANICAL ROOM.
8 REMOVE EXISTING RETURN AIR FAN AND ALL ASSOCIATED WIRING
COMPLETE.
HP-10A (D)
HP-10E (D)
HP-10B (D)
HP-10D (D)
P (D)
CONTROL PANEL (D)
STACK (E)
P (D)
(TYP)
(TYP)
30x20 EA (E) UP
HP-10C (D)
RF (E)
30x20 EA (E) UP
36x24 OA (E)
36x24 RA (E)
M
M
MOTORIZED DAMPER (E)
MOTORIZED DAMPER (E)
96x24 OA LOUVER (E)
M MOTORIZED DAMPER (E)
(TYP)
(TYP)
B1226 - HVAC DEMOLITION PLANS - BASEMENT
1/8" = 1'-0"
MD1.0
N
B1226 - HVAC DEMOLITION PLANS - BASEMENT MECHANICAL ROOM
1/4" = 1'-0"
MD1.0
N do not scale drawings. verify all dimensions and clearances from provide clearances required for operation, maintenance, and codes and verify non-interference with other work. do not fabricate prior at site. lay out and coordinate all work prior to installation to architectural, structural, shop and other appropriate drawings or to verification of clearance for all trades.
permission of morrissey engineering, inc. is prohibited by copyright law.
unauthorized copying, disclosure or construction use without written solely for the limited purpose of construction of this project or archiving.
permission to reproduce all or part of this drawing is hereby granted copyright note:
7/17/2024
FA460025R0002
Attachment 12
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
MD1.0 B1226 - HVAC DEMOLITION PLANS - BASEMENT
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
BY/DATE
AutoCAD SHX Text
DESIGN FIRM
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Facility Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drafter
AutoCAD SHX Text Designer
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Date
AutoCAD SHX Text
COORDINATION
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text Offutt
AutoCAD SHX Text Air Force Base
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
"SIGNING OF THE COVER SHEET
AutoCAD SHX Text
CONSTITUTES COORDINATION OF
AutoCAD SHX Text
ALL DRAWINGS IN THIS PROJECT;
AutoCAD SHX Text
SUBSEQUENT SHEETS NEED NOT
AutoCAD SHX Text
BE SIGNED."
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text
SURVEYING
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text S S I T E S
AutoCAD SHX Text
ARCHITECTURE
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text council bluffs omaha
AutoCAD SHX Text
BASE CIVIL ENGINEER
AutoCAD SHX Text
CHIEF OF ENGINEERING
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
FIRE DEPARTMENT
AutoCAD SHX Text
ENVIRONMENTAL (CEA)
AutoCAD SHX Text
SAFTY
AutoCAD SHX Text
COMMUNICATION
AutoCAD SHX Text
USING AGENCY
AutoCAD SHX Text
CHIEF OF DESIGN
AutoCAD SHX Text
FORCE PROTECTION
AutoCAD SHX Text
REPAIR HVAC, B1226
AutoCAD SHX Text
WJG
AutoCAD SHX Text 7-17-24
AutoCAD SHX Text B1226
AutoCAD SHX Text
AFPC/SERVICES DIRECTORATE
AutoCAD SHX Text
JBSA LACKLAND TEXAS
AutoCAD SHX Text
SGBP-22-0041
AutoCAD SHX Text
AutoCAD SHX Text
OFF-B-6499
AutoCAD SHX Text c
AutoCAD SHX Text
MCK
AutoCAD SHX Text
BDR
AutoCAD SHX Text
MEI JOB #22368
AutoCAD SHX Text E-15922
AutoCAD SHX Text
KASPRZAK
MATTHEW C
103A - ANNEX NORTH104 - STORAGE
103C - CHOIR
103D - MEETING
0010 - WEST STAIR
105 - COAT ROOM
109 - KITCHENETTE
131 - MECHANICAL SPACE
107 - OFFICE
101 - LOBBY
117 - CHAPEL
110 - CHAPLAINS OFFICE
111 - CHAPLAINS OFFICE
112 - CHAPLAINS OFFICE
113 - GENERAL OFFICE
101 - NARTHEX
117 - MENS RR
116 - WOMENS RR
114 - STORAGE
115 - JANITOR
101B - WEST SANCTUARY WING 101C - EAST SANCTUARY WING
101A - SANCTUARY
107 - SUNDAY SCHOOL 108 - SUNDAY SCHOOL 110 - USHER OFFERING
111 - MECHANICAL SPACE
114 - SUNDAY SCHOOL 115 - SUNDAY SCHOOL 116 - SUNDAY SCHOOL
103B - ANNEX SOUTH
HP-5 (D)
HP-6 (D) HP-4 (D)
HP-1 (D)
HP-2 (D)
HP-3 (E)
HP-21 (D) HP-11 (D)HP-14 (D)
HP-15 (D)
HP-16 (D)
HP-17 (D)
HP-18 (D) HP-19 (D)
HP-7 (E) HP-8 (E)
HP-9 (E)
G (E)
340 CFM
D (D)
D (E)
(TYP 5)
D (E)
D (E)
(TYP 12)
D (E)
(TYP 7)
D (E)
(TYP 3)
D (E)
D (E)D (E)D (E) D (E)D (E) D (E)
16x12 SA (E) AND 16x12 RA (E) UP
30x10 SA (E) AND 30x10 RA (E) UP
1 (TYP)2 3
1 (TYP)2 3
1(TYP) 23
1 (TYP)2 3
1 (TYP)2 3
1 (TYP)2 3
T
T T
T
T
T
T
T
4(TYP)
4 (TYP)
D (E) D (E)
470 CFM
D (E)
D (E) D (E)
G (E)
470 CFM
1(TYP) 23
24X12 SA (E)
RA (E)
RA (E)
RA (E)
RA (E)
SA (E)
SA (E)
16/8 SA (E)
300 CFM 340 CFM
D (E)
340 CFM
D (E)
380 CFM
D (E)
340 CFM
D (E)
340 CFM
155 CFM
D (E)
490 CFM 470 CFM
D (E)
470 CFM
(TYP 2)
G (E)
470 CFM
G (E)
470 CFM
G (E)
470 CFM
G (E)
490 CFM
G (E)
100 CFM
G (E)
340 CFM
G (E)
380 CFM
G (E)
380 CFM
G (E)
380 CFM
D (E)
650 CFM
10/6 SA (D)
T
T
T
T
T
T
201 - BALCONY
HP-12 (D) HP-13 (D)
1 (TYP)2 3
T T
4(TYP)
GENERAL DEMOLITION NOTES
1. ALL MECHANICAL ITEMS SHOWN LIGHT AND/OR INDICATED WITH (E) ARE
EXISTING. NOT ALL EXISTING MECHANICAL ITEMS ARE SHOWN. ITEMS
MARKED (E) SHALL REMAIN AS IS UNLESS OTHERWISE NOTED. REMOVE
ITEMS HATCHED AND/OR MARKED (D).
2. EXISTING DRAWINGS ARE BASED ON APPROXIMATIONS FROM FIELD
OBSERVATIONS AND EXISTING DRAWINGS (FURNISHED BY OTHERS).
DRAWINGS ARE SCHEMATIC IN NATURE. FIELD VERIFY EXACT LOCATION OF
ALL EXISTING EQUIPMENT, DUCTWORK AND PIPING. EQUIPMENT,
DUCTWORK AND PIPING DISCOVERED ON SITE TO BE REMOVED BUT NOT
INDICATED ON PLANS TO BE IDENTIFIED BY CONTRACTOR AND REMOVED AS
DIRECTED BY ENGINEER.
3. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO
PROVIDING NEW WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR
ADJUSTING REMOVAL AS REQUIRED TO ACCOMMODATE ACTUAL
CONDITIONS.
4. COORDINATE ALL REQUIRED UTILITY SHUT-DOWNS WITH GOVERNMENT
REPRESENTATIVE.
5. HOLES CUT IN WALLS, FLOORS AND CEILINGS TO PERMIT THE REMOVAL OF
EXISTING EQUIPMENT, PIPING, ETC. SHALL BE CAREFULLY MADE AND
RESTRICTED TO THE SMALLEST PRACTICAL SIZE. PATCH ALL HOLES NOT
REQUIRED FOR NEW WORK TO MATCH EXISTING.
6. THE GOVERNMENT RESERVES THE FIRST RIGHT OF SALVAGE OF ANY ITEMS
REMOVED. CONTRACTOR SHALL REMOVE ALL UNWANTED MATERIALS FROM
THE SITE. DISTRICT'S DUMPSTER OR OTHER TRASH RECEPTACLES ARE NOT
TO BE UTILIZED.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND
REPLACEMENT OF ANY AND ALL BUILDING COMPONENTS AS REQUIRED TO
REMOVE AND REPLACE HEAT PUMPS. BUILDING COMPONENTS INCLUDE
BUT ARE NOT LIMITED TO: DUCTWORK, PIPING, LINE VOLTAGE WIRING, LOW
VOLTAGE WIRING, FIRE SPRINKLERS PIPING/DEVICES, LIGHT FIXTURES, A/V
DEVICES, FIRE ALARM WIRING/DEVICES, EQUIPMENT SUPPORTS,
STRUCTURAL SUPPORTS, ETC.
8. WHERE APPLICABLE, COORDINATE EXTENT OF DEMOLITION WITH NEW
WORK.
T.A.B. NOTES
1. MEASURE AND RECORD EXISTING AIR FLOW PRIOR TO DEMOLITION. AIRFLOW
INDICATED ON PLANS ARE FROM EXISTING DRAWINGS. NOTIFY ENGINEER IF
ACTUAL AIRFLOW DIFFERS MORE THAN 10% FROM INDICATED.
DEMOLITION FLAG NOTES
1 REMOVE EXISTING HEAT PUMP SHOWN HATCHED COMPLETE.
CONTRACTOR OPTION TO REUSE EXISTING HEAT PUMP SUPPORTS
WHERE APPLICABLE. SEE NEW WORK.
2 EXISTING SA/RA DUCT AND DIFFUSER/GRILLES TO REMAIN. PREPARE
EXISTING DUCT FOR CONNECTION TO NEW HEAT PUMP.
3 REMOVE EXISTING CONDENSATE PIPING COMPLETE.
4 REMOVE EXISTING THERMOSTAT AND ASSOCIATED WIRING
COMPLETE.
5 REMOVE EXISTING DUCT WORK SHOWN HATCHED COMPLETE.
6 REMOVE EXISTING DIFFUSER SHOWN DASHED COMPLETE.
B1226 - HVAC DEMOLITION PLANS - FIRST FLOOR
1/8" = 1'-0"
MD1.1
N
B1226 - HVAC DEMOLITION PLANS - BALCONY
1/8" = 1'-0"
MD1.1
N do not scale drawings. verify all dimensions and clearances from provide clearances required for operation, maintenance, and codes and verify non-interference with other work. do not fabricate prior at site. lay out and coordinate all work prior to installation to architectural, structural, shop and other appropriate drawings or to verification of clearance for all trades.
permission of morrissey engineering, inc. is prohibited by copyright law.
unauthorized copying, disclosure or construction use without written solely for the limited purpose of construction of this project or archiving.
permission to reproduce all or part of this drawing is hereby granted copyright note:
7/17/2024
FA460025R0002
Attachment 12
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
STEP DOWN
AutoCAD SHX Text
MD1.1 B1226 - HVAC DEMOLITION PLANS - FIRST FLOOR AND BALCONY
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
BY/DATE
AutoCAD SHX Text
DESIGN FIRM
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Facility Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drafter
AutoCAD SHX Text Designer
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Date
AutoCAD SHX Text
COORDINATION
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text Offutt
AutoCAD SHX Text Air Force Base
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
"SIGNING OF THE COVER SHEET
AutoCAD SHX Text
CONSTITUTES COORDINATION OF
AutoCAD SHX Text
ALL DRAWINGS IN THIS PROJECT;
AutoCAD SHX Text
SUBSEQUENT SHEETS NEED NOT
AutoCAD SHX Text
BE SIGNED."
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text
SURVEYING
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text S S I T E S
AutoCAD SHX Text
ARCHITECTURE
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text council bluffs omaha
AutoCAD SHX Text
BASE CIVIL ENGINEER
AutoCAD SHX Text
CHIEF OF ENGINEERING
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
FIRE DEPARTMENT
AutoCAD SHX Text
ENVIRONMENTAL (CEA)
AutoCAD SHX Text
SAFTY
AutoCAD SHX Text
COMMUNICATION
AutoCAD SHX Text
USING AGENCY
AutoCAD SHX Text
CHIEF OF DESIGN
AutoCAD SHX Text
FORCE PROTECTION
AutoCAD SHX Text
REPAIR HVAC, B1226
AutoCAD SHX Text
WJG
AutoCAD SHX Text 7-17-24
AutoCAD SHX Text B1226
AutoCAD SHX Text
AFPC/SERVICES DIRECTORATE
AutoCAD SHX Text
JBSA LACKLAND TEXAS
AutoCAD SHX Text
SGBP-22-0041
AutoCAD SHX Text
AutoCAD SHX Text
OFF-B-6499
AutoCAD SHX Text c
AutoCAD SHX Text
MCK
AutoCAD SHX Text
BDR
AutoCAD SHX Text
MEI JOB #22368
AutoCAD SHX Text E-15922
AutoCAD SHX Text
KASPRZAK
MATTHEW C
002 - RR
003 - CLOSET
004 - KITCHEN
HP-10A (E)
HP-10C (E)
HP-10E (E)
HP-10B (E)
HP-10D (E)
P (E)
CONTROL PANEL (E)
P (E)
EF (E)
4 (TYP)
1 (TYP)3
5(TYP)
RF (E)
3" HPLS (E) AND 3" HPLR (E) UP
EXISTING PIPING OUT
TO WELL FIELD
6 (TYP 2)
6(TYP 2)
6(TYP 2)
3" HPLS (E) AND 3"
HPLR (E) UP TO
MECHANICAL ROOM
2" HPLS (E) 2" HPLR (E)
HPLS (E) AND HPLR
(E) UP TO CONSOLE
HEAT PUMP
HPLS (E) AND HPLR
(E) UP TO CONSOLE
HEAT PUMP
HPLS (E) AND HPLR
(E) UP TO CONSOLE
HEAT PUMP
HPLS (E) AND HPLR
(E) UP TO CONSOLE
HEAT PUMP
STACK (E)
G (E)
GENERAL DEMOLITION NOTES
1. ALL MECHANICAL ITEMS SHOWN ARE EXISTING. NOT ALL EXISTING
MECHANICAL ITEMS ARE SHOWN. REMOVE / RELOCATE ITEMS SHOWN
HATCHED.
2. EXISTING DRAWINGS ARE BASED ON APPROXIMATIONS FROM FIELD
OBSERVATIONS AND EXISTING DRAWINGS (FURNISHED BY OTHERS).
DRAWINGS ARE SCHEMATIC IN NATURE. FIELD VERIFY EXACT LOCATION OF
ALL EXISTING EQUIPMENT, DUCTWORK AND PIPING. EQUIPMENT,
DUCTWORK AND PIPING DISCOVERED ON SITE TO BE REMOVED BUT NOT
INDICATED ON PLANS TO BE IDENTIFIED BY CONTRACTOR AND REMOVED AS
DIRECTED BY ENGINEER.
3. PLAN WORK TO MINIMIZE SHUTDOWNS. COORDINATE ALL BUILDING SYSTEM
SHUTDOWN WITH PHASING NOTES AND GOVERNMENT CONSTRUCTION
REPRESENTATIVE. BUILDING OPERATIONS ARE CRITICAL, SHUTDOWN
COORDINATION SHALL OCCUR IN ADVANCE (MINIMUM OF FOUR WEEKS).
4. ALL WORK MUST BE PREFORMED IN COMPLIANCE WITH ALL APPLICABLE
OSHA AND AFOSH STANDARDS.
5. THE GOVERNMENT RESERVES THE FIRST RIGHT OF SALVAGE OF ANY ITEMS
REMOVED. CONTRACTOR SHALL REMOVE ALL UNWANTED MATERIALS FROM
THE SITE. OWNERS DUMPSTER OR OTHER TRASH RECEPTACLES ARE NOT
TO BE UTILIZED.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND
REPLACEMENT OF ANY AND ALL BUILDING COMPONENTS AS REQUIRED TO
REMOVE AND REPLACE HEAT PUMPS. BUILDING COMPONENTS INCLUDE
BUT ARE NOT LIMITED TO: DUCTWORK, PIPING, LINE VOLTAGE WIRING, LOW
VOLTAGE WIRING, FIRE SPRINKLERS PIPING/DEVICES, LIGHT FIXTURES, A/V
DEVICES, FIRE ALARM WIRING/DEVICES, EQUIPMENT SUPPORTS,
STRUCTURAL SUPPORTS, ETC.
7. WHERE APPLICABLE, COORDINATE EXTENT OF DEMOLITION WITH NEW
WORK.
DEMOLITION FLAG NOTES
1 REMOVE EXISTING HEAT PUMP SHOWN HATCHED COMPLETE.
CONTRACTOR OPTION TO REUSE EXISTING HEAT PUMP SUPPORTS
WHERE APPLICABLE. SEE NEW WORK.
2 REMOVE ALL HEAT PUMP LOOP PIPING IN MECHANICAL ROOM SHOWN
HATCHED COMPLETE. SEE SCHEMATIC 1 ON SHEET M3.1 FOR
EXTENTS OF DEMOLITION PREPARE REMAINING PIPING FOR
CONNECTION TO NEW HEAT PUMP LOOP PIPING.
3 REMOVE EXISTING CONDENSATE PIPING COMPLETE.
4 REMOVE EXISTING PUMPS INCLUDING ALL PIPING ACCESSORIES
INCLUDING ISOLATION VALVES COMPLETE. EXISTING EQUIPMENT PAD
TO REMAIN. COORDINATE EXTENT OF DEMOLITION WITH NEW WORK.
5 REMOVE EXISTING CONTROL PANEL AND ASSOCIATED WIRING SHOWN
DASHED COMPETE.
6 CUT EXISTING PIPE WITHIN 6 INCHES OF WALL PENETRATION.
PREPARE EXISTING PIPE FOR CONNECTION TO NEW HEAT PUMP LOOP
PIPING. POINT INDICATED IS APPROXIMATE.
7 REMOVE EXISTING GAS METER AND GAS PIPING SHOWN DASHED
COMPLETE. CUT EXISTING PIPE WITHIN 6 INCHES OF WALL
PENETRATION. PREPARE EXISTING PIPING FOR CONNECTION TO NEW
GAS PIPING
B1226 - MECHANICAL PIPING DEMOLITION PLANS - BASEMENT
1/8" = 1'-0"
MD2.0
N do not scale drawings. verify all dimensions and clearances from provide clearances required for operation, maintenance, and codes and verify non-interference with other work. do not fabricate prior at site. lay out and coordinate all work prior to installation to architectural, structural, shop and other appropriate drawings or to verification of clearance for all trades.
permission of morrissey engineering, inc. is prohibited by copyright law.
unauthorized copying, disclosure or construction use without written solely for the limited purpose of construction of this project or archiving.
permission to reproduce all or part of this drawing is hereby granted copyright note:
7/17/2024
FA460025R0002
Attachment 12
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
MD2.0 B1226 - MECHANICAL PIPING DEMOLITION PLANS - BASEMENT
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
BY/DATE
AutoCAD SHX Text
DESIGN FIRM
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Facility Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drafter
AutoCAD SHX Text Designer
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Date
AutoCAD SHX Text
COORDINATION
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text Offutt
AutoCAD SHX Text Air Force Base
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
"SIGNING OF THE COVER SHEET
AutoCAD SHX Text
CONSTITUTES COORDINATION OF
AutoCAD SHX Text
ALL DRAWINGS IN THIS PROJECT;
AutoCAD SHX Text
SUBSEQUENT SHEETS NEED NOT
AutoCAD SHX Text
BE SIGNED."
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text
SURVEYING
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text S S I T E S
AutoCAD SHX Text
ARCHITECTURE
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text council bluffs omaha
AutoCAD SHX Text
BASE CIVIL ENGINEER
AutoCAD SHX Text
CHIEF OF ENGINEERING
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
FIRE DEPARTMENT
AutoCAD SHX Text
ENVIRONMENTAL (CEA)
AutoCAD SHX Text
SAFTY
AutoCAD SHX Text
COMMUNICATION
AutoCAD SHX Text
USING AGENCY
AutoCAD SHX Text
CHIEF OF DESIGN
AutoCAD SHX Text
FORCE PROTECTION
AutoCAD SHX Text
REPAIR HVAC, B1226
AutoCAD SHX Text
WJG
AutoCAD SHX Text 7-17-24
AutoCAD SHX Text B1226
AutoCAD SHX Text
AFPC/SERVICES DIRECTORATE
AutoCAD SHX Text
JBSA LACKLAND TEXAS
AutoCAD SHX Text
SGBP-22-0041
AutoCAD SHX Text
AutoCAD SHX Text
OFF-B-6499
AutoCAD SHX Text c
AutoCAD SHX Text
MCK
AutoCAD SHX Text
BDR
AutoCAD SHX Text
MEI JOB #22368
AutoCAD SHX Text E-15922
AutoCAD SHX Text
KASPRZAK
AutoCAD SHX Text
MATTHEW C
103D - MEETING
0010 - WEST STAIR
105 - COAT ROOM
109 - KITCHENETTE
131 - MECHANICAL SPACE
107 - OFFICE
101 - LOBBY
117 - CHAPEL
110 - CHAPLAINS OFFICE
111 - CHAPLAINS OFFICE
112 - CHAPLAINS OFFICE
113 - GENERAL OFFICE
101 - NARTHEX
117 - MENS RR
116 - WOMENS RR
114 - STORAGE
115 - JANITOR
101B - WEST SANCTUARY WING 101C - EAST SANCTUARY WING
101A - SANCTUARY
107 - SUNDAY SCHOOL 108 - SUNDAY SCHOOL 110 - USHER OFFERING
111 - MECHANICAL SPACE
114 - SUNDAY SCHOOL 115 - SUNDAY SCHOOL 116 - SUNDAY SCHOOL
103B - ANNEX SOUTH
HP-5 (E)
HP-6 (E) HP-4 (E)
HP-1 (E)
HP-2 (E)
HP-3 (E)
HP-21 (E) HP-11 (E)HP-14 (E)
HP-15 (E)
HP-16 (E)
HP-17 (E)
HP-18 (E) HP-19 (E)
HP-7 (E) HP-8 (E)
HP-9 (E)
1(TYP) 3
1 (TYP)3
1(TYP) 3
1 (TYP)3
1 (TYP)3
1 (TYP)3
1 (TYP)3
3" HPLS (E) AND 3" HPLR (E)
3" HPLS (E) AND 3" HPLR (E)
4 (TYP 2)
4 (TYP 2)
5 5
201 - BALCONY
HP-12 (E) HP-13 (E)
1 (TYP)3
GENERAL DEMOLITION NOTES
1. ALL MECHANICAL ITEMS SHOWN ARE EXISTING. NOT ALL EXISTING
MECHANICAL ITEMS ARE SHOWN. REMOVE / RELOCATE ITEMS SHOWN
HATCHED.
2. EXISTING DRAWINGS ARE BASED ON APPROXIMATIONS FROM FIELD
OBSERVATIONS AND EXISTING DRAWINGS (FURNISHED BY OTHERS).
DRAWINGS ARE SCHEMATIC IN NATURE. FIELD VERIFY EXACT LOCATION OF
ALL EXISTING EQUIPMENT, DUCTWORK AND PIPING. EQUIPMENT,
DUCTWORK AND PIPING DISCOVERED ON SITE TO BE REMOVED BUT NOT
INDICATED ON PLANS TO BE IDENTIFIED BY CONTRACTOR AND REMOVED AS
DIRECTED BY ENGINEER.
3. PLAN WORK TO MINIMIZE SHUTDOWNS. COORDINATE ALL BUILDING SYSTEM
SHUTDOWN WITH PHASING NOTES AND GOVERNMENT CONSTRUCTION
REPRESENTATIVE. BUILDING OPERATIONS ARE CRITICAL, SHUTDOWN
COORDINATION SHALL OCCUR IN ADVANCE (MINIMUM OF FOUR WEEKS).
4. ALL WORK MUST BE PREFORMED IN COMPLIANCE WITH ALL APPLICABLE
OSHA AND AFOSH STANDARDS.
5. THE GOVERNMENT RESERVES THE FIRST RIGHT OF SALVAGE OF ANY ITEMS
REMOVED. CONTRACTOR SHALL REMOVE ALL UNWANTED MATERIALS FROM
THE SITE. OWNERS DUMPSTER OR OTHER TRASH RECEPTACLES ARE NOT
TO BE UTILIZED.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND
REPLACEMENT OF ANY AND ALL BUILDING COMPONENTS AS REQUIRED TO
REMOVE AND REPLACE HEAT PUMPS. BUILDING COMPONENTS INCLUDE
BUT ARE NOT LIMITED TO: DUCTWORK, PIPING, LINE VOLTAGE WIRING, LOW
VOLTAGE WIRING, FIRE SPRINKLERS PIPING/DEVICES, LIGHT FIXTURES, A/V
DEVICES, FIRE ALARM WIRING/DEVICES, EQUIPMENT SUPPORTS,
STRUCTURAL SUPPORTS, ETC.
7. WHERE APPLICABLE, COORDINATE EXTENT OF DEMOLITION WITH NEW
WORK.
DEMOLITION FLAG NOTES
1 REMOVE EXISTING HEAT PUMP SHOWN HATCHED COMPLETE.
CONTRACTOR OPTION TO REUSE EXISTING HEAT PUMP SUPPORTS
WHERE APPLICABLE. SEE NEW WORK.
2 REMOVE ALL HEAT PUMP LOOP PIPING IN MECHANICAL ROOM SHOWN
HATCHED COMPLETE. PREPARE REMAINING PIPING FOR CONNECTION
TO NEW HEAT PUMP LOOP PIPING.
3 REMOVE EXISTING CONDENSATE PIPING COMPLETE.
4 CUT EXISTING PIPE WITHIN 6" OF WALL PENETRATION. PREPARE
EXISTING PIPE FOR CONNECTION TO NEW HEAT PUMP LOOP PIPING.
POINT INDICATED IS APPROXIMATE.
5 DISCONNECT CONSOLE HEAT PUMP FOR HPLS (E) AND HPLR (E)
PIPING. PIPING SERVES HEAT PUMP FROM BELOW. PREPARE PIPING
FOR CONNECTION TO NEW HEAT PUMP. SEE NEW WORK.
B1226 - MECHANICAL PIPING DEMOLITION PLANS - FIRST FLOOR
1/8" = 1'-0"
MD2.1
N
B1226 - MECHANICAL PIPING DEMOLITION PLANS - BALCONY
1/8" = 1'-0"
MD2.1
N do not scale drawings. verify all dimensions and clearances from provide clearances required for operation, maintenance, and codes and verify non-interference with other work. do not fabricate prior at site. lay out and coordinate all work prior to installation to architectural, structural, shop and other appropriate drawings or to verification of clearance for all trades.
permission of morrissey engineering, inc. is prohibited by copyright law.
unauthorized copying, disclosure or construction use without written solely for the limited purpose of construction of this project or archiving.
permission to reproduce all or part of this drawing is hereby granted copyright note:
7/17/2024
FA460025R0002
Attachment 12
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
STEP DOWN
AutoCAD SHX Text
MD2.1 B1226 - MECHANICAL PIPING DEMOLITION PLANS - FIRST FLOOR AND BALCONY
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
BY/DATE
AutoCAD SHX Text
DESIGN FIRM
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Facility Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drafter
AutoCAD SHX Text Designer
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Date
AutoCAD SHX Text
COORDINATION
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text Offutt
AutoCAD SHX Text Air Force Base
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
"SIGNING OF THE COVER SHEET
AutoCAD SHX Text
CONSTITUTES COORDINATION OF
AutoCAD SHX Text
ALL DRAWINGS IN THIS PROJECT;
AutoCAD SHX Text
SUBSEQUENT SHEETS NEED NOT
AutoCAD SHX Text
BE SIGNED."
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text
SURVEYING
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text S S I T E S
AutoCAD SHX Text
ARCHITECTURE
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text council bluffs omaha
AutoCAD SHX Text
BASE CIVIL ENGINEER
AutoCAD SHX Text
CHIEF OF ENGINEERING
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
FIRE DEPARTMENT
AutoCAD SHX Text
ENVIRONMENTAL (CEA)
AutoCAD SHX Text
SAFTY
AutoCAD SHX Text
COMMUNICATION
AutoCAD SHX Text
USING AGENCY
AutoCAD SHX Text
CHIEF OF DESIGN
AutoCAD SHX Text
FORCE PROTECTION
AutoCAD SHX Text
REPAIR HVAC, B1226
AutoCAD SHX Text
WJG
AutoCAD SHX Text 7-17-24
AutoCAD SHX Text B1226
AutoCAD SHX Text
AFPC/SERVICES DIRECTORATE
AutoCAD SHX Text
JBSA LACKLAND TEXAS
AutoCAD SHX Text
SGBP-22-0041
AutoCAD SHX Text
AutoCAD SHX Text
OFF-B-6499
AutoCAD SHX Text c
AutoCAD SHX Text
MCK
AutoCAD SHX Text
BDR
AutoCAD SHX Text
MEI JOB #22368
AutoCAD SHX Text E-15922
AutoCAD SHX Text
KASPRZAK
AutoCAD SHX Text
MATTHEW C
002 - RR
003 - CLOSET
004 - KITCHEN
D (E)
400 CFM
G (E)
(TYP 2)
G (E)
385 CFM
G (E)
240 CFM
30x10 SA (E) AND 30x10 RA (E) UP
16x12 SA (E) AND 16x12 RA (E) UP
G (E)
(TYP 3)
D (E)
700 CFM
D (E)
410 CFM
D (E)
D (E)
350 CFM
D (E)
D (E)
(TYP 3)
D (E)
(TYP 3)
D (E)
SA (E) UP
SA (E) UP
HP-10A
HP-10C
HP-10E
HP
-1
0B
HP
-1 0D
30x20 EA (E) UP
HP
LP
-1
NEW CONTROL PANEL
HP
LP
-2
VFD-HPLP-2
VFD-HPLP-1
1(TYP)
3(TYP)
2 (TYP)
N/E (TYP)
T
T
HP-6
HP-3 5
B-1
AS-1
ET-1
GT-1
(TYP 6)
D (E)
650 CFM
(TYP 6)
D (E)
650 CFM
(TYP 2)
650 CFM D (E)
350 CFM
D (E)
360 CFM
(TYP 4)
RF (E)
D (E)
150 CFM D (E)
510 CFM
(TYP 5)
EF (E)
STACK (E)
9 (TYP)
10 (TYP)
11 (TYP)
11 (TYP)
M1.0
BP-1
CO 12
ACCHP-1
(TYP 3)
(TYP 5)
D (E)
400 CFM
(TYP 2)
D (E)
375 CFM
D (E)
775 CFM
D (E)
640 CFM
(TYP 2)
G (E)
320 CFM
(TYP 2)
G (E)
320 CFM
BP-1
GENERAL NOTES
1. DO NOT ROUTE DUCTWORK, PIPING OR LOCATE EQUIPMENT ABOVE
ELECTRICAL PANELS. MAINTAIN ALL CODE REQUIRED CLEARANCES.
2. MECHANICAL ITEMS SHOWN LIGHT AND / OR INDICATED WITH (E) ARE
EXISTING. ALL ITEMS SHOWN DARK ARE NEW.
3. EXISTING DRAWINGS ARE BASED ON APPROXIMATIONS FROM FIELD
OBSERVATIONS AND EXISTING DRAWINGS (FURNISHED BY OTHERS).
DRAWINGS ARE SCHEMATIC IN NATURE. FIELD VERIFY EXACT LOCATION OF
ALL EXISTING EQUIPMENT, DUCTWORK AND PIPING. EQUIPMENT, DUCTWORK
AND PIPING DISCOVERED ON SITE TO BE REMOVED BUT NOT INDICATED ON
PLANS TO BE IDENTIFIED BY CONTRACTOR AND REMOVED AS DIRECTED BY
ENGINEER.
4. SPACE IS LIMITED. COORDINATE DUCT ROUTING WITH STRUCTURE AND ALL
OTHER TRADES. OFFSET AND EXTEND DUCTWORK AS REQUIRED TO AVOID
CONFLICTS.
5. SEE DUCT FITTING DETAIL 2 ON SHEET M3.0.
6. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO NEW
WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING DUCTWORK
AND PIPING AS NECESSARY TO AVOID CONFLICTS WITH EXISTING STRUCTURE
AND WITH ALL TRADES OF NEW WORK.
7. ALL WORK SHALL CONFORM TO BUILDING STANDARDS. COORDINATE ALL
WORK WITH GOVERNMENT REPRESENTATIVE.
8. PLAN WORK TO MINIMIZE SHUT DOWNS. COORDINATE ALL REQUIRED
SHUT-DOWNS WITH GOVERNMENT REPRESENTATIVE.
9. MAINTAIN ALL CODE AND MANUFACTURER'S RECOMMENDED CLEARANCES
AROUND ALL MECHANICAL EQUIPMENT TO ALLOW PROPER OPERATION AND
EASY MAINTENANCE AND FILTER ACCESS.
10. REPAIR INSULATION DAMAGED DURING DEMOLITION PHASE AND
INSTALLATION OF NEW EQUIPMENT TO MATCH EXISTING CONDITIONS.
11. CONTRACTOR TO DOCUMENT ALL EXISTING DAMAGE PRIOR TO START OF
WORK. ALL DAMAGE AT END OF PROJECT NOT DOCUMENTED BY
CONTRACTOR WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO FIX.
TEMPERATURE CONTROL NOTES
1. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF
CONTROLS WITH EQUIPMENT SUPPLIERS AND TEMPERATURE CONTROL
CONTRACTOR.
2. SCOPE OF WORK INCLUDES NEW TEMPERATURE SENSORS, HEAT PUMP
CONTROLLERS, BUILDING MANAGEMENT SYSTEM. PROVIDE NEW WIRING,
RELAYS, SENSORS, ETC FOR COMPLETE SYSTEM OPERATION.
3. PROVIDE COMPLETE PROGRAMMING AND CREATION OF SYSTEM GRAPHICS.
4. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
5. CONTROL CONTRACTOR SHALL SUBMIT A COPY OF THE CONTROLS SYSTEM
ARCHITECTURE SHOWING THE SYSTEMS CONTROL RISER FOR APPROVAL
PRIOR TO START OF WORK
T.A.B. NOTES
1. BALANCE AIRFLOW TO AIRFLOW INDICATED ON PLANS. AIRFLOWS INDICATED
ON PLANS ARE FROM NEW EQUIPMENT. NOTIFY ENGINEER IF ACTUAL
AIRFLOW DIFFERS MORE THEN 10% FROM INDICATED.
INSTALL VFD SERVING HEAT PUMP LOOP PUMPS ON EXISTING WALL IN
PLACE OF REMOVED DISCONNECTS. MAINTAIN ALL MANUFACTURER'S
RECOMMENDED ACCESS REQUIREMENTS.
INSTALL HEAT PUMP LOOP PUMPS (P-1,P-2) ON EXISTING EQUIPMENT
PAD. MAINTAIN ALL MANUFACTURER'S RECOMMENDED ACCESS
REQUIREMENTS.
PROVIDE NEW THERMOSTAT THAT IS COMPATIBLE WITH NEW
BUILDING MANAGEMENT SYSTEM.
6 EXISTING 36x28 SA MAIN OPEN TO SUPPLY AIR TUNNEL TO REMAIN.
7 EXISTING 26x24 RA DUCT OPEN TO MECHANICAL ROOM TO REMAIN.
8 ROUTE BOILER FLUE AND COMBUSTION AIR PIPING UP THROUGH
EXISTING STACK. SEE PIPING SCHEMATIC 1/M3.2 FOR ROUTING. SIZE
PER MANUFACTURER RECOMMENDATIONS.
9 NO EXISTING DUCTWORK ROUTED IN SUPPLY AIR TUNNEL.
10 NO EXISTING DUCTWORK ROUTED IN RETURN AIR TUNNEL.
11 DUCTWORK UP TO DIFFUSERS SERVING FLOOR ABOVE.
12 SEE ELECTRICAL PLANS FOR LOCATION OF BOILER SHUT DOWN.
13 CARBON MONOXIDE DETECTOR CONNECTED TO BOILER AND FIRE
ALARM.
14 BOILER EMERGENCY SHUTOFF. SEE ELECTRICAL PLANS FOR MORE
INFORMATION.
HP-10A
HP-10C
HP-10E
HP-10B
HP-10D
30x20 EA (E) UP
P-1
NEW CONTROL PANEL
P-2
VFD-P-2VFD-P-1
(TYP)
(TYP)
AS-1
ET-1
GT-1
RF (E)
36x28 SA (E)
30x20 EA (E) UP
14x12 SA (E)
(TYP 5)
36x24 OA (E)
36x24 RA (E)
M
M
MOTORIZED DAMPER (E)
MOTORIZED DAMPER (E)
N/E(TYP 5)
2(TYP 5)
96x24 OA LOUVER (E)
M MOTORIZED DAMPER (E)
B-1
STACK (E)
CO13
ACCHP-1
BP-1
DO NOT ROUTE DUCTWORK OR PIPING ABOVE ELECTRICAL PANELS.
MAINTAIN ALL CODE REQUIRED CLEARANCES.
FLAG NOTES
PROVIDE NEW HEAT PUMP IN PLACE OF EXISTING. CONNECT NEW HEAT
PUMP TO EXISTING SA/RA DUCT. TRANSITION DUCTWORK AS
NECESSARY TO MAKE CONNECTION. MODIFY EXISTING DUCTWORK AS
REQUIRED TO ACCOMMODATE NEW HEAT PUMP. FIELD VERIFY SIZE AND
LOCATION OF EXISTING. SEE DETAIL 4, SHEET M3.0.
CONNECT NEW TO EXISTING. FIELD VERIFY EXISTING SIZE AND
LOCATION PRIOR TO NEW WORK.
N/E
B1226 - HVAC PLANS - BASEMENT
1/8" = 1'-0"
M1.0
N do not scale drawings. verify all dimensions and clearances from provide clearances required for operation, maintenance, and codes and verify non-interference with other work. do not fabricate prior at site. lay out and coordinate all work prior to installation to architectural, structural, shop and other appropriate drawings or to verification of clearance for all trades.
permission of morrissey engineering, inc. is prohibited by copyright law.
unauthorized copying, disclosure or construction use without written solely for the limited purpose of construction of this project or archiving.
permission to reproduce all or part of this drawing is hereby granted copyright note:
7/17/2024
B1226 - HVAC PLANS - BASEMENT MECHANICAL ROOM
1/4" = 1'-0"
M1.0
N
FA460025R0002
Attachment 12
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
BY/DATE
AutoCAD SHX Text
DESIGN FIRM
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Facility Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drafter
AutoCAD SHX Text Designer
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Date
AutoCAD SHX Text
COORDINATION
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text Offutt
AutoCAD SHX Text Air Force Base
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
"SIGNING OF THE COVER SHEET
AutoCAD SHX Text
CONSTITUTES COORDINATION OF
AutoCAD SHX Text
ALL DRAWINGS IN THIS PROJECT;
AutoCAD SHX Text
SUBSEQUENT SHEETS NEED NOT
AutoCAD SHX Text
BE SIGNED."
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text
SURVEYING
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text S S I T E S
AutoCAD SHX Text
ARCHITECTURE
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text council bluffs omaha
AutoCAD SHX Text
BASE CIVIL ENGINEER
AutoCAD SHX Text
CHIEF OF ENGINEERING
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
FIRE DEPARTMENT
AutoCAD SHX Text
ENVIRONMENTAL (CEA)
AutoCAD SHX Text
SAFTY
AutoCAD SHX Text
COMMUNICATION
AutoCAD SHX Text
USING AGENCY
AutoCAD SHX Text
CHIEF OF DESIGN
AutoCAD SHX Text
FORCE PROTECTION
AutoCAD SHX Text
REPAIR HVAC, B1226
AutoCAD SHX Text
WJG
AutoCAD SHX Text 7-17-24
AutoCAD SHX Text B1226
AutoCAD SHX Text
AFPC/SERVICES DIRECTORATE
AutoCAD SHX Text
JBSA LACKLAND TEXAS
AutoCAD SHX Text
SGBP-22-0041
AutoCAD SHX Text
AutoCAD SHX Text
OFF-B-6499
AutoCAD SHX Text c
AutoCAD SHX Text
MCK
AutoCAD SHX Text
BDR
AutoCAD SHX Text
MEI JOB #22368
AutoCAD SHX Text E-15922
AutoCAD SHX Text
KASPRZAK
AutoCAD SHX Text
MATTHEW C
AutoCAD SHX Text
M1.0 B1226 - HVAC PLANS - BASEMENT
103D - MEETING
0010 - WEST STAIR
105 - COAT ROOM
109 - KITCHENETTE
131 - MECHANICAL SPACE
107 - OFFICE
101 - LOBBY
117 - CHAPEL
110 - CHAPLAINS OFFICE
111 - CHAPLAINS OFFICE
112 - CHAPLAINS OFFICE
113 - GENERAL OFFICE
101 - NARTHEX
117 - MENS RR
116 - WOMENS RR
114 - STORAGE
115 - JANITOR
101B - WEST SANCTUARY WING 101C - EAST SANCTUARY WING
101A - SANCTUARY
107 - SUNDAY SCHOOL 108 - SUNDAY SCHOOL 110 - USHER OFFERING
111 - MECHANICAL SPACE
114 - SUNDAY SCHOOL 115 - SUNDAY SCHOOL 116 - SUNDAY SCHOOL
103B - ANNEX SOUTH
HP-5
HP-6 HP-4
HP-1
HP-2HP-3
HP-20 HP-11HP-14
HP-15
HP-16
HP-17
HP-18
HP-9
D (E)
340 CFM
D (E)
(TYP 3)
D (E)
12" D-1
D (E)
D (E)
510 CFM
D (E)
D (E)
16x12 SA (E) AND 16x12 RA (E) UP
30x10 SA (E) AND 30x10 RA (E) UP
HP-19
HP-7 HP-8
2 (TYP)
(TYP) N/E
2(TYP)
(TYP)N/E
3 (TYP)
(TYP)N/E
(TYP)N/E
3 (TYP)
3 (TYP)N/E
3(TYP)
(TYP) N/E
T
T T
T
T
T
T
T
HP-9
HP-5
HP-4
HP-2
T HP-1
HP-18 & HP-19
HP-10A,10B,10C,10D,10E
HP-7 HP-8
THP-17
THP-16
THP-15
THP-14
T
HP-11 & HP-20
4 (TYP)
4(TYP)
4 (TYP)
4 (TYP)
4 (TYP)
4 (TYP)
4(TYP)
EA (E) UP/DN
G (E)
425 CFM
G (E)
4 (TYP)
(TYP 5)
150 CFM
D (E)
700 CFM
D (E)
525 CFM
D (E)
D (E)
450 CFM
(TYP 6)
D (E)
650 CFM
(TYP 6)
D (E)
650 CFM
(TYP 2)
650 CFM
D (E)
450 CFM
D (E)
475 CFM
(TYP 4)
(TYP 3)
D (E)
340 CFM
(TYP 2) (TYP)1
BALCONY ABOVE
M1.1
300 CFM
D (E)
150 CFM
500 CFM
D (E)
(TYP 2)
525 CFM
600 CFM
12Ø SA
600 CFM
220 CFM
D (E)
220 CFM
D (E)
145 CFM
D (E)
400 CFM
D (E)
200 CFM
D (E)
220 CFM
D (E)
220 CFM
D (E)
375 CFM
(TYP 3)
500 CFM
G (E)
(TYP 2)
525 CFM
G (E)
(TYP 3)
150 CFM
(TYP 4)
G (E)
300 CFM
(TYP 4)
ACCH-1
201 - BALCONY
HP-12 HP-13
2 (TYP)
(TYP)N/E
T T
HP-12 HP-13
4 (TYP)
7. ALL WORK SHALL CONFORM TO BUILDING STANDARDS. COORDINATE ALL
WORK WITH GOVERNMENT REPRESENTATIVE.
8. PLAN WORK TO MINIMIZE SHUT DOWNS. COORDINATE ALL REQUIRED
SHUT-DOWNS WITH GOVERNMENT REPRESENTATIVE.
9. MAINTAIN ALL CODE AND MANUFACTURER'S RECOMMENDED CLEARANCES
AROUND ALL MECHANICAL EQUIPMENT TO ALLOW PROPER OPERATION AND
EASY MAINTENANCE AND FILTER ACCESS.
10. REPAIR INSULATION DAMAGED DURING DEMOLITION PHASE AND
INSTALLATION OF NEW EQUIPMENT TO MATCH EXISTING CONDITIONS.
11. CONTRACTOR TO DOCUMENT ALL EXISTING DAMAGE PRIOR TO START OF
WORK. ALL DAMAGE AT END OF PROJECT NOT DOCUMENTED BY
CONTRACTOR WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO FIX.
TEMPERATURE CONTROL NOTES
1. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF
CONTROLS WITH EQUIPMENT SUPPLIERS AND TEMPERATURE CONTROL
CONTRACTOR.
2. SCOPE OF WORK INCLUDES NEW TEMPERATURE SENSORS, HEAT PUMP
CONTROLLERS, BUILDING MANAGEMENT SYSTEM. PROVIDE NEW WIRING,
RELAYS, SENSORS, ETC FOR COMPLETE SYSTEM OPERATION.
3. PROVIDE COMPLETE PROGRAMMING AND CREATION OF SYSTEM GRAPHICS.
4. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
5. CONTROL CONTRACTOR SHALL SUBMIT A COPY OF THE CONTROLS SYSTEM
ARCHITECTURE SHOWING THE SYSTEMS CONTROL RISER FOR APPROVAL
PRIOR TO START OF WORK
T.A.B. NOTES
1. BALANCE AIRFLOW TO AIRFLOW INDICATED ON PLANS. AIRFLOWS INDICATED
ON PLANS ARE FROM NEW EQUIPMENT. NOTIFY ENGINEER IF ACTUAL
AIRFLOW DIFFERS MORE THEN 10% FROM INDICATED.
DO NOT ROUTE DUCTWORK OR PIPING ABOVE ELECTRICAL PANELS.
MAINTAIN ALL CODE REQUIRED CLEARANCES.
3 PROVIDE NEW CONSOLE HEAT PUMP IN THE SAME LOCATION AS
REMOVED HEAT PUMP.
FLAG NOTES
PROVIDE NEW HEAT PUMP IN PLACE OF EXISTING. CONNECT NEW HEAT
PUMP TO EXISTING SA/RA DUCT. TRANSITION DUCTWORK AS
NECESSARY TO MAKE CONNECTION. MODIFY EXISTING DUCTWORK AS
REQUIRED TO ACCOMMODATE NEW HEAT PUMP. FIELD VERIFY SIZE AND
LOCATION OF EXISTING. SEE DETAIL 4, SHEET M3.0.
CONNECT NEW TO EXISTING. FIELD VERIFY EXISTING SIZE AND
LOCATION PRIOR TO NEW WORK.
N/E
4 PROVIDE NEW THERMOSTAT THAT IS COMPATIBLE WITH NEW BUILDING
MANAGEMENT SYSTEM.
5 COORDINATE THE INSTALLATION OF NEW CONSOLE HEAT PUMP WITH
WOOD PANEL ENCLOSURE.
6 PROPOSED LOCATION OF WHOLE BUILDING HVAC EMERGENCY
SHUTDOWN.
7 SEE PIPING PIPING SCHEMATIC ON SHEET M3.1 FOR CHILLER PIPING
AND PIPING SPECIALTIES.
8 SEE DETAIL 6/M3.0 FOR CHILLER EQUIPMENT PAD DETAIL.
GENERAL NOTES
1. DO NOT ROUTE DUCTWORK, PIPING OR LOCATE EQUIPMENT ABOVE
ELECTRICAL PANELS. MAINTAIN ALL CODE REQUIRED CLEARANCES.
2. MECHANICAL ITEMS SHOWN LIGHT AND / OR INDICATED WITH (E) ARE
EXISTING. ALL ITEMS SHOWN DARK ARE NEW.
3. EXISTING DRAWINGS ARE BASED ON APPROXIMATIONS FROM FIELD
OBSERVATIONS AND EXISTING DRAWINGS (FURNISHED BY OTHERS).
DRAWINGS ARE SCHEMATIC IN NATURE. FIELD VERIFY EXACT LOCATION OF
ALL EXISTING EQUIPMENT, DUCTWORK AND PIPING. EQUIPMENT, DUCTWORK
AND PIPING DISCOVERED ON SITE TO BE REMOVED BUT NOT INDICATED ON
PLANS TO BE IDENTIFIED BY CONTRACTOR AND REMOVED AS DIRECTED BY
ENGINEER.
4. SPACE IS LIMITED. COORDINATE DUCT ROUTING WITH STRUCTURE AND ALL
OTHER TRADES. OFFSET AND EXTEND DUCTWORK AS REQUIRED TO AVOID
CONFLICTS.
5. SEE DUCT FITTING DETAIL 2 ON SHEET M3.0.
6. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO NEW
WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING DUCTWORK
AND PIPING AS NECESSARY TO AVOID CONFLICTS WITH EXISTING STRUCTURE
AND WITH ALL TRADES OF NEW WORK.
B1226 - HVAC PLANS - FIRST FLOOR
1/8" = 1'-0"
M1.1
N
B1226 - HVAC PLANS - BALCONY
1/8" = 1'-0"
M1.1
N do not scale drawings. verify all dimensions and clearances from provide clearances required for operation, maintenance, and codes and verify non-interference with other work. do not fabricate prior at site. lay out and coordinate all work prior to installation to architectural, structural, shop and other appropriate drawings or to verification of clearance for all trades.
permission of morrissey engineering, inc. is prohibited by copyright law.
unauthorized copying, disclosure or construction use without written solely for the limited purpose of construction of this project or archiving.
permission to reproduce all or part of this drawing is hereby granted copyright note:
7/17/2024
FA460025R0002
Attachment 12
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
STEP DOWN
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
BY/DATE
AutoCAD SHX Text
DESIGN FIRM
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Facility Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drafter
AutoCAD SHX Text Designer
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Date
AutoCAD SHX Text
COORDINATION
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
SIGNATURE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text Offutt
AutoCAD SHX Text Air Force Base
AutoCAD SHX Text D
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
"SIGNING OF THE COVER SHEET
AutoCAD SHX Text
CONSTITUTES COORDINATION OF
AutoCAD SHX Text
ALL DRAWINGS IN THIS PROJECT;
AutoCAD SHX Text
SUBSEQUENT SHEETS NEED NOT
AutoCAD SHX Text
BE SIGNED."
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text
SURVEYING
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text S S I T E S
AutoCAD SHX Text
ARCHITECTURE
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text council bluffs omaha
AutoCAD SHX Text
BASE CIVIL ENGINEER
AutoCAD SHX Text
CHIEF OF ENGINEERING
AutoCAD SHX Text
PROJECT MANAGER
AutoCAD SHX Text
FIRE DEPARTMENT
AutoCAD SHX Text
ENVIRONMENTAL (CEA)
AutoCAD SHX Text
SAFTY
AutoCAD SHX Text
COMMUNICATION
AutoCAD SHX Text
USING AGENCY
AutoCAD SHX Text
CHIEF OF DESIGN
AutoCAD SHX Text
FORCE PROTECTION
AutoCAD SHX Text
REPAIR HVAC, B1226
AutoCAD SHX Text
WJG
AutoCAD SHX Text 7-17-24
AutoCAD SHX Text B1226
AutoCAD SHX Text
AFPC/SERVICES DIRECTORATE
AutoCAD SHX Text
JBSA LACKLAND TEXAS
AutoCAD SHX Text
SGBP-22-0041
AutoCAD SHX Text
AutoCAD SHX Text
OFF-B-6499
AutoCAD SHX Text c
AutoCAD SHX Text
MCK
AutoCAD SHX Text
BDR
AutoCAD SHX Text
MEI JOB #22368
AutoCAD SHX Text E-15922
AutoCAD SHX Text
KASPRZAK
AutoCAD SHX Text
MATTHEW C
AutoCAD SHX Text
M1.1 B1226 - HAVC PLANS - FIRST FLOOR AND BALCONY
002 - RR
003 - CLOSET
004 - KITCHEN
HP
LP
-1
NEW CONTROL
PANEL
HP
LP
-2
VFD-HPLP-2
VFD-HPLP-1
1(TYP)
2 (TYP)4
N/E
3" HPLS (E) AND 3" HPLR (E) UP
3" HPLS (E)
3" HPLS (E) & 3"
HPLR (E) UP
RF (E)
3" HPLR (E)
HPLS…
This is the start of the file's text. The full file is on GovTribe.