This is an AF Form 66 Schedule of Material Submittals document for a construction project at Offutt AFB, Nebraska. The form details 52 required submittals that the contractor must provide throughout the project lifecycle, including their timing and approval requirements.

Key submittals include: contractor daily logs, material delivery receipts, traffic control plan, security documentation, confined space permits, digging permits, project schedules, commissioning plans, O&M manuals, warranty information, shop drawings, as-built drawings, and various environmental compliance documents (SWPPP, SPCC, hazardous materials plans, waste management documentation). Many items require Civil Engineering Inspector (CEI) approval, particularly those related to environmental and hazardous materials. Critical timing requirements include several items due within 10 days of Notice to Proceed (NTP), while others are required 30-90 days before/after Beneficial Occupancy (BO) or prior to specific construction activities. The form provides columns for tracking submittal status, approval dates, and contractor resubmittals.

View the file

Other files for this federal contract opportunity

Other files attached to Offutt AFB Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Sol Amendment FA460025R00020004.pdf PDF
MACC QnA_11Apr25_F.xlsx XLSX spreadsheet
Attachment 5_Offutt AFB MACC SOW_r1.pdf PDF
Attachment 17_230700_THERMAL INSULATION FOR MECHANICAL SYSTEMS 2025-04-03.pdf PDF
Amendment FA460025R00020003.pdf PDF
Sol Amendment 25R00020002.pdf PDF
MACC Site Visit_18March2025.pdf PDF
Amendment FA460025R00020001.pdf PDF
MACC Site Visit_06March2025.pdf PDF
Solicitation - FA460025R0002.pdf PDF
Attachment 4_Env Spec Conditions_Division 1_01 57 19_Nov24.pdf PDF
Attachment 10_21-0048 Repair Water Line Specifications.pdf PDF
Attachment 11_SOW_B1226 HVAC Renovation.pdf PDF
Attachment 13_SGBP 22-0041 Repair HVAC B1226 Specifications.pdf PDF
AF3052_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
Attachment 2_Division 1 - 01 33 00 Section 1B_Jan21.pdf PDF
Attachment 14_SGBP 22-0041 Repair HVAC B1226_Cut Sheets.pdf PDF
Attachment 1_Division 0 - 00 10 00 Section 1A_Mar22.pdf PDF
Attachment 5_Offutt AFB MACC SOW.pdf PDF
Attachment 7_21-0048 Project Diagram.pdf PDF
Attachment 8_21-0048 Repair Water Line Design Analysis.pdf PDF
Attachment 12_SGBP 22-0041 Repair HVAC B1226 Drawings.pdf PDF
Attachment 15_SGBP 22-0041 Repair HVAC B1226_Design Analysis.pdf PDF
Attachment 16_WD_NE20250059.pdf PDF
MACC_55 SFS Contractor Vendor NCIC Screening Pass Request.pdf PDF
Attachment 6_SOW_21-0048 Repair Water Line_F627.pdf PDF
Attachment 9_21-0048 Repair Water Line Drawings.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 33 01-5

PROJECT NO.

SGBP

APPROVED DISAPPROVED

1 Contractor Daily Logs. Sec 00 10 00 Para 1.8

2 Material Delivery Receipt. Sec 00 10 00 Para 1.11 CEI Approval Required

3 Traffic Control Plan. Sec 00 10 00 Para 1.12c

4 Security - Listing of Employees. Sec 00 10 00 Para 1.23a Prior to start of any work

5 Security - Training. Sec 00 10 00 Para 1.23b Prior to start of any work

6 Confined Space Permit. Sec 00 10 00 Para 1.24c6 Prior to Confined Space work

7 Air Space Coordniation. Sec 00 10 00 Para 1.25 As Required

8 Digging Permit. Sec 00 10 00 Para 1.27a Prior to any Earthwork

9 Contractor Single Point of Contact. Sec 00 10 00 Para 1.37c Within 10 days of

NTP

10 AF Form 3064. Sec 00 10 00 Para 1.39 Within 10 days of NTP Must submit with #5

11 AF Form 3065. Sec 00 10 00 Para 1.39

12 MS Project Gant Schedule. Sec 00 10 00 Para 1.39 Within 10 days of NTP Must submit with #4

13 CD of all Submittals. Sec 00 10 00 Para 1.39 NLT + 30 days

BO

14 Project Commissioning Plan. Sec 00 10 00 Para 1.40 Within 30 days of

NTP

15 Termite Treatment Reporting. Sec 00 10 00 Para 1.42 As Required

16 O & M Manuals. Sec 00 10 00 Para 1.44 3 NLT + 30 days

BO

17 Warranty Book. Sec 00 10 00 Para 1.45 3 NLT + 30 days

BO

18 Extra Stock. Sec 00 10 00 Para 1.46 1 At Final

Inspection

19 Shop Drawings. Sec 01 33 00 Para 1.1

20 Color Sample/Selections. Sec 01 33 00 Para 1.1

21 Close-out cd of all project submittals. Sec 01 33 00 Para 1.4D2n 1 NLT + 90 days

22 As-Constucted Drawings Sec 01 33 00 Para 1.5 1 NLT + 90 days

23 Record Shop Drawings. Sec 01 33 00 Para 1.6

24 Draft DD Form 1354. Sec 01 33 00 Para 1.7 1 -30 days of BO

25 Interim DD Form 1354. Sec 01 33 00 Para 1.7 1 Beneficial

Occupancy (BO) Hardcopy provided at Beneficial Occupancy

26 Final DD Form 1354. Sec 01 33 00 Para 1.7 1 NLT + 30 days

BO

27 Corrective Plan for Lead Based Paint /Asbetos. Sec 01 33 00 Para 1.9

28 Personal Geodatabase. Sec 01 33 00 Para 1.10 NLT + 90 days

BO

29 Safety Data Sheets. Sec 01 57 19 Para 1.2.3 CEI Approval Required

30 Hazardous Material Storage Plan. Sec 01 57 19 Para 1.2.4 CEI Approval Required

31 Spill Reporting. Sec 01 57 19 Para 1.2.5 CEI Approval Required

32 Contractor HAZMAT Request. Sec 01 57 19 Para 1.4 CEI Approval Required

33 Certificate of Hazardous Waste Training. Sec 01 57 19 Para

1.5.1 CEI Approval Required

SOLICITATION/CONTRACT NO.PROJECT TITLE

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NAME,

BUILDING ###

OFFUTT AFB, NEBRASKA

DATE CONTRACTOR NOTIFIED REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R

AT

IN

G

ST

R

U C

TI

O

N

S DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSE

DATE

SH

O

P D

R

AW

IN

G

S

BEFORE CONSTR AFTER CONSTR

M

AN

U

FA

C

TU

R

ER

'S

W

AR

R

AN

TY

C

LO

SE

O

U

T FOLLOW-UPREQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACT

ING

O

TH

ER

M

AT

ER

IA

L

O R

D

AT

A

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

EC

O M

M

EN

D

AT

IO

N

S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

SA

M

PL

ES

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

AN

C

LO

SE

O U

T

Prior to start of any work

1270747449C Highlight

1270747449C Highlight

01 33 01-6

SGBP

APPROVED DISAPPROVED

SOLICITATION/CONTRACT NO.PROJECT TITLE

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NAME,

BUILDING ###

OFFUTT AFB, NEBRASKA

DATE CONTRACTOR NOTIFIED REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R

AT

R

U C

TI

O

N

S DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSE

DATE

SH

O

P D

R

AW

IN

G

S

BEFORE CONSTR AFTER CONSTR

M

AN

U

FA

C

TU

R

R

AN

TY

C

LO

SE

O

U

T FOLLOW-UPREQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACT

ING

O

TH

ER

M

AT

ER

IA

L

A

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

O M

M

EN

D

AT

IO

N

S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

SA

M

PL

ES

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SE

O U

T

34 Waste Analysis Reports. Sec 01 57 19 Para 1.5.4

35 Request for Disposal. Sec 01 57 19 Para 1.5.4 CEI Approval Required

36 Test Results. Sec 01 57 19 Para 1.5.4 CEI Approval Required

37 SPCC Plan. Sec 01 57 19 Para 1.6.2

38 Petroleum Container Storage Plan. Sec 01 57 19 Para 1.6.2 CEI Approval Required

39 Report of Waste Water Discharges. Sec 01 57 19 Para 1.7 CEI Approval Required

40 NPDES Weekly Inspection Reports. Sec 01 57 19 Para 1.8

41 NPDES CSW-NOI and SWPPP. Sec 01 57 019 Para 1.8.1 CEI Approval Required

42 NPDES CSW Permit. Sec 01 57 19 Para 1.8.1 CEI Approval Required

43 NPDES CSW Reports. Sec 01 57 19 Para 1.7.3 Sediment and Contamination Control Plan Sec 01 57 19 Para 1.8.4 CEI Approval Required

44 SWPPP. Sec 01 57 19 Para 1.7.4 CEI Approval Required

45 NPDES / SWPPP Termination Letter. Sec 01 57 19 Para 1.8.5 CEI Approval Required

46 NPDES NOI Dewatering. Sec 01 57 19 Para 1.9 CEI Approval Required

47 NPDES Dewatering Permit. Sec 01 57 19 Para 1.9 CEI Approval Required

48 NPDES Permit Requirements. Sec 01 57 19 Para 1.9 CEI Approval Required

49 NPDES Dewatering Permit Disposal Method. Sec 01 57 19 Para

1.9 CEI Approval Required

50 Nonhazardous Solid Waste Diversion. Sec 01 57 19 Para 1.11 CEI Approval Required

51 Environmental Management System. Sec 01 57 19 Para 1.15 Within 10 days of

NTP

52 Record of Designated Equipment and Materials Data Sec 01 33 00 Para 1.11

1 Beneficial Occupancy (BO)

LEGEND:

A - Include with line 10 Operations and Maintenance Manual

NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.

01 33 01-7

SGBP

APPROVED DISAPPROVED

SOLICITATION/CONTRACT NO.PROJECT TITLE

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NAME,

BUILDING ###

OFFUTT AFB, NEBRASKA

DATE CONTRACTOR NOTIFIED REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R

AT

R

U C

TI

O

N

S DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSE

DATE

SH

O

P D

R

AW

IN

G

S

BEFORE CONSTR AFTER CONSTR

M

AN

U

FA

C

TU

R

R

AN

TY

C

LO

SE

O

U

T FOLLOW-UPREQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACT

ING

O

TH

ER

M

AT

ER

IA

L

A

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

O M

M

EN

D

AT

IO

N

S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

SA

M

PL

ES

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SE

O U

T

C - Include with line 15 Color Samples B - Include with line 11 Warranty Book

Sheet1

File details come from the government source that posted it. Updated .