About this file
This is an AF Form 66 Schedule of Material Submittals document for a construction project at Offutt AFB, Nebraska. The form details 52 required submittals that the contractor must provide throughout the project lifecycle, including their timing and approval requirements.
Key submittals include: contractor daily logs, material delivery receipts, traffic control plan, security documentation, confined space permits, digging permits, project schedules, commissioning plans, O&M manuals, warranty information, shop drawings, as-built drawings, and various environmental compliance documents (SWPPP, SPCC, hazardous materials plans, waste management documentation). Many items require Civil Engineering Inspector (CEI) approval, particularly those related to environmental and hazardous materials. Critical timing requirements include several items due within 10 days of Notice to Proceed (NTP), while others are required 30-90 days before/after Beneficial Occupancy (BO) or prior to specific construction activities. The form provides columns for tracking submittal status, approval dates, and contractor resubmittals.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01 33 01-5
PROJECT NO.
SGBP
APPROVED DISAPPROVED
1 Contractor Daily Logs. Sec 00 10 00 Para 1.8
2 Material Delivery Receipt. Sec 00 10 00 Para 1.11 CEI Approval Required
3 Traffic Control Plan. Sec 00 10 00 Para 1.12c
4 Security - Listing of Employees. Sec 00 10 00 Para 1.23a Prior to start of any work
5 Security - Training. Sec 00 10 00 Para 1.23b Prior to start of any work
6 Confined Space Permit. Sec 00 10 00 Para 1.24c6 Prior to Confined Space work
7 Air Space Coordniation. Sec 00 10 00 Para 1.25 As Required
8 Digging Permit. Sec 00 10 00 Para 1.27a Prior to any Earthwork
9 Contractor Single Point of Contact. Sec 00 10 00 Para 1.37c Within 10 days of
NTP
10 AF Form 3064. Sec 00 10 00 Para 1.39 Within 10 days of NTP Must submit with #5
11 AF Form 3065. Sec 00 10 00 Para 1.39
12 MS Project Gant Schedule. Sec 00 10 00 Para 1.39 Within 10 days of NTP Must submit with #4
13 CD of all Submittals. Sec 00 10 00 Para 1.39 NLT + 30 days
BO
14 Project Commissioning Plan. Sec 00 10 00 Para 1.40 Within 30 days of
NTP
15 Termite Treatment Reporting. Sec 00 10 00 Para 1.42 As Required
16 O & M Manuals. Sec 00 10 00 Para 1.44 3 NLT + 30 days
BO
17 Warranty Book. Sec 00 10 00 Para 1.45 3 NLT + 30 days
BO
18 Extra Stock. Sec 00 10 00 Para 1.46 1 At Final
Inspection
19 Shop Drawings. Sec 01 33 00 Para 1.1
20 Color Sample/Selections. Sec 01 33 00 Para 1.1
21 Close-out cd of all project submittals. Sec 01 33 00 Para 1.4D2n 1 NLT + 90 days
22 As-Constucted Drawings Sec 01 33 00 Para 1.5 1 NLT + 90 days
23 Record Shop Drawings. Sec 01 33 00 Para 1.6
24 Draft DD Form 1354. Sec 01 33 00 Para 1.7 1 -30 days of BO
25 Interim DD Form 1354. Sec 01 33 00 Para 1.7 1 Beneficial
Occupancy (BO) Hardcopy provided at Beneficial Occupancy
26 Final DD Form 1354. Sec 01 33 00 Para 1.7 1 NLT + 30 days
BO
27 Corrective Plan for Lead Based Paint /Asbetos. Sec 01 33 00 Para 1.9
28 Personal Geodatabase. Sec 01 33 00 Para 1.10 NLT + 90 days
BO
29 Safety Data Sheets. Sec 01 57 19 Para 1.2.3 CEI Approval Required
30 Hazardous Material Storage Plan. Sec 01 57 19 Para 1.2.4 CEI Approval Required
31 Spill Reporting. Sec 01 57 19 Para 1.2.5 CEI Approval Required
32 Contractor HAZMAT Request. Sec 01 57 19 Para 1.4 CEI Approval Required
33 Certificate of Hazardous Waste Training. Sec 01 57 19 Para
1.5.1 CEI Approval Required
SOLICITATION/CONTRACT NO.PROJECT TITLE
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
PROJECT NAME,
BUILDING ###
OFFUTT AFB, NEBRASKA
DATE CONTRACTOR NOTIFIED REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
O
PE
R
AT
IN
G
ST
R
U C
TI
O
N
S DATE
TO
CIVIL
ENGR.
RETURN
SUSPENSE
DATE
SH
O
P D
R
AW
IN
G
S
BEFORE CONSTR AFTER CONSTR
M
AN
U
FA
C
TU
R
ER
'S
W
AR
R
AN
TY
C
LO
SE
O
U
T FOLLOW-UPREQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACT
ING
O
TH
ER
M
AT
ER
IA
L
O R
D
AT
A
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
EC
O M
M
EN
D
AT
IO
N
S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
SA
M
PL
ES
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
C
LO
SE
O U
T
Prior to start of any work
1270747449C Highlight
1270747449C Highlight
01 33 01-6
SGBP
APPROVED DISAPPROVED
SOLICITATION/CONTRACT NO.PROJECT TITLE
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
PROJECT NAME,
BUILDING ###
OFFUTT AFB, NEBRASKA
DATE CONTRACTOR NOTIFIED REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
O
PE
R
AT
R
U C
TI
O
N
S DATE
TO
CIVIL
ENGR.
RETURN
SUSPENSE
DATE
SH
O
P D
R
AW
IN
G
S
BEFORE CONSTR AFTER CONSTR
M
AN
U
FA
C
TU
R
R
AN
TY
C
LO
SE
O
U
T FOLLOW-UPREQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACT
ING
O
TH
ER
M
AT
ER
IA
L
A
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
O M
M
EN
D
AT
IO
N
S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
SA
M
PL
ES
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
SE
O U
T
34 Waste Analysis Reports. Sec 01 57 19 Para 1.5.4
35 Request for Disposal. Sec 01 57 19 Para 1.5.4 CEI Approval Required
36 Test Results. Sec 01 57 19 Para 1.5.4 CEI Approval Required
37 SPCC Plan. Sec 01 57 19 Para 1.6.2
38 Petroleum Container Storage Plan. Sec 01 57 19 Para 1.6.2 CEI Approval Required
39 Report of Waste Water Discharges. Sec 01 57 19 Para 1.7 CEI Approval Required
40 NPDES Weekly Inspection Reports. Sec 01 57 19 Para 1.8
41 NPDES CSW-NOI and SWPPP. Sec 01 57 019 Para 1.8.1 CEI Approval Required
42 NPDES CSW Permit. Sec 01 57 19 Para 1.8.1 CEI Approval Required
43 NPDES CSW Reports. Sec 01 57 19 Para 1.7.3 Sediment and Contamination Control Plan Sec 01 57 19 Para 1.8.4 CEI Approval Required
44 SWPPP. Sec 01 57 19 Para 1.7.4 CEI Approval Required
45 NPDES / SWPPP Termination Letter. Sec 01 57 19 Para 1.8.5 CEI Approval Required
46 NPDES NOI Dewatering. Sec 01 57 19 Para 1.9 CEI Approval Required
47 NPDES Dewatering Permit. Sec 01 57 19 Para 1.9 CEI Approval Required
48 NPDES Permit Requirements. Sec 01 57 19 Para 1.9 CEI Approval Required
49 NPDES Dewatering Permit Disposal Method. Sec 01 57 19 Para
1.9 CEI Approval Required
50 Nonhazardous Solid Waste Diversion. Sec 01 57 19 Para 1.11 CEI Approval Required
51 Environmental Management System. Sec 01 57 19 Para 1.15 Within 10 days of
NTP
52 Record of Designated Equipment and Materials Data Sec 01 33 00 Para 1.11
1 Beneficial Occupancy (BO)
LEGEND:
A - Include with line 10 Operations and Maintenance Manual
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.
01 33 01-7
SGBP
APPROVED DISAPPROVED
SOLICITATION/CONTRACT NO.PROJECT TITLE
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
PROJECT NAME,
BUILDING ###
OFFUTT AFB, NEBRASKA
DATE CONTRACTOR NOTIFIED REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
O
PE
R
AT
R
U C
TI
O
N
S DATE
TO
CIVIL
ENGR.
RETURN
SUSPENSE
DATE
SH
O
P D
R
AW
IN
G
S
BEFORE CONSTR AFTER CONSTR
M
AN
U
FA
C
TU
R
R
AN
TY
C
LO
SE
O
U
T FOLLOW-UPREQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACT
ING
O
TH
ER
M
AT
ER
IA
L
A
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
O M
M
EN
D
AT
IO
N
S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
SA
M
PL
ES
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
SE
O U
T
C - Include with line 15 Color Samples B - Include with line 11 Warranty Book
Sheet1
File details come from the government source that posted it. Updated .