Attachment 7 L-3 PPQ Cover Letter.pdf

PDF 763 KB Posted

Attached to
Facility Exhaust System
Solicitation number
FA910125RB001
Issued by

About this file

This document is a memorandum requesting Past Performance Questionnaire (PPQ) evaluators to provide source selection information for the Facility Exhaust System solicitation (FA9101-25-R-B001) at Arnold Engineering Development Complex (AEDC), Arnold Air Force Base, Tennessee. The solicitation seeks a contractor for designing, procuring, and installing an exhaust vacuum system for arc heaters used in high-temperature materials testing.

The memorandum requests recipients to complete the attached PPQ and submit their written response via email by 16 May 2025. The PPQ is considered source selection information and will become part of the official source selection records. The document emphasizes the importance of first-hand performance information in evaluating the offeror's ability to perform on the proposed effort, with the completed questionnaire to be sent directly to the Government to assist in the acquisition process.

View the file

Other files

File Type Posted
Attachment 2e - AEDC Design Review Flow and Expectations.pdf PDF
Attachment 4 Section L_Amend2.pdf PDF
Attachment 1 - Statement of Objectives_Amend2.pdf PDF
Attachment 14 Section M_Amend2.pdf PDF
Solicitation Amendment FA910125RB0010002 SF 30.pdf PDF
Attachment 2 - Technical Requirements Document_Amend2.pdf PDF
Attachment 12 L-8 - Requirements Matrix_Amend2.pdf PDF
Solicitation Amendment FA910125RB0010001 SF 30.pdf PDF
FA910125RB001 Facility Exhaust System QandA 20May25.pdf PDF
Raw Water Analysis Report 7-13-12.pdf PDF
Solicitation - FA910125RB001.pdf PDF
Attachment 2a - Exhaust Boundary Utility Interface.pdf PDF
Facility Exhaust System RFP Cover Letter.pdf PDF
Attachment 1 - Statement of Objectives.pdf PDF
Attachment 2 - Technical Requirements Document.pdf PDF
Attachment 2d - Design Submittal Requirements.pdf PDF
Attachment 3 - DD1423 CDRL Template.pdf PDF
Attachment 4 Section L.pdf PDF
Attachment 6 L-2 Past and Present Performance Questionnaire.pdf PDF
Attachment 9 L-5 Subcontractor Consent Letter.pdf PDF
Attachment 13 L-9 SB Participation Commitment Document.pdf PDF
Attachment 2b - Reference Drawings.pdf PDF
Attachment 2c - SHE and Eng Standards.pdf PDF
Attachment 10 L-6 Relevancy Matrix.xlsx XLSX spreadsheet
Attachment 11 L-7 Initial Order Pricing Sheet.xlsx XLSX spreadsheet
Attachment 5 L-1 PPI Tool Instructions.pdf PDF
Attachment 12 L-8 - Requirements Matrix.pdf PDF
Attachment 14 Section M.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEMORANDUM FOR Past Performance Questionnaire Evaluators

FROM: AFTC/PZI (Arnold)

SUBJECT: Request for Source Selection Information, FA9101-25-R-B001 Facility Exhaust System

1. The Arnold Engineering Development Complex (AEDC), Arnold Air Force Base, TN, is in the process of selecting a contractor for the Facility Exhaust System effort.

The Facility Exhaust System effort is for the design, procurement and installation of a system to pull exhaust vacuum to arc heaters used while conducting high temperature materials testing. Detailed information regarding this solicitation may be found at SAM.gov.

2. One of the considerations in proposal evaluation is the verification of the offeror’s past and current performance on contracts, which reflects the offeror's ability to perform on the proposed effort. Information received from agencies which have had first-hand experience with an offeror is crucial to the evaluation of the offeror's performance on those contracts. Our areas of interest in the offeror are summarized in the attached questionnaire.

3. To assist in our evaluation of the offeror’s past and current performance, we respectfully request that you complete the attached Past Performance Questionnaire (PPQ). Due to a constrained schedule, please provide your written response via email to haley.smith.10@us.af.mil by 16 May 2025. This will allow sufficient time to analyze the data prior to the start of potential discussions.

Since the PPQ is considered source selection information when completed, it is important that the completed questionnaire is returned directly to the Government. Your completed questionnaire will become a part of the official source selection records.

4. Your assistance is greatly appreciated, and your prompt response will be important to the successful and timely completion of this acquisition. Please contact me at haley.smith.10@us.af.mil if you have any questions.

HALEY M. K. SMITH, DAF

Procuring Contracting Officer

Attachment

PPQ

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS AIR FORCE TEST CENTER

(AFMC)

Facility Exhaust System

FA9101-25-R-B001

Attachment 7, L-3

2025-04-16T09:37:03-0500
SMITH.HALEY.MICHELLE KAY.1547867463

File details come from the government source that posted it. Updated .