Attachment 14 Section M.pdf
PDF 203 KB Posted
- Attached to
- Facility Exhaust System
- Solicitation number
- FA910125RB001
About this file
This document is Section M (Evaluation Factors for Award) for a federal solicitation (FA9101-25-R-B001) for a Facility Exhaust System at Arnold Air Force Base. The Air Force intends to award a single firm-fixed-price requirements contract with a five-year ordering period. The solicitation will evaluate proposals across four primary factors: Technical (with five subfactors), Past Performance, Price, and Small Business Participation, with Technical being the most important factor. Proposals must demonstrate capability in designing, manufacturing, and integrating a steam boiler, steam ejector exhaust system, associated utilities, civil/structural design, and control systems.
The evaluation will use a color/adjectival rating system ranging from Exceptional (Blue) to Unacceptable (Red), with proposals assessed on technical capabilities, past performance relevance and quality, pricing completeness and reasonableness, and small business participation. Offerors must propose a plan to include at least 10% small business participation. Proposals are due by 2:00 p.m. Central Time on 2 June 2025, with a 90-day validity period. The total contract value is estimated at $90M, with the North American Industry Classification System (NAICS) code 333248 and a business size standard of 750 employees. Proposals will be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE).
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA9101-25-R-B001
Attachment 14
SECTION M
EVALUATION FACTORS FOR AWARD
16 April 2025
Facility Exhaust System
SECTION M
EVALUATION FACTORS FOR AWARD IN PLACE OF FAR 52.212-2
M-1.0 EVALUATION CRITERIA
M-1.1 Basis for Contract Award
This is a competitive best value source selection conducted in accordance with (IAW) Federal
Acquisition Regulation (FAR) Subpart 15.3, Source Selection, as supplemented by the Defense
Federal Acquisition Regulation Supplement (DFARS) Subpart 215.3, and the Department of the
Air Force Federal Acquisition Regulation Supplement (DAFFARS) Part 5315, and Department of Defense (DoD) Source Selection Procedures dated 20 August 2022. To be eligible for award, the Offeror must be deemed responsible IAW FAR Subpart 9.1, as supplemented, conform to the solicitation’s requirements (to include all stated terms, conditions, representations, certifications, and all other information required by Attachment 4, Section L of this solicitation) and is judged, based on the evaluation factors and subfactors, to represent the best value to the Government.
The Government will select for award the most advantageous proposal representing the best value to the Government based upon an integrated assessment of Technical, Past Performance, Price, and Small Business. This may result in an award to a higher rated, higher priced Offeror, where the decision is consistent with the evaluation factors, and the Source Selection Authority
(SSA) reasonably determines that the technical and/or past performance of the higher priced
Offeror outweighs the price difference. The SSA will base the source selection decision on an integrated assessment of proposals against all source selection criteria in the solicitation
(described below). While the Government source selection evaluation team and the SSA will strive for maximum objectivity, the source selection process, by its nature, is subjective; and therefore, professional judgment is implicit throughout the entire process.
M-1.2 Number of Contracts to be Awarded
The Government intends to award one, firm-fixed-price (FFP), Requirements Contract with a five year ordering period for the Facility Exhaust System.
M-1.3 Competitive Advantage from use of Government-Furnished Property (GFP)
The Government will evaluate any competitive advantage resulting from the Offeror’s proposed use of GFP and make adjustment to Initial Order Total Evaluated Price (TEP) IAW FAR 45.2 and
52.245-9.
M-1.4 Correction Potential of Proposals
The Government will consider, throughout the evaluation, the "correction potential" of any deficiency. The judgment of such "correction potential" is within the sole discretion of the
Government. If an aspect of an Offeror's proposal does not meet the Government's requirements and is not considered correctable, the Offeror may be eliminated from the competitive range.
The Government may exclude a proposal from this competition prior to discussions or competitive range determination, if during evaluation, the proposal is found to be grossly deficient. Grossly deficient proposals are proposals that fail to address essential requirements of the solicitation, fail to furnish information demonstrating compliance with mandatory solicitation requirements set forth in the solicitation, or in some other manner do not represent a reasonable initial effort by the Offeror to satisfy the requirements of the solicitation. Further, the
Government may reject any proposal that is incomplete (e.g., missing a volume or other information required by the solicitation).
M-1.5 Discussions
The Government intends to evaluate proposals and award the contract without discussions
(except clarifications may be conducted as described in FAR 15.306(a)). Therefore, the
Offeror’s initial proposal should contain the Offeror’s best terms. The Government reserves the right to conduct discussions if the Procuring Contracting Officer (PCO) later determines them to be necessary. If the PCO determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the
PCO with the approval of the SSA may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
Should the Government need to conduct written exchanges with Offerors, they will be in the form of Evaluation Notices (ENs). Page format and limitations will be placed on responses to
ENs in the event they are issued. The specified page limits for EN responses will be identified in the letters forwarding the ENs to the Offerors. If discussions are required, they may be conducted either orally or in writing. The scope and extent of the discussions are a matter of the
PCO’s judgment as set forth in FAR Subpart 15.306. Offerors may be restricted to a short turnaround (e.g., within 2-10 business days) in responding to the PCO.
M-1.6 Competitive Range
If discussions are conducted, the PCO will establish a competitive range comprised of the most highly rated proposals based on the ratings of each proposal against all evaluation criteria, which will be approved by the SSA. If the PCO determines that an Offeror’s proposal should not be included in the competitive range, whether for purposes of efficiency or otherwise, the proposal will be eliminated from consideration for award. A written notice of the decision will be provided to the unsuccessful Offeror IAW FAR 15.503, whereupon Offerors may request and receive a debriefing IAW FAR Subpart 15.505.
M-1.7 Final Proposal Revisions (FPRs)
FPRs will be requested from those Offerors remaining in the competitive range when discussions have been concluded. If the Offeror’s proposal has been evaluated as acceptable at the time discussions are closed, any changes or exceptions in the FPR are subject to evaluation and may increase the risk that the Offeror’s proposal will be determined unacceptable and, thus, ineligible for award. Any changes to or non-concurrence with contract terms and conditions submitted in the FPR may not be subject to further discussion or negotiation and may render the offer unacceptable to the Government. This provision is not intended to restrict the Offeror’s opportunity to revise its proposal. Rather, it is intended to preclude any misunderstandings by the Government, which could result if new or revised terms and conditions are submitted in the
FPR that have not been fully disclosed, discussed, and understood during discussions. Hence, such new or revised terms and conditions are not solicited and, if submitted in the FPR, may render the offer unacceptable to the Government.
M-1.8 Solicitation Requirements, Terms, and Conditions
Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as factors or subfactors to be eligible for award. Failure to comply with the terms and conditions of the solicitation and instructions contained in Attachment 4, Section L may result in the Offeror being removed from consideration for award; this includes incomplete proposal submission (e.g., missing a volume or other information required by the solicitation). Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale. The Government reserves the right to determine any such exceptions unacceptable and the proposal, therefore, ineligible for award.
M-2.0 EVALUATION FACTORS
M-2.1 Evaluation Factors and Subfactors
M-2.1.1 The following evaluation factors and subfactors will be used to evaluate each proposal.
Award will be made to the Offeror proposing the combination most advantageous to the
Government based upon an integrated assessment of the evaluation factors and subfactors described below.
Factor 1: Technical
Subfactor 1.1: Design and Analysis Capability and Technical Resources
Subfactor 1.2: Manufacturing Capability
Subfactor 1.3: Integration Capability
Subfactor 1.4: Contractor Statement of Work
Subfactor 1.5: Project Schedule – Initial Order
Factor 2: Past Performance
Factor 3: Price
Factor 4: Small Business
M-2.1.2 Relative Importance of Factors and Subfactors
Except for the Small Business factor, the relative importance of each factor and subfactor is as follows: The Technical factor is more important than either the Past Performance factor or Price.
The Past Performance factor is more important than Price. IAW FAR 15.304(e), all evaluation factors other than Price, when combined, are significantly more important than Price. Price will be evaluated for completeness, reasonableness, and total evaluated price (TEP) and will be considered as part of the integrated assessment of best value. Within the Technical factor, all of the subfactors are of equal importance. The Small Business factor will be evaluated on an
“Acceptable/Unacceptable” basis using the ratings at Table M-2.5.1-1, and therefore is not included in the relative order of importance for the factors.
M-2.2 Factor 1: Technical
The Technical Factor will be evaluated to assess the Offeror’s Design and Analysis Capability, Manufacturing Capability, Integration Capability, Contractor Statement of Work and Initial Order
Schedule.
M-2.2.1 Technical Rating
The Government will evaluate proposals for Technical subfactors 1.1, 1.2, 1.3, 1.4 and 1.5 using the ratings described in Table M-2.2.1-1. The ratings described in Table M-2.2.1-1 focus on the significant strengths, strengths, weaknesses, significant weaknesses, excesses, uncertainties, and deficiencies of the Offeror's proposal. In arriving at a best value decision, the Government reserves the right to give positive consideration (i.e., assign a significant strength or strength), for performance in excess of threshold requirements. The Government, in its discretion, may consider various performance concerns when evaluating risk (manifested in the form of weaknesses) associated with the submitted proposals. The risk evaluation considers the potential for disruption of schedule, degradation of performance, and the need for increased Government oversight. Note: risk will not be separately rated.
Each subfactor will receive an independent rating that will not be rolled up into an overall rating.
However, a Technical rating of “Unacceptable” in one or more Technical subfactors will result in a proposal that is unawardable.
Table M-2.2.1-1: Combined Technical / Risk Rating Definitions
Color Rating Adjectival Rating Description
Blue Outstanding Proposal demonstrates an exceptional approach and understanding of the requirements and contains multiple strengths and / or at least one significant strength, and risk of unsuccessful performance is low.
Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength or significant strength, and risk of unsuccessful performance is low to moderate.
M-2.2.1.1 Evaluation Finding Types
Each proposal will be evaluated against the solicitation and its stated evaluation factors and subfactors for award. The Government’s Technical evaluation will focus on compliance with solicitation requirements, including proposal significant strengths, strengths, excesses, uncertainties, weaknesses, significant weaknesses, and deficiencies (as defined in Table M-
2.2.1.1-1).
Table M-2.2.1.1-1: Evaluation Finding Type Definitions
Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and / or risk of unsuccessful performance is high.
Red Unacceptable Proposal does not meet requirements of the solicitation and, thus, contains one or more deficiencies and is unawardable, and / or risk of performance is unacceptably high.
Finding Type Definition
Significant Strength An aspect of the proposal with appreciable merit or exceeds specified performance or capability requirements to the considerable advantage of the Government during contract performance.
Strength An aspect of the proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the
Government during contract performance.
Meets Requirement Proposal indicates an adequate approach and understanding, meeting the minimum requirements.
Excess An aspect of the proposal that has exceeded mandatory minimums whose removal and corresponding price decrease may make an Offeror’s proposal more competitive.
Uncertainty An aspect of the proposal for which the intent of the offer is unclear.
Weakness A flaw in the proposal that increases the risk of unsuccessful contract performance.
Significant
Weakness
A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.
M-2.2.2 Subfactor 1.1: Design and Analysis Capability and Technical Resources
This subfactor evaluates the Offeror’s understanding and capability to design and analyze the
Facility Exhaust System effort identified in Attachment 1, Statement of Objectives (SOO), Attachment 2, Technical Requirements Document (TRD) and the Measures of Merit below.
M-2.2.2.1 Design Capability
Measure of Merit: This element of the subfactor is met when the Offeror demonstrates a comprehensive understanding and the capability to design a steam boiler, steam ejector exhaust system, all associated utilities, all civil/structural design, and control systems per the requirements in the SOO and TRD.
M-2.2.2.2 Analysis Capability a comprehensive understanding and the capability to analyze a steam boiler, steam ejector exhaust system, all associated utilities, all civil/structural design, and control systems per the requirements in the SOO and TRD.
M-2.2.2.3 Technical Resources
Measure of Merit: This element of the subfactor is met when the Offeror provides a list of the types of technical personnel, individual years of experience, and certifications, if applicable, which demonstrates its understanding and capability to design and analyze an exhaust system as described in the SOO and TRD.
M-2.2.3 Subfactor 1.2: Manufacturing Capability an understanding and the capability to fabricate a steam boiler, steam ejector exhaust system, all associated utilities, all civil/structural design, and control systems per the requirements in the
SOO and TRD.
M-2.2.4 Subfactor 1.3: Integration Capability an understanding of and capability to install, integrate and commission/check out a steam boiler, Deficiency A material failure of the proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
steam ejector exhaust system, all associated utilities, all civil/structural design, and control systems per the requirements in the SOO and TRD.
M-2.2.5 Subfactor 1.4: Contractor Statement of Work (CSOW)
Measure of Merit: This element is met when the Offeror proposes a comprehensive
CSOW, including Contract Data Requirements List (CDRL) items, that clearly demonstrates how the Offeror will meet all requirements of the SOO and TRD.
M-2.2.6 Subfactor 1.5: Project Schedule – Initial Order
Measure of Merit: This element of the subfactor is met when the Offeror provides a project schedule for the initial order illustrating a logical sequence of work from kick-off through closeout with a minimum of 14 calendar days included for Government design review between each design phase.
M-2.2.7 Data Assertions
The Government will evaluate the degree to which any of the Offeror's asserted restrictions reflected in its completed Section K representation (DFARS 252.227-7017(d)) will inhibit successful accomplishment of the objectives specified in the SOO and TRD.
M-2.3 Factor 2: Past Performance
The purpose of the past performance evaluation is to allow the Government to assess the
Offeror’s probability of meeting the solicitation requirements based on the Offeror’s demonstrated past performance. Each Offeror will receive a Performance Confidence
Assessment (PCA) at the Past Performance factor level. The PCO shall seek recent and relevant past performance information (PPI) based on (1) the past efforts provided by the Offeror and (2) data independently obtained from other Government and commercial sources.
M-2.3.1 Evaluation Process
The past performance evaluation considers each Offeror’s demonstrated recent and relevant record of performance in supplying services that meet the contract’s requirements. Performance confidence is assessed at the overall Past Performance factor level after evaluating aspects of the
Offeror’s recent past performance, focusing on performance that is relevant to the Technical subfactors and Price factor and taking into consideration their relative order of importance stated in M-2.1.2. The Government may consider past performance in the aggregate in addition to on an individual contract basis. The Government will, as deemed necessary, confirm past and present performance data identified by Offerors in the proposals. In conducting the Past
Performance evaluation, the Government reserves the right to use both the information provided in the Offeror’s Past Performance proposal volume and information obtained from other sources available to the Government to include, but not limited to, the Contractor Performance
Assessment Reporting System (CPARS), Federal Awardee Performance and Integrity
Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program Managers, Contracting Officers, and the Defense Contract
Management Agency (DCMA).
M-2.3.1.1 Recency Assessment
An assessment of the PPI will be made to determine if it is recent. To be recent, the effort must be ongoing for at least one year or must have been performed during the past five years from the date of issuance of this solicitation. PPI that fails this condition will not be evaluated.
M-2.3.1.2 Relevancy Assessment
The Government will conduct an in-depth evaluation of all recent performance information obtained to determine how closely the work performed under those contracts relate to the
Technical subfactors and Price factor. For each recent past performance citation reviewed, the relevance of the work performed will generally be assessed for the Technical subfactors and
Price factor; however, all aspects of performance that relate to this acquisition may be considered. Consideration will be given to efforts which are considered to be of the type and similar in contract scope, magnitude, and complexity when compared to the effort described in this solicitation.
The following past performance relevancy criteria will be used during the evaluation:
Scope: Relevancy in regards to scope includes those Technical subfactors identified in
M-2.2 and the Facility Exhaust System SOO and TRD.
Magnitude: Relevancy in regard to magnitude may be assessed based on, but not limited to, the similarities between a given past performance effort and the Facility Exhaust
System SOO and TRD. Efforts of less than $500K total contract scope will be considered Not Relevant.
Complexity: Relevancy in regard to complexity may be assessed based on, but not limited to, the similarities between a given past performance effort and the tasks / functions referenced in the Facility Exhaust System SOO and TRD in terms of the breadth of disciplines required, contract type, and performance period.
A relevancy rating will be assigned to each reference by evaluating relevancy against the
Technical subfactors and the tasks/functions described in the Facility Exhaust System SOO and
TRD. A relevancy determination of the Offeror's past performance will be made based upon the aforementioned considerations, including JV partner(s) and major subcontractor(s). For purposes of proposals only, a major subcontractor is defined as a subcontractor, other than the Offeror itself, that will perform 10 percent or more of the contract scope based on labor hours or total price. In determining relevancy for individual contracts, consideration will only be given to the effort, or portion of the effort, being proposed by the Offeror, teaming partner, or major subcontractor whose contract is being reviewed and evaluated. The Government will not consider experience of subordinate or affiliated offices of the Offeror, unless the Offeror clearly details the proposed meaningful involvement of the Offeror’s subordinate or affiliated offices in this requirement. Past performance examples from Offerors submitted from previous JVs may not be considered as relevant in terms of scope and complexity as those where the Offeror was wholly responsible for the cited work.
The Government is not bound by the Offeror’s opinion of relevancy. The relevancy matrix and data obtained from other sources (see Attachment L-6) will be used to establish the relevance of present and past efforts. The Government will use the following relevancy definitions when assessing recent, relevant contracts:
Table M-2.3.1.2-1: Past Performance Relevancy Definitions
Rating Definition
Very Relevant Present / past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present / past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present / past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present / past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
M-2.3.1.3 Performance Quality Assessment
The Government will consider the performance quality (how well the Offeror performed on the contracts) of recent, relevant efforts. For each recent, relevant past performance citation reviewed, the performance quality of the work performed will be assessed for the Technical subfactors and Price factor (however, all aspects of performance that relate to this acquisition may be considered). Each recent, relevant reference will be assigned a quality rating as defined in Table M-2.3.1.3-1. The quality assessment consists of an in-depth evaluation of all PPI available, regardless of its source.
The quality assessment may result in positive or adverse findings. Adverse is defined as PPI that supports a less than satisfactory rating on any evaluation element or any unfavorable comment received from sources without a formal rating system. For adverse information identified, the evaluation will consider the number and severity of the problem(s), mitigating circumstances, and the effectiveness of corrective actions that have resulted in sustained improvements. Process changes will only be considered when objectively measurable improvements in performance have been demonstrated. The Government may review more recent contracts or performance evaluations to ensure corrective actions have been implemented and evaluate their effectiveness.
The Government will use the following quality levels when assessing recent, relevant efforts:
Table M-2.3.1.3-1: Quality Level Definitions
Quality Assessment Rating /
Color
Description
Exceptional (E) / Blue During the contract period, contractor performance is meeting (or met) all contract requirements and consistently exceeding (or exceeded) many. Very few, if any, minor problems encountered. Contractor took immediate and effective corrective action.
Very Good (VG) / Purple During the contract period, contractor is meeting (or met) all contract requirements and consistently exceeding (or exceeded) some. Some minor problems encountered.
Contractor took timely corrective action.
Satisfactory (S) / Green During the contract period, contractor performance is meeting (or met) all contract requirements. For any problems encountered, contractor took effective corrective action.
Marginal (M) / Yellow During the contract period, contractor performance is not meeting (or did not meet) some contract requirements. For problems encountered, corrective action appeared only marginally effective, not effective, or not fully implemented. Customer involvement was required.
Unsatisfactory (U) / Red During the contract period, contractor performance is failing (or failed) to meet most contract requirements.
Serious problems encountered. Corrective actions were either ineffective or non-existent. Extensive Customer oversight and involvement was required.
Not Applicable (NA) / White Unable to provide a rating. Contract did not include performance for this aspect. Do not know.
M-2.3.2 Assigning Ratings
As a result of the relevancy and quality assessments of the recent contracts evaluated, Offerors will receive an integrated PCA rating. Although the past performance evaluation focuses on performance that is relevant to the Technical subfactors and Price factor, the resulting PCA rating is made at the factor level and represents an overall evaluation of contractor performance. The assessment process will result in an overall PCA of Substantial Confidence, Satisfactory
Confidence, Neutral Confidence, Limited Confidence, or No Confidence as defined in Table M-
2.3.2-1 below. Offerors with no recent / relevant performance history, or if the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, will receive the rating "Neutral Confidence," meaning the rating is treated neither favorably nor unfavorably.
More recent and more relevant performance will have a greater impact on the PCA than less recent or relevant efforts. A strong record of relevant past performance may be considered more advantageous to the Government than a "Neutral Confidence" rating. Likewise, a more relevant past performance record may receive a higher confidence rating and be considered more favorably than a less relevant record of favorable performance.
Table M-2.3.2-1: PCA Definitions
Rating Description
Substantial Confidence Based on the Offeror’s recent / relevant performance record, the
Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence Based on the Offeror’s recent / relevant performance record, the
Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Neutral Confidence No recent / relevant performance record is available or the
Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The
Offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the Offeror’s recent / relevant performance record, the
Government has a low expectation that the Offeror will successfully perform the required effort.
M-2.4 Factor 3: Price
M-2.4.1 Price Evaluation
Evaluation of proposed pricing will be based on review of the Offeror’s price proposal for the
Facility Exhaust System initial order. The Government will evaluate the Price proposal for (1) completeness, (2) reasonableness, (3) unbalanced pricing, and (4) Total Evaluated Price (TEP).
Offerors whose price is determined to be unreasonable will not be considered for award.
Proposals that are determined to be incomplete may be ineligible for award.
M-2.4.2.1 Completeness
The Government will review the Offeror’s Price volume for completeness and compliance with
Attachment 4, Section L-3.4 of the solicitation. The Government will evaluate both the Initial
Order Pricing Sheet and accompanied Price Narrative for completeness.
M-2.4.2.2 Reasonableness
The Offeror’s Price volume will be evaluated, using one or more of the techniques defined in
FAR 15.404, in order to determine if it is reasonable. For a price to be reasonable, it must represent a price to the Government that a prudent person would pay in the conduct of competitive business. Normally, price reasonableness is established through price analysis techniques as described in FAR 15.404.
M-2.4.2.3 Unbalanced Pricing
Unbalanced pricing. Offerors are cautioned against submitting an Offer that contains unbalanced pricing. Unbalanced pricing may increase performance risk and could result in payment of unreasonably high prices. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated. The Government shall analyze Offers to determine whether they are unbalanced with respect to separately priced line items or sub-line items. An Offer that is determined to be unbalanced may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government. The Government will analyze proposals for unbalanced pricing IAW FAR 15.404-1.
No Confidence Based on the Offeror’s recent / relevant performance record, the
Government has no expectation that the Offeror will be able to successfully perform the required effort.
M-2.4.2.4 TEP
The TEP will be calculated as the sum of the Offeror’s price for all Contract Line Item Numbers
(CLINs), including any options.
M-2.5 Factor 4: Small Business
M-2.5.1 Small Business Evaluation
M-2.2.5.1 Small Business Participation Commitment Document
This Measure of Merit is met when the Offeror’s proposal demonstrates a sound plan to meet the
Minimum Quantitative Requirement of 10% of $90M for the participation of small businesses in performance of the contract, whether as a joint venture (JV), teaming arrangement, or subcontractor.
Table M-2.5.1-1: Small Business Factor Technical Rating Definitions
M-2.2.5.2 Offerors that receive an “Unacceptable” rating for Small Business (after discussions if discussions are held) will result in a proposal that is unawardable.
Color Rating Adjectival Rating Description
Green Acceptable The proposed SBPCD meets all measures of merit.
Red Unacceptable The proposed SBPCD does not meet all measures of merit.
File details come from the government source that posted it. Updated .