Attachment 10 L-6 Relevancy Matrix.xlsx

XLSX spreadsheet 36 KB Posted

Attached to
Facility Exhaust System
Solicitation number
FA910125RB001
Issued by

About this file

Attachment 10 L-6 Relevancy Matrix is an Excel spreadsheet detailing technical capabilities, manufacturing capabilities, and integration capabilities for a prime contractor and potential partner/subcontractor for the Facility Exhaust System contract. The matrix comprehensively outlines five key areas of technical design and analysis capabilities, including air duct design, steam systems, steam ejector systems, heat exchangers, and PLC-based industrial control systems.

The matrix specifically focuses on capabilities for design, manufacturing, and integration of complex industrial systems, with detailed subcategories spanning areas such as civil/structural construction, equipment integration, utility connections, control systems software development, and instrumentation design. These capabilities are directly aligned with the Facility Exhaust System solicitation (FA910125RB001) for the Air Force Test Center Arnold Engineering Development Complex, which seeks a contractor to design, procure, and install a new exhaust system at Arnold Air Force Base in Tennessee.

View the file

Other files

File Type Posted
Solicitation Amendment FA910125RB0010002 SF 30.pdf PDF
Attachment 2 - Technical Requirements Document_Amend2.pdf PDF
Attachment 1 - Statement of Objectives_Amend2.pdf PDF
Attachment 14 Section M_Amend2.pdf PDF
Attachment 2e - AEDC Design Review Flow and Expectations.pdf PDF
Attachment 4 Section L_Amend2.pdf PDF
Attachment 12 L-8 - Requirements Matrix_Amend2.pdf PDF
Solicitation Amendment FA910125RB0010001 SF 30.pdf PDF
FA910125RB001 Facility Exhaust System QandA 20May25.pdf PDF
Raw Water Analysis Report 7-13-12.pdf PDF
Attachment 2b - Reference Drawings.pdf PDF
Attachment 2c - SHE and Eng Standards.pdf PDF
Attachment 7 L-3 PPQ Cover Letter.pdf PDF
Attachment 11 L-7 Initial Order Pricing Sheet.xlsx XLSX spreadsheet
Facility Exhaust System RFP Cover Letter.pdf PDF
Attachment 1 - Statement of Objectives.pdf PDF
Attachment 2 - Technical Requirements Document.pdf PDF
Attachment 2d - Design Submittal Requirements.pdf PDF
Attachment 3 - DD1423 CDRL Template.pdf PDF
Attachment 4 Section L.pdf PDF
Attachment 6 L-2 Past and Present Performance Questionnaire.pdf PDF
Attachment 9 L-5 Subcontractor Consent Letter.pdf PDF
Attachment 13 L-9 SB Participation Commitment Document.pdf PDF
Solicitation - FA910125RB001.pdf PDF
Attachment 2a - Exhaust Boundary Utility Interface.pdf PDF
Attachment 5 L-1 PPI Tool Instructions.pdf PDF
Attachment 12 L-8 - Requirements Matrix.pdf PDF
Attachment 14 Section M.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prime

Name of Prime ContractorReference 1Reference 2Reference 3Reference 4Reference 5
Technical Capabilities
Design and Analysis Capability and Technical Resources
D1Design and Analysis of Air duct, expansion joints, and control/process valves (≥ 72” Ø, full vacuum to 30 psig), and associated civil/structural supports and concrete foundations.
D2Design and Analysis of Large steam systems (≥100 kpph boilers, and piping up to 14" Ø) including chemical water treatment and filtration
D3Design and Analysis of Large steam ejector systems (>20 pps, < 0.7 psia)
D4Design and Analysis of Large heat exchangers: water to air; shell and tube, etc.
D5Design and Analysis of PLC-based industrial control systems
Manufacturing Capability
M1Manufacture of Air duct, expansion joints, and control/process valves (≥ 72” Ø, full vacuum to 30 psig), and associated civil/structural supports and concrete foundations.
M2Manufacture of Large steam systems (≥100 kpph boilers, and piping up to 14" Ø) including chemical water treatment and filtration
M3Manufacture of Large steam ejector systems (>20 pps, < 0.7 psia)
M4Manufacture of Large heat exchangers: water to air; shell and tube, etc.
M5Manufacture of PLC-based industrial control systems
Integration Capability
I1PLC-based industrial control systems and integrations with existing control systems
I2Controls software development and modification
I3Civil/Structural construction of equipment support structural supports and concrete foundations
I4Integration of large industrial equipment such as steam boilers, steam ejectors, and large scale ducting (≥ 72” Ø) into a functioning integrated system.
I5Integration of existing utilities to industrial equipment including raw water, electrical power, and natural gas.
I6Control systems instrumentation design and integration

&"Times New Roman,Bold"ATTACHMENT L-6 RELEVANCY MATRIX &"Times New Roman,Regular"Facility Exhaust System

FA9101-25-R-B001

Attachment 10, L-6

Partner

Name of Partner (Subcontractor/Joint Venture)Reference 1Reference 2Reference 3Reference 4Reference 5
Technical Capabilities
Design and Analysis Capability and Technical Resources
D1Design and Analysis of Air duct, expansion joints, and control/process valves (≥ 72” Ø, full vacuum to 30 psig), and associated civil/structural supports and concrete foundations.
D2Design and Analysis of Large steam systems (≥100 kpph boilers, and piping up to 14" Ø) including chemical water treatment and filtration
D3Design and Analysis of Large steam ejector systems (>20 pps, < 0.7 psia)
D4Design and Analysis of Large heat exchangers: water to air; shell and tube, etc.
D5Design and Analysis of PLC-based industrial control systems
Manufacturing Capability
M1Manufacture of Air duct, expansion joints, and control/process valves (≥ 72” Ø, full vacuum to 30 psig), and associated civil/structural supports and concrete foundations.
M2Manufacture of Large steam systems (≥100 kpph boilers, and piping up to 14" Ø) including chemical water treatment and filtration
M3Manufacture of Large steam ejector systems (>20 pps, < 0.7 psia)
M4Manufacture of Large heat exchangers: water to air; shell and tube, etc.
M5Manufacture of PLC-based industrial control systems
Integration Capability
I1PLC-based industrial control systems and integrations with existing control systems
I2Controls software development and modification
I3Civil/Structural construction of equipment support structural supports and concrete foundations
I4Integration of large industrial equipment such as steam boilers, steam ejectors, and large scale ducting (≥ 72” Ø) into a functioning integrated system.
I5Integration of existing utilities to industrial equipment including raw water, electrical power, and natural gas.
I6Control systems instrumentation design and integration

&"Times New Roman,Bold"ATTACHMENT L-6 RELEVANCY MATRIX &"Times New Roman,Regular"Facility Exhaust System

FA9101-25-R-B001

Attachment 10, L-4