Attachment 7 - Drawing Part 4 676-325 Renovate B404 - Architectural_Part3.pdf

PDF 2 MB Posted

Attached to
Y1DA--Minor Construction - Tomah VAMC 676-325 Expand and Renovate B404 for Outpatient Mental Health
Solicitation number
36C77623B0050_1
Issued by

About this file

This document package includes architectural drawings and specifications for a construction project to expand and renovate an outpatient mental health clinic at the Tomah VA Medical Center in Tomah, Wisconsin. The project involves renovations to approximately 10,000 square feet of existing space on the second and third floors, including new offices, exam rooms, group rooms, waiting areas, and support spaces. It also includes demolition of existing spaces on those floors to accommodate the new construction. The drawings provide floor plans, reflected ceiling plans, elevations, sections, and construction details. Specifications cover finishes, fixtures, equipment requirements, and scope of work. The solicitation is for a fixed-price construction contract to be awarded by the Department of Veterans Affairs.

View the file

Other files

File Type Posted
Amendment 0007 Attachment 33 - Wage Determination 02-02-24.pdf PDF
Amendment_0007 36C77623B0050_1 0007.pdf PDF
Amendment_0006 36C77623B0050_1 pdf.pdf PDF
Amendment_0005 Attachment 31 - VAT-MP-ADD-1 - Response to 39.pdf PDF
Amendment_0005 Attachment 25 - B404 ACM Spreadsheet Inventory 2015 - Response to 1.pdf PDF
Amendment_0005 Attachment 29 - Response to 34.pdf PDF
Amendment_0005 Attachment 32 - Replace HVAC AC B404 Record Drawings Set - Response to 38.pdf PDF
Amendment_0005 36C77623B0050_1 pdf.pdf PDF
Amendment_0005 Attachment 30 -237413 PackagedOutdoorCentral-Station Air-Handling Units_addendum 1.pdf PDF
Amendment_0005 Attachment 24 - 2431 Tomah WI ACM - Response to 1.pdf PDF
Amendment_0005 Attachment 26 - Spec Section 27 52 23 - Response to 15.pdf PDF
Amendment_0005 Attachment 27 - Spec Section 26 29 11 - Response to 16.pdf PDF
Amendment_0005 Attachment 28 - B404 TR - Response to 18.pdf PDF
Amendment_0005 Attachment 23 - Tomah Technical Questions and VA Responses.pdf PDF
Amendment_0004 36C77623B0050_1 .pdf PDF
Amendment _0003 36C77623B0050_1 .pdf PDF
Amendment_0002 Attachment 21 - Tomah Site Visit sign-in sheet.pdf PDF
Amendment_0002 36C77623B0050_1 .pdf PDF
Attachment 2 - Bid Set - Spec V1R.pdf PDF
Amendment_0001 36C77623B0050_1 pdf.pdf PDF
Amendment_0001 Attachment 20 - 676-325 Renovate B404 - Structural Pages SG-001 to SB-100.pdf PDF
Amendment_0001 Attachment 3 - Bid Set - Spec V2R revised.pdf PDF
Attachment 17 - VA Notice of Limitations on Subcontracting.pdf PDF
Attachment 15 - Drawing Part 12 676-325 Renovate B404 - Structural.pdf PDF
36C77623B0050_1.pdf PDF
Attachment 6 - Drawing Part 3 676-325 Renovate B404 - Architectural_Part2.pdf PDF
Attachment 18 - Wage Determination 10-13-23.pdf PDF
Attachment 5 - Drawing Part 2 676-325 Renovate B404 - Architectural_Part1.pdf PDF
Attachment 4 - Drawing Part 1 676-325 Renovate B404 - Architectural.pdf PDF
Attachment 13 - Drawing Part 10 676-325 Renovate B404 - Plumbing.pdf PDF
Attachment 10 - Drawing Part 7 676-325 Renovate B404 - Fire Supression.pdf PDF
Attachment 1 - Statement of Work - Tomah.pdf PDF
Attachment 19 - Brand Name JA Tomah.pdf PDF
Attachment 3 - Bid Set - Spec V2R.pdf PDF
Attachment 2 - Bid Set - Spec V1R.pdf PDF
Attachment 8 - Drawing Part 5 676-325 Renovate B404 - Electrical and Technology.pdf PDF
Attachment 16 - GeoTech Report.pdf PDF
Attachment 11 - Drawing Part 8 676-325 Renovate B404 - Floor Plans.pdf PDF
Attachment 12 - Drawing Part 9 676-325 Renovate B404 - Mechanical.pdf PDF
Attachment 9 - Drawing Part 6 676-325 Renovate B404 - Finishes.pdf PDF
Attachment 14 - Drawing Part 11 676-325 Renovate B404 - Site Drawings GI-001 to LS-101.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STEEL STUD (TYP)

GWB (TYP)

MECHANICAL FASTENER (TYP)

ALUMINUM RETAINER (TYP)

HIGH IMPACT VINYL OR PLASTIC

EXTRUSION (TYP)

6"

CUSHION (TYP)

1 63/256"

5/

/1 6"

A F

F

A

F F

LOWER BUMPER

BASE AS SCHEDULED

FLOORING AS SCHEDULED

UPPER BUMPER

6"

1 63/256"

5/

/1 6"

STEEL STUD (TYP)

GWB (TYP)

ADHESIVE (TYP)

HIGH IMPACT VINYL OR PLASTIC

EXTRUSION (TYP)49

A

F F

RESILIENT BASE AS SCHEDULED

(CONFIRM ADHESIVE WITH

MANUFACTURER)

FLOORING AS SCHEDULED

CLEAR SILICONE AT BASE (TYP)

CLEAR SILICONE AT TOP (TYP)

STEEL STUD (TYP)

EDGE TRIM, COLOR TO MATCH

THE PANEL (TYP)

N O

T L

E S

S T

H A

N

A

F F

STEEL STUD (TYP)

GWB (TYP)

ADHESIVE (TYP)

HIGH IMPACT VINYL OR PLASTIC

EXTRUSION (TYP)52

A

F F

COVE BASE AS SCHEDULED

FLOORING AS SCHEDULED

CLEAR SILICONE AT BASE (TYP)

CLEAR SILICONE AT TOP (TYP)

STEEL STUD (TYP)4"

EDGE TRIM, COLOR TO MATCH

THE PANEL (TYP)

EDGE TRIM, COLOR TO MATCH

THE PANEL (TYP)

3"

MECHANICAL FASTENER (TYP)

STEEL STUD (TYP)

CONTINUOUS ALUMINUM RETAINER

GWB

HIGH IMPACT

VINYL OR PLASTIC

EXTRUSION

1/4" RADIUS

GWB

MECHANICAL FASTENER (TYP).

STEEL STUD (TYP)

WALL WIDTH

CONTINUOUS ALUMINUM RETAINER

1/4" RADIUS

HIGH IMPACT VINYL OR

PLASTIC EXTRUSION

3"

STEEL STUD

MECHANICAL

FASTENER (TYP)

16 GA STAINLESS STEEL

GWB

CLEAR SEALANT (TYP)

3 1/2"

16 GA STAINLESS STEEL

GWB

CLEAR SEALANT (TYP)

MECHANICAL FASTENER (TYP).

STEEL STUD (TYP)

1/

2"

WALL WIDTH

EXISTING WALL CONSTUCTION

5/8" GWB

3-5/8" METAL STUD FRAMING

ROLLER SHADE

3/4" PLYWOOD

RESILIENT FLOORING

RESILIENT FLOORING

HEAT WELD SEAM W/

WELDING ROD PER MFR

FLOOR LEVELING FEATHERED OUT

SO FINISH FLOORING IS FLUSH

WITH TOP OF RESLIENT

TRANSITOIN STRIP (TS-1)

CARPET TILE

RESILIENT TRANSITION (TS-1)

RESILIENT FLOORING

FEATHER OUT 36" MIN

FLOOR TILE

(SLOPE 1/4" PER FOOT TO

DRAIN WHERE PRESENT)

SOLID SURFACE

TRANSITION (TS-2)

RESILIENT/CARPET FLOORING

FULL COVERAGE

CRACK ISOLATION

SHEET MEMBRANE

(PER ANSI A118.12)

FLOOR LEVELING FEATHERED

OUT SO FINISH FLOORING IS

FLUSH WITH TOP OF SOLID

SURFACE (TS-2)

THINSET MORTAR

SEALANT TO MATCH

GROUT COLOR

SEALANT

12" MIN

NOTES:

1. TRANSITION TO BE INSTALLED AT DOOR THRESHOLD OF ALL ROOMS WITH FLOOR TILE SCHEDULED.

CARPET TILE

RESILIENT TRANSITION (TS-3)

RESILIENT FLOORING

RESILIENT FLOORING

RESILIENT OR RESINOUS

FLOORING

RESILIENT TRANSITION (TS-4)

RESILIENT FLOORING

SEALED CONCRETE

RESILIENT REDUCER (TS-6)

A R C H I T E C T S E N G I N E E R S

CB

DESIGN

GROUP

Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:

Revisions: Date:

CONSULTANT:

23456789101112131415

B

C

D

E

F

G

H

I

J

123456789101112131415

/8

/4

/8

/2

/4

-1

/2

Drawing of

Architect:

CB DESIGN GROUP, INC.

421 King St., Suite 301 Alexandria, VA 22314 POC: Wes Bridges, AIA 703.772.4213

TOMAH VAMC

TOMAH, WISCONSIN

DECEMBER 15, 2022

676-325

AuthorChecker

EXPAND AND RENOVATE

B404 FOR OUTPATIENT

MENTAL HEALTH

BID SET

INTERIORS FINISHES DETAILS

AF-501

87 250

-3

A F

-5

/1

/2

.p d f

SCALE: 3" = 1'-0"

WALL PROTECTION DETAIL - BUMPER RAIL

SCALE: 3" = 1'-0"

WALL PROTECTION DETAIL - WALL PANEL

(RESILIENT BASE)

SCALE: 3" = 1'-0"

WALL PROTECTION - WALL PANEL (COVE BASE)

SCALE: 3" = 1'-0"

WALL PROTECTION DETAIL - CORNER GUARD

(RESILIENT)

SCALE: 3" = 1'-0"

WALL PROTECTION DETAIL - END WALL

(RESILIENT)

SCALE: 3" = 1'-0"

WALL PROTECTION DETAIL - CORNER GUARD

(STAINLESS STEEL)

SCALE: 3" = 1'-0"

WALL PROTECTION DETAIL - END WALL

(STAINLESS STEEL)

SCALE: 1 1/2" = 1'-0"

TYPICAL ROLLER SHADE

SCALE: 3" = 1'-0"

TRANSITION - RESILIENT TO RESILIENT (HEAT

WELD)

SCALE: 3" = 1'-0"

TRANSITION - RESILIENT TO CARPET

(TS-1-RESILIENT)

SCALE: 3" = 1'-0"

TRANSITION - RESILIENT/CARPET TO TILE

(TS-2-SOLID SURFACE)

SCALE: 3" = 1'-0"

TRANSITION - RESILIENT TO CARPET

(TS-3-RESILIENT)

SCALE: 3" = 1'-0"

TRANSITION - RESILIENT / POURED RESINOUS TO

RESILIENT (TS-4 RESILIENT)

SCALE: 3" = 1'-0"

TRANSITION - RESILIENT TO CONCRETE (TS-6

RESILIENT)

82 of 2332/15/2023 82 of 233

Above finished floor AFF Acoustic ACST Acoustic Panel Ceiling APC Addendum ADD Alternate ALT Aluminum AL Angle L Approximate APPROX Architecture, architectural ARCH Asbestos ASB Asphalt ASPH Assistant ASST Association ASSN Automatic AUTO Average AVG Base plate BP Basement BSMT Beam BM Bearing BRG Bedroom BR Benchmark BM Board BD Boiler BLR Bottom BOT Brick BRK Building line BL Building BLDG Built-up-roof BUR Cabinet CAB Carpet CPT Catalog CAT Ceiling height CH Ceiling CLG Center CTR Centerline CL Ceramic Tile CT Ceramic CER Chalkboard CB Clear CLR Closet CLO Coated CTD Cold rolled CR Column COL Company CO Composition COMP Concrete Masonry Unit CMU Concrete CONC Construction joint CJ Construction CONSTR "Continue, Continuous" CONT Corridor CORR Countersink CSK Cubic CU Curve(d) CRV Dampproofing DP Degree DEG Department(al) DEPT Detail DET Diagonal DIAG Diameter DIA Dimension DIM Dishwasher DW Dispenser DISP Door DR Double DBL Double-hung DH Down DN Downspout DS Drain DR Drawing DWG Each EA East E Electric Water Cooler EWC "Electric, electrical" ELEC Elevation EL Elevator ELEV Engineer ENGR Entrance ENTR Equal EQ Equipment EQUIP Existing To Remain ETR Exhaust EXH Existing EXIST Expansion joint EXP JT Exposed EXP Exterior EXT Fabricate FAB Face of Stud F. OF S.

Fan Coil Unit FCU Fiberglass-reinforced plastics FRP Finish FIN Finished Floor FF Fire Extinguisher FE Fire Extinguisher & Cabinet FEC Fire Retardant Treated FRT Fireproof FPRF Fixture FXTR Flange FLG Flashing FL Floor FL Floor drain FD Flooring FLG Fluorescent FLUOR

Footing FTG Foundation FDN Furnish(ed), furniture FURN Furring FURR Gage (gauge) GA Galvanize(d) GALV Galvanized Iron GALVI Glazed Wall Tile GWT Grab Bar GB Grade GR Gravel GVL Gypsum Wallboard GWB Gypsum GYP Handicapped HC Hardware HDW Heating ventilating and HVAC air conditioning Height HGT High Point HPT High Performance HP High Performance Coating HPC Hollow Metal HM Horizontal HORIZ Include(d), inclusive INCL Incorporated INC Information INFO Inside diameter ID Install(ed), installation INSTL Insulation INSUL Interior INT Janitor JAN Joint JT Joist J, JST Junction box JB Knock down KD Laboratory LAB Lavatory LAV Left Hand LH Left L Length LG Level LVL Light LT Machine MACH Maintenance MAINT Manager MGR Manual MNL Manufacturing MFG Markerboard MB Masonry opening MO Masonry MSNRY Master bedroom MBR Material MATL Maximum MAX Mechanical MECH Membrane MEMB Men M Metal MET, MTL Mezzanine MEZZ Minimum MIN Mirror MIR Miscellaneous MISC Mounted MTD Mounting MTG Necessary NEC Noise-reduction coefficient NRC Nominal NOM Non Combustible NC, NONCOM North N Not in Contract NIC Not to scale NTS Not available NA Number NO Office OFF On center OC Opening OPNG Opposite OPP Outside diameter OD Overall OA Overhead OVHD Page P Painted PTD Pair PR Panel PNL Partition PTN Percent PCT Perforate(d) PERF Permanent PERM Perpendicular PERP Piece PC Plastic Laminate PLAM Plastic Laminate PLAS.LAM Plate PL Plumbing PLMB Plywood PLYWD Point PT Polyvinyl chloride PVC Precast PRCST Prefabricated PREFAB Preliminary PRELIM Preparation, prepare PREP Program PRGM Projection Screen PS

Project PROJ Property PROP Public Address PA Quality control QC Quality QUAL Quantity QTY Quarry Tile QT Radius RAD Rain Leader RL Received RCVD Receptacle RCPT Receptionist RECPT Recess(ed) REC Refer, reference REF Refrigerate, refrigerator REFR Reinforce REINF Reinforced concrete RC Remove RMV Repair RPR Required REQD Revise, revision REV Right hand RH Road RD Roof Drain RD Roof RF Roofing RFG Room RM Rubber tile floor RTF Rubber RBR Schedule SCHED Schematic SCHEM Section SECT Service SVCE "Sheet, sheeting" SHT Shower SH Siding SDG Similar SIM Slope SL Sound-transmission class STC South S Speaker SPKR Specification SPEC Sprinkler SPR Square SQ Stainless steel SS Standard STD Standpipe SP Steel STL Storage STOR Structural Glazed Facing Tile SGFT Structural, structure STRUCT Substitute SUBST Surface SURF Suspend(ed) SUSP Switch SW Symmetrical SYM System SYS Tackboard TB Tackstrip TS Telephone TEL Television TV Temporary TEMP Terrazzo TER Thick THK Through THRU Toilet T Tongue and groove T&G Top and bottom T&B Top chord TC Top of Masonry Parapet TMP Top of Bearing TOFB Top of Steel T.O.S.

Topping TOPG Total TOT Transformer XFMR Transom TR Transparent TRANS Tread TRD Threshold THRESH Typical TYP Underground UG Underwriters Laboratories UL Unfinished UNF Unit Ventilator UV Unless Otherwise Noted UON Urinal UR US Gypsum Company USG Vertical VERT Vestibule VEST, V Vinyl Reducing Strip VRS Vinyl Composite Tile VCT Vinyl asbestos tile VAT Wardrobe WARD Water closet WC Waterproof WP Weight WT Welded WLD Welded Wire Mesh WWM With W/ Without W/O Women W Wood WD Wrought Iron WI

ABBREVIATIONS

A R C H I T E C T S E N G I N E E R S

CB

Drawing Number:

Project Title:

Project Location:

Issue Date

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:

Revisions: Date:

CONSULTANT:

23456789101112131415

B

C

D

E

F

G

H

I

J

123456789101112131415

/8

/4

/8

/2

/4

-1

/2

Drawing of

Architect:

CB DESIGN GROUP, INC.

421 King St., Suite 301 Alexandria, VA 22314 POC: Wes Bridges, AIA 703.772.4213

TOMAH VAMC

TOMAH, WISCONSIN

DECEMBER 15, 2022

676-325

AuthorChecker

EXPAND AND RENOVATE

B404 FOR OUTPATIENT

MENTAL HEALTH

BID SET

ROOM FINISH SCHEDULE

AF-601

88 250

-3

A F

-6

/1

/2

.p d f

ROOM

NUMBER ROOM NAME

Floor Finish

FLOOR WALLS Ceiling Finish NOTESBASE NORTH (A) EAST (D) SOUTH (C) WEST (B)

20460 MH CLINIC OFFICE CPT-2 RB-2 PT-1 PT-1 PT-7 PT-1 ACT-1

20461 MH CLINIC OFFICE CPT-2 RB-2 PT-0 PT-0 PT-10 PT-0 ACT-1

20462 MH CLINIC OFFICE CPT-2 RB-2 PT-9 PT-1 PT-1 PT-1 ACT-1

20463 MH CLINIC OFFICE CPT-2 RB-2 PT-9 PT-1 PT-1 PT-1 ACT-1

20464 MH CLINIC OFFICE CPT-2 RB-2 PT-0 PT-0 PT-10 PT-0 ACT-1

20466 STAFF TOILET PFT-2 CTB-2 CT-2 / PT-2A CT-2 / PT-2A CT-2 / PT-2A CT-2 / PT-2A PT-2A

20467 MH CLINIC OFFICE CPT-2 RB-2 PT-1 PT-1 PT-9 PT-1 ACT-1

20468 MH CLINIC OFFICE CPT-2 RB-2 PT-7 PT-1 PT-1 PT-1 ACT-1

20469 MH CLINIC OFFICE CPT-2 RB-2 PT-10 PT-0 PT-0 PT-0 ACT-1

20470 MH CLINIC OFFICE CPT-2 RB-2 PT-9 PT-1 PT-1 PT-1 ACT-1

20474 MH CLINIC OFFICE CPT-2 RB-2 PT-1 PT-1 PT-1 PT-3 ACT-1

20475 MH CLINIC OFFICE CPT-2 RB-2 PT-0 PT-10 PT-0 PT-0 ACT-1

20476 MH CLINIC OFFICE CPT-2 RB-2 PT-1 PT-1 PT-1 PT-9 ACT-1

20477 MH CLINIC OFFICE CPT-2 RB-2 PT-1 PT-1 PT-1 PT-9 ACT-1

20478 MH CLINIC OFFICE CPT-2 RB-2 PT-0 PT-10 PT-0 PT-0 ACT-1

20479 MH CLINIC OFFICE CPT-2 RB-2 PT-1 PT-7 PT-1 PT-1 ACT-1

3C03 CORRIDOR CPT-3 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

3C04 CORRIDOR CPT-3 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

3C06 CORRIDOR LVT-4 RB-2 PT-1 PT-1 PT-1 PT-6 ACT-1

3C08 CORRIDOR LVT-4 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

3C12 CORRIDOR LVT-4 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

3S1 EAST STAIR ETR ETR ETR ETR ETR ETR ETR

3S2 WEST STAIR ETR ETR ETR ETR ETR ETR ETR

30450 STORAGE CONC-1 RB-2 PT-1 PT-1 PT-1 PT-1 PT-1

30456 OFFICE CPT-3 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

30458 OFFICE CPT-3 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

30460 OFFICE CPT-3 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

30461 OFFICE CPT-3 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

30474 STORAGE CONC-1 RB-2 PT-1 PT-1 PT-1 PT-1 PT-1

3C02 CORRIDOR CPT-3 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

3C05 ELEVATOR LOBBY LVT-4 RB-2 - PT-1 / WP-3 PT-1 PT-1 / WP-3 PT-6

3C07 CORRIDOR LVT-4 RB-2 PT-1 / WPS-3 PT-3 PT-1 / WPS-3 PT-3 ACT-1

3C10 CORRIDOR CPT-3 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

3C11 CORRIDOR LVT-4 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

30401 RRTP OFFICE CPT-3 RB-2 PT-1 PT-1 PT-3 PT-1 ACT-1

30402 RRTP OFFICE CPT-3 RB-2 PT-1 PT-1 PT-10 PT-1 ACT-1

30403 RRTP OFFICE CPT-3 RB-2 PT-10 PT-1 PT-1 PT-1 ACT-1

30404 RRTP OFFICE CPT-3 RB-2 PT-9 PT-1 PT-1 PT-1 ACT-1

30405 STAFF TOILET PFT-3 CTB-2 CT-2 / PT-7A CT-2 / PT-7A CT-2 / PT-7A CT-2 / PT-7A PT-7A

30406 RRTP OFFICE CPT-3 RB-2 PT-1 PT-1 PT-3 PT-1 ACT-1

30409 ADMIN WAIT CPT-3 RB-2 PT-1 PT-6 PT-1 PT-1 ACT-1 / PT-6

30415 ADMIN RECP. CPT-2 RB-2 - PT-1 PT-1 - ACT-1

30416 BUILDING ELECTRICAL CONC1-1 RB-2 PT-1 PT-1 PT-1 PT-1 -

30417 CHIEF OFFICE CPT-3 RB-2 PT-1 PT-1 PT-1 PT-3 ACT-1

30418 ADMIN CONFERENCE CPT-3 RB-2 PT-1 PT-6 PT-1 PT-1 ACT-1

30423 ADMIN CUBICLES CPT-3 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

30426 ADMIN OFFICE CPT-3 RB-2 PT-1 PT-3 PT-1 PT-1 ACT-1

30428 RRTP OFFICE CPT-3 RB-2 PT-1 PT-1 PT-1 PT-6 ACT-1

30430 RECP. WORKROOM CPT-3 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

30432 RECEPTION CPT-3 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1 / PT-6

30436 GROUP ROOM C LVT-5 RB-2 PT-1 PT-1 PT-1 PT-6 ACT-1

30436A STORAGE LVT-5 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

30437 GROUP ROOM A LVT-5 RB-2 PT-1 PT-6 PT-1 PT-6 ACT-1

30437A STORAGE LVT-5 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

30441 GROUP ROOM B LVT-5 RB-2 PT-1 PT-6 PT-1 PT-6 ACT-1

30441A STORAGE LVT-5 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

30442 WAITING CPT-3 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

30443 LOUNGE CPT-3 RB-2 - - PT-6 / VWC-3 - ACT-1

30446 HVAC N.I.C N.I.C N.I.C N.I.C N.I.C N.I.C N.I.C

30447 GENDER NEUTRAL TOILET PFT-3 CTB-2 CT-2 / PT-7A CT-2 / PT-7A CT-2 / PT-7A CT-2 / PT-7A PT-7A

30448 FAMILY TOILET PFT-3 CTB-2 CT-2 / PT-7A CT-2 / PT-7A CT-2 / PT-7A CT-2 / PT-7A PT-7A

30449 GENDER NEUTRAL TOILET PFT-3 CTB-2 CT-2 / PT-7A CT-2 / PT-7A CT-2 / PT-7A CT-2 / PT-7A PT-7A

30451 BUILDING DATA N.I.C N.I.C PT-1 PT-1 PT-1 PT-1 N.I.C

30452 GENDER NEUTRAL TOILET PFT-3 CTB-2 CT-2 / PT-7A CT-2 / PT-7A CT-2 / PT-7A CT-2 / PT-7A PT-7A

30453 STAFF BREAK RFT-1 RB-1 PT-0 PT-0A PT-0A PT-0A ACT-2

30457 OFFICE CPT-3 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

30459 OFFICE CPT-3 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

30462 HAC ETR ETR ETR ETR ETR ETR ETR

30464 MH CLINIC ADMIN CPT-3 RB-2 PT-1 PT-1 PT-1 PT-3 ACT-1

30465 MH CLINIC OFFICE CPT-3 RB-2 PT-0 PT-0 PT-10 PT-0 ACT-1

30466 MH CLINIC OFFICE CPT-3 RB-2 PT-1 PT-3 PT-1 PT-1 ACT-1

30467 MH CLINIC OFFICE CPT-3 RB-2 PT-3 PT-1 PT-1 PT-1 ACT-1

30468 MH CLINIC OFFICE CPT-2 RB-2 PT-1 PT-1 PT-9 PT-1 ACT-1

30470 MH CLINIC OFFICE CPT-3 RB-2 PT-10 PT-0 PT-0 PT-0 ACT-1

30471 MHICM STORAGE RSF-2 RSFB-2 PT-1 PT-1 PT-1 PT-1 ACT-2

30472 STAFF TOILET PFT-3 CTB-2 CT-2 / PT-7A CT-2 / PT-7A CT-2 / PT-7A CT-2 / PT-7A PT-7A

30473 MHICM MED ROOM RSF-2 RSFB-2 PT-1A PT-1A PT-1A PT-1A ACT-2

30476 MHICM PRIVATE COUNSEL CPT-3 RB-2 PT-7 PT-1 PT-1 PT-1 ACT-1

30478 MHICM PATIENT CARE RSF-2 RSFB-2 PT-1A PT-1A PT-1A PT-1A ACT-2

30479 MHICM CUBICLES CPT-3 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

4S1 EAST STAIR ETR ETR ETR ETR ETR ETR ETR

40401 MECHANICAL CONC-1 RB-2 PT-1 PT-1 PT-1 PT-1 -

ROOM

NUMBER ROOM NAME

Floor Finish

FLOOR WALLS Ceiling Finish NOTESBASE NORTH (A) EAST (D) SOUTH (C) WEST (B)

30418A EVTR CONTROL CLST CONC-1 RB-2 PT-1 PT-1 PT-1 PT-1 -

B0400 CRAWL SPACE ETR - - - - - -

B0403 ELEVATOR PIT CONC-1 - - - - - -

B0405 MECHANICAL ROOM CONC-1 RB-2 PT-1 PT-1 PT-1 PT-1 -

BS1 EAST STAIR ETR ETR ETR ETR ETR ETR -

1C02 CORRIDOR TT-1 TT-1 PT-0 PT-0 PT-0 PT-0 ACT-1

1C04 CORRIDOR CONC-1 / TT-1 RB-1 / TT-1 - PT-0 / WPS-1 PT-0 / WPS-1 PT-0 / WPS-1 ACT-1

1C05 MAIN CORRIDOR TT-1 TT-1 PT-0 / WPS-1 PT-0 / WPS-1 PT-0 / WPS-1 / PT-3 PT-10 / DFP-1 ACT-1

1C06 ELEVATOR LOBBY TT-1 TT-1 - PT-0 / WPS-1 PT-0 PT-0 / WPS-1 PT-10

1C07 CORRIDOR TT-1 TT-1 -- -- -- -- ACT-1

1C08 CORRIDOR TT-1 TT-1 - PT-0 / WPS-1 PT-0 PT-0 / WPS-1 ACT-1

1C10 HALL TT-1 TT-1 PT-0 / WPS-1 PT-0 PT-0 / WPS-1 PT-0 ACT-1

1C11 CORRIDOR TT-1 TT-1 PT-0 PT-0 / WPS-1 - PT-0 / WPS-1 ACT-1

1C12 CORRIDOR TT-1 TT-1 - PT-0 / WPS-1 PT-0 PT-0 / WPS-1 ACT-1

1C20 TRAM WALKWAY ETR ETR ETR ETR ETR ETR ETR

1S1 EAST STAIR ETR ETR ETR ETR ETR ETR -

1S2 WEST STAIR ETR ETR ETR ETR ETR ETR -

10404 RRTP COUNSELOR CPT-1 RB-1 PT-9 PT-0 PT-0 PT-0 ACT-1

10405 RRTP COUNSELOR CPT-1 RB-1 PT-3 PT-0 PT-0 PT-0 ACT-1

10411 MAIN ELECTRICAL CONC-1 RB-2 PT-1 PT-1 PT-1 PT-1 -

10412 EMR CONC-1 RB-2 PT-1 PT-1 PT-1 PT-1 -

10413 ELECTRICAL CLOSET CONC-1 RB-2 PT-1 PT-1 PT-1 PT-1 -

10414 BED BUG ZAPPER RSF-2 RSFB-2 PT-1A PT-1A PT-1A PT-1A ACT-2

10415 STORAGE CONC-1 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

10415A ELECTRICAL CONC-1 RB-2 PT-1 PT-1 PT-1 PT-1 PT-1

10416 RRTP VITALS & LOCKERS RSF-1 RSFB-1 PT-0 PT-0 PT-0 PT-0 ACT-2

10417 RRTP WAITING ETR ETR ETR ETR ETR ETR ACT-1

10418 RRTP TOILET PFT-1 CTB-1 PT-3/ CT-1 PT-0A / CT-1 PT-0A / CT-1 PT-0A / CT-1 PT-0A

10419 RRTP SECURITY OFFICE RSF-1 RSFB-1 PT-0 PT-0 PT-0 PT-0 ACT-1

10420 ADMIN OFFICE CPT-1 RB-1 PT-0 PT-10 PT-0 PT-0 ACT-1

10424 WAITING CPT-1 RB-1 PT-0 DFP-1 - DFP-1 ACT-1

10425 LOUNGE CPT-1 RB-1 - -- VWC-1 -- ACT-1

10426 RRTP OFFICES ETR ETR ETR ETR ETR ETR ETR

10427 RRTP FOYER TT-1 TT-1 PT-0 PT-0 PT-0 PT-0 ACT-1

10430 GROUP ROOM C LVT-1 RB-1 PT-0 PT-10 PT-0 PT-0 ACT-1

10430A STORAGE LVT-1 RB-1 PT-0 PT-0 PT-0 PT-0 -

10435 GROUP ROOM A LVT-1 RB-1 PT-0 PT-10 PT-0 OP-1 ACT-1 / PT-10

10435A STORAGE LVT-1 RB-1 PT-0 PT-0 PT-0 PT-0 PT-0

10438A STORAGE LVT-1 RB-1 PT-0 PT-0 PT-0 PT-0 PT-0

10440 VESTIBULE MAT-1 MTB-1 PT-1 PT-1 PT-1 PT-1 PT-0

10442 INFO DESK TT-1 TT-1 PT-0 PT-0 PT-0 PT-0 ACT-1

10443 WAITING TT-1 TT-1 PT-0 PL-1 / DFP-1 -- PL-1 / DFP-1 ACT-1

10444 FAMILY TOILET PFT-1 CTB-1 PT-0A / CT-1 PT-0A / CT-1 PT-0A / CT-1 PT-0A / CT-1 PT-0A

10445 GENDER NEUTRAL TOILET PFT-1 CTB-1 PT-0A / CT-1 PT-0A / CT-1 PT-0A / CT-1 PT-0A / CT-1 PT-0A

10446 MOTHERS ROOM RSF-1 RSFB-1 PT-3 PT-0 PT-0 PT-0 ACT-2

10447 GENDER NEUTRAL TOILET PFT-1 CTB-1 CT-1 / PT-0 CT-1 / PT-0 CT-1 / PT-0 CT-1 / PT-0 PT-0

10449 BUILDING DATA N.I.C N.I.C N.I.C N.I.C N.I.C N.I.C N.I.C

10450 TREATMENT CIRCULATION RSF-1 RB-1 PT-0 - PT-0 PT-0 ACT-1

10451 TREATMENT OBSERVATION RSF-1 RSFB-1 PT-0 PT-0 / WP-1 PT-1 - ACT-1

10452 NURSE STATION RSF-1 RSFB-1 PT-0 -- PT-0 PT-0 ACT-1

10453 TREATMENT OBSERVATION RSF-1 RSFB-1 PT-0 PT-0 / WP-1 PT-0 - ACT-1

10454 SPECIMEN TOILET PFT-1 CTB-1 PTE-1 PTE-1 PTE-1 PTE-1 PT-11

10464 HAC ETR ETR ETR ETR ETR ETR ETR

10465 FAMILY WAITING TT-2 TT-2 PT-0 / DFP-1 PT-0-DFP-1 PT-0 PT-0 ACT-1

10466 WORKROOM CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1

10470 MH CLINIC OFFICE CPT-1 RB-1 PT-10 PT-1 PT-1 PT-1 ACT-1

10471 MH CLINIC OFFICE CPT-1 RB-1 PT-9 PT-1 PT-1 PT-1 ACT-1

10472 MH CLINIC OFFICE CPT-1 RB-1 PT-1 PT-1 PT-9 PT-1 ACT-1

10473 MH CLINIC OFFICE CPT-1 RB-1 PT-3 PT-1 PT-1 PT-1 ACT-1

10474 MH CLINIC MED/SUPPLY RSF-2 RSFB-2 PT-0A PT-0A PT-0A PT-0A ACT-2

10475 MH CLINIC EXAM/VITALS RSF-2 RSFB-2 CT-1 / PT-0A CT-1 / PT-0A CT-1 / PT-0A CT-1 / PT-0A ACT-2

10476 STAFF TOILET PFT-1 CTB-1 PT-1 PT-9 PT-1 PT-1 PT-0

10476A STORAGE CONC-1 RB-2 PT-1 PT-1 PT-1 PT-1 PT-0

10477 MH CLINIC OFFICE CPT-1 RB-1 PT-0 PT-0 PTE-3/WP-1 PTE-3/WP-1 ACT-1

10478 MH CLINIC OFFICE (FUTURE EXAM) CPT-1 RB-1 PT-0 PT-0 PT-0 PT-0 ACT-1

10479 MH CLINIC OFFICE CPT-1 RB-1 PT-9 PT-0 PT-0 PT-0 ACT-1

10480 MH CLINIC OFFICE CPT-1 RB-1 PT-3 PT-0 PT-0 PT-0 ACT-1

10484 MH CLINIC TELEMED OFFICE CPT-1 RB-1 PT-0 PT-3 PT-0 PT-0 ACT-1

10485 MH CLINIC OFFICE CPT-1 RB-1 PT-0 PT-0 PT-0 PT-3 ACT-1

10499 RECEIVING ETR ETR ETR ETR ETR ETR ETR

10400 GROUP TESTING CPT-1 RB-1 PT-0 PT-0 PT-0 PT-0 ACT-1

10401 TESTING OFFICE CPT-1 RB-1 PT-0 PT-0 PT-10 PT-0 ACT-1

10422 VENDING TT-1 TT-1 PT-0A PL-0 - DFP-1 PT-0A

10438 GROUP ROOM B LVT-1 RB-1 PT-0 OP-1 PT-0 PT-10 ACT-1 / PT-10

10460 RECEPTION CPT-1 RB-1 PT-0 PL-0 PT-0 PT-0 ACT-1 / PT-10

10486 MH CLINIC TELEMED OFFICE CPT-1 RB-1 PT-0 PT-0 PT-0 PT-9 ACT-1

10487 MH CLINIC OFFICE CPT-1 RB-1 PT-0 PT-0 PT-8 PT-10 ACT-1

10488 MH CLINIC TELEMED OFFICE CPT-1 RB-1 PT-0 PT-10 PT-0 PT-0 ACT-1

10489 MH CLINIC TELEMED OFFICE CPT-1 RB-1 PT-0 PT-3 PT-0 PT-0 ACT-1

2C02 CORRIDOR LVT-2 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

2C03 CORRIDOR LVT-2 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

2C04 CORRIDOR LVT-2 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

2C05 CORRIDOR LVT-2 RB-2 PT-1 / WPS-2 PT-1 PT-1 / WPS-2 / CWC PT-1 / WPS-2 PT-8

2C07 CORRIDOR LVT-2 RB-2 PT-1 PT-1 PT-1 PT-8 ACT-1

2C08 CORRIDOR LVT-2 RB-2 - PT-1 PT-1 PT-1 ACT-1

2C11 CORRIDOR LVT-2 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

2C12 CORRIDOR RSF-1 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

2S1 EAST STAIR ETR ETR ETR ETR ETR ETR ETR

2S2 WEST STAIR ETR ETR ETR ETR ETR ETR ETR

20434 GROUP ROOM B LVT-3 RB-2 PT-1 PT-8 PT-1 PT-8 ACT-1

20446 STORAGE LVT-3 RB-2 PT-1 PT-1 PT-1 PT-1 PT-1

20456 HAC ETR ETR ETR ETR ETR ETR ETR

2C06 ELEVATOR LOBBY LVT-2 RB-2 - PT-1 / WPS-2 PT-1 PT-1 / WPS-2 ACT-1

2C10 CORRIDOR LVT-2 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

20401 RRTP COUNSELOR CPT-2 RB-2 PT-1 PT-1 PT-9 PT-1 ACT-1

20402 RRTP COUNSELOR CPT-2 RB-2 PT-1 PT-1 PT-7 PT-1 ACT-1

20403 RRTP COUNSELOR CPT-2 RB-2 PT-1 PT-1 PT-10 PT-1 ACT-1

20404 RRTP COUNSELOR CPT-2 RB-2 PT-9 PT-1 PT-1 PT-1 ACT-1

20405 STAFF TOILET PFT-2 CTB-2 CT-2 / PT-2A CT-2 / PT-2A CT-2 / PT-2A CT-2 / PT-2A PT-2A

20406 RRTP COUNSELOR CPT-2 RB-2 PT-10 PT-0 PT-0 PT-0 ACT-1

20407 RRTP COUNSELOR CPT-2 RB-2 PT-1 PT-1 PT-7 PT-1 ACT-1

20408 BUILDING ELECTRICAL CONC-1 RB-2 PT-1 PT-1 PT-1 PT-1 -

20409 RRTP COUNSELOR CPT-2 RB-2 PT-1 PT-1 PT-9 PT-1 ACT-1

20410 RRTP COUNSELOR CPT-2 RB-2 PT-7 PT-1 PT-1 PT-1 ACT-1

20411 RRTP COUNSELOR CPT-2 RB-2 PT-10 PT-0 PT-0 PT-0 ACT-1

20415 RRTP COUNSELOR CPT-2 RB-2 PT-1 PT-1 PT-1 PT-7 ACT-1

20416 RRTP COUNSELOR CPT-2 RB-2 PT-0 PT-0 PT-0 PT-10 ACT-1

20417 RRTP COUNSELOR CPT-2 RB-2 PT-1 PT-9 PT-1 PT-1 ACT-1

20418 RRTP COUNSELOR CPT-2 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

20419 RRTP COUNSELOR CPT-2 RB-2 PT-0 PT-10 PT-0 PT-0 ACT-1

20420 RRTP COUNSELOR CPT-2 RB-2 PT-1 PT-9 PT-1 PT-7 ACT-1

20422 RRTP COUNSELOR CPT-2 RB-2 PT-1 PT-1 PT-1 PT-7 ACT-1

20424 RECP. WORKROOM CPT-2 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

20426 RECEPTION CPT-2 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1 / PT-9

20427 WAITING CPT-2 RB-2 - - PT-9 / VWC-2 - ACT-1

20428 GROUP ROOM C LVT-3 RB-2 PT-1 PT-1 PT-1 PT-7 ACT-1

20428A STORAGE LVT-3 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

20431 GROUP ROOM A LVT-3 RB-2 PT-1 PT-8 PT-1 PT-8 ACT-1

20431A STORAGE LVT-3 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

20434A STORAGE LVT-3 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

20440 WAITING CPT-2 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

20442 HVAC N.I.C N.I.C N.I.C N.I.C N.I.C N.I.C N.I.C

20443 GENDER NEUTRAL TOILET PFT-2 CTB-2 CT-2 / PT-2A CT-2 / PT-2A CT-2 / PT-2A CT-2 / PT-2A PT-2A

20444 FAMILY TOILET PFT-2 CTB-2 CT-2 / PT-2A CT-2 / PT-2A CT-2 / PT-2A CT-2 / PT-2A PT-2A

20445 GENDER NEUTRAL TOILET PFT-2 CTB-2 CT-2 / PT-2A CT-2 / PT-2A CT-2 / PT-2A CT-2 / PT-2A PT-2A

20447 BUILDING DATA N.I.C N.I.C N.I.C N.I.C N.I.C N.I.C N.I.C

20448 GENDER NEUTRAL TOILET PFT-2 CTB-2 CT-2 / PT-2A CT-2 / PT-2A CT-2 / PT-2A CT-2 / PT-2A PT-2A

20449 STAFF BREAK RFT-1 RB-1 PT-0A PT-0A PT-0A PT-0A ACT-2

20453 RRTP KITCHEN OFFICE CPT-2 RB-2 PT-1 PT-1 PT-1 PT-1 ACT-1

20454 RRTP TEACHING KITCHEN RFT-1 RB-2 PT-0 PT-0A PT-0A PT-0A ACT-2

20457 MH CLINIC TMS CPT-2 RB-2 CWC-1 CWC-1 PT-1A PT-1A ACT-2

20458 MH CLINIC OFFICE CPT-2 RB-2 PT-7 PT-1 PT-1 PT-1 ACT-1

NOTE:

PLANS ARE ROTATED 180 DEGREES FROM TRUE NORTH AND ALL FINISH SCHEDULES WALL NOTES (NORTH, SOUTH, EAST & WEST)ARE BASED ON PLAN NORTH (AND NOT TRUE NORTH)

83 of 2332/15/2023 83 of 233

D W

Range

A

B

C

D

E

F

H

E.8

C.3

G

1 94 5 876321A 1910 151411 12 13 16 17 187.66.4

A.8

B.9

5.2 11a

A.A

A.9

C.6

2C02

20428

20428A

20427

2C06

20408

20447

20445

20444 20443

20448

20442

20440

2042420405 20478

20466

20454

20457 20453

20476 20474

20464

20462

2046020461

20463

20458

20467

20469 20470

20468

20477 20479 20475

20411 20410

20409

20407 20419

2041720415

20420 2041820416

20403

20401 20402

20404

20406 20422

2C10

20426

2S1 2S2

2C05 2C04

2C03

B L-

4 20456

20446

F1

SDF

S4A

A

NX

ENEN

S4EO

NXC

B2

B 2 B

B

B4

B

B5

B6 R2

R2

R2R2A

B

C

D

E

F

H

E.8

C.3

G

1 94 5 876321A 1910 151411 12 13 16 17 187.66.4

A.8

B.9

5.2 11a

A.A

A.9

C.6

A

A

A

CC

D D

D

B B A

A

A

A A A

A

A

A A A

A

A

A A A

A

A A A A

A

A

A A A

A

A

A C C

C C

C

CC

A

A

A

AA

A

A

A

AAA

A

A

A A

A

A A

A

A

A

A

B

B

T Y

P

T Y

P

B

B

N

KEY PLAN

NEW ADDITION

BID DEDUCT #1: REMOVE 3RD FLOOR ADDITION(THIS BECOMES A ROOF AREA)

• REFER TO SHEET BD102, BD103 & BD104 FOR BID DEDUCT #1 DETAILS

BID DEDUCTS LEGEND

BID DEDUCT #3: BID DEDUCT #2 + REMOVE THIS AREA FROM 3RD FLOOR RENOVATION

• NO DEMOLITION IN THIS AREA AND EXISTING TO REMAIN AND CONTRACTOR SHALL

TIE SERVICES TO EXITING SYSTEMS

BID DEDUCT #4: BID DEDUCT #3 + REMOVE 2ND FLOOR ADDITION

• REFER TO BID DECUT #1 ROOF DETAILS FOR THIS BID DEDUCT (SIMILAR

CONDITION )

BID DEDUCT #2: BID DEDUCT #1 + REMOVE THIS AREA FROM 3RD FLOOR RENOVATION

• NO DEMOLITION IN THIS AREA AND EXISTING TO REMAIN AND CONTRACTOR SHALL TIE

SERVICES TO EXITING SYSTEMS

A

B

C

D

E

F

H

E.8

C.3

G

1 94 5 876321A 10 117.66.4

A.8

B.9

5.2

A.A

A.9

C.6

30409

30436

3C05

30416

30451

30453

30449

30448

30447

30452

30446

30442

30428 30405

3C0730423

LOUNGE

30443

30417

30418

30430

30402

30404

30406

30401

30403

30415

30426

3C02

30432

2HR FIRE BARRIER

EAST STAIR

3S1

3C03

3C06

3C08

30450

F1

A

A

ENEN

NX

NXC

A

B

C

D

E

F

H

E.8

C.3

G

1 94 5 876321A 1910 151411 12 13 16 17 187.66.4

A.8

B.9

5.2 11a

A.A

A.9

C.6

30409

30436

3C05

30416

30451

30453

30449

30448

30447

30452

30446

30442

30428 30405

3C07

30459

30457 30464

30472

3C10 30423

LOUNGE

30443

30417

30418

30476

30471

30478 30473

30479

3C11

30430

30402

30404

30406

30401

30403

30415

30426

3C02

30470

30468

30466 30465

30467

3046230432

EAST STAIR

3S1 3S2

3C03

3C06

3C08

3046130460

30456 30458

30450

30474

F1

A

A

EN EN NX

N

XC

S4EO

S4

19151412 13 16 17 1811a

2HR FIRE BARRIER

A

A A A

A

A

A A A

A

A

A C C

C C

C

CC

A

A

A

AAA

A

A

AAAA

B

B

T Y

P

T Y

P

B

30436

3C05

30453

EN EN

NX

N

XC

1. CONTRACTOR SHALL EXCLUDE THE APPROVED BID DEDUCT AREAS TO ALL TASKS AND ITEMS IN ALL DICIPLINES INCLUDING ARCHITECTURE, MEP AND STRUCTURE AND OTHER ARCHITECTURAL ITEMS AND SHEET LIKE FINISH PLANS, RCP, DOOR

SCHEDULE, DEMOLITION ETC.

2. THERE IS NO BID EXCLUSION AREA ON BASEMENT & FIRST FLOOR

BID EXCLUSIONS TYPICAL NOTES

A R C H I T E C T S E N G I N E E R S

CB

Drawing Number:

Project Title:

Project Location:

Issue Date

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:

Revisions: Date:

CONSULTANT:

23456789101112131415

B

C

D

E

F

G

H

I

J

123456789101112131415

/8

/4

/8

/2

/4

-1

/2

Drawing of

Architect:

CB DESIGN GROUP, INC.

421 King St., Suite 301 Alexandria, VA 22314 POC: Wes Bridges, AIA 703.772.4213

TOMAH VAMC

TOMAH, WISCONSIN

DECEMBER 15, 2022

676-325

AuthorChecker

EXPAND AND RENOVATE

B404 FOR OUTPATIENT

MENTAL HEALTH

BID SET

BID DEDUCTS - FLOOR PLANS

BD-101

89 250

-3

B D

-1

/1

/2

.p d f

SCALE: 1/16" = 1'-0"BD-101

2 BID EXCLUSION - SECOND FLOOR PLAN BID DEDUCT # 4

SCALE: 1/16" = 1'-0"BD-101

3 BID EXCLUSION - THIRD FLOOR PLAN BID DEDUCT #3

SCALE: 1/16" = 1'-0"BD-101

1 BID EXCLUSION - THIRD FLOOR PLAN BID DEDUCT #2

SCALE: 1/16" = 1'-0"BD-101

4 BID EXCLUSION - THIRD FLOOR PLAN - BID DEDUCT # 1

KEYNOTES - BID DEDUCTS PLAN

# DESCRIPTION

B1 TYPICAL: ALL THE EXTERIOR WINDOWS TO BE REPLACED IN THE BID DEDUCT AREA

ALL THE EXTERIOR WINDOWS TO BE REPLACED IN THE BID DEDUCT AREA

B2 WINDOW TO GET REPLACED INSTEAD OF INFILLED.

B3 NEW WINDOW TO BE ADDED (REFER TO WINDOWS SCHEDULE)

B4 REAR WALL OF CLOSET GETS REMOVED. CLOSET EXTENDS TO EXTERIOR WALL. CONTRACTOR SHALL VERIFY IF

CLOSET BECOMES LARGE ENOUGH TO REQUIRE SPRINKLER.

B5 ADD 42” PARAPET AT ROOF LEVEL AT GRID LINE A.9

B6 ROOF DRAIN LOCATION AND SLOPE REMAINS THE SAME AS ROOF PLAN AND THE PARAPET REMAIN THE SAME.

B7 CONTRACTOR SHALL USE 3S2 DOOR TYPE AND HARDWARE FROM SHEET AE602 – THIS DOOR WOULD BE ALARMED ON

AFTER HOURS

B8 CONTRACTOR SHALL USE 3S1 DOOR TYPE AND HARDWARE FROM SHEET AE602 - THIS DOOR WOULD BE ALARMED

AFTER HOURS

KEYNOTES - ROOF PLAN

# DESCRIPTION

R1 ROOF DRAIN AND OVERFLOW DRAIN. SEE DETAIL 2/AE550.

R2 PARAPET WALL TO WRAP ROUND EXTENDED COLUMNS WHICH ARE 4 FT ABOVE FINISHED FLOOR TO ALLOW FOR

CONNECTION OF FUTURE FLOOR. (REFER TO STRUCTURAL DRAWINGS)

R3 FALL PROTECTION ANCHOR: CONTRACTOR SHALL PERFORM A DELEGATED DESIGN TO MEET ALL STRUCTURAL AND

OSHA REQUIREMENTS AND THE DESIGN SHALL BE STAMPED BY THE CONTRACTOR ENGINEERS

84 of 2332/15/2023 84 of 233

A

B

C

D

C.3

95 876 10 117.66.4

A.8

B.9

AE-429

5.2

A.A

A.9

215 SF

GROUP ROOM

C

30436

Option Conflict

ELEVATOR

LOBBY

3C05

71 SF

BUILDING

ELECTRICAL

30416

109 SF

BUILDING

DATA

30451

Option Conflict

STAFF BREAK

30453

78 SF

GENDER

NEUTRAL

TOILET

30449

89 SF

FAMILY

TOILET

30448

73 SF

GENDER

NEUTRAL

TOILET

30447

90 SF

GENDER

NEUTRAL

TOILET

30452

CORRIDOR

3C07

110 SF

OFFICE

30459

FEATURE WALL

DF

LOUNGE

30443

231 SF

ADMIN

CONFERENCE

30418 S6A

S4A

S4AO

2S4H

2S4H

S4A

EAST STAIR

3S1

A

A

A

A

A

AAA

30452

30448

6 30

6A

30416

3S

3C03

CORRIDOR

3C08

S2AO

S2AO

S2AO

S2AO

S2AO

S2AO

S2AO

9"

8'-3 1/4"

NXC

NXC

NXC

2S4H

'-0

DN

S4EO

S4AO

S4A

S4AS4EO

S4EO

S4EO

S4A

S4EO

S4A

S4EO

STORAGE

30450

S6EO

S4A

30450

S4A

F1

TV(N.I.C)

T V

(N .I

.C

T V

(N .I

.C

STORAGE

30436A

1/4" PER 1'-0" TAPERED INSULATION

AND EPDM ROOFING

PARAPET CAP

SLOPE 1/4"

PER FOOT

SLOPE 1/4"

PER FOOT

S

LO

P E

/4

P

E R

F O

O T

S

LO

P E

/4

P

E R

F O

O T

3'-0" 18'-7 1/8" 3'-0" 12'-2"

+3 +3

+2

+3

+3 +3

+2 +2

BD-105

BD-105

BD-105

BD-105

BD-105

SIM

A

ENEN

S4AO

NX

NXC

NX

AA

S4AO

S4AO

NX

S4AOS4A

S4AO

BD-104

R1

R1

R2R2

R

R2

A

B

C

D

C.3

95 876 10 117.66.4

A.8

B.9

5.2

A.A

A.9

AD-130

D

D3

D4

D1

D4

D4

D4

D4

D4

D

D

D

AD130

D4 D4

D4

D4

D4 D4 D4

D4

D4

D4

D4

D3

D3

D

D

D

D

D

D11D5

D5 D1

D5D5

D5D5

D1

D1

D1 D1D11

D1

D1 D1

D5

D5

D

1. ALL WORK SHOWN IS EXISTING TO REMAIN UNLESS NOTED OR INDICATED AS DASHED LINES TO BE REMOVED. THE EXTENT OF DEMOLITION WORK SHALL INCLUDE ALL INCIDENTAL DEMOLITION WORK NECESSARY TO PROPERLY PROVIDE ALL NEW WORK SHOWN AND SPECIFIED, TO INCLUDE MECHANICAL, ELECTRICAL, & PLUMBING ITEMS.

2. DEMOLITION WORK SHOWN IS BASED ON EXISTING DRAWINGS AND INSPECTIONS. THE CONTRACTOR SHALL VISUALLY INSPECT ALL EXISTING CONDITIONS, AND IS RESPONSIBLE FOR PERFORMING THE INDICATED DEMOLITION WORK EVEN

IF ACTUAL CONDITIONS DIFFER FROM THESE SHOWN ON THE DRAWINGS.

3. DEMOLITION CONTRACTOR SHALL COORDINATE WITH NEW WORK SECTIONS FOR ADDITIONAL INFORMATION RELATED

TO EXTENT OF DEMOLITION.

4. REFER TO ALL OTHER DRAWINGS IN THIS SET FOR INCIDENTAL DEMOLITION WORK NOT NOTED ON THE DEMOLITION

PLANS.

5. THE OWNER HAS FIRST RIGHT OF REFUSAL OF ALL SALVAGE ITEMS. THE CONTRACTOR SHALL PROPERLY DISPOSE OF

ALL CONSTRUCTION DEBRIS. DO NOT STOCKPILE DEBRIS ON SITE.

6. ITEMS TO BE DEMOLISHED SHALL BE REMOVED COMPLETELY INCLUDING ALL ANCHORS, HANGERS, FASTENERS, PIPES, CONDUCTS, DUCTS, ETC. UNLESS OTHERWISE INDICATED TO BE ABANDONED IN PLACE.

7. CONC. SLAB PATCHES MUST BE FLUSH WITH REMAINING SURFACES TO PERMIT APPLICATION OF FINISHES. PROVIDE

WELDED WIRE MESH IN PATCH AREAS LARGER THAT (4) FOUR SQUARE FEET.

8. CONC. SLABS TO REMAIN SHALL BE PATCHED, SCRAPED, LEVELED, AND CLEANED TO PROVIDE SURFACE SUITABLE FOR NEW FINISHES. WHERE RENOVATED AREAS ARE RECEIVING NEW UNDERGROUND MECHANICAL, PLUMBING, ELECTRICAL, OR ADDITIONAL FOUNDATION WORK, SEE MECHANICAL, PLUMBING, ELECTRIC, AND STRUCTURAL DRAWINGS, AS WELL AS ARCHITECTURAL DRAWINGS TO DETERMINE EXTENT OF REQUIRED CUT AND PATCH OF EXISTING SLAB. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL CONC. SLAB DEMOLITION AND REPLACEMENT NECESSARY TO INSTALL THE NEW WORK. BACKFILL ALL BELOW GRADE DEMOLITION WORK WITH SUITABLE FILL

MEETING STRUCTURAL REQUIREMENTS FOR NEW WORK.

9. PARTITIONS SHOWN TO BE REMOVED SHALL BE CONFIRMED BY THE CONTRACTOR AS TO TYPE OF PARTITION AND EXACT LOCATION. COMPLETELY REMOVE PARTITIONS FROM FLOOR TO STRUCTURE ABOVE INCLUDING BASE, ALL FASTENERS, GROUTS, SEAL ANTS, ETC., UNLESS NOTED OTHERWISE. MASONRY PARTITIONS WHICH EXTEND THROUGH THE SLAB SHALL BE REMOVED TO 8" BELOW FINISH FLOOR. FILL SLAB OPENING WITH CONCRETE FILL TO RECEIVE FINISH FLOOR. WHERE WALLS SCHEDULED TO BE REMOVED SIT ON SLABS, GRIND SLAB TO RECEIVE FINISH FLOOR.

10. REMOVE, PATCH AND REPAIR PORTIONS OF WALL PARTITIONS WHICH CONFLICT WITH NEW WORK TO BE INSTALLED, EVEN IF NOT SPECIFICALLY NOTED TO BE DEMOLISHED ON PLANS.

11. WALLS TO BE REMOVED FROM INTERSECTING WALLS SHALL INCLUDE TOOTHED IN REPLACEMENT OF DAMAGED MASONRY ON WALL TO REMAIN AND REMOVAL OF TIES PROJECTING FROM WALLS. SEE DETAILS FOR ADDITIONAL

CONDITIONS.

12. WALLS TO BE PARTIALLY REMOVED SHALL BE TERMINATED WITH FINISHED MASONRY ENDS BY TOOTHING IN NEW MASONRY UNITS, TO MATCH ADJACENT MASONRY. SEE DETAILS FOR OTHER CONDITIONS. NO WALLS SHALL BE

TERMINATED WITH EXPOSED OPEN CELLS OR DAMAGED MASONRY UNITS.

13. WHERE NEW OPENINGS ARE SHOWN IN EXISTING WALLS, CAREFULLY REMOVE MASONRY TO NEAREST JOINT LINE WITHOUT DISTURBING ADJACENT WORK SO THAT NEW WORK CAN BE PATCHED IN TO MATCH. ALL NEW MASONRY

WORK SHALL BE TOOTHED IN.

14. ALL EXISTING STRUCTURE SHALL REMAIN, UNLESS NOTED OTHERWISE.

15. COORDINATE DEMOLITION OF ALL STRUCTURAL ITEMS (COLUMNS, BEAMS, SLABS, ET, ETC.) WITH STRUCTURAL DWGS.

EXTENT OF DEMOLITION AREA SHALL BE IN ACCORDANCE WITH STRUCTURAL REQUIREMENTS AND COORDINATED WITH

ALL NEW WORK.

16. TEMPORARILY SUPPORT ALL BEAMS, LINTELS, PORTIONS OF WALLS ETC., TO BE DISTURBED BY DEMOLITION WORK, UNTIL THEY ARE RE-SUPPORTED BY NEW WORK.

17. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF EXISTING BUILDING ELEMENTS TO REMAIN THROUGHOUT SEQUENCE OF WORK. ANY DAMAGE TO EXISTING BUILDING CONDITIONS SHOWN TO REMAIN SHALL BE

RESTORED TO NEW WORK CONDITION AT NO ADDITIONAL COST TO THE OWNER.

18. WINDOWS SCHEDULED FOR REMOVAL SHALL BE REMOVED COMPLETELY. FASTENERS MAY BE CUT FLUSH WITH HEAD, JAMBS, AND SILLS IF THE NEW WINDOW UNIT WILL CONCEAL FASTENER. PROTECT EXISTING SILLS SCHEDULED TO REMAIN. ALL EXISTING WINDOW OPENINGS MUST BE FIELD MEASURED PRIOR TO SUBMITTAL OF SHOP DRAWINGS.

19. WERE FINISHES ARE INDICATED TO BE REMOVED, REMOVAL SHALL INCLUDE ANY GROUT, ADHESIVES, FASTENERS, AND

ALL OTHER ITEMS USED TO ATTACH THE FINISHES TO THE SURFACES THAT THEY COVER.

20. ANY FLOOR AREAS DAMAGED BY THE DEMOLITION CONTRACTOR SHALL BE PATCHED TO MATCH EXISTING.

21. WHERE CEILINGS ARE TO BE REMOVED, REMOVE ALL CEILINGS SYSTEMS COMPLETE INCLUDING GRID, TRIM HANGER, CLIPS, ETC. WHERE NEW CEILINGS ARE SPECIFIED, NO DOUBLE CEILINGS PERMITTED. REMOVE ALL ORIGINAL

CONCEALED CEILINGS WHERE ENCOUNTERED.

22. ALL EXISTING SURFACES TO REMAIN SHALL BE PROTECTED, PATCHED IF DAMAGED AND CLEANED PRIOR TO

APPLICATION OF FINISHES.

23. CONTRACTOR TO PROTECT ALL EQUIPMENT AND OTHER ELEMENTS IN AREA OF NEW OR DEMOLITION WORK.

24. REMOVE ALL CURTAINS AND BLINDS IN AREAS OF RENOVATION OR DEMOLITION, UNLESS NOTED OTHERWISE.

25. REMOVE MECHANICAL, ELECTRICAL AND PLUMBING ITEMS AS NOTED ON MECHANICAL, ELECTRICAL AND PLUMBING

PLANS. COORDINATE WITH CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING, FOR ADDITIONAL DEMOLITION NOTES. REMOVAL WORK IS INTENDED TO INCLUDE ALL ASSOCIATED ITEMS SUCH AS ELECTRICAL OUTLETS, SWITCHES, CONDUITS, CONTROLS, PIPING, MOUNTING BLOCKS, ETC., AS NOTED. THE CONTRACTOR SHALL REFER TO ALL CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS AND SPECIFICATIONS FOR PROCEDURES CONCERNING RELATED TRADES IN AREAS WHICH REQUIRE DEMOLITION. REPAIR AND PATCH ANY AREAS

DAMAGED DURING REMOVAL WORK.

26. ASBESTOS CONTAINING MATERIALS (ACM) MAY BE PRESENT IN DEMOLISHED MATERIALS. CONTRACTOR TO PROVIDE TESTING AND REMEDIATE ANY MATERIAL FOUND IN SCOPE OF WORK AREA. IF ACM OR OTHER HAZARDOUS MATERIALS ARE FOUND IN PROJECT AREA AND ARE DISTURBED BY CONSTRUCTION ACTIVITY STOP WORK IMMEDIATELY AND

CONTACT THE COR FOR THE PROJECT.

GENERAL NOTES - DEMOLITION

DOOR TO BE REMOVED

CONSTRUCTION TO BE REMOVED

CONSTRUCTION TO REMAIN

DEMOLITION LEGEND

AREA NOT INCLUDED IN SCOPE

1 HOUR FIRE BARRIER. REFER TO LIFE SAFETY PLAN FOR INFORMATION

LEGEND

2 HOUR FIRE BARRIER. REFER TO LIFE SAFETY PLAN FOR INFORMATION

SMOKE PARTITION. REFER TO LIFE SAFETY PLAN FOR INFORMATION

FEC RECESSED FIRE EXTINGUISHER CABINET AND FIRE EXTINGUISHER

FE FIRE EXTINGUISHER ON WALL MOUNTED BRACKET

1. REFER TO SHEET AE521 FOR WALL TYPES AS REFERENCED ON PLANS WITH THE DIAMOND SYMBOL.

2. TYPICAL GYPSUM BOARDS/STUD WALL PARTITION TO BE TYPE S4A UNLESS INDICATED OTHERWISE BY WALL TYPE

SYMBOLS, WALL SECTIONS OR OTHER DETAILS.

3. TYPICAL GYPSUM BOARD CHASE WALLS TO BE TYPE S4AO UNLESS INDICATED OTHERWISE BY WALL TYPE

SYMBOLS, WALL SECTIONS OR OTHER DETAILS.

4. UNLESS NOTED OTHERWISE, WALLS MUST EXTEND TO THE ROOF OR FLOOR DECK ABOVE AND BE SEALED IN

ACCORDANCE WITH THE WALL TERMINATION DETAILS. REFER TO THE CODE STUDY PLAN FOR IDENTIFICATION OF ALL SMOKE AND FIRE WALL CONDITIONS. PERIMETER CORRIDOR AND LOBBY WALLS MUST BE BUILT TO RESIST

THE PASSAGE OF SMOKE.

5. DIMENSIONS ON PLANS ARE FROM FACE OF MASONRY TO FACE OF MASONRY, FACE OF MASONRY TO FACE OF

GYPSUM BOARD OR FACE OF GYPSUM BOARD TO FACE OF GYPSUM BOARD.

6. COLUMN GRID LINES ARE FOR REFERENCE ONLY, REFER TO STRUCTURAL DRAWINGS FOR COLUMN LOCATIONS.

7. FEC - INDICATES A FIRE EXTINGUISHER WITH A RECESSED CABINET. FE - INDICATES A FIRE EXTINGUISHER WITH A

WALL MOUNTING BRACKET.

8. UNLESS SPECIFICALLY INDICATED OTHERWISE, THE SAME WALL TYPE NEXT TO A DOOR OR OPENING TO

CONTINUE OVER THE DOOR OR OPENING.

9. PLAN LOCATION OF DOORS AND FRAMES RELATIVE TO THE PLANE OF THE WALL IS DIAGRAMMATIC ONLY. REFER

TO THE REFERENCED JAMB AND HEAD CONDITION DETAILS TO DETERMINE ACTUAL PLACEMENT OF DOOR AND

FRAME.

10. PLAN DIMENSIONS ARE FROM FACE OF PARTITION TYPE AND DO NOT INCLUDE APPLIED FINISHES, UNLESS NOTED OTHERWISE. PLAN DIMENSIONS INDICATED AS "HOLD" OR "CLEAR" DIMENSIONS ARE FROM FACE OF APPLIED

FINISH.

11. INSTALL WORK STRAIGHT, PLUMB, LEVEL, SQUARE, AND TRUE, IN PROPER ALIGNMENT.

12. FLATNESS: LEVEL FLOORS TO TRUE PLANE WITHIN 1/4 INCH (6 MM) IN 10'-0" (3 M) WHEN TESTED BY TEN FOOT (3 M)

STRAIGHTEDGE PLACED ANYWHERE ON FLOOR IN ANY DIRECTION.

13. BEFORE PROCEEDING WITH PARTITION FRAMING, PROVIDE LAYOUT MARKINGS OF PARTITIONS AND ASSOCIATED IN-WALL ELECTRICAL DEVICES ON SUBFLOOR FOR REVIEW BY ARCHITECT. BEFORE PROCEEDING WITH PARTITION FRAMING, PROVIDE LAYOUT MARKINGS OF PARTITIONS AND ASSOCIATED IN-WALL ELECTRICAL DEVICES ON

SUBFLOOR FOR REVIEW BY ARCHITECT.

14. COORDINATE FURNITURE-RELATED ELECTRICAL LAYOUT WITH FURNITURE VENDOR.

15. WHERE HANDRAILS, GRAB BARS, CABINETS, WALL-MOUNTED DOOR STOPS, OR OTHER WALL-HUNG ITEMS ARE

ATTACHED TO PARTITIONS, INSTALL BACKER PLATES [OR WOOD BLOCKING ] ACCURATELY POSITIONED AND FIRMLY SECURED TO METAL STUDS, WHETHER OR NOT SUCH BACKER PLATES OR BLOCKING ARE INDICATED ON

DRAWINGS.

16. WHERE NEW WORK ABUTS, ALIGNS OR ADJOINS EXISITING MATERIALS, MAKE SMOOTH AND EVEN TRANSITION AND ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. FINISH NEW WORK TO MATCH ADJACENT UNDISTURBED

SURFACES, UNLESS NOTED OTHERWISE.

17. CLOSE AND PATCH HOLES AND OPENINGS IN EXISTING FLOOR, WALL AND CEILING WHICH EXIST OR RESULT FROM

DEMOLITION OR ALTERATION WORK TO MATCH ADJACENT UNDISTURBED SURFACES.

18. PRIOR TO CONCEALMENT OF FIRE RESISTIVE MATERIALS BY OTHER WORK, PATCH AND REPAIR AREAS OF REMOVED OR DAMAGED APPLIED FIREPROOFING. COMPLETE PATCHING AND REPAIR TO MAINTAIN EXISTING FIRE- RESISTANCE DESIGN IN ACCORDANCE WITH FIREPROOFING MANUFACTURER'S WRITTEN INSTRUCTIONS FOR CONDITIONS OF EXPOSURE AND INTENDED USE. COORDINATE TESTING AND INSPECTION OF ASSEMBLIES AS

REQUIRED BY AUTHORITIES HAVING JURISDICTION.

19. PROVIDE FIRESTOPPING OF PENETRATIONS AND VOIDS THROUGH FIRE-RATED WALL, FLOOR AND PARTITION ASSEMBLIES [AND ROOF] INCLUDING EMPTY OPENINGS AND OPENINGS CONTAINING CABLES, PIPES, DUCTS, CONDUIT AND OTHER ELEMENTS.

20. AT SOUND-RATED PARTITION WALLS, PROVIDE CONTINUOUS BEAD OF ACOUSTICAL SEALANT AT AT JUNCTURE OF BOTH FACES OF RUNNERS OR PLATES WITH FLOOR AND CEILING CONSTRUCTION, AND WHEREVER GYPSUM

BOARD ABUTS DISSIMILAR MATERIALS.

• AT OPENINGS AND CUTOUTS, FILL OPEN SPACES BETWEEN GYPSUM BOARD AND FIXTURES, CABINETS, DUCTS AND OTHER FLUSH OR PENETRATING ITEMS, WITH CONTINUOUS BEAD OF SEALANT.

• SEAL SIDES AND BACKS OF ELECTRICAL BOXES TO COMPLETELY CLOSE OFF OPENINGS AND JOINTS.

21. BL- # REFER TO BORROWED LIGHT SCHEDULE ON AE610.

GENERAL NOTES - FLOOR PLAN

A

B

C

D

C.3

95 876 10 117.66.4

A.8

B.9

5.2

A.A

A.9

AD-130

REMOVE EXISTING STONE CORNICE TO EXTENT REQUIRED TO INSTALL NEW

CONSTRUCTION. SEE BID DEDUCT #1 ARCHITECTURAL NEW WORK

EXISTING SHEATHING AND JOISTS TO REMAIN. NEW OPENINGS TO BE CUT

WHERE SHOWN ON SEE BID DEDUCT #1 NEW WORK PLAN.

REMOVE EXISTING DORMER AND STRUCTURE TO EXTENT REQUIRED TO

INSTALL NEW CONSTRUCTION. SEE ARCHITECTURAL AND STRUCTURAL NEW

WORK

DETAIL

2/AE506

DETAIL

2/AE506

DETAIL

2/AE506

EXISTING JOISTS AND

SHEATHING TO REMAIN.

CAREFULLY REMOVE

EXISTING LOUVER

COORDINATE WITH BID

DEDUCT #1 NEW PLANS

A

B

C

D

C.3

95 876 10 117.66.4

A.8

B.9

5.2

A.A

A.9

REMOVE EXISTING STONE CORNICE TO EXTENT

REQUIRED TO INSTALL NEW CONSTRUCTION. SEE

SEE BID DEDUCT #1 ARCHITECTURAL NEW WORK

REMOVE EXISTING ROOFING TO EXTENT REQUIRED

TO INSTALL NEW CONSTRUCTION. SEE

ARCHITECTURAL AND STRUCTURAL FOR NEW WORK

DETAIL

2AE506

DETAIL

2/AE506

DETAIL

2/AE506

REMOVE EXISTING DORMER AND STRUCTURE TO

EXTEND REQUIRED TO INSTALL NEW

CONSTRUCTION. SEE ARCHITECTURAL AND

STRUCTURAL NEW WORK

N

KEY PLAN(BID DEDUCT 1)

NEW ADDITION

A R C H I T E C T S E N G I N E E R S

CB

Drawing Number:

Project Title:

Project Location:

Issue Date

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:

Revisions: Date:

CONSULTANT:

23456789101112131415

B

C

D

E

F

G

H

I

J

123456789101112131415

/8

/4

/8

/2

/4

-1

/2

Drawing of

Architect:

CB DESIGN GROUP, INC.

421 King St., Suite 301 Alexandria, VA 22314 POC: Wes Bridges, AIA 703.772.4213

TOMAH VAMC

TOMAH, WISCONSIN

DECEMBER 15, 2022

676-325

AuthorChecker

EXPAND AND RENOVATE

B404 FOR OUTPATIENT

MENTAL HEALTH

BID SET

FLOOR PLANS - BID DEDUCT 1

BD-102

90 250

-3

B D

-1

/1

/2

.p d f

SCALE: 1/8" = 1'-0"

THIRD FLOOR PLAN BID DEDUCT #1

SCALE: 1/8" = 1'-0"

THIRD FLOOR DEMO PLAN BID DEDUCT 1

KEYNOTES - DEMOLITION PLAN

# DESCRIPTION

D1 REMOVE EXISTING STONE BELT TO EXTENT REQUIRED TO INSTALL NEW CONSTRUCTION. SEE ARCHITECTURAL NEW

WORK

D2 REMOVE PLUMBING FIXTURES AND TOILET ACCESSORIES.

D3 REMOVE FURRED WALL STRUCTURE SLAB TO DECK

D4 REMOVE EXISTING WINDOW, FRAME, SILL, SHADES, BLINDS, AND ALL ASSOCIATED HARDWARE. PREPARE FOR NEW

WINDOW INSTALLATION OR INFILL. SEE NEW WORK PLANS

D5 REMOVE DOOR(S) AND FRAME(S). (TO INCLUDE STOPS & HOLD OPENS WHERE THEY OCCUR)

D6 REMOVE EXTERIOR MASONRY WALL (BRICK & CMU), INCLUDING ALL WINDOWS, DOORS, ETC. IN AREA INDICATED. EXIST.

FOUNDATION & FOOTING TO REMAIN IN PLACE FOR REUSE W/ NEW EXTERIOR CLOSURE SYSTEM - SEE STRUCT. DWGS.

D7 REMOVE PORTION OF WALL INDICATED. INSTALL LINTEL PER STRUCTURAL AS REQUIRED. SEE ARCHITECTURAL PLANS

FOR SIZE.

D8 REMOVE LANDING, STAIR, AND FOUNDATION

D9 REFER TO MECHANICAL DEMO PLAN

D10 REMOVE EXISTING MILLWORK AND ALL ASSOICATED COMPONENTS.

D11 CAREFULLY REMOVE EXISTING PARTITION AS NEEDED FOR NEW DOOR INSTALLATION. PROVIDE TEMPORARY SUPPORT

AT OPENING DURING CONSTRUCTION. REFER TO NEW WORK PLAN FOR NEW DOOR LOCATION

D12 CAREFULLY REMOVE EXISTING CONCRETE SLAB TO THE EXTENT SHOWN TO PREPARE FOR NEW WORK REFER TO NEW

WORK PLAN FOR DIMENSIONS

D13 REMOVE EXISTING STONE BELT TO EXTENT REQUIRED TO INSTALL NEW CONSTRUCTION. SEE ARCHITECTURAL NEW

WORK

D14 REMOVE ALL ROOM FINISHES. REMOVE FLOOR FINISHES DOWN TO SLAB. PREPARE EXISTING SLAB TO RECEIVE NEW

FLOORING.

D15 REMOVE ELEVATOR AND ALL ASSOCIATED EQUIPMENT DOWN TO PIT

D16 REMOVE ALL CEILINGS AND BULKHEADS INCLUDING ALL ANCHORS, HANGERS, LIGHTING DEVICES, ETC.

D17 REMOVE LOCKERS

D18 REMOVE CORRIDOR WALL FINISHES, CORNER GUARDS, WALL PROTECTION FLOORING DOWN TO SLAB, BASE, AND ALL

OTHER FINISH ITEMS.

SCALE: 1/8" = 1'-0"

ATTIC FLOOR DEMO PLAN BID DEDUCT 1

SCALE: 1/8" = 1'-0"

ROOF LEVEL DEMO PLAN BID DEDUCT 1

KEYNOTES - ROOF PLAN

# DESCRIPTION

R1 ROOF DRAIN AND OVERFLOW DRAIN. SEE DETAIL 2/AE550.

R2 PARAPET WALL TO WRAP ROUND EXTENDED COLUMNS WHICH ARE 4 FT ABOVE FINISHED FLOOR TO ALLOW FOR

CONNECTION OF FUTURE FLOOR. (REFER TO STRUCTURAL DRAWINGS)

R3 FALL PROTECTION ANCHOR: CONTRACTOR SHALL PERFORM A DELEGATED DESIGN TO MEET ALL STRUCTURAL AND

OSHA REQUIREMENTS AND THE DESIGN SHALL BE STAMPED BY THE CONTRACTOR ENGINEERS

2/15/2023 85 of 233

T P

R

S P

S P

AT

AT

AT AT

AT

AT

ATAT

AT

DA

AT AT

AT AT

W P

S -3

WPS-3

W P

S -3

P T

-6

PT-6

PT-6 & IMAGE

VWC-3 ON

WALL

P T

-6

WPS-3

W P

S -3

W P

S -3

WPS-3

W P

S -3

WPS-3

W P

S -3

WPS-3

WPS-3

T P

R

DOOR STAIR

2' - 8"

5' - 0"

E

94 94

N1

N1

N1

N1

N1

S P

S P

F

TV

CR

D A

DA

DA

N L

N L

N L

N L

NL

NS

J J

VS

WF

T V

T V

A

B

C

D

C.3

95 876 10 117.66.4

A.8

B.9

5.2

A.A

A.9

AE-551

ADMIN

CONFERENCE

30418

BUILDING

ELECTRICAL

30416

ELEVATOR

LOBBY

3C05

GROUP ROOM

C

30436

LOUNGE

30443

CORRIDOR

3C07

GENDER

NEUTRAL

TOILET

30447

GENDER

NEUTRAL

TOILET

30449

BUILDING

DATA

30451

STAFF BREAK

30453

GENDER

NEUTRAL

TOILET

30452

FAMILY

TOILET

30448

HVAC

30446 OFFICE

30459

EAST STAIR

3S1

AE-511

AE-516

STORAGE

30450

C1

C2

C1

C1

GROUP ROOM

C

30436

CORRIDOR

3C07

ELEVATOR

LOBBY

3C05

BUILDING

ELECTRICAL

30416

BUILDING

DATA

30451

STAFF BREAK

30453

GENDER

NEUTRAL

TOILET

30449

FAMILY

TOILET

30448

GENDER

NEUTRAL

TOILET

30447

GENDER

NEUTRAL

TOILET

30452

HVAC

30446 OFFICE

30459

LOUNGE

30443

ADMIN

CONFERENCE

30418

EAST STAIR

3S1

CORRIDOR

3C03

CORRIDOR

3C04

CORRIDOR

3C08

STORAGE

30450

F1

FLOOR DIRECTORY -

SIGN TYPE 'D' REFER

TO SHEET AE305

GENERAL NOTE APPLICABLE TO ALL DRAWINGS - ITEMS AND CONDITIONS DETAILED NOTED OR OTHERWISE IDENTIFIED ON ONE OF THE SECTIONS OR DETAILS ARE APPLICABLE AND BINDING TO ALL OTHER SECTIONS AND DETAILS FOR IDENTICAL OR

SIMILAR CONDITIONS.

1. TYPICAL CEILING HEIGHT TO BE UNLESS OTHERWISE INDICATED ON REFLECTED CEILING PLANS. BULKHEADS TO BE 8'-0" UNLESS OTHERWISE INDICATED ON REFLECTED CEILING PLANS OR DETAILS. TOILETS AND STORAGE ROOMS TO BE

8'-0".

2. REFER TO ELECTRICAL DRAWINGS FOR LIGHT PATTERN AND EXIT LIGHT LOCATIONS. NOTIFY ARCHITECT OF

DISCREPANCIES PRIOR TO SHOP DRAWINGS.

3. REFER TO MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ITEMS NOT SHOWN ON CEILING PLAN. GRILLES, SPEAKERS, SPRINKLERS, HEAT & SMOKE DETECTORS, TO BE CENTERED IN TILES UNLESS NOTED OTHERWISE.

4. ALL BULKHEAD DIMENSIONS ARE FROM FINISH FACE OF WALL OR BULKHEAD TO FINISH FACE OF BULKHEAD.

5. PROVIDE 1/2" REVEALS BETWEEN DISSIMILAR MATERIALS ON THE SAME PLANE AT THE CEILINGS.

6. CEILING HEIGHTS ARE DIMENSIONED FROM FLOOR DATUM ELEVATION TO FINISHED CEILING, UNLESS OTHERWISE NOTED.

7. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION RELATIVE TO DEVICE AND FIXTURE

LOCATIONS.

8. COORDINATE INTEGRATION OF CEILING SYSTEMS WORK INCLUDING, BUT NOT LIMITED TO, MECHANICAL, ELECTRICAL, SPRINKLER AND FIRE PROTECTION, TELECOMMUNICATIONS, AND STRUCTURAL SYSTEMS, TO MAINTAIN CEILING HEIGHT

INDICATED. NOTIFY ARCHITECT OF CONFLICTS PRIOR TO PROCEEDING WITH THE WORK.

9. LOCATE COMPONENTS WITHIN CEILING PLENUM TO MAXIMIZE CLEAR AREA FOR INSTALLATION OF LIGHT FIXTURES AND

ACCOMMODATE FIXTURE LAYOUT AS INDICATED..

10. PROVIDE ACCESS PANELS AT GYPSUM BOARD CEILINGS AND WHERE ACCESS IS REQUIRED FOR ITEMS OF MECHANICAL, PLUMBING AND ELECTRICAL WORK LOCATED BEHIND OR ABOVE FINISHED WALLS OR CEILINGS WHICH REQUIRE ACCESS, WHETHER OR NOT SUCH PANELS ARE INDICATED ON DRAWINGS. VERIFY LOCATION OF ACCESS PANELS WITH ARCHITECT

PRIOR TO INSTALLATION.

11. REVIEW LOCATION OF LIFE-SAFETY DEVICES AND/OR EQUIPMENT NOT SHOWN ON THE DRAWINGS WITH ARCHITECT

PRIOR TO INSTALLATION.

12. COORDINATE ABOVE CEILING DRAFTSTOP LOCATIONS IN ACCORDANCE WITH REQUIREMENTS OF APPLICABLE CODES AND

AUTHORITIES HAVING JURISDICTION.

13. ACOUSTICAL CEILING GRID AND LIGHTING SHALL BE CENTERED IN ROOM(S) UNLESS NOTED OTHERWISE.

14. CENTER RECESSED LIGHTS, ELECTRICAL, MECHANICAL DEVICES AND SPRINKLER HEADS WHEN SHOWN IN CEILING TILES.

WHERE RECESSED LIGHTS ARE SHOWN OFF-CENTER IN 2X4 SCORED CEILING TILE, CENTER THE FIXTURE WITHIN THE 2X2

PORTION OF THE TILE.

15. CEILING FINISHES ADJACENT TO OR WITHIN THE LIMITS OF CONSTRUCTION DISTURBED OR DAMAGED BY CONSTRUCTION

SHALL BE PATCHED TO MATCH EXISTING ADJACENT CEILING FINISH.

16. SEE SHEETS FA001, FP001, MH001 AND EJ001 FOR CEILING EQUIPMENT LEGENDS.

17. AT WINDOW HEAD, CEILING IS 8'-10 1/2" TO ACCOMMODATE FOR HEAD OF WINDOW. SEE DETAIL 1/AE516.

GENERAL NOTES - RCP

8'-0"

TT-1: TERRAZZO TILE -

COLOR 1

HR-# & WP-# (HAND RAILS & RIGID SHEET \

WALL PROTECTION)

CG-# (CORNER GUARD \ WALL PROTECTION)

CPT-1: CARPET

TILE - COLOR 1

CPT-2: CARPET

TILE - COLOR 2

CPT-3: CARPET

TILE - COLOR 3

PFT-1: PORCELAIN FLOOR

TILE - COLOR 1

PFT-2: PORCELAIN FLOOR

TILE - COLOR 2

PFT-3: PORCELAIN FLOOR

TILE - COLOR 3

RFT-1: RESILIENT FLOOR

TILE - COLOR 1

CONC-1

LVT-1: LUXURY

VINYL TILE - COLOR 1

LVT-2: LUXURY

VINYL TILE - COLOR 2

RSF-1: RESILIENT SHEET

FLOORING - COLOR 1

RSF-2: RESILIENT SHEET

FLOORING - COLOR 2

TT-2: TERRAZZO TILE -

COLOR 2

LVT-3: LUXURY

VINYL TILE - COLOR 3

LVT-4: LUXURY

VINYL TILE - COLOR 4

LVT-5: LUXURY

VINYL TILE - COLOR 5

ACT-1: ACOUSTIC PANEL CLG. - 2'X2'

ACT-2: ACOUSTIC PANEL CLG. - 2'X2' CLEAN ROOM

EXP: EXPOSED CONSTRUCTION - PAINTED

PT#: PAINT - COLOR #

ETR: EXISTING TO REMAIN

N.I.C: NOT IN CONTRACT

CEILINGS

BASES

NONE: NO BASE

CTB-1: CERAMIC TILE BASE - COLOR 1

CTB-2: CERAMIC TILE BASE - COLOR 2

RSFB-1: RESILIENT SHEET BASE - COLOR 1

RSFB-2: RESILIENT SHEET BASE - COLOR 2

RB-1: RESILIENT SHEET BASE, INTEGRAL

- COLOR 1

RB-2: RESILIENT SHEET BASE, INTEGRAL

- COLOR 2

TT-1: TERRAZZO TILE BASE - COLOR 1

TT-2: TERRAZZO TILE BASE - COLOR 2

MTB-1: WALK OFF MAT BASE - COLOR 1

ETR: EXISTING TO REMAIN

N.I.C: NOT IN CONTRACT

WALLS

CT1: CERAMIC TILE - COLOR 1

CT2: CERAMIC TILE - COLOR 2

PT#: PAINT - COLOR #

WPS-1: WALL PROTECTION SYSTEM (HANDRAIL) - COLOR 1

WPS-2: WALL PROTECTION SYSTEM (HANDRAIL) - COLOR 2

WPS-3: WALL PROTECTION SYSTEM (HANDRAIL) - COLOR 3

PL-0: PLASTIC LAMINATE - COLOR 0

PL-1: PLASTIC LAMINATE - COLOR 1

VWC#: FULL WALL GRAPHIC IMAGE #

DFP-1: DIVIDE PARTITION PANEL - 1

OP-1: OPERABLE PARTITION

CWC: CORK WALL FINISH - ACOUSTICS WALL COVERING

ETR: EXISTING TO REMAIN

N.I.C: NOT IN CONTRACT

FLOORS:

ETR : EXISTING TO REMAIN

FINISH MATERIALS

WT-# (ROLLER SHADE \ WINDOW

TREATMENT)

PT-#, CT-#, ETC. (WALL FINISH EXTENTS)

SPACES NOT LISTED ON THE SCHEDULE TO HAVE THE TYPICAL

FINISHES LISTED BELOW:

FLOORS: REFER TO FINISH PLAN AND SCHEDULE

BASE: REFER TO FINISH PLAN & SCHEDULE

WALLS: PT-1

CEILING: ACT-1

GYP. BD. ABOVE H.M. FRAMES AS INDICATED ON SECTIONS.

DETAILS TO RECEIVE SAME TOP COATS AS ADJACENT WALLS

UNLESS OTHERWISE NOTED.

TYPICAL FINISHES

A

B

C

D

C.3

95 876 10 117.66.4

A.8

B.9

5.2

A.A

A.9

AE-551

1/4" PER 1'-0" TAPERED INSULATION

AND EPDM ROOFING

ROOF PARAPET

AND EXPANSION

JOINT

PARAPET CAP EXPANSION JOINT

EXPANSION JOINT

CRICKET LOCATIONS TO BE

CONFIRMED ON SITE

ACCORDING TO EXISTING

ROOF SLOPE

SLOPE 1/4"

PER FOOTSLOPE 1/4"

PER FOOT

S

LO

P E

/4

P

E R

F O

O T

S

LO

P E

/4

P

E R

F O

O T

3'-0" 18'-7 1/8" 3'-0"

+3 +3

+2

+3

+3 +3

+2 +2

SLOPE 1/4"

PER FOOT

S

LO

P E

/4

P

E R

F O

O T

S

LO

P E

/4

P

E R

F O

O T

SLOPE 1/4"

PER FOOT

SLOPE 1/4"

PER FOOT +3

+3

+3

AE-506

AE-506

AE-506

AE-506

METAL DECK SCREEN WALL ASSEMBLY.

SEE STRUCT.

AE-417

AE-417

R1

R1

R1

BD-104

R2R2

R2

R2

R3 R3

1. UNIFORMLY SLOPE TAPERED INSULATION MINIMUM 1/4" IN HEIGHT PER 1'-0" HORIZONTALLY (OR AS REQUIRED BY

CODE) AT LEVEL ROOF AREAS, UNLESS OTHERWISE NOTED.

2. MINIMUM ROOF INSULATION THICKNESS AT ROOF DRAINS (LOW POINT) MUST MAINTAIN THE R-VALUE THAT IS REQUIRED BASED ON ASHRAE 90.1. SLOPE CRICKET INSULATION TO DRAIN AROUND PENETRATIONS (VENTS, STACK, ETC) AND AT VALLEYS BETWEEN ROOF DRAINS SHALL TAPER UPWARDS TO MAINTAIN THE SLOPE.

3. UNLESS THERE ARE SCUPPERS PROVIDE SECONDARY ROOF DRAINS 2" ABOVE PRIMARY ROOF DRAIN.

4. SEE AE550 AND AE551 FOR ROOF DETAILS.

GENERAL NOTES - ROOF PLAN

A

B

C

D

C.3

95 876 10 117.66.4

A.8

B.9

5.2

A.A

A.9

GROUP ROOM

C

30436

ELEVATOR

LOBBY

3C05

BUILDING

ELECTRICAL

30416

BUILDING

DATA

30451

STAFF BREAK

30453

GENDER

NEUTRAL

TOILET

30449

FAMILY

TOILET

30448

GENDER

NEUTRAL

TOILET

30447

GENDER

NEUTRAL

TOILET

30452

HVAC

30446

OFFICE

30459

LOUNGE

30443

ADMIN

CONFERENCE

30418

EAST STAIR

3S1

CORRIDOR

3C04

CORRIDOR

3C08

F1

STORAGE

30450

SIGN TYPE D

T V

(N .I

.C

TV(N.I.C)

T V

(N .I

.C

STORAGE

30436A

N

KEY PLAN(BID DEDUCT 1)

NEW ADDITION

A R C H I T E C T S E N G I N E E R S

CB

Drawing Number:

Project Title:

Project Location:

Issue Date

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Subm…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .