Attachment 5 - Drawing Part 2 676-325 Renovate B404 - Architectural_Part1.pdf

PDF 10 MB Posted

Attached to
Y1DA--Minor Construction - Tomah VAMC 676-325 Expand and Renovate B404 for Outpatient Mental Health
Solicitation number
36C77623B0050_1
Issued by

About this file

This document provides details on a federal contract opportunity for architectural design services. The solicitation is for minor construction services to expand and renovate an outpatient mental health facility at the Tomah Veterans Affairs Medical Center in Tomah, Wisconsin. Specifically, the project involves renovating room B404 to better accommodate outpatient mental health needs. The contracting agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. Interested parties should reference solicitation number 36C77623B0050_1 in any responses, which are due on the date specified in the full solicitation. The award is expected to be a firm-fixed-price contract for architectural design and construction oversight services.

View the file

Other files

File Type Posted
Amendment 0007 Attachment 33 - Wage Determination 02-02-24.pdf PDF
Amendment_0007 36C77623B0050_1 0007.pdf PDF
Amendment_0006 36C77623B0050_1 pdf.pdf PDF
Amendment_0005 Attachment 31 - VAT-MP-ADD-1 - Response to 39.pdf PDF
Amendment_0005 Attachment 25 - B404 ACM Spreadsheet Inventory 2015 - Response to 1.pdf PDF
Amendment_0005 Attachment 29 - Response to 34.pdf PDF
Amendment_0005 Attachment 32 - Replace HVAC AC B404 Record Drawings Set - Response to 38.pdf PDF
Amendment_0005 36C77623B0050_1 pdf.pdf PDF
Amendment_0005 Attachment 30 -237413 PackagedOutdoorCentral-Station Air-Handling Units_addendum 1.pdf PDF
Amendment_0005 Attachment 24 - 2431 Tomah WI ACM - Response to 1.pdf PDF
Amendment_0005 Attachment 26 - Spec Section 27 52 23 - Response to 15.pdf PDF
Amendment_0005 Attachment 27 - Spec Section 26 29 11 - Response to 16.pdf PDF
Amendment_0005 Attachment 28 - B404 TR - Response to 18.pdf PDF
Amendment_0005 Attachment 23 - Tomah Technical Questions and VA Responses.pdf PDF
Amendment_0004 36C77623B0050_1 .pdf PDF
Amendment _0003 36C77623B0050_1 .pdf PDF
Amendment_0002 Attachment 21 - Tomah Site Visit sign-in sheet.pdf PDF
Amendment_0002 36C77623B0050_1 .pdf PDF
Attachment 2 - Bid Set - Spec V1R.pdf PDF
Amendment_0001 36C77623B0050_1 pdf.pdf PDF
Amendment_0001 Attachment 20 - 676-325 Renovate B404 - Structural Pages SG-001 to SB-100.pdf PDF
Amendment_0001 Attachment 3 - Bid Set - Spec V2R revised.pdf PDF
Attachment 17 - VA Notice of Limitations on Subcontracting.pdf PDF
Attachment 15 - Drawing Part 12 676-325 Renovate B404 - Structural.pdf PDF
36C77623B0050_1.pdf PDF
Attachment 6 - Drawing Part 3 676-325 Renovate B404 - Architectural_Part2.pdf PDF
Attachment 7 - Drawing Part 4 676-325 Renovate B404 - Architectural_Part3.pdf PDF
Attachment 18 - Wage Determination 10-13-23.pdf PDF
Attachment 4 - Drawing Part 1 676-325 Renovate B404 - Architectural.pdf PDF
Attachment 13 - Drawing Part 10 676-325 Renovate B404 - Plumbing.pdf PDF
Attachment 10 - Drawing Part 7 676-325 Renovate B404 - Fire Supression.pdf PDF
Attachment 1 - Statement of Work - Tomah.pdf PDF
Attachment 19 - Brand Name JA Tomah.pdf PDF
Attachment 3 - Bid Set - Spec V2R.pdf PDF
Attachment 2 - Bid Set - Spec V1R.pdf PDF
Attachment 8 - Drawing Part 5 676-325 Renovate B404 - Electrical and Technology.pdf PDF
Attachment 16 - GeoTech Report.pdf PDF
Attachment 11 - Drawing Part 8 676-325 Renovate B404 - Floor Plans.pdf PDF
Attachment 12 - Drawing Part 9 676-325 Renovate B404 - Mechanical.pdf PDF
Attachment 9 - Drawing Part 6 676-325 Renovate B404 - Finishes.pdf PDF
Attachment 14 - Drawing Part 11 676-325 Renovate B404 - Site Drawings GI-001 to LS-101.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JT

J T

UP

B ri ck

W a ll

949.91 949.77

.7

. 0

951.04

.8

.6

.1

.8

951.62

951.69

FFE=

952.10

FFE=

953.34

FFE=

951.93

GFE=

951.55

Planters

Planters

Wood Fence

Wood Fence

Vinyl Fence

C h a in

L in k F e n c e

47.2

.0

50.01 .8

117.8

46.1

.3

.8

46.2

.1

127.4

950.83

TNH=

952.89

G STREET

(A Public R/W)

G

R

UP

N

N

N

Range

BUILDING NO. 405

BUILDING NO. 404

NEW ENTRY WALK AND

LANDSCAPING

EXISTING TRANSFORMERS NEW ADDITION

A R C H I T E C T S E N G I N E E R S

CB

DESIGN

GROUP

Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:

Revisions: Date:

CONSULTANT:

23456789101112131415

B

C

D

E

F

G

H

I

J

123456789101112131415

/8

/4

/8

/2

/4

-1

/2

Drawing of

Architect:

CB DESIGN GROUP, INC.

421 King St., Suite 301 Alexandria, VA 22314 POC: Wes Bridges, AIA 703.772.4213

TOMAH VAMC

TOMAH, WISCONSIN

DECEMBER 15, 2022

676-325

AuthorChecker

EXPAND AND RENOVATE

B404 FOR OUTPATIENT

MENTAL HEALTH

BID SET

ARCHITECTURAL SITE PLAN

AS-100

13 250

-3

A S

-1

/2

/2

.p d f

SCALE:1" = 15'-0"AS-100

1 ARCHITECTURAL SITE PLAN N

13 of 2332/15/2023 13 of 233

A

B

C

D

E

F

H

E.8

C.3

G

1 94 5 876321A 1910 151411 12 13 16 17 187.66.4

A.8

B.9 D8

5.2 11a

A.A

D9 D9 D9

D9

D9

D9

D9

A.9

D

C.6

D1

D1

1. ALL WORK SHOWN IS EXISTING TO REMAIN UNLESS NOTED OR INDICATED AS DASHED LINES TO BE REMOVED. THE EXTENT OF DEMOLITION WORK SHALL INCLUDE ALL INCIDENTAL DEMOLITION WORK NECESSARY TO PROPERLY PROVIDE ALL NEW WORK SHOWN AND SPECIFIED, TO INCLUDE MECHANICAL, ELECTRICAL, & PLUMBING ITEMS.

2. DEMOLITION WORK SHOWN IS BASED ON EXISTING DRAWINGS AND INSPECTIONS. THE CONTRACTOR SHALL VISUALLY INSPECT ALL EXISTING CONDITIONS, AND IS RESPONSIBLE FOR PERFORMING THE INDICATED DEMOLITION WORK EVEN

IF ACTUAL CONDITIONS DIFFER FROM THESE SHOWN ON THE DRAWINGS.

3. DEMOLITION CONTRACTOR SHALL COORDINATE WITH NEW WORK SECTIONS FOR ADDITIONAL INFORMATION RELATED

TO EXTENT OF DEMOLITION.

4. REFER TO ALL OTHER DRAWINGS IN THIS SET FOR INCIDENTAL DEMOLITION WORK NOT NOTED ON THE DEMOLITION

PLANS.

5. THE OWNER HAS FIRST RIGHT OF REFUSAL OF ALL SALVAGE ITEMS. THE CONTRACTOR SHALL PROPERLY DISPOSE OF

ALL CONSTRUCTION DEBRIS. DO NOT STOCKPILE DEBRIS ON SITE.

6. ITEMS TO BE DEMOLISHED SHALL BE REMOVED COMPLETELY INCLUDING ALL ANCHORS, HANGERS, FASTENERS, PIPES, CONDUCTS, DUCTS, ETC. UNLESS OTHERWISE INDICATED TO BE ABANDONED IN PLACE.

7. CONC. SLAB PATCHES MUST BE FLUSH WITH REMAINING SURFACES TO PERMIT APPLICATION OF FINISHES. PROVIDE

WELDED WIRE MESH IN PATCH AREAS LARGER THAT (4) FOUR SQUARE FEET.

8. CONC. SLABS TO REMAIN SHALL BE PATCHED, SCRAPED, LEVELED, AND CLEANED TO PROVIDE SURFACE SUITABLE FOR NEW FINISHES. WHERE RENOVATED AREAS ARE RECEIVING NEW UNDERGROUND MECHANICAL, PLUMBING, ELECTRICAL, OR ADDITIONAL FOUNDATION WORK, SEE MECHANICAL, PLUMBING, ELECTRIC, AND STRUCTURAL DRAWINGS, AS WELL AS ARCHITECTURAL DRAWINGS TO DETERMINE EXTENT OF REQUIRED CUT AND PATCH OF EXISTING SLAB. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL CONC. SLAB DEMOLITION AND REPLACEMENT NECESSARY TO INSTALL THE NEW WORK. BACKFILL ALL BELOW GRADE DEMOLITION WORK WITH SUITABLE FILL

MEETING STRUCTURAL REQUIREMENTS FOR NEW WORK.

9. PARTITIONS SHOWN TO BE REMOVED SHALL BE CONFIRMED BY THE CONTRACTOR AS TO TYPE OF PARTITION AND EXACT LOCATION. COMPLETELY REMOVE PARTITIONS FROM FLOOR TO STRUCTURE ABOVE INCLUDING BASE, ALL FASTENERS, GROUTS, SEAL ANTS, ETC., UNLESS NOTED OTHERWISE. MASONRY PARTITIONS WHICH EXTEND THROUGH THE SLAB SHALL BE REMOVED TO 8" BELOW FINISH FLOOR. FILL SLAB OPENING WITH CONCRETE FILL TO RECEIVE FINISH FLOOR. WHERE WALLS SCHEDULED TO BE REMOVED SIT ON SLABS, GRIND SLAB TO RECEIVE FINISH FLOOR.

10. REMOVE, PATCH AND REPAIR PORTIONS OF WALL PARTITIONS WHICH CONFLICT WITH NEW WORK TO BE INSTALLED, EVEN IF NOT SPECIFICALLY NOTED TO BE DEMOLISHED ON PLANS.

11. WALLS TO BE REMOVED FROM INTERSECTING WALLS SHALL INCLUDE TOOTHED IN REPLACEMENT OF DAMAGED MASONRY ON WALL TO REMAIN AND REMOVAL OF TIES PROJECTING FROM WALLS. SEE DETAILS FOR ADDITIONAL

CONDITIONS.

12. WALLS TO BE PARTIALLY REMOVED SHALL BE TERMINATED WITH FINISHED MASONRY ENDS BY TOOTHING IN NEW MASONRY UNITS, TO MATCH ADJACENT MASONRY. SEE DETAILS FOR OTHER CONDITIONS. NO WALLS SHALL BE

TERMINATED WITH EXPOSED OPEN CELLS OR DAMAGED MASONRY UNITS.

13. WHERE NEW OPENINGS ARE SHOWN IN EXISTING WALLS, CAREFULLY REMOVE MASONRY TO NEAREST JOINT LINE WITHOUT DISTURBING ADJACENT WORK SO THAT NEW WORK CAN BE PATCHED IN TO MATCH. ALL NEW MASONRY

WORK SHALL BE TOOTHED IN.

14. ALL EXISTING STRUCTURE SHALL REMAIN, UNLESS NOTED OTHERWISE.

15. COORDINATE DEMOLITION OF ALL STRUCTURAL ITEMS (COLUMNS, BEAMS, SLABS, ET, ETC.) WITH STRUCTURAL DWGS.

EXTENT OF DEMOLITION AREA SHALL BE IN ACCORDANCE WITH STRUCTURAL REQUIREMENTS AND COORDINATED WITH

ALL NEW WORK.

16. TEMPORARILY SUPPORT ALL BEAMS, LINTELS, PORTIONS OF WALLS ETC., TO BE DISTURBED BY DEMOLITION WORK, UNTIL THEY ARE RE-SUPPORTED BY NEW WORK.

17. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF EXISTING BUILDING ELEMENTS TO REMAIN THROUGHOUT SEQUENCE OF WORK. ANY DAMAGE TO EXISTING BUILDING CONDITIONS SHOWN TO REMAIN SHALL BE

RESTORED TO NEW WORK CONDITION AT NO ADDITIONAL COST TO THE OWNER.

18. WINDOWS SCHEDULED FOR REMOVAL SHALL BE REMOVED COMPLETELY. FASTENERS MAY BE CUT FLUSH WITH HEAD, JAMBS, AND SILLS IF THE NEW WINDOW UNIT WILL CONCEAL FASTENER. PROTECT EXISTING SILLS SCHEDULED TO REMAIN. ALL EXISTING WINDOW OPENINGS MUST BE FIELD MEASURED PRIOR TO SUBMITTAL OF SHOP DRAWINGS.

19. WERE FINISHES ARE INDICATED TO BE REMOVED, REMOVAL SHALL INCLUDE ANY GROUT, ADHESIVES, FASTENERS, AND

ALL OTHER ITEMS USED TO ATTACH THE FINISHES TO THE SURFACES THAT THEY COVER.

20. ANY FLOOR AREAS DAMAGED BY THE DEMOLITION CONTRACTOR SHALL BE PATCHED TO MATCH EXISTING.

21. WHERE CEILINGS ARE TO BE REMOVED, REMOVE ALL CEILINGS SYSTEMS COMPLETE INCLUDING GRID, TRIM HANGER, CLIPS, ETC. WHERE NEW CEILINGS ARE SPECIFIED, NO DOUBLE CEILINGS PERMITTED. REMOVE ALL ORIGINAL

CONCEALED CEILINGS WHERE ENCOUNTERED.

22. ALL EXISTING SURFACES TO REMAIN SHALL BE PROTECTED, PATCHED IF DAMAGED AND CLEANED PRIOR TO

APPLICATION OF FINISHES.

23. CONTRACTOR TO PROTECT ALL EQUIPMENT AND OTHER ELEMENTS IN AREA OF NEW OR DEMOLITION WORK.

24. REMOVE ALL CURTAINS AND BLINDS IN AREAS OF RENOVATION OR DEMOLITION, UNLESS NOTED OTHERWISE.

25. REMOVE MECHANICAL, ELECTRICAL AND PLUMBING ITEMS AS NOTED ON MECHANICAL, ELECTRICAL AND PLUMBING

PLANS. COORDINATE WITH CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING, FOR ADDITIONAL DEMOLITION NOTES. REMOVAL WORK IS INTENDED TO INCLUDE ALL ASSOCIATED ITEMS SUCH AS ELECTRICAL OUTLETS, SWITCHES, CONDUITS, CONTROLS, PIPING, MOUNTING BLOCKS, ETC., AS NOTED. THE CONTRACTOR SHALL REFER TO ALL CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS AND SPECIFICATIONS FOR PROCEDURES CONCERNING RELATED TRADES IN AREAS WHICH REQUIRE DEMOLITION. REPAIR AND PATCH ANY AREAS

DAMAGED DURING REMOVAL WORK.

26. ASBESTOS CONTAINING MATERIALS (ACM) MAY BE PRESENT IN DEMOLISHED MATERIALS. CONTRACTOR TO PROVIDE TESTING AND REMEDIATE ANY MATERIAL FOUND IN SCOPE OF WORK AREA. IF ACM OR OTHER HAZARDOUS MATERIALS ARE FOUND IN PROJECT AREA AND ARE DISTURBED BY CONSTRUCTION ACTIVITY STOP WORK IMMEDIATELY AND

CONTACT THE COR FOR THE PROJECT.

GENERAL NOTES - DEMOLITION

DOOR TO BE REMOVED

CONSTRUCTION TO BE REMOVED

CONSTRUCTION TO REMAIN

DEMOLITION LEGEND

AREA NOT INCLUDED IN SCOPE

N

KEY PLAN

NEW ADDITION

A R C H I T E C T S E N G I N E E R S

CB

Drawing Number:

Project Title:

Project Location:

Issue Date

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:

Revisions: Date:

CONSULTANT:

23456789101112131415

B

C

D

E

F

G

H

I

J

123456789101112131415

/8

/4

/8

/2

/4

-1

/2

Drawing of

Architect:

CB DESIGN GROUP, INC.

421 King St., Suite 301 Alexandria, VA 22314 POC: Wes Bridges, AIA 703.772.4213

TOMAH VAMC

TOMAH, WISCONSIN

DECEMBER 15, 2022

676-325

AuthorChecker

EXPAND AND RENOVATE

B404 FOR OUTPATIENT

MENTAL HEALTH

BID SET

BASEMENT FLOOR DEMO PLAN

AD-100

14 250

-3

A D

-1

/1

/2

.p d f

SCALE: 1/8" = 1'-0"AD-100

1 BASEMENT FLOOR DEMO PLAN

KEYNOTES - DEMOLITION PLAN

# DESCRIPTION

D1 REMOVE EXISTING STONE BELT TO EXTENT REQUIRED TO INSTALL NEW CONSTRUCTION. SEE ARCHITECTURAL NEW

WORK

D2 REMOVE PLUMBING FIXTURES AND TOILET ACCESSORIES.

D3 REMOVE FURRED WALL STRUCTURE SLAB TO DECK

D4 REMOVE EXISTING WINDOW, FRAME, SILL, SHADES, BLINDS, AND ALL ASSOCIATED HARDWARE. PREPARE FOR NEW

WINDOW INSTALLATION OR INFILL. SEE NEW WORK PLANS

D5 REMOVE DOOR(S) AND FRAME(S). (TO INCLUDE STOPS & HOLD OPENS WHERE THEY OCCUR)

D6 REMOVE EXTERIOR MASONRY WALL (BRICK & CMU), INCLUDING ALL WINDOWS, DOORS, ETC. IN AREA INDICATED. EXIST.

FOUNDATION & FOOTING TO REMAIN IN PLACE FOR REUSE W/ NEW EXTERIOR CLOSURE SYSTEM - SEE STRUCT. DWGS.

D7 REMOVE PORTION OF WALL INDICATED. INSTALL LINTEL PER STRUCTURAL AS REQUIRED. SEE ARCHITECTURAL PLANS

FOR SIZE.

D8 REMOVE LANDING, STAIR, AND FOUNDATION

D9 REFER TO MECHANICAL DEMO PLAN

D10 REMOVE EXISTING MILLWORK AND ALL ASSOICATED COMPONENTS.

D11 CAREFULLY REMOVE EXISTING PARTITION AS NEEDED FOR NEW DOOR INSTALLATION. PROVIDE TEMPORARY SUPPORT

AT OPENING DURING CONSTRUCTION. REFER TO NEW WORK PLAN FOR NEW DOOR LOCATION

D12 CAREFULLY REMOVE EXISTING CONCRETE SLAB TO THE EXTENT SHOWN TO PREPARE FOR NEW WORK REFER TO NEW

WORK PLAN FOR DIMENSIONS

D13 REMOVE EXISTING STONE BELT TO EXTENT REQUIRED TO INSTALL NEW CONSTRUCTION. SEE ARCHITECTURAL NEW

WORK

D14 REMOVE ALL ROOM FINISHES. REMOVE FLOOR FINISHES DOWN TO SLAB. PREPARE EXISTING SLAB TO RECEIVE NEW

FLOORING.

D15 REMOVE ELEVATOR AND ALL ASSOCIATED EQUIPMENT DOWN TO PIT

D16 REMOVE ALL CEILINGS AND BULKHEADS INCLUDING ALL ANCHORS, HANGERS, LIGHTING DEVICES, ETC.

D17 REMOVE LOCKERS

D18 REMOVE CORRIDOR WALL FINISHES, CORNER GUARDS, WALL PROTECTION FLOORING DOWN TO SLAB, BASE, AND ALL

OTHER FINISH ITEMS.

REV 1 - BID ADDENDUM 1 02/16/2023REV 1 - BID ADDENDUM 1 02/16/2023

2/15/2023 14 of 233

C

D

E

F

H

E.8

C.3

G

1 94 5 876321A 1910 151411 12 13 16 17 187.66.4

A.8

B.9

5.2 11a

A.A

REMOVE EXISTING

LOUVER

BRICKED IN OPENING

W/ LOUVER

DOOR W/ STOOP

AND STAIRS TO

GRADE TO BE

REMOVED

EXISTING SIDEWALK, ADA

RAMP AND STAIR TO BE

REMOVED AND DISPOSED.

DN

8 R

REMOVE SEMI-RECESSED CABINET

UNIT HEATERS UNDER WINDOWS.

TYP.

AD130

A.9

AD-130

10'-4"

BRICKED IN OPENING

W/ LOUVER

6' -2

/8

2'-3"

1'-1 3/4" 5'-6"

2'-7 1/8" 3'-4"

6'-0"

6'-1 1/4"

1/

2" 3'

-4

3' -4

1'

-9

5' -9

/8

1'

-2

3' -4

4'

-1

3/ 4"

3' -7

/4

4" 3'

-4

C.6

IT CLOSET NOT

INCLUDED IN SCOPE

3' -7

4' -9

/2

3'

-5

/8

1' -2

/8

5' -1

5/

8"

7/

8" 3'

-4

D15

D1

D1

D1

D1 D1

D1

D11

D11

D1

D1

D1

D1

D1 D1 D1

D1

D1

D1 D1

D1 D1 D1

D1

D1

D1

D1

D1 D1

D1

D1

D1 D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1 D1D1

D1

D1 D1

D1

D1

D1D1

D1D1

D1

D1D1

D1

D2

D2

D2

D2

D17

D2

D2

D2

D1

D2D17

D17

D3 D3

D3 D3

D3 D3 D3

D3

D3

D3D3

D3

D3

D3

D3

D3

D3

D3

D3

D3D3D3 D3D4

D4D4

D4

D4

D4D4

D4

D4

D4

D4D4D4

D4 D4 D4

D4

D4 D4

D4

D4 D4 D4 D4

D4

D4

D4 D4 D4

D4

D4

D4

D4 D4

D4

D4

D4D4

D4

D4

D4

D4D4D4

D4

D4

D4D4

D4

D4

D4

D4D4

D4

D4

D4

D4D4D4

D4

D1

D4

D4

D5

D5

D5

D5

D5

D5

D5

D5

D5

D5

D5

D5 D5 D5 D5

D5

D5 D5

D5

D5 D5

D5

D5

D5

D5

D5

D5D5D5D5

D5D5D5D5

D5

D5

D5

D5

D5D5

D5

D5

D5

D5 D5

D5

D5

D5

D5D5

D5

D5D5

D5

D5

D5

D5

D6

D8D8

D10

D10

D10

D7

D10

D7

D11 D11 D14

D14 D14

D14

D14

D14 D14

D14

D14

D14

D14

D14

D14

D14 D14

D14

D14 D14

D14

D14 D14

D14

D14

D14

D14

D14 D14

D14 D1

12'-10 1/8"

EXISTING

FLOORING

TO

REMAIN

4' -2

/4

D12

D14

D14

D14 D14

D14 D14

D14

D14 D14 D14

D14

D14D14

D14D14

D14

D14

D14

D14

D14

D14

D14

D14

D14

D14

D14

D14

D14

D14

D14

D14

D14

D14

D14

D14

D14

D14 D14

D14

D14

D14

D1

D16

D16

D16

D16

D16

D16

D16

D16

D16

D16 D16 D16

D16

D16

D16

D16

D16 D16

D16

D16

D16

D16 D16

D16 D16

D16

D16 D16

D16

D16

D16D16

D16D16

D16

D16

D16

D16

D16

D16

D16

D16

D16D16 D16

D16

D16

D16

D16

D16

D16

D16 D16

D16

D16

D16

D16

D16 D16

D1

D1

D16

D18

D18

D18

D18 D18

D18

D18

D18

D18

D18

D18

D5

1. ALL WORK SHOWN IS EXISTING TO REMAIN UNLESS NOTED OR INDICATED AS DASHED LINES TO BE REMOVED. THE EXTENT OF DEMOLITION WORK SHALL INCLUDE ALL INCIDENTAL DEMOLITION WORK NECESSARY TO PROPERLY PROVIDE ALL NEW WORK SHOWN AND SPECIFIED, TO INCLUDE MECHANICAL, ELECTRICAL, & PLUMBING ITEMS.

2. DEMOLITION WORK SHOWN IS BASED ON EXISTING DRAWINGS AND INSPECTIONS. THE CONTRACTOR SHALL VISUALLY INSPECT ALL EXISTING CONDITIONS, AND IS RESPONSIBLE FOR PERFORMING THE INDICATED DEMOLITION WORK EVEN

IF ACTUAL CONDITIONS DIFFER FROM THESE SHOWN ON THE DRAWINGS.

3. DEMOLITION CONTRACTOR SHALL COORDINATE WITH NEW WORK SECTIONS FOR ADDITIONAL INFORMATION RELATED

TO EXTENT OF DEMOLITION.

4. REFER TO ALL OTHER DRAWINGS IN THIS SET FOR INCIDENTAL DEMOLITION WORK NOT NOTED ON THE DEMOLITION

PLANS.

5. THE OWNER HAS FIRST RIGHT OF REFUSAL OF ALL SALVAGE ITEMS. THE CONTRACTOR SHALL PROPERLY DISPOSE OF

ALL CONSTRUCTION DEBRIS. DO NOT STOCKPILE DEBRIS ON SITE.

6. ITEMS TO BE DEMOLISHED SHALL BE REMOVED COMPLETELY INCLUDING ALL ANCHORS, HANGERS, FASTENERS, PIPES, CONDUCTS, DUCTS, ETC. UNLESS OTHERWISE INDICATED TO BE ABANDONED IN PLACE.

7. CONC. SLAB PATCHES MUST BE FLUSH WITH REMAINING SURFACES TO PERMIT APPLICATION OF FINISHES. PROVIDE

WELDED WIRE MESH IN PATCH AREAS LARGER THAT (4) FOUR SQUARE FEET.

8. CONC. SLABS TO REMAIN SHALL BE PATCHED, SCRAPED, LEVELED, AND CLEANED TO PROVIDE SURFACE SUITABLE FOR NEW FINISHES. WHERE RENOVATED AREAS ARE RECEIVING NEW UNDERGROUND MECHANICAL, PLUMBING, ELECTRICAL, OR ADDITIONAL FOUNDATION WORK, SEE MECHANICAL, PLUMBING, ELECTRIC, AND STRUCTURAL DRAWINGS, AS WELL AS ARCHITECTURAL DRAWINGS TO DETERMINE EXTENT OF REQUIRED CUT AND PATCH OF EXISTING SLAB. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL CONC. SLAB DEMOLITION AND REPLACEMENT NECESSARY TO INSTALL THE NEW WORK. BACKFILL ALL BELOW GRADE DEMOLITION WORK WITH SUITABLE FILL

MEETING STRUCTURAL REQUIREMENTS FOR NEW WORK.

9. PARTITIONS SHOWN TO BE REMOVED SHALL BE CONFIRMED BY THE CONTRACTOR AS TO TYPE OF PARTITION AND EXACT LOCATION. COMPLETELY REMOVE PARTITIONS FROM FLOOR TO STRUCTURE ABOVE INCLUDING BASE, ALL FASTENERS, GROUTS, SEAL ANTS, ETC., UNLESS NOTED OTHERWISE. MASONRY PARTITIONS WHICH EXTEND THROUGH THE SLAB SHALL BE REMOVED TO 8" BELOW FINISH FLOOR. FILL SLAB OPENING WITH CONCRETE FILL TO RECEIVE FINISH FLOOR. WHERE WALLS SCHEDULED TO BE REMOVED SIT ON SLABS, GRIND SLAB TO RECEIVE FINISH FLOOR.

10. REMOVE, PATCH AND REPAIR PORTIONS OF WALL PARTITIONS WHICH CONFLICT WITH NEW WORK TO BE INSTALLED, EVEN IF NOT SPECIFICALLY NOTED TO BE DEMOLISHED ON PLANS.

11. WALLS TO BE REMOVED FROM INTERSECTING WALLS SHALL INCLUDE TOOTHED IN REPLACEMENT OF DAMAGED MASONRY ON WALL TO REMAIN AND REMOVAL OF TIES PROJECTING FROM WALLS. SEE DETAILS FOR ADDITIONAL

CONDITIONS.

12. WALLS TO BE PARTIALLY REMOVED SHALL BE TERMINATED WITH FINISHED MASONRY ENDS BY TOOTHING IN NEW MASONRY UNITS, TO MATCH ADJACENT MASONRY. SEE DETAILS FOR OTHER CONDITIONS. NO WALLS SHALL BE

TERMINATED WITH EXPOSED OPEN CELLS OR DAMAGED MASONRY UNITS.

13. WHERE NEW OPENINGS ARE SHOWN IN EXISTING WALLS, CAREFULLY REMOVE MASONRY TO NEAREST JOINT LINE WITHOUT DISTURBING ADJACENT WORK SO THAT NEW WORK CAN BE PATCHED IN TO MATCH. ALL NEW MASONRY

WORK SHALL BE TOOTHED IN.

14. ALL EXISTING STRUCTURE SHALL REMAIN, UNLESS NOTED OTHERWISE.

15. COORDINATE DEMOLITION OF ALL STRUCTURAL ITEMS (COLUMNS, BEAMS, SLABS, ET, ETC.) WITH STRUCTURAL DWGS.

EXTENT OF DEMOLITION AREA SHALL BE IN ACCORDANCE WITH STRUCTURAL REQUIREMENTS AND COORDINATED WITH

ALL NEW WORK.

16. TEMPORARILY SUPPORT ALL BEAMS, LINTELS, PORTIONS OF WALLS ETC., TO BE DISTURBED BY DEMOLITION WORK, UNTIL THEY ARE RE-SUPPORTED BY NEW WORK.

17. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF EXISTING BUILDING ELEMENTS TO REMAIN THROUGHOUT SEQUENCE OF WORK. ANY DAMAGE TO EXISTING BUILDING CONDITIONS SHOWN TO REMAIN SHALL BE

RESTORED TO NEW WORK CONDITION AT NO ADDITIONAL COST TO THE OWNER.

18. WINDOWS SCHEDULED FOR REMOVAL SHALL BE REMOVED COMPLETELY. FASTENERS MAY BE CUT FLUSH WITH HEAD, JAMBS, AND SILLS IF THE NEW WINDOW UNIT WILL CONCEAL FASTENER. PROTECT EXISTING SILLS SCHEDULED TO REMAIN. ALL EXISTING WINDOW OPENINGS MUST BE FIELD MEASURED PRIOR TO SUBMITTAL OF SHOP DRAWINGS.

19. WERE FINISHES ARE INDICATED TO BE REMOVED, REMOVAL SHALL INCLUDE ANY GROUT, ADHESIVES, FASTENERS, AND

ALL OTHER ITEMS USED TO ATTACH THE FINISHES TO THE SURFACES THAT THEY COVER.

20. ANY FLOOR AREAS DAMAGED BY THE DEMOLITION CONTRACTOR SHALL BE PATCHED TO MATCH EXISTING.

21. WHERE CEILINGS ARE TO BE REMOVED, REMOVE ALL CEILINGS SYSTEMS COMPLETE INCLUDING GRID, TRIM HANGER, CLIPS, ETC. WHERE NEW CEILINGS ARE SPECIFIED, NO DOUBLE CEILINGS PERMITTED. REMOVE ALL ORIGINAL

CONCEALED CEILINGS WHERE ENCOUNTERED.

22. ALL EXISTING SURFACES TO REMAIN SHALL BE PROTECTED, PATCHED IF DAMAGED AND CLEANED PRIOR TO

APPLICATION OF FINISHES.

23. CONTRACTOR TO PROTECT ALL EQUIPMENT AND OTHER ELEMENTS IN AREA OF NEW OR DEMOLITION WORK.

24. REMOVE ALL CURTAINS AND BLINDS IN AREAS OF RENOVATION OR DEMOLITION, UNLESS NOTED OTHERWISE.

25. REMOVE MECHANICAL, ELECTRICAL AND PLUMBING ITEMS AS NOTED ON MECHANICAL, ELECTRICAL AND PLUMBING

PLANS. COORDINATE WITH CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING, FOR ADDITIONAL DEMOLITION NOTES. REMOVAL WORK IS INTENDED TO INCLUDE ALL ASSOCIATED ITEMS SUCH AS ELECTRICAL OUTLETS, SWITCHES, CONDUITS, CONTROLS, PIPING, MOUNTING BLOCKS, ETC., AS NOTED. THE CONTRACTOR SHALL REFER TO ALL CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS AND SPECIFICATIONS FOR PROCEDURES CONCERNING RELATED TRADES IN AREAS WHICH REQUIRE DEMOLITION. REPAIR AND PATCH ANY AREAS

DAMAGED DURING REMOVAL WORK.

26. ASBESTOS CONTAINING MATERIALS (ACM) MAY BE PRESENT IN DEMOLISHED MATERIALS. CONTRACTOR TO PROVIDE TESTING AND REMEDIATE ANY MATERIAL FOUND IN SCOPE OF WORK AREA. IF ACM OR OTHER HAZARDOUS MATERIALS ARE FOUND IN PROJECT AREA AND ARE DISTURBED BY CONSTRUCTION ACTIVITY STOP WORK IMMEDIATELY AND

CONTACT THE COR FOR THE PROJECT.

GENERAL NOTES - DEMOLITION

DOOR TO BE REMOVED

CONSTRUCTION TO BE REMOVED

CONSTRUCTION TO REMAIN

DEMOLITION LEGEND

AREA NOT INCLUDED IN SCOPE

N

KEY PLAN

NEW ADDITION

A R C H I T E C T S E N G I N E E R S

CB

Drawing Number:

Project Title:

Project Location:

Issue Date

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:

Revisions: Date:

CONSULTANT:

23456789101112131415

B

C

D

E

F

G

H

I

J

123456789101112131415

/8

/4

/8

/2

/4

-1

/2

Drawing of

Architect:

CB DESIGN GROUP, INC.

421 King St., Suite 301 Alexandria, VA 22314 POC: Wes Bridges, AIA 703.772.4213

TOMAH VAMC

TOMAH, WISCONSIN

DECEMBER 15, 2022

676-325

AuthorChecker

EXPAND AND RENOVATE

B404 FOR OUTPATIENT

MENTAL HEALTH

BID SET

FIRST FLOOR DEMO PLAN

AD-101

15 250

-3

A D

-1

/2

/2

.p d f

SCALE: 1/8" = 1'-0"AD-101

1 FIRST FLOOR DEMO PLAN

KEYNOTES - DEMOLITION PLAN

# DESCRIPTION

D1 REMOVE EXISTING STONE BELT TO EXTENT REQUIRED TO INSTALL NEW CONSTRUCTION. SEE ARCHITECTURAL NEW

WORK

D2 REMOVE PLUMBING FIXTURES AND TOILET ACCESSORIES.

D3 REMOVE FURRED WALL STRUCTURE SLAB TO DECK

D4 REMOVE EXISTING WINDOW, FRAME, SILL, SHADES, BLINDS, AND ALL ASSOCIATED HARDWARE. PREPARE FOR NEW

WINDOW INSTALLATION OR INFILL. SEE NEW WORK PLANS

D5 REMOVE DOOR(S) AND FRAME(S). (TO INCLUDE STOPS & HOLD OPENS WHERE THEY OCCUR)

D6 REMOVE EXTERIOR MASONRY WALL (BRICK & CMU), INCLUDING ALL WINDOWS, DOORS, ETC. IN AREA INDICATED. EXIST.

FOUNDATION & FOOTING TO REMAIN IN PLACE FOR REUSE W/ NEW EXTERIOR CLOSURE SYSTEM - SEE STRUCT. DWGS.

D7 REMOVE PORTION OF WALL INDICATED. INSTALL LINTEL PER STRUCTURAL AS REQUIRED. SEE ARCHITECTURAL PLANS

FOR SIZE.

D8 REMOVE LANDING, STAIR, AND FOUNDATION

D9 REFER TO MECHANICAL DEMO PLAN

D10 REMOVE EXISTING MILLWORK AND ALL ASSOICATED COMPONENTS.

D11 CAREFULLY REMOVE EXISTING PARTITION AS NEEDED FOR NEW DOOR INSTALLATION. PROVIDE TEMPORARY SUPPORT

AT OPENING DURING CONSTRUCTION. REFER TO NEW WORK PLAN FOR NEW DOOR LOCATION

D12 CAREFULLY REMOVE EXISTING CONCRETE SLAB TO THE EXTENT SHOWN TO PREPARE FOR NEW WORK REFER TO NEW

WORK PLAN FOR DIMENSIONS

D13 REMOVE EXISTING STONE BELT TO EXTENT REQUIRED TO INSTALL NEW CONSTRUCTION. SEE ARCHITECTURAL NEW

WORK

D14 REMOVE ALL ROOM FINISHES. REMOVE FLOOR FINISHES DOWN TO SLAB. PREPARE EXISTING SLAB TO RECEIVE NEW

FLOORING.

D15 REMOVE ELEVATOR AND ALL ASSOCIATED EQUIPMENT DOWN TO PIT

D16 REMOVE ALL CEILINGS AND BULKHEADS INCLUDING ALL ANCHORS, HANGERS, LIGHTING DEVICES, ETC.

D17 REMOVE LOCKERS

D18 REMOVE CORRIDOR WALL FINISHES, CORNER GUARDS, WALL PROTECTION FLOORING DOWN TO SLAB, BASE, AND ALL

OTHER FINISH ITEMS.

REV 1 - BID ADDENDUM 1 02/16/2023

15 of 2332/15/2023 15 of 233

C

D

E

F

H

E.8

C.3

G

1 94 5 876321A 1910 151411 12 13 16 17 187.66.4

A.8

B.9

5.2 11a

A.A

D6

D3

D4

D1

D5

D4

D4

D4

D4

D4

D4

D4

D4

D1

D15

AD130

D9

D9

A.9

AD-130

D4

D4

D3 D4 D3 D4

D4 D4

D3 D3

D3 D3

D3 D3 D3

D3

D3

D3

D3

D4

D4 D4 D4

D4

D4 D4 D4 D4

D4

D4

D4 D4 D4

D4

D4

D4

D4 D4

D4

D4

D4

D4 D4

D4

D4

D4

D4D4D4

D4

D4

D4 D4 D4

D4

D4

D4

D4

D4D4D4

D4

D4

D4

D4

D4 D4

D4

D4

D4

D4 D4

D4 D4

D1

D1

D1

D1

D1D1 D1 D1

D1

D1

D1

D1

D1

D1

D1

D1

D1 D1

D1

D1

D11

D11

D1

D11

D5 D5

D11

D5

D5

D11 D5

D11

D11

D5 D5

D5

D5

D5

D5D5

D5

D5 D5 D5 D5

D5 D5

D5

D5

D11

D1

D1

D5

D5 D5

D11

D11

D11

D5

D5

D11

D11

D11

D5

D5

D11

D11

D4 D4 D4

D5 D1

D4

D4

D4

D3

D3

D3

DETAIL

3/AE506

DETAIL

3/AE506

DETAIL

3/AE506

DETAIL

3/AE506

D13

D13

D13

D13

3'-2" 3'-4"

3' -4

2'

-7

/4

3' -4

7'

-2

3' -4

2' -1

3'

-4

3' -4

3"

6' -3

3'

-4

9' -1

3/

4"

1/

2" 3'

-4

BASED ON LABORATORY ANALYSIS OF

BULK SAMPLES TAKEN THROUGH OUT

NURSE STATION HAVE ASBESTOS MASTIC

PRESENT UNDER THE FLOOR TILE

C.6

IT CLOSET NOT

INCLUDED IN SCOPE

D14

D14

D14

D14

D14

D14

D14 D14

D14

D14 D14 D14

D14

D14 D14

D14

D14

D14D14

D14

D14

D14

D14

D14

D14

D14

D14

D14

D14

D14

D14 D14

D14 D14

D14D14

D14

D14 D14

D14

D14 D14

D14

D14

D14D14D14

D14

D14

D14

D14

D14

D14

D14

D1 D4

D5

D5

D1

D1 D1

D1

D1

D1

D1

D1 D1

D1

D1

D1

D1

D1D1

D1

D1

D3

D1

D1

D1

D5

D1

D11

D1

D11

D11

D1

D1 D3

D1

D1

D2

D2

D2 D2 D2

D2

D2 D2

D2

D2

D2

D2

D2

D3

D3D3

D5

D5 D5

D5

D5

D5

D5

D5

D5

D5D5D5

D5

D5D5

D5

D10

D10

D10D2

D2

D15

D11

D1

D11

D16

D16

D16

D16

D16

D16

D16 D16

D16

D16

D16

D16

D16

D16

D16

D16

D16

D16

D16

D16

D16

D16

D16 D16

D16

D16

D16 D16

D16

D16

D16 D16

D16

D16D16

D16

D16D16D16

D16

D16

D16

D16

D16

D16

D16

D16

D16

D18

D18

D18

D18

D18

D18

D18 D18

D18

D18

D18

3' -4

"8

/4

3' -4

7'

-5

/2

5" 3'-6" 2'-0"

6' -3

/4

1'-8"

7' -0

/4

3'

-4

5' -1

3/

8" 3'

-4

16'-9 1/2" 3'-4"

3'-4" 6'-6 1/2"

3' -4

"3' -4

2' -0

/4

3'

-6

1' -8

4'

-2

3/

4"

3' -4

3 7/8" 3'-10"

2' -1

3/

4" 4'

-1

1/ 2"

2' -0

/4

3' -4

3' -4

3'

-1

7/ 8"

5' -6

/4

3' -1

/4

10'-11 1/2"

2'-2" 3'-4"

1. ALL WORK SHOWN IS EXISTING TO REMAIN UNLESS NOTED OR INDICATED AS DASHED LINES TO BE REMOVED. THE EXTENT OF DEMOLITION WORK SHALL INCLUDE ALL INCIDENTAL DEMOLITION WORK NECESSARY TO PROPERLY PROVIDE ALL NEW WORK SHOWN AND SPECIFIED, TO INCLUDE MECHANICAL, ELECTRICAL, & PLUMBING ITEMS.

2. DEMOLITION WORK SHOWN IS BASED ON EXISTING DRAWINGS AND INSPECTIONS. THE CONTRACTOR SHALL VISUALLY INSPECT ALL EXISTING CONDITIONS, AND IS RESPONSIBLE FOR PERFORMING THE INDICATED DEMOLITION WORK EVEN

IF ACTUAL CONDITIONS DIFFER FROM THESE SHOWN ON THE DRAWINGS.

3. DEMOLITION CONTRACTOR SHALL COORDINATE WITH NEW WORK SECTIONS FOR ADDITIONAL INFORMATION RELATED

TO EXTENT OF DEMOLITION.

4. REFER TO ALL OTHER DRAWINGS IN THIS SET FOR INCIDENTAL DEMOLITION WORK NOT NOTED ON THE DEMOLITION

PLANS.

5. THE OWNER HAS FIRST RIGHT OF REFUSAL OF ALL SALVAGE ITEMS. THE CONTRACTOR SHALL PROPERLY DISPOSE OF

ALL CONSTRUCTION DEBRIS. DO NOT STOCKPILE DEBRIS ON SITE.

6. ITEMS TO BE DEMOLISHED SHALL BE REMOVED COMPLETELY INCLUDING ALL ANCHORS, HANGERS, FASTENERS, PIPES, CONDUCTS, DUCTS, ETC. UNLESS OTHERWISE INDICATED TO BE ABANDONED IN PLACE.

7. CONC. SLAB PATCHES MUST BE FLUSH WITH REMAINING SURFACES TO PERMIT APPLICATION OF FINISHES. PROVIDE

WELDED WIRE MESH IN PATCH AREAS LARGER THAT (4) FOUR SQUARE FEET.

8. CONC. SLABS TO REMAIN SHALL BE PATCHED, SCRAPED, LEVELED, AND CLEANED TO PROVIDE SURFACE SUITABLE FOR NEW FINISHES. WHERE RENOVATED AREAS ARE RECEIVING NEW UNDERGROUND MECHANICAL, PLUMBING, ELECTRICAL, OR ADDITIONAL FOUNDATION WORK, SEE MECHANICAL, PLUMBING, ELECTRIC, AND STRUCTURAL DRAWINGS, AS WELL AS ARCHITECTURAL DRAWINGS TO DETERMINE EXTENT OF REQUIRED CUT AND PATCH OF EXISTING SLAB. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL CONC. SLAB DEMOLITION AND REPLACEMENT NECESSARY TO INSTALL THE NEW WORK. BACKFILL ALL BELOW GRADE DEMOLITION WORK WITH SUITABLE FILL

MEETING STRUCTURAL REQUIREMENTS FOR NEW WORK.

9. PARTITIONS SHOWN TO BE REMOVED SHALL BE CONFIRMED BY THE CONTRACTOR AS TO TYPE OF PARTITION AND EXACT LOCATION. COMPLETELY REMOVE PARTITIONS FROM FLOOR TO STRUCTURE ABOVE INCLUDING BASE, ALL FASTENERS, GROUTS, SEAL ANTS, ETC., UNLESS NOTED OTHERWISE. MASONRY PARTITIONS WHICH EXTEND THROUGH THE SLAB SHALL BE REMOVED TO 8" BELOW FINISH FLOOR. FILL SLAB OPENING WITH CONCRETE FILL TO RECEIVE FINISH FLOOR. WHERE WALLS SCHEDULED TO BE REMOVED SIT ON SLABS, GRIND SLAB TO RECEIVE FINISH FLOOR.

10. REMOVE, PATCH AND REPAIR PORTIONS OF WALL PARTITIONS WHICH CONFLICT WITH NEW WORK TO BE INSTALLED, EVEN IF NOT SPECIFICALLY NOTED TO BE DEMOLISHED ON PLANS.

11. WALLS TO BE REMOVED FROM INTERSECTING WALLS SHALL INCLUDE TOOTHED IN REPLACEMENT OF DAMAGED MASONRY ON WALL TO REMAIN AND REMOVAL OF TIES PROJECTING FROM WALLS. SEE DETAILS FOR ADDITIONAL

CONDITIONS.

12. WALLS TO BE PARTIALLY REMOVED SHALL BE TERMINATED WITH FINISHED MASONRY ENDS BY TOOTHING IN NEW MASONRY UNITS, TO MATCH ADJACENT MASONRY. SEE DETAILS FOR OTHER CONDITIONS. NO WALLS SHALL BE

TERMINATED WITH EXPOSED OPEN CELLS OR DAMAGED MASONRY UNITS.

13. WHERE NEW OPENINGS ARE SHOWN IN EXISTING WALLS, CAREFULLY REMOVE MASONRY TO NEAREST JOINT LINE WITHOUT DISTURBING ADJACENT WORK SO THAT NEW WORK CAN BE PATCHED IN TO MATCH. ALL NEW MASONRY

WORK SHALL BE TOOTHED IN.

14. ALL EXISTING STRUCTURE SHALL REMAIN, UNLESS NOTED OTHERWISE.

15. COORDINATE DEMOLITION OF ALL STRUCTURAL ITEMS (COLUMNS, BEAMS, SLABS, ET, ETC.) WITH STRUCTURAL DWGS.

EXTENT OF DEMOLITION AREA SHALL BE IN ACCORDANCE WITH STRUCTURAL REQUIREMENTS AND COORDINATED WITH

ALL NEW WORK.

16. TEMPORARILY SUPPORT ALL BEAMS, LINTELS, PORTIONS OF WALLS ETC., TO BE DISTURBED BY DEMOLITION WORK, UNTIL THEY ARE RE-SUPPORTED BY NEW WORK.

17. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF EXISTING BUILDING ELEMENTS TO REMAIN THROUGHOUT SEQUENCE OF WORK. ANY DAMAGE TO EXISTING BUILDING CONDITIONS SHOWN TO REMAIN SHALL BE

RESTORED TO NEW WORK CONDITION AT NO ADDITIONAL COST TO THE OWNER.

18. WINDOWS SCHEDULED FOR REMOVAL SHALL BE REMOVED COMPLETELY. FASTENERS MAY BE CUT FLUSH WITH HEAD, JAMBS, AND SILLS IF THE NEW WINDOW UNIT WILL CONCEAL FASTENER. PROTECT EXISTING SILLS SCHEDULED TO REMAIN. ALL EXISTING WINDOW OPENINGS MUST BE FIELD MEASURED PRIOR TO SUBMITTAL OF SHOP DRAWINGS.

19. WERE FINISHES ARE INDICATED TO BE REMOVED, REMOVAL SHALL INCLUDE ANY GROUT, ADHESIVES, FASTENERS, AND

ALL OTHER ITEMS USED TO ATTACH THE FINISHES TO THE SURFACES THAT THEY COVER.

20. ANY FLOOR AREAS DAMAGED BY THE DEMOLITION CONTRACTOR SHALL BE PATCHED TO MATCH EXISTING.

21. WHERE CEILINGS ARE TO BE REMOVED, REMOVE ALL CEILINGS SYSTEMS COMPLETE INCLUDING GRID, TRIM HANGER, CLIPS, ETC. WHERE NEW CEILINGS ARE SPECIFIED, NO DOUBLE CEILINGS PERMITTED. REMOVE ALL ORIGINAL

CONCEALED CEILINGS WHERE ENCOUNTERED.

22. ALL EXISTING SURFACES TO REMAIN SHALL BE PROTECTED, PATCHED IF DAMAGED AND CLEANED PRIOR TO

APPLICATION OF FINISHES.

23. CONTRACTOR TO PROTECT ALL EQUIPMENT AND OTHER ELEMENTS IN AREA OF NEW OR DEMOLITION WORK.

24. REMOVE ALL CURTAINS AND BLINDS IN AREAS OF RENOVATION OR DEMOLITION, UNLESS NOTED OTHERWISE.

25. REMOVE MECHANICAL, ELECTRICAL AND PLUMBING ITEMS AS NOTED ON MECHANICAL, ELECTRICAL AND PLUMBING

PLANS. COORDINATE WITH CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING, FOR ADDITIONAL DEMOLITION NOTES. REMOVAL WORK IS INTENDED TO INCLUDE ALL ASSOCIATED ITEMS SUCH AS ELECTRICAL OUTLETS, SWITCHES, CONDUITS, CONTROLS, PIPING, MOUNTING BLOCKS, ETC., AS NOTED. THE CONTRACTOR SHALL REFER TO ALL CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS AND SPECIFICATIONS FOR PROCEDURES CONCERNING RELATED TRADES IN AREAS WHICH REQUIRE DEMOLITION. REPAIR AND PATCH ANY AREAS

DAMAGED DURING REMOVAL WORK.

26. ASBESTOS CONTAINING MATERIALS (ACM) MAY BE PRESENT IN DEMOLISHED MATERIALS. CONTRACTOR TO PROVIDE TESTING AND REMEDIATE ANY MATERIAL FOUND IN SCOPE OF WORK AREA. IF ACM OR OTHER HAZARDOUS MATERIALS ARE FOUND IN PROJECT AREA AND ARE DISTURBED BY CONSTRUCTION ACTIVITY STOP WORK IMMEDIATELY AND

CONTACT THE COR FOR THE PROJECT.

GENERAL NOTES - DEMOLITION

DOOR TO BE REMOVED

CONSTRUCTION TO BE REMOVED

CONSTRUCTION TO REMAIN

DEMOLITION LEGEND

AREA NOT INCLUDED IN SCOPE

N

KEY PLAN

NEW ADDITION

A R C H I T E C T S E N G I N E E R S

CB

Drawing Number:

Project Title:

Project Location:

Issue Date

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:

Revisions: Date:

CONSULTANT:

23456789101112131415

B

C

D

E

F

G

H

I

J

123456789101112131415

/8

/4

/8

/2

/4

-1

/2

Drawing of

Architect:

CB DESIGN GROUP, INC.

421 King St., Suite 301 Alexandria, VA 22314 POC: Wes Bridges, AIA 703.772.4213

TOMAH VAMC

TOMAH, WISCONSIN

DECEMBER 15, 2022

676-325

AuthorChecker

EXPAND AND RENOVATE

B404 FOR OUTPATIENT

MENTAL HEALTH

BID SET

SECOND FLOOR DEMO PLAN

AD-102

16 250

-3

A D

-1

/1

/2

.p d f

SCALE: 1/8" = 1'-0"AD-102

1 SECOND FLOOR DEMO PLAN

KEYNOTES - DEMOLITION PLAN

# DESCRIPTION

D1 REMOVE EXISTING STONE BELT TO EXTENT REQUIRED TO INSTALL NEW CONSTRUCTION. SEE ARCHITECTURAL NEW

WORK

D2 REMOVE PLUMBING FIXTURES AND TOILET ACCESSORIES.

D3 REMOVE FURRED WALL STRUCTURE SLAB TO DECK

D4 REMOVE EXISTING WINDOW, FRAME, SILL, SHADES, BLINDS, AND ALL ASSOCIATED HARDWARE. PREPARE FOR NEW

WINDOW INSTALLATION OR INFILL. SEE NEW WORK PLANS

D5 REMOVE DOOR(S) AND FRAME(S). (TO INCLUDE STOPS & HOLD OPENS WHERE THEY OCCUR)

D6 REMOVE EXTERIOR MASONRY WALL (BRICK & CMU), INCLUDING ALL WINDOWS, DOORS, ETC. IN AREA INDICATED. EXIST.

FOUNDATION & FOOTING TO REMAIN IN PLACE FOR REUSE W/ NEW EXTERIOR CLOSURE SYSTEM - SEE STRUCT. DWGS.

D7 REMOVE PORTION OF WALL INDICATED. INSTALL LINTEL PER STRUCTURAL AS REQUIRED. SEE ARCHITECTURAL PLANS

FOR SIZE.

D8 REMOVE LANDING, STAIR, AND FOUNDATION

D9 REFER TO MECHANICAL DEMO PLAN

D10 REMOVE EXISTING MILLWORK AND ALL ASSOICATED COMPONENTS.

D11 CAREFULLY REMOVE EXISTING PARTITION AS NEEDED FOR NEW DOOR INSTALLATION. PROVIDE TEMPORARY SUPPORT

AT OPENING DURING CONSTRUCTION. REFER TO NEW WORK PLAN FOR NEW DOOR LOCATION

D12 CAREFULLY REMOVE EXISTING CONCRETE SLAB TO THE EXTENT SHOWN TO PREPARE FOR NEW WORK REFER TO NEW

WORK PLAN FOR DIMENSIONS

D13 REMOVE EXISTING STONE BELT TO EXTENT REQUIRED TO INSTALL NEW CONSTRUCTION. SEE ARCHITECTURAL NEW

WORK

D14 REMOVE ALL ROOM FINISHES. REMOVE FLOOR FINISHES DOWN TO SLAB. PREPARE EXISTING SLAB TO RECEIVE NEW

FLOORING.

D15 REMOVE ELEVATOR AND ALL ASSOCIATED EQUIPMENT DOWN TO PIT

D16 REMOVE ALL CEILINGS AND BULKHEADS INCLUDING ALL ANCHORS, HANGERS, LIGHTING DEVICES, ETC.

D17 REMOVE LOCKERS

D18 REMOVE CORRIDOR WALL FINISHES, CORNER GUARDS, WALL PROTECTION FLOORING DOWN TO SLAB, BASE, AND ALL

OTHER FINISH ITEMS.

2/15/2023 16 of 233

C

D

E

F

H

E.8

C.3

G

1 94 5 876321A 1910 151411 12 13 16 17 187.66.4

A.8

B.9

5.2 11a

A.A

D6

D3 D3

D1

D3

D3

D1

D2 D1

AD130

A.9

AD-130

D3

D3 D3

D3

D3

D3

D3 D3

D3

D

D3

D3

D3

D3 D3 D3

D3D3D3

D1

D1

D1

D1 D1

D1

D1

D1

D11

D5

D11

D1

D1 D5

D11 D1

D1

D11 D5

D1

D1 D1

D1 D1 D1

D5 D5 D5 D5

D5 D5 D5

D1 D5

D11

D11

D1

D1

D1

D1

D1

D1

D5

D5

D5 D5

D11

D1

D1

D1

D18

D5D5

D5

D1

D5D5

D5D5

D1

D1

D1 D1

D11

D1 D1

D1

D5

D1

D5

C.6

IT CLOSET NOT

INCLUDED IN SCOPE

D1

D1

D1

D1

D1

D1

D1 D1

D1

D11

D11

D1

D1

D1

D1

D1

D1

D1

D4

D4

D4

D4

D4

D4

D4

D4

D4

D4

D4

D4 D4

D4 D4

D4

D4 D4 D4

D4

D4 D4 D4 D4

D4

D4

D4 D4 D4

D4

D4

D4

D4 D4

D4

D4

D4

D4 D4

D4

D4

D4

D4D4D4

D4

D4

D4 D4 D4

D4

D4

D4

D4

D4D4D4

D4

D4

D4

D4

D4 D4

D4

D4

D4

D4 D4

D4 D4

D4 D4 D4

D4

D4

D4

D4

D5

D5

D5

D5

D5

D5 D5

D5 D5

D5

D5

D5

D5

D5

D5 D5

D5

D5

D5

D5

D5

D5

D5

D5

D5

D4

D10

D10 D10

D11

D11

D11

D11

D11

D11

D11

D14

D14

D14 D14

D14

D14

D14

D14 D14

D14

D14

D14

D14

D14

D14

D14

D14 D14 D14

D14

D14 D14

D14

D14

D14 D14

D14

D14

D14

D14D14

D14

D14

D14 D14D14

D14

D14

D14D14

D14

D14 D14

D14D14

D14 D14

D14

D14

D14

D16

D16

D16 D16

D16

D16

D16

D16

D16

D16

D16

D16

D16

D16

D16

D16

D16

D16

D16

D16 D16

D16

D16 D16 D16

D16

D16

D16

D16

D16

D16

D16

D16 D16

D16

D16

D16

D16

D16

D16

D16

D16

D16 D16D16

D16

D16

D16

D16

D16

D16

D16

D16

D16 D16

D16

2' -1

/8

9'

-5

/4

D16

D16

D16

D16

D18

D18

D18D18

D18

D18

D18

D18

D18

D18

'-7

/8

'-0

/2

11'-7 5/8"

2'-7" 3'-4" 5'-10 5/8"

'-4

/8

D11 3' -4

7'

-2

/2

1'-0 1/8"5'-5 1/2" 3'-4"1'-4 5/8"

3'-4" 1'-5 1/8"

6' -6

/2

3'

-4 "1

'-0

/4 "3

'-4

6' -7

/4

3'

-4 "1

'-8

/8 "3

'-4

7'-2" 3'-4" 8"

11'-1 1/2"

3/

4" 3'

-6

1' -2

3' -4

7'

-7 " 6' -4

/8

2' -1

/4

3'

-4

8' -9

3' -4

4'

-0

/8

5' -7

/4

3'

-7

/4

1. ALL WORK SHOWN IS EXISTING TO REMAIN UNLESS NOTED OR INDICATED AS DASHED LINES TO BE REMOVED. THE EXTENT OF DEMOLITION WORK SHALL INCLUDE ALL INCIDENTAL DEMOLITION WORK NECESSARY TO PROPERLY PROVIDE ALL NEW WORK SHOWN AND SPECIFIED, TO INCLUDE MECHANICAL, ELECTRICAL, & PLUMBING ITEMS.

2. DEMOLITION WORK SHOWN IS BASED ON EXISTING DRAWINGS AND INSPECTIONS. THE CONTRACTOR SHALL VISUALLY INSPECT ALL EXISTING CONDITIONS, AND IS RESPONSIBLE FOR PERFORMING THE INDICATED DEMOLITION WORK EVEN

IF ACTUAL CONDITIONS DIFFER FROM THESE SHOWN ON THE DRAWINGS.

3. DEMOLITION CONTRACTOR SHALL COORDINATE WITH NEW WORK SECTIONS FOR ADDITIONAL INFORMATION RELATED

TO EXTENT OF DEMOLITION.

4. REFER TO ALL OTHER DRAWINGS IN THIS SET FOR INCIDENTAL DEMOLITION WORK NOT NOTED ON THE DEMOLITION

PLANS.

5. THE OWNER HAS FIRST RIGHT OF REFUSAL OF ALL SALVAGE ITEMS. THE CONTRACTOR SHALL PROPERLY DISPOSE OF

ALL CONSTRUCTION DEBRIS. DO NOT STOCKPILE DEBRIS ON SITE.

6. ITEMS TO BE DEMOLISHED SHALL BE REMOVED COMPLETELY INCLUDING ALL ANCHORS, HANGERS, FASTENERS, PIPES, CONDUCTS, DUCTS, ETC. UNLESS OTHERWISE INDICATED TO BE ABANDONED IN PLACE.

7. CONC. SLAB PATCHES MUST BE FLUSH WITH REMAINING SURFACES TO PERMIT APPLICATION OF FINISHES. PROVIDE

WELDED WIRE MESH IN PATCH AREAS LARGER THAT (4) FOUR SQUARE FEET.

8. CONC. SLABS TO REMAIN SHALL BE PATCHED, SCRAPED, LEVELED, AND CLEANED TO PROVIDE SURFACE SUITABLE FOR NEW FINISHES. WHERE RENOVATED AREAS ARE RECEIVING NEW UNDERGROUND MECHANICAL, PLUMBING, ELECTRICAL, OR ADDITIONAL FOUNDATION WORK, SEE MECHANICAL, PLUMBING, ELECTRIC, AND STRUCTURAL DRAWINGS, AS WELL AS ARCHITECTURAL DRAWINGS TO DETERMINE EXTENT OF REQUIRED CUT AND PATCH OF EXISTING SLAB. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL CONC. SLAB DEMOLITION AND REPLACEMENT NECESSARY TO INSTALL THE NEW WORK. BACKFILL ALL BELOW GRADE DEMOLITION WORK WITH SUITABLE FILL

MEETING STRUCTURAL REQUIREMENTS FOR NEW WORK.

9. PARTITIONS SHOWN TO BE REMOVED SHALL BE CONFIRMED BY THE CONTRACTOR AS TO TYPE OF PARTITION AND EXACT LOCATION. COMPLETELY REMOVE PARTITIONS FROM FLOOR TO STRUCTURE ABOVE INCLUDING BASE, ALL FASTENERS, GROUTS, SEAL ANTS, ETC., UNLESS NOTED OTHERWISE. MASONRY PARTITIONS WHICH EXTEND THROUGH THE SLAB SHALL BE REMOVED TO 8" BELOW FINISH FLOOR. FILL SLAB OPENING WITH CONCRETE FILL TO RECEIVE FINISH FLOOR. WHERE WALLS SCHEDULED TO BE REMOVED SIT ON SLABS, GRIND SLAB TO RECEIVE FINISH FLOOR.

10. REMOVE, PATCH AND REPAIR PORTIONS OF WALL PARTITIONS WHICH CONFLICT WITH NEW WORK TO BE INSTALLED, EVEN IF NOT SPECIFICALLY NOTED TO BE DEMOLISHED ON PLANS.

11. WALLS TO BE REMOVED FROM INTERSECTING WALLS SHALL INCLUDE TOOTHED IN REPLACEMENT OF DAMAGED MASONRY ON WALL TO REMAIN AND REMOVAL OF TIES PROJECTING FROM WALLS. SEE DETAILS FOR ADDITIONAL

CONDITIONS.

12. WALLS TO BE PARTIALLY REMOVED SHALL BE TERMINATED WITH FINISHED MASONRY ENDS BY TOOTHING IN NEW MASONRY UNITS, TO MATCH ADJACENT MASONRY. SEE DETAILS FOR OTHER CONDITIONS. NO WALLS SHALL BE

TERMINATED WITH EXPOSED OPEN CELLS OR DAMAGED MASONRY UNITS.

13. WHERE NEW OPENINGS ARE SHOWN IN EXISTING WALLS, CAREFULLY REMOVE MASONRY TO NEAREST JOINT LINE WITHOUT DISTURBING ADJACENT WORK SO THAT NEW WORK CAN BE PATCHED IN TO MATCH. ALL NEW MASONRY

WORK SHALL BE TOOTHED IN.

14. ALL EXISTING STRUCTURE SHALL REMAIN, UNLESS NOTED OTHERWISE.

15. COORDINATE DEMOLITION OF ALL STRUCTURAL ITEMS (COLUMNS, BEAMS, SLABS, ET, ETC.) WITH STRUCTURAL DWGS.

EXTENT OF DEMOLITION AREA SHALL BE IN ACCORDANCE WITH STRUCTURAL REQUIREMENTS AND COORDINATED WITH

ALL NEW WORK.

16. TEMPORARILY SUPPORT ALL BEAMS, LINTELS, PORTIONS OF WALLS ETC., TO BE DISTURBED BY DEMOLITION WORK, UNTIL THEY ARE RE-SUPPORTED BY NEW WORK.

17. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF EXISTING BUILDING ELEMENTS TO REMAIN THROUGHOUT SEQUENCE OF WORK. ANY DAMAGE TO EXISTING BUILDING CONDITIONS SHOWN TO REMAIN SHALL BE

RESTORED TO NEW WORK CONDITION AT NO ADDITIONAL COST TO THE OWNER.

18. WINDOWS SCHEDULED FOR REMOVAL SHALL BE REMOVED COMPLETELY. FASTENERS MAY BE CUT FLUSH WITH HEAD, JAMBS, AND SILLS IF THE NEW WINDOW UNIT WILL CONCEAL FASTENER. PROTECT EXISTING SILLS SCHEDULED TO REMAIN. ALL EXISTING WINDOW OPENINGS MUST BE FIELD MEASURED PRIOR TO SUBMITTAL OF SHOP DRAWINGS.

19. WERE FINISHES ARE INDICATED TO BE REMOVED, REMOVAL SHALL INCLUDE ANY GROUT, ADHESIVES, FASTENERS, AND

ALL OTHER ITEMS USED TO ATTACH THE FINISHES TO THE SURFACES THAT THEY COVER.

20. ANY FLOOR AREAS DAMAGED BY THE DEMOLITION CONTRACTOR SHALL BE PATCHED TO MATCH EXISTING.

21. WHERE CEILINGS ARE TO BE REMOVED, REMOVE ALL CEILINGS SYSTEMS COMPLETE INCLUDING GRID, TRIM HANGER, CLIPS, ETC. WHERE NEW CEILINGS ARE SPECIFIED, NO DOUBLE CEILINGS PERMITTED. REMOVE ALL ORIGINAL

CONCEALED CEILINGS WHERE ENCOUNTERED.

22. ALL EXISTING SURFACES TO REMAIN SHALL BE PROTECTED, PATCHED IF DAMAGED AND CLEANED PRIOR TO

APPLICATION OF FINISHES.

23. CONTRACTOR TO PROTECT ALL EQUIPMENT AND OTHER ELEMENTS IN AREA OF NEW OR DEMOLITION WORK.

24. REMOVE ALL CURTAINS AND BLINDS IN AREAS OF RENOVATION OR DEMOLITION, UNLESS NOTED OTHERWISE.

25. REMOVE MECHANICAL, ELECTRICAL AND PLUMBING ITEMS AS NOTED ON MECHANICAL, ELECTRICAL AND PLUMBING

PLANS. COORDINATE WITH CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING, FOR ADDITIONAL DEMOLITION NOTES. REMOVAL WORK IS INTENDED TO INCLUDE ALL ASSOCIATED ITEMS SUCH AS ELECTRICAL OUTLETS, SWITCHES, CONDUITS, CONTROLS, PIPING, MOUNTING BLOCKS, ETC., AS NOTED. THE CONTRACTOR SHALL REFER TO ALL CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS AND SPECIFICATIONS FOR PROCEDURES CONCERNING RELATED TRADES IN AREAS WHICH REQUIRE DEMOLITION. REPAIR AND PATCH ANY AREAS

DAMAGED DURING REMOVAL WORK.

26. ASBESTOS CONTAINING MATERIALS (ACM) MAY BE PRESENT IN DEMOLISHED MATERIALS. CONTRACTOR TO PROVIDE TESTING AND REMEDIATE ANY MATERIAL FOUND IN SCOPE OF WORK AREA. IF ACM OR OTHER HAZARDOUS MATERIALS ARE FOUND IN PROJECT AREA AND ARE DISTURBED BY CONSTRUCTION ACTIVITY STOP WORK IMMEDIATELY AND

CONTACT THE COR FOR THE PROJECT.

GENERAL NOTES - DEMOLITION

DOOR TO BE REMOVED

CONSTRUCTION TO BE REMOVED

CONSTRUCTION TO REMAIN

DEMOLITION LEGEND

AREA NOT INCLUDED IN SCOPE

N

KEY PLAN

NEW ADDITION

A R C H I T E C T S E N G I N E E R S

CB

Drawing Number:

Project Title:

Project Location:

Issue Date

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:

Revisions: Date:

CONSULTANT:

23456789101112131415

B

C

D

E

F

G

H

I

J

123456789101112131415

/8

/4

/8

/2

/4

-1

/2

Drawing of

Architect:

CB DESIGN GROUP, INC.

421 King St., Suite 301 Alexandria, VA 22314 POC: Wes Bridges, AIA 703.772.4213

TOMAH VAMC

TOMAH, WISCONSIN

DECEMBER 15, 2022

676-325

AuthorChecker

EXPAND AND RENOVATE

B404 FOR OUTPATIENT

MENTAL HEALTH

BID SET

THIRD FLOOR DEMO PLAN

AD-103

17 250

-3

A D

-1

/1

/2

.p d f

SCALE: 1/8" = 1'-0"AD-103

1 THIRD FLOOR DEMO PLAN

KEYNOTES - DEMOLITION PLAN

# DESCRIPTION

D1 REMOVE EXISTING STONE BELT TO EXTENT REQUIRED TO INSTALL NEW CONSTRUCTION. SEE ARCHITECTURAL NEW

WORK

D2 REMOVE PLUMBING FIXTURES AND TOILET ACCESSORIES.

D3 REMOVE FURRED WALL STRUCTURE SLAB TO DECK

D4 REMOVE EXISTING WINDOW, FRAME, SILL, SHADES, BLINDS, AND ALL ASSOCIATED HARDWARE. PREPARE FOR NEW

WINDOW INSTALLATION OR INFILL. SEE NEW WORK PLANS

D5 REMOVE DOOR(S) AND FRAME(S). (TO INCLUDE STOPS & HOLD OPENS WHERE THEY OCCUR)

D6 REMOVE EXTERIOR MASONRY WALL (BRICK & CMU), INCLUDING ALL WINDOWS, DOORS, ETC. IN AREA INDICATED. EXIST.

FOUNDATION & FOOTING TO REMAIN IN PLACE FOR REUSE W/ NEW EXTERIOR CLOSURE SYSTEM - SEE STRUCT. DWGS.

D7 REMOVE PORTION OF WALL INDICATED. INSTALL LINTEL PER STRUCTURAL AS REQUIRED. SEE ARCHITECTURAL PLANS

FOR SIZE.

D8 REMOVE LANDING, STAIR, AND FOUNDATION

D9 REFER TO MECHANICAL DEMO PLAN

D10 REMOVE EXISTING MILLWORK AND ALL ASSOICATED COMPONENTS.

D11 CAREFULLY REMOVE EXISTING PARTITION AS NEEDED FOR NEW DOOR INSTALLATION. PROVIDE TEMPORARY SUPPORT

AT OPENING DURING CONSTRUCTION. REFER TO NEW WORK PLAN FOR NEW DOOR LOCATION

D12 CAREFULLY REMOVE EXISTING CONCRETE SLAB TO THE EXTENT SHOWN TO PREPARE FOR NEW WORK REFER TO NEW

WORK PLAN FOR DIMENSIONS

D13 REMOVE EXISTING STONE BELT TO EXTENT REQUIRED TO INSTALL NEW CONSTRUCTION. SEE ARCHITECTURAL NEW

WORK

D14 REMOVE ALL ROOM FINISHES. REMOVE FLOOR FINISHES DOWN TO SLAB. PREPARE EXISTING SLAB TO RECEIVE NEW

FLOORING.

D15 REMOVE ELEVATOR AND ALL ASSOCIATED EQUIPMENT DOWN TO PIT

D16 REMOVE ALL CEILINGS AND BULKHEADS INCLUDING ALL ANCHORS, HANGERS, LIGHTING DEVICES, ETC.

D17 REMOVE LOCKERS

D18 REMOVE CORRIDOR WALL FINISHES, CORNER GUARDS, WALL PROTECTION FLOORING DOWN TO SLAB, BASE, AND ALL

OTHER FINISH ITEMS.

2/15/2023 17 of 233

C

D

E

F

H

E.8

C.3

G

1 94 5 876321A 1910 151411 12 13 16 17 187.66.4

A.8

B.9

5.2 11a

A.A

REMOVE EXISTING STONE CORNICE TO EXTENT REQUIRED TO INSTALL NEW

CONSTRUCTION. SEE ARCHITECTURAL NEW WORK

EXISTING SHEATHING AND JOISTS TO REMAIN. NEW OPENINGS TO BE CUT

WHERE SHOWN ON NEW WORK PLAN.

REMOVE EXISTING DORMER AND STRUCTURE TO EXTENT REQUIRED TO

INSTALL NEW CONSTRUCTION. SEE ARCHITECTURAL AND STRUCTURAL NEW

WORK

DETAIL

2/AE506

DETAIL

2/AE506

DETAIL

2/AE506

DETAIL

2/AE506

DETAIL

2/AE506

A.9

AD-130

EXISTING JOISTS AND

SHEATHING TO REMAIN.

CAREFULLY REMOVE

EXISTING LOUVER

C.6

1. ALL WORK SHOWN IS EXISTING TO REMAIN UNLESS NOTED OR INDICATED AS DASHED LINES TO BE REMOVED. THE EXTENT OF DEMOLITION WORK SHALL INCLUDE ALL INCIDENTAL DEMOLITION WORK NECESSARY TO PROPERLY PROVIDE ALL NEW WORK SHOWN AND SPECIFIED, TO INCLUDE MECHANICAL, ELECTRICAL, & PLUMBING ITEMS.

2. DEMOLITION WORK SHOWN IS BASED ON EXISTING DRAWINGS AND INSPECTIONS. THE CONTRACTOR SHALL VISUALLY INSPECT ALL EXISTING CONDITIONS, AND IS RESPONSIBLE FOR PERFORMING THE INDICATED DEMOLITION WORK EVEN

IF ACTUAL CONDITIONS DIFFER FROM THESE SHOWN ON THE DRAWINGS.

3. DEMOLITION CONTRACTOR SHALL COORDINATE WITH NEW WORK SECTIONS FOR ADDITIONAL INFORMATION RELATED

TO EXTENT OF DEMOLITION.

4. REFER TO ALL OTHER DRAWINGS IN THIS SET FOR INCIDENTAL DEMOLITION WORK NOT NOTED ON THE DEMOLITION

PLANS.

5. THE OWNER HAS FIRST RIGHT OF REFUSAL OF ALL SALVAGE ITEMS. THE CONTRACTOR SHALL PROPERLY DISPOSE OF

ALL CONSTRUCTION DEBRIS. DO NOT STOCKPILE DEBRIS ON SITE.

6. ITEMS TO BE DEMOLISHED SHALL BE REMOVED COMPLETELY INCLUDING ALL ANCHORS, HANGERS, FASTENERS, PIPES, CONDUCTS, DUCTS, ETC. UNLESS OTHERWISE INDICATED TO BE ABANDONED IN PLACE.

7. CONC. SLAB PATCHES MUST BE FLUSH WITH REMAINING SURFACES TO PERMIT APPLICATION OF FINISHES. PROVIDE

WELDED WIRE MESH IN PATCH AREAS LARGER THAT (4) FOUR SQUARE FEET.

8. CONC. SLABS TO REMAIN SHALL BE PATCHED, SCRAPED, LEVELED, AND CLEANED TO PROVIDE SURFACE SUITABLE FOR NEW FINISHES. WHERE RENOVATED AREAS ARE RECEIVING NEW UNDERGROUND MECHANICAL, PLUMBING, ELECTRICAL, OR ADDITIONAL FOUNDATION WORK, SEE MECHANICAL, PLUMBING, ELECTRIC, AND STRUCTURAL DRAWINGS, AS WELL AS ARCHITECTURAL DRAWINGS TO DETERMINE EXTENT OF REQUIRED CUT AND PATCH OF EXISTING SLAB. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL CONC. SLAB DEMOLITION AND REPLACEMENT NECESSARY TO INSTALL THE NEW WORK. BACKFILL ALL BELOW GRADE DEMOLITION WORK WITH SUITABLE FILL

MEETING STRUCTURAL REQUIREMENTS FOR NEW WORK.

9. PARTITIONS SHOWN TO BE REMOVED SHALL BE CONFIRMED BY THE CONTRACTOR AS TO TYPE OF PARTITION AND EXACT LOCATION. COMPLETELY REMOVE PARTITIONS FROM FLOOR TO STRUCTURE ABOVE INCLUDING BASE, ALL FASTENERS, GROUTS, SEAL ANTS, ETC., UNLESS NOTED OTHERWISE. MASONRY PARTITIONS WHICH EXTEND THROUGH THE SLAB SHALL BE REMOVED TO 8" BELOW FINISH FLOOR. FILL SLAB OPENING WITH CONCRETE FILL TO RECEIVE FINISH FLOOR. WHERE WALLS SCHEDULED TO BE REMOVED SIT ON SLABS, GRIND SLAB TO RECEIVE FINISH FLOOR.

10. REMOVE, PATCH AND REPAIR PORTIONS OF WALL PARTITIONS WHICH CONFLICT WITH NEW WORK TO BE INSTALLED, EVEN IF NOT SPECIFICALLY NOTED TO BE DEMOLISHED ON PLANS.

11. WALLS TO BE REMOVED FROM INTERSECTING WALLS SHALL INCLUDE TOOTHED IN REPLACEMENT OF DAMAGED MASONRY ON WALL TO REMAIN AND REMOVAL OF TIES PROJECTING FROM WALLS. SEE DETAILS FOR ADDITIONAL

CONDITIONS.

12. WALLS TO BE PARTIALLY REMOVED SHALL BE TERMINATED WITH FINISHED MASONRY ENDS BY TOOTHING IN NEW MASONRY UNITS, TO MATCH ADJACENT MASONRY. SEE DETAILS FOR OTHER CONDITIONS. NO WALLS SHALL BE

TERMINATED WITH EXPOSED OPEN CELLS OR DAMAGED MASONRY UNITS.

13. WHERE NEW OPENINGS ARE SHOWN IN EXISTING WALLS, CAREFULLY REMOVE MASONRY TO NEAREST JOINT LINE WITHOUT DISTURBING ADJACENT WORK SO THAT NEW WORK CAN BE PATCHED IN TO MATCH. ALL NEW MASONRY

WORK SHALL BE TOOTHED IN.

14. ALL EXISTING STRUCTURE SHALL REMAIN, UNLESS NOTED OTHERWISE.

15. COORDINATE DEMOLITION OF ALL STRUCTURAL ITEMS (COLUMNS, BEAMS, SLABS, ET, ETC.) WITH STRUCTURAL DWGS.

EXTENT OF DEMOLITION AREA SHALL BE IN ACCORDANCE WITH STRUCTURAL REQUIREMENTS AND COORDINATED WITH

ALL NEW WORK.

16. TEMPORARILY SUPPORT ALL BEAMS, LINTELS, PORTIONS OF WALLS ETC., TO BE DISTURBED BY DEMOLITION WORK, UNTIL THEY ARE RE-SUPPORTED BY NEW WORK.

17. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF EXISTING BUILDING ELEMENTS TO REMAIN THROUGHOUT SEQUENCE OF WORK. ANY DAMAGE TO EXISTING BUILDING CONDITIONS SHOWN TO REMAIN SHALL BE

RESTORED TO NEW WORK CONDITION AT NO ADDITIONAL COST TO THE OWNER.

18. WINDOWS SCHEDULED FOR REMOVAL SHALL BE REMOVED COMPLETELY. FASTENERS MAY BE CUT FLUSH WITH HEAD, JAMBS, AND SILLS IF THE NEW WINDOW UNIT WILL CONCEAL FASTENER. PROTECT EXISTING SILLS SCHEDULED TO REMAIN. ALL EXISTING WINDOW OPENINGS MUST BE FIELD MEASURED PRIOR TO SUBMITTAL OF SHOP DRAWINGS.

19. WERE FINISHES ARE INDICATED TO BE REMOVED, REMOVAL SHALL INCLUDE ANY GROUT, ADHESIVES, FASTENERS, AND

ALL OTHER ITEMS USED TO ATTACH THE FINISHES TO THE SURFACES THAT THEY COVER.

20. ANY FLOOR AREAS DAMAGED BY THE DEMOLITION CONTRACTOR SHALL BE PATCHED TO MATCH EXISTING.

21. WHERE CEILINGS ARE TO BE REMOVED, REMOVE ALL CEILINGS SYSTEMS COMPLETE INCLUDING GRID, TRIM HANGER, CLIPS, ETC. WHERE NEW CEILINGS ARE SPECIFIED, NO DOUBLE CEILINGS PERMITTED. REMOVE ALL ORIGINAL

CONCEALED CEILINGS WHERE ENCOUNTERED.

22. ALL EXISTING SURFACES TO REMAIN SHALL BE PROTECTED, PATCHED IF DAMAGED AND CLEANED PRIOR TO

APPLICATION OF FINISHES.

23. CONTRACTOR TO PROTECT ALL EQUIPMENT AND OTHER ELEMENTS IN AREA OF NEW OR DEMOLITION WORK.

24. REMOVE ALL CURTAINS AND BLINDS IN AREAS OF RENOVATION OR DEMOLITION, UNLESS NOTED OTHERWISE.

25. REMOVE MECHANICAL, ELECTRICAL AND PLUMBING ITEMS AS NOTED ON MECHANICAL, ELECTRICAL AND PLUMBING

PLANS. COORDINATE WITH CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING, FOR ADDITIONAL DEMOLITION NOTES. REMOVAL WORK IS INTENDED TO INCLUDE ALL ASSOCIATED ITEMS SUCH AS ELECTRICAL OUTLETS, SWITCHES, CONDUITS, CONTROLS, PIPING, MOUNTING BLOCKS, ETC., AS NOTED. THE CONTRACTOR SHALL REFER TO ALL CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS AND SPECIFICATIONS FOR PROCEDURES CONCERNING RELATED TRADES IN AREAS WHICH REQUIRE DEMOLITION. REPAIR AND PATCH ANY AREAS

DAMAGED DURING REMOVAL WORK.

26. ASBESTOS CONTAINING MATERIALS (ACM) MAY BE PRESENT IN DEMOLISHED MATERIALS. CONTRACTOR TO PROVIDE TESTING AND REMEDIATE ANY MATERIAL FOUND IN SCOPE OF WORK AREA. IF ACM OR OTHER HAZARDOUS MATERIALS ARE FOUND IN PROJECT AREA AND ARE DISTURBED BY CONSTRUCTION ACTIVITY STOP WORK IMMEDIATELY AND

CONTACT THE COR FOR THE PROJECT.

GENERAL NOTES - DEMOLITION

DOOR TO BE REMOVED

CONSTRUCTION TO BE REMOVED

CONSTRUCTION TO REMAIN

DEMOLITION LEGEND

AREA NOT INCLUDED IN SCOPE

N

KEY PLAN

NEW ADDITION

A R C H I T E C T S E N G I N E E R S

CB

Drawing Number:

Project Title:

Project Location:

Issue Date

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:PROFESSIONAL SEAL:

Revisions: Date:

CONSULTANT:

23456789101112131415

B

C

D

E

F

G

H

I

J

123456789101112131415

/8

/4

/8

/2

/4

-1

/2

Drawing of

Architect:

CB DESIGN GROUP, INC.

421 King St., Suite 301 Alexandria, VA 22314 POC: Wes Bridges, AIA 703.772.4213

TOMAH VAMC

TOMAH, WISCONSIN

DECEMBER 15, 2022

676-325

AuthorChecker

EXPAND AND RENOVATE

B404 FOR OUTPATIENT

MENTAL HEALTH

BID SET

ATTIC FLOOR DEMO PLAN

AD-104

18 250

-3

A D

-1

/1

/2

.p d f

SCALE: 1/8" = 1'-0"AD-104

1 ATTIC FLOOR DEMO PLAN

KEYNOTES - DEMOLITION PLAN

# DESCRIPTION

D1 REMOVE EXISTING STONE BELT TO EXTENT REQUIRED TO INSTALL NEW CONSTRUCTION. SEE ARCHITECTURAL NEW

WORK

D2 REMOVE PLUMBING FIXTURES AND TOILET ACCESSORIES.

D3 REMOVE FURRED WALL STRUCTURE SLAB TO DECK

D4 REMOVE EXISTING WINDOW, FRAME, SILL, SHADES, BLINDS, AND ALL ASSOCIATED HARDWARE. PREPARE FOR NEW

WINDOW INSTALLATION OR INFILL. SEE NEW WORK PLANS

D5 REMOVE DOOR(S) AND FRAME(S). (TO INCLUDE STOPS & HOLD OPENS WHERE THEY OCCUR)

D6 REMOVE EXTERIOR MASONRY WALL (BRICK & CMU), INCLUDING ALL WINDOWS, DOORS, ETC. IN AREA INDICATED. EXIST.

FOUNDATION & FOOTING TO REMAIN IN PLACE FOR REUSE W/ NEW EXTERIOR CLOSURE SYSTEM - SEE STRUCT. DWGS.

D7 REMOVE PORTION OF WALL INDICATED. INSTALL LINTEL PER STRUCTURAL AS REQUIRED. SEE ARCHITECTURAL PLANS

FOR SIZE.

D8 REMOVE LANDING, STAIR, AND FOUNDATION

D9 REFER TO MECHANICAL DEMO PLAN

D10 REMOVE EXISTING MILLWORK AND ALL ASSOICATED COMPONENTS.

D11 CAREFULLY REMOVE EXISTING PARTITION AS NEEDED FOR NEW DOOR INSTALLATION. PROVIDE TEMPORARY SUPPORT

AT OPENING DURING CONSTRUCTION. REFER TO NEW WORK PLAN FOR NEW DOOR LOCATION

D12 CAREFULLY REMOVE EXISTING CONCRETE SLAB TO THE EXTENT SHOWN TO PREPARE FOR NEW WORK REFER TO NEW

WORK PLAN FOR DIMENSIONS

D13 REMOVE EXISTING STONE BELT TO EXTENT REQUIRED TO INSTALL NEW CONSTRUCTION. SEE ARCHITECTURAL NEW

WORK

D14 REMOVE ALL ROOM FINISHES. REMOVE FLOOR FINISHES DOWN TO SLAB. PREPARE EXISTING SLAB TO RECEIVE NEW

FLOORING.

D15 REMOVE ELEVATOR AND ALL ASSOCIATED EQUIPMENT DOWN TO PIT

D16 REMOVE ALL CEILINGS AND BULKHEADS INCLUDING ALL ANCHORS, HANGERS, LIGHTING DEVICES, ETC.

D17 REMOVE LOCKERS

D18 REMOVE CORRIDOR WALL FINISHES, CORNER GUARDS, WALL PROTECTION FLOORING DOWN TO SLAB, BASE, AND ALL

OTHER FINISH ITEMS.

18 of 2332/15/2023 18 of 233

1. ALL WORK SHOWN IS EXISTING TO REMAIN UNLESS NOTED OR INDICATED AS DASHED LINES TO BE REMOVED. THE EXTENT OF DEMOLITION WORK SHALL INCLUDE ALL INCIDENTAL DEMOLITION WORK NECESSARY TO PROPERLY PROVIDE ALL NEW WORK SHOWN AND SPECIFIED, TO INCLUDE MECHANICAL, ELECTRICAL, & PLUMBING ITEMS.

2. DEMOLITION WORK SHOWN IS BASED ON EXISTING DRAWINGS AND INSPECTIONS. THE CONTRACTOR SHALL VISUALLY INSPECT ALL EXISTING CONDITIONS, AND IS RESPONSIBLE FOR PERFORMING THE INDICATED DEMOLITION WORK EVEN

IF ACTUAL CONDITIONS DIFFER FROM THESE SHOWN ON THE DRAWINGS.

3. DEMOLITION CONTRACTOR SHALL COORDINATE WITH NEW WORK SECTIONS FOR ADDITIONAL INFORMATION RELATED

TO EXTENT OF DEMOLITION.

4. REFER TO ALL OTHER DRAWINGS IN THIS SET FOR INCIDENTAL DEMOLITION WORK NOT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .