This document is a summary of a federal contract opportunity to expand and renovate space at the Tomah VA Medical Center in Wisconsin. The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting proposals under solicitation number 36C77623B0050_1 to complete minor construction work expanding and renovating room B404 for outpatient mental health services. Specifically, the project involves replacing the HVAC and AC system as well as other renovations as outlined in Attachment 32 of the solicitation documents. Proposals are due by the date specified in the solicitation for the design and execution of this construction project at the Tomah VAMC.

View the file

Other files

File Type Posted
Amendment 0007 Attachment 33 - Wage Determination 02-02-24.pdf PDF
Amendment_0007 36C77623B0050_1 0007.pdf PDF
Amendment_0006 36C77623B0050_1 pdf.pdf PDF
Amendment_0005 Attachment 31 - VAT-MP-ADD-1 - Response to 39.pdf PDF
Amendment_0005 Attachment 25 - B404 ACM Spreadsheet Inventory 2015 - Response to 1.pdf PDF
Amendment_0005 Attachment 29 - Response to 34.pdf PDF
Amendment_0005 36C77623B0050_1 pdf.pdf PDF
Amendment_0005 Attachment 30 -237413 PackagedOutdoorCentral-Station Air-Handling Units_addendum 1.pdf PDF
Amendment_0005 Attachment 24 - 2431 Tomah WI ACM - Response to 1.pdf PDF
Amendment_0005 Attachment 26 - Spec Section 27 52 23 - Response to 15.pdf PDF
Amendment_0005 Attachment 27 - Spec Section 26 29 11 - Response to 16.pdf PDF
Amendment_0005 Attachment 28 - B404 TR - Response to 18.pdf PDF
Amendment_0005 Attachment 23 - Tomah Technical Questions and VA Responses.pdf PDF
Amendment_0004 36C77623B0050_1 .pdf PDF
Amendment _0003 36C77623B0050_1 .pdf PDF
Amendment_0002 Attachment 21 - Tomah Site Visit sign-in sheet.pdf PDF
Amendment_0002 36C77623B0050_1 .pdf PDF
Attachment 2 - Bid Set - Spec V1R.pdf PDF
Amendment_0001 36C77623B0050_1 pdf.pdf PDF
Amendment_0001 Attachment 20 - 676-325 Renovate B404 - Structural Pages SG-001 to SB-100.pdf PDF
Amendment_0001 Attachment 3 - Bid Set - Spec V2R revised.pdf PDF
Attachment 17 - VA Notice of Limitations on Subcontracting.pdf PDF
Attachment 15 - Drawing Part 12 676-325 Renovate B404 - Structural.pdf PDF
36C77623B0050_1.pdf PDF
Attachment 6 - Drawing Part 3 676-325 Renovate B404 - Architectural_Part2.pdf PDF
Attachment 7 - Drawing Part 4 676-325 Renovate B404 - Architectural_Part3.pdf PDF
Attachment 18 - Wage Determination 10-13-23.pdf PDF
Attachment 5 - Drawing Part 2 676-325 Renovate B404 - Architectural_Part1.pdf PDF
Attachment 4 - Drawing Part 1 676-325 Renovate B404 - Architectural.pdf PDF
Attachment 13 - Drawing Part 10 676-325 Renovate B404 - Plumbing.pdf PDF
Attachment 10 - Drawing Part 7 676-325 Renovate B404 - Fire Supression.pdf PDF
Attachment 1 - Statement of Work - Tomah.pdf PDF
Attachment 19 - Brand Name JA Tomah.pdf PDF
Attachment 3 - Bid Set - Spec V2R.pdf PDF
Attachment 2 - Bid Set - Spec V1R.pdf PDF
Attachment 8 - Drawing Part 5 676-325 Renovate B404 - Electrical and Technology.pdf PDF
Attachment 16 - GeoTech Report.pdf PDF
Attachment 11 - Drawing Part 8 676-325 Renovate B404 - Floor Plans.pdf PDF
Attachment 12 - Drawing Part 9 676-325 Renovate B404 - Mechanical.pdf PDF
Attachment 9 - Drawing Part 6 676-325 Renovate B404 - Finishes.pdf PDF
Attachment 14 - Drawing Part 11 676-325 Renovate B404 - Site Drawings GI-001 to LS-101.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.: 676-16-102

LOCATION MAP

PROJECT TEAM

PROJECT LEADER/ARCHITECT

ELECTRICAL

FIRE PROTECTION

PENN CONSTRUCTION GROOP

MILWAUKEE, WI

309 N. WATER ST.,

SUITE 650

MILWAUKEE, WI 53202

PHONE: (414) 391-2797

VETERANS AFFAIRS MEDICAL CENTER

500 E VETERANS ST

TOMAH, WI 54660

CAMPUS MAP SHEET INDEX

IN THE CASE OF CONFLICTS OR DISCREPANCIES

WITHIN OR AMONG THE CONTRACT DRAWINGS, THE

BETTER QUALITY, MORE STRINGENT REQUIREMENTS

OR GREATER QUANTITY OF WORK, AS DETERMINED

BY THE GOVERNMENT, SHALL BE PROVIDED.

MECHANICAL

PENN CONSTRUCTION GROUP

MILWAUKEE, WI

309 N. WATER ST.

SUITE 650

MILWAUKEE, WI 53202

PLUMBING

REPLACE HVAC & AC B404

SHEET NUMBER SHEET NAME

ISSUED FOR

35% SDs

09/06/2017

ARCHITECTURAL

A001 ARCHITECTURAL LEGEND, ABBREVIATIONS, SCHEDULES,

AND DETAILS

X

AD101 ARCHITECTURAL DEMOLITION X

AS101 ARCHITECTURAL NEW WORK X

A401 ARCHITECTURAL ELEVATIONS

MECHANICAL

M001 MECHANICAL LEGEND, ABBREVIATIONS, AND NOTES X

X

X

X

X

X

X

X

X

M501 MECHANICAL DETAILS AND DIAGRAMS

M502

PLUMBING

P001 PLUMBING LEGEND, ABBREVIATIONS, AND DIAGRAMS X

XPD101 PLUMBING DEMOLITION

XPL101 PLUMBING NEW WORK - THIRD FLOOR X

FIRE PROTECTION

F001 FIRE PROTECTION LEGEND, ABBREVIATIONS, SCHEDULES

AND DETAILS

X

FD102 FIRE PROTECTION DETECTION AND ALARM DEMOLITION

XFD101 FIRE PROTECTION SUPPRESSION DEMOLITION

ELECTRICAL

E001 ELECTRICAL LEGEND, ABBREVIATIONS, AND SCHEDULE

ED101 ELECTRICAL DEMOLITION

ISSUED FOR

65% DDs

11/03/2017

MECHANICAL DETAILS AND DIAGRAMS

M601 MECHANICAL SCHEDULES

PENN CONSTRUCTION GROUP

MILWAUKEE, WI

309 N. WATER ST.

SUITE 650

MILWAUKEE, WI 53202

PENN CONSTRUCTION GROUP

MILWAUKEE, WI

309 N. WATER ST.

SUITE 650

MILWAUKEE, WI 53202

PENN CONSTRUCTION GROUP

MILWAUKEE, WI

309 N. WATER ST.

SUITE 650

MILWAUKEE, WI 53202

GENERAL INFORMATION

GI001 TITLE SHEET X

ISSUED FOR

95% CDs

12/22/17

ISSUED FOR

100% CDs

02/09/18

ES101 ELECTRICAL NEW WORK

E301 ELECTRICAL MCC ELEVATIONS

E302 ELECTRICAL MCC ELEVATIONS

M701

M703

M704

MECHANICAL CONTROL DIAGRAMS

MECHANICAL AIR FLOW DIAGRAMS

MECHANICAL FLOW DIAGRAMS

FA101 FIRE PROTECTION DETECTION AND ALARM NEW WORK

M301 MECHANICAL SECTIONS

FIRE PROTECTION SUPPRESSION NEW WORKFX101

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Tomah, Wisconsin

676-16-102

Office of

Facilities

Management

RECORD DRAWINGS

January 13, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Replace HVAC & AC B404

309 N. Water St Suite 650 Milwaukee, Wisconsin 53202

GI001

MDG

TITLE SHEET

HFB

X

X

X

MD101 MECHANICAL BASEMENT DEMOLITION X

MD102-A MECHANICAL PARTIAL ATTIC DEMOLITION - DUCTWORK X

MD102-B MECHANICAL PARTIAL ATTIC DEMOLITION - DUCTWORK X

MD102-C MECHANICAL PARTIAL ATTIC DEMOLITION - DUCTWORK X

MD103-A MECHANICAL PARTIAL ATTIC DEMOLITION - PIPING X

MD103-B MECHANICAL PARTIAL ATTIC DEMOLITION - PIPING X

MD103-C MECHANICAL PARTIAL ATTIC DEMOLITION - PIPING X

X

MH101 MECHANICAL BASEMENT NEW WORK

MH102-A MECHANICAL PARTIAL ATTIC NEW WORK - DUCTWORK

MH102-B MECHANICAL PARTIAL ATTIC NEW WORK - DUCTWORK

MH102-C MECHANICAL PARTIAL ATTIC NEW WORK - DUCTWORK

MP102-A MECHANICAL PARTIAL ATTIC NEW WORK - PIPING

MP102-B MECHANICAL PARTIAL ATTIC NEW WORK - PIPING

MP102-C MECHANICAL PARTIAL ATTIC NEW WORK - PIPING

GC101 PHASING DEMOLITION X

GC102 PHASING NEW WORK X

X

X

X

X

X

A402 ARCHITECTURAL ELEVATIONS

X

X

GC104

INFECTION CONTROL GENERAL NOTES AND DETAILS

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

GC103

X

PL102 PLUMBING NEW WORK - ATTIC X

X

X

AS201 ARCHITECTURAL REFLECTED CEILING PLAN

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

INFECTION CONTROL PLANS X

X

X

M702 MECHANICAL CONTROL DIAGRAMS X

M302 MECHANICAL SECTIONS X X X

CIVIL

C001 SITE DETAILS

C101 SITE STAGING AND EQUIPMENT LAYOUT PLAN X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

PROJECT

LOCATION

ISSUED FOR

CONSTRUCTION

07/09/21

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231, OCT 1978

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Tomah, Wisconsin

676-16-102

Office of

Facilities

Management

RECORD DRAWINGS

January 13, 2023

ATTIC KEY PLAN

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Replace HVAC & AC B404

309 N. Water St Suite 650 Milwaukee, Wisconsin 53202

GC101

JMD

PHASING DEMOLITION

HFB

1/8" = 1'-0"

ATTIC PLAN

AutoCAD SHX Text

AutoCAD SHX Text 1A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 17A

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text F

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text F

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ATTIC

AutoCAD SHX Text

AREA

AutoCAD SHX Text

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text 20X20

AutoCAD SHX Text 30X14

AutoCAD SHX Text

AutoCAD SHX Text

PLENUM

AutoCAD SHX Text M

AutoCAD SHX Text 16X10

AutoCAD SHX Text

DN

AutoCAD SHX Text 16X10

AutoCAD SHX Text 16X12

AutoCAD SHX Text 16X12

AutoCAD SHX Text

DN

AutoCAD SHX Text 52X18

AutoCAD SHX Text 16X12

AutoCAD SHX Text 14X16

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text

16X10 ABOVE 16X12 BELOW

AutoCAD SHX Text

AutoCAD SHX Text 26X16

AutoCAD SHX Text M

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text 22X24

AutoCAD SHX Text 26X16

AutoCAD SHX Text M

AutoCAD SHX Text 30X16

AutoCAD SHX Text M

AutoCAD SHX Text 22X24

AutoCAD SHX Text 22X24

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text 22X24

AutoCAD SHX Text 22X48

AutoCAD SHX Text 42X14

AutoCAD SHX Text M

AutoCAD SHX Text 22X24

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text 22X24

AutoCAD SHX Text 14X16

AutoCAD SHX Text 14X16

AutoCAD SHX Text 36X20

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 56X14

AutoCAD SHX Text 36X20

AutoCAD SHX Text 16X12

AutoCAD SHX Text 16X10

AutoCAD SHX Text 14X16

AutoCAD SHX Text 10X12

AutoCAD SHX Text 10X12

AutoCAD SHX Text

AutoCAD SHX Text M

AutoCAD SHX Text 48X18

AutoCAD SHX Text 42X14

AutoCAD SHX Text 36X24

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text 56X14

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text

AutoCAD SHX Text 30X16

AutoCAD SHX Text 30X14

AutoCAD SHX Text 24X22

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text 24X22

AutoCAD SHX Text M

AutoCAD SHX Text 16X14

AutoCAD SHX Text 16X14

AutoCAD SHX Text

AutoCAD SHX Text 30X26

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text 56X14

AutoCAD SHX Text 42X14

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text 26X14

AutoCAD SHX Text M

AutoCAD SHX Text

AutoCAD SHX Text 18X22

AutoCAD SHX Text 20X20

AutoCAD SHX Text

AutoCAD SHX Text 20X20

AutoCAD SHX Text

AutoCAD SHX Text 16X26

AutoCAD SHX Text M

AutoCAD SHX Text 24X18

AutoCAD SHX Text 24X22

AutoCAD SHX Text 22X40

AutoCAD SHX Text

404-EF-2-2

AutoCAD SHX Text

404-EF-8

AutoCAD SHX Text

404-EF-3-1

AutoCAD SHX Text 16X24

AutoCAD SHX Text PHASE 1 - REPLACE EXHAUST FANS EF-1, EF-3-1, AND EF-3-2 DEMOLITION. - EXISTING DUCTWORK PARTIALLY BLOCKS EXISTING ACCESS DOORS. EXISTING DUCTWORK PARTIALLY BLOCKS EXISTING ACCESS DOORS. - CUT NEW TEMPORARY OPENING IN EAST WALL. SALVAGE EXISTING CUT NEW TEMPORARY OPENING IN EAST WALL. SALVAGE EXISTING BRICK FOR RE-USE. - PROVIDE A TEMPORARY EXHAUST FAN AND EXHAUST THROUGH THE PROVIDE A TEMPORARY EXHAUST FAN AND EXHAUST THROUGH THE NEW TEMPORARY OPENING IN EAST WALL. EC TO PROVIDE A TEMPORARY POWER FEEDER TO THE EXHAUST FAN FROM EXISTING MCC-2. EC TO PROVIDE A NEW FUSED SWITCH IN EXISTING BUSSED CUBICLE SPACE IN MCC-2. - PROVIDE SCREENED OUTLET FOR EXHAUST AND SEAL ALL AROUND PROVIDE SCREENED OUTLET FOR EXHAUST AND SEAL ALL AROUND EXHAUST DUCT. - REMOVE/DEMOLISH EXISTING EXHAUST FANS, EF-1, EF-3-1 AND REMOVE/DEMOLISH EXISTING EXHAUST FANS, EF-1, EF-3-1 AND EF-3-2. CONDUIT, POWER CONDUCTORS, CONTROLS AND DISCONNECT SWITCHES SHALL BE REMOVED BACK TO POWER DISTRIBUTION SOURCE(S) SERVING EACH SYSTEM. - INSTALL NEW EXHAUST FAN EF-1, ENERGY RECOVERY COIL, INSTALL NEW EXHAUST FAN EF-1, ENERGY RECOVERY COIL, DUCTWORK, AND RELATED ACCESSORIES. PROVIDE NEW CONDUIT, POWER CONDUCTORS AND LOCAL DISCONNECT SWITCH AS REQUIRED. EF-1 SHALL BE FED FROM EXISTING MCC-2. - REMOVE TEMPORARY FAN AND DUCTWORK. DISCONNECT AND REMOVE REMOVE TEMPORARY FAN AND DUCTWORK. DISCONNECT AND REMOVE TEMPORARY POWER FEEDER TO EXHAUST FAN. TEMPORARY FUSED SWITCH USED FOR EXHAUST FAN TO REMAIN. - INFILL TEMPORARY OPENING IN EAST WALL TO MATCH EXISTING INFILL TEMPORARY OPENING IN EAST WALL TO MATCH EXISTING CONSTRUCTION. RE-USE SALVAGED BRICK OR PROVIDE NEW BRICK TO MATCH EXISTING. PHASE 2 - OPEN EXISTING WEST WALL AND INSTALL NEW 6 FT BY 6 FT OPENING FOR ACCESS DOORS, REPLACE EXHAUST FANS. - EXISTING DUCTS COVER THE WEST WALL MAKING ACCESS EXISTING DUCTS COVER THE WEST WALL MAKING ACCESS IMPOSSIBLE. - CUT NEW OPENINGS IN THE EXISTING WEST WALL FOR NEW CUT NEW OPENINGS IN THE EXISTING WEST WALL FOR NEW DOORWAY AND A TEMPORARY OPENING. SALVAGE EXISTING BRICK FOR RE-USE. - PROVIDE TEMPORARY EXHAUST FAN AND EXHAUST THROUGH PROVIDE TEMPORARY EXHAUST FAN AND EXHAUST THROUGH TEMPORARY OPENING IN WEST WALL. EC TO PROVIDE A TEMPORARY POWER FEEDER TO THE EXHAUST FAN FROM EXISTING MCC-3. EC TO PROVIDE A NEW FUSED SWITCH IN EXISTING BUSSED CUBICLE SPACE IN MCC-3. - PROVIDE SCREENED OUTLET FOR EXHAUST AND SEAL ALL AROUND PROVIDE SCREENED OUTLET FOR EXHAUST AND SEAL ALL AROUND EXHAUST DUCT. - PROVIDE NEW EXHAUST DUCT CONNECTIONS TO THE NEW LOUVER(S) PROVIDE NEW EXHAUST DUCT CONNECTIONS TO THE NEW LOUVER(S) TO NEW EXHAUST FAN(S). - REMOVE/DEMOLISH EXISTING EXHAUST FANS, EF-2-3, EF-5-1 AND REMOVE/DEMOLISH EXISTING EXHAUST FANS, EF-2-3, EF-5-1 AND EF-5-2. CONDUIT, POWER CONDUCTORS, CONTROLS AND DISCONNECT SWITCHES SHALL BE REMOVED BACK TO POWER DISTRIBUTION SOURCE(S) SERVING EACH SYSTEM. - INSTALL NEW EXHAUST FAN EF-5, ENERGY RECOVERY COIL, INSTALL NEW EXHAUST FAN EF-5, ENERGY RECOVERY COIL, DUCTWORK, AND RELATED ACCESSORIES. PROVIDE NEW CONDUIT, POWER CONDUCTORS AND LOCAL DISCONNECT SWITCH. EF-5 SHALL BE FED FROM EXISTING MCC-3. - REMOVE TEMPORARY FAN AND DUCTWORK. DISCONNECT AND REMOVE REMOVE TEMPORARY FAN AND DUCTWORK. DISCONNECT AND REMOVE TEMPORARY POWER FEEDER TO EXHAUST FAN. TEMPORARY FUSED SWITCH USED FOR EXHAUST FAN TO REMAIN. - PROVIDE NEW 6 FT BY 6 FT DOORS IN WEST WALL. PROVIDE NEW 6 FT BY 6 FT DOORS IN WEST WALL. - INFILL TEMPORARY OPENING IN WEST WALL TO MATCH EXISTING INFILL TEMPORARY OPENING IN WEST WALL TO MATCH EXISTING CONSTRUCTION. RE-USE SALVAGED BRICK OR PROVIDE NEW BRICK TO MATCH EXISTING. PHASE 3 - AHU 1 AND 3 REMOVAL AND REPLACEMENT - ALL WORK SHALL BE COMPLETED BETWEEN THE DATES NOVEMBER 1 ALL WORK SHALL BE COMPLETED BETWEEN THE DATES NOVEMBER 1 AND APRIL 1. DURING THIS TIME IT IS EXPECTED THE AHU OPERATE AT MINIMUM AIRFLOWS. PHASE 3A - PROVIDE TEMPORARY SUPPLY AND RETURN DUCT CONNECTIONS PROVIDE TEMPORARY SUPPLY AND RETURN DUCT CONNECTIONS BETWEEN AHU-3 AND AHU-1. - REMOVE SUPPLY AND RETURN DUCTWORK FOR AHU-1. REMOVE SUPPLY AND RETURN DUCTWORK FOR AHU-1. - REMOVE CHILLED WATER, STEAM, AND CONDENSATE PIPING AT REMOVE CHILLED WATER, STEAM, AND CONDENSATE PIPING AT AHU-1. - COMPLETELY REMOVE EXISTING AHU-1 AND RF-1. CONDUIT, POWER COMPLETELY REMOVE EXISTING AHU-1 AND RF-1. CONDUIT, POWER CONDUCTORS, CONTROLS AND DISCONNECT SWITCHES SHALL BE REMOVED BACK TO POWER DISTRIBUTION SOURCE(S) SERVING SYSTEM. PHASE 3C - REMOVE CHILLED WATER, STEAM, AND CONDENSATE PIPING AT REMOVE CHILLED WATER, STEAM, AND CONDENSATE PIPING AT EXISTING AHU-3. - COMPLETELY REMOVE EXISTING AHU-3 AND RF-3. CONDUIT, POWER COMPLETELY REMOVE EXISTING AHU-3 AND RF-3. CONDUIT, POWER CONDUCTORS, CONTROLS AND DISCONNECT SWITCHES SHALL BE REMOVED BACK TO POWER DISTRIBUTION SOURCE(S) SERVING SYSTEM. PHASE 4 - AHU 2 AND 5 REMOVAL AND REPLACEMENT - ALL WORK SHALL BE COMPLETED BETWEEN THE DATES NOVEMBER 1 ALL WORK SHALL BE COMPLETED BETWEEN THE DATES NOVEMBER 1 AND APRIL 1. DURING THIS TIME IT IS EXPECTED THE AHU OPERATE MINIMUM AIRFLOWS. PHASE 4A - PROVIDE TEMPORARY SUPPLY AND RETURN DUCT CONNECTIONS PROVIDE TEMPORARY SUPPLY AND RETURN DUCT CONNECTIONS BETWEEN AHU-5 AND AHU-2. PROVIDE A TEMPORARY CONNECTION BETWEEN THE DISCHARGE OF RF-2 AND THE RETURN DUCTWORK OF AHU-5. - REMOVE SUPPLY AND RETURN DUCTWORK FOR AHU-2. REMOVE SUPPLY AND RETURN DUCTWORK FOR AHU-2. - REMOVE CHILLED WATER, STEAM, AND CONDENSATE PIPING AHU-2. REMOVE CHILLED WATER, STEAM, AND CONDENSATE PIPING AHU-2. - COMPLETELY REMOVE EXISTING AHU-2. CONDUIT, POWER COMPLETELY REMOVE EXISTING AHU-2. CONDUIT, POWER CONDUCTORS, CONTROLS AND DISCONNECT SWITCHES SHALL BE REMOVED BACK TO POWER DISTRIBUTION SOURCE(S) SERVING SYSTEM. PHASE 4B - DEMO EXISTING RF-5. CONDUIT, POWER CONDUCTORS, CONTROLS DEMO EXISTING RF-5. CONDUIT, POWER CONDUCTORS, CONTROLS AND DISCONNECT SWITCHES SHALL BE REMOVED BACK TO POWER DISTRIBUTION SOURCE(S) SERVING SYSTEM. PROVIDE TEMPORARY INLINE FAN IN DUCTWORK TO REPLACE RF-5. EC TO PROVIDE A TEMPORARY POWER FEEDER TO THE INLINE FAN FROM EXISTING MCC-2. EC TO PROVIDE A NEW FUSED SWITCH IN EXISTING BUSSED SPACE IN MCC-2. - DEMO EXISTING EF-9. CONDUIT, POWER CONDUCTORS, CONTROLS DEMO EXISTING EF-9. CONDUIT, POWER CONDUCTORS, CONTROLS AND DISCONNECT SWITCHES SHALL BE REMOVED BACK TO POWER DISTRIBUTION SOURCE(S) SERVING SYSTEM. PHASE 4D - REMOVE CHILLED WATER, STEAM, AND CONDENSATE PIPING AHU-5. REMOVE CHILLED WATER, STEAM, AND CONDENSATE PIPING AHU-5. - COMPLETELY REMOVE EXISTING AHU-5, RF-2, AND TEMPORARY COMPLETELY REMOVE EXISTING AHU-5, RF-2, AND TEMPORARY INLINE FAN. RECONNECT RETURN DUCTS WHERE FANS WERE REMOVED. CONDUIT, POWER CONDUCTORS, CONTROLS AND DISCONNECT SWITCHES SHALL BE REMOVED BACK TO POWER DISTRIBUTION SOURCE(S) SERVING SYSTEM. PHASE 5 - AHU-4 REMOVAL AND REPLACEMENT - PHASE 5 WORK SHALL BE COMPLETED ONLY AFTER PHASES 1 PHASE 5 WORK SHALL BE COMPLETED ONLY AFTER PHASES 1 THROUGH 4 ARE COMPLETED. PHASE 5A - PROVIDE TEMPORARY OPENING IN THE SOUTH WALL. OPENING IS PROVIDE TEMPORARY OPENING IN THE SOUTH WALL. OPENING IS FOR REMOVAL OF EXISTING AHU-4 AND NEW AHU-4 IN PLACE. PROVIDE FALL PROTECTION AT OPENING AND PROVIDE A TEMPORARY REMOVABLE STUD WALL WITH VISQUEEN COVER TO PROTECT ATTIC FROM WEATHER, RAIN, WIND AND SNOW. - SALVAGE ALL EXTERIOR MATERIALS FOR REPLACEMENT. SALVAGE ALL EXTERIOR MATERIALS FOR REPLACEMENT. - PROVIDE A TEMPORARY UNIT WITH STEAM HEATING AND PROVIDE PROVIDE A TEMPORARY UNIT WITH STEAM HEATING AND PROVIDE TEMPORARY SUPPLY AND RETURN DUCT CONNECTIONS. EC TO PROVIDE A TEMPORARY POWER FEEDER TO NEW UNIT FROM EXISTING MCC-2. EC TO PROVIDE A NEW FUSED SWITCH IN EXISTING BUSSED SPACE IN MCC-2. PHASE 5B - REMOVE SUPPLY DUCTWORK FOR AHU-4. KEEP EXISTING RETURN REMOVE SUPPLY DUCTWORK FOR AHU-4. KEEP EXISTING RETURN DUCTWORK WHILE TEMPORARY UNIT IS REQUIRED. - REMOVE CHILLED WATER, STEAM, AND CONDENSATE PIPING AT REMOVE CHILLED WATER, STEAM, AND CONDENSATE PIPING AT AHU-4. - COMPLETELY REMOVE EXISTING AHU-4 AND RF-4. CONDUIT, POWER COMPLETELY REMOVE EXISTING AHU-4 AND RF-4. CONDUIT, POWER CONDUCTORS, CONTROLS AND DISCONNECT SWITCHES SHALL BE REMOVED BACK TO POWER DISTRIBUTION SOURCE(S) SERVING SYSTEM. PHASE 5C - PROVIDE NEW AHU-4 IN LOCATION OF DEMOLISHED AHU-4. PROVIDE PROVIDE NEW AHU-4 IN LOCATION OF DEMOLISHED AHU-4. PROVIDE NEW CONDUIT, POWER CONDUCTORS AND LOCAL DISCONNECT SWITCH AS REQUIRED. AHU-4 SHALL BE FED FROM EXISTING MCC-3. EC TO REUSE EXISTING FUSED SWITCH IN MCC-2 AND PROVIDE NEW FUSES AS REQUIRED. - PROVIDE CHILLED WATER, STEAM AND CONDENSATE PIPING TO NEW PROVIDE CHILLED WATER, STEAM AND CONDENSATE PIPING TO NEW AHU-4. - PROVIDE PERMANENT CONNECTIONS TO SUPPLY AND RETURN DUCTS PROVIDE PERMANENT CONNECTIONS TO SUPPLY AND RETURN DUCTS FOR AHU-4. - REMOVE TEMPORARY UNIT. DEMO RETURN DUCTWORK NOT REMOVED REMOVE TEMPORARY UNIT. DEMO RETURN DUCTWORK NOT REMOVED DURING PHASE 5B. TEMPORARY FUSED SWITCH USED FOR AHU UNIT TO REMAIN IN MCC-3. - INFILL TEMPORARY OPENING IN SOUTH WALL TO MATCH EXISTING INFILL TEMPORARY OPENING IN SOUTH WALL TO MATCH EXISTING CONSTRUCTION. RE-USE SALVAGED BRICK OR PROVIDE NEW BRICK TO MATCH EXISTING.

AutoCAD SHX Text NOTES: 1. USE EXISTING FANS ABD EQUIPMENT AS LONG AS POSSIBLE. USE EXISTING FANS ABD EQUIPMENT AS LONG AS POSSIBLE. 2. NEW EXHAUST FANS SET IN PLACE MAY ELIMINATE THE NEED FOR NEW EXHAUST FANS SET IN PLACE MAY ELIMINATE THE NEED FOR TEMPORARY EXHAUST FANS. 3. TEMPORARY EXHAUST FAN #1 FOR EF-1, EF-3-1 AND EF-3-2 TEMPORARY EXHAUST FAN #1 FOR EF-1, EF-3-1 AND EF-3-2 USE GREENHECK BSQ-240HP OR EQUIVALENT. 4. TEMPORARY EXHAUST FAN #2 FOR EF-5-1, EF-5-2 AND EF-2-3 TEMPORARY EXHAUST FAN #2 FOR EF-5-1, EF-5-2 AND EF-2-3 USE GREENHECK BSQ-300HP OR EQUIVALENT. 5. MOUNTING AND CONNECTIONS PER SPECIFICATIONS, DETAILS, AND MOUNTING AND CONNECTIONS PER SPECIFICATIONS, DETAILS, AND REQUIRED SMACNA STANDARDS. 6. TEMPORARY RETURN FAN #5 FOR USE GREENHECK BSQ-240HP OR TEMPORARY RETURN FAN #5 FOR USE GREENHECK BSQ-240HP OR EQUIVALENT. 7. TEMPORARY AHU-4, 4230CFM SUPPLY AIR, 2200 OUTDOOR AIR, TEMPORARY AHU-4, 4230CFM SUPPLY AIR, 2200 OUTDOOR AIR, STEAM HEATING COIL FOR 4230 CFM AT 160 MBH, HUMIDIFIER SECTION AT 208 LB/HR, PREFILTERS, FINAL FILTERS, AND VFD'S. USE JCI SOLUTION MODEL OR EQUIVALENT.

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Tomah, Wisconsin

676-16-102

Office of

Facilities

Management

RECORD DRAWINGS

January 13, 2023

ATTIC KEY PLAN

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Replace HVAC & AC B404

309 N. Water St Suite 650 Milwaukee, Wisconsin 53202

GC102

JMD

PHASING NEW WORK

HFB

1/8" = 1'-0"

ATTIC PLAN

AutoCAD SHX Text

AutoCAD SHX Text 1A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 17A

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text F

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text F

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

ATTIC

AutoCAD SHX Text

AREA

AutoCAD SHX Text

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text PHASE 1 - REPLACE EXHAUST FANS EF-1, EF-3-1, AND EF-3-2 NEW WORK. - INSTALL NEW EXHAUST FAN EF-1, ENERGY RECOVERY COIL, DUCTWORK, INSTALL NEW EXHAUST FAN EF-1, ENERGY RECOVERY COIL, DUCTWORK, AND RELATED ACCESSORIES. PROVIDE NEW CONDUIT, POWER CONDUCTORS AND LOCAL DISCONNECT SWITCH AS REQUIRED. EF-1 SHALL BE FED FROM EXISTING MCC-2. - REMOVE TEMPORARY FAN AND DUCTWORK. DISCONNECT AND REMOVE REMOVE TEMPORARY FAN AND DUCTWORK. DISCONNECT AND REMOVE TEMPORARY POWER FEEDER TO EXHAUST FAN. TEMPORARY FUSED SWITCH USED FOR EXHAUST FAN TO REMAIN. - INFILL TEMPORARY OPENING IN EAST WALL TO MATCH EXISTING INFILL TEMPORARY OPENING IN EAST WALL TO MATCH EXISTING CONSTRUCTION. RE-USE SALVAGED BRICK OR PROVIDE NEW BRICK TO MATCH EXISTING. PHASE 2 - OPEN EXISTING WEST WALL AND INSTALL NEW 6 FT BY 6 FT OPENING FOR ACCESS DOORS, REPLACE EXHAUST FANS. - INSTALL NEW EXHAUST FAN EF-5, ENERGY RECOVERY COIL, DUCTWORK, INSTALL NEW EXHAUST FAN EF-5, ENERGY RECOVERY COIL, DUCTWORK, AND RELATED ACCESSORIES. PROVIDE NEW CONDUIT, POWER CONDUCTORS AND LOCAL DISCONNECT SWITCH. EF-5 SHALL BE FED FROM EXISTING MCC-3. - REMOVE TEMPORARY FAN AND DUCTWORK. DISCONNECT AND REMOVE REMOVE TEMPORARY FAN AND DUCTWORK. DISCONNECT AND REMOVE TEMPORARY POWER FEEDER TO EXHAUST FAN. TEMPORARY FUSED SWITCH USED FOR EXHAUST FAN TO REMAIN. - PROVIDE NEW 6 FT BY 6 FT DOORS IN WEST WALL. PROVIDE NEW 6 FT BY 6 FT DOORS IN WEST WALL. - INFILL TEMPORARY OPENING IN WEST WALL TO MATCH EXISTING INFILL TEMPORARY OPENING IN WEST WALL TO MATCH EXISTING CONSTRUCTION. RE-USE SALVAGED BRICK OR PROVIDE NEW BRICK TO MATCH EXISTING. PHASE 3 - AHU 1 AND 3 REMOVAL AND REPLACEMENT - ALL WORK SHALL BE COMPLETED BETWEEN THE DATES NOVEMBER 1 AND ALL WORK SHALL BE COMPLETED BETWEEN THE DATES NOVEMBER 1 AND APRIL 1. DURING THIS TIME IT IS EXPECTED THE AHU OPERATE AT MINIMUM AIRFLOWS. PHASE 3B - PROVIDE NEW AHU-3 IN LOCATION OF DEMOLISHED AHU-1. PROVIDE NEW PROVIDE NEW AHU-3 IN LOCATION OF DEMOLISHED AHU-1. PROVIDE NEW CONDUIT, POWER CONDUCTORS AND LOCAL DISCONNECT SWITCH AS REQUIRED. AHU-3 SHALL BE FED FROM EXISTING MCC-2. EC TO REUSE EXISTING FUSED SWITCH IN MCC-2 AND PROVIDE NEW FUSES AS REQUIRED. - PROVIDE CHILLED WATER, STEAM AND CONDENSATE PIPING TO NEW AHU-3. PROVIDE CHILLED WATER, STEAM AND CONDENSATE PIPING TO NEW AHU-3. - PROVIDE TEMPORARY DISCHARGE PLENUM FOR AHU-3. PROVIDE TEMPORARY DISCHARGE PLENUM FOR AHU-3. - PROVIDE TEMPORARY SUPPLY AND RETURN DUCTS FROM AHU-3 TO PROVIDE TEMPORARY SUPPLY AND RETURN DUCTS FROM AHU-3 TO EXISTING DUCT RISERS. KEEP CROSS CONNECTIONS TO AHU-1. PHASE 3D - PROVIDE NEW AHU-1 IN THE LOCATION WHERE EXISTING AHU-3 PROVIDE NEW AHU-1 IN THE LOCATION WHERE EXISTING AHU-3 WAS. PROVIDE NEW CONDUIT, POWER CONDUCTORS AND LOCAL DISCONNECT SWITCH AS REQUIRED. AHU-1 SHALL BE FED FROM EXISTING MCC-2. EC TO REUSE EXISTING FUSED SWITCH IN MCC-2 AND PROVIDE NEW FUSES AS REQUIRED. - INSTALL PERMANENT DISCHARGE PLENUM AND FINAL FILTERS FOR AHU-3. INSTALL PERMANENT DISCHARGE PLENUM AND FINAL FILTERS FOR AHU-3. - PROVIDE PERMANENT CONNECTIONS TO SUPPLY AND RETURN DUCTS. PROVIDE PERMANENT CONNECTIONS TO SUPPLY AND RETURN DUCTS. - PROVIDE PERMANENT CHILLED WATER, STEAM AND CONDENSATE PROVIDE PERMANENT CHILLED WATER, STEAM AND CONDENSATE CONNECTIONS TO NEW AHU-1. PHASE 4 - AHU 2 AND 5 REMOVAL AND REPLACEMENT - ALL WORK SHALL BE COMPLETED BETWEEN THE DATES NOVEMBER 1 AND ALL WORK SHALL BE COMPLETED BETWEEN THE DATES NOVEMBER 1 AND APRIL 1. DURING THIS TIME IT IS EXPECTED THE AHU OPERATE MINIMUM AIRFLOWS. PHASE 4C - PROVIDE NEW AHU-5 NEAR THE LOCATION OF DEMOLISHED AHU-2 BUT PROVIDE NEW AHU-5 NEAR THE LOCATION OF DEMOLISHED AHU-2 BUT PERPENDICULAR. PROVIDE NEW CONDUIT, POWER CONDUCTORS AND LOCAL DISCONNECT SWITCH AS REQUIRED. AHU-5 SHALL BE FED FROM EXISTING MCC-3. EC TO REUSE EXISTING FUSED SWITCH IN MCC-3 AND PROVIDE NEW FUSES AS REQUIRED. - PROVIDE TEMPORARY DISCHARGE PLENUM FOR AHU-5. PROVIDE TEMPORARY DISCHARGE PLENUM FOR AHU-5. - PROVIDE TEMPORARY SUPPLY AND RETURN DUCTS FROM AHU-5 TO PROVIDE TEMPORARY SUPPLY AND RETURN DUCTS FROM AHU-5 TO EXISTING DUCT RISERS. - PROVIDE CHILLED WATER, STEAM AND CONDENSATE PIPING TO NEW AHU-5. PROVIDE CHILLED WATER, STEAM AND CONDENSATE PIPING TO NEW AHU-5. PHASE 4E - PROVIDE NEW AHU-2 IN THE LOCATION WHERE EXISTING AHU-5 WAS. PROVIDE NEW AHU-2 IN THE LOCATION WHERE EXISTING AHU-5 WAS. PROVIDE NEW CONDUIT, POWER CONDUCTORS AND LOCAL DISCONNECT SWITCH AS REQUIRED. AHU-2 SHALL BE FED FROM EXISTING MCC-3. EC TO REUSE EXISTING FUSED SWITCH IN MCC-3 AND PROVIDE NEW FUSES AS REQUIRED. - PROVIDE PERMANENT CHILLED WATER, STEAM AND CONDENSATE PROVIDE PERMANENT CHILLED WATER, STEAM AND CONDENSATE CONNECTIONS TO NEW AHU-2. - INSTALL PERMANENT DISCHARGE PLENUM AND FINAL FILTERS FOR AHU-5. INSTALL PERMANENT DISCHARGE PLENUM AND FINAL FILTERS FOR AHU-5. - PROVIDE PERMANENT CONNECTIONS TO NEW AHU-2 SUPPLY AND RETURN PROVIDE PERMANENT CONNECTIONS TO NEW AHU-2 SUPPLY AND RETURN DUCTS. PHASE 5 - AHU-4 REMOVAL AND REPLACEMENT - PHASE 5 WORK SHALL BE COMPLETED ONLY AFTER PHASES 1 THROUGH 4 PHASE 5 WORK SHALL BE COMPLETED ONLY AFTER PHASES 1 THROUGH 4 ARE COMPLETED. PHASE 5A - PROVIDE TEMPORARY OPENING IN THE SOUTH WALL. OPENING IS FOR PROVIDE TEMPORARY OPENING IN THE SOUTH WALL. OPENING IS FOR REMOVAL OF EXISTING AHU-4 AND NEW AHU-4 IN PLACE. PROVIDE FALL PROTECTION AT OPENING AND PROVIDE A TEMPORARY REMOVABLE STUD WALL WITH VISQUEEN COVER TO PROTECT ATTIC FROM WEATHER, RAIN, WIND AND SNOW. - SALVAGE ALL EXTERIOR MATERIALS FOR REPLACEMENT. SALVAGE ALL EXTERIOR MATERIALS FOR REPLACEMENT. - PROVIDE A TEMPORARY UNIT WITH STEAM HEATING AND PROVIDE TEMPORARY PROVIDE A TEMPORARY UNIT WITH STEAM HEATING AND PROVIDE TEMPORARY SUPPLY AND RETURN DUCT CONNECTIONS. EC TO PROVIDE A TEMPORARY POWER FEEDER TO NEW UNIT FROM EXISTING MCC-2. EC TO PROVIDE A NEW FUSED SWITCH IN EXISTING BUSSED SPACE IN MCC-2. PHASE 5C - PROVIDE NEW AHU-4 IN LOCATION OF DEMOLISHED AHU-4. PROVIDE NEW PROVIDE NEW AHU-4 IN LOCATION OF DEMOLISHED AHU-4. PROVIDE NEW CONDUIT, POWER CONDUCTORS AND LOCAL DISCONNECT SWITCH AS REQUIRED. AHU-4 SHALL BE FED FROM EXISTING MCC-3. EC TO REUSE EXISTING FUSED SWITCH IN MCC-2 AND PROVIDE NEW FUSES AS REQUIRED. - PROVIDE CHILLED WATER, STEAM AND CONDENSATE PIPING TO NEW AHU-4. PROVIDE CHILLED WATER, STEAM AND CONDENSATE PIPING TO NEW AHU-4. - PROVIDE PERMANENT CONNECTIONS TO SUPPLY AND RETURN DUCTS FOR PROVIDE PERMANENT CONNECTIONS TO SUPPLY AND RETURN DUCTS FOR AHU-4. - REMOVE TEMPORARY UNIT. DEMO RETURN DUCTWORK NOT REMOVED REMOVE TEMPORARY UNIT. DEMO RETURN DUCTWORK NOT REMOVED DURING PHASE 5B. TEMPORARY FUSED SWITCH USED FOR AHU UNIT TO REMAIN IN MCC-3. - INFILL TEMPORARY OPENING IN SOUTH WALL TO MATCH EXISTING INFILL TEMPORARY OPENING IN SOUTH WALL TO MATCH EXISTING CONSTRUCTION. RE-USE SALVAGED BRICK OR PROVIDE NEW BRICK TO MATCH EXISTING.

AutoCAD SHX Text

EA

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text

BDD

AutoCAD SHX Text

BDD

AutoCAD SHX Text

AFMD

AutoCAD SHX Text

AFMD

AutoCAD SHX Text

AFMD

AutoCAD SHX Text

BDD

AutoCAD SHX Text

BDD

AutoCAD SHX Text

VSMC

AutoCAD SHX Text

404-EF-4

AutoCAD SHX Text

VSMC

AutoCAD SHX Text

404-AHU-2-SF

AutoCAD SHX Text

VSMC

AutoCAD SHX Text

404-EF-6

AutoCAD SHX Text

VSMC

AutoCAD SHX Text

404-EF-9

AutoCAD SHX Text

VSMC

AutoCAD SHX Text

404-EF-5

AutoCAD SHX Text

VSMC

AutoCAD SHX Text

404-AHU-2-RF

AutoCAD SHX Text

VSMC

AutoCAD SHX Text

404-AHU-2-RF

AutoCAD SHX Text

VSMC

AutoCAD SHX Text

404-AHU-2-SF

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text

BDD

AutoCAD SHX Text

BDD

AutoCAD SHX Text M

AutoCAD SHX Text

AFMD

AutoCAD SHX Text

AFMD

AutoCAD SHX Text

AFMD

AutoCAD SHX Text

BDD

AutoCAD SHX Text

AutoCAD SHX Text M

AutoCAD SHX Text

VSMC

AutoCAD SHX Text

VSMC

AutoCAD SHX Text

VSMC

AutoCAD SHX Text

404-EF-2

AutoCAD SHX Text

404-AHU-1-RF

AutoCAD SHX Text

404-AHU-1-SF

AutoCAD SHX Text

VSMC

AutoCAD SHX Text

404-AHU-3-RF

AutoCAD SHX Text

VSMC

AutoCAD SHX Text

404-AHU-3-SF

AutoCAD SHX Text

VSMC

AutoCAD SHX Text

404-EF-8

AutoCAD SHX Text

VSMC

AutoCAD SHX Text

404-EF-1

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

GC103

KAB

INFECTION CONTROL

GENERAL NOTES AND

DETAILS

BAM

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Tomah, Wisconsin

676-16-102

Office of

Facilities

Management

RECORD DRAWINGS

January 13, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Replace HVAC & AC B404

309 N. Water St Suite 650 Milwaukee, Wisconsin 53202

INFECTION CONTROL GENERAL NOTES:

INFECTION CONTROL DESIGN NOTES:

1/2" = 1'-0"

1 HOUR CONSTRUCTION (UL #465) & INFECTION CONTROL BARRIER

ICB-1

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231, OCT 1978

AutoCAD SHX Text

1. SEE SPECIFICATION SECTIONS 010000-IC AND 013526 FOR INFECTION CONTROL SEE SPECIFICATION SECTIONS 010000-IC AND 013526 FOR INFECTION CONTROL DESIGN REQUIREMENTS. 2. THE INTENT OF INFECTION CONTROL (IC) ISOLATION IS TO PROTECT PATIENTS IN THE INTENT OF INFECTION CONTROL (IC) ISOLATION IS TO PROTECT PATIENTS IN THE HOSPITAL WHO HAVE LOW IMMUNE LEVELS. THEREFORE, CONSTRUCTION OPERATIONS NEED TO BE DIRECTED TO CONTAIN DUST AND PARTICULATE MATTER TO THE CONSTRUCTION AREA. 3. PROVIDE TRIATEK ISOLATION MONITORS DURING CLASS III OR CLASS IV PROVIDE TRIATEK ISOLATION MONITORS DURING CLASS III OR CLASS IV CONSTRUCTION OPERATIONS. EACH AREA TO BE UNDER NEGATIVE PRESSURE (0.02"WC) DURING THESE OPERATIONS. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA COR 4. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA USE TRIATEK DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA USE TRIATEK ISOLATION MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF, (2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR AREAS BETWEEN 5000 SF AND 10000 SF. CONTRACTOR SHALL PROVIDE EXISTING POWER CONNECTIONS FOR TRIATEK ISOLATION MONITORS OR PROVIDE TEMPORARY POWER TO TRIATEK ISOLATION MONITORS DURING CONSTRUCTION. 5. PROVIDE BALANCING DAMPER IN THE BRANCH SUPPLY & EXHAUST DUCT WORK PROVIDE BALANCING DAMPER IN THE BRANCH SUPPLY & EXHAUST DUCT WORK SERVING THE AFFECTED AREA. TEMPORARILY BALANCE AIR FLOW TO PROVIDE NEGATIVE AIR FLOW IN CONSTRUCTION ZONE AT ALL TIMES AS INDICATED IN NOTE BELOW. DAMPERS TO REMAIN IN DUCT AFTER CONSTRUCTION IS COMPLETE AND IS TO BE SECURED IN FINAL BALANCING POSITION PRIOR TO TURNING SYSTEM OVER FOR OCCUPANCY. 6. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR. PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE AND/OR EMERGENCY IN AN ADJACENT AREA. 7. AS CONSTRUCTION PROGRESSES FROM TYPE D TO TYPE C (SEE SPECIFICATION AS CONSTRUCTION PROGRESSES FROM TYPE D TO TYPE C (SEE SPECIFICATION SECTION 013526 "SAFETY REQUIREMENTS") AND THEREON, REQUEST A NEW "INFECTION CONTROL CONSTRUCTION PERMIT" FROM THE VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE OF CONSTRUCTION. PROVIDE AT LEAST 10 DAYS NOTICE FOR EACH PERMIT. 8. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER FROM FLOOR TO CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER FROM FLOOR TO DECK/FLOOR ABOVE. SEE DETAIL 3/GC104 & SPECIFICATION SECTION 013526. EXCEPTION: IF BARRIER IS ADJACENT TO A SMOKE, FIRE, OR EXISTING WALL CONSTRUCTION WHICH WILL NOT BE DEMOLISHED AND TERMINATES TO FLOOR OR DECK ABOVE, THEN CONSTRUCT IC BARRIER FROM FLOOR TO ABOVE CORRIDOR CEILING WITH 6 MIL POLY BEING SEALED ON ALL EDGES: FLOOR, TOP OF WALL, SIDES, AND ALL PENETRATIONS. 9. GENERAL CONTRACTOR SHALL PROVIDE NEW YELLOW CONSTRUCTION ACCESS GENERAL CONTRACTOR SHALL PROVIDE NEW YELLOW CONSTRUCTION ACCESS DOORS AND PROXIMITY CARD READERS AT ALL BARRIERS. MAINTAIN ALL INFECTION CONTROL STANDARDS. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00 A.M. AND AFTER 8:00 P.M. IN OCCUPIED AREAS. 12. EGRESS IS TO BE MAINTAINED TO THE STAIRWELLS AT ALL TIMES. 13. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED WALLS, CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED WALLS PER NEW PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE BARRIER. 14. A PORTION OF THE CORRIDOR MAY BE MADE AVAILABLE TO CREATE AN INFECTION CONTROL AREA; HOWEVER, A MINIMUM OF 4 FT MUST BE MAINTAINED OPEN FOR THE MOVEMENT OF PERSONNEL. THE CORRIDOR WILL NOT BE CLOSED OFF.

AutoCAD SHX Text %%uOCCUPIED SIDE OF BARRIER

AutoCAD SHX Text %%u"WORK" SIDE OF BARRIER

AutoCAD SHX Text

EXISTING CEILING

AutoCAD SHX Text

CONTINUOUS MUD AND TAPE EACH SIDE

AutoCAD SHX Text

COMPRESSIBLE INSULATION

AutoCAD SHX Text

CONTINUOUS MUD AND TAPE EACH SIDE

AutoCAD SHX Text

EXISTING FINISHED FLOOR

AutoCAD SHX Text

3 5/8" STEEL STUDS @ 16" OC WITH FULL BATT SOUND ATTENUATING INSULATION

AutoCAD SHX Text

(1) LAYER 5/8" GYP BD EACH SIDE. 1 HOUR RATED WALL TO COMPLY WITH UL # U465.

AutoCAD SHX Text

CAP DUCTS

AutoCAD SHX Text SEAL ALL JOINTS, PENETRATIONS AND ENTIRE PERIMETER OF BARRIER w/ CONTINUOUS MUD AND TAPE

AutoCAD SHX Text

6 MIL POLY WITH TAPED SEAMS

6 MIL POLY WITH TAPED SEAMS

GC104

INFECTION CONTROL

PLANS

BAM

3/32" = 1'-0"

ATTIC PLAN

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Tomah, Wisconsin

676-16-102

Office of

Facilities

Management

RECORD DRAWINGS

January 13, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Replace HVAC & AC B404

309 N. Water St Suite 650 Milwaukee, Wisconsin 53202

BASEMENT KEY PLAN

3/32" = 1'-0"

BASEMENT PLAN

3/32" = 1'-0"

THIRD FLOOR PLAN

ATTIC KEY PLAN

THIRD FLOOR KEY PLAN

AutoCAD SHX Text

AutoCAD SHX Text 1A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 17A

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text F

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text F

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ATTIC

AutoCAD SHX Text

AREA

AutoCAD SHX Text

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

FLOOR HATCH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text

SUMP

AutoCAD SHX Text

BASEMENT

AutoCAD SHX Text

AutoCAD SHX Text

CLASS IV INFECTION CONTROL

AutoCAD SHX Text

INFECTION CONTROL - LEGEND

AutoCAD SHX Text

INFECTION CONTROL BARRIER PER CLASS

AutoCAD SHX Text

REQUIREMENTS; SEE INFECTION CONTROL

AutoCAD SHX Text

DESIGN NOTES ON SHEET GC103.

AutoCAD SHX Text

AutoCAD SHX Text 1A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 17A

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text F

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text F

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 3460A

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 3460B

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

OFFICES

AutoCAD SHX Text

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text

AutoCAD SHX Text

MENS

AutoCAD SHX Text

RESTROOM/

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 3453A

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 4C37

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 4C31

AutoCAD SHX Text

CLASS IV IC

AutoCAD SHX Text

CLASS IV IC

AutoCAD SHX Text

CLASS IV IC

AutoCAD SHX Text

CLASS IV IC

AutoCAD SHX Text

CLASS IV IC

AutoCAD SHX Text

CLASS IV IC

AutoCAD SHX Text

CLASS IV IC

AutoCAD SHX Text

CLASS IV IC

AutoCAD SHX Text

CLASS IV IC

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

SILT FENCE INLET SEDIMENT BARRIER

SCALE: NOT TO SCALE

C001

JMD

SITE DETAILS

HFB

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Tomah, Wisconsin

676-16-102

Office of

Facilities

Management

RECORD DRAWINGS

January 13, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Replace HVAC & AC B404

309 N. Water St Suite 650 Milwaukee, Wisconsin 53202

AutoCAD SHX Text

PIPE SPACING, 10FT ON CENTER

AutoCAD SHX Text

2-1/4", 11-1/2 GAUGE CHAIN LINK FENCE

AutoCAD SHX Text

WIRE TO SECURE CHAIN TO FENCE POST, SPACE EVERY 15" TYP

AutoCAD SHX Text

84" LONG, 1-5/8" DIA STEEL PIPE DRIVEN 24" BELOW GRADE

AutoCAD SHX Text

FINISHED GRADE

AutoCAD SHX Text

72" LONG, 1-5/8" DIA STEEL PIPE SET ON STEEL SURFACE STAND, OR COMPARABLE

AutoCAD SHX Text

WIRE TO SECURE CHAIN TO FENCE POST

AutoCAD SHX Text SURFACE STAND, TO BE IMPLEMENTED ON IMPERVIOUS SURFACES TO REMAIN. GENERIC DESIGN, CONTRACTOR TO COORDINATE WITH ENGINEER/COTR

AutoCAD SHX Text NOTES: 1. CHAIN LINK CONSTRUCTION FENCING IS TO BE INSTALLED PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES. 2. CHAIN LINK CONSTRUCTION FENCE SHALL BE A MINIMUM OF 84" ABOVE GRADE. 3. CHAIN LINK CONSTRUCTION FENCE SHALL HAVE THE FOLLOWING PROPERTIES: FENCE SHALL BE INSPECTED DAILY AFTER CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED FOR THE DAY. IF DAMAGED, FENCING SHALL BE REPAIRED IMMEDIATELY. WHERE CHAIN LINK CONSTRUCTION FENCE IS SHOWN ON IMPERVIOUS SURFACES, SUCH AS THE EXISTING BRICK PAVERS IN THE COURTYARD AREA, POST ARE TO BE ANCHORED ON SURFACE STANDS. STEEL PIPE IS NOT TO BE DRIVEN BELOW GRADE ON IMPERVIOUS SURFACES TO REMAIN.

AutoCAD SHX Text

%%UELEVATION

AutoCAD SHX Text

18" HIGH BUT LESS THAN 36" HIGH.

AutoCAD SHX Text

FILTER FABRIC SHALL BE @ LEAST

AutoCAD SHX Text

GUAGE WELDED WIRE FENCE OR

AutoCAD SHX Text

FILTER FABRIC SUPPORTED BY HEAVY

AutoCAD SHX Text

2 OR 3 LAYERS OF 8" CONCRETE BLOCKS

AutoCAD SHX Text %%uNOTE:

AutoCAD SHX Text

FABRIC, TYPICAL

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

OF 8" CONCRETE

AutoCAD SHX Text

OR 2 OR 3 LAYERS

AutoCAD SHX Text

WELDED WIRE FENCE

AutoCAD SHX Text

HEAVY GUAGE

AutoCAD SHX Text

SUPPORTED BY

AutoCAD SHX Text

FILTER FABRIC

AutoCAD SHX Text

WRAP IN FILTER

AutoCAD SHX Text

STORM SEWER INLET

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

BLOCKS

AutoCAD SHX Text

AutoCAD SHX Text

STORM INLET PROTECTION DETAIL

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

FLOW

AutoCAD SHX Text

EXCESS FABRIC

AutoCAD SHX Text

GEOTEXTILE FABRIC

AutoCAD SHX Text

SILT FENCE

AutoCAD SHX Text

ANCHOR STAKE MIN. 18" LONG

AutoCAD SHX Text

TIEBACK BETWEEN FENCE POST AND ANCHOR

AutoCAD SHX Text

GEOTEXTILE FABRIC ONLY

AutoCAD SHX Text WOOD POST SHALL BE A MINIMUM SIZE OF 1 1/8" x 1 1/8" OF OAK OR HICKORY

AutoCAD SHX Text FABRIC. FOLD MATERIAL TO FIT TRENCH AND BACKFILL AND COMPACT TRENCH WITH EXCAVATED

AutoCAD SHX Text TRENCH SHALL BE A MINIMUM OF 4" WIDE AND 6" DEEP TO BURY AND ANCHOR THE GEOTEXTILE

AutoCAD SHX Text HORIZONTAL BRACE WITH 2" x 4" WOODEN FRAME OR EQUIVALENT AT TOP OF POSTS AS DIRECTED

AutoCAD SHX Text

REQUIREMENTS OF THE STANDARD SPECIFICATIONS AND APPLICABLE SPECIAL PROVISIONS.

AutoCAD SHX Text

DETAILS OF CONSTRUCTION NOT SHOWN ON THIS DRAWING SHALL CONFORM TO THE PERTINENT

AutoCAD SHX Text

%%USILT FENCE @ UNPAVED SURFACE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BY THE ENGINEER.

AutoCAD SHX Text

SOIL.

AutoCAD SHX Text

ADDITIONAL POST DEPTH OR THE BACKS MAY BE REQUIRED IN UNSTABLE SOILS

AutoCAD SHX Text

BACKFILL AND COMPACT TRENCH WITH EXCAVATED SOIL

AutoCAD SHX Text %%uNOTE:

AutoCAD SHX Text

(NON-REINFORCED)

AutoCAD SHX Text %%uGENERAL NOTES:

AutoCAD SHX Text

LATH AND NAILS

AutoCAD SHX Text

STAPLES OR WOODEN

AutoCAD SHX Text

THE POSTS WITH WIRE

AutoCAD SHX Text

ATTACH THE FABRIC TO

AutoCAD SHX Text

AutoCAD SHX Text

WOOD POSTS LENGTH 4'-0" MIN. 2'-0" MIN. DEPTH IN GROUND

AutoCAD SHX Text

AutoCAD SHX Text

GEOTEXTILE FABRIC

AutoCAD SHX Text

SUPPORT CORD

AutoCAD SHX Text

8'-0" POST SPACING ALLOWED IF A WOVEN GEOTEXTILE FABRIC IS USED.

AutoCAD SHX Text

FLOW

AutoCAD SHX Text %%uNOTE:

AutoCAD SHX Text

3" MAX.

AutoCAD SHX Text

FOLD

AutoCAD SHX Text

%%USILT FENCE TIE BACK

AutoCAD SHX Text

(WHEN REQUIRED BY THE ENGINEER)

AutoCAD SHX Text

FLOW

AutoCAD SHX Text

%%UTRENCH DETAIL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TEMPORARY SILT FENCE, SPECIAL (TOE-IN METHOD)

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

INSTALLATION NOTES

AutoCAD SHX Text

GEOTEXTILE FABRIC, MONOFILAMENT IN BOTH DIRECTIONS

AutoCAD SHX Text WOOD 2" x 4" EXTENDS 8" BEYOND GRATE WIDTH ON BOTH SIDES, LENGTH VARIES. SECURE TO GRATE WITH WIRE OR PLASTIC TIES

AutoCAD SHX Text TRIM EXCESS FABRIC IN THE FLOW LINE TO WITHIN 3" OF THE GRATE. THE CONTRACTOR SHALL DEMONSTRATE A METHOD OF MAINTENANCE, USING A SEWN FLAP, HAND HOLDS OR OTHER METHOD TO PREVENT ACCUMULATED SEDIMENT FROM ENTERING THE INLET.

AutoCAD SHX Text WHEN REMOVING OR MAINTAINING INLET PROTECTION, CARE SHALL BE TAKEN SO THAT THE SEDIMENT TRAPPED ON THE GEOTEXTILE FABRIC DOES NOT FALL INTO THE INLET. ANY MATERIAL FALLING INTO THE INLET SHALL BE REMOVED IMMEDIATELY.

AutoCAD SHX Text FINISHED SIZE, INCLUDING FLAP POCKETS WHERE REQUIRED, SHALL EXTEND A MINIMUM OF 10" AROUND THE PERIMETER TO FACILITATE MAINTENANCE OR REMOVAL.

AutoCAD SHX Text FOR INLET PROTECTION, CURB TYPE, AN ADDITIONAL 18" OF FABRIC IS WRAPPED AROUND THE WOOD AND SECURED WITH STAPLES. THE WOOD SHALL NOT BLOCK THE ENTIRE HEIGHT OF THE CURB BOX OPENING.

AutoCAD SHX Text

AutoCAD SHX Text

TEMPORARY CHAIN LINK FENCE DETAIL

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

C101

JMD

SITE STAGING AND

EQUIPMENT LAYOUT

PLAN

HFB

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Tomah, Wisconsin

676-16-102

Office of

Facilities

Management

RECORD DRAWINGS

January 13, 2023

CONSULTANTS:

500 E VETERANS ST

TOMAH, WI 54660

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Replace HVAC & AC B404

309 N. Water St Suite 650 Milwaukee, Wisconsin 53202

1/16" = 1'-0"

SITE PLAN

1/16" = 1'-0"

PARTIAL SITE PLAN

NORTH

NORTH

AutoCAD SHX Text

BUILDING 404

AutoCAD SHX Text

EXISTING GRASS AREA

AutoCAD SHX Text

EXISTING PARKING AREA

AutoCAD SHX Text

EXISTING COVERED TRAMWAY

AutoCAD SHX Text

EXISTING COVERED TRAMWAY

AutoCAD SHX Text

EXISTING GARDEN AREA DO NOT DISTURB

AutoCAD SHX Text

CONTRACTOR STAGING AREA

AutoCAD SHX Text

CRANE LIFT AREA 1 FOR ACCESS TO EAST HALF OF ATTIC DEMOLITION AND NEW WORK

AutoCAD SHX Text

CRANE LIFT AREA 2 FOR ACCESS TO WEST HALF OF ATTIC DEMOLITION AND NEW WORK.

AutoCAD SHX Text CRANE LIFT AREA 3 FOR ACCESS TO SOUTH/MIDDLE PORTION OF ATTIC DEMOLITION AND NEW WORK.

AutoCAD SHX Text

EXISTING GRASS AREA

AutoCAD SHX Text

EXISTING AIR COOLED CHILLER

AutoCAD SHX Text

EXISTING PARKING AREA

AutoCAD SHX Text FRONT OF BUILDING 404 - MAIN ENTRANCE, NO EQUIPMENT OR CONSTRUCTION ALONG THE ENTIRE FRONT ELEVATION.

AutoCAD SHX Text TRAMWAY ACCESS - DO NOT BLOCK, NO EQUIPMENT OR CONSTRUCTION WITHIN 8 FEET OF ENTRANCE, ACCESS MUST BE MAINTAINED THROUGHOUT PROJECT.

AutoCAD SHX Text

EXISTING AIR COOLED CHILLER(S)

AutoCAD SHX Text

TRAMWAY ACCESS TO BUILDING 404

AutoCAD SHX Text

EXISTING GRASS AREA

AutoCAD SHX Text

DUMPSTER LOCATION

AutoCAD SHX Text

DUMPSTER LOCATION

AutoCAD SHX Text

DUMPSTER LOCATION

AutoCAD SHX Text

CONSTRUCTION WASTE CHUTE

AutoCAD SHX Text

CONSTRUCTION WASTE CHUTE

AutoCAD SHX Text

CONSTRUCTION WASTE CHUTE

AutoCAD SHX Text

CONTRACTOR TRAILER PARKING LOCATION

AutoCAD SHX Text

TRASH REMOVAL PATH, KEEP CLEAR

AutoCAD SHX Text

EMERGENCY EXIT PATHWAY FOR OCCUPANTS

AutoCAD SHX Text

BUILDING 405

AutoCAD SHX Text

4TH STREET

AutoCAD SHX Text

TEMPORARY CONSTRUCTION FENCE REQUIRED TYP

AutoCAD SHX Text

CONTRACTOR STAGING AREA

AutoCAD SHX Text

CONTRACTOR STAGING AREA

AutoCAD SHX Text

EXISTING CONNECTOR WALKWAY

AutoCAD SHX Text

COVERED LOADING DOCK AREA, KEEP CLEAR

AutoCAD SHX Text

12' CONSTRUCTION GATE, TYP

AutoCAD SHX Text PROVIDE TEMPORARY RECYCLED RUBBER CURB RAMP DURING CONSTRUCTION, SIMILAR TO OR EQUAL TO GUARDIAN RUBBER CURB RAMP MODEL KR01, SECURE TO EXISTING ROADWAY WHILE IN USE

AutoCAD SHX Text

PROVIDE SILT FENCE AROUND GRASS AREAS, TYP

AutoCAD SHX Text

PROVIDE SILT FENCE AROUND GRASS AREAS, TYP

AutoCAD SHX Text

PROVIDE SILT FENCE AROUND GRASS AREAS, TYP

AutoCAD SHX Text CONSTRUCTION WASHOUT AREA, 50' x 18'

AutoCAD SHX Text

CONSTRUCTION MAT REQUIRED AS SHOWN, MINIMUM

AutoCAD SHX Text

CONSTRUCTION MAT REQUIRED AS SHOWN, MINIMUM

AutoCAD SHX Text CONSTRUCTION MAT REQUIRED AS SHOWN, MINIMUM (ENTIRE CONSTRUCTION AREA EXCEPT DIRECTLY UNDER THE EXISTING TREE)

AutoCAD SHX Text NOTE: TREE REMOVAL FOR CRANE LIFT AREA AT CONTRACTORS EXPENSE. VA COR APPROVAL REQUIRED BEFORE REMOVAL.

AutoCAD SHX Text NOTE: TREE REMOVAL FOR CRANE LIFT AREA AT CONTRACTORS EXPENSE. VA COR APPROVAL REQUIRED BEFORE REMOVAL.

AutoCAD SHX Text

EXISTING PARKING AREA

AutoCAD SHX Text CONTRACTOR AND SUB-CONTRACTOR PARKING ALONG NORTH ROW IN EXISTING PARKING LOT ACROSS FROM BUILDING 405

AutoCAD SHX Text

EXISTING PARKING AREA

AutoCAD SHX Text

1. ALL DISTURBED GRASS SHALL BE RE-SODDED AT END OF THE PHASE. ALL DISTURBED GRASS SHALL BE RE-SODDED AT END OF THE PHASE. CONTRACTOR SHALL PROVIDE 3" BROWN SIFTED TOPSOIL. GRADE TO MATCH EXISTING. SLOPE NEW GRADE AWAY FROM BUILDING 404. CONTRACTOR SHALL PROVIDE WATERING OF NEW SOD FOR 4 TIMES PER WEEK FOR 8 WEEKS. 2. CONSTRUCTION STAGING AREA SHALL BE COMPLETELY FENCED IN AND CONSTRUCTION STAGING AREA SHALL BE COMPLETELY FENCED IN AND LOCKED DURING OFF HOURS. ADDITIONAL SPACE IF REQUIRED SHALL BE COORDINATED WITH THE VA CONSTRUCTION MANAGER. 3.