Attachment 7-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 5.pdf
PDF 4 MB Posted
- Solicitation number
- 36C26025R0071
About this file
This document is a set of 21 electrical one-line diagram sheets for Building 100 at the VA Portland Health Care System, part of a project to correct electrical Facility Condition Assessment (FCA) deficiencies. The detailed technical drawings comprehensively map the existing electrical distribution system, including utility service connections, main switchboards, transformers, panelboards, motor control centers, and branch circuit breakers across multiple voltage levels (480V, 208V, 335V).
The diagrams provide granular technical details for each electrical component, including specific equipment manufacturers (predominantly Square D), amperage ratings, short circuit current levels, transformer impedances, and feeder cable specifications. The sheets are part of contract 648-20-119 and include extensive notes about contractor responsibilities, such as field verification of existing conditions, shutdown planning, overcurrent protective device replacement and adjustment, and requirements for updated circuit panel directories. The drawings are dated 01/31/2025 and were prepared by Spees Design Build from Kent, Washington for the VA Office of Construction and Facilities Management.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 100 - ONE LINE DIAGRAM (SUB USCL)
UTIL: USCL (equip eval) Isc 3P 10739 Amps Isc SLG 8433 Amps
UTIL: USCL
Isc 3P 4466 Amps Isc SLG 3625 Amp
FU: USCL
GE (EJO-1, 125E)
125 A
XF: USCL
2000KVA; 6.02%Z
Pri: 12470V Sec: 480V
F: 100_SWBD Sub USCL
(1) #5000 Class B; 10 ft
TAP: 100_SWBD
USCL
480V, 30.1k SCA
CB: 100_ATS-DE-CL-1
SQUARE D (DS 416)
400 A
F: 100_ATS-DE-CL-1
(1) #500 THWN; 80 ft
F: 100_SWBD Sub USCL_a
(1) #5000 Class B; 5 ft
CB: 100_Sub USCL Main
SQUARE D (DS 632)
3200 A
SWBD: 100_Sub
USCL
480V, 3000A 30.1k SCA 50k SCAR
CB: 100_Chiller 4
CUTLER-HAMMER
(DS-416)
1600 A, 1200 A Plug
F: 100_Chiller 4
(3) #350 THWN; 130 ft
EP: 100_Chiller 4 480V, 23.8k SCA
VFD: 100_Chiller 4
MTR: 100_Chiller 4 1 @ 500.0 hp
F: 100_Chiller 3
(2) #500 THWN; 120 ft
EP: 100_Chiller 3 480V, 22.5k SCA
VFD: 100_Chiller 3
MTR: 100_Chiller 3 1 @ 500.0 hp
CB: 100_Chiller 1
SQUARE D (DS 416)
800 A
F: 100_Chiller 1
(2) #500 THWN; 100 ft
EP: 100_Chiller 1 480V, 23.5k SCA
VFD: 100_Chiller 1
MTR: 100_Chiller 1 1 @ 500.0 hp
CB: 100_Chiller 2
SQUARE D (DS 416)
800 A
F: 100_Chiller 2
(2) #500 THWN; 110 ft
EP: 100_Chiller 2 480V, 23.0k SCA
VFD: 100_Chiller 2
MTR: 100_Chiller 2 1 @ 500.0 hp
CB: 100_Chiller 3
SQUARE D (DS 416)
800 A
F: 100_ATS-DE-CL-1 (E)
(1) #500 THWN; 210 ft
F: 100_SWBD
B2SDE-L-1
(1) #500 THWN; 25 ft
ATS: 100_DE-CL-1
600 A
CB: 100_Fire Pump
SQUARE D (LA)
F: 100_Fire Pump
(1) #350 THWN; 30 ft
EP: 100_Fire Pump Controller 480V, 17.1k SCA 30k SCAR
CB: 100_Fire Pump Controller
ITE (225)
225 A
F: 100_Fire Pump_a
(1) #1 THHN; 20 ft
MTR: 100_Fire Pump 1 @ 40.0 hp
CB: 100_Jockey Pump
SQUARE D (FH)
60 A
F: 100_Jockey Pump
(1) #1 THWN; 40 ft
MTR: 100_Jockey Pump 3 @ 7.5 hp
CB: 100_XFMR T-39
SQUARE D (FA)
100 A
F: 100_XFMR T-39
(1) #2 THWN; 50 ft
XF: 100_T-39
75KVA; 5.50%Z
Pri: 480V Sec: 208V
F: 100_Pnl
B2DEL1-M-4
(1) #3/0 THWN; 30 ft
CB:
100_B2DEL1-M-4
Main
SQUARE D (Q2)
200 A
PNL:
100_B2DEL1-M-4
208V, 225A 3.2k SCA 65k SCAR
CB: 100_Drill Press
SQUARE D (QO)
20 A
SWBD:
100_B2SDE-L-1
480V, 400A 19.1k SCA 50k SCAR
SPACESPACESPACESPACE
GENERAL NOTES
EXISTING SPACE TO BE UTILIZED.
EXISTING OVERCURRENT PROTECTIVE DEVICE TO BE
REMOVED AND REPLACED.
EXISTING CONDUCTORS TO BE DEMOLISHED BACK TO
ATS; EXISTING RACEWAY TO REMAIN FOR REUSE.
REFERENCE ONE-LINE DIAGRAM ON SHEET 100EP601 FOR
ADDITIONAL INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
KEY NOTES
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
2. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS,
TEMPORARY POWER PLANS, AND PHASING PLANS FOR
VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO
COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED
FOR REVIEW 30-DAYS PRIOR TO IMPLEMENTATION.
REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
3. FOR ALL OVERCURRENT PROTECTION DEVICE
REPLACEMENT WORK, REFERENCE ASSOCIATED
BUILDING SCHEDULE "OVER-CURRENT PROTECTIVE
DEVICE (OCPD) REPLACEMENT SCHEDULE" FOR
ADDITIONAL INFORMATION.
4. FOR ALL OVERCURRENT PROTECTION DEVICE
ADJUSTMENT WORK, REFERENCE ASSOCIATED BUILDING
SCHEDULE "OVERCURRENT PROTECTIVE DEVICE (OCPD)
SETTING ADJUSTMENT SCHEDULE" FOR ADDITIONAL
INFORMATION.
5. FOR ALL POWER DISTRIBUTION EQUIPMENT
REPLACEMENT OR ADDITION WORK, REFERENCE
ASSOCIATED BUILDING SCHEDULE "POWER DISTRIBUTION
EQUIPMENT SCHEDULE" FOR ADDITIONAL INFORMATION.
6. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAIN CIRCUITS
IMPACTED BY THIS PROJECT.
8. REFERENCE REVISED ONE-LINE DIAGRAM ON SHEET
100EP601 FOR ALL MODIFICATIONS.
100ED602
SCALE : NTS
1 BLDG 100 - EXISTING ONE-LINE DIAGRAM (PART 2 OF 21)
BLDG 100 - EXISTING ONE-LINE
DIAGRAM (PART 2 OF 21)
100EP602
P
S
P
S
CONTINUE TO SWBD: 100_USS1
(SEE SHEET 100ED620)
F: 100_Service Bay2 1200A Bus
(1) #1200 Class B; 40 ft
FU: 100_MCC-N-1-G-17
BUSSMANN (FRS-R)
200 A
F: 100_MCC-N-1-G-17
(1) #3/0 THWN; 80 ft
FU: 100_MCC-N-1-C-17
BUSSMANN (FRS-R)
200 A
F: 100_MCC-N-1-C-17
(1) #3/0 THWN; 160 ft
BD: 100_S1 N1
480V, 1200A 30.4k SCA 85k SCAR
MCP: 100_RF-13
SQUARE D (FAL)
F: 100_RF-13
(1) #10 THWN; 25 ft
VFD: 100_RF-13
MTR: 100_RF-13
3 @ 1.5 hp
MCP: 100_SF-13
SQUARE D (FAL)
F: 100_SF-13
(1) #10 THWN; 25 ft
VFD: 100_SF-13
MTR: 100_SF-13
4 @ 7.5 hp
MCP: 100_Pump PR-13
SQUARE D (FAL)
MCC: 100_N-1-C-17
480V, 600A 12.2k SCA 25k SCAR
F: 100_BD 2N 2
(1) #1200 Class B; 30 ft
FU: 100_MCC-N-2-C-17
BUSSMANN (FRS-R)
200 A
F: 100_MCC-N-2-C-17
(1) #3/0 THWN; 80 ft
FU: 100_MCC-N-2-G-17
BUSSMANN (FRS-R)
200 A
F: 100_MCC-N-1-G-17
(1) #3/0 THWN; 160 ft
MCP: 100_RF-12
SQUARE D (FAL)
F: 100_RF-12
(1) #10 THWN; 15 ft
VFD: 100_RF-12
MTR: 100_RF-12
2 @ 2.0 hp
MCP: 100_SF-B25
SQUARE D (FAL)
MCP: 100_SF-12
SQUARE D (FAL)
F: 100_SF-12
(1) #6 THWN; 15 ft
VFD: 100_SF-12
MTR: 100_SF-12
2 @ 10.0 hp
MCP: 100_Pump PR-12
SQUARE D (FAL)
MCC: 100_N-1-G-17
480V, 600A 17.9k SCA 25k SCAR
MCP: 100_Pump PR-23
SQUARE D (FAL)
MCP: 100_TB Hood Exh Fan
SQUARE D (FAL)
MCP: 100_SF-23
SQUARE D (FAL)
MCP: 100_P-16
SQUARE D (FAL)
MCC: 100_N-2-C-17
480V, 600A 17.5k SCA 25k SCAR
F: 100_SF-23
(1) #2 THWN; 15 ft
VFD: 100_SF-23
MTR: 100_SF-23
6 @ 10.0 hp
FU: 100_XFMR T-106
BUSSMANN (FRS-R)
125 A
F: 100_XFMR T-106
(1) #1 THWN; 20 ft
XF: 100_T-106
75kVA; 5.80%Z Pri: 480V Sec: 208V
BD: 100_S1 N2
480V, 1200A 29.5k SCA 85k SCAR
TAP: 100_ T-106 Sec.
208V, 3.4k SCA
F: 100_Pnl 2L3-E-17 Sec 1
(1) #3/0 THWN; 10 ft
CB: 100_2L3-E-17 Sec 1 Main
SQUARE D (Q2H)
CB: 100_Glass Washer
SQUARE D (QO-VH)
30 A
PNL: 100_2L3-E-17 Sec 1 208V, 225A 3.3k SCA 65k SCAR
F: 100_Pnl 2L3-E-17 Sec 2
(1) #1 THWN; 10 ft
CB: 100_2L3-E-17 Sec 2 Main
SQUARE D (Q2H)
CB: 100_2C-114 Nourish Station
SQUARE D (QO-VH)
50 A
PNL: 100_2L3-E-17 Sec 2 208V, 225A 3.3k SCA 65k SCA
F: 100_BD S1 N3
(1) #1200 Class B; 30 ft
F: 100_BD S1 N4
(1) #1200 Class B; 30 ft
CB: 100_XFMR T-138
SQUARE D (FA)
90 A
F: 100_XFMR T-138
(1) #2 THWN; 20 ft
XF: 100_T-138
75kVA; 5.50%Z Pri: 480V Sec: 208V
F: 100_Pnl 3L3-D-17
(1) #3/0 THWN; 5 ft
CB: 100_3L3-D-17 Main
SQUARE D (Q2)
200 A
PNL: 100_3L3-D-17
208V, 225A 3.4k SCA 65k SCAR
FU: 100_PNL 3H2-D-17
BUSSMANN (FRS-R)
350 A
F: 100_PNL 3H2-D-17
(1) #500 THWN; 50 ft
CB: 100_Cystology X-ray
SQUARE D (KA)
175 A
F: 100_Cystology X-ray
(1) #4 THWN; 260 ft
PNL: 100_3H2-D-17
208V, 225A 3.4k SCA 65k SCAR
DISC: 100_Cystology X-Ray 480V, 3.0k SCA
CB: 100_Cystology X-Ray_a Unknown (Unknown) 100 A
FU: 100_MCC-N-4-G-17
BUSSMANN (FRS-R)
200 A
F: 100_MCC-N-4-G-17
(1) #3/0 THWN; 120 ft
MCP: 100_Pump PR-41
SQUARE D (FAL)
MCC: 100_N-4-G-17
480V, 600A 13.7k SCA 25k SCAR
MCP: 100_RF-41
SQUARE D (FAL)
F: 100_RF-41
(1) #10 THWN; 10 ft
VFD: 100_RF-41
MTR: 100_RF-41
2 @ 5.0 hp
MCP: 100_SF-41
SQUARE D (FAL)
F: 100_SF-41
(1) #6 THWN; 20 ft
VFD: 100_SF-41
MTR: 100_SF-41
4 @ 7.5 hp
FU: 100_MCC-N-4-C-17
BUSSMANN (FRS-R)
200 A
F: 100_MCC-N-4-C-17
(1) #3/0 THWN; 130 ft
BD: 100_S1 N4
480V, 1200A 27.6k SCA 85k SCAR
F: 100_BD S1 N5
(1) #1200 THWN; 30 ft
MCP: 100_RF-42
SQUARE D (FAL)
F: 100_RF-42
(1) #10 THWN; 10 ft
VFD: 100_RF-42
MTR: 100_RF-42
2 @ 2.0 hp
MCP: 100_SF-42
SQUARE D (FAL)
F: 100_SF-42
(1) #6 THWN; 20 ft
MCC: 100_N-4-C-17
480V, 600A 13.1k SCA 25k SCAR
VFD: 100_SF-42
MTR: 100_SF-42
2 @ 10.0 hp
MCP: 100_EF-22
SQUARE D (FAL)
F: 100_EF-22
(1) #10 THWN; 50 ft
VFD: 100_EF-22
MTR: 100_EF-22
2 @ 5.0 hp
CB: 100_APU Blower #29
SQUARE D (FA)
30 A
MCP: 100_Pump PR-22
SQUARE D (FAL)
MCP: 100_SF-22
SQUARE D (FAL)
F: 100_SF-22
(1) #4 THWN; 40 ft
VFD: 100_SF-22
MTR: 100_SF-22
4 @ 7.5 hp
MCP: 100_OHSU Blower 40
SQUARE D (FAL)
MCC: 100_N-2-G-17
480V, 600A 15.7k SCA 25k SCAR
CB: 100_APU Blower #30
SQUARE D (FA)
30 A
BD: 100_S1 N9
480V, 1200A 23.7k SCA 85k SCAR
FU: 100_MCC-N-9-G-17
BUSSMANN (FRS-R)
200 A
F: 100_MCC-N-9-G-17
(1) #3/0 THWN; 120 ft
MCP: 100_SF-23
SQUARE D (FAL)
F: 100_SF-23
(1) #2 THWN; 15 ft
VFD: 100_SF-23
MTR: 100_SF-23
6 @ 10.0 hp
MCC: 100_N-9-G-17
480V, 600A 12.5k SCA 25k SCAR
CB: 100_EF-P1
SQUARE D (FAL)
30 A
MCP: 100_RF-91
SQUARE D (FAL)
F: 100_RF-91
(1) #12 THWN; 50 ft
VFD: 100_RF-91
MTR: 100_RF-91
3 @ 1.5 hp
MCP: 100_Pump PR-91
SQUARE D (FAL)
MCP: 100_EF-P3
SQUARE D (FAL)
F: 100_BD S1 N9
(1) #1200 Class B; 30 ft
MCP: 100_RF-81
SQUARE D (FAL)
F: 100_RF-81
(1) #12 THWN; 40 ft
VFD: 100_RF-81
MTR: 100_RF-81
2 @ 2.0 hp
FU: 100_MCC-N-8-G-17
BUSSMANN (FRS-R)
200 A
F: 100_MCC-N-8-G-17
(1) #3/0 THWN; 120 ft
MCP: 100_SF-81
SQUARE D (FAL)
F: 100_SF-81
(1) #6 THWN; 25 ft
VFD: 100_SF-81
MTR: 100_SF-81
4 @ 7.5 hp
MCC: 100_N-8-G-17
480V, 600A 12.7k SCA 25k SCAR
MCP: 100_Pump PR-81
SQUARE D (FAL)
FU: 100_MCC-N-7-G-17
BUSSMANN (FRS-R)
200 A
F: 100_MCC-N-7-G-17
(1) #3/0 THWN; 120 ft
F: 100_BD S1 N8
(1) #1200 Class B; 30 ft
F: 100_BD S1 N7
(1) #1200 Class B; 30 ft
F: 100_BD S1 N6
(1) #1200 Class B; 30 ft
MCP: 100_RF-71
SQUARE D (FAL)
F: 100_RF-81
(1) #12 THWN; 40 ft
VFD: 100_RF-71
MTR: 100_RF-71
2 @ 3.0 hp
MCP: 100_SF-71
SQUARE D (FAL)
F: 100_SF-81
(1) #6 THWN; 25 ft
VFD: 100_SF-71
MTR: 100_SF-71
4 @ 7.5 hp
MCC: 100_N-7-G-17
480V, 600A 12.9k SCA 25k SCAR
MCP: 100_Pump PR-71
SQUARE D (FAL)
MCC: 100_N-6-G-17
480V, 600A 13.2k SCA 25k SCAR
MCP: 100_Pump PR-61
SQUARE D (FAL)
MCP: 100_RF-61
SQUARE D (FAL)
F: 100_RF-61
(1) #12 THWN; 40 ft
VFD: 100_RF-61
MTR: 100_RF-61
2 @ 3.0 hp
FU: 100_MCC-N-6-G-17
BUSSMANN (FRS-R)
200 A
F: 100_MCC-N-6-G-17
(1) #3/0 THWN; 120 ft
MCP: 100_SF-61
SQUARE D (FAL)
F: 100_SF-61
(1) #6 THWN; 25 ft
VFD: 100_SF-61
MTR: 100_SF-61
4 @ 7.5 hp
FU: 100_MCC-N-5-G-17
BUSSMANN (FRS-R)
200 A
F: 100_MCC-N-5-G-17
(1) #3/0 THWN; 80 ft
FU: 100_MCC-N-5-G-17
BUSSMANN (FRS-R)
200 A
F: 100_MCC-N-5-G-17
(1) #3/0 THWN; 120 ft
BD: 100_S1 N8
480V, 1200A 24.4k SCA 85k SCAR
BD: 100_S1 N7
480V, 1200A 25.1k SCA 85k SCAR
BD: 100_S1 N6
480V, 1200A 25.9k SCA 85k SCAR
BD: 100_S1 N5
480V, 1200A 26.8k SCA 85k SCAR
MCP: 100_RF-52
SQUARE D (FAL)
F: 100_RF-52
(1) #10 THWN; 20 ft
VFD: 100_RF-52
MTR: 100_RF-52
2 @ 2.0 hp
MCP: 100_EF-62
SQUARE D (FAL)
F: 100_EF-62
(1) #10 THWN; 20 ft
VFD: 100_EF-62
MCP: 100_EF-61
SQUARE D (FAL)
MCC: 100_N-5-G-17
480V, 600A 16.3k SCA 25k SCAR
F: 100_SF-52
(1) #6 THWN; 30 ft
MCP: 100_SF-52
SQUARE D (FAL)
VFD: 100_SF-52
MCP: 100_RF-51
SQUARE D (FAL)
F: 100_RF-51
(1) #12 THWN; 40 ft
VFD: 100_RF-51
MTR: 100_RF-51
2 @ 3.0 hp
MCC: 100_N-5-G-17
480V, 600A 13.4k SCA 25k SCAR
MCP: 100_Pump PR-51
SQUARE D (FAL)
MCP: 100_SF-51
SQUARE D (FAL)
F: 100_SF-51
(1) #6 THWN; 25 ft
VFD: 100_SF-51
MTR: 100_SF-51
4 @ 7.5 hp
BD: 100_S1 N3
480V, 1200A 28.5k SCA 85k SCAR
BUILDING 100 - ONE LINE DIAGRAM (RISER SB2)
EXISTING OVERCURRENT PROTECTIVE DEVICE SETTINGS
TO BE REVISED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GENERAL NOTES
KEY NOTES
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
2. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS,
TEMPORARY POWER PLANS, AND PHASING PLANS FOR
VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO
COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED
FOR REVIEW 30-DAYS PRIOR TO IMPLEMENTATION.
REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
3. FOR ALL OVERCURRENT PROTECTION DEVICE
REPLACEMENT WORK, REFERENCE ASSOCIATED
BUILDING SCHEDULE "OVER-CURRENT PROTECTIVE
DEVICE (OCPD) REPLACEMENT SCHEDULE" FOR
ADDITIONAL INFORMATION.
4. FOR ALL OVERCURRENT PROTECTION DEVICE
ADJUSTMENT WORK, REFERENCE ASSOCIATED BUILDING
SCHEDULE "OVERCURRENT PROTECTIVE DEVICE (OCPD)
SETTING ADJUSTMENT SCHEDULE" FOR ADDITIONAL
INFORMATION.
5. FOR ALL POWER DISTRIBUTION EQUIPMENT
REPLACEMENT OR ADDITION WORK, REFERENCE
ASSOCIATED BUILDING SCHEDULE "POWER DISTRIBUTION
EQUIPMENT SCHEDULE" FOR ADDITIONAL INFORMATION.
6. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAIN CIRCUITS
IMPACTED BY THIS PROJECT.
8. REFERENCE REVISED ONE-LINE DIAGRAM ON SHEET
100EP602 FOR ALL MODIFICATIONS.
100ED603
SCALE : NTS
1 BLDG 100 - EXISTING ONE-LINE DIAGRAM (PART 3 OF 21)
BLDG 100 - EXISTING ONE-LINE
DIAGRAM (PART 3 OF 21)
100EP603
F: 100_ATS-DE-S1-2 (E)
(1) #500 THWN; 140 ft
F: 100_ATS-DE-S1-2
(1) #500 THWN; 160 ft
ATS:100_ATS-DE-S1-2
600 A
F: 100_SWBD B1SDE-D-16
(1) #500 THWN; 5 ft
CB: 100_XFMR T-83
SQUARE D (FH)
100 A
CB: 100_Cart Lift 3
SQUARE D (FH)
90 A
CB: 100_UPS 1 Future Bypass
SQUARE D (KA)
125 A
Open CB: 100_Cart Washer (3)
SQUARE D (FH)
40 A
CB: 100_Cart Lift (4)
SQUARE D (FH)
90 A
CB: 100_Eleve S-8
SQUARE D (LA)
250 A
CB: 100_UPS 2 BYPASS
SQUARE D (KA)
125 A
CB: 100_Cart Washer (2)
SQUARE D (FH)
40 A
SWBD: 100_B1SDE-D-16
480V, 400A 16.3k SCA 50k SCAR
F: 100_XFMR T-83
(1) #1 THWN; 35 ft
XF: 100_T-83
75kVA; 4.90%Z Pri: 480V Sec: 208V
F: 100_T-83 Second
(1) #250 THWN; 5 ft
DISC: 100_T-83 Second 208V, 3.8k SCA
CB: 100_T-83 Second
SQUARE D (LA)
250 A
F: 100_Pnl B1DEL1-J-12
(1) #250 THWN; 100 ft
CB: 100_B1DEL1-J-12 MAIN
SQUARE D (Q2H)
225 A
PNL: 100_B1DEL1-J-12
208V, 225A 3.1k SCA 65k SCAR
CB: 100_UPS (Phone)
SQUARE D (QO)
60 A
F: 100_UPS (Phone)
(1) #6 THWN; 50 ft
UPS: 100_Telephone
F: 100_Pnl UPS
(1) #6 THWN; 50 ft
CB: 100_UPS Main
SQUARE D (QO)
50 A
PNL: 100_UPS
208V, 100A 1.5k SCA 65k SCAR
CB: 100_A/C Unit
SQUARE D (QO-VH)
50 A
F: 100_A/C Unit
(1) #6 THWN; 50 ft
DISC: 100_AC Unit 208V, 2.2k SCA
FU: 100_AC Unit
BUSSMANN (FRS-R)
35 A
F: 100_A/C Unit_a
(1) #8 THWN; 20 ft
MTR: 100_AC Unit
1 @ 5.0 HP
F: 100_Cart Lift 3
(1) #6 THWN; 160 FT
DISC: 100_Cart Lift 3 480V, 3.1k SCA
FU: 100_Cart Lift 3
BUSSMANN (FRS-R)
60 A
F: 100_Cart Lift 3_a
(1) #6 THWN; 5 ft
EP: 100_Cart Lift 3 480V, 10A 3.0k SCA
XF: 100_Cart Lift 3 20kVA; 4.90%Z Pri: 480V Sec: 480V
MTR: 100_Cart Lift 3
1 @ 15.0 HP
F: 100_Cart Lift (4)
(1) #6 THWN; 160 ft
DISC: 100_Cart Lift (4) 480V, 3.1k SCA
FU: 100_Cart Lift (4)
BUSSMANN (FRS-R)
60 A
F: 100_Cart Lift (4)_a
(1) #6 THWN; 5 ft
EP: 100_Cart Lift (4) 480V, 10A 3.0k SCA
XF: 100_Cart Lift (4) 20kVA; 4.90%Z Pri: 480V Sec: 480V
MTR: 100_Cart Lift (4) 1 @ 15.0 hp
F: 100_Eleve S-8
(1) #1/0 THWN; 110 ft
DISC: 100_Elev S-8 480V, 9.5k SCA
FU: 100_Elev S-8
BUSSMANN (FRS-R)
150 A
F: 100_Elev S-8_a
(1) #1/0 THWN; 5 ft
EP: 100_Elev S-8 480V, 10A 9.3k SCA
XF: 100_Elev S-8 63kVA; 5.40%Z Pri: 480V Sec: 480V
MTR: 100_Elev S-8 1 @ 60.0 hp
F: 100_UPS 2 BYPASS
(1) #2/0 THWN; 210 ft
F: 100_Cart Washer (2)
(1) #8 THWN; 210 ft
DISC: 100_Cart Washer (2) 480V, 1.5k SCA
FU: 100_Cart Washer (2)
GOULD SHAWMUT (TRS)
30 A
TAP: 100_UPS_2_ Bypass 480V, 7.2k SCA
CB: 100_UPS-2_CB3
SQUARE D (KA)
125 A
F: 100_UPS-2a
(1) #2/0 THWN; 3 ft
CB: 100_UPS-2_CB1
SQUARE D (KA)
125 A
F: 100_UPS-2b
(1) #2/0 THWN; 3 ft
Open
CB: 100_XFMR T-11
SQUARE D (FI)
50 A
F: 100_XFMR T-11
(1) #6 THWN; 160 ft
XF: 100_T-11
30kVA; 5.60%Z Pri: 480V Sec: 208V
F: 100_Pnl B2DEL1-F-12
(1) #2 THWN; 10 ft
CB: 100_B2DEL1-F-12 MAIN
SQUARE D (QO-VH)
100 A
PNL: 100_B2DEL1-F-12
208V, 100A 1.3k SCA 65k SCAR
CB: 100_Motorized Door (3)
SQUARE D (QO)
20 A
CB: 100_Motorized Door (1)
SQUARE D (QO)
20 A
CB: 100_Motorized Door (2)
SQUARE D (QO)
20 A
CB: 100_Compressor B2C-122
SQUARE D (FA)
20 A
CB: 100_Outer Door/Supply
SQUARE D (QO-VH)
20 A
CB: 100_XFMR B2DEL1-B-15
SQUARE D (FA)
30 A
F: 100_XFMR B2DEL1-B-15
(1) #6 THWN; 10 ft
XF: 100_B2DEL1-B-15
15kVA; 5.10%Z Pri: 480V Sec: 208V
F: 100_Pnl B2DEL1-B-15
(1) #1 THWN; 10 ft
CB: 100_B2DEL1-B-15 Main
SQUARE D (QO-VH)
50 A
PNL: 100_B2DEL1-B-15
208V, 100A 0.8k SCA 65k SCAR
CB: 100_Recept Under Pnl
SQUARE D (QO-VH)
30 A
CB: 100_MCC-E-B-2-B-15
SQUARE D (FI)
20 A
F: 100_MCC-E-B-2-B-15
(1) #1 THWN; 10 ft
MCC: 100_E-B2-B-15
480V, 600A 26.0k SCA 25k SCAR
CB: 100_Compactor
SQUARE D (FA)
20 A
CB: 100_Leveler (1)
SQUARE D (FI)
20 A
F: 100_Leveler (1)
(1) #12 THWN; 160 ft
DISC: 100_Leveler (1) 480V, 0.9k SCA
FU: 100_Leveler (1)
LITTELFUSE (FLSR)
10 A
CB: 100_Scissor Lift (1)
SQUARE D (FI)
20 A
CB: 100_CP-1
SQUARE D (FI)
20 A
CB: 100_Leveler (2)
SQUARE D (FI)
20 A
CB: 100_DW-2
SQUARE D (FI)
50 A
CB: 100_Scissor Lift (2)
SQUARE D (FI)
20 A
MTR: 100_Fans 10 @ 3.4 hp
SWBD: 100_B2SDE-B-15
480V, 600A 28.6k SCA 50k SCAR
CB: 100_ACCU-2 (Chiller)
SQUARE D (LI)
450 A
F: 100_ACCU-2
(1) #500 THWN; 70 ft
EP: 100_ACCU-2 (Chiller) 480V, 21.3k SCA
MTR: 100_Compressors 2 @ 60.0 hp
CONTINUE TO SWBD: 100_USS1
(SEE SHEET 100ED620)
ATS: 100_ATS-DE-S1-3
800 A
F: 100_SWBD B2SDE-B-15
(2) #500 THWN; 10 ft
F: 100_ATS-DE-S1-3 (E)
(2) #500 THWN; 170 ft
F: 100_ATS-DE-S1-3
(2) #500 THWN; 30 ft
CONTINUE TO SWBD:
100_USS1
(SEE SHEET 100ED620)
GENERAL NOTES
KEY NOTES
BUILDING 100 - ONE LINE DIAGRAM (ATS-DE-S1-3 & ATS- DE-S1-2)
EXISTING OVERCURRENT PROTECTIVE DEVICE SETTINGS
TO BE REVISED.
EXISTING CONDUCTORS TO BE DEMOLISHED BACK TO
ATS; EXISTING RACEWAY TO REMAIN FOR REUSE.
REFERENCE ONE-LINE DIAGRAM ON SHEET 100EP601 FOR
ADDITIONAL INFORMATION.
EXISTING FEEDER TO BE REUSED, REFERENCE ONE-LINE
DIAGRAM ON SHEET 100ED601 FOR ADDITIONAL
INFORMATION.
EXISTING FEEDER TO BE MODIFIED. REFERENCE
ONE-LINE DIAGRAM ON SHEET 100EP604 FOR ADDITIONAL
INFORMATION.
2 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
BLDG 100 - EXISTING ONE-LINE
DIAGRAM (PART 4 OF 21)
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
2. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS,
TEMPORARY POWER PLANS, AND PHASING PLANS FOR
VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO
COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED
FOR REVIEW 30-DAYS PRIOR TO IMPLEMENTATION.
REFERENCE SPECIFICATION 01 00 00 FOR
COORDINATION OF ALL SHUTDOWNS.
3. FOR ALL OVERCURRENT PROTECTION DEVICE
REPLACEMENT WORK, REFERENCE ASSOCIATED
BUILDING SCHEDULE "OVER-CURRENT PROTECTIVE
DEVICE (OCPD) REPLACEMENT SCHEDULE" FOR
ADDITIONAL INFORMATION.
4. FOR ALL OVERCURRENT PROTECTION DEVICE
ADJUSTMENT WORK, REFERENCE ASSOCIATED
BUILDING SCHEDULE "OVERCURRENT PROTECTIVE
DEVICE (OCPD) SETTING ADJUSTMENT SCHEDULE" FOR
ADDITIONAL INFORMATION.
5. FOR ALL POWER DISTRIBUTION EQUIPMENT
REPLACEMENT OR ADDITION WORK, REFERENCE
ASSOCIATED BUILDING SCHEDULE "POWER
DISTRIBUTION EQUIPMENT SCHEDULE" FOR
ADDITIONAL INFORMATION.
6. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAIN CIRCUITS
IMPACTED BY THIS PROJECT.
8. REFERENCE REVISED ONE-LINE DIAGRAM ON SHEET
100EP603 FOR ALL MODIFICATIONS.
100ED604
SCALE : NTS
1 BLDG 100 - EXISTING ONE-LINE DIAGRAM (PART 4 OF 21)
100EP604100EP603 100EP604
F: 100_BAY 2 Normal Riser
(1) #1000 CLASS B; 80 ft
FU: 100_1H1-E-17
BUSSMANN (FRS-R)
200 A
F: 100_1H1-E-17
(1) #4/0 THWN; 50ft
PNL: 100_1H1-E-17
480V, 225A 24.6k SCA 200k SCAR
CB: 100_XFMR T-14
SQUARE D (KA)
F: 100_XFMR T-14
(1) #1 THWN; 35 ft
XF: 100_T-14
75kVA; 4.90%Z Pri: 480V Sec: 208V
TAP: 100_XF T-14 Sec 208V, 3.9k SCA
F: 100_Pnl 1L1-E-17 SEC 1
(1) #1 THWN; 35 ft
CB: 100_1L1-E-17 SEC 1 Main SQUARE D (Q1(B)-VH (Obs.)) 100 A
PNL: 100_1L1-E-17 SEC 1
208V, 100A 3.4k SCA 65k SCAR
F: 100_Pnl 1L1-E-17 SEC 2
(1) #1 THWN; 35 ft
CB: 100_1L1-E-17 SEC 2 Main SQUARE D (Q1(B)-VH (Obs.)) 100 A
PNL: 100_1L1-E-17 SEC 2
208V, 100A 3.4k SCA 65k SCAR
F: 100_Pnl 1L2-E-17
(1) #1 THWN; 45 ft
CB: 100_1L2-E-17 Main SQUARE D (Q1(B)-VH (Obs.)) 100 A
PNL: 100_1L2-E-17
208V, 100A 3.3k SCA 65k SCAR
F: 100_1H1-F.1-19.6
(1) #2 THWN; 240 ft
FU: 100_1H1-F.1-19.6
BUSSMANN (FRS-R)
100 A
BD: 100_S2 N1
480V, 1000A 36.2k SCA 85k SCAR
F: 100_BD S2 N2
(1) #1000 Class B; 25 ft
FU: 100_2H1-F.1-19
BUSSMANN (FRS-R)
125 A
F: 100_2H1-F.1-19 Sec 1
(1) #1 THWN; 280 ft
BD: 100_S2-N9
480V, 1000A 25.6k SCA 85k SCAR
F: 100_BD S2-N9
(1) #1000 Class B; 25 ft
FU: 100_9H1-E-17
BUSSMANN (FRS-R)
200 A
F: 100_9H1-E-17
(1) #3/0 THWN; 40 ft
PNL: 100_9H1-E-17
480V, 225A 19.2k SCA 50k SCAR
CB: 100_XFMR T-34
SQUARE D (KA)
125 A
F: 100_XFMR T-34
(1) #1 THWN; 40 ft
XF: 100_T-34
75kVA; 4.90%Z Pri: 480V Sec: 208V
TAP: 100_XF T-34 Sec 208V, 3.8k SCA
F: 100_Pnl 9L1-E-17 SEC 1
(1) #1/0 THWN; 40 ft
CB: 100_9L1-E-17 SEC 1 Main
SQUARE D (KA)
150 A
PNL: 100_9L1-E-17 SEC 1
208V, 150A 3.4k SCA 65k SCAR
F: 100_Pnl 9L1-E-17 SEC 2
(1) #1 THWN; 60 ft
CB: 100_9L1-E-17 SEC 2 Main
SQUARE D (KA)
125 A
PNL: 100_9L1-E-17 SEC 2
208V, 125A 3.1k SCA 65k SCAR
PNL: 100_8L1-E-17 SEC 2
208V, 125A 3.3k SCA 65k SCAR
CB: 100_8L1-E-17 SEC 2 Main
SQUARE D (KA)
125 A
F: 100_Pnl 8L1-E-17 SEC 2
(1) #1 THWN; 40 ft
PNL: 100_8L1-E-17 SEC 1
208V, 150A 3.3k SCA 65k SCAR
CB: 100_8L1-E-17 SEC 1 Main
SQUARE D (KA)
150 A
F: 100_Pnl 8L1-E-17 SEC 1
(1) #1/0 THWN; 40 ft
TAP: 100_XF T-33 Sec 208V, 3.8k SCA
XF: 100_T-33
75kVA; 4.90%Z Pri: 480V Sec: 208V
F: 100 XFMR T-33
(1) #1 THWN; 40 ft
CB: 100 XFMR T-33
SQUARE D (KA)
125 A
PNL: 100_8H1-E-17
480V, 225A 16.6k SCA 50k SCAR
F: 100_8H1-E-17
(1) #3/0 THWN; 70 ft
FU: 100_8H1-E-17
BUSSMANN (FRS-R)
200 A
F: 100_BD S2-N8
(1) #1000 Class B; 25 ft
BD: 100_S2-N8
480V, 1000A 26.6k SCA 85k SCAR
F: 100_Pnl 2L2-E-17 SEC 1
(1) #1/0 THWN; 40 ft
CB: 100_2L2-E-17 SEC 1 Main
SQUARE D (KA)
150 A
PNL: 100_2L2-E-17 SEC 1
208V, 150A 1.8k SCA 65k SCAR
PNL: 100_2L2-E-17 SEC 2
208V, 50A 1.8k SCA 65k SCAR
CB: 100_2L2-E-17 SEC 2 Main SQUARE D (Q1(B)-VH (Obs.)) 50 A
F: 100_Pnl 2L2-E-17 SEC 2
(1) #4 THWN; 30 ft
TAP: 100_XF T-17 Sec 208V, 1.9k SCA
XF: 100_T-17
45kVA; 6.10%Z Pri: 480V Sec: 208V
F: 100_XFMR T-17
(1) #4 THWN; 45 ft
CB: 100_XFMR T-17
SQUARE D (EH)
70 A
PNL: 100_2H1-E-17 SEC 2
480V, 225A 25.3k SCA 14k SCAR
FU: 100_2H1-E-17
BUSSMANN (FRS-R)
200 A
F: 100_2H1-E-17
(1) #3/0 THWN; 30 ft
PNL: 100_2H1-E-17 SEC 1
480V, 225A 26.4k SCA 14k SCAR
F: 100_Pnl 2H1-E-17 SEC 2
(1) #3/0 THWN; 5 ft
BD: 100_S2 N2
480V, 1000A 34.6k SCA 85k SCAR
F: 100_BD S2-N3
(1) #1000 Class B; 25 ft
FU: 100_T-16
BUSSMANN (FRS-R)
125 A
F: 100_XFMR T-16
(1) #1 THWN; 30 f
XF: 100_T-16
75kVA; 4.90%Z Pri: 480V Sec: 208V
TAP: 100_XF T-16 Sec 208V, 4.0k SCA
F: 100_Pnl 2L1-E-17 SEC 1
(1) #1 THWN; 50 ft
CB: 100_2L1-E-17 SEC 1 Main
SQUARE D (KA)
125 A
PNL: 100_2L1-E-17 SEC 1
208V, 125A 3.3k SCA 65k SCAR
PNL: 100_2L1-E-17 SEC 2
208V, 100A 3.3k SCA 65k SCAR
CB: 100_2L1-E-17 SEC 2 Main
SQUARE D (KA)
100 A
F: 100_Pnl 2L1-E-17 SEC 2
(1) #1 THWN; 50 ft
BD: 100_S2-N3
480V, 1000A 33.0k SCA 85k SCAR
F: 100_BD S2-N4
(1) #1000 Class B; 25 ft
FU: 100_3H1-E-17
BUSSMANN (FRS-R)
200 A
F: 100_3H1-E-17
(1) #3/0 THWN; 60 ft PANELBOARD "PNL: 100_3H1-E-17"
480V, 225A, 20.4k SCA, 50k SCAR
CB: 100_XFMR T-19
SQUARE D (KA)
125 A
F: 100_XFMR T-19
(1) #1 THWN; 60 ft
XF: 100_T-19
75kVA; 4.90%Z Pri: 480V Sec: 208V
TAP: 100_XF T-19 Sec 208V, 3.8k SCA
F: 100_Pnl 3L2-E-17
(1) #3/0 THWN; 60 ft
PNL: 100_3L2-E-17
208V, 225A 3.3k SCA 65k SCAR
F: 100_Pnl 3L1-E-17
(1) #4/0 THWN; 40 ft
CB: 100_3L1-E-17 Main
SQUARE D (KA)
225 A
CB: 100_Nourish Station SQUARE D (Q1(B)-VH (Obs.)) 70 A
PNL: 100_3L1-E-17
208V, 225A 3.5k SCA 65k SCAR
CB: 100_Cystology SQUARE D (Q1(B)-VH (Obs.)) 40 A
F: 100_Cystology
(1) #8 THWN; 160 ft
DISC: 100_Cystology 3C-146 208V, 0.8k SCA
CB: 100_ Cystology 3C-146
SQUARE D (FH)
20 A
BD: 100_S2-N6
480V, 1000A 28.9k SCA 85k SCAR
BD: 100_S2-N7
480V, 1000A 27.7k SCA 85k SCAR
F: 100_BD S2-N7
(1) #1000 Class B; 25 ft
FU: 100_7H1-E-17
BUSSMANN (FRS-R)
200 A
F: 100_7H1-E-17
(1) #3/0 THWN; 40 ft
PNL: 100_7H1-E-17
480V, 225A 20.5k SCA 50k SCAR
CB: 100_XFMR T-32
SQUARE D (KA)
125 A
F: 100_XFMR T-32
(1) #1 THWN; 40 ft
XF: 100_T-32
75kVA; 4.90%Z Pri: 480V Sec: 208V
TAP: 100_XF T-32 Sec 208V, 3.8k SCA
F: 100_Pnl 7L1-E-17 SEC 1
(1) #1/0 THWN; 40 ft
CB: 100_7L1-E-17 SEC 1 Main
SQUARE D (KA)
150 A
PNL: 100_7L1-E-17 SEC 1
208V, 150A 3.4k SCA 65k SCAR
F: 100_Pnl 7L1-E-17 SEC 2
(1) #1/0 THWN; 40 ft
CB: 100_7L1-E-17 SEC 2 Main
SQUARE D (KA)
150 A
PNL: 100_7L1-E-17 SEC 2
208V, 150A 3.4k SCA 65k SCAR
F: 100_Pnl 6L1-E-17 SEC 2
(1) #1 THWN; 40 ft
CB: 100_6L1-E-17 SEC 2 Main
SQUARE D (KA)
125 A
PNL: 100_6L1-E-17 SEC 2
208V, 125A 3.3k SCA 65k SCAR
PNL: 100_6L1-E-17 SEC 1
208V, 150A 3.4k SCA 65k SCAR
CB: 100_6C-126
SQUARE D (QO)
20 A
CB: 100_6L1-E-17 SEC 1 Main
SQUARE D (KA)
150 A
F: 100_Pnl 6L1-E-17 SEC 1
(1) #1/0 THWN; 40 f
TAP: 100_XF T-29 Sec 208V, 3.8k SCA
XF: 100_T-29
75kVA; 4.90%Z Pri: 480V Sec: 208V
F: 100_XFMR T-29
(1) #1 THWN; 40 ft
CB: 100_XFMR T-29
SQUARE D (KA)
125 A
F: 100_6H1-E-17
(1) #3/0 THWN; 40 ft
FU: 100_6H1-E-17
BUSSMANN (FRS-R)
200 A
F: 100_BD S2-N6
(1) #1000 Class B; 25 ft
PNL: 100_6L2-E-17
208V, 225A 3.1k SCA 65k SCAR
CB: 100_6L2-E-17 Main
SQUARE D (Q2H)
200 A
F: 100_Pnl 6L2-E-17
(1) #3/0 THWN; 30 ft
XF: 100_T-141
75kVA; 5.80%Z Pri: 480V Sec: 208V
F: 100_XFMR T-141
(1) #1 THWN; 40 ft
CB: 100_XFMR T-141
SQUARE D (KA)
125 A
PNL: 100_6H1-E-17
480V, 225A 21.2k SCA 50k SCAR
PNL: 100_5L1-E-17 SEC 2
208V, 150A 3.9k SCA 65k SCAR
CB: 100_5L1-E-17 SEC 2 Main
SQUARE D (KA)
150 A
F: 100_Pnl 5L1-E-17 SEC 2
(1) #1/0 THWN; 40 ft
PNL: 100_5L1-E-17 SEC 1
208V, 225A 4.1k SCA 65k SCAR
CB: 100_5L1-E-17 SEC 1 Main
SQUARE D (KA)
225 A
F: 100_Pnl 5L1-E-17 SEC 1
(1) #250 THWN; 40 ft
PNL: 100_5L2-E-17
208V, 100A 3.9k SCA 65k SCAR
CB: 100_5L2-E-17 Main SQUARE D (Q1(B)-VH (Obs.)) 100 A
F: 100_Pnl 5L2-E-17
(1) #1/0 THWN; 40 ft
TAP: 100_XF T-26 Sec 208V, 4.5k SCA
PNL: 100_5H1-E-17
480V, 225A 19.2k SCA 14k SCAR
FU: 100_5H1-E-17
BUSSMANN (FRS-R)
200 A
F: 100_5H1-E-17
(1) #3/0 THWN; 60 ft
XF: 100_T-26
113kVA; 6.20%Z Pri: 480V Sec: 208V
F: 100_XFMR T-26
(1) #2/0 THWN; 60 ft
FU: 100_XFMR T-26
BUSSMANN (FRS-R)
125 A
BD: 100_S2-N5
480V, 1000A 30.2k SCA 85k SCAR
BD: 100_S2-N4
480V, 1000A 31.5k SCA 85k SCAR
F: 100_BD S2-N5
(1) #1000 Class B; 25 ft
FU: 100_4H1-E-17
BUSSMANN (FRS-R)
200 A
F: 100_4H1-E-17
(1) #3/0 THWN; 60 ft
PNL: 100_4H1-E-17
480V, 225A 19.8k SCA 50k SCAR
CB: 100_XFMR T-140
SQUARE D (FA)
60 A
F: 100_XFMR T-140
(1) #4 THWN; 60 ft
XF: 100_T-140
30kVA; 5.60%Z Pri: 480V Sec: 208V
F: 100_Pnl 4L2-E-17 SEC 2
(1) #2 THWN; 10 ft
CB: 100_4L2-E-17 SEC 2 Main SQUARE D (Q1(B)-VH (Obs.)) 100 A
PNL: 100_4L2-E-17 SEC 2
208V, 100A 1.4k SCA 65k SCARPNL: 100_4L1-E-17 SEC 1
208V, 225A 3.3k SCA 65k SCAR
CB: 100_4L1-E-17 SEC 1 Main
SQUARE D (KA)
225 A
F: 100_Pnl 4L1-E-17 SEC 1
(1) #250 THWN; 60 ft
TAP: 100_XF T-25 Sec 208V, 3.8k SCA
XF: 100_T-25
75kVA; 4.90%Z Pri: 480V Sec: 208V
F: 100_XFMR T-25
(1) #1 THWN; 60 ft
CB: 100_XFMR T-25
SQUARE D (KA)
125 A
FU: 100_T-154
BUSSMANN (FRS-R)
70 A
F: 100_XFMR T-154
(1) #4 THWN; 60 ft
XF: 100_T-154
45kVA; 6.20%Z Pri: 480V Sec: 208V
F: 100_Pnl 4L3-E-17
(1) #1 THWN; 20 ft
CB: 100_4L3-E-17 Main
SQUARE D (QD)
125 A
PNL: 100_4L3-E-17
208V, 125A 1.8k SCA 65k SCAR
F: 100_Pnl 4L1-E-17 SEC 2
(1) #2 THWN; 60 ft
CB: 100_4L1-E-17 SEC 2 Main
SQUARE D (KA)
100 A
PNL: 100_4L1-E-17 SEC 2
208V, 100A 2.9k SCA 65k SCAR
CONTINUE TO PNL:
101_1H1-F.1-19.6
(SEE SHEET 101ED605)
CONTINUE TO PNL:
101_2H1-F.1-19 SEC 1
(SEE SHEET 101ED605)
CONTINUE TO SWBD:
100_USS2
(SEE SHEET 100ED606)
1P SPACE (X2)3P SPACE (X7)SPARE
20A/1P (X4)20A/1P (X12)
LIGHTING
BUILDING 100 - ONE LINE DIAGRAM (BUSDUCT RISER N1 BAY2)
GENERAL NOTES
KEY NOTES
EXISTING OVERCURRENT PROTECTIVE DEVICE SETTINGS
TO BE REVISED.
EXISTING OVERCURRENT PROTECTIVE DEVICE SETTINGS
TO BE REMOVED AND REPLACED.
EXISTING TAP LOCATED WITHIN TRANSFORMER AND
PANEL "100_3L2-E-17" FEEDER TO BE DEMOLISHED.
REFERENCE ONE-LINE DIAGRAM ON SHEET 100EP604 FOR
ADDITIONAL INFORMATION.
EXISTING PANELBOARD TO BE MODIFIED. REFERENCE
ONE-LINE DIAGRAM ON SHEET 100EP604 FOR ADDITIONAL
INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
BLDG 100 - EXISTING ONE -LINE
DIAGRAM (PART 5 OF 21)
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
2. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS,
TEMPORARY POWER PLANS, AND PHASING PLANS FOR
VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO
COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED
FOR REVIEW 30-DAYS PRIOR TO IMPLEMENTATION.
REFERENCE SPECIFICATION 01 00 00 FOR
COORDINATION OF ALL SHUTDOWNS.
3. FOR ALL OVERCURRENT PROTECTION DEVICE
REPLACEMENT WORK, REFERENCE ASSOCIATED
BUILDING SCHEDULE "OVER-CURRENT PROTECTIVE
DEVICE (OCPD) REPLACEMENT SCHEDULE" FOR
ADDITIONAL INFORMATION.
4. FOR ALL OVERCURRENT PROTECTION DEVICE
ADJUSTMENT WORK, REFERENCE ASSOCIATED
BUILDING SCHEDULE "OVERCURRENT PROTECTIVE
DEVICE (OCPD) SETTING ADJUSTMENT SCHEDULE" FOR
ADDITIONAL INFORMATION.
5. FOR ALL POWER DISTRIBUTION EQUIPMENT
REPLACEMENT OR ADDITION WORK, REFERENCE
ASSOCIATED BUILDING SCHEDULE "POWER
DISTRIBUTION EQUIPMENT SCHEDULE" FOR
ADDITIONAL INFORMATION.
6. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAIN CIRCUITS
IMPACTED BY THIS PROJECT.
8. REFERENCE REVISED ONE-LINE DIAGRAM ON SHEET
100EP604 FOR ALL MODIFICATIONS.
100ED605
1 1 1 1 1
SCALE : NTS
1 BLDG 100 - EXISTING ONE-LINE DIAGRAM (PART 5 OF 21)
EXISTING FEEDER TO BE DEMOLISHED AND REPLACED.5
100EP605 FOR ALL MODIFICATIONS.
EXISTING FEEDER TO BE DEMOLISHED AND REPLACED.
UTIL: USS2
Isc 3P 4437 Amps Isc SLG 3241 Amps
UTIL: USS2 (equip eval) Isc 3P 10553 Amps Isc SLG 8272 Amps
SW: USS2 (3)
SQUARE D (600A)
FU: USS2
GE (EJO-1, 150E)
150A
XF: USS2
2500kVA; 6.09%Z Pri: 12470V Sec: 480V
F: 100_SWBD USS2
(1) #4000 Class B; 1 ft
CB: 100_USS2 Main W/G
SQUARE D (DS 840)
4000 A
CB: 100_B1-SDN-E-17 W/G
SQUARE D (DS 416)
1600 A
F: 100_B1-SDN-E-17
(4) #750 THWN; 60 ft
SWBD: 100_B1SDN-E-17
480V, 2000A
36.7K SCA
50K SCAR
CB: 100_MCC-N-B1-D-18
SQUARE D (LH)
400 A
F: 100_MCC-N-B1-D-18
(1) #500 THWN; 170 ft
CB: 100_ATS-LSS2-2 W/G
SQUARE D (DS 416)
200 A
F: 100_ATS-LS-S2-2 (N)
(1) #3/0 THWN; 80 ft
CB: 100_ATS-CES2-1 W/G
SQUARE D (DS 416)
800 A
F: 100_ATS-CE-S2-1(N)
(3) #350 THWN; 240 ft
CB: 100_ATS-DES2-3 W/G
SQUARE D (DS 416)
800 A
F: 100_ATS-DE-S2-3(N)
(3) #350 THWN; 160 ft
SWBD: 100_USS2
480V, 4000A 40.6k SCA 50k SCAR
CB: 100_BAY 2 Normal Riser W/G
SQUARE D (DS 416)
1200 A
F: 100_BAY 2 Normal G: Riser
(1) #1000 CLASS B; 80 ft
CB: 100_B1H1-F-14
SQUARE D (IK)
200 A
F: 100_B1H1-F-14
(1) #3/0 THWN; 60 ft
CB: 100_104-L1 BLD 107
SQUARE D (FI)
20 A
F: 100_104-L1 BLD 107
(1) #8 THWN; 220 ft
DISC: 107_T-116 PRIM
480V, 1.5K SCA
CB: 107_T-116 PRIM
SQUARE D (FA)
90 A
XF: 107_T-116
30KVA; 2.10%Z
PRI: 480V
SEC: 208V
DISC: 107_T-116 SEC
208V, 2.2K SCA
CB: 107 _T-116 SEC
SQUARE D (FA)
100 A
F: 107_Pnl L1
(1) #1/0 THWN; 10 ft
PNL: 107_L1
208V, 100A
2.1K SCA
10K SCAR
CB: 100_B1L1-E-17
SQUARE D (FI)
50 A
F: 100_B1L1-E-17
(1) #6 THWN; 50 ft
CB: 100_Normal Riser Bay 3
SQUARE D (MH)
800 A
F: 100_Normal Riser Bay 3
(3) #300 THWN; 150 ft
CONTINUE TO BD:
100_S2 N1 B3
(SEE SHEET 100ED607)
CB: 100_1SDN-M-17
SQUARE D (LH)
400 A
F: 100_1SDN-M-17
(2) #4/0 THWN; 180 ft
CB: 100_B1H1-B-13
SQUARE D (KH)
150 A
F: 100_B1H1-B-13
(1) #1/0 THWN; 120 ft
PNL: 100_B1H1-B-13
480V, 225A
12.6K SCA
14K SCAR
CB: 100_STERIS
SQUARE D (EH)
30 A
F: 100_STERIS
(1) #10 THWN; 260 ft
DISC: 100_STERIS
480V, 0.9K SCA
FU: 100_STERIS
BUSSMANN (FRS-R)
30 A
CB: 100_XFMR T-40
SQUARE D (EH)
70 A
F: 100_XFMR T-40
(1) #4 THWN; 25 ft
XF: 100_T-40
45KVA; 6.10%Z
PRI: 480V
SEC: 208V
TAP: 100_XF T-40 SEC
208V, 1.9K SCA
F: 100_PNL B1L1-B-13 SEC 1
(1) #1/0 THWN; 20 ft
CB: 100_B1L1-B-13 SEC 1 Main
SQUARE D (KA)
150 A
PNL: 100_B1L1-B-13 SEC 1
208V, 150A
1.8K SCA
65K SCAR
CB: 100_VS 329
SQUARE D (EH)
20 A
F: 100_PNL B1L1-B-13 SEC 2
(1) #2 THWN; 20 ft
CB: 100_B1L1-B-13 SEC 2 Main SQUARE D (Q1(B)-VH (Obs.)) 100 A
PNL: 100_B1L1-B-13 SEC 2
208V, 100A
1.8K SCA
65K SCAR
XF: 100_T-12
30KVA; 5.60%Z
PRI: 480V
SEC: 208V
TAP: 100_XF T-12 SEC
208V, 1.4K SCA
F: 100_Pnl B1L1-E-17
(1) #2 THWN; 25 ft
CB: 100_B1L1-E-17 Main
SQUARE D (QO)
100 A
PNL: 100_B1L1-E-17
208V, 100A
1.4K SCA
22K SCAR
F: 100_Pnl B1L1-E.1-17
(1) #2 THWN; 10 ft
PNL: 100_B1H1-F-14
480V, 225A
22.4K SCA
200K SCAR
CB: 100_HORI Milling Mach
SQUARE D (FA)
20 A
F: 100_HORI Milling Mach
(1) #12 THWN; 60 ft
DISC: 100_HORI Milling Mach
480V, 2.3K SCA
FU: 100_HORI Milling Mach
BUSSMANN (FRS-R)
20 A
CB: 100_XFMR T-13
SQUARE D (KA)
125 A
F: 100_XFMR T-13
(1) #1 THWN; 25 ft
XF: 100_T-13
75KVA; 4.90%Z
PRI: 480V
SEC: 208V
TAP: 100_XF T-13 SEC
208V, 3.9K SCA
F: 100_Pnl B1L1-F-14 SEC 1
(1) #1 THWN; 10 ft
CB: 100_B1L1-F-14 SEC 1 Main SQUARE D (Q1(B)-VH (Obs.)) 100 A
PNL: 100_B1L1-F-14 SEC 1
208V, 100A
3.7K SCA
22K SCAR
PNL: 100_B1L1-E.1-17
208V, 100A
1.4K SCA
65K SCAR
CB: 100_LATHE B1C-118
SQUARE D (QO)
30 A
F: 100_LATHE B1C-118
(1) #10 THWN; 30 ft
DISC: 100_LATHE B1C-118
208V, 1.1K SCA
FU: 100_LATHE B1C-118
BUSSMANN (FRS-R)
20 A
CB: 100_DISC Work Bench
SQUARE D (QO)
30 A
F: 100_DISC Work Bench
(1) #10 THWN; 10 ft
DISC: 100_Work Bench
208V, 1.3K SCA
FU: 100_Work Bench
BUSSMANN (FRS-R)
30 A
SWBD: 100_1SDN-M-17
480V, 400A
19.8K SCA
50K SCAR
CB:100_3H1-M-17
SQUARE D (FA)
70 A
F: 100_3H1-M-17
(1) #4 THWN; 180 ft
PNL: 100_3H1-M-17
480V, 100A
4.0K SCA
14K SCAR
CB: 100_XFMR T-7
SQUARE D (EH)
50 A
F: 100_XFMR T-7
(1) #6 THWN; 5 ft
XF: 100_T-7
30kVA; 5.60%Z
PRI: 480V
SEC: 208V
TAP: 100_T-7
208V, 1.3K SCA
F: 100_PNL 3L1-M-17
(1) #4 THWN; 15 ft
CB: 100_3L1-M-17 Main
SQUARE D (Q1(B)-VH (OBS.))
100 A
PNL: 100_3L1-M-17
208V, 100A
1.3K SCA
65K SCAR
F: 100_Pnl B1L1-F-14 SEC 2
(1) #1/0 THWN; 25 ft
CB: 100_B1L1-F-14 SEC 2 Main
SQUARE D (Q1(B)-VH (OBS.))
100 A
PNL: 100_B1L1-F-14 SEC 2
208V, 100A
3.6K SCA
22K SCAR
F: 100_Pnl B1L1-F-14 SEC 3
(1) #2 THWN; 20 ft
CB: 100_B1L1-F-14 SEC 3 Main SQUARE D (Q1 (Obs.)) 100 A
PNL: 100_B1L1-F-14 SEC 3
208V, 100A
3.6K SCA
10K SCAR
CB: 100_XFMR T-2a
SQUARE D (FA)
60 A
F: 100_XFMR T-2a
(1) #8 THWN; 10 ft
XF: 100_T-2a
30KVA; 5.20%Z
PRI: 480V
SEC: 208V
F: 100_Pnl NO NAME
(1) #1/0 THWN; 10 ft
CB: 100_No Name Main
SQUARE D (Q1(B)-VH (OBS.))
100 A
F: 100_PNL 3L2-M-17
(1) #2 THWN; 15 ft
PNL: 100_3L2-M-17
208V, 100A
1.3K SCA
65K SCAR
CB: 100_MCC-N-1-L-17
SQUARE D (KA)
200 A
F: 100_MCC-N-1-L-17
(1) #3/0 THWN; 240 ft
CB: 100_MCC-N-2-L-17
SQUARE D (KA)
200 A
F: 100_MCC-N-2-L-17
(1) #3/0 THWN; 260 ft
CB: 100_MCC-N-3-L-17
SQUARE D (KA)
200 A
F: 100_MCC-N-3-L-17
(1) #3/0 THWN; 310 ft
CB: 100_2H1-M-17
SQUARE D (LA)
300 A
F: 100_2H1-M-17
(1) #350 THWN; 140 ft
PNL: 100_2H1-M-17
480V, 400A
12.2K SCA
50K SCAR
CB: 100_XFMR T-5
SQUARE D (KA)
175 A
F: 100_XFMR T-5
(1) #2/0 THWN; 60 ft
CB: 100_1H1-M-17
SQUARE D (KA)
125 A
F: 100_1H1-M-17
(1) #1 THWN; 120 ft
PNL: 100_1H1-M-17
480V, 225A
8.5K SCA
14K SCAR
CB: 100_XFMR T-3
SQUARE D (EH)
70 A
F: 100_XFMR T-3
(1) #4 THWN; 15 ft
XF: 100_T-3
45KVA; 6.10%Z
PRI: 480V
SEC: 208V
TAP: 100_XF T-3 SEC
208V, 1.9K SCA
F: 100_PNL 1L1-M-17 SEC 1
(1) #1 THWN; 20
CB: 100_1L1-M-17 SEC 1 Main
SQUARE D (KA)
125 A
PNL: 100_1L1-M-17 SEC 1
208V, 125A
1.8K SCA
65K SCAR
F: 100_PNL 1L1-M-17 SEC 2
(1) #2 THWN; 15 ft
CB: 100_1L1-M-17 SEC 2 Main
SQUARE D (Q1(B)-VH (OBS.))
60 A
PNL: 100_1L1-M-17 SEC 2
208V, 60A 1.8k SCA 65k SCAR
XF: 100_T-5
112.5 KVA; 6.20%Z
PRI: 480V
SEC: 208V
TAP: 100_XF T-5 SEC
208V, 4.2K SCA
F: 100_PNL 2L1-M-17 SEC 1
(1) #1/0 THWN; 60 ft
CB: 100_2L1-M-17 SEC 1 Main
SQUARE D (KA)
125 A
PNL: 100_2L1-M-17
208V, 125A
3.4K SCA
22K SCAR
F: 100_PNL 2L1-M-17 SEC 2
(1) #1/0 THWN; 60 ft
CB: 100_2L1-M-17 SEC 2 Main
SQUARE D (KA)
90 A
PNL: 100_2L1-M-17 SEC 2
208V, 90A
3.4K SCA
22K SCAR
F: 100_PNL 2L2-M-17 SEC 1
(1) #1/0 THWN; 50 ft
CB: 100_2L2-M-17 SEC 1 Main
SQUARE D (KA)
125 A
PNL: 100_2L2-M-17 SEC 1
208V, 125A
3.5K SCA
65K SCAR
F: 100_PNL 2L2-M-17 SEC 2
(1) #1/0 THWN; 10 ft
CB: 100_2L2-M-17 SEC 2 Main
SQUARE D (KA)
100 A
PNL: 100_2L2-M-17 SEC 2
208V, 100A
4.0K SCA
22K SCAR
MCP: 100_EF-42
SQUARE D (FAL)
MCP: 100_RF-31
SQUARE D (FAL)
F: 100_100-RF-31
(1) #12 THWN; 60 ft
VFD: 100_RF-31
MTR: 100_RF-31
2 @ 2.0 HP
MCP: 100_SF-31
SQUARE D (FAL)
F: 100_100-SF-31
(1) #8 THWN; 60 ft
VFD: 100_SF-31
MTR: 100_SF-31
2 @ 2.0 HP
MCP: 100_EF-41
SQUARE D (FAL)
MCC: 100_MCC-N-3-L-17
480V, 600A
6.5K SCA
25K SCAR
MCP: 100_EF-43
SQUARE D (FAL)
MCP: 100_RF-11
SQUARE D (FAL)
F: 100_100-RF-11
(1) #12 THWN; 30 ft
VFD: 100_RF-11
MTR: 100_RF-11
2 @ 5.0 HP
MCP: 100_RF-21
SQUARE D (FAL)
F: 100_RF-21
(1) #10 THWN; 60 ft
VFD: 100_RF-21
MTR: 100_RF-21
2 @ 1.5 HP
MCP: 100_Pump PR-21
SQUARE D (FAL)
F: 100_Pump PR-21
(1) #12 THWN; 60 ft
MTR: 100_Pump PR-21
1 @ 0.5 HP
MCP: 100_SF-11
SQUARE D (FAL)
F: 100_100-SF-11
(1) #6 THWN; 30 ft
VFD: 100_SF-11
MTR: 100_SF-11
2 @ 10.0 HP
MCP: 100_SF-21
SQUARE D (FAL)
F: 100_SF-21
(1) #6 THWN; 60 ft
VFD: 100_SF-21
MTR: 100_SF-21
4 @ 7.5 HP
MCC: 100_MCC-N-2-L-17
480V, 600A
7.3K SCA
25K SCAR
MCP: 100_EF-11
SQUARE D (FAL)
F: 100_100-EF-11
(1) #12 THWN; 30 ft
MTR: 100_EF-11
1 @ 5.0 HP
MCC: 100_MCC-N-1-L-17
480V, 600A
7.7K SCA
25K SCAR
F: 100_Disc FU ERC-11
(1) #10 THWN; 15 ft
DISC: 100_FU ERC-11
480V, 5.4K SCA
FU: 100_ERC-11
BUSSMANN (FRS-R)
30 A
F: 100_Disc CB ERC-11
(1) #10 THWN; 50 ft
DISC: 100_CB ERC-11
480V, 2.6K SCA
CB: 100_ERC-11
SQUARE D (FA)
15 A
F: 100_VFD ERC-11
(1) #12 THWN; 5 ft
VFD: 100_ERC-11
F: 100_ERC-11
(1) #12 THWN; 35 ft
MTR: 100_ERC-11
1 @ 1.5 HP
MCP: 100_SF-B15
SQUARE D (FAL)
MCP: 100_RF-B11
SQUARE D (FAL)
F: 100_100-RF-B11
(1) #10 THWN; 50 ft
VFD: 100_RF-B11
MTR: 100_RF-B11
4 @ 2.0 HP
MCP: 100_SF-B11
SQUARE D (KAL)
F: 100_100-SF-B11
(1) #1/0 THWN; 50 ft
VFD: 100_SF-B11
MTR: 100_SF-B11
6 @ 10.0 HP
MCC: 100_MCC-N-B1-D-18
480V, 600A
16.6K SCA
25K SCAR
MCP: 100_PR-B11
SQUARE D (FAL)
CONTINUE TO ATS:
100_LSS2-2
(SEE SHEET 100ED610)
CONTINUE TO ATS:
100_CE-S2-1
(SEE SHEET 100ED609)
CONTINUE TO ATS:
100_DES2-3
(SEE SHEET 100ED609)
CONTINUE TO BD:
100_S2 N1
(SEE SHEET 100ED605)
SPACESPACESPACESPACESPACE
GENERAL NOTES
BUILDING 100 - ONE LINE DIAGRAM (SUB USS2)
EXISTING OVERCURRENT PROTECTIVE DEVICE SETTINGS
TO BE REVISED.
EXISTING OVERCURRENT PROTECTIVE DEVICE TO BE
REMOVED AND REPLACED.
SPACE TO BE UTILIZED.
EXISTING TAP LOCATED WITHIN TRANSFORMER TO BE
DEMOLISHED.
EXISTING TAP LOCATED WITHIN TRANSFORMER SHALL BE
DEMOLISHED. EXISTING PANEL "1L1-M-17" FEEDER TO BE
MODIFIED.
EXISTING PANEL TO BE DEMOLISHED AND REPLACED.
EXISTING FEEDER AND BRANCH CIRCUITS TO BE REUSED
AND EXTENDED TO REPLACEMENT PANEL AS REQUIRED.
EXISTING TAP LOCATED WITHIN TRANSFORMER SHALL BE
DEMOLISHED. EXISTING FEEDERS TERMINATING TO
PANELS "2L2-M-17" AND "2L1-M-17" TO BE MODIFIED.
EXISTING TAP LOCATED WITHIN TRANSFORMER AND
PANEL FEEDERS SHALL BE DEMOLISHED, AS INDICATED.
EXISTING PANEL TO BE DEMOLISHED AND REPLACED.
EXISTING BRANCH CIRCUITS TO BE REUSED AND
EXTENDED TO REPLACEMENT PANEL AS REQUIRED.
221111
1 1
BLDG 100 - EXISTING ONE-LINE
DIAGRAM (PART 6 OF 21)
2 2 2 22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
KEY NOTES
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
2. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS,
TEMPORARY POWER PLANS, AND PHASING PLANS FOR
VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO
COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED
FOR REVIEW 30-DAYS PRIOR TO IMPLEMENTATION.
REFERENCE SPECIFICATION 01 00 00 FOR
COORDINATION OF ALL SHUTDOWNS.
3. FOR ALL OVERCURRENT PROTECTION DEVICE
REPLACEMENT WORK, REFERENCE ASSOCIATED
BUILDING SCHEDULE "OVER-CURRENT PROTECTIVE
DEVICE (OCPD) REPLACEMENT SCHEDULE" FOR
ADDITIONAL INFORMATION.
4. FOR ALL OVERCURRENT PROTECTION DEVICE
ADJUSTMENT WORK, REFERENCE ASSOCIATED
BUILDING SCHEDULE "OVERCURRENT PROTECTIVE
DEVICE (OCPD) SETTING ADJUSTMENT SCHEDULE" FOR
ADDITIONAL INFORMATION.
5. FOR ALL POWER DISTRIBUTION EQUIPMENT
REPLACEMENT OR ADDITION WORK, REFERENCE
ASSOCIATED BUILDING SCHEDULE "POWER
DISTRIBUTION EQUIPMENT SCHEDULE" FOR
ADDITIONAL INFORMATION.
6. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAIN CIRCUITS
IMPACTED BY THIS PROJECT.
8. REFERENCE REVISED ONE-LINE DIAGRAM ON SHEET
100EP605 FOR ALL MODIFICATIONS.
100ED606
SCALE : NTS
1 BLDG 100 - EXISTING ONE-LINE DIAGRAM (PART 6 OF 21)
100EP606
100_LS-S2-2 100_DE-S2-3
CONTINUE TO SWBD:
100_B1SDN-E-17
(SEE SHEET 100EP606)
F: 100_NORMAL RISER BAY 3
(3) #300 THWN; 150 ft
BD: 100_S2 N1 B3
480V, 800A
26.1K SCA
85K SCAR
FU: 100_T-42
BUSSMANN (FRS-R)
200 A
F: 100_XFMR T-42
(1) #4/0 THWN; 25 ft
XF: 100_T-42
150KVA; 5.10%Z
PRI: 480V
SEC: 208V
F: 100_SWBD 1SDN-D-17
(2) #350 THWN; 10 ft
FU: 100_1H1-D-17
BUSSMANN (FRS-R)
200 A
F: 100_1H1-D-17
(1) #4/0 THWN; 55 ft
F: 100_BD S2 N2 B3
(1) #800 CLASS B; 25 ft
CB: 100_DUST COLLECTOR a
SQUARE D (EH)
20 A
CB: 100_OVEN
SQUARE D (EH)
20 A
CB: 100_DUST COLLECTOR
SQUARE D (EH)
20 A
CB: 100_AIR
COMPRESSOR
SQUARE D (EH)
30 A
PNL: 100_1H1-D-17
480V, 225A
18.9K SCA
14K SCAR
CB: 100_1L1-B-12
SQUARE D (FA)
100 A
F: 100_1L1-B-12
(1) #1 THWN; 100 ft
CB: 100_1L1-D-17 SEC 2
SQUARE D (FA)
100 A
F: 100_1L1-D-17 SEC 2
(1) #1 THWN; 50 ft
CB: 100_1L2-D-17 SEC 1
SQUARE D (Q2)
175 A
F: 100_1L2-D-17 SEC 1
(1) #2/0 THWN; 50 ft
CB: 100_1L2-D-17 SEC 2
SQUARE D (FA)
F: 100_1L2-D-17 SEC 2
(1) #6 THWN; 50 ft
Open CB: 100_1L3-D-17
SQUARE D (Q2)
225 A
F: 100_1L3-D-17
(1) #2/0 THWN; 50 ft
PNL: 100_1L3-D-17
208V, 225A
200K SCAR
CB: 100_1L1-D-17 SEC 1
SQUARE D (Q2)
175 A
F: 100_1L1-D-17 SEC 1
(1) #2/0 THWN; 50 ft
PNL: 100_1L1-D-17
SEC1
208V, 225A
5.5K SCA
65K SCAR
SWBD: 100_1SDN-D-17
208V, 600A
6.9K SCA
50K SCAR
FU: 100_T-43
BUSSMANN (FRS-R)
175 A
F: 100_XFMR T-43
(1) #2/0 THWN; 60 ft
P XF: 100_T-43
113KVA; 6.20%Z
PRI: 480V
SEC: 208V
F: 100_SWBD 2SDN-D-17
(1) #500 THWN; 20 ft
FU: 100_2H1-D-17
BUSSMANN (FRS-R)
200 A
F: 100_2H1-D-17
(1) #3/0 THWN; 60 ft
PNL: 100_2H1-D-17
480V, 225A
17.1K SCA
14K SCAR
CB: 100_XFMR T-137
SQUARE D (EH)
100 A
F: 100_XFMR T-137
(1) #2 THWN; 30 ft
XF: 100_T-137
75KVA; 5.80%Z
PRI: 480V
SEC: 208V
F: 100_PNL 2L3-D-17
(1) #4/0 THWN; 10 ft
PNL: 100_2L3-D-17
208V, 225A
3.2K SCA
200K SCAR
BD: 100_S2 N2 B3
480V, 800A
25.0K SCA
85K SCAR
F: 100_BD S2-N3-B3
(1) #800 CLASS B; 25 ft
FU: 100_3H1-D-17
BUSSMANN (FRS-R)
100 A
F: 100_3H1-D-17
(1) #2 THWN; 50 ft
PNL: 100_3HI-D-17
480V, 100A
13.8K SCA
14K SCAR
CB: 100_XFMR T-45
SQUARE D (EH)
30 A
F: 100_XFMR T-45
(1) #10 THWN; 20 ft
XF: 100_T-45
15KVA; 5.10%Z
PRI: 480V
SEC: 208V
F: 100_PNL 3L1-D-17
(1) #6 THWN; 30 ft
CB: 100_3L1-D-17 Main
SQUARE D (Q1(B)-VH (OBS.))
50 A
PNL: 100_3L1-D-17
208V, 50A
0.7K SCA
65K SCAR
BC: 100_S2-N3-B3
480V, 800A
24.1K SCA
85K SCAR
F: 100_BD S2-N4-B3
(1) #800 CLASS B; 25 ft
FU: 100_T-51
BUSSMANN (FRS-R)
125 A
F: 100_XFMR T-51
(1) #1 THWN; 50 ft
XF: 100_T-51
113KVA; 4.60%Z
PRI: 480V
SEC: 208V
F: 100_PNL 3L2-D-17
(1) #250 THWN; 30 ft
CB: 100_3L2-D-17 Main
SQUARE D (KA)
225 A
CB: 100_Laser Recp.Rm 3c 143
SQUARE D (Q1(B)-VH (OBS.))
50 A
CB: 100_Laser Recp.Rm 3c 134
SQUARE D (Q1(B)-VH (OBS.))
50 A
CB: 100_Laser Recp.Rm 3c 135
SQUARE D (QO)
50 A
PNL: 100_3L2-D-17
208V, 225A
5.3K SCA
65K SCAR
FU: 100_4H1-D-17
BUSSMANN (FRS-R)
70 A
F: 100_4H1-D-17
(1) #2 THWN; 60 ft
PNL: 100_4H1-D-17
480V, 100A
12.3K SCA
14K SCAR
CB: 100_XFMR T-47
SQUARE D (EH)
30 A
F: 100_XFMR T-47
(1) #12 THWN; 60 ft
XF: 100_T-47
15KVA; 5.10%Z
PRI: 480V
SEC: 208V
F: 100_Pnl 4L1-D-17
(1) #6 THWN; 60 ft
CB: 100_4L1-D-17 Main
SQUARE D (Q1(B)-VH (OBS.))
50 A
PNL: 100_4L1-D-17
208V, 50A
0.7K SCA
65K SCAR
FU: 100_T-49
BUSSMANN (FRS-R)
125 A
F: 100_XFMR T-49
(1) #1 THWN; 120 ft
XF: 100_T-49
75KVA; 4.90%Z
PRI: 480V
SEC: 208V
BD: 100_S2-N4-B3
480V, 800A
23.2K SCA
85K SCAR
PNL: 100_5L1-D-17
208V, 225A
3.5K SCA
65K SCAR
F: 100_PNL 5L1-D-17
(1) #250 THWN; 20 ft
CB: 100_5L1-D-17 Main
SQUARE D (KA)
225 A
TAP: 100_XF T-49 SEC
208V, 3.6K SCA
F: 100_PNL 5L2-D-17
(1) #2 THWN; 20 ft
CB: 100_5L2-D-17 Main
SQUARE D (Q2)
125 A
PNL: 100_5L2-D-17
208V, 225A
3.4K SCA
65K SCAR
SWBD: 100_2SDN-D-17
208V, 400A
4.3K SCA
50K SCAR
CB: 100_2L1-D-17 SEC 2
SQUARE D (FA)
100 A
F: 100_2L1-D-17 SEC 2
(1) #1 THWN; 60 ft
CB: 100_2L1-D-17 SEC 2 Main
SQUARE D (KA)
100 A
PNL: 100_2L1-D-17 SEC 2
208V, 100A
3.4K SCA
65K SCAR
CB: 100_2L1-D-17 SEC 1
SQUARE D (Q2)
150 A
F: 100_2L1-D-17 SEC 1
(1) #1/0 THWN; 60 ft
CB: 100_2L1-D-17 SEC 1 MAIN
SQUARE D (KA)
150 A
PNL: 100_2L1-D-17 SEC 1
208V, 150A
3.5K SCA
65K SCAR
CB: 100_2L2-D-17 SEC 2
SQUARE D (Q2)
150 A
F: 100_2L2-D-17 SEC 2
(1) #1/0 THWN; 60 ft
CB: 100_2L2-D-17 SEC 1
SQUARE D (FA)
100 A
F: 100_2L2-D-17 SEC 1
(1) #1 THWN; 60 ft
CB: 100_2L2-D-17 SEC 1 Main
SQUARE D (Q1(B)-VH (OBS.))
100 A
PNL: 100_2L2-D-17 SEC 1
208V, 100A
3.4K SCA
65K SCAR
PNL: 100_2L2-D-17 SEC 2
208V, 225A
3.5K SCA
65K SCAR
CB: 100_WASHER 2C-118b
SQUARE D (QO)
20 A
CB: 100_BANDSAW 2C-154
SQUARE D (QO)
40 A
CB: 100_ORTHO DRILL PRESS
SQUARE D (QO)
20 A
PNL: 100_1L2-D-17 SEC 2
208V, 225A
3.3K SCA
65K SCAR
CB: 100_NETMUX 2C-154
SQUARE D (QO)
20 A
CB: 100_SEWING MACH
SQUARE D (QO)
20 A
CB: 100_BUFFER
SQUARE D (QO)
20 A
PNL: 100_1L2-D-17 SEC 1
208V, 225A
5.5K SCA
65K SCAR
CB: 100_ORTHO SHOE FINISH
SQUARE D (QO)
20 A
PNL: 100_1L1-D-17 SEC 2
208V, 225A
5.1K SCA
65K SCAR
CB: 100_Drill Press_a
SQUARE D (QO-VH)
20 A
PNL: 100_1L1-B-12
208V, 100A
3.9K SCA
10K SCAR
CB: 100_DRILL PRESS
SQUARE D (QO)
20 A
CB: 100_ORTHO BAND SAW
SQUARE D (QO)
20 A
CB: 100_DRILL
SQUARE D (QO)
20 A
CB: 100_SHOE FINISHER
SQUARE D (QO)
20 A
CB: 100_SEWING MACH.
SQUARE D (QO)
20 A
CB: 100_ORTHO LAB GRINDER
SQUARE D (QO)
20 A
CB: 100_SEWING MACHINE
SQUARE D (QO)
20 A
CB: 100_SHOE STITCHER
SQUARE D (QO)
20 A
CB: 100_SPARE IN REHAB
SQUARE D (QO)
20 A
CB: 100_Sewing Machine_a
SQUARE D (QO-VH)
20 A
CB: 100_Shoe Sander
SQUARE D (QO-VH)
20 A
CB: 100_Disc Sander
SQUARE D (QO-VH)
20 A
CB: 100_Delta Grinder
SQUARE D (QO-VH)
20 A
CB: 100_Shoe Sander_a
SQUARE D (QO-VH)
20 A
400A /3P
CB: 100_SWBD 2SDN-D-17 MAIN
THERMAL CURVE = 400A (FIXED)
LONG TIME PICK UP = 1.0 (400A)
LONG TIME DELAY = 8 SEC
INSTANTANEOUS = 8.0 (3200A)
DPM
GENERAL NOTES
KEY NOTES
BUILDING 100 - ONE LINE DIAGRAM (BUSDUCT RISER N1 BAY3)
BLDG 100 - REVISED ONE-LINE
DIAGRAM (PART 7 OF 21)
PROVIDE FIELD MODIFICATIONS AS REQUIRED TO
REPLACE INCOMING LUGS AND ANALOG METERING WITH
MAIN CIRCUIT BREAKER AND INTEGRAL POWER METER
(SE 8244), RESPECTIVELY. MODIFIED EQUIPMENT SHALL
BE RE-CERTIFIED BY UL FIELD ENGINEERS AS REQUIRED.
COORDINATE SHUTDOWN AND RE-CERTIFICATION WITH
VA. EXTEND EXISTING FEEDER "F:100_SWBD 2SDN-D-17"
AS REQUIRED. REFERENCE DETAIL '5' ON SHEET E-502
FOR ADDITIONAL INFORMATION.
PROVIDE PANELBOARD AS SHOWN. EXISTING INCOMING
FEEDER AND BRACH CIRCUITS SHALL BE EXTENDED AS
REQUIRED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
2. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS,
TEMPORARY POWER PLANS, AND PHASING PLANS FOR
VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO
COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED
FOR REVIEW 30-DAYS PRIOR TO IMPLEMENTATION.
REFERENCE SPECIFICATION 01 00 00 FOR
COORDINATION OF ALL SHUTDOWNS.
3. FOR ALL OVERCURRENT PROTECTION DEVICE
REPLACEMENT WORK, REFERENCE ASSOCIATED
BUILDING SCHEDULE "OVER-CURRENT PROTECTIVE
DEVICE (OCPD) REPLACEMENT SCHEDULE" FOR
ADDITIONAL INFORMATION.
4. FOR ALL OVERCURRENT PROTECTION DEVICE
ADJUSTMENT WORK, REFERENCE ASSOCIATED
BUILDING SCHEDULE "OVERCURRENT PROTECTIVE
DEVICE (OCPD) SETTING ADJUSTMENT SCHEDULE" FOR
ADDITIONAL INFORMATION.
5. FOR ALL POWER DISTRIBUTION EQUIPMENT
REPLACEMENT OR ADDITION WORK, REFERENCE
ASSOCIATED BUILDING SCHEDULE "POWER
DISTRIBUTION EQUIPMENT SCHEDULE" FOR
ADDITIONAL INFORMATION.
6. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAIN CIRCUITS
IMPACTED BY THIS PROJECT.
8. REFERENCE EXISTING ONE-LINE DIAGRAM ON SHEET
100ED606 FOR ALL MODIFICATIONS.
100EP607
SCALE : NTS
1 BLDG 100 - REVISED ONE-LINE DIAGRAM (PART 7 OF 21)
CONTINUE TO SWBD:
100_B1SDN-E-17
(SEE SHEET 100ED606)
F: 100_NORMAL RISER BAY 3
(3) #300 THWN; 150 ft
BD: 100_S2 N1 B3
480V, 800A
26.1K SCA
85K SCAR
FU: 100_T-42
BUSSMANN (FRS-R)
200 A
F: 100_XFMR T-42
(1) #4/0 THWN; 25 ft
XF: 100_T-42
150KVA; 5.10%Z
PRI: 480V
SEC: 208V
F: 100_SWBD 1SDN-D-17
(2) #350 THWN; 10 ft
FU: 100_1H1-D-17
BUSSMANN (FRS-R)
200 A
F: 100_1H1-D-17
(1) #4/0 THWN; 55 ft
F: 100_BD S2 N2 B3
(1) #800 CLASS B; 25 ft
CB: 100_DUST COLLECTOR a
SQUARE D (EH)
20 A
CB: 100_OVEN
SQUARE D (EH)
20 A
CB: 100_DUST COLLECTOR
SQUARE D (EH)
20 A
CB: 100_AIR
COMPRESSOR
SQUARE D (EH)
30 A
PNL: 100_1H1-D-17
480V, 225A
18.9K SCA
14K SCAR
CB: 100_1L1-B-12
SQUARE D (FA)
100 A
F: 100_1L1-B-12
(1) #1 THWN; 100 ft
CB: 100_1L1-D-17 SEC 2
SQUARE D (FA)
100 A
F: 100_1L1-D-17 SEC 2
(1) #1 THWN; 50 ft
CB: 100_1L2-D-17 SEC 1
SQUARE D (Q2)
175 A
F: 100_1L2-D-17 SEC 1
(1) #2/0 THWN; 50 ft
CB: 100_1L2-D-17 SEC 2
SQUARE D (FA)
F: 100_1L2-D-17 SEC 2
(1) #6 THWN; 50 ft
Open CB: 100_1L3-D-17
SQUARE D (Q2)
225 A
F: 100_1L3-D-17
(1) #2/0 THWN; 50 ft
PNL: 100_1L3-D-17
208V, 225A
200K SCAR
CB: 100_1L1-D-17 SEC 1
SQUARE D (Q2)
175 A
F: 100_1L1-D-17 SEC 1
(1) #2/0 THWN; 50 ft
PNL: 100_1L1-D-17
SEC1
208V, 225A
5.5K SCA
65K SCAR
SWBD: 100_1SDN-D-17
208V, 600A
6.9K SCA
50K SCAR
FU: 100_T-43
BUSSMANN (FRS-R)
175 A
F: 100_XFMR T-43
(1) #2/0 THWN; 60 ft
P XF: 100_T-43
112.5KVA; 6.20%Z
PRI: 480V
SEC: 208V
F: 100_SWBD 2SDN-D-17
#500…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .