Attachment 11-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 9.pdf
PDF 8 MB Posted
- Solicitation number
- 36C26025R0071
About this file
These electrical schedule documents are part of a facilities condition assessment (FCA) project for the VA Portland Health Care System, specifically addressing electrical deficiencies across multiple buildings (Buildings 100-105). The documents detail comprehensive electrical infrastructure schedules including conduit and wire routing, luminaire specifications, over-current protective device (OCPD) replacement schedules, and branch panel configurations.
The technical drawings, prepared by Spees Design Build and dated 01/31/2025, provide detailed electrical system specifications for each building, including voltage ratings, circuit breaker configurations, power distribution panel layouts, and specific routing information for various electrical components such as cooling tower variable frequency drives (VFDs), pumps, transformers, and networking equipment. The documents are part of construction documents for a fully sprinklered facility, with precise technical specifications for electrical infrastructure upgrades and corrections across the VA medical center campus.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
KEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
BLDG 100 - ELECTRICAL
SCHEDULES
100EP710
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
BLDG 101 - ELECTRICAL
SCHEDULES
101EP701
FROM TO QTY SIZE (QTY) & SIZE
GROUND
SIZE
101-P-01A ATS "ATS-LS-101-1" STATUS ATS "ATS-LS-101-1" DPM "PME-LS-101-1" 1 1" MFRS CABLE 12 AWG - - - 101-P-01B ATS "ATS-LS-101-1" STATUS DPM "PME-LS-101-1" LOCAL METERING SYSTEM PANEL 1 1" MFRS CABLE 12 AWG - - - 101-P-02 PNL: 101_2H1-F.1-19 SEC 1 PNL "2H1-F.1-19 BUSWAY SWITCH PNL: 101_2H1-F.1-19 SEC 1 1 2-1/2" (3) 4/0 AWG 6 AWG - - -
101-C-01A ATS "ATS-LS-101-1" STATUS ATS "ATS-LS-101-1" DPM "PME-LS-101-1" 1 1-1/4" (2) CAT6A 12 AWG - - - 101-C-01B ATS "ATS-LS-101-1" STATUS DPM "PME-LS-101-1" LOCAL METERING SYSTEM PANEL 1 1-1/4" (2) CAT6A 12 AWG - - - 101-C-02 UNIT SUBSTATION "US101" NETWORK SWITCH (ROOM 702) UNIT SUBSTATION "US101" NETWORK SWITCH (ROOM 702) PME SERVER CABINET (RM 702) 1 3/4" (1) CAT6A 12 AWG - -
2. REFER TO VENDOR DRAWINGS FOR ADDITIONAL REQUIREMENTS.
BLDG 101 - CONDUIT AND WIRE SCHEDULE - PORTLAND VA FCA DEFICIENCIES
CONDUIT
TAG
SERVICE
ROUTING CONDUIT CONDUCTORS
VOLTAGE
DROP
FAULT
CURRENT
NOTES
ABBREVIATIONS
EX - EXISTING, NEG - NEGLIGIBLE
NOTE(S):
1. VENDOR PROVIDED CONDUCTORS IN CONTRACTOR PROVIDED CONDUIT. CONDUCTORS TO BE INSTALLED BY VENDOR. CONTRACTOR TO PROVIDE PULL STRINGS IN EACH CONDUIT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
BLDG 102 - ELECTRICAL
102EP701
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
BLDG 103 - ELECTRICAL
103EP701
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
BLDG 103 - ELECTRICAL
103EP702
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
BLDG 104 - ELECTRICAL
SCHEDULES
104EP701
FROM TO QTY SIZE (QTY) & SIZE
GROUND
SIZE
104-P-01 TRANSFORMER "104_T-150" PANELBOARD "104_B1H" TRANSFORMER "104_T-150" 1 2-1/2" (3) 4/0 AWG 8 AWG 0.87 < 15000 -
3. EXISTING CONDUIT AND WIRE TO BE EXTENEDED AS NEEDED.
BLDG 104 - CONDUIT AND WIRE SCHEDULE - PORTLAND VA FCA DEFICIENCIES
CONDUIT
TAG
SERVICE
ROUTING CONDUIT CONDUCTORS
VOLTAGE
DROP
FAULT
CURRENT
(A)
NOTES
ABBREVIATIONS
EX - EXISTING, NEG - NEGLIGIBLE
NOTE(S):
1. VENDOR PROVIDED CONDUCTORS IN CONTRACTOR PROVIDED CONDUIT. CONDUCTORS TO BE INSTALLED BY VENDOR. CONTRACTOR TO PROVIDE PULL STRINGS IN EACH CONDUIT.
2. REFER TO VENDOR DRAWINGS FOR ADDITIONAL REQUIREMENTS.
FROM TO QTY SIZE (QTY) & SIZE
GROUND
SIZE
104-P-01 TRANSFORMER "104_T-150" PANELBOARD "104_B1H" TRANSFORMER "104_T-150" 1 2-1/2" (3) 4/0 AWG 8 AWG 0.87 < 15000 -
3. EXISTING CONDUIT AND WIRE TO BE EXTENEDED AS NEEDED.
BLDG 104 - CONDUIT AND WIRE SCHEDULE - PORTLAND VA FCA DEFICIENCIES
CONDUIT
TAG
SERVICE
ROUTING CONDUIT CONDUCTORS
VOLTAGE
DROP
FAULT
CURRENT
(A)
NOTES
ABBREVIATIONS
EX - EXISTING, NEG - NEGLIGIBLE
NOTE(S):
1. VENDOR PROVIDED CONDUCTORS IN CONTRACTOR PROVIDED CONDUIT. CONDUCTORS TO BE INSTALLED BY VENDOR. CONTRACTOR TO PROVIDE PULL STRINGS IN EACH CONDUIT.
2. REFER TO VENDOR DRAWINGS FOR ADDITIONAL REQUIREMENTS.
BLDG 105 - ELECTRICAL
SCHEDULES 105
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED 105EP701
FROM TO QTY SIZE (QTY) & SIZE
GROUND
SIZE
105-P-01 PANELBOARD "P-105A" SWITCHBOARD "100_SUB USCP" (VIA JUNCTION BOX "JB-MER") PANELBOARD "P-105" 2 3" (3) 500KCMIL 1 AWG 1.69% 17,060 105-P-02A COOLING TOWER #1 PANELBOARD "P-105" COOLING TOWER #1 VFD 1 1-1/2" (3) 1 AWG 6 AWG 1.78% 15,626 105-P-02B COOLING TOWER #1 COOLING TOWER #1 VFD COOLING TOWER #1 DISCONNECT 1 1-1/2" (3) 1 AWG 6 AWG 2.17% 10,897 105-P-03A COOLING TOWER #2 PANELBOARD "P-105" COOLING TOWER #2 VFD 1 1-1/2" (3) 1 AWG 6 AWG 1.78% 15,626 105-P-03B COOLING TOWER #2 COOLING TOWER #2 VFD COOLING TOWER #2 DISCONNECT 1 1-1/2" (3) 1 AWG 6 AWG 2.38% 9,230 105-P-04A COOLING TOWER #3 PANELBOARD "P-105" COOLING TOWER #3 VFD 1 1-1/2" (3) 1 AWG 6 AWG 1.78% 15,626 105-P-04B COOLING TOWER #3 COOLING TOWER #3 VFD COOLING TOWER #3 DISCONNECT 1 1-1/2" (3) 1 AWG 6 AWG 2.65% 7,665 105-P-05A PANELBOARD "105A" PANELBOARD "P-105" TRANSFORMER "TX-105A" 1 3/4" (3) 10 AWG 10 AWG 1.73% 11,790 105-P-05B PANELBOARD "105A" TRANSFORMER "TX-105A" PANELBOARD "105A" 1 1" (3) 6 AWG 10 AWG 0.09% 1,282 105-P-06A MOTOR PUMP "P-9" PANELBOARD "P-105" PUMP P-9 VFD 1 1-1/2" (3) 1 AWG 6 AWG 1.78% 15,627 105-P-06B MOTOR PUMP "P-9" PUMP P-9 VFD MOTOR PUMP "P-9" 1 1-1/2" (3) 1 AWG 6 AWG 2.29% 9,886 105-P-07A MOTOR PUMP "P-10" PANELBOARD "P-105" PUMP P-10 VFD 1 1-1/2" (3) 1 AWG 6 AWG 1.78% 15,627 105-P-07B MOTOR PUMP "P-10" PUMP P-10 VFD MOTOR PUMP "P-10" 1 1-1/2" (3) 1 AWG 6 AWG 2.32% 9,659 105-P-08A MOTOR PUMP "P-11" PANELBOARD "P-105" PUMP P-11 VFD 1 1-1/2" (3) 1 AWG 6 AWG 1.78% 16,387 105-P-08B MOTOR PUMP "P-11" PUMP P-11 VFD MOTOR PUMP "P-11" 1 1-1/2" (3) 1 AWG 6 AWG 2.35% 9,440 105-P-09 HVAC UNIT "105-ER-HV-01" PANELBOARD "P-105" HVAC UNIT "105-ER-HV-01" 1 3/4" (3) 10 AWG 10 AWG 1.83% 9,834 105-P-10 HVAC UNIT THERMOMETER BARD HVAC UNIT HVAC UNIT THERMOMETER 1 3/4" (3) 10 AWG 10 AWG - - 1 105-P-11 EMERGENCY POWER OFF ENCLOSURE PANELBOARD "P-105" EMERGENCY POWER OFF ENCLOSURE 1 3/4" (6) 14 AWG 14 AWG - - 105-P-12 VEHICLE VACUUM PANELBOARD "105A" VEHICLE VACUUM 1 1" (3) 12 AWG 12 AWG - -
105-C-01 COOLING TOWER #1 VFD STATUS DDC PANEL "ELECTRICAL ROOM" COOLING TOWER #1 VFD 1 1" (1) CAT6A 12 AWG - - 105-C-02 COOLING TOWER #2 VFD STATUS DDC PANEL "ELECTRICAL ROOM" COOLING TOWER #2 VFD 1 1" (1) CAT6A 12 AWG - - 105-C-03 COOLING TOWER #3 VFD STATUS DDC PANEL "ELECTRICAL ROOM" COOLING TOWER #3 VFD 1 1" (1) CAT6A 12 AWG - - 105-C-04 PUMP P-9 VFD STATUS DDC PANEL "ELECTRICAL ROOM" PUMP P-9 VFD 1 1" (1) CAT6A 12 AWG - - 105-C-05 PUMP P-10 VFD STATUS DDC PANEL "ELECTRICAL ROOM" PUMP P-10 VFD 1 1" (1) CAT6A 12 AWG - - 105-C-06 PUMP P-11 VFD STATUS DDC PANEL "ELECTRICAL ROOM" PUMP P-11 VFD 1 1" (1) CAT6A 12 AWG - -
105-S-01 DDC PANEL "ELECTRICAL ROOM" JUNCTION BOX "JB-DDC" DDC PANEL "ELECTRICAL ROOM" 1 1" (1) 6-STR FO CABLE - - - 2
105-FA-01 TYPICAL FIELD DEVICE AS SHOWN ON PLANS AS SHOWN ON PLANS 1 EX (4) 16 STP 12 AWG - - 105-FA-02 TYPICAL FIELD DEVICE AS SHOWN ON PLANS AS SHOWN ON PLANS 1 1" (2) 16 STP 12 AWG - - 105-FA-03 TYPICAL FIELD DEVICE AS SHOWN ON PLANS AS SHOWN ON PLANS 1 1" (1) 16 STP 12 AWG - -
2. SPLICE FIBER OPTIC CABLE AS REQUIRED. COORDINATE WITH VA FOR EXACT REQUIREMENTS.
NOTE(S):
1. REFER TO VENDOR DRAWINGS FOR ADDITIONAL REQUIREMENTS.
BLDG 105 - CONDUIT AND WIRE SCHEDULE - PORTLAND VA FCA DEFICIENCIES
CONDUIT
TAG
SERVICE
ROUTING CONDUIT CONDUCTORS
NOTES
VOLTAGE
DROP
FAULT
CURRENT
(A)
ABBREVIATIONS
EX - EXISTING, NEG - NEGLIGIBLE
BLDG 105 - ELECTRICAL
SCHEDULES 105
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED 105EP702
Location: ELECTRICAL BUILDING 105 Volts: 480/277 A.I.C Rating: 65k
Supply From: SWBD 100_SUB USCP Phases: 3 Bus Rating: 600A
Mounting: Surface Wires 4 Main Circuit Breaker: 600A
Enclosure: Type 1
CKT Trip Poles Poles Trip CKT 1 125A 3 18333 18333 3 125A 2
3 " " 18333 18333 " " 4
5 " " 18333 18333 " " 6
7 125A 3 18333 660 3 30A 8
9 " " 18333 300 " " 10
11 " " 18333 560 " " 12
13 125A 3 18333 18333 3 125A 14
15 " " 18333 18333 " " 16
17 " " 18333 18333 " " 18
19 " " 0 0 " " 20
21 125A 3 18333 0 3 - 22
23 " " 18333 0 " " 24
25 " " 18333 0 " " 26
27 " " 0 0 1 - 28
29 30A 3 4253 0 1 - 30
31 " " 4253 100 3 70A 32
33 " " 4253 100 " " 34
35 - 3 0 100 " " 36
37 " " 0 100 3 20A 38
39 " " 0 100 " " 40
41 - 1 0 100 " " 42
Total Load:
Total Amps:
LOAD TYPE
Largest Motor 55000 125.00% 344878 VA Other 2120 100.00% 358628 VA Receptacle 100.00% 415 A Lighting 125.00% 431 A All other Motor 287758 100.00%
Notes:
1. 3-POLE BREAKER TO UTILIZE (4) SPACES.
287758
PANELBOARD "105A"
PUMP P-10 (NOTE 1)
2120 Total Est. Power Demand:
0 Total Conn. Amperage:
0 Total Est. Amperage Demand:
DPM
SPACE
68750 Total Conn. Power Load:
115113 114753 115013 959 956 958
Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals
COOLING TOWER #2
SPACE "
COOLING TOWER #3
PUMP P-9 (NOTE 1)
SPACE
SPD
SPACE
Branch Panel: P-105
VA PER PHASE
CIRCUIT DESCRIPTION A B C
PUMP P-11 (NOTE 1)
BARD HVAC UNIT "105-ER-HV-01"
SPACE
CIRCUIT DESCRIPTION
COOLING TOWER #1