Attachment 11-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 9.pdf

PDF 8 MB Posted

Attached to
Z2DA--CON-NRM 648-20-119 Correct Electrical FCA Deficiencies (Portland)
Solicitation number
36C26025R0071
Issued by

About this file

These electrical schedule documents are part of a facilities condition assessment (FCA) project for the VA Portland Health Care System, specifically addressing electrical deficiencies across multiple buildings (Buildings 100-105). The documents detail comprehensive electrical infrastructure schedules including conduit and wire routing, luminaire specifications, over-current protective device (OCPD) replacement schedules, and branch panel configurations.

The technical drawings, prepared by Spees Design Build and dated 01/31/2025, provide detailed electrical system specifications for each building, including voltage ratings, circuit breaker configurations, power distribution panel layouts, and specific routing information for various electrical components such as cooling tower variable frequency drives (VFDs), pumps, transformers, and networking equipment. The documents are part of construction documents for a fully sprinklered facility, with precise technical specifications for electrical infrastructure upgrades and corrections across the VA medical center campus.

View the file

Other files

File Type Posted
36C26025R0071 0005.docx DOCX document
36C26025R0071 0004.docx DOCX document
F-103-1-TJC-Fire Life Safety - Bldg.103-1.pdf PDF
36C26025R0071 0003.pdf PDF
F-104-2-TJC-Fire Life Safety - Bldg.104-2.pdf PDF
F-104-P2-TJC-Fire Life Safety - Bldg.104-P2.pdf PDF
F-104-R-TJC-Fire Life Safety - Bldg.104-R.pdf PDF
36C26025R0071 0002.docx DOCX document
F-104-1-TJC-Fire Life Safety - Bldg.104-1.pdf PDF
F-104-P3-TJC-Fire Life Safety - Bldg.104-P3.pdf PDF
F-16-2-TJC-Fire Life Safety - Bldg.16-2.pdf PDF
F-6-2-TJC-Fire Life Safety - Bldg.6-2.pdf PDF
F-103-P3-TJC-Fire Life Safety - Bldg.103-P3.pdf PDF
F-103-P5-TJC-Fire Life Safety - Bldg.103-P5.pdf PDF
F-103-R-TJC-Fire Life Safety - Bldg.103-R.pdf PDF
F-6-3-TJC-Fire Life Safety - Bldg.6-3.pdf PDF
F-103-P4-TJC-Fire Life Safety - Bldg.103-P4.pdf PDF
F-16-B-TJC-Fire Life Safety - Bldg.16-B.pdf PDF
F-103-P2-TJC-Fire Life Safety - Bldg.103-P2.pdf PDF
36C26025R0071 0001.pdf PDF
F-16-R-TJC-Fire Life Safety - Bldg.16-R.pdf PDF
F-16-1-TJC-Fire Life Safety - Bldg.16-1.pdf PDF
F-103-2-TJC-Fire Life Safety - Bldg.103-2.pdf PDF
F-6-1-TJC-Fire Life Safety - Bldg.6-1.pdf PDF
Contractor sign in.pdf PDF
F-16-3-TJC-Fire Life Safety - Bldg.16-3.pdf PDF
Portland TJC Set Buildings 100 and 101.pdf PDF
36C26025R0071_2.docx DOCX document
Attachment 3-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 1.pdf PDF
Attachment 7-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 5.pdf PDF
Attachment 6-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 4.pdf PDF
Attachment 15-Past Performance Questionnaire.pdf PDF
Attachment 10-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 8.pdf PDF
Attachment 9-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 7.pdf PDF
Attachment 8-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 6.pdf PDF
Attachment 2-648-20-119-VA OR Portland Electrical FCA SPECS STAMPED.pdf PDF
Attachment 13-Price Schedule by Division.xlsx XLSX spreadsheet
Attachment 12-Wage Determination 7-11-2025.pdf PDF
Attachment 1-Statement of Work 648-20-119.pdf PDF
Attachment 4-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 2.pdf PDF
Attachment 14- VAAR 852.219-75.docx DOCX document
Attachment 5-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 3.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

KEY NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

BLDG 100 - ELECTRICAL

SCHEDULES

100EP710

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

BLDG 101 - ELECTRICAL

SCHEDULES

101EP701

FROM TO QTY SIZE (QTY) & SIZE

GROUND

SIZE

101-P-01A ATS "ATS-LS-101-1" STATUS ATS "ATS-LS-101-1" DPM "PME-LS-101-1" 1 1" MFRS CABLE 12 AWG - - - 101-P-01B ATS "ATS-LS-101-1" STATUS DPM "PME-LS-101-1" LOCAL METERING SYSTEM PANEL 1 1" MFRS CABLE 12 AWG - - - 101-P-02 PNL: 101_2H1-F.1-19 SEC 1 PNL "2H1-F.1-19 BUSWAY SWITCH PNL: 101_2H1-F.1-19 SEC 1 1 2-1/2" (3) 4/0 AWG 6 AWG - - -

101-C-01A ATS "ATS-LS-101-1" STATUS ATS "ATS-LS-101-1" DPM "PME-LS-101-1" 1 1-1/4" (2) CAT6A 12 AWG - - - 101-C-01B ATS "ATS-LS-101-1" STATUS DPM "PME-LS-101-1" LOCAL METERING SYSTEM PANEL 1 1-1/4" (2) CAT6A 12 AWG - - - 101-C-02 UNIT SUBSTATION "US101" NETWORK SWITCH (ROOM 702) UNIT SUBSTATION "US101" NETWORK SWITCH (ROOM 702) PME SERVER CABINET (RM 702) 1 3/4" (1) CAT6A 12 AWG - -

2. REFER TO VENDOR DRAWINGS FOR ADDITIONAL REQUIREMENTS.

BLDG 101 - CONDUIT AND WIRE SCHEDULE - PORTLAND VA FCA DEFICIENCIES

CONDUIT

TAG

SERVICE

ROUTING CONDUIT CONDUCTORS

VOLTAGE

DROP

FAULT

CURRENT

NOTES

ABBREVIATIONS

EX - EXISTING, NEG - NEGLIGIBLE

NOTE(S):

1. VENDOR PROVIDED CONDUCTORS IN CONTRACTOR PROVIDED CONDUIT. CONDUCTORS TO BE INSTALLED BY VENDOR. CONTRACTOR TO PROVIDE PULL STRINGS IN EACH CONDUIT.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

BLDG 102 - ELECTRICAL

102EP701

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

BLDG 103 - ELECTRICAL

103EP701

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

BLDG 103 - ELECTRICAL

103EP702

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

BLDG 104 - ELECTRICAL

SCHEDULES

104EP701

FROM TO QTY SIZE (QTY) & SIZE

GROUND

SIZE

104-P-01 TRANSFORMER "104_T-150" PANELBOARD "104_B1H" TRANSFORMER "104_T-150" 1 2-1/2" (3) 4/0 AWG 8 AWG 0.87 < 15000 -

3. EXISTING CONDUIT AND WIRE TO BE EXTENEDED AS NEEDED.

BLDG 104 - CONDUIT AND WIRE SCHEDULE - PORTLAND VA FCA DEFICIENCIES

CONDUIT

TAG

SERVICE

ROUTING CONDUIT CONDUCTORS

VOLTAGE

DROP

FAULT

CURRENT

(A)

NOTES

ABBREVIATIONS

EX - EXISTING, NEG - NEGLIGIBLE

NOTE(S):

1. VENDOR PROVIDED CONDUCTORS IN CONTRACTOR PROVIDED CONDUIT. CONDUCTORS TO BE INSTALLED BY VENDOR. CONTRACTOR TO PROVIDE PULL STRINGS IN EACH CONDUIT.

2. REFER TO VENDOR DRAWINGS FOR ADDITIONAL REQUIREMENTS.

FROM TO QTY SIZE (QTY) & SIZE

GROUND

SIZE

104-P-01 TRANSFORMER "104_T-150" PANELBOARD "104_B1H" TRANSFORMER "104_T-150" 1 2-1/2" (3) 4/0 AWG 8 AWG 0.87 < 15000 -

3. EXISTING CONDUIT AND WIRE TO BE EXTENEDED AS NEEDED.

BLDG 104 - CONDUIT AND WIRE SCHEDULE - PORTLAND VA FCA DEFICIENCIES

CONDUIT

TAG

SERVICE

ROUTING CONDUIT CONDUCTORS

VOLTAGE

DROP

FAULT

CURRENT

(A)

NOTES

ABBREVIATIONS

EX - EXISTING, NEG - NEGLIGIBLE

NOTE(S):

1. VENDOR PROVIDED CONDUCTORS IN CONTRACTOR PROVIDED CONDUIT. CONDUCTORS TO BE INSTALLED BY VENDOR. CONTRACTOR TO PROVIDE PULL STRINGS IN EACH CONDUIT.

2. REFER TO VENDOR DRAWINGS FOR ADDITIONAL REQUIREMENTS.

BLDG 105 - ELECTRICAL

SCHEDULES 105

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED 105EP701

FROM TO QTY SIZE (QTY) & SIZE

GROUND

SIZE

105-P-01 PANELBOARD "P-105A" SWITCHBOARD "100_SUB USCP" (VIA JUNCTION BOX "JB-MER") PANELBOARD "P-105" 2 3" (3) 500KCMIL 1 AWG 1.69% 17,060 105-P-02A COOLING TOWER #1 PANELBOARD "P-105" COOLING TOWER #1 VFD 1 1-1/2" (3) 1 AWG 6 AWG 1.78% 15,626 105-P-02B COOLING TOWER #1 COOLING TOWER #1 VFD COOLING TOWER #1 DISCONNECT 1 1-1/2" (3) 1 AWG 6 AWG 2.17% 10,897 105-P-03A COOLING TOWER #2 PANELBOARD "P-105" COOLING TOWER #2 VFD 1 1-1/2" (3) 1 AWG 6 AWG 1.78% 15,626 105-P-03B COOLING TOWER #2 COOLING TOWER #2 VFD COOLING TOWER #2 DISCONNECT 1 1-1/2" (3) 1 AWG 6 AWG 2.38% 9,230 105-P-04A COOLING TOWER #3 PANELBOARD "P-105" COOLING TOWER #3 VFD 1 1-1/2" (3) 1 AWG 6 AWG 1.78% 15,626 105-P-04B COOLING TOWER #3 COOLING TOWER #3 VFD COOLING TOWER #3 DISCONNECT 1 1-1/2" (3) 1 AWG 6 AWG 2.65% 7,665 105-P-05A PANELBOARD "105A" PANELBOARD "P-105" TRANSFORMER "TX-105A" 1 3/4" (3) 10 AWG 10 AWG 1.73% 11,790 105-P-05B PANELBOARD "105A" TRANSFORMER "TX-105A" PANELBOARD "105A" 1 1" (3) 6 AWG 10 AWG 0.09% 1,282 105-P-06A MOTOR PUMP "P-9" PANELBOARD "P-105" PUMP P-9 VFD 1 1-1/2" (3) 1 AWG 6 AWG 1.78% 15,627 105-P-06B MOTOR PUMP "P-9" PUMP P-9 VFD MOTOR PUMP "P-9" 1 1-1/2" (3) 1 AWG 6 AWG 2.29% 9,886 105-P-07A MOTOR PUMP "P-10" PANELBOARD "P-105" PUMP P-10 VFD 1 1-1/2" (3) 1 AWG 6 AWG 1.78% 15,627 105-P-07B MOTOR PUMP "P-10" PUMP P-10 VFD MOTOR PUMP "P-10" 1 1-1/2" (3) 1 AWG 6 AWG 2.32% 9,659 105-P-08A MOTOR PUMP "P-11" PANELBOARD "P-105" PUMP P-11 VFD 1 1-1/2" (3) 1 AWG 6 AWG 1.78% 16,387 105-P-08B MOTOR PUMP "P-11" PUMP P-11 VFD MOTOR PUMP "P-11" 1 1-1/2" (3) 1 AWG 6 AWG 2.35% 9,440 105-P-09 HVAC UNIT "105-ER-HV-01" PANELBOARD "P-105" HVAC UNIT "105-ER-HV-01" 1 3/4" (3) 10 AWG 10 AWG 1.83% 9,834 105-P-10 HVAC UNIT THERMOMETER BARD HVAC UNIT HVAC UNIT THERMOMETER 1 3/4" (3) 10 AWG 10 AWG - - 1 105-P-11 EMERGENCY POWER OFF ENCLOSURE PANELBOARD "P-105" EMERGENCY POWER OFF ENCLOSURE 1 3/4" (6) 14 AWG 14 AWG - - 105-P-12 VEHICLE VACUUM PANELBOARD "105A" VEHICLE VACUUM 1 1" (3) 12 AWG 12 AWG - -

105-C-01 COOLING TOWER #1 VFD STATUS DDC PANEL "ELECTRICAL ROOM" COOLING TOWER #1 VFD 1 1" (1) CAT6A 12 AWG - - 105-C-02 COOLING TOWER #2 VFD STATUS DDC PANEL "ELECTRICAL ROOM" COOLING TOWER #2 VFD 1 1" (1) CAT6A 12 AWG - - 105-C-03 COOLING TOWER #3 VFD STATUS DDC PANEL "ELECTRICAL ROOM" COOLING TOWER #3 VFD 1 1" (1) CAT6A 12 AWG - - 105-C-04 PUMP P-9 VFD STATUS DDC PANEL "ELECTRICAL ROOM" PUMP P-9 VFD 1 1" (1) CAT6A 12 AWG - - 105-C-05 PUMP P-10 VFD STATUS DDC PANEL "ELECTRICAL ROOM" PUMP P-10 VFD 1 1" (1) CAT6A 12 AWG - - 105-C-06 PUMP P-11 VFD STATUS DDC PANEL "ELECTRICAL ROOM" PUMP P-11 VFD 1 1" (1) CAT6A 12 AWG - -

105-S-01 DDC PANEL "ELECTRICAL ROOM" JUNCTION BOX "JB-DDC" DDC PANEL "ELECTRICAL ROOM" 1 1" (1) 6-STR FO CABLE - - - 2

105-FA-01 TYPICAL FIELD DEVICE AS SHOWN ON PLANS AS SHOWN ON PLANS 1 EX (4) 16 STP 12 AWG - - 105-FA-02 TYPICAL FIELD DEVICE AS SHOWN ON PLANS AS SHOWN ON PLANS 1 1" (2) 16 STP 12 AWG - - 105-FA-03 TYPICAL FIELD DEVICE AS SHOWN ON PLANS AS SHOWN ON PLANS 1 1" (1) 16 STP 12 AWG - -

2. SPLICE FIBER OPTIC CABLE AS REQUIRED. COORDINATE WITH VA FOR EXACT REQUIREMENTS.

NOTE(S):

1. REFER TO VENDOR DRAWINGS FOR ADDITIONAL REQUIREMENTS.

BLDG 105 - CONDUIT AND WIRE SCHEDULE - PORTLAND VA FCA DEFICIENCIES

CONDUIT

TAG

SERVICE

ROUTING CONDUIT CONDUCTORS

NOTES

VOLTAGE

DROP

FAULT

CURRENT

(A)

ABBREVIATIONS

EX - EXISTING, NEG - NEGLIGIBLE

BLDG 105 - ELECTRICAL

SCHEDULES 105

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED 105EP702

Location: ELECTRICAL BUILDING 105 Volts: 480/277 A.I.C Rating: 65k

Supply From: SWBD 100_SUB USCP Phases: 3 Bus Rating: 600A

Mounting: Surface Wires 4 Main Circuit Breaker: 600A

Enclosure: Type 1

CKT Trip Poles Poles Trip CKT 1 125A 3 18333 18333 3 125A 2

3 " " 18333 18333 " " 4

5 " " 18333 18333 " " 6

7 125A 3 18333 660 3 30A 8

9 " " 18333 300 " " 10

11 " " 18333 560 " " 12

13 125A 3 18333 18333 3 125A 14

15 " " 18333 18333 " " 16

17 " " 18333 18333 " " 18

19 " " 0 0 " " 20

21 125A 3 18333 0 3 - 22

23 " " 18333 0 " " 24

25 " " 18333 0 " " 26

27 " " 0 0 1 - 28

29 30A 3 4253 0 1 - 30

31 " " 4253 100 3 70A 32

33 " " 4253 100 " " 34

35 - 3 0 100 " " 36

37 " " 0 100 3 20A 38

39 " " 0 100 " " 40

41 - 1 0 100 " " 42

Total Load:

Total Amps:

LOAD TYPE

Largest Motor 55000 125.00% 344878 VA Other 2120 100.00% 358628 VA Receptacle 100.00% 415 A Lighting 125.00% 431 A All other Motor 287758 100.00%

Notes:

1. 3-POLE BREAKER TO UTILIZE (4) SPACES.

287758

PANELBOARD "105A"

PUMP P-10 (NOTE 1)

2120 Total Est. Power Demand:

0 Total Conn. Amperage:

0 Total Est. Amperage Demand:

DPM

SPACE

68750 Total Conn. Power Load:

115113 114753 115013 959 956 958

Connected Load (VA) Demand Factor Estimated Demand (VA) Panel Totals

COOLING TOWER #2

SPACE "

COOLING TOWER #3

PUMP P-9 (NOTE 1)

SPACE

SPD

SPACE

Branch Panel: P-105

VA PER PHASE

CIRCUIT DESCRIPTION A B C

PUMP P-11 (NOTE 1)

BARD HVAC UNIT "105-ER-HV-01"

SPACE

CIRCUIT DESCRIPTION

COOLING TOWER #1

File details come from the government source that posted it. Updated .