The file is a Price Schedule Breakdown template for a Department of Veterans Affairs contract (Solicitation Number 36C26025R0071) located in Portland, Oregon, focused on correcting electrical FCA (Facility Condition Assessment) deficiencies. The price schedule is structured using Construction Specification Institute (CSI) division breakdowns, with multiple divisions listed (including General Requirements, Thermal and Moisture Protection, Openings, Special Construction, and Facility Services subgroups such as HVAC, Electric, Communications, and Electronic Safety & Security).
The pricing document indicates a fixed-price contract with placeholder line items currently set at $0.00, suggesting contractors will need to complete the pricing details. The template includes spaces for insurance/bonds, taxes, O&M manuals, overhead rates, subcontract markup rates, profit rates, and other potential cost elements. While no specific dollar amounts are populated, the document provides a structured framework for pricing the electrical deficiency correction project at a Veterans Health Administration facility in Veterans Integrated Service Network 20.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| PRICE SCHEDULE BREAKDOWN INSTRUCTIONS | |
| INSTRUCTIONS | |
| 1 | Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary |
| 2 | The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record. |
| 3 | The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables. |
| 4 | Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable. |
| 5 | All pricing is fixed price. |
Proposal Price Schedule
PRICE SCHEDULE BREAKDOWN
648-20-119 Correct Electrical FCA Deficiencies Project Location: Portland, OR
| CLIN 0001 | ||
| Rates | Base Item | |
| General Requirements & Facility Construction | Price | |
| Division Item 1 General Requirements (furnish and install) | N/A | $0.00 |
| Division Item 7 Thermal and Moisture Protection (furnish and install) | N/A | $0.00 |
| Division Item 8 Openings (furnish and install) | N/A | $0.00 |
| Division Item 13 Special Construction (furnish and install) | N/A | $0.00 |
| Facility Services Subgroup | ||
| Division Item 23 Heating, Ventilating and A/C (furnish and install) | N/A | $0.00 |
| Division Item 25 Integrated Automation | N/A | $0.00 |
| Division Item 26 Electric | N/A | $0.00 |
| Division Item 27 Communications | N/A | $0.00 |
| Division Item 28 Electronic Safety & Security | N/A | $0.00 |
TOTAL DIVISIONS $0.00
| Insurance / Bonds | N/A | $0.00 |
| Taxes / Other Fees (provide itemized list) | N/A | $0.00 |
| O&M Manuals and Red Line Drawings | N/A | $0.00 |
| Overhead | Rate _______% | N/A |
| Overhead (daily rate) | Per Day $0.00 | N/A |
| SubContract Mark-Up | Rate _______% | N/A |
| Profit | Rate _______% | N/A |
| SubTotals | $0.00 |
Other Items not Requested Above (provide itemized list) $0.00
| CONTRACT TOTALS | $0.00 | |
| TOAL | $0.00 |