This document is a set of electrical demolition and renovation plans for the VA Portland Health Care System, specifically detailing electrical modifications across multiple buildings (Buildings 100, 101, 102, 103, 104, 105, 016). The comprehensive set of electrical plans covers seven different levels/areas, including basement, parking, and utility spaces, and provides detailed schematics for electrical system upgrades, equipment replacements, and demolition work.
The plans involve extensive electrical infrastructure modifications, including replacing unit substations, modifying motor control centers, rerouting conduits and feeders, installing new junction boxes, and updating electrical distribution equipment. Key elements include replacing circuit breakers, installing network switches, providing new control power transformers, and integrating equipment status/data systems. The project appears focused on correcting electrical facility condition assessment (FCA) deficiencies, with work spanning multiple buildings and involving complex electrical system reconfigurations for the Veterans Affairs medical facility in Portland, Oregon.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
L.6
L.7
L.5
K.1
K
J
27 26 25 24 23 22 21
BL
D
G . 1
FIRST FLOOR CLINICS
TO BLDG NO. 100
20 19
UPUP
UP
LO
U
VE
R
DN
ENTRANCE
LOADING DOCK
SKYBRIDGE ABOVE
DF
SP
HOOD
AREA WELL
SP
MECH.. VENT
FD
UP
OVERHEAD COILING DOOR
MECH.. VENT
DF
RAMP DOWN
LOCKERS
DN
ACCESS FLOORING
FD
A/ C
U N
IT
PNL: 101_1H1-K-27
116 SF
133a
OFFICE
260 SF
STAIR
NO. 14
371 SF
C1-1
LOBBY
144 SF
100a
OFFICE
145 SF
100b
OFFICE
82 SF
100d
OFFICE
112 SF
101a
OFFICE
116 SF
OFFICE
97 SF
103a
OFFICE
104 SF
103e
OFFICE
77 SF
VESTIBULE
123 SF
103d
OFFICE
69 SF
103c
OFFICE
114 SF
103b
OFFICE
123 SF
101b
OFFICE
122 SF
103c
OFFICE
79 SF
VESTIBULE
600 SF
C1-2
CORRIDOR
293 SF
OFFICE
127 SF
OFFICE
113 SF
106a
OFFICE
95 SF
107d
OFFICE
116 SF
107c
OFFICE
126 SF
107a
OFFICE
148 SF
107b
OFFICE
STAIR
NO. 15
41 SF
112a H.A.C.
284 SF
1012f
MECH. ROOM
119 SF
112b
LOUNGE
147 SF
OFFICE
97 SF
108a
OFFICE
123 SF
105a
OFFICE
173 SF
OFFICE
111 SF
105b
OFFICE
211 SF
OFFICE
121 SF
115b
OFFICE
108 SF
105c
OFFICE
139 SF
109b
TELE. CONF. EDITING
123 SF
115a
OFFICE
271 SF
OFFICEM VOL. SVC.
273 SF
109a
CONTROL BOOTH
542 SF
CONF./ CLASSROOM
26 SF
CLOSET, SIGNAL
22 SF
CLOSET, TELE.
113 SF
VESTIBULE
142 SF
112c
TOILET, F.
132 SF
112d
TOILET, M.
90 SF
112e
CLOSET, ELEC.
215 SF
C1-3
CORRIDOR
354 SF
TEAM ROOM
115 SF
113a
OFFICE
123 SF
113b
OFFICE
156 SF
114a
OFFICE
142 SF
116a
OFFICE 95 SF
116b
OFFICE
129 SF
OFFICE, SECRETARY
132 SF
120b
OFFICE
100 SF
120c
OFFICE
80 SF
120a
OFFICE
235 SF
OFFICE, PUB. & CONG. AFFAIRS
96 SF
OFFICE 110 SF
OFFICE
136 SF
120d
OFFICE
44 SF
TELE. 47 SF
ELEC.
136 SF
102a
OFFICE
258 SF
122a
SUPPLY ROOM 392 SF
WORK ROOM, VOL. SVC.
57 SF
127e
OFFICE
99 SF
OFFICE
702 SF
C1-4
CORRIDOR
232 SF
C1-5
CORRIDOR
379 SF
OFFICE
130 SF
127f
OFFICE 367 SF
OFFICE
113 SF
127d
WORK/STOR.
113 SF
127c
OFFICE
104 SF
127b
EXAM/TREAT.
117 SF
127a
EXAM/TREAT.
63 SF
TOILET, F.
68 SF
TOILET, M.
176 SF
C1-8
ELEV. LOBBY
144 SF
C1-9
VESTIBULE
271 SF
MECH. ROOM
334 SF
C1-7
CORRIDOR
131 SF
C1-6
CORRIDOR
160 SF
PAT. ADVOCATE WAITING
128 SF
123a
OFFICE
145 SF
125a
OFFICE
114 SF
125b
WORK RM.
133 SF
125c
OFFICE
320 SF
RELEASE OF INFO.
165 SF
C1-10
CORRIDOR
385 SF
LOCKER ROOM
46 SF
131a
ARMS STOR.
45 SF
131b
HOLDING CELL
968 SF
OFFICE, OI&T
582 SF
MECH. SPACE
594 SF
133d
COMPUTER ROOM, OI&T
434 SF
134a
COMPUTER ROOM
76 SF
C1-10a
CORRIDOR
P7
ELEV.
P8
ELEV.
S11
ELEV.
S12
ELEV.
113 SF
127g
OFFICE
50 SF
WAITING
F.
E.
C
F.E.C.
F.E.C.F.E.C.
F.E.C.
F.E.C.
PNL: 101_1DEH1-F.1-19.6
FMS SWITCH
SCALE : 3/32" = 1'-0"
1 BLDG 101 - LEVEL 01 - ELECTRICAL PLAN
0' 4' 8' 16'
BLDG 101 - LEVEL 01 - ELECTRICAL
PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
PROJECT
NORTH
101E-101
BLDG 41
BLDG 16
BLDG 6
BLDG T-51
BLDG
BLDG 101
BLDG 100
BLDG 102
BLDG 103
BLDG 104
GENERAL NOTES
KEY NOTES
AREA OF WORK
gmsfgnsfg
PROJECT
NORTH
KEY PLAN
1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE
SHOWN FOR CLARITY.
2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATIONS SHALL BE FIELD VERIFIED AND
REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT
IS BEING RELOCATED AND/OR MODIFIED.
4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS
IMPACTED BY THIS PROJECT.
BLDG 101
PLAN IS INCLUDED FOR AS-BUILDING PURPOSES. ALL
EQUIPMENT MAY NOT BE SHOWN FOR CLARITY.
K.1
L.5
L.7
L.6
K
J
28 27 2326 25 24 22 21 20 19
FEC
PNL: 101_2H1-K-27
BUSDUCT
BD: 101_101-N2
FE
C
LAT
LAT
LAT
LAT
LAT
LAT
768 SF
C2-6
CORRIDOR
207 SF
212a
OFFICE
420 SF
OFFICE
106 SF
212c
OFFICE
97 SF
212d
OFFICE
79 SF
212e
OFFICE
79 SF
212f
OFFICE
134 SF
212h
OFFICE
71 SF
212g
BREAK RM.
66 SF
212j
WORK ROOM 77 SF
215a
WORKROOM
115 SF
215b
OFFICE 97 SF
215c
OFFICE
91 SF
215d
OFFICE
92 SF
215e
OFFICE
133 SF
215f
OFFICE
419 SF
EDUCATION OFFICE
86 SF
215g
OFFICE
158 SF
216a
OFFICE
147 SF
OFFICE
316 SF
216b
OFFICE
141 SF
216c
OFFICE
198 SF
C2-7
CORRIDOR
310 SF
C2-8
CORRIDOR
711 SF
C2-9
LOBBY
2253 SF
AUDITORIUM
82 SF
220b
STORAGE
66 SF
220c
STORAGE
80 SF
220d
EQUIP. STOR.
147 SF
TOILET, F.
130 SF
TOILET, M.
177 SF
220e
VESTIBULE
100 SF
220a
STORAGE
142 SF
210c
TOILET, F.
132 SF
210d
TOILET, M.
113 SF
VESTIBULE
86 SF
210e
CLOSET, ELEC.
119 SF
210b
OFFICE 41 SF
210a
H.A.C. 26 SF
CLOSET, ELEC.
22 SF
CLOSET, TELE.
226 SF
C2-5
CORRIDOR
46 SF
CLOSET, ELEC.
152 SF
205d
OFFICE
143 SF
205a
ILLUSTRATION
310 SF
204a
CLASSROOM
350 SF
WORK ROOM, MED. MEDIA
455 SF
201a
CLASSROOM
219 SF
201a
CLASSROOM
265 SF
CLASSROOM
36 SF
H.A.C.
71 SF
201c
STOR.
305 SF
C2-3
CORRIDOR
176 SF
C2-1
ELEV. LOBBY
425 SF
MECHANICAL SHAFT
74 SF
C2-2
VESTIBULE
16 SF
SPRINKLER CONTROL
STAIR
NO. 14
STAIR
NO. 15 280 SF
202a
POLICE OFFICE
483 SF
202c
POLICE OFFICE
143 SF
202d
OFFICE
66 SF
202b
ARMORY
247 SF
CIRCULATION
1357 SF
LIBRARY
229 SF
POLICE
222 SF
CONFERENCE RM
155 SF
206a
OFFICE
161 SF
207a
OFFICE
751 SF
C2-4
CORRIDOR
29 SF
202c
VESTIBULE
516 SF
206b
NEUROLOGY OFFICE
MECHANICAL SHAFT
P7
ELEV.
P8
ELEV.
S11
ELEV.
S12
ELEV.
156 SF
211d
STORAGE
256 SF
211c
SIMULATION LAB
156 SF
211b
OBSERVATION
160 SF
211a
EXAM
257 SF
CLASSROOM
204 SF
205b
WORK ROOM
294 SF
OFFICE
52 SF
SIGNAL CLOSET
122 SF
203a
POLICE
95 SF
203b
POLICE
20 SF
202e
HOLDING
282 SF
OFFICE
117 SF
206e
COUNSELING
108 SF
206d
COUNSELING
132 SF
206c
COUNSELING
117 SF
206f
COUNSELING
2338 SF
C2-11
SKYWALK
2PNL: 101_2L1-F.1-19
3PNL: 101_2H1-F.1-19 Sec 1 101-P-02
SCALE : 3/32" = 1'-0"
1 BLDG 101 - LEVEL 02 - ELECTRICAL PLAN
0' 4' 8' 16'
BLDG 101 - LEVEL 02 - ELECTRICAL
PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
PROJECT
NORTH
101E-102
BLDG 41
BLDG 16
BLDG T-51
BLDG
BLDG 101
BLDG 102
BLDG 103
BLDG 104
GENERAL NOTES
KEY NOTES
AREA OF WORK
PROJECT
NORTH
KEY PLAN
1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE
SHOWN FOR CLARITY.
2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATIONS SHALL BE FIELD VERIFIED AND
REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT
IS BEING RELOCATED AND/OR MODIFIED.
4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS
IMPACTED BY THIS PROJECT.
BLDG 101
BLDG 6
BLDG 100
EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE
ONE-LINE DIAGRAMS ON SHEETS 101ED603 & 101EP603
FOR ADDITIONAL INFORMATION.
EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE
ONE-LINE DIAGRAMS ON SHEETS 101ED605 & 101EP605
FOR ADDITIONAL INFORMATION. A/E FIELD VERIFICATION
IS REQUIRED.
APPROXIMATE LOCATION OF PANELBOARD. EXISTING
CONDUCTORS FROM BD: 100_S2 N2 TO BE DEMOLISHED.
CONTRACTOR SHALL ACCOUNT FOR EXTRA 25%
LENGTH OF REPLACEMENT RACEWAYS AND
CONDUCTORS AS SHOWN ON EXISTING ONE-LINE
DIAGRAM. REFERENCE ONE-LINE DIAGRAMS ON SHEETS
100ED605, 101ED605, 100EP605, AND 100EP605 FOR
ADDITIONAL INFORMATION.
PNL: 101_2H1-F.1-19 Sec 1
APPROXIMATE PANELBOARD LOCATION. DEMOLISH AND
REPLACE EXISTING FEEDER FROM BUSDUCT "BD: 100_S2
N2" TO PANELBOARD. CONTRACTOR SHALL ACCOUNT
FOR ADDITIONAL 25% FOR FEEDER LENGTH BASED ON
EXISTING ONE-LINE DIAGRAM. REFERENCE ONE-LINE
DIAGRAMS ON SHEETS 100ED605, 101ED605, 100EP605,
AND 100EP605 FOR ADDITIONAL INFORMATION.
COORDINATE WITH VA FOR EXACT EQUIPMENT
LOCATIONS.
CONTINUE FROM
100E-102
L.5
L.7
L.6
K.1
K
J
28 26 25 24 23 22 21 1920
UP
DN
SP
MECHANICAL
SHAFT
MECHANICAL
SHAFT
PNL: 101_3H1-K-27
142 SF
354c
TOILET, F.
132 SF
354d
TOILET, M.
783 SF
C3-6
CORRIDOR
113 SF
VESTIBULE
91 SF
354e
CLOSET, ELEC.
119 SF
354b
LACTATION ROOM 41 SF
354a
H.A.C. 26 SF
CLOSET, SIGNAL
22 SF
CLOSET, TELE.
220 SF
C3-15
CORRIDOR
ELEV.
P7
ELEV.
P8 ELEV.
S11
176 SF
C3-1
ELEV. LOBBY
ELEV.
S12
77 SF
C3-2
VESTIBULE
16 SF
SPRINKLER CONTROL
STAIR
NO. 14
STAIR
NO. 15
310 SF
C3-5
CORRIDOR
248 SF
C3-3
CORRIDOR
184 SF
C3-11
CORRIDOR
183 SF
C3-10
CORRIDOR
96 SF
OFFICE
98 SF
OFFICE
97 SF
OFFICE
99 SF
OFFICE
95 SF
OFFICE
185 SF
C3-14
CORRIDOR
183 SF
C3-7
CORRIDOR
128 SF
OFFICE
197 SF
OFFICE
67 SF
C3-13
OFFICE, SEC.
559 SF
C3-12
OFFICE, SEC. MED.
114 SF
OFFICE
116 SF
OFFICE
115 SF
OFFICE
117 SF
OFFICE
106 SF
OFFICE
110 SF
OFFICE
112 SF
OFFICE
111 SF
OFFICE
113 SF
OFFICE
108 SF
OFFICE
112 SF
OFFICE
111 SF
OFFICE
113 SF
OFFICE
114 SF
OFFICE
113 SF
OFFICE
115 SF
OFFICE
116 SF
OFFICE
112 SF
OFFICE
45 SF
CLOSET, SIGNAL
46 SF
ELEC.61 SF
OFFICE
62 SF
OFFICE
363 SF
CONF. ROOM
245 SF
CONF. ROOM
123 SF
OFFICE
125 SF
OFFICE
114 SF
OFFICE
116 SF
OFFICE
115 SF
OFFICE
117 SF
OFFICE
112 SF
OFFICE
110 SF
OFFICE
112 SF
OFFICE
111 SF
OFFICE
113 SF
OFFICE
103 SF
OFFICE
116 SF
OFFICE
112 SF
WORK ROOM
555 SF
C3-9
OFFICE, SEC. SURG.
120 SF
OFFICE
202 SF
OFFICE
57 SF
C3-8
OFFICE, SEC.
96 SF
OFFICE
98 SF
OFFICE
97 SF
WORK ROOM
105 SF
OFFICE
105 SF
OFFICE
154 SF
OFFICE
84 SF
OFFICE
116 SF
OFFICE
82 SF
OFFICE
69 SF
OFFICE
184 SF
C3-16
WORK
221 SF
C3-20
CORRIDOR
96 SF
OFFICE
143 SF
OFFICE 123 SF
364a
OFFICE
105 SF
OFFICE
108 SF
OFFICE
87 SF
OFFICE
270 SF
CONF. ROOM
95 SF
OFFICE 96 SF
OFFICE
46 SF
C3-18
CORRIDOR
110 SF
OFFICE
103 SF
OFFICE
77 SF
OFFICE
87 SF
OFFICE
237 SF
OFFICE
175 SF
C3-22
CORRIDOR
187 SF
C3-23
OFFICE, SEC. PSYCH.
184 SF
C3-4
CORRIDOR
104 SF
OFFICE
101 SF
OFFICE
104 SF
OFFICE
104 SF
OFFICE
92 SF
WORK ROOM
92 SF
OFFICE
79 SF
OFFICE
68 SF
OFFICE
110 SF
OFFICE46 SF
C3-21
CORRIDOR
SCALE : 1/8" = 1'-0"
1 BLDG 101 - LEVEL 03 - ELECTRICAL PLAN
0' 4' 8' 16'
BLDG 101 - LEVEL 03 - ELECTRICAL
PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
PROJECT
NORTH
101E-103
BLDG 41
BLDG 16
BLDG T-51
BLDG
BLDG 101
BLDG 102
BLDG 103
BLDG 104
GENERAL NOTES
KEY NOTES
AREA OF WORK
PROJECT
NORTH
KEY PLAN
1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE
SHOWN FOR CLARITY.
2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATIONS SHALL BE FIELD VERIFIED AND
REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT
IS BEING RELOCATED AND/OR MODIFIED.
4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS
IMPACTED BY THIS PROJECT.
BLDG 101
BLDG 6
BLDG 100
L.6
K.1
L.5
L.7
K
J
2427 26 25 23 22 21 20
UPUP
DNDN
SP
DF
DF
SP
MECH SHAFT
MECH SHAFT
SWBD: 101_4SDN-K.1-24
PNL:101_4H1-K-27
PNL:101_4L1-K.1-24
662 SF
LAB.
929 SF
C4-7
CORRIDOR
83 SF
427a
OFFICE
86 SF
OFFICE
760 SF
LAB.
640 SF
LAB.
131 SF
427b
OFFICE
878 SF
LAB.
136 SF
421c
TOILET, F.
132 SF
421d
TOILET, M.
118 SF
VESTIBULE
91 SF
421e
CLOSET, ELEC.
119 SF
421b
LOUNGE 41 SF
421a
H.A.C. 26 SF
CLOSET, SIGNAL
22 SF
CLOSET, TELE.
261 SF
C4-6
CORRIDOR
176 SF
C4-1
ELEV. LOBBY
77 SF
C4-2
VESTIBULE
STAIR
NO. 14
STAIR
NO. 15
245 SF
C4-3
CORRIDOR
47 SF
CLOSET, TELE.
45 SF
CLOSET, ELEC.
53 SF
C4-8
LOBBY 16 SF
SPRINKLER CONTROL
584 SF
GENERAL LAB.
607 SF
LAB
79 SF
COLD ROOM
115 SF
418b
LAB
149 SF
LAB
109 SF
418c
OFFICE
248 SF
C4-5
CORRIDOR
44 SF
412a
VESTIBULE
139 SF
INSTRUMENT ROOM
93 SF
CONT. TEMP 4° C
139 SF
P-3 LAB
381 SF
LAB.
194 SF
DRY LAB.
400 SF
LAB.
199 SF
MULTI-PURP. LAB.
100 SF
OFFICE
92 SF
432a
DRY LAB.
497 SF
CONF. ROOM
440 SF
LAB.
94 SF
VESTIBULE
83 SF
404a
OFFICE
87 SF
404b
OFFICE
84 SF
404c
OFFICE
646 SF
LAB.
434 SF
LAB.
633 SF
LAB.
846 SF
C4-4
CORRIDOR
97 SF
OFFICE
213 SF
LAB.
96 SF
405a
OFFICE
778 SF
LAB.
78 SF
OFFICE
146 SF
416e
OFFICE
P7
ELEV.
P8
ELEV.
S11
ELEV.
S12
ELEV.
SCALE : 1/8" = 1'-0"
1 BLDG 101 - LEVEL 04 - ELECTRICAL PLAN
0' 4' 8' 16'
BLDG 101 - LEVEL 04 - ELECTRICAL
PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
PROJECT
NORTH
101E-104
BLDG 41
BLDG 16
BLDG 6
BLDG T-51
BLDG
BLDG 101
BLDG 100
BLDG 102
BLDG 103
BLDG 104
GENERAL NOTES
KEY NOTES
AREA OF WORK
gmsfgnsfg
PROJECT
NORTH
KEY PLAN
1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE
SHOWN FOR CLARITY.
2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATIONS SHALL BE FIELD VERIFIED AND
REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT
IS BEING RELOCATED AND/OR MODIFIED.
4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS
IMPACTED BY THIS PROJECT.
EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE
ONE-LINE DIAGRAMS ON SHEETS 101ED603 & 101EP603
FOR ADDITIONAL INFORMATION.
BLDG 101
UPUP
DNDN
SPSP
D.F.
EW
ES
D.F.
EW
EW
EW
EW EW EW EW
EW
ES
FS
EWEW
ES
EWEW
EW
MECHANICAL SHAFT
MECHANICAL SHAFT
EQ
EQ
895 SF
GENERAL LAB.
932 SF
C5-8
CORRIDOR
414 SF
MULTTI-PURP. LAB.
457 SF
GENERAL LAB.
136 SF
523c
TOILET, F.
132 SF
523d
TOILET, M.
118 SF
VESTIBULE
90 SF
523e
CLOSET, ELEC.
119 SF
523b
LOUNGE 41 SF
523a
H.A.C. 26 SF
CLOSET, SIGNAL
22 SF
CLOSET, TELE.
262 SF
C5-7
CORRIDOR
P7
ELEV.
P8
ELEV.
S11
ELEV.
176 SF
C5-1
ELEV. LOBBY
S12
ELEV.
77 SF
C5-2
VESTIBULE
STAIR
NO. 14
STAIR
NO. 15
375 SF
C5-3
CORRIDOR
45 SF
CLOSET, SIGNAL
51 SF
CLOSET, ELEC.
53 SF
C5-9
LOBBY
16 SF
SPRINKLER CONTROL
473 SF
GENERAL LAB.
149 SF
LAB.
603 SF
CHEMISTRY LAB.
410 SF
OFFICE
465 SF
GENERAL LAB.
398 SF
GENERAL LAB.
570 SF
GENERAL LAB.
424 SF
MULTTI-PURP. LAB.
187 SF
LAB.
154 SF
LAB.
75 SF
CONT. TEMP. 4° C
89 SF
519a
OFFICE
97 SF
OFFICE
113 SF
DARKROOM
59 SF
DARKROOM
115 SF
LAB.
140 SF
C5-6
CORRIDOR
95 SF
OFFICE
96 SF
511a
OFFICE
88 SF
505a
CONF. 90 SF
502f
OFFICE
90 SF
502d
OFFICE
86 SF
502g
OFFICE
87 SF
502e
OFFICE
87 SF
502c
OFFICE
371 SF
OFFICE
140 SF
502b
OFFICE
109 SF
502a
OFFICE
39 SF
CENT. REF. EQPT.
99 SF
CONT. TEMP. 4°C
84 SF
530a
OFFICE
87 SF
OFFICE
245 SF
C5-5
CORRIDOR
712 SF
C5-4
CORRIDOR
285 SF
TISSUE CULT. LAB.
82 SF
506a
TISSUE CULT. LAB.
91 SF
506b
TISSUE CULT. LAB.
91 SF
506c
TISSUE CULT. LAB.
91 SF
506d
TISSUE CULT. LAB.
85 SF
506e
TISSUE CULT. LAB.
337 SF
CHEMISTRY LAB.
360 SF
CHEMISTRY LAB.
190 SF
OFFICE
198 SF
COPY ROOM
152 SF
STORAGE
248SF
GLASS WASH CLEAN
689 SF
GENERAL LAB85 SF
514b
OFFICE
86 SF
514a
OFFICE
N
L.6
K.1
L.5
L.7
K
J
2427 26 25 23 22 21 20
PNL: 101_5H1-K-27
SWBD: 101_5SDN-K.1-24
SCALE : 1/8" = 1'-0"
1 BLDG 101 - LEVEL 05 - ELECTRICAL PLAN
0' 4' 8' 16'
BLDG 101 - LEVEL 05 - ELECTRICAL
PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
PROJECT
NORTH
101E-105
BLDG 41
BLDG 16
BLDG 6
BLDG T-51
BLDG
BLDG 101
BLDG 100
BLDG 102
BLDG 103
BLDG 104
GENERAL NOTES
KEY NOTES
AREA OF WORK
gmsfgnsfg
PROJECT
NORTH
KEY PLAN
1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE
SHOWN FOR CLARITY.
2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATIONS SHALL BE FIELD VERIFIED AND
REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT
IS BEING RELOCATED AND/OR MODIFIED.
4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS
IMPACTED BY THIS PROJECT.
EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE
ONE-LINE DIAGRAMS ON SHEETS 101ED603 & 101EP603
FOR ADDITIONAL INFORMATION.
BLDG 101
L.7
L.5
L.6
K.1
K
J
27 26 25 24 23 22 20
UPUP
DNDN
DF
FD
UPUP
FD
FD
FD
FFD
FFDFFDFFDFFDFFDFFDFFDFFD
FFD
FFD FFD FFD
FFDFFDFFDFFD
DF
FFD
FFD
LOCKER
LOCKER
MECHANICAL
SHAFT
MECHANICAL
SHAFT
EYE
WASH
& SHWR
EYE
WASH
PNL: 101_6H1-K-27
977 SF
C6-9
CORRIDOR
132 SF
621d
TOILET, F.
132 SF
621e
TOILET, M.
102 SF
VESTIBULE
89 SF
621f
CLOSET, ELEC.
142 SF
621c
LOUNGE
38 SF
621a
SHOWER 22 SF
CLOSET, SIGNAL
20 SF
CLOSET, TELE.
164 SF
C6-7
CORRIDOR
176 SF
C6-1
ELEV. LOBBY
77 SF
C6-2
VESTIBULE
NO.14
STAIR
STAIR
NO. 15
270 SF
C6-3
CORRIDOR
46 SF
CLOSET, SIGNAL
46 SF
CLOSET, ELEC.
231 SF
C6-12
ANIMAL RECEIVE
16 SF
SPRINKLER CONTROL
598 SF
C6-5
CORRIDOR
271 SF
ANIMAL QUARTERS
264 SF
ANIMAL QUARTERS
119 SF
625b
ANIMAL QUARTERS
103 SF
625a
ANIMAL QUARTERS
78 SF
CORRIDOR
107 SF
625c
ANIMAL QUARTERS
81 SF
625d
ANIMAL QUARTERS
280 SF
ANIMAL QUARTERS
263 SF
ANIMAL QUARTERS
108 SF
ANIMAL QUARTERS
102 SF
ANIMAL QUARTERS
91 SF
C6-10
CORRIDOR
106 SF
ANIMAL QUARTERS
100 SF
ANIMAL QUARTERS
107 SF
ANIMAL QUARTERS
101 SF
ANIMAL QUARTERS
93 SF
C6-11
CORRIDOR
107 SF
ANIMAL QUARTERS
101 SF
ANIMAL QUARTERS
261 SF
ANIMAL QUARTERS
268 SF
ANIMAL QUARTERS
158 SF
ANIMAL QUARTERS
160 SF
ANIMAL QUARTERS
169 SF
ANIMAL QUARTERS
169 SF
ANIMAL QUARTERS
335 SF
CAGE WASH SOILED
258 SF
C6-13
CORRIDOR
144 SF
C6-6
CORRIDOR
120 SF
607a
CLEAN STORAGE
286 SF
CLEAN STORAGE
63 SF
604a
CAGE WASHER
40 SF
H.A.C.
336 SF
CAGE WASH CLEAN 107 SF
CONT. TEMP. 4°C
204 SF
PROCEDURE
32 SF
COLD ROOM
209 SF
LAB
124 SF
OFFICE
82 SF
643a
OFFICE
265 SF
C6-4
CORRIDOR
98 SF
626W
ANIMAL QUARTERS
101 SF
626E
ANIMAL QUARTERS
227 SF
ETHANOL CHAMBER
240 SF
AUTOCLAVE
113 SF
ANIMAL QUARTERS
48 SF
PROCEDURE
348 SF
PROCEDURE
237 SF
PROCEDURE
56 SF
617a
PROCEDURE
161 SF
C6-8
CORRIDOR
48 SF
H.A.C.
26 SF
613a
STORAGE
256 SF
PROCEDURE
237 SF
ANIMAL QUARTERS
62 SF
606a
STOR. FEED& BED.
146 SF
FEED & BEDDING
261 SF
610b
ANIMAL QUARTERS
257 SF
610a
ANIMAL QUARTERS
225 SF
606c
ANIMAL QUARTERS
60 SF
606b
STOR. FEED& BED.
453 SF
MULTI-PURP. LAB.
89 SF
602b
OFFICE
86 SF
605a
OFFICE
530 SF
CHEMISTRY LAB.
112 SF
601b
OFFICE
109 SF
OFFICE
93 SF
602a
OFFICE
112 SF
601a
OFFICE
P7
ELEV.
P8
ELEV.
S11
ELEV.
S12
ELEV.
SCALE : 1/8" = 1'-0"
1 BLDG 101 - LEVEL 06 - ELECTRICAL PLAN
0' 4' 8' 16'
BLDG 101 - LEVEL 06 - ELECTRICAL
PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
PROJECT
NORTH
101E-106
BLDG 41
BLDG 16
BLDG 6
BLDG T-51
BLDG
BLDG 101
BLDG 100
BLDG 102
BLDG 103
BLDG 104
GENERAL NOTES
KEY NOTES
AREA OF WORK
gmsfgnsfg
PROJECT
NORTH
KEY PLAN
1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE
SHOWN FOR CLARITY.
2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATIONS SHALL BE FIELD VERIFIED AND
REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT
IS BEING RELOCATED AND/OR MODIFIED.
4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS
IMPACTED BY THIS PROJECT.
BLDG 101
L.7
L.6
L.5
K.1
K
J
2627 25
SIXTH FLOOR ROOF
24 23 22 21 20
MCC: 101_MCC-P/P_2 1 STAIR
NO. 14
STAIR
NO. 15
699 SF
STORAGE
92 SF
ELECTRICAL
26 SF
SIGNAL
22 SF
TELEPHONE
9493 SF
MECHANICAL
901 SF
MECH. RM. ELEV. SERVICE
759 SF
ELEC. RM. ELEC. UNIT SUBSTATION
579 SF
ELEC. RM. EMERG. & SWITCHGEAR
303 SF
ELEC. RM. AND STORAGE
UNIT SUBSTATION: US101 1
FUSE ENCLOSURE
METERING SYSTEM
SCALE : 1/8" = 1'-0"
1 BLDG 101 - LEVEL 07 - ELECTRICAL PLAN
0' 4' 8' 16'
BLDG 101 - LEVEL 07 - ELECTRICAL
PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
101-P-01B 101-C-01B
101E-407
PROJECT
NORTH
101E-407
101E-107
BLDG 41
BLDG 16
BLDG T-51
BLDG
BLDG 101
BLDG 102
BLDG 103
BLDG 104
GENERAL NOTES
KEY NOTES
AREA OF WORK
PROJECT
NORTH
KEY PLAN
1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE
SHOWN FOR CLARITY.
2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATIONS SHALL BE FIELD VERIFIED AND
REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT
IS BEING RELOCATED AND/OR MODIFIED.
4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS
IMPACTED BY THIS PROJECT.
BLDG 101
BLDG 6
BLDG 100
EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE
ONE-LINE DIAGRAMS ON SHEETS 101ED602 & 101EP602
FOR ADDITIONAL INFORMATION.
CONTINUE TO PME ENCLOSURE. REFERENCE SHEET
101E-407 FOR ADDITIONAL INFORMATION.
E-505
PROVIDE NETWORK SWITCH WITH CONTROL POWER
TRANSFOMER (CPT) LOCATED INTERIOR TO EXISTING UNIT
SUBSTATION POWER METER CUBICLE; CPT SHALL USE
SUBSTATION AS SOURCE. PROVIDE DATA CABLES FROM
REPLACEMENT UNIT SUBSTATION CIRCUIT BREAKERS TO
NETWORK SWITCH. PROVIDE CAT6A CABLING FROM
NETWORK SWITCH TO EXTEND TO LOCAL PME ENCLOSURE
NETWORK SWITCH. PROVIDE PROGRAMMING AND
INTEGRATION OF US101 REPLACEMENT CIRCUIT BREAKER
STATUS / DATA TO EXISTING FACILITY PME NETWORK.
759 SF
ELEC. RM. ELEC. UNIT SUBSTATION
�3���7�5������7�5����101-P-01B �3���7�5����101-P-01B��7�5����C-01B
E-504
101-C-02
TRANSFORMER (CPT) LOCATED INTERIOR TO EXISTING UNIT
COMPACT
ENTRANCE
COMPACT
BUILDING 100, LEVEL B1
BUILDING 103
DN
NO PARKING
B B
COLAPSABLE
GATE
STORAGE
NO PARKING
COMPACT
MC
MC MC MC MC MC MC MC MC MC
MECHANICAL
EQUIPMENT
COMPACT
NO PARKING
NO PARKING
F.D.
BIKE
LOCKER
MC
BIKE
LOCKERS MC
R
AM
P D O
W N
RAMP DOWN
B B
FIRE
DEPARTMENT
CONNECTION
B
WATER
VALVE
COMPACTCOMPACT COMPACT COMPACTCOMPACT COMPACT
COMPACTCOMPACT COMPACT COMPACTCOMPACT COMPACT
UP
MCBIKE
LOCKER
F.D.
F.D.
MC
MC
F.D.
MC
SEISMIC JOINT
NO PARKING
BOLLARD
P-2 A-12
P-2 A-16
P-2 A-15
P-2 A-14P-2
A-13 P-2 A-11
P-2 A-10P-2
A-9 P-2 A-8
P-2 A-7
P-2 A-6
P-2 A-5
P-2 A-4
P-2 A-3
P-2 A-2
P-2 A-1
P-2 B-12
P-2 B-15
P-2 B-14
P-2 B-13
P-2 B-11
P-2 B-10
P-2 B-9
P-2 B-8P-2
B-7 P-2 B-6
P-2 B-5
P-2 B-4
P-2 B-3
P-2 B-2
P-2 B-1
P-2 C-12
P-2 C-15
P-2 C-14P-2
C-13 P-2 C-11
P-2 C-10P-2
C-9
P-2 C-8
P-2 C-7
P-2 C-6
P-2 C-5
P-2 C-4
P-2 C-3
P-2 C-2
P-2 C-1
P-2 D-12
P-2 D-15
P-2 D-14
P-2 D-13
P-2 D-11
P-2 D-10
P-2 D-9
P-2 D-8
P-2 D-7
P-2 D-6
P-2 D-5
P-2 D-4
P-2 D-3
P-2 D-2
P-2 D-1
PNL: 102_NH102-1 1
990 SF
P2-2
UNIFORM ROOM
STAIR
NO. 3 STAIR
NO. 4
STAIR
NO. 1
557 SF
P2-4
LOBBY
P2-LEVEL
PARKING DECK
37 SF
T-52
GUARD SHACK
STAIR
NO. 2
P2-1
ELEC. VAULT
0 4' 8' 16' 32'
BLDG 102 - LEVEL P2 - ELECTRICAL
PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
PROJECT
NORTH
SCALE : 1/16" = 1'-0"
1 BLDG 102 - LEVEL P2 - ELECTRICAL PLAN
102E-101
BLDG 41
BLDG 16
BLDG 6
BLDG T-51
BLDG
BLDG 101
BLDG 100
BLDG 102
BLDG 103
BLDG 104
GENERAL NOTES
KEY NOTES
AREA OF WORK
gmsfgnsfg
PROJECT
NORTH
KEY PLAN
1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE
SHOWN FOR CLARITY.
2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATIONS SHALL BE FIELD VERIFIED AND
REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT
IS BEING RELOCATED AND/OR MODIFIED.
4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS
IMPACTED BY THIS PROJECT.
BLDG 102
EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE
ONE-LINE DIAGRAMS ON SHEETS 102ED601 & 102EP601
FOR ADDITIONAL INFORMATION.
UP
DN
TYP. BOLLARD
BE
N
C H
F.O.
CONC.
LOW WALL
FD FD FD FD FD
LOW WALLLOW WALL
FD
FD
PL
AN
TE
R
FD
FS
F.D.
FS
F.D.
F.D.
FD
D.F.
PLANTER
PLANTER
DOCK LIFT
UP
O /H
D O
O R
O /H
D O
O R
FD FD FD FD FD
FD FD
FD
A-
FP
-0
4-
A-
FP
-0
3-
M
AT
C H
LI
N
E
A-
FP
-0
4-
A-
FP
-0
3-
M
AT
C H
LI
N
E
177 SF
C1-6
CORRIDOR
STAIR
NO. 3
146SF
C1-7
CORRIDOR
ELEV.
P-11
ELEV.
S-13
359SF
C1-10
CORRIDOR
108SF
C1-9
CORRIDOR
186SF
C1-11
CORRIDOR
112SF
E106
BSL-3 STOR.
164SF
E105
BSL-3 LAB.
143SF
E104
LAB
164SF
E103
PROC. LAB.
138SF
E102
ANIMAL HOLDING
129SF
E100
CHANGE/ SHOWER
139SF
E101
CHANGE/ SHOWER
98SF
C1-5
ANTE-ROOM
88SF
C1-8
CORRIDOR
240SF
E115
ANIMAL HOLDING
146SF
E116
SM. ANIMAL HOLDING
146SF
E120
SM. ANIMAL HOLDING
87SF
E114
STAFF
153SF
E118
PROC. LAB.
161SF
E123
PROC. LAB.
239SF
E112
CLEAN CAGEWASHER
163SF
E110
DIRTY CAGEWASHER
162SF
E111
ANIMAL HOLDING
162SF
E113
CLEAN STOR.
162SF
E125
ANIMAL REC.
24SF
E117
BED.
17SF
E119
FEED EQUIP. ALCOVE
188SF
E121
ANIMAL HOLDING
175SF
E122
ANIMAL HOLDING
130SF
E124
ANIMAL TECH. OFF.
114SF
E126
STAFF TOILET
335SF
E130
EQUIP. GEN. STOR.
481 SF
E131
RO/DI WATER
791SF
C1-4
CORRIDOR
71SF
E135
MACH. RM.
240SF
E137
GLASS WASH
258SF
E134
ELECT. ROOM
211SF
E140
EQUIP.
185SF
E142
T.C. WKRM.
96SF
E142b
T.C. LAB.
98SF
E142a
T.C. LAB.
90SF
E142c
T.C. LAB.
42SF
E144 H.W.
45 SF
E133 H.A.C.
138SF
E145
COLD ROOM
68SF
C1-12
CORRIDOR
235SF
E147
EQUIP. ROOM
47SF
E132
ELEV. MACH.
204SF
E148
OFFICE
540SF
E139
LAB.159SF
E138
OFFICE
162SF
E136
OFFICE
535SF
E141
LAB.
535SF
E143
LAB.
541 SF
E146
LAB.
803 SF
C1-14
CORRIDOR
145SF
E149
OFFICE
115SF
E149a
OFFICE
118SF
E149c
OFFICE
114SF
E149b
OFFICE
65SF
C1-4B
CORRIDOR
1279 SF
D1-100
LOADING DOCK
595SF
C1-17B
CORRIDOR
196 SF
F120
CONFERENCE RM.
STAIR
NO. 2
78SF
F119
PATIENT TOILET
47SF
F114a
LINEN CLOSET
83SF
F114b
MED. ROOM
127SF
F114d
EXAM
110SF
F114e
EXAM ROOM
112SF
F108
EXAM ROOM
57SF
F114f
HALL
50SF
F114c
STAFF TOIL. 113SF
F109
EXAM ROOM 57SF
F144 H.A.C.
77SF
F101
SOILED UTIL.
45SF
C1-16
CORR
80SF
C1-15
CORRIDOR
627SF
C1-1
LOBBY
143SF
C1-2
VESTIBULE
147SF
F102
EXAM ROOM
91SF
F103
EXAM ROOM
1473SF
C1-3
LOBBY
100SF
F106
EXAM ROOM
100SF
F110
EXAM ROOM
98SF
F111
EXAM ROOM
95SF
F105
EXAM ROOM 172SF
F104
EXAM
129SF
C1-18
CORRIDOR
126SF
C1-20
CORRIDOR
506SF
F124
LAB.
173SF
F125
LUNCH ROOM
133SF
F129a
COLD
238SF
F128
EQUIP. ROOM
215SF
F132
T.C. WORK RM.
126SF
F132A
T.C. LAB.
132SF
F132B
T.C. LAB.
252SF
F135
ELECT.
786SF
C1-23
CORRIDOR
52SF
C1-24
CORRIDOR
76SF
C1-25
CORRIDOR
188SF
F143
TOILET, F.
147SF
F142
TOILET, M.
109SF
F141
OFFICE
101SF
F139
COPY/ WORKRM.
101SF
F137
OFFICE
27SF
F134 H.W.
27SF
F133 H.W.
535SF
F131
LAB.
539SF
F136
LAB.
159SF
F138
OFFICE
162SF
F140
OFFICE
535SF
F130
LAB.
544SF
F127
LAB.
145SF
F126
OFFICE
116SF
F126c
OFFICE
114SF
F126b
OFFICE
118SF
F126a
OFFICE
STAIR
NO. 1
116SF
C1-17A
CORRIDOR
205SF
F122
CHECK OUT
188 SF
F100
TEAM
124SF
C1-21
CORR.
106SF
F109a
EXAM
111SF
F107
EXAM
109SF
F108a
EXAM
214SF
F121
BREAK ROOM
100SF
F123c
EXAM
100SF
F123
EXAM
100SF
F123a
EXAM
100SF
F123b
EXAM
132SF
C1-22
CORR.
721SF
C1-17
CORRIDOOR
100SF
F113
EXAM ROOM
98SF
F112
EXAM ROOM
150SF
C1-19
CORRIDOR
154SF
F114
OMNI
571 SF
F115a
TEAM ROOM
479 SF
F115
OFFICE AREA
342 SF
D1-101
STORAGE
3/32" = 1'-0"
BLDG 103 - LEVEL 01 - ELECTRICAL PLAN1
0 4' 16'8'
PNL: 103_LSH1031N
PNL: 103_NH1031N
PNL: 103_EL103DP1N
PNL: 103_EL103DP1S
PNL: 103_NH103DP1S
BLDG 103 - LEVEL 01 - ELECTRICAL
PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
PROJECT
NORTH
103E-101
BLDG 41
BLDG 16
BLDG 6
BLDG T-51
BLDG
BLDG 101
BLDG 100
BLDG 102
BLDG 103
BLDG 104
GENERAL NOTES
KEY NOTES
AREA OF WORK
gmsfgnsfg
PROJECT
NORTH
KEY PLAN
1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE
SHOWN FOR CLARITY.
2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATIONS SHALL BE FIELD VERIFIED AND
REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT
IS BEING RELOCATED AND/OR MODIFIED.
4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS
IMPACTED BY THIS PROJECT.
BLDG 103
EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE
ONE-LINE DIAGRAMS ON SHEETS 103ED601 & 103EP601
FOR ADDITIONAL INFORMATION.
EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE
ONE-LINE DIAGRAMS ON SHEETS 103ED603 & 103EP603
FOR ADDITIONAL INFORMATION.
EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE
ONE-LINE DIAGRAMS ON SHEETS 103ED604 & 103EP604
FOR ADDITIONAL INFORMATION.
c
UP
DN
UP UP
UP
FD
FD
DN
F.E.C.
7 6 4 35 12
UP
F.E.C.
PIPE
STAND
FD
STANDPIPE
UP
RAMPRAMP
ccccccc
FS
PUMP
COVER
UP
F.E.C.
DRAIN
TRENCH DRAIN
O/H COILING DOOR
R
AM
P
DRIVEWAY
#53
RESERVED
UP
TO
BLDG. 16
BUILDING 16
(SEE DWG 16-2)
RESERVED
RESERVED
RESERVED
RESERVED
RESERVED
RESERVED
RESERVED
RESERVED
168 SF
TOILET, MALE
147 SF
P5F-109a
PIT
1523 SF
P5F-109a
TUNNEL
STAIR
NO. 1
1523 SF
P5F-109a
TUNNEL
STORAGESTORAGE
349 SF
P5F-154b
CONFERENCE
129 SF
P5F-124B
TEST BOOTH
STORAGE
70 SF
CP5-5a
ELEV. LOBBY
865 SF
EXT. CORRIDOR
70 SF
P5F-172 H.A.C.
59 SF
P5F-173
TOILET
59 SF
P5F-174
TOILET
223 SF
P5F-177
STAFF LOUNGE
226 SF
P5F-175
OFFICE
122 SF
P5F-178
OFFICE
113 SF
P5F-179
OFFICE
79 SF
P5F-190
VESTIBULE
247 SF
CP5-20
CORRIDOR
345 SF
P5F-154a
CONFERENCE
387 SF
P5F-145
LAB
105 SF
P5F-138
OFFICE
101 SF
P5F-140
OFFICE
103 SF
P5F-142
OFFICE
212 SF
P5F-145a
HARDWARE /SOFTWARE LAB
212 SF
P5F-145b
BIO MED ENG.
14 SF
P5F-192
SOILED LINEN
14 SF
P5F-191
STORAGE
134 SF
P5F-180
OFFICE
234 SF
P5F-134
VESTIBULE
121 SF
P5F-134a
CONTROL
153 SF
P5F-134b
TEST BOOTH
117 SF
P5F-134d
CONTROL
141 SF
P5F-134c
TEST BOOTH
129 SF
P5F-181
OFFICE
128 SF
P5F-182
OFFICE
138 SF
P5F-183
ADMIN. OFFICER OFF. 132 SF
P5F-184
OFFICE
184 SF
P5F-185
OFFICE
153 SF
P5F-186
LIBRARY
122 SF
P5F-187
CONTROL
116 SF
P5F-188
TEST BOOTH
307 SF
CP5-17
CORRIDOR
123 SF
P5F-189
CONTROL
130 SF
P5F-131
RESEARCH COORD.
130 SF
P5F-130
OFFICE
154 SF
P5F-128
TEST BOOTH
159 SF
P5F-126
CONTROL
357 SF
CP5-13
CORRIDOR
311 SF
CP5-12
CORRIDOR
251 SF
P5F-133
LAB
200 SF
P5F-127
CONTROL
129 SF
P5F-125
TEST BOOTH
SF
P5F-124
CONTROL
138 SF
P5F-122
CONTROL
163 SF
P5F-121
CONTROL
151 SF
P5F-123
TEST BOOTH
149 SF
P5F-120
TEST BOOTH
70 SF
P5F-135
STORAGE
212 SF
P5F-137
LAB
152 SF
P5F-119
TEST BOOTH
142 SF
P5F-117
CONTROL
40 SF
P5F-139 H.A.C.CP5-10a
RECEPTION
715 SF
CP5-14
CORRIDOR
691 SF
CP5-16
CORRIDOR
282 SF
CP5-21
CORRIDOR
208 SF
CP5-22
CORRIDOR
70 SF
CP5-25
CORRIDOR
118 SF
P5F-168
OFFICE
118 SF
P5F-169
OFFICE
116 SF
P5F-166
OFFICE
116 SF
P5F-164
OFFICE
119 SF
P5F-167
OFFICE
120 SF
P5F-165
OFFICE
116 SF
P5F-162
OFFICE
120 SF
P5F-163
OFFICE
234 SF
P5F-161
CONTROL
441 SF
P5F-161a
ANECHOIC CHAMBER
184 SF
P5F-160
GROUP OFFICE
386 SF
CP5-23
CORRIDOR
111 SF
P5F-158
OFFICE
111 SF
P5F-157
OFFICE
111 SF
P5F-156
OFFICE
115 SF
P5F-155
OFFICE
136 SF
P5F-153
SIM. REAL LIFE TEST.
133 SF
P5F-152
OFFICE
135 SF
P5F-151
LAB135 SF
P5F-150
IN-TAKE/EXAM
129 SF
P5F-143
TOILET, W
130 SF
P5F-141
TOILET, M
736 SF
P5F
RECEPT. & WAITING
CP5-10b
WAITING
CP5-10
LOBBY
277 SF
CP5-11
CORRIDOR
153 SF
P5F-118
TEST BOOTH
143 SF
P5F-116
CONTROL
134 SF
P5F-115
OFFICE
100 SF
P5F-114
EXAM
166 SF
CP5-1
LOBBY
179 SF
P5F-100
MECH. RM.
100 SF
P5F-109
MECH. RM.
658 SF
P5F-108
ELECT. ROOM231 SF
P5F-107
ELEC. PANEL
70 SF
P5F-106
TEL. EQ.
106 SF
P5F-105
ELEC. RM.
464 SF
P5F-104
MECH. RM.
150 SF
P5F-103
MECH. RM.
101 SF
P5F-102
SPRINKLER
87 SF
P5F-101
TEL. RM.
71 SF
CP5-5b
ELEV. LOBBY
572 SF
CP5-15
CORRIDOR
486 SF
CP5-6
ENTRANCE
97 SF
P5F-100
STOR./MECH.
337 SF
CP5-7
EXT. CORRIDOR
21,981 SF
P5-LEVEL
PARKING STRUCTURE
806 SF
CP5-4
CORRIDOR
582 SF
CP5-3
CORRIDOR
207 SF
NO. 1
STAIR
217 SF
NO. 2
STAIR
216 SF
NO. 3
STAIR
203 SF
NO. 4
STAIR
ELEV.
P-9
ELEV.
P-10 c
F.E.C.
7 6 4 35 12
F.E.C.
ccccccc
PUMP
COVER
F.E.C.
DRAIN
#53
RESERVED
TO
BLDG. 16
RESERVED
RESERVED
RESERVED
RESERVED
RESERVED
RESERVED
RESERVED
RESERVED
BLDG 103 - LEVEL P5 - ELECTRICAL PLAN1
- 3/64" = 1'-0"
0 8' 32'4' 16'
P5F-107
PNL: 103_LSH103P5
SWBD: 103_105
PNL: 103_NH103P5M
PNL: 103_DEH103P5
UNIT SUBSTATION:
US103
METERING SYSTEM
BLDG 103 - LEVEL P5 - ELECTRICAL
PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
103E-402
PROJECT
NORTH
103E-402
103E-102
GENERAL NOTES
KEY NOTES
AREA OF WORK
PROJECT
NORTH
KEY PLAN
1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE
SHOWN FOR CLARITY.
2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATIONS SHALL BE FIELD VERIFIED AND
REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT
IS BEING RELOCATED AND/OR MODIFIED.
4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS
IMPACTED BY THIS PROJECT.
EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE
ONE-LINE DIAGRAMS ON SHEETS 103ED602 & 103EP602
FOR ADDITIONAL INFORMATION.
EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE
ONE-LINE DIAGRAMS ON SHEETS 103ED603 & 103EP603
FOR ADDITIONAL INFORMATION.
EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE
ONE-LINE DIAGRAMS ON SHEETS 103ED604 & 103EP604
FOR ADDITIONAL INFORMATION.
EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE
ONE-LINE DIAGRAMS ON SHEETS 103ED601 & 103EP601
FOR ADDITIONAL INFORMATION.
E-504
FPS
75 SF
CB2G-1
CORRIDOR
109 SF
CB2G-5
CORRIDOR
K-2007KINGSTONC_LAVATORY VITREOUS CHINA
310 SF
CB2G-6
CORRIDOR
188 SF
CB2G-9
CORRIDOR
195 SF
CB2G-10
CORRIDOR
32 SF
CB2G-10A
COPY
136 SF
B2G-155
RECEPTION
64 SF
B2G-143
OFFICE
101 SF
B2G-153
OFFICE
106 SF
B2G-151
OFFICE
186 SF
CB2G-7
CORRIDOR
108 SF
B2G-145
OFFICE
109 SF
B2G-144
OFFICE
109 SF
B2G-142
OFFICE
63 SF
CB2G-8
CORRIDOR
97 SF
B2G-146
OFFICE
110 SF
B2G-147
OFFICE
131 SF
B2G-148
OFFICE
196 SF
B2G-149
OFFICE
93 SF
B2G-150
OFFICE
93 SF
B2G-152
OFFICE
93 SF
B2G-154
OFFICE
116 SF
B2G-141
OFFICE
93 SF
B2G-156
OFFICE
111 SF
B2G-157
OFFICE
34 SF
B2G-140
FILE
267 SF
CB2G-4
CORRIDOR 122 SF
B2G-109
OFFICE 4
100 SF
B2G-111
OFFICE 3
104 SF
B2G-108
INTERVIEW 4
100 SF
B2G-110
INTERVIEW 3
98 SF
B2G-112
INTERVIEW 2
159 SF
B2G-122
BULLPEN 3
192 SF
B2G-100
WAITING ROOM
121 SF
B2G-116
BULLPEN 2
1186 SF
CORRIDOR
216 S.F.
NO. 6
STAIR
NO. 10
ELEV
132 SF
B2G-113
SECURE INTERVIEW 1
111 SF
B2G-114
OFFICE 2
61 SF
B2G-115
HAC
116 SF
B2G-117
BULLPEN 1
121 SF
B2G-118
MED
117 SF
B2G-119
LEAD
70 SF
B2G-100
RECEPT
121 SF
B2G-120
NP
121 SF
B2G-101
SHARED INTERVIEW
120 SF
B2G-103
OFFICE 1
64 SF
B2G-121
STORAGE
42 SF
B2G-124
UNISEX
90 SF
B2G-123
TLT, MALE
114 SF
B2G-107
BREAK ROOM
255 SF
B2G-106
GROUP 4
286 SF
B2G-105
GROUP 3
365 SF
B2G-104
GROUP 2
245 SF
B2G-102
GROUP 1
150 SF
B2G-140c
TOILET, F.
125 SF
B2G-140b
TOILET, M.
257 SF
CB2G-1
CORRIDOR
141 SF
CB2G-2
CORRIDOR
289 SF
CB2G-3
CORRIDOR
23 SF
B2G-140a
ELEC. RM.
PNL: 104_P3-104-H1
XF: 104_T-150
CONTINUE FROM
SHEET 104E-100
SCALE : 1/8" = 1'-0"
1 BLDG 104 - LEVEL B2 - ELECTRICAL PLAN
0' 16'4' 8'
BLDG 104 - LEVEL B2 - ELECTRICAL
PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
PROJECT
NORTH
104E-1000
BLDG 41
BLDG 16
BLDG T-51
BLDG
BLDG 101
BLDG 102
BLDG 103
GENERAL NOTES
KEY NOTES
AREA OF WORK
PROJECT
NORTH
KEY PLAN
1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE
SHOWN FOR CLARITY.
2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATIONS SHALL BE FIELD VERIFIED AND
REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT
IS BEING RELOCATED AND/OR MODIFIED.
4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS
IMPACTED BY THIS PROJECT.
BLDG 6
BLDG 100
EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE
ONE-LINE DIAGRAMS ON SHEETS 104ED601 & 104EP601
FOR ADDITIONAL INFORMATION.
BLDG 104
104-P-01
STAIR
ST-6
144SF
B1G-120
OFFICE
120 SF
B1G-122
OFFICE
120 SF
B1G-124
OFFICE
119 SF
B1G-126
OFFICE
120 SF
B1G-128
OFFICE
139 SF
B1G-150
OFFICE
58 SF
CB1-5
CORRIDOR
53 SF
B1G-121
S. TLT.
80 SF
B1G-123
OFFICE
80 SF
B1G-125
OFFICE
80 SF
B1G-127
OFFICE
100 SF
B1G-129
OFFICE
80 SF
B1G-130
OFFICE
102 SF
B1G-132
OFFICE
100 SF
B1G-134
OFFICE
100 SF
B1G-136
OFFICE
100 SF
B1G-138
OFFICE
204 SF
CB1-6
CORRIDOR
232 SF
CB1-8
CORRIDOR
100 SF
B1G-131
OFFICE
100 SF
B1G-133
OFFICE
100 SF
B1G-135
OFFICE
100 SF
B1G-137
OFFICE
98 SF
B1G-139
OFFICE
100 SF
B1G-140
OFFICE
120 SF
B1G-141
OFFICE
120 SF
B1G-142
OFFICE
120 SF
B1G-144
OFFICE
118 SF
B1G-146
OFFICE
31 SF
B1G-145
S. TLT.
33 SF
B1G-143 H.A.C.
200 SF
B1G-103
GROUP RM.
250 SF
B1G-105
GROUP RM.
100 SF
B1G-160
OFFICE
681 SF
CB1-7
CORRIDOR
120 SF
B1G-151
OFFICE
119 SF
B1G-152
OFFICE
119 SF
B1G-153
OFFICE
120 SF
B1G-154
OFFICE
120 SF
B1G-155
OFFICE
120 SF
B1G-156
OFFICE
118 SF
B1G-157
OFFICE
121 SF
B1G-158
OFFICE
120 SF
B1G-159
OFFICE
120 SF
B1G-161
OFFICE
125 SF
B1G-162
OFFICE
123 SF
B1G-165
OFFICE
144 SF
B1G-167
OFFICE
144 SF
B1G-168
OFFICE
112 SF
B1G-169
STORAGE
169 SF
B1G-171a
ELEC/TEL.
44 SF
B1G-170
S. TLT.
55 SF
B1G-171
VESTIBULE
127 SF
B1G-172
EXAM
127 SF
B1G-173
EXAM
100 SF
B1G-166
OFFICE
100 SF
B1G-164
OFFICE
426 SF
B1G-100a
ADMIN.
224 SF
B1G-163
SUPPORT
217 SF
CB1-9
CORRIDOR
110 SF
CB1-10
CORRIDOR
119 SF
CB1-3
CORRIDOR
219 SF
CB1-11
CORRIDOR
151 SF
B1G-104
TOILET, F.
152 SF
B1G-102
TOILET, M.
30 SF
B1G-174
CLOSET
202 SF
B1G-100
RECEPTION
83 SF
CB1-0
ELEV. VEST.281 SF
CB1-2
WAITING
394 SF
CB1-1
CORRIDOR
323 SF
B1G-101
GROUP RM
118 SF
B1G-106
OFFICE
121 SF
B1G-107
OFFICE
120 SF
B1G-108
OFFICE
121 SF
B1G-109
OFFICE
121 SF
B1G-110
OFFICE
122 SF
B1G-111
OFFICE
121 SF
B1G-113
OFFICE
329 SF
CB1-4
CORRIDOR
121 SF
B1G-112
OFFICE
ELEV.
P-10
PNL: 104_B1H1
PNL: 104_B1H
CONTINUE TO
SHEET 104E-1000
SCALE : 1/8" = 1'-0"
1 BLDG 104 - LEVEL B1 - ELECTRICAL PLAN
0' 16'4' 8'
BLDG 104 - LEVEL B1 - ELECTRICAL
PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
PROJECT
NORTH
104E-100
BLDG 41
BLDG 16
BLDG T-51
BLDG
BLDG 101
BLDG 102
BLDG 103
GENERAL NOTES
KEY NOTES
AREA OF WORK
PROJECT
NORTH
KEY PLAN
1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE
SHOWN FOR CLARITY.
2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATIONS SHALL BE FIELD VERIFIED AND
REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT
IS BEING RELOCATED AND/OR MODIFIED.
4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS
IMPACTED BY THIS PROJECT.
BLDG 6
BLDG 100
EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE
ONE-LINE DIAGRAMS ON SHEETS 104ED601 & 104EP601
FOR ADDITIONAL INFORMATION.
BLDG 104
104-P-01
FANS
STAIR
ST-4
STAIR
ST-6
53 SF
G172
VITALS
117 SF
G107c
HALLWAY
140 5SF
G102
OFFICE
93 SF
G105
OFFICE
82 SF
G104
OFFICE
82 SF
G103
OFFICE
85 SF
G103a
OFFICE
980SF
C1-2
WAITING
BRIDGE
ELEV.
P-9
ELEV.
P-10
12 SF
G107a
STOR.
11 SF
G107b
STOR.
113 SF
G106
HALLWAY
104 SF
G106e
EXAM RM.
90 SF
G106c
EXAM RM.
129 SF
G106d
EXAM RM.
108 SF
G106b
OFFICE
105 SF
G106a
EXAM RM.50 SF
G171
VITALS
144 SF
G170
MECH. ROOM
54 SF
G101
TOILET
54 SF
G100
TOILET
343 SF
C1-3
CORRIDOR
72 SF
G160
OFFICE
114 SF
G163
OFFICE
115 SF
G162
OFFICE
887 SF
C1-4
WAITING ROOM
55 SF
C1-16
CORRIDOR
192 SF
C1-1
CORRIDOR
40 SF
G108
P. TOILET 107 SF
G107
BREAK RM.63 SF
G109
SOILED UTILITY
74 SF
G109a
CLEAN UTILITY
44 SF
G114
MED. CABINET
103 SF
G111
EXAM RM.
104 SF
G110
EXAM RM.
101 SF
G157
EXAM RM.
105 SF
G156
EXAM RM.
80 SF
G112
EXAM RM.
81 SF
G118
EXAM RM.
82 SF
G113
EXAM RM.
82 SF
G117
EXAM RM.
78 SF
G154
EXAM RM.
80 SF
G155
EXAM RM.
87 SF
G151
EXAM RM.
89 SF
G150
EXAM RM.
500 SF
C1-14
CORRIDOR
92 SF
G161
OFFICE
92 SF
G159
OFFICE
92 SF
G158
OFFICE
94 SF
G153
OFFICE
93 SF
G152
OFFICE
92 SF
G147
OFFICE
295 SF
C1-15
CORRIDOR
91 SF
G146
OFFICE
188 SF
G139
OFFICE
92 SF
G138
SPD
84 SF
G137
OFFICE147 SF
G136
OFFICE
143 SF
G134
OFFICE
116 SF
G131
OFFICE
115 SF
G131a
BREAK ROOM
68 SF
G130
LAB
55 SF
G132
SOILED UTIL.
44 SF
G133 H.A.C.
34 SF
G135
TOILET
165 SF
G141
PROCEDURE RM.
291 SF
C1-11
CORRIDOR
235 SF
C1-6
CORRIDOR286 SF
C1-7
CORRIDOR
310 SF
C1-8
CORRIDOR
92 SF
G148
EXAM RM.
98 SF
G144
EXAM RM.
95 SF
G149
EXAM RM.
101 SF
G143
EXAM RM.
80 SF
G119a
P. TOILET
82 SF
G142
P. TOILET
93 SF
G119
EXAM RM.
98 SF
G125
EXAM RM.
95 SF
G120
EXAM RM.
100 SF
G124
EXAM RM.
401 SF
G123
WAITING AREA
94 SF
G126
EXAM RM.
56 SF
G127
RECEPTION
211 SF
G129
EDUC. WAIT. ROOM
275 SF
C1-10
CORRIDOR
47 SF
G122
P. TOILET
101 SF
G115
EXAM RM.79 SF
G116
CLEAN LINEN
85 SF
OFFICE
339 SF
C1-5
CORRIDOR
STAIR
ST-6
STAIR
ST-4
STAIR
ST-3
81 SF
G140
PATIENT TOILET
PNL: 104_EL104DP1
SCALE : 1/8" = 1'-0"
1 BLDG 104 - LEVEL 01 - ELECTRICAL PLAN
0' 16'4' 8'
BLDG 104 - LEVEL 01 - ELECTRICAL
PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
PROJECT
NORTH
104E-101
BLDG 41
BLDG 16
BLDG 6
BLDG T-51
BLDG
BLDG 101
BLDG 100
BLDG 102
BLDG 103
BLDG 104
GENERAL NOTES
KEY NOTES
AREA OF WORK
gmsfgnsfg
PROJECT
NORTH
KEY PLAN
1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE
SHOWN FOR CLARITY.
2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATIONS SHALL BE FIELD VERIFIED AND
REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT
IS BEING RELOCATED AND/OR MODIFIED.
4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS
IMPACTED BY THIS PROJECT.
EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE
ONE-LINE DIAGRAMS ON SHEETS 104ED601 & 104EP601
FOR ADDITIONAL INFORMATION.
BLDG 104
COOLING TOWER #1 COOLING TOWER #2 COOLING TOWER #3
STAIR
NO. 4
B2D-101
CARPENTER SHOP
1565 SF
CB2-6
CORRIDOR
210 SF
B2D-105
LOCK SHOP
292 SF
B2D-106
EMERGENCY GENERATOR
2702 SF
STAIR
NO. 28
B2D-106a
AIR TUNNEL - BELOW STAIR
NO. 13
SCALE : 1/8" = 1'-0"
1 BLDG 105 - OVERALL ELECTRICAL DEMOLITION PLAN
0' 4' 8' 16'
BUILDING 105 STRUCTURE
UNDER COOLING TOWER PAD
BLDG 105 - OVERALL ELECTRICAL
DEMOLITION PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
648-20-119
Date:Revisions:
Approved:
Approved:CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
CONSULTANT
VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR
CORRECT ELECTRICAL FCA
DEFICIENCIES BLDGS - VAORA/E:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES, PRESIDENT
DCW/LRL JGD/JRB01/31/2025
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
E85 FUEL DISPENSARY
EQUIPMENT
E85 FUEL DISPENSARY
FEEDER
105E-401a
105E-401b
4 TYP.
PROJECT
NORTH
SEWER MANHOLE
ELECTRIC MANHOLE
EMERGENCY PHONE
EPO SWITCH,
DISCONNECT /SWITCH,
AND RECEPTACLE
BUILDING 105 STRUCTURE
UNDER COOLING TOWER PAD
CIRCULATION PUMP VFD ENCLOSURE 5
COOLING TOWER VFD ENCLOSURE 5
FUEL DISPENSARY POS3
GATE, WALLS
AND CURBING
3B E-506
VEHICLE VACUUM
3A E-506
105ED101
BLDG 41
BLDG 16
BLDG T-51
BLDG
BLDG 101
BLDG 102
BLDG 103
GENERAL NOTES
KEY NOTES
AREA OF WORK
PROJECT
NORTH
KEY PLAN
1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND
ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE
SHOWN FOR CLARITY.
2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE
REPORTED TO COR.
3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.
EXACT LOCATIONS SHALL BE FIELD VERIFIED AND
REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT
IS BEING RELOCATED AND/OR MODIFIED.
4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT
BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,
IMMEDIATELY INFORM AND COORDINATE WITH VA AS
REQUIRED.
5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION
OF ALL SHUTDOWNS.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL
DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS
IMPACTED BY THIS PROJECT.
BLDG 6
BLDG 100
EXISTING CONDUIT AND WIRE EXTENDING TO "105 MCC-1"
TO BE MODIFIED. REFERENCE SHEETS 105EP101,
105E-401a, and 105E-401b FOR ADDITIONAL INFORMATION.
EXISTING 4" x 4" UTILIDOR LID TO BE DEMOLISHED AND
REPLACED.
EXISTING E85 FUEL DISPENSORY AND RELATED
EQUIPMENT SHALL BE DEMOLISHED. ALL CORRESPONDING
CONDUIT AND WIRING SHALL BE DEMOLISHED BACK TO
SOURCE.
EXISTING COOLING TOWER CONDUIT AND WIRE TO BE
DEMOLISHED BACK TO SOURCE.
EXISTING CIRCULATION PUMP AND COOLING TOWER VFD
ENCLOSURES SHALL BE DEMOLISHED. ALL
CORRESPONDING CONDUIT AND WIRING SHALL BE
DEMOLISHED BACK TO SOURCE; ALL CONCRETE SLAB
PENETRATIONS SHALL BE PATCHED TO MATCH SLAB.
EXISTING GATE AND ALL ELECTRONIC ACCESS CONTROL
SHALL BE DEMOLISHED. ALL CORRESPONDING CONDUIT
AND WIRING SHALL BE DEMOLISHED BACK TO SOURCE.
BLDG 105
AN
COOLING TOWER #1 COOLING TOWER #2 COOLING TOWER #3
BUILDING 105
STRUCTURE UNDER
COOLING TOWER PAD
DN
STAIR
NO. 4
B2D-101
CARPENTER SHOP
1565 SF
CB2-6
CORRIDOR
210 SF
B2D-105
LOCK SHOP
292 SF
B2D-106
EMERGENCY GENERATOR
2702 SF
STAIR
NO. 28
B2D-106a
AIR TUNNEL - BELOW STAIR
NO. 13
B2D-122
4' X 4' COVER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .