Attachment 4-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 2.pdf

PDF 5 MB Posted

Attached to
Z2DA--CON-NRM 648-20-119 Correct Electrical FCA Deficiencies (Portland)
Solicitation number
36C26025R0071
Issued by

About this file

This document is a set of electrical demolition and renovation plans for the VA Portland Health Care System, specifically detailing electrical modifications across multiple buildings (Buildings 100, 101, 102, 103, 104, 105, 016). The comprehensive set of electrical plans covers seven different levels/areas, including basement, parking, and utility spaces, and provides detailed schematics for electrical system upgrades, equipment replacements, and demolition work.

The plans involve extensive electrical infrastructure modifications, including replacing unit substations, modifying motor control centers, rerouting conduits and feeders, installing new junction boxes, and updating electrical distribution equipment. Key elements include replacing circuit breakers, installing network switches, providing new control power transformers, and integrating equipment status/data systems. The project appears focused on correcting electrical facility condition assessment (FCA) deficiencies, with work spanning multiple buildings and involving complex electrical system reconfigurations for the Veterans Affairs medical facility in Portland, Oregon.

View the file

Other files

File Type Posted
36C26025R0071 0005.docx DOCX document
36C26025R0071 0004.docx DOCX document
F-103-1-TJC-Fire Life Safety - Bldg.103-1.pdf PDF
36C26025R0071 0003.pdf PDF
F-104-2-TJC-Fire Life Safety - Bldg.104-2.pdf PDF
F-104-P2-TJC-Fire Life Safety - Bldg.104-P2.pdf PDF
F-104-R-TJC-Fire Life Safety - Bldg.104-R.pdf PDF
36C26025R0071 0002.docx DOCX document
F-104-1-TJC-Fire Life Safety - Bldg.104-1.pdf PDF
F-104-P3-TJC-Fire Life Safety - Bldg.104-P3.pdf PDF
F-16-2-TJC-Fire Life Safety - Bldg.16-2.pdf PDF
F-6-2-TJC-Fire Life Safety - Bldg.6-2.pdf PDF
F-103-P3-TJC-Fire Life Safety - Bldg.103-P3.pdf PDF
F-103-P5-TJC-Fire Life Safety - Bldg.103-P5.pdf PDF
F-103-R-TJC-Fire Life Safety - Bldg.103-R.pdf PDF
F-6-3-TJC-Fire Life Safety - Bldg.6-3.pdf PDF
F-103-P4-TJC-Fire Life Safety - Bldg.103-P4.pdf PDF
F-16-B-TJC-Fire Life Safety - Bldg.16-B.pdf PDF
F-103-P2-TJC-Fire Life Safety - Bldg.103-P2.pdf PDF
36C26025R0071 0001.pdf PDF
F-16-R-TJC-Fire Life Safety - Bldg.16-R.pdf PDF
F-16-1-TJC-Fire Life Safety - Bldg.16-1.pdf PDF
F-103-2-TJC-Fire Life Safety - Bldg.103-2.pdf PDF
F-6-1-TJC-Fire Life Safety - Bldg.6-1.pdf PDF
Contractor sign in.pdf PDF
F-16-3-TJC-Fire Life Safety - Bldg.16-3.pdf PDF
Portland TJC Set Buildings 100 and 101.pdf PDF
36C26025R0071_2.docx DOCX document
Attachment 3-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 1.pdf PDF
Attachment 7-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 5.pdf PDF
Attachment 6-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 4.pdf PDF
Attachment 15-Past Performance Questionnaire.pdf PDF
Attachment 10-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 8.pdf PDF
Attachment 11-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 9.pdf PDF
Attachment 9-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 7.pdf PDF
Attachment 8-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 6.pdf PDF
Attachment 2-648-20-119-VA OR Portland Electrical FCA SPECS STAMPED.pdf PDF
Attachment 13-Price Schedule by Division.xlsx XLSX spreadsheet
Attachment 12-Wage Determination 7-11-2025.pdf PDF
Attachment 1-Statement of Work 648-20-119.pdf PDF
Attachment 14- VAAR 852.219-75.docx DOCX document
Attachment 5-648-20-119-VA OR Portland Electrical FCA DWGS STAMPED part 3.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

L.6

L.7

L.5

K.1

K

J

27 26 25 24 23 22 21

BL

D

G . 1

FIRST FLOOR CLINICS

TO BLDG NO. 100

20 19

UPUP

UP

LO

U

VE

R

DN

ENTRANCE

LOADING DOCK

SKYBRIDGE ABOVE

DF

SP

HOOD

AREA WELL

SP

MECH.. VENT

FD

UP

OVERHEAD COILING DOOR

MECH.. VENT

DF

RAMP DOWN

LOCKERS

DN

ACCESS FLOORING

FD

A/ C

U N

IT

PNL: 101_1H1-K-27

116 SF

133a

OFFICE

260 SF

STAIR

NO. 14

371 SF

C1-1

LOBBY

144 SF

100a

OFFICE

145 SF

100b

OFFICE

82 SF

100d

OFFICE

112 SF

101a

OFFICE

116 SF

OFFICE

97 SF

103a

OFFICE

104 SF

103e

OFFICE

77 SF

VESTIBULE

123 SF

103d

OFFICE

69 SF

103c

OFFICE

114 SF

103b

OFFICE

123 SF

101b

OFFICE

122 SF

103c

OFFICE

79 SF

VESTIBULE

600 SF

C1-2

CORRIDOR

293 SF

OFFICE

127 SF

OFFICE

113 SF

106a

OFFICE

95 SF

107d

OFFICE

116 SF

107c

OFFICE

126 SF

107a

OFFICE

148 SF

107b

OFFICE

STAIR

NO. 15

41 SF

112a H.A.C.

284 SF

1012f

MECH. ROOM

119 SF

112b

LOUNGE

147 SF

OFFICE

97 SF

108a

OFFICE

123 SF

105a

OFFICE

173 SF

OFFICE

111 SF

105b

OFFICE

211 SF

OFFICE

121 SF

115b

OFFICE

108 SF

105c

OFFICE

139 SF

109b

TELE. CONF. EDITING

123 SF

115a

OFFICE

271 SF

OFFICEM VOL. SVC.

273 SF

109a

CONTROL BOOTH

542 SF

CONF./ CLASSROOM

26 SF

CLOSET, SIGNAL

22 SF

CLOSET, TELE.

113 SF

VESTIBULE

142 SF

112c

TOILET, F.

132 SF

112d

TOILET, M.

90 SF

112e

CLOSET, ELEC.

215 SF

C1-3

CORRIDOR

354 SF

TEAM ROOM

115 SF

113a

OFFICE

123 SF

113b

OFFICE

156 SF

114a

OFFICE

142 SF

116a

OFFICE 95 SF

116b

OFFICE

129 SF

OFFICE, SECRETARY

132 SF

120b

OFFICE

100 SF

120c

OFFICE

80 SF

120a

OFFICE

235 SF

OFFICE, PUB. & CONG. AFFAIRS

96 SF

OFFICE 110 SF

OFFICE

136 SF

120d

OFFICE

44 SF

TELE. 47 SF

ELEC.

136 SF

102a

OFFICE

258 SF

122a

SUPPLY ROOM 392 SF

WORK ROOM, VOL. SVC.

57 SF

127e

OFFICE

99 SF

OFFICE

702 SF

C1-4

CORRIDOR

232 SF

C1-5

CORRIDOR

379 SF

OFFICE

130 SF

127f

OFFICE 367 SF

OFFICE

113 SF

127d

WORK/STOR.

113 SF

127c

OFFICE

104 SF

127b

EXAM/TREAT.

117 SF

127a

EXAM/TREAT.

63 SF

TOILET, F.

68 SF

TOILET, M.

176 SF

C1-8

ELEV. LOBBY

144 SF

C1-9

VESTIBULE

271 SF

MECH. ROOM

334 SF

C1-7

CORRIDOR

131 SF

C1-6

CORRIDOR

160 SF

PAT. ADVOCATE WAITING

128 SF

123a

OFFICE

145 SF

125a

OFFICE

114 SF

125b

WORK RM.

133 SF

125c

OFFICE

320 SF

RELEASE OF INFO.

165 SF

C1-10

CORRIDOR

385 SF

LOCKER ROOM

46 SF

131a

ARMS STOR.

45 SF

131b

HOLDING CELL

968 SF

OFFICE, OI&T

582 SF

MECH. SPACE

594 SF

133d

COMPUTER ROOM, OI&T

434 SF

134a

COMPUTER ROOM

76 SF

C1-10a

CORRIDOR

P7

ELEV.

P8

ELEV.

S11

ELEV.

S12

ELEV.

113 SF

127g

OFFICE

50 SF

WAITING

F.

E.

C

F.E.C.

F.E.C.F.E.C.

F.E.C.

F.E.C.

PNL: 101_1DEH1-F.1-19.6

FMS SWITCH

SCALE : 3/32" = 1'-0"

1 BLDG 101 - LEVEL 01 - ELECTRICAL PLAN

0' 4' 8' 16'

BLDG 101 - LEVEL 01 - ELECTRICAL

PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

PROJECT

NORTH

101E-101

BLDG 41

BLDG 16

BLDG 6

BLDG T-51

BLDG

BLDG 101

BLDG 100

BLDG 102

BLDG 103

BLDG 104

GENERAL NOTES

KEY NOTES

AREA OF WORK

gmsfgnsfg

PROJECT

NORTH

KEY PLAN

1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND

ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE

SHOWN FOR CLARITY.

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE

REPORTED TO COR.

3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.

EXACT LOCATIONS SHALL BE FIELD VERIFIED AND

REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT

IS BEING RELOCATED AND/OR MODIFIED.

4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT

BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,

IMMEDIATELY INFORM AND COORDINATE WITH VA AS

REQUIRED.

5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION

OF ALL SHUTDOWNS.

6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL

DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS

IMPACTED BY THIS PROJECT.

BLDG 101

PLAN IS INCLUDED FOR AS-BUILDING PURPOSES. ALL

EQUIPMENT MAY NOT BE SHOWN FOR CLARITY.

K.1

L.5

L.7

L.6

K

J

28 27 2326 25 24 22 21 20 19

FEC

PNL: 101_2H1-K-27

BUSDUCT

BD: 101_101-N2

FE

C

LAT

LAT

LAT

LAT

LAT

LAT

768 SF

C2-6

CORRIDOR

207 SF

212a

OFFICE

420 SF

OFFICE

106 SF

212c

OFFICE

97 SF

212d

OFFICE

79 SF

212e

OFFICE

79 SF

212f

OFFICE

134 SF

212h

OFFICE

71 SF

212g

BREAK RM.

66 SF

212j

WORK ROOM 77 SF

215a

WORKROOM

115 SF

215b

OFFICE 97 SF

215c

OFFICE

91 SF

215d

OFFICE

92 SF

215e

OFFICE

133 SF

215f

OFFICE

419 SF

EDUCATION OFFICE

86 SF

215g

OFFICE

158 SF

216a

OFFICE

147 SF

OFFICE

316 SF

216b

OFFICE

141 SF

216c

OFFICE

198 SF

C2-7

CORRIDOR

310 SF

C2-8

CORRIDOR

711 SF

C2-9

LOBBY

2253 SF

AUDITORIUM

82 SF

220b

STORAGE

66 SF

220c

STORAGE

80 SF

220d

EQUIP. STOR.

147 SF

TOILET, F.

130 SF

TOILET, M.

177 SF

220e

VESTIBULE

100 SF

220a

STORAGE

142 SF

210c

TOILET, F.

132 SF

210d

TOILET, M.

113 SF

VESTIBULE

86 SF

210e

CLOSET, ELEC.

119 SF

210b

OFFICE 41 SF

210a

H.A.C. 26 SF

CLOSET, ELEC.

22 SF

CLOSET, TELE.

226 SF

C2-5

CORRIDOR

46 SF

CLOSET, ELEC.

152 SF

205d

OFFICE

143 SF

205a

ILLUSTRATION

310 SF

204a

CLASSROOM

350 SF

WORK ROOM, MED. MEDIA

455 SF

201a

CLASSROOM

219 SF

201a

CLASSROOM

265 SF

CLASSROOM

36 SF

H.A.C.

71 SF

201c

STOR.

305 SF

C2-3

CORRIDOR

176 SF

C2-1

ELEV. LOBBY

425 SF

MECHANICAL SHAFT

74 SF

C2-2

VESTIBULE

16 SF

SPRINKLER CONTROL

STAIR

NO. 14

STAIR

NO. 15 280 SF

202a

POLICE OFFICE

483 SF

202c

POLICE OFFICE

143 SF

202d

OFFICE

66 SF

202b

ARMORY

247 SF

CIRCULATION

1357 SF

LIBRARY

229 SF

POLICE

222 SF

CONFERENCE RM

155 SF

206a

OFFICE

161 SF

207a

OFFICE

751 SF

C2-4

CORRIDOR

29 SF

202c

VESTIBULE

516 SF

206b

NEUROLOGY OFFICE

MECHANICAL SHAFT

P7

ELEV.

P8

ELEV.

S11

ELEV.

S12

ELEV.

156 SF

211d

STORAGE

256 SF

211c

SIMULATION LAB

156 SF

211b

OBSERVATION

160 SF

211a

EXAM

257 SF

CLASSROOM

204 SF

205b

WORK ROOM

294 SF

OFFICE

52 SF

SIGNAL CLOSET

122 SF

203a

POLICE

95 SF

203b

POLICE

20 SF

202e

HOLDING

282 SF

OFFICE

117 SF

206e

COUNSELING

108 SF

206d

COUNSELING

132 SF

206c

COUNSELING

117 SF

206f

COUNSELING

2338 SF

C2-11

SKYWALK

2PNL: 101_2L1-F.1-19

3PNL: 101_2H1-F.1-19 Sec 1 101-P-02

SCALE : 3/32" = 1'-0"

1 BLDG 101 - LEVEL 02 - ELECTRICAL PLAN

0' 4' 8' 16'

BLDG 101 - LEVEL 02 - ELECTRICAL

PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

PROJECT

NORTH

101E-102

BLDG 41

BLDG 16

BLDG T-51

BLDG

BLDG 101

BLDG 102

BLDG 103

BLDG 104

GENERAL NOTES

KEY NOTES

AREA OF WORK

PROJECT

NORTH

KEY PLAN

1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND

ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE

SHOWN FOR CLARITY.

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE

REPORTED TO COR.

3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.

EXACT LOCATIONS SHALL BE FIELD VERIFIED AND

REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT

IS BEING RELOCATED AND/OR MODIFIED.

4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT

BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,

IMMEDIATELY INFORM AND COORDINATE WITH VA AS

REQUIRED.

5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION

OF ALL SHUTDOWNS.

6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL

DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS

IMPACTED BY THIS PROJECT.

BLDG 101

BLDG 6

BLDG 100

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE

ONE-LINE DIAGRAMS ON SHEETS 101ED603 & 101EP603

FOR ADDITIONAL INFORMATION.

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE

ONE-LINE DIAGRAMS ON SHEETS 101ED605 & 101EP605

FOR ADDITIONAL INFORMATION. A/E FIELD VERIFICATION

IS REQUIRED.

APPROXIMATE LOCATION OF PANELBOARD. EXISTING

CONDUCTORS FROM BD: 100_S2 N2 TO BE DEMOLISHED.

CONTRACTOR SHALL ACCOUNT FOR EXTRA 25%

LENGTH OF REPLACEMENT RACEWAYS AND

CONDUCTORS AS SHOWN ON EXISTING ONE-LINE

DIAGRAM. REFERENCE ONE-LINE DIAGRAMS ON SHEETS

100ED605, 101ED605, 100EP605, AND 100EP605 FOR

ADDITIONAL INFORMATION.

PNL: 101_2H1-F.1-19 Sec 1

APPROXIMATE PANELBOARD LOCATION. DEMOLISH AND

REPLACE EXISTING FEEDER FROM BUSDUCT "BD: 100_S2

N2" TO PANELBOARD. CONTRACTOR SHALL ACCOUNT

FOR ADDITIONAL 25% FOR FEEDER LENGTH BASED ON

EXISTING ONE-LINE DIAGRAM. REFERENCE ONE-LINE

DIAGRAMS ON SHEETS 100ED605, 101ED605, 100EP605,

AND 100EP605 FOR ADDITIONAL INFORMATION.

COORDINATE WITH VA FOR EXACT EQUIPMENT

LOCATIONS.

CONTINUE FROM

100E-102

L.5

L.7

L.6

K.1

K

J

28 26 25 24 23 22 21 1920

UP

DN

SP

MECHANICAL

SHAFT

MECHANICAL

SHAFT

PNL: 101_3H1-K-27

142 SF

354c

TOILET, F.

132 SF

354d

TOILET, M.

783 SF

C3-6

CORRIDOR

113 SF

VESTIBULE

91 SF

354e

CLOSET, ELEC.

119 SF

354b

LACTATION ROOM 41 SF

354a

H.A.C. 26 SF

CLOSET, SIGNAL

22 SF

CLOSET, TELE.

220 SF

C3-15

CORRIDOR

ELEV.

P7

ELEV.

P8 ELEV.

S11

176 SF

C3-1

ELEV. LOBBY

ELEV.

S12

77 SF

C3-2

VESTIBULE

16 SF

SPRINKLER CONTROL

STAIR

NO. 14

STAIR

NO. 15

310 SF

C3-5

CORRIDOR

248 SF

C3-3

CORRIDOR

184 SF

C3-11

CORRIDOR

183 SF

C3-10

CORRIDOR

96 SF

OFFICE

98 SF

OFFICE

97 SF

OFFICE

99 SF

OFFICE

95 SF

OFFICE

185 SF

C3-14

CORRIDOR

183 SF

C3-7

CORRIDOR

128 SF

OFFICE

197 SF

OFFICE

67 SF

C3-13

OFFICE, SEC.

559 SF

C3-12

OFFICE, SEC. MED.

114 SF

OFFICE

116 SF

OFFICE

115 SF

OFFICE

117 SF

OFFICE

106 SF

OFFICE

110 SF

OFFICE

112 SF

OFFICE

111 SF

OFFICE

113 SF

OFFICE

108 SF

OFFICE

112 SF

OFFICE

111 SF

OFFICE

113 SF

OFFICE

114 SF

OFFICE

113 SF

OFFICE

115 SF

OFFICE

116 SF

OFFICE

112 SF

OFFICE

45 SF

CLOSET, SIGNAL

46 SF

ELEC.61 SF

OFFICE

62 SF

OFFICE

363 SF

CONF. ROOM

245 SF

CONF. ROOM

123 SF

OFFICE

125 SF

OFFICE

114 SF

OFFICE

116 SF

OFFICE

115 SF

OFFICE

117 SF

OFFICE

112 SF

OFFICE

110 SF

OFFICE

112 SF

OFFICE

111 SF

OFFICE

113 SF

OFFICE

103 SF

OFFICE

116 SF

OFFICE

112 SF

WORK ROOM

555 SF

C3-9

OFFICE, SEC. SURG.

120 SF

OFFICE

202 SF

OFFICE

57 SF

C3-8

OFFICE, SEC.

96 SF

OFFICE

98 SF

OFFICE

97 SF

WORK ROOM

105 SF

OFFICE

105 SF

OFFICE

154 SF

OFFICE

84 SF

OFFICE

116 SF

OFFICE

82 SF

OFFICE

69 SF

OFFICE

184 SF

C3-16

WORK

221 SF

C3-20

CORRIDOR

96 SF

OFFICE

143 SF

OFFICE 123 SF

364a

OFFICE

105 SF

OFFICE

108 SF

OFFICE

87 SF

OFFICE

270 SF

CONF. ROOM

95 SF

OFFICE 96 SF

OFFICE

46 SF

C3-18

CORRIDOR

110 SF

OFFICE

103 SF

OFFICE

77 SF

OFFICE

87 SF

OFFICE

237 SF

OFFICE

175 SF

C3-22

CORRIDOR

187 SF

C3-23

OFFICE, SEC. PSYCH.

184 SF

C3-4

CORRIDOR

104 SF

OFFICE

101 SF

OFFICE

104 SF

OFFICE

104 SF

OFFICE

92 SF

WORK ROOM

92 SF

OFFICE

79 SF

OFFICE

68 SF

OFFICE

110 SF

OFFICE46 SF

C3-21

CORRIDOR

SCALE : 1/8" = 1'-0"

1 BLDG 101 - LEVEL 03 - ELECTRICAL PLAN

0' 4' 8' 16'

BLDG 101 - LEVEL 03 - ELECTRICAL

PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

PROJECT

NORTH

101E-103

BLDG 41

BLDG 16

BLDG T-51

BLDG

BLDG 101

BLDG 102

BLDG 103

BLDG 104

GENERAL NOTES

KEY NOTES

AREA OF WORK

PROJECT

NORTH

KEY PLAN

1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND

ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE

SHOWN FOR CLARITY.

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE

REPORTED TO COR.

3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.

EXACT LOCATIONS SHALL BE FIELD VERIFIED AND

REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT

IS BEING RELOCATED AND/OR MODIFIED.

4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT

BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,

IMMEDIATELY INFORM AND COORDINATE WITH VA AS

REQUIRED.

5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION

OF ALL SHUTDOWNS.

6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL

DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS

IMPACTED BY THIS PROJECT.

BLDG 101

BLDG 6

BLDG 100

L.6

K.1

L.5

L.7

K

J

2427 26 25 23 22 21 20

UPUP

DNDN

SP

DF

DF

SP

MECH SHAFT

MECH SHAFT

SWBD: 101_4SDN-K.1-24

PNL:101_4H1-K-27

PNL:101_4L1-K.1-24

662 SF

LAB.

929 SF

C4-7

CORRIDOR

83 SF

427a

OFFICE

86 SF

OFFICE

760 SF

LAB.

640 SF

LAB.

131 SF

427b

OFFICE

878 SF

LAB.

136 SF

421c

TOILET, F.

132 SF

421d

TOILET, M.

118 SF

VESTIBULE

91 SF

421e

CLOSET, ELEC.

119 SF

421b

LOUNGE 41 SF

421a

H.A.C. 26 SF

CLOSET, SIGNAL

22 SF

CLOSET, TELE.

261 SF

C4-6

CORRIDOR

176 SF

C4-1

ELEV. LOBBY

77 SF

C4-2

VESTIBULE

STAIR

NO. 14

STAIR

NO. 15

245 SF

C4-3

CORRIDOR

47 SF

CLOSET, TELE.

45 SF

CLOSET, ELEC.

53 SF

C4-8

LOBBY 16 SF

SPRINKLER CONTROL

584 SF

GENERAL LAB.

607 SF

LAB

79 SF

COLD ROOM

115 SF

418b

LAB

149 SF

LAB

109 SF

418c

OFFICE

248 SF

C4-5

CORRIDOR

44 SF

412a

VESTIBULE

139 SF

INSTRUMENT ROOM

93 SF

CONT. TEMP 4° C

139 SF

P-3 LAB

381 SF

LAB.

194 SF

DRY LAB.

400 SF

LAB.

199 SF

MULTI-PURP. LAB.

100 SF

OFFICE

92 SF

432a

DRY LAB.

497 SF

CONF. ROOM

440 SF

LAB.

94 SF

VESTIBULE

83 SF

404a

OFFICE

87 SF

404b

OFFICE

84 SF

404c

OFFICE

646 SF

LAB.

434 SF

LAB.

633 SF

LAB.

846 SF

C4-4

CORRIDOR

97 SF

OFFICE

213 SF

LAB.

96 SF

405a

OFFICE

778 SF

LAB.

78 SF

OFFICE

146 SF

416e

OFFICE

P7

ELEV.

P8

ELEV.

S11

ELEV.

S12

ELEV.

SCALE : 1/8" = 1'-0"

1 BLDG 101 - LEVEL 04 - ELECTRICAL PLAN

0' 4' 8' 16'

BLDG 101 - LEVEL 04 - ELECTRICAL

PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

PROJECT

NORTH

101E-104

BLDG 41

BLDG 16

BLDG 6

BLDG T-51

BLDG

BLDG 101

BLDG 100

BLDG 102

BLDG 103

BLDG 104

GENERAL NOTES

KEY NOTES

AREA OF WORK

gmsfgnsfg

PROJECT

NORTH

KEY PLAN

1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND

ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE

SHOWN FOR CLARITY.

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE

REPORTED TO COR.

3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.

EXACT LOCATIONS SHALL BE FIELD VERIFIED AND

REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT

IS BEING RELOCATED AND/OR MODIFIED.

4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT

BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,

IMMEDIATELY INFORM AND COORDINATE WITH VA AS

REQUIRED.

5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION

OF ALL SHUTDOWNS.

6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL

DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS

IMPACTED BY THIS PROJECT.

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE

ONE-LINE DIAGRAMS ON SHEETS 101ED603 & 101EP603

FOR ADDITIONAL INFORMATION.

BLDG 101

UPUP

DNDN

SPSP

D.F.

EW

ES

D.F.

EW

EW

EW

EW EW EW EW

EW

ES

FS

EWEW

ES

EWEW

EW

MECHANICAL SHAFT

MECHANICAL SHAFT

EQ

EQ

895 SF

GENERAL LAB.

932 SF

C5-8

CORRIDOR

414 SF

MULTTI-PURP. LAB.

457 SF

GENERAL LAB.

136 SF

523c

TOILET, F.

132 SF

523d

TOILET, M.

118 SF

VESTIBULE

90 SF

523e

CLOSET, ELEC.

119 SF

523b

LOUNGE 41 SF

523a

H.A.C. 26 SF

CLOSET, SIGNAL

22 SF

CLOSET, TELE.

262 SF

C5-7

CORRIDOR

P7

ELEV.

P8

ELEV.

S11

ELEV.

176 SF

C5-1

ELEV. LOBBY

S12

ELEV.

77 SF

C5-2

VESTIBULE

STAIR

NO. 14

STAIR

NO. 15

375 SF

C5-3

CORRIDOR

45 SF

CLOSET, SIGNAL

51 SF

CLOSET, ELEC.

53 SF

C5-9

LOBBY

16 SF

SPRINKLER CONTROL

473 SF

GENERAL LAB.

149 SF

LAB.

603 SF

CHEMISTRY LAB.

410 SF

OFFICE

465 SF

GENERAL LAB.

398 SF

GENERAL LAB.

570 SF

GENERAL LAB.

424 SF

MULTTI-PURP. LAB.

187 SF

LAB.

154 SF

LAB.

75 SF

CONT. TEMP. 4° C

89 SF

519a

OFFICE

97 SF

OFFICE

113 SF

DARKROOM

59 SF

DARKROOM

115 SF

LAB.

140 SF

C5-6

CORRIDOR

95 SF

OFFICE

96 SF

511a

OFFICE

88 SF

505a

CONF. 90 SF

502f

OFFICE

90 SF

502d

OFFICE

86 SF

502g

OFFICE

87 SF

502e

OFFICE

87 SF

502c

OFFICE

371 SF

OFFICE

140 SF

502b

OFFICE

109 SF

502a

OFFICE

39 SF

CENT. REF. EQPT.

99 SF

CONT. TEMP. 4°C

84 SF

530a

OFFICE

87 SF

OFFICE

245 SF

C5-5

CORRIDOR

712 SF

C5-4

CORRIDOR

285 SF

TISSUE CULT. LAB.

82 SF

506a

TISSUE CULT. LAB.

91 SF

506b

TISSUE CULT. LAB.

91 SF

506c

TISSUE CULT. LAB.

91 SF

506d

TISSUE CULT. LAB.

85 SF

506e

TISSUE CULT. LAB.

337 SF

CHEMISTRY LAB.

360 SF

CHEMISTRY LAB.

190 SF

OFFICE

198 SF

COPY ROOM

152 SF

STORAGE

248SF

GLASS WASH CLEAN

689 SF

GENERAL LAB85 SF

514b

OFFICE

86 SF

514a

OFFICE

N

L.6

K.1

L.5

L.7

K

J

2427 26 25 23 22 21 20

PNL: 101_5H1-K-27

SWBD: 101_5SDN-K.1-24

SCALE : 1/8" = 1'-0"

1 BLDG 101 - LEVEL 05 - ELECTRICAL PLAN

0' 4' 8' 16'

BLDG 101 - LEVEL 05 - ELECTRICAL

PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

PROJECT

NORTH

101E-105

BLDG 41

BLDG 16

BLDG 6

BLDG T-51

BLDG

BLDG 101

BLDG 100

BLDG 102

BLDG 103

BLDG 104

GENERAL NOTES

KEY NOTES

AREA OF WORK

gmsfgnsfg

PROJECT

NORTH

KEY PLAN

1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND

ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE

SHOWN FOR CLARITY.

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE

REPORTED TO COR.

3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.

EXACT LOCATIONS SHALL BE FIELD VERIFIED AND

REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT

IS BEING RELOCATED AND/OR MODIFIED.

4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT

BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,

IMMEDIATELY INFORM AND COORDINATE WITH VA AS

REQUIRED.

5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION

OF ALL SHUTDOWNS.

6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL

DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS

IMPACTED BY THIS PROJECT.

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE

ONE-LINE DIAGRAMS ON SHEETS 101ED603 & 101EP603

FOR ADDITIONAL INFORMATION.

BLDG 101

L.7

L.5

L.6

K.1

K

J

27 26 25 24 23 22 20

UPUP

DNDN

DF

FD

UPUP

FD

FD

FD

FFD

FFDFFDFFDFFDFFDFFDFFDFFD

FFD

FFD FFD FFD

FFDFFDFFDFFD

DF

FFD

FFD

LOCKER

LOCKER

MECHANICAL

SHAFT

MECHANICAL

SHAFT

EYE

WASH

& SHWR

EYE

WASH

PNL: 101_6H1-K-27

977 SF

C6-9

CORRIDOR

132 SF

621d

TOILET, F.

132 SF

621e

TOILET, M.

102 SF

VESTIBULE

89 SF

621f

CLOSET, ELEC.

142 SF

621c

LOUNGE

38 SF

621a

SHOWER 22 SF

CLOSET, SIGNAL

20 SF

CLOSET, TELE.

164 SF

C6-7

CORRIDOR

176 SF

C6-1

ELEV. LOBBY

77 SF

C6-2

VESTIBULE

NO.14

STAIR

STAIR

NO. 15

270 SF

C6-3

CORRIDOR

46 SF

CLOSET, SIGNAL

46 SF

CLOSET, ELEC.

231 SF

C6-12

ANIMAL RECEIVE

16 SF

SPRINKLER CONTROL

598 SF

C6-5

CORRIDOR

271 SF

ANIMAL QUARTERS

264 SF

ANIMAL QUARTERS

119 SF

625b

ANIMAL QUARTERS

103 SF

625a

ANIMAL QUARTERS

78 SF

CORRIDOR

107 SF

625c

ANIMAL QUARTERS

81 SF

625d

ANIMAL QUARTERS

280 SF

ANIMAL QUARTERS

263 SF

ANIMAL QUARTERS

108 SF

ANIMAL QUARTERS

102 SF

ANIMAL QUARTERS

91 SF

C6-10

CORRIDOR

106 SF

ANIMAL QUARTERS

100 SF

ANIMAL QUARTERS

107 SF

ANIMAL QUARTERS

101 SF

ANIMAL QUARTERS

93 SF

C6-11

CORRIDOR

107 SF

ANIMAL QUARTERS

101 SF

ANIMAL QUARTERS

261 SF

ANIMAL QUARTERS

268 SF

ANIMAL QUARTERS

158 SF

ANIMAL QUARTERS

160 SF

ANIMAL QUARTERS

169 SF

ANIMAL QUARTERS

169 SF

ANIMAL QUARTERS

335 SF

CAGE WASH SOILED

258 SF

C6-13

CORRIDOR

144 SF

C6-6

CORRIDOR

120 SF

607a

CLEAN STORAGE

286 SF

CLEAN STORAGE

63 SF

604a

CAGE WASHER

40 SF

H.A.C.

336 SF

CAGE WASH CLEAN 107 SF

CONT. TEMP. 4°C

204 SF

PROCEDURE

32 SF

COLD ROOM

209 SF

LAB

124 SF

OFFICE

82 SF

643a

OFFICE

265 SF

C6-4

CORRIDOR

98 SF

626W

ANIMAL QUARTERS

101 SF

626E

ANIMAL QUARTERS

227 SF

ETHANOL CHAMBER

240 SF

AUTOCLAVE

113 SF

ANIMAL QUARTERS

48 SF

PROCEDURE

348 SF

PROCEDURE

237 SF

PROCEDURE

56 SF

617a

PROCEDURE

161 SF

C6-8

CORRIDOR

48 SF

H.A.C.

26 SF

613a

STORAGE

256 SF

PROCEDURE

237 SF

ANIMAL QUARTERS

62 SF

606a

STOR. FEED& BED.

146 SF

FEED & BEDDING

261 SF

610b

ANIMAL QUARTERS

257 SF

610a

ANIMAL QUARTERS

225 SF

606c

ANIMAL QUARTERS

60 SF

606b

STOR. FEED& BED.

453 SF

MULTI-PURP. LAB.

89 SF

602b

OFFICE

86 SF

605a

OFFICE

530 SF

CHEMISTRY LAB.

112 SF

601b

OFFICE

109 SF

OFFICE

93 SF

602a

OFFICE

112 SF

601a

OFFICE

P7

ELEV.

P8

ELEV.

S11

ELEV.

S12

ELEV.

SCALE : 1/8" = 1'-0"

1 BLDG 101 - LEVEL 06 - ELECTRICAL PLAN

0' 4' 8' 16'

BLDG 101 - LEVEL 06 - ELECTRICAL

PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

PROJECT

NORTH

101E-106

BLDG 41

BLDG 16

BLDG 6

BLDG T-51

BLDG

BLDG 101

BLDG 100

BLDG 102

BLDG 103

BLDG 104

GENERAL NOTES

KEY NOTES

AREA OF WORK

gmsfgnsfg

PROJECT

NORTH

KEY PLAN

1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND

ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE

SHOWN FOR CLARITY.

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE

REPORTED TO COR.

3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.

EXACT LOCATIONS SHALL BE FIELD VERIFIED AND

REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT

IS BEING RELOCATED AND/OR MODIFIED.

4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT

BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,

IMMEDIATELY INFORM AND COORDINATE WITH VA AS

REQUIRED.

5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION

OF ALL SHUTDOWNS.

6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL

DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS

IMPACTED BY THIS PROJECT.

BLDG 101

L.7

L.6

L.5

K.1

K

J

2627 25

SIXTH FLOOR ROOF

24 23 22 21 20

MCC: 101_MCC-P/P_2 1 STAIR

NO. 14

STAIR

NO. 15

699 SF

STORAGE

92 SF

ELECTRICAL

26 SF

SIGNAL

22 SF

TELEPHONE

9493 SF

MECHANICAL

901 SF

MECH. RM. ELEV. SERVICE

759 SF

ELEC. RM. ELEC. UNIT SUBSTATION

579 SF

ELEC. RM. EMERG. & SWITCHGEAR

303 SF

ELEC. RM. AND STORAGE

UNIT SUBSTATION: US101 1

FUSE ENCLOSURE

METERING SYSTEM

SCALE : 1/8" = 1'-0"

1 BLDG 101 - LEVEL 07 - ELECTRICAL PLAN

0' 4' 8' 16'

BLDG 101 - LEVEL 07 - ELECTRICAL

PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

101-P-01B 101-C-01B

101E-407

PROJECT

NORTH

101E-407

101E-107

BLDG 41

BLDG 16

BLDG T-51

BLDG

BLDG 101

BLDG 102

BLDG 103

BLDG 104

GENERAL NOTES

KEY NOTES

AREA OF WORK

PROJECT

NORTH

KEY PLAN

1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND

ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE

SHOWN FOR CLARITY.

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE

REPORTED TO COR.

3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.

EXACT LOCATIONS SHALL BE FIELD VERIFIED AND

REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT

IS BEING RELOCATED AND/OR MODIFIED.

4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT

BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,

IMMEDIATELY INFORM AND COORDINATE WITH VA AS

REQUIRED.

5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION

OF ALL SHUTDOWNS.

6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL

DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS

IMPACTED BY THIS PROJECT.

BLDG 101

BLDG 6

BLDG 100

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE

ONE-LINE DIAGRAMS ON SHEETS 101ED602 & 101EP602

FOR ADDITIONAL INFORMATION.

CONTINUE TO PME ENCLOSURE. REFERENCE SHEET

101E-407 FOR ADDITIONAL INFORMATION.

E-505

PROVIDE NETWORK SWITCH WITH CONTROL POWER

TRANSFOMER (CPT) LOCATED INTERIOR TO EXISTING UNIT

SUBSTATION POWER METER CUBICLE; CPT SHALL USE

SUBSTATION AS SOURCE. PROVIDE DATA CABLES FROM

REPLACEMENT UNIT SUBSTATION CIRCUIT BREAKERS TO

NETWORK SWITCH. PROVIDE CAT6A CABLING FROM

NETWORK SWITCH TO EXTEND TO LOCAL PME ENCLOSURE

NETWORK SWITCH. PROVIDE PROGRAMMING AND

INTEGRATION OF US101 REPLACEMENT CIRCUIT BREAKER

STATUS / DATA TO EXISTING FACILITY PME NETWORK.

759 SF

ELEC. RM. ELEC. UNIT SUBSTATION

�3���7�5������7�5����101-P-01B �3���7�5����101-P-01B��7�5����C-01B

E-504

101-C-02

TRANSFORMER (CPT) LOCATED INTERIOR TO EXISTING UNIT

COMPACT

ENTRANCE

COMPACT

BUILDING 100, LEVEL B1

BUILDING 103

DN

NO PARKING

B B

COLAPSABLE

GATE

STORAGE

NO PARKING

COMPACT

MC

MC MC MC MC MC MC MC MC MC

MECHANICAL

EQUIPMENT

COMPACT

NO PARKING

NO PARKING

F.D.

BIKE

LOCKER

MC

BIKE

LOCKERS MC

R

AM

P D O

W N

RAMP DOWN

B B

FIRE

DEPARTMENT

CONNECTION

B

WATER

VALVE

COMPACTCOMPACT COMPACT COMPACTCOMPACT COMPACT

COMPACTCOMPACT COMPACT COMPACTCOMPACT COMPACT

UP

MCBIKE

LOCKER

F.D.

F.D.

MC

MC

F.D.

MC

SEISMIC JOINT

NO PARKING

BOLLARD

P-2 A-12

P-2 A-16

P-2 A-15

P-2 A-14P-2

A-13 P-2 A-11

P-2 A-10P-2

A-9 P-2 A-8

P-2 A-7

P-2 A-6

P-2 A-5

P-2 A-4

P-2 A-3

P-2 A-2

P-2 A-1

P-2 B-12

P-2 B-15

P-2 B-14

P-2 B-13

P-2 B-11

P-2 B-10

P-2 B-9

P-2 B-8P-2

B-7 P-2 B-6

P-2 B-5

P-2 B-4

P-2 B-3

P-2 B-2

P-2 B-1

P-2 C-12

P-2 C-15

P-2 C-14P-2

C-13 P-2 C-11

P-2 C-10P-2

C-9

P-2 C-8

P-2 C-7

P-2 C-6

P-2 C-5

P-2 C-4

P-2 C-3

P-2 C-2

P-2 C-1

P-2 D-12

P-2 D-15

P-2 D-14

P-2 D-13

P-2 D-11

P-2 D-10

P-2 D-9

P-2 D-8

P-2 D-7

P-2 D-6

P-2 D-5

P-2 D-4

P-2 D-3

P-2 D-2

P-2 D-1

PNL: 102_NH102-1 1

990 SF

P2-2

UNIFORM ROOM

STAIR

NO. 3 STAIR

NO. 4

STAIR

NO. 1

557 SF

P2-4

LOBBY

P2-LEVEL

PARKING DECK

37 SF

T-52

GUARD SHACK

STAIR

NO. 2

P2-1

ELEC. VAULT

0 4' 8' 16' 32'

BLDG 102 - LEVEL P2 - ELECTRICAL

PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

PROJECT

NORTH

SCALE : 1/16" = 1'-0"

1 BLDG 102 - LEVEL P2 - ELECTRICAL PLAN

102E-101

BLDG 41

BLDG 16

BLDG 6

BLDG T-51

BLDG

BLDG 101

BLDG 100

BLDG 102

BLDG 103

BLDG 104

GENERAL NOTES

KEY NOTES

AREA OF WORK

gmsfgnsfg

PROJECT

NORTH

KEY PLAN

1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND

ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE

SHOWN FOR CLARITY.

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE

REPORTED TO COR.

3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.

EXACT LOCATIONS SHALL BE FIELD VERIFIED AND

REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT

IS BEING RELOCATED AND/OR MODIFIED.

4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT

BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,

IMMEDIATELY INFORM AND COORDINATE WITH VA AS

REQUIRED.

5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION

OF ALL SHUTDOWNS.

6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL

DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS

IMPACTED BY THIS PROJECT.

BLDG 102

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE

ONE-LINE DIAGRAMS ON SHEETS 102ED601 & 102EP601

FOR ADDITIONAL INFORMATION.

UP

DN

TYP. BOLLARD

BE

N

C H

F.O.

CONC.

LOW WALL

FD FD FD FD FD

LOW WALLLOW WALL

FD

FD

PL

AN

TE

R

FD

FS

F.D.

FS

F.D.

F.D.

FD

D.F.

PLANTER

PLANTER

DOCK LIFT

UP

O /H

D O

O R

O /H

D O

O R

FD FD FD FD FD

FD FD

FD

A-

FP

-0

4-

A-

FP

-0

3-

M

AT

C H

LI

N

E

A-

FP

-0

4-

A-

FP

-0

3-

M

AT

C H

LI

N

E

177 SF

C1-6

CORRIDOR

STAIR

NO. 3

146SF

C1-7

CORRIDOR

ELEV.

P-11

ELEV.

S-13

359SF

C1-10

CORRIDOR

108SF

C1-9

CORRIDOR

186SF

C1-11

CORRIDOR

112SF

E106

BSL-3 STOR.

164SF

E105

BSL-3 LAB.

143SF

E104

LAB

164SF

E103

PROC. LAB.

138SF

E102

ANIMAL HOLDING

129SF

E100

CHANGE/ SHOWER

139SF

E101

CHANGE/ SHOWER

98SF

C1-5

ANTE-ROOM

88SF

C1-8

CORRIDOR

240SF

E115

ANIMAL HOLDING

146SF

E116

SM. ANIMAL HOLDING

146SF

E120

SM. ANIMAL HOLDING

87SF

E114

STAFF

153SF

E118

PROC. LAB.

161SF

E123

PROC. LAB.

239SF

E112

CLEAN CAGEWASHER

163SF

E110

DIRTY CAGEWASHER

162SF

E111

ANIMAL HOLDING

162SF

E113

CLEAN STOR.

162SF

E125

ANIMAL REC.

24SF

E117

BED.

17SF

E119

FEED EQUIP. ALCOVE

188SF

E121

ANIMAL HOLDING

175SF

E122

ANIMAL HOLDING

130SF

E124

ANIMAL TECH. OFF.

114SF

E126

STAFF TOILET

335SF

E130

EQUIP. GEN. STOR.

481 SF

E131

RO/DI WATER

791SF

C1-4

CORRIDOR

71SF

E135

MACH. RM.

240SF

E137

GLASS WASH

258SF

E134

ELECT. ROOM

211SF

E140

EQUIP.

185SF

E142

T.C. WKRM.

96SF

E142b

T.C. LAB.

98SF

E142a

T.C. LAB.

90SF

E142c

T.C. LAB.

42SF

E144 H.W.

45 SF

E133 H.A.C.

138SF

E145

COLD ROOM

68SF

C1-12

CORRIDOR

235SF

E147

EQUIP. ROOM

47SF

E132

ELEV. MACH.

204SF

E148

OFFICE

540SF

E139

LAB.159SF

E138

OFFICE

162SF

E136

OFFICE

535SF

E141

LAB.

535SF

E143

LAB.

541 SF

E146

LAB.

803 SF

C1-14

CORRIDOR

145SF

E149

OFFICE

115SF

E149a

OFFICE

118SF

E149c

OFFICE

114SF

E149b

OFFICE

65SF

C1-4B

CORRIDOR

1279 SF

D1-100

LOADING DOCK

595SF

C1-17B

CORRIDOR

196 SF

F120

CONFERENCE RM.

STAIR

NO. 2

78SF

F119

PATIENT TOILET

47SF

F114a

LINEN CLOSET

83SF

F114b

MED. ROOM

127SF

F114d

EXAM

110SF

F114e

EXAM ROOM

112SF

F108

EXAM ROOM

57SF

F114f

HALL

50SF

F114c

STAFF TOIL. 113SF

F109

EXAM ROOM 57SF

F144 H.A.C.

77SF

F101

SOILED UTIL.

45SF

C1-16

CORR

80SF

C1-15

CORRIDOR

627SF

C1-1

LOBBY

143SF

C1-2

VESTIBULE

147SF

F102

EXAM ROOM

91SF

F103

EXAM ROOM

1473SF

C1-3

LOBBY

100SF

F106

EXAM ROOM

100SF

F110

EXAM ROOM

98SF

F111

EXAM ROOM

95SF

F105

EXAM ROOM 172SF

F104

EXAM

129SF

C1-18

CORRIDOR

126SF

C1-20

CORRIDOR

506SF

F124

LAB.

173SF

F125

LUNCH ROOM

133SF

F129a

COLD

238SF

F128

EQUIP. ROOM

215SF

F132

T.C. WORK RM.

126SF

F132A

T.C. LAB.

132SF

F132B

T.C. LAB.

252SF

F135

ELECT.

786SF

C1-23

CORRIDOR

52SF

C1-24

CORRIDOR

76SF

C1-25

CORRIDOR

188SF

F143

TOILET, F.

147SF

F142

TOILET, M.

109SF

F141

OFFICE

101SF

F139

COPY/ WORKRM.

101SF

F137

OFFICE

27SF

F134 H.W.

27SF

F133 H.W.

535SF

F131

LAB.

539SF

F136

LAB.

159SF

F138

OFFICE

162SF

F140

OFFICE

535SF

F130

LAB.

544SF

F127

LAB.

145SF

F126

OFFICE

116SF

F126c

OFFICE

114SF

F126b

OFFICE

118SF

F126a

OFFICE

STAIR

NO. 1

116SF

C1-17A

CORRIDOR

205SF

F122

CHECK OUT

188 SF

F100

TEAM

124SF

C1-21

CORR.

106SF

F109a

EXAM

111SF

F107

EXAM

109SF

F108a

EXAM

214SF

F121

BREAK ROOM

100SF

F123c

EXAM

100SF

F123

EXAM

100SF

F123a

EXAM

100SF

F123b

EXAM

132SF

C1-22

CORR.

721SF

C1-17

CORRIDOOR

100SF

F113

EXAM ROOM

98SF

F112

EXAM ROOM

150SF

C1-19

CORRIDOR

154SF

F114

OMNI

571 SF

F115a

TEAM ROOM

479 SF

F115

OFFICE AREA

342 SF

D1-101

STORAGE

3/32" = 1'-0"

BLDG 103 - LEVEL 01 - ELECTRICAL PLAN1

0 4' 16'8'

PNL: 103_LSH1031N

PNL: 103_NH1031N

PNL: 103_EL103DP1N

PNL: 103_EL103DP1S

PNL: 103_NH103DP1S

BLDG 103 - LEVEL 01 - ELECTRICAL

PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

PROJECT

NORTH

103E-101

BLDG 41

BLDG 16

BLDG 6

BLDG T-51

BLDG

BLDG 101

BLDG 100

BLDG 102

BLDG 103

BLDG 104

GENERAL NOTES

KEY NOTES

AREA OF WORK

gmsfgnsfg

PROJECT

NORTH

KEY PLAN

1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND

ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE

SHOWN FOR CLARITY.

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE

REPORTED TO COR.

3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.

EXACT LOCATIONS SHALL BE FIELD VERIFIED AND

REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT

IS BEING RELOCATED AND/OR MODIFIED.

4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT

BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,

IMMEDIATELY INFORM AND COORDINATE WITH VA AS

REQUIRED.

5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION

OF ALL SHUTDOWNS.

6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL

DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS

IMPACTED BY THIS PROJECT.

BLDG 103

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE

ONE-LINE DIAGRAMS ON SHEETS 103ED601 & 103EP601

FOR ADDITIONAL INFORMATION.

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE

ONE-LINE DIAGRAMS ON SHEETS 103ED603 & 103EP603

FOR ADDITIONAL INFORMATION.

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE

ONE-LINE DIAGRAMS ON SHEETS 103ED604 & 103EP604

FOR ADDITIONAL INFORMATION.

c

UP

DN

UP UP

UP

FD

FD

DN

F.E.C.

7 6 4 35 12

UP

F.E.C.

PIPE

STAND

FD

STANDPIPE

UP

RAMPRAMP

ccccccc

FS

PUMP

COVER

UP

F.E.C.

DRAIN

TRENCH DRAIN

O/H COILING DOOR

R

AM

P

DRIVEWAY

#53

RESERVED

UP

TO

BLDG. 16

BUILDING 16

(SEE DWG 16-2)

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

168 SF

TOILET, MALE

147 SF

P5F-109a

PIT

1523 SF

P5F-109a

TUNNEL

STAIR

NO. 1

1523 SF

P5F-109a

TUNNEL

STORAGESTORAGE

349 SF

P5F-154b

CONFERENCE

129 SF

P5F-124B

TEST BOOTH

STORAGE

70 SF

CP5-5a

ELEV. LOBBY

865 SF

EXT. CORRIDOR

70 SF

P5F-172 H.A.C.

59 SF

P5F-173

TOILET

59 SF

P5F-174

TOILET

223 SF

P5F-177

STAFF LOUNGE

226 SF

P5F-175

OFFICE

122 SF

P5F-178

OFFICE

113 SF

P5F-179

OFFICE

79 SF

P5F-190

VESTIBULE

247 SF

CP5-20

CORRIDOR

345 SF

P5F-154a

CONFERENCE

387 SF

P5F-145

LAB

105 SF

P5F-138

OFFICE

101 SF

P5F-140

OFFICE

103 SF

P5F-142

OFFICE

212 SF

P5F-145a

HARDWARE /SOFTWARE LAB

212 SF

P5F-145b

BIO MED ENG.

14 SF

P5F-192

SOILED LINEN

14 SF

P5F-191

STORAGE

134 SF

P5F-180

OFFICE

234 SF

P5F-134

VESTIBULE

121 SF

P5F-134a

CONTROL

153 SF

P5F-134b

TEST BOOTH

117 SF

P5F-134d

CONTROL

141 SF

P5F-134c

TEST BOOTH

129 SF

P5F-181

OFFICE

128 SF

P5F-182

OFFICE

138 SF

P5F-183

ADMIN. OFFICER OFF. 132 SF

P5F-184

OFFICE

184 SF

P5F-185

OFFICE

153 SF

P5F-186

LIBRARY

122 SF

P5F-187

CONTROL

116 SF

P5F-188

TEST BOOTH

307 SF

CP5-17

CORRIDOR

123 SF

P5F-189

CONTROL

130 SF

P5F-131

RESEARCH COORD.

130 SF

P5F-130

OFFICE

154 SF

P5F-128

TEST BOOTH

159 SF

P5F-126

CONTROL

357 SF

CP5-13

CORRIDOR

311 SF

CP5-12

CORRIDOR

251 SF

P5F-133

LAB

200 SF

P5F-127

CONTROL

129 SF

P5F-125

TEST BOOTH

SF

P5F-124

CONTROL

138 SF

P5F-122

CONTROL

163 SF

P5F-121

CONTROL

151 SF

P5F-123

TEST BOOTH

149 SF

P5F-120

TEST BOOTH

70 SF

P5F-135

STORAGE

212 SF

P5F-137

LAB

152 SF

P5F-119

TEST BOOTH

142 SF

P5F-117

CONTROL

40 SF

P5F-139 H.A.C.CP5-10a

RECEPTION

715 SF

CP5-14

CORRIDOR

691 SF

CP5-16

CORRIDOR

282 SF

CP5-21

CORRIDOR

208 SF

CP5-22

CORRIDOR

70 SF

CP5-25

CORRIDOR

118 SF

P5F-168

OFFICE

118 SF

P5F-169

OFFICE

116 SF

P5F-166

OFFICE

116 SF

P5F-164

OFFICE

119 SF

P5F-167

OFFICE

120 SF

P5F-165

OFFICE

116 SF

P5F-162

OFFICE

120 SF

P5F-163

OFFICE

234 SF

P5F-161

CONTROL

441 SF

P5F-161a

ANECHOIC CHAMBER

184 SF

P5F-160

GROUP OFFICE

386 SF

CP5-23

CORRIDOR

111 SF

P5F-158

OFFICE

111 SF

P5F-157

OFFICE

111 SF

P5F-156

OFFICE

115 SF

P5F-155

OFFICE

136 SF

P5F-153

SIM. REAL LIFE TEST.

133 SF

P5F-152

OFFICE

135 SF

P5F-151

LAB135 SF

P5F-150

IN-TAKE/EXAM

129 SF

P5F-143

TOILET, W

130 SF

P5F-141

TOILET, M

736 SF

P5F

RECEPT. & WAITING

CP5-10b

WAITING

CP5-10

LOBBY

277 SF

CP5-11

CORRIDOR

153 SF

P5F-118

TEST BOOTH

143 SF

P5F-116

CONTROL

134 SF

P5F-115

OFFICE

100 SF

P5F-114

EXAM

166 SF

CP5-1

LOBBY

179 SF

P5F-100

MECH. RM.

100 SF

P5F-109

MECH. RM.

658 SF

P5F-108

ELECT. ROOM231 SF

P5F-107

ELEC. PANEL

70 SF

P5F-106

TEL. EQ.

106 SF

P5F-105

ELEC. RM.

464 SF

P5F-104

MECH. RM.

150 SF

P5F-103

MECH. RM.

101 SF

P5F-102

SPRINKLER

87 SF

P5F-101

TEL. RM.

71 SF

CP5-5b

ELEV. LOBBY

572 SF

CP5-15

CORRIDOR

486 SF

CP5-6

ENTRANCE

97 SF

P5F-100

STOR./MECH.

337 SF

CP5-7

EXT. CORRIDOR

21,981 SF

P5-LEVEL

PARKING STRUCTURE

806 SF

CP5-4

CORRIDOR

582 SF

CP5-3

CORRIDOR

207 SF

NO. 1

STAIR

217 SF

NO. 2

STAIR

216 SF

NO. 3

STAIR

203 SF

NO. 4

STAIR

ELEV.

P-9

ELEV.

P-10 c

F.E.C.

7 6 4 35 12

F.E.C.

ccccccc

PUMP

COVER

F.E.C.

DRAIN

#53

RESERVED

TO

BLDG. 16

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

RESERVED

BLDG 103 - LEVEL P5 - ELECTRICAL PLAN1

- 3/64" = 1'-0"

0 8' 32'4' 16'

P5F-107

PNL: 103_LSH103P5

SWBD: 103_105

PNL: 103_NH103P5M

PNL: 103_DEH103P5

UNIT SUBSTATION:

US103

METERING SYSTEM

BLDG 103 - LEVEL P5 - ELECTRICAL

PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

103E-402

PROJECT

NORTH

103E-402

103E-102

GENERAL NOTES

KEY NOTES

AREA OF WORK

PROJECT

NORTH

KEY PLAN

1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND

ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE

SHOWN FOR CLARITY.

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE

REPORTED TO COR.

3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.

EXACT LOCATIONS SHALL BE FIELD VERIFIED AND

REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT

IS BEING RELOCATED AND/OR MODIFIED.

4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT

BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,

IMMEDIATELY INFORM AND COORDINATE WITH VA AS

REQUIRED.

5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION

OF ALL SHUTDOWNS.

6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL

DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS

IMPACTED BY THIS PROJECT.

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE

ONE-LINE DIAGRAMS ON SHEETS 103ED602 & 103EP602

FOR ADDITIONAL INFORMATION.

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE

ONE-LINE DIAGRAMS ON SHEETS 103ED603 & 103EP603

FOR ADDITIONAL INFORMATION.

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE

ONE-LINE DIAGRAMS ON SHEETS 103ED604 & 103EP604

FOR ADDITIONAL INFORMATION.

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE

ONE-LINE DIAGRAMS ON SHEETS 103ED601 & 103EP601

FOR ADDITIONAL INFORMATION.

E-504

FPS

75 SF

CB2G-1

CORRIDOR

109 SF

CB2G-5

CORRIDOR

K-2007KINGSTONC_LAVATORY VITREOUS CHINA

310 SF

CB2G-6

CORRIDOR

188 SF

CB2G-9

CORRIDOR

195 SF

CB2G-10

CORRIDOR

32 SF

CB2G-10A

COPY

136 SF

B2G-155

RECEPTION

64 SF

B2G-143

OFFICE

101 SF

B2G-153

OFFICE

106 SF

B2G-151

OFFICE

186 SF

CB2G-7

CORRIDOR

108 SF

B2G-145

OFFICE

109 SF

B2G-144

OFFICE

109 SF

B2G-142

OFFICE

63 SF

CB2G-8

CORRIDOR

97 SF

B2G-146

OFFICE

110 SF

B2G-147

OFFICE

131 SF

B2G-148

OFFICE

196 SF

B2G-149

OFFICE

93 SF

B2G-150

OFFICE

93 SF

B2G-152

OFFICE

93 SF

B2G-154

OFFICE

116 SF

B2G-141

OFFICE

93 SF

B2G-156

OFFICE

111 SF

B2G-157

OFFICE

34 SF

B2G-140

FILE

267 SF

CB2G-4

CORRIDOR 122 SF

B2G-109

OFFICE 4

100 SF

B2G-111

OFFICE 3

104 SF

B2G-108

INTERVIEW 4

100 SF

B2G-110

INTERVIEW 3

98 SF

B2G-112

INTERVIEW 2

159 SF

B2G-122

BULLPEN 3

192 SF

B2G-100

WAITING ROOM

121 SF

B2G-116

BULLPEN 2

1186 SF

CORRIDOR

216 S.F.

NO. 6

STAIR

NO. 10

ELEV

132 SF

B2G-113

SECURE INTERVIEW 1

111 SF

B2G-114

OFFICE 2

61 SF

B2G-115

HAC

116 SF

B2G-117

BULLPEN 1

121 SF

B2G-118

MED

117 SF

B2G-119

LEAD

70 SF

B2G-100

RECEPT

121 SF

B2G-120

NP

121 SF

B2G-101

SHARED INTERVIEW

120 SF

B2G-103

OFFICE 1

64 SF

B2G-121

STORAGE

42 SF

B2G-124

UNISEX

90 SF

B2G-123

TLT, MALE

114 SF

B2G-107

BREAK ROOM

255 SF

B2G-106

GROUP 4

286 SF

B2G-105

GROUP 3

365 SF

B2G-104

GROUP 2

245 SF

B2G-102

GROUP 1

150 SF

B2G-140c

TOILET, F.

125 SF

B2G-140b

TOILET, M.

257 SF

CB2G-1

CORRIDOR

141 SF

CB2G-2

CORRIDOR

289 SF

CB2G-3

CORRIDOR

23 SF

B2G-140a

ELEC. RM.

PNL: 104_P3-104-H1

XF: 104_T-150

CONTINUE FROM

SHEET 104E-100

SCALE : 1/8" = 1'-0"

1 BLDG 104 - LEVEL B2 - ELECTRICAL PLAN

0' 16'4' 8'

BLDG 104 - LEVEL B2 - ELECTRICAL

PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

PROJECT

NORTH

104E-1000

BLDG 41

BLDG 16

BLDG T-51

BLDG

BLDG 101

BLDG 102

BLDG 103

GENERAL NOTES

KEY NOTES

AREA OF WORK

PROJECT

NORTH

KEY PLAN

1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND

ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE

SHOWN FOR CLARITY.

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE

REPORTED TO COR.

3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.

EXACT LOCATIONS SHALL BE FIELD VERIFIED AND

REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT

IS BEING RELOCATED AND/OR MODIFIED.

4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT

BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,

IMMEDIATELY INFORM AND COORDINATE WITH VA AS

REQUIRED.

5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION

OF ALL SHUTDOWNS.

6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL

DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS

IMPACTED BY THIS PROJECT.

BLDG 6

BLDG 100

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE

ONE-LINE DIAGRAMS ON SHEETS 104ED601 & 104EP601

FOR ADDITIONAL INFORMATION.

BLDG 104

104-P-01

STAIR

ST-6

144SF

B1G-120

OFFICE

120 SF

B1G-122

OFFICE

120 SF

B1G-124

OFFICE

119 SF

B1G-126

OFFICE

120 SF

B1G-128

OFFICE

139 SF

B1G-150

OFFICE

58 SF

CB1-5

CORRIDOR

53 SF

B1G-121

S. TLT.

80 SF

B1G-123

OFFICE

80 SF

B1G-125

OFFICE

80 SF

B1G-127

OFFICE

100 SF

B1G-129

OFFICE

80 SF

B1G-130

OFFICE

102 SF

B1G-132

OFFICE

100 SF

B1G-134

OFFICE

100 SF

B1G-136

OFFICE

100 SF

B1G-138

OFFICE

204 SF

CB1-6

CORRIDOR

232 SF

CB1-8

CORRIDOR

100 SF

B1G-131

OFFICE

100 SF

B1G-133

OFFICE

100 SF

B1G-135

OFFICE

100 SF

B1G-137

OFFICE

98 SF

B1G-139

OFFICE

100 SF

B1G-140

OFFICE

120 SF

B1G-141

OFFICE

120 SF

B1G-142

OFFICE

120 SF

B1G-144

OFFICE

118 SF

B1G-146

OFFICE

31 SF

B1G-145

S. TLT.

33 SF

B1G-143 H.A.C.

200 SF

B1G-103

GROUP RM.

250 SF

B1G-105

GROUP RM.

100 SF

B1G-160

OFFICE

681 SF

CB1-7

CORRIDOR

120 SF

B1G-151

OFFICE

119 SF

B1G-152

OFFICE

119 SF

B1G-153

OFFICE

120 SF

B1G-154

OFFICE

120 SF

B1G-155

OFFICE

120 SF

B1G-156

OFFICE

118 SF

B1G-157

OFFICE

121 SF

B1G-158

OFFICE

120 SF

B1G-159

OFFICE

120 SF

B1G-161

OFFICE

125 SF

B1G-162

OFFICE

123 SF

B1G-165

OFFICE

144 SF

B1G-167

OFFICE

144 SF

B1G-168

OFFICE

112 SF

B1G-169

STORAGE

169 SF

B1G-171a

ELEC/TEL.

44 SF

B1G-170

S. TLT.

55 SF

B1G-171

VESTIBULE

127 SF

B1G-172

EXAM

127 SF

B1G-173

EXAM

100 SF

B1G-166

OFFICE

100 SF

B1G-164

OFFICE

426 SF

B1G-100a

ADMIN.

224 SF

B1G-163

SUPPORT

217 SF

CB1-9

CORRIDOR

110 SF

CB1-10

CORRIDOR

119 SF

CB1-3

CORRIDOR

219 SF

CB1-11

CORRIDOR

151 SF

B1G-104

TOILET, F.

152 SF

B1G-102

TOILET, M.

30 SF

B1G-174

CLOSET

202 SF

B1G-100

RECEPTION

83 SF

CB1-0

ELEV. VEST.281 SF

CB1-2

WAITING

394 SF

CB1-1

CORRIDOR

323 SF

B1G-101

GROUP RM

118 SF

B1G-106

OFFICE

121 SF

B1G-107

OFFICE

120 SF

B1G-108

OFFICE

121 SF

B1G-109

OFFICE

121 SF

B1G-110

OFFICE

122 SF

B1G-111

OFFICE

121 SF

B1G-113

OFFICE

329 SF

CB1-4

CORRIDOR

121 SF

B1G-112

OFFICE

ELEV.

P-10

PNL: 104_B1H1

PNL: 104_B1H

CONTINUE TO

SHEET 104E-1000

SCALE : 1/8" = 1'-0"

1 BLDG 104 - LEVEL B1 - ELECTRICAL PLAN

0' 16'4' 8'

BLDG 104 - LEVEL B1 - ELECTRICAL

PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

PROJECT

NORTH

104E-100

BLDG 41

BLDG 16

BLDG T-51

BLDG

BLDG 101

BLDG 102

BLDG 103

GENERAL NOTES

KEY NOTES

AREA OF WORK

PROJECT

NORTH

KEY PLAN

1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND

ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE

SHOWN FOR CLARITY.

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE

REPORTED TO COR.

3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.

EXACT LOCATIONS SHALL BE FIELD VERIFIED AND

REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT

IS BEING RELOCATED AND/OR MODIFIED.

4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT

BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,

IMMEDIATELY INFORM AND COORDINATE WITH VA AS

REQUIRED.

5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION

OF ALL SHUTDOWNS.

6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL

DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS

IMPACTED BY THIS PROJECT.

BLDG 6

BLDG 100

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE

ONE-LINE DIAGRAMS ON SHEETS 104ED601 & 104EP601

FOR ADDITIONAL INFORMATION.

BLDG 104

104-P-01

FANS

STAIR

ST-4

STAIR

ST-6

53 SF

G172

VITALS

117 SF

G107c

HALLWAY

140 5SF

G102

OFFICE

93 SF

G105

OFFICE

82 SF

G104

OFFICE

82 SF

G103

OFFICE

85 SF

G103a

OFFICE

980SF

C1-2

WAITING

BRIDGE

ELEV.

P-9

ELEV.

P-10

12 SF

G107a

STOR.

11 SF

G107b

STOR.

113 SF

G106

HALLWAY

104 SF

G106e

EXAM RM.

90 SF

G106c

EXAM RM.

129 SF

G106d

EXAM RM.

108 SF

G106b

OFFICE

105 SF

G106a

EXAM RM.50 SF

G171

VITALS

144 SF

G170

MECH. ROOM

54 SF

G101

TOILET

54 SF

G100

TOILET

343 SF

C1-3

CORRIDOR

72 SF

G160

OFFICE

114 SF

G163

OFFICE

115 SF

G162

OFFICE

887 SF

C1-4

WAITING ROOM

55 SF

C1-16

CORRIDOR

192 SF

C1-1

CORRIDOR

40 SF

G108

P. TOILET 107 SF

G107

BREAK RM.63 SF

G109

SOILED UTILITY

74 SF

G109a

CLEAN UTILITY

44 SF

G114

MED. CABINET

103 SF

G111

EXAM RM.

104 SF

G110

EXAM RM.

101 SF

G157

EXAM RM.

105 SF

G156

EXAM RM.

80 SF

G112

EXAM RM.

81 SF

G118

EXAM RM.

82 SF

G113

EXAM RM.

82 SF

G117

EXAM RM.

78 SF

G154

EXAM RM.

80 SF

G155

EXAM RM.

87 SF

G151

EXAM RM.

89 SF

G150

EXAM RM.

500 SF

C1-14

CORRIDOR

92 SF

G161

OFFICE

92 SF

G159

OFFICE

92 SF

G158

OFFICE

94 SF

G153

OFFICE

93 SF

G152

OFFICE

92 SF

G147

OFFICE

295 SF

C1-15

CORRIDOR

91 SF

G146

OFFICE

188 SF

G139

OFFICE

92 SF

G138

SPD

84 SF

G137

OFFICE147 SF

G136

OFFICE

143 SF

G134

OFFICE

116 SF

G131

OFFICE

115 SF

G131a

BREAK ROOM

68 SF

G130

LAB

55 SF

G132

SOILED UTIL.

44 SF

G133 H.A.C.

34 SF

G135

TOILET

165 SF

G141

PROCEDURE RM.

291 SF

C1-11

CORRIDOR

235 SF

C1-6

CORRIDOR286 SF

C1-7

CORRIDOR

310 SF

C1-8

CORRIDOR

92 SF

G148

EXAM RM.

98 SF

G144

EXAM RM.

95 SF

G149

EXAM RM.

101 SF

G143

EXAM RM.

80 SF

G119a

P. TOILET

82 SF

G142

P. TOILET

93 SF

G119

EXAM RM.

98 SF

G125

EXAM RM.

95 SF

G120

EXAM RM.

100 SF

G124

EXAM RM.

401 SF

G123

WAITING AREA

94 SF

G126

EXAM RM.

56 SF

G127

RECEPTION

211 SF

G129

EDUC. WAIT. ROOM

275 SF

C1-10

CORRIDOR

47 SF

G122

P. TOILET

101 SF

G115

EXAM RM.79 SF

G116

CLEAN LINEN

85 SF

OFFICE

339 SF

C1-5

CORRIDOR

STAIR

ST-6

STAIR

ST-4

STAIR

ST-3

81 SF

G140

PATIENT TOILET

PNL: 104_EL104DP1

SCALE : 1/8" = 1'-0"

1 BLDG 104 - LEVEL 01 - ELECTRICAL PLAN

0' 16'4' 8'

BLDG 104 - LEVEL 01 - ELECTRICAL

PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

PROJECT

NORTH

104E-101

BLDG 41

BLDG 16

BLDG 6

BLDG T-51

BLDG

BLDG 101

BLDG 100

BLDG 102

BLDG 103

BLDG 104

GENERAL NOTES

KEY NOTES

AREA OF WORK

gmsfgnsfg

PROJECT

NORTH

KEY PLAN

1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND

ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE

SHOWN FOR CLARITY.

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE

REPORTED TO COR.

3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.

EXACT LOCATIONS SHALL BE FIELD VERIFIED AND

REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT

IS BEING RELOCATED AND/OR MODIFIED.

4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT

BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,

IMMEDIATELY INFORM AND COORDINATE WITH VA AS

REQUIRED.

5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION

OF ALL SHUTDOWNS.

6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL

DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS

IMPACTED BY THIS PROJECT.

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE

ONE-LINE DIAGRAMS ON SHEETS 104ED601 & 104EP601

FOR ADDITIONAL INFORMATION.

BLDG 104

COOLING TOWER #1 COOLING TOWER #2 COOLING TOWER #3

STAIR

NO. 4

B2D-101

CARPENTER SHOP

1565 SF

CB2-6

CORRIDOR

210 SF

B2D-105

LOCK SHOP

292 SF

B2D-106

EMERGENCY GENERATOR

2702 SF

STAIR

NO. 28

B2D-106a

AIR TUNNEL - BELOW STAIR

NO. 13

SCALE : 1/8" = 1'-0"

1 BLDG 105 - OVERALL ELECTRICAL DEMOLITION PLAN

0' 4' 8' 16'

BUILDING 105 STRUCTURE

UNDER COOLING TOWER PAD

BLDG 105 - OVERALL ELECTRICAL

DEMOLITION PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

648-20-119

Date:Revisions:

Approved:

Approved:CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

CONSULTANT

VA PORTLAND HEALTH CARE SYSTEM - PORTLAND, OR

CORRECT ELECTRICAL FCA

DEFICIENCIES BLDGS - VAORA/E:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES, PRESIDENT

DCW/LRL JGD/JRB01/31/2025

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

E85 FUEL DISPENSARY

EQUIPMENT

E85 FUEL DISPENSARY

FEEDER

105E-401a

105E-401b

4 TYP.

PROJECT

NORTH

SEWER MANHOLE

ELECTRIC MANHOLE

EMERGENCY PHONE

EPO SWITCH,

DISCONNECT /SWITCH,

AND RECEPTACLE

BUILDING 105 STRUCTURE

UNDER COOLING TOWER PAD

CIRCULATION PUMP VFD ENCLOSURE 5

COOLING TOWER VFD ENCLOSURE 5

FUEL DISPENSARY POS3

GATE, WALLS

AND CURBING

3B E-506

VEHICLE VACUUM

3A E-506

105ED101

BLDG 41

BLDG 16

BLDG T-51

BLDG

BLDG 101

BLDG 102

BLDG 103

GENERAL NOTES

KEY NOTES

AREA OF WORK

PROJECT

NORTH

KEY PLAN

1. PLAN IS INCLUDED TO SHOW OVERALL FLOOR PLAN AND

ASSOCIATED EQUIPMENT. ALL EQUIPMENT MAY NOT BE

SHOWN FOR CLARITY.

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

CONDITIONS. ANY DISCREPANCIES FOUND SHALL BE

REPORTED TO COR.

3. EXISTING EQUIPMENT LOCATIONS ARE APPROXIMATE.

EXACT LOCATIONS SHALL BE FIELD VERIFIED AND

REDLINED VIA CONTRACTOR WHERE EXISTING EQUIPMENT

IS BEING RELOCATED AND/OR MODIFIED.

4. IF NUISANCE TRIPPING OCCURS AFTER CIRCUIT

BREAKERS HAVE BEEN REPLACED AND/OR ADJUSTED,

IMMEDIATELY INFORM AND COORDINATE WITH VA AS

REQUIRED.

5. REFERENCE SPECIFICATION 01 00 00 FOR COORDINATION

OF ALL SHUTDOWNS.

6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL

DIRECTORIES FOR ALL PANELS THAT CONTAINS CIRCUITS

IMPACTED BY THIS PROJECT.

BLDG 6

BLDG 100

EXISTING CONDUIT AND WIRE EXTENDING TO "105 MCC-1"

TO BE MODIFIED. REFERENCE SHEETS 105EP101,

105E-401a, and 105E-401b FOR ADDITIONAL INFORMATION.

EXISTING 4" x 4" UTILIDOR LID TO BE DEMOLISHED AND

REPLACED.

EXISTING E85 FUEL DISPENSORY AND RELATED

EQUIPMENT SHALL BE DEMOLISHED. ALL CORRESPONDING

CONDUIT AND WIRING SHALL BE DEMOLISHED BACK TO

SOURCE.

EXISTING COOLING TOWER CONDUIT AND WIRE TO BE

DEMOLISHED BACK TO SOURCE.

EXISTING CIRCULATION PUMP AND COOLING TOWER VFD

ENCLOSURES SHALL BE DEMOLISHED. ALL

CORRESPONDING CONDUIT AND WIRING SHALL BE

DEMOLISHED BACK TO SOURCE; ALL CONCRETE SLAB

PENETRATIONS SHALL BE PATCHED TO MATCH SLAB.

EXISTING GATE AND ALL ELECTRONIC ACCESS CONTROL

SHALL BE DEMOLISHED. ALL CORRESPONDING CONDUIT

AND WIRING SHALL BE DEMOLISHED BACK TO SOURCE.

BLDG 105

AN

COOLING TOWER #1 COOLING TOWER #2 COOLING TOWER #3

BUILDING 105

STRUCTURE UNDER

COOLING TOWER PAD

DN

STAIR

NO. 4

B2D-101

CARPENTER SHOP

1565 SF

CB2-6

CORRIDOR

210 SF

B2D-105

LOCK SHOP

292 SF

B2D-106

EMERGENCY GENERATOR

2702 SF

STAIR

NO. 28

B2D-106a

AIR TUNNEL - BELOW STAIR

NO. 13

B2D-122

4' X 4' COVER…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .