Attachment 6 Seed Project Price Breakout.xlsx
XLSX spreadsheet 17 KB Posted
- Solicitation number
- 36C26024R0087
About this file
This file is a Price Schedule Breakdown template for the Vancouver Consolidated Dental B20 Project (Project Number 648-22-100) located at the Portland VA Vancouver Campus. The document provides a detailed line-item pricing structure across multiple construction divisions (CSI specification categories), such as General Requirements, Concrete, Masonry, Metals, Electrical, Plumbing, and HVAC, though all line items are currently marked with $0.00 values. The template is associated with Solicitation Number 36C26024R0087 for VISN 20 General Construction MATOC Replacement Construction Services, issued by the Department of Veterans Affairs Veterans Health Administration, and includes provisions for fixed-price contract pricing, with sections for mobilization, insurance, bonds, overhead rates, subcontract markup, and profit rates.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| PRICE SCHEDULE BREAKDOWN INSTRUCTIONS | |
| INSTRUCTIONS | |
| 1 | Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary |
| 2 | The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record. |
| 3 | The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables. |
| 4 | Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable. |
| 5 | All pricing is fixed price. |
Proposal Price Schedule
PRICE SCHEDULE BREAKDOWN
Project Number / Title: 648-22-100, Vancouver Consolidated Dental B20 Project Location: Portland VA Vancouver Campus
| Seed Project | ||
| Rates | Base Item | |
| Price | ||
| Division Item 1 General Requirements (furnish and install) | N/A | $0.00 |
| Division Item 2 Existing Conditions (furnish and install) | N/A | $0.00 |
| Division Item 3 Concrete (furnish and install) | N/A | $0.00 |
| Division Item 4 Masonry (furnish and install) | N/A | $0.00 |
| Division Item 5 Metals (furnish and install) | N/A | $0.00 |
| Division Item 6 Woods, Plastic and Composites (furnish and install) | N/A | $0.00 |
| Division Item 7 Thermal and Moisture Protection (furnish and install) | N/A | $0.00 |
| Division Item 8 Openings (furnish and install) | N/A | $0.00 |
| Division Item 9 Finishes (furnish and install or state included in Division 5) | N/A | $0.00 |
| Division Item 10 Specialties (furnish and install) | N/A | $0.00 |
| Division Item 11 Equipment (furnish and install) | N/A | $0.00 |
| Division Item 13 Special Construction (furnish and install) | N/A | $0.00 |
| Division Item 21 Fire Suppression (furnish and install) | N/A | $0.00 |
| Division Item 22 Plumbing (furnish and install) | N/A | $0.00 |
| Division Item 23 Heating, Ventilating and A/C (furnish and install) | N/A | $0.00 |
| Division Item 26 Electric | N/A | $0.00 |
| Division Item 27 Communications | N/A | $0.00 |
| SubTotals | N/A | $0.00 |
Period of Performance (FAR 52.211-10) ________ days
| Mobilization / Demobilization | N/A | $0.00 |
| Insurance / Bonds | N/A | $0.00 |
| Taxes / Other Fees (provide itemized list) | N/A | $0.00 |
| O&M Manuals and Red Line Drawings | N/A | $0.00 |
| Overhead | Rate _______% | N/A |
| Overhead (daily rate) | Per Day $0.00 | N/A |
| SubContract Mark-Up | Rate _______% | N/A |
| Profit | Rate _______% | N/A |
| SubTotals | $0.00 |
Other Items not Requested Above (provide itemized list) $0.00
CONTRACT TOTALS $0.00