These documents are architectural drawings for the VA Portland Health Care System (VAPORCS), specifically a dental services renovation project located in Vancouver, Washington. The drawings include a demolition ceiling plan, room finish and wall schedule, casework details, and a floor plan with equipment schedule for a medical/dental facility.
Key details include a comprehensive demolition plan to remove existing ceiling tiles, suspended acoustical grids, and permanently installed ceiling-mounted equipment. The project involves multiple room types such as treatment rooms, storage, surgical spaces, staff areas, and support spaces like an Omnicell supply room and sterile instrument area. The specialty equipment schedule lists numerous items including patient lifts, garment hooks, AED cabinets, corner guards, wall-mounted computer cabinets, grab bars, mirrors, and roller window shades. The floor plan uses color-coded flooring types (CPT1, LVT1, LVT2, SVT1) across different room zones, indicating specific material requirements for each space.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S S SS S S
BA.8 B.5 B.9 C C.4 C.5 DA.7
REMOVE ALL CEILINGS THIS AREA TO INCLUDE SUSPENDED
ACOUSTICAL TILES AND GRIDS, SUSPENDED AND STRUCTURE MOUNTED
GYPSUM BOARD, AND ALL SOFFITS OVER CASEWORK.
REMOVE ALL PERMANENTLY INSTALLED CEILING MOUNTED EQUIPMENT AND
TURN OVER TO THE OWNER - NOT SHOWN FOR CLARITY - VERIFY IN FIELD
SEE ELECTRICAL AND MECHANICAL DRAWINGS FOR OTHER CEILING
MOUNTED ITEMS TO BE REMOVED AND EITHER REINSTALLED IN NEW
LOCATIONS, OR REPLACED WITH NEW MATERIALS.
PHASE 2 DEMOLITION -
SHADED - IS TO REMAIN
OPERATIONAL DURING
PHASE 1 DEMOLITION
AND CONSTRUCTION
PHASE 1 DEMOLITION
CONSTRUCT TEMPORARY WALL AS SHOWN WITH BLUE
DASHED LINES PROR TO BEGINNING DEMOLITION - ADD
TEMP DOOR FOR CONTRACTORS ENTRANCE - AT
CONTRACTORS OPTION, THE PERMANANT WALL (TYPE AS
SCHEDULED) CAN BE INSTALLED THIS LOCATION.
ALIGN TEMPORARY WALL WITH CEILING GRID -
THIS CORRIDOR SHALL REMAIN OPEN DURING
CONSTRUCTION. THE TEMPORARY WALL
LOCATION IS FLEXIBLE BUT SHALL NOT REDUCE
THE WIDTH OF THE CORRIDOR TO LESS THAN 44".
REMOVE EXISTING CEILING TILES AND ALL OTHER
CEILING MOUNTED ITEMS AS NECESSARY BETWEEN
TEMP. AND EXISTING WALLS SUCH AS SIGNAGE AND
SALVAGE FOR REINSTALLATION IN THE SAME LOCATION
UPON COMPLETION OF CONSTRUCTION.
REMOVE EXISTING WALL MOUNTED
TELEVISION AND COORDINATE WITH
OWNER FOR NEW PERMANENT LOCATION
J
K
Ksim
F
L
Lsim opp
EXISTING CLERESTORY WINDOW TO BE
REMOVED AND WALL INFILLED
J K
GYPSUM BOARD SOFFIT AT
CORRIDOR CONNERS TO
BE REMOVED
TYPICAL CEILING FINISHES IN
OFFICE SPACES TO BE
DEMOLISHED AND REMOVED
TYPICAL EXISTING WINDOW
MULLION PATTERN - WINDOW
BILNDS TO REMAIN (REMOVE
DURING CONSTRUCTION
OPERATIONS AND REINSTALL)
L 1/ 2' 0'
1' 4'
4' 8'
4' 2'
2'
1/ 8' 0'
1' 0' 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
8' 8'
1/ 0'
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
B20
Sheet of
ISSUED FOR CONSTRUCTION
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc
B
D en ta l\0
5- C
A
SE
R
VI
C
ES
\0 9_
As -B ui lt\
-0
_3
- V
AN
C D en ta l B
C
PS
.rv t
4/
/2
1:
:4
PM
AD101
DEMOLITION CEILING PLAN
BLUE TRIDENT, LLC
900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110
(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME
Renovate Building 20 in Vancouver to Consolidate Dental Services
VANCOUVER, WA
648-22-100
15 AUG 2024
EB LMS
3/8" = 1'-0"F3 2nd FLOOR CEILING PLAN DEMO
Revisions: Date:
1 RESPONSE TO PREBID QUESTIONS 4/22/2025
LD
A
T
1/
8"
5/8" TYPE 'X' GWB
CONT. METAL EDGE MOLD ALL
EXPOSED EDGES
FLUSH MOUNTED RESILIENT
CORNER GUARD SET AT TOP OF
BASE - SHIM AS REQUIRED TO
ACHIEVE FLUSH MOUNT - APPLY
TOP AND BOTTOM CLOSURES
CAULK JOINTS
B.9 C F1
A-601
C3
C3
A3
A4
HOLD FACE OF CABINET BACK FROM
FACE OF WALL TO ALLOW ADJACENT
SLIDING DOORS TO PASS IN FRONT
OF DOOR HANDLES
2'
- 0
3' - 0" 3' - 0" 3' - 0"
ALL CABINET DOORS TO BE LOCKABLE WITH VA
CORE - SF 7 PIN
2"
HOLD FACE OF CABINET
BACK FROM FACE OF
WALL TO ALLOW
ADJACENT SLIDING
DOORS TO PASS IN
FRONT OF CABINET DOOR
HANDLES
6"
SLIDING DOOR
BEYOND
ADJUSTABLE SHELVING
A4
C3
6'
- 8
2' - 5"
4"
CEILING AS
SCHEDULED
ALL CABINET
DOORS TO BE
LOCKABLE
WITH VA
CORE - SF 7 PIN
2" X 2"
STAINLESS
STEEL CORNER
GUARD
ADHERED ALL
AROUND
OPENING -
MITER
CORNERS
2" X 2"
STAINLESS
STEEL CORNER
GUARD
ADHERED ALL
AROUND
OPENING -
MITER
CORNERS
TOP MNT, STAINLESS STEEL SINK -
SET IN CONT BEAD OF SEALANT
(INTERGRAL SINK IN LAB AND SOILED)
P.LAM BASE CABINET WITH
REMOVABLE FRONT PANEL(S)
(NOT IN SOILED ROOM)
FAUCET W/ LEVER HANDLES (ADD
EYEWASH ATTACHMENT IN LAB)
FINISH END OF EXISTING
ADJ. BASE CABINET BEYOND
WITH SAME LAMINATE
1/2" SOLID SURFACE COUNTERTOP (STAINLESS
STEEL IN LAB AND SOILED) OVER 3/4" MARINE
GRADE PLYWOOD UNDERLAYMENT
FINISH WALL AND FLOOR
AT EXPOSED BY CABINET
1/2" SOLID SURFACE BACKSPLASH (&
SIDE SPLASHES WHERE OCCURS)
(STAINLESS STEEL IN LAB AND SOILED)
SEE ELEVATION FOR ACCESSORIES
KNEE SPC
TO
P
O F
FI
N
IS
H
ED
C
O U
N
TE
R
2'
1/
2" U
.N .O
6" 2'
1/ 2"
COUNTER WIDTH
VARIES - SEE PLAN
1/2" SOLID SURFACE
COUNTER EDGE
(STAINLESS STEEL
IN LAB AND SOILED)
2'
" M
AX
. S
IN
K
R
IM
9" (CABINET DIMS)
11" 6"
1' - 5"
4"
1" O.H.
1/ 2"
1'
- 1 1"
SOLIDS INTERCEPTOR
WITH BOTTOM CLEAN
OUT- LAB ONLY
CERAMIC TILE FINISH AS SCHEDULED
CERAMIC TILE
WALL AS SCHEDULED
METAL COVE BASE SCHLUTER DILEX-AHK OR EQUAL
FINISH PLAN NOTES
1. ALL WALLS AND COLUMNS TO BE PAINTED P-1, UON.
2. ALL GYP BD SOFFITS TO BE PAINTED P-1, FLAT FINISH @ UNDERSIDE SURFACE UON.
3. ALL WALLS TO RECEIVE BASE B1, 4" HIGH EXCEPT AT TREATMENT ROOMS AND
SURGERY ROOM PROVIDE 6" BASE, UON.
4. REFER TO INTERIOR ELEVATIONS FOR ADDITIONAL FINISH INFORMATION.
5. REFER TO DOOR SCHEDULE FOR DOOR & FRAME FINISHES.
6. DENOTES CHANGE IN FLOORING MATERIALS.
7. REFER TO PROJECT SPECIFICATIONS AND/OR MANUFACTURER'S PRODUCT
SPECIFICATIONS FOR GENERAL PRODUCT INFORMATION.
8. CONTRACTOR SHALL EXAMINE ALL SURFACES TO BE FINISHED AND VERIFY THAT THEY
ARE ACCEPTABLE TO RECEIVE SPECIFIED FINISHES.
9. SURFACE DEFECTS OR DEFICIENCIES WHICH MAY ADVERSELY AFFECT WORK SHALL BE
CORRECTED OR BROUGHT TO THE ATTENTION OF THE GENERAL CONTRACTOR AND COR
FOR CORRECTION PRIOR TO COMMENCEMENT OF WORK.
10. ALL SURFACES SHALL BE PREPARED AND PRIMED ACCORDING TO MANUFACTURERS'
DIRECTIONS AND RECOMMENDATIONS.
11. CONTRACTOR IS TO NOTIFY ARCHITECT OF ANY DISCREPANCIES OR CONFLICTS
REGARDING CONDITIONS OR LOCATIONS FOR APPLICATION OF MATERIALS PRIOR TO OR
DURING CONSTRUCTION/ INSTALLATION, OR TRADE RESPONSIBILE FOR CORRECTING
SUCH WORK AS DIRECTED BY THE ARCHITECT.
12. THE CONTRACTOR SHALL EXAMINE ALL AREAS OF CONSTRUCTION AFTER COMPLETION OF
WORK BY ALL TRADES AND APPROVE ALL NECESSARY TOUCH-UP PAINTING OR
PATCHING.
13. REFERENCE WAINSCOT DETAILS FOR HEIGHTS AND MATERIALS TO BE USED AT EACH TYPE.
14. PROVIDE STRAIGHT WALL BASE BEHIND SLIDING DOORS SO IT DOES NOT INTERFERE WITH
DOOR OPENING.
15. ALL RESILIENT AND CARPET FLOORING AREAS TO RECEIVE COVE BASE UON.
16. WHERE SEVERAL FINISHES OCCUR ON SAME WALL, SEE ELEVATION FOR
CLARIFICATION.
17. ALL EXPOSED DRYWALL SURFACES TO BE PAINTED UON.
18. NO RESILIENT BASE SEAM TO OCCUR WITHIN 12" OF A WALL CORNER.
19. ALL CHANGES IN FLOOR MATERIAL TO OCCUR AT CENTER LINE OF DOOR UON
20. REPLACE ALL SOLID SURFACE WINDOW STOOLS WITH NEW SOLID SURFACE WINDOW
STOOLS
CONT. SNAP-ON
PLASTIC HANDRAIL
(HR) BY CORNER
GUARD MANUF. -
MOUNTED TO FRP
3/8" FRP PANEL (RWC1)
ADHERED TO GYPSUM
BOARD PER
MANUFACTURES
RECOMMENDATIONS -
COLOR AS SCHEDULED
RESILIENT BASE AS
SCHEDULED
WALL TYPE AS SCHEDULED
2'
- 9
3 1 /2"
45 DEGREE CONT.
CHAMFER AT TOP
EDGE
3"
CONT. 3/4" X 4"
PLASTIC CRASH RAIL
(CR) BY CORNER
GUARD MANUF. -
MOUNTED TO FRP
3/8" FRP PANEL (RWC2)
ADHERED TO GYPSUM
BOARD PER
MANUFACTURES
RECOMMENDATIONS -
COLOR AS SCHEDULED
RESILIENT BASE AS
SCHEDULED
WALL TYPE AS
SCHEDULED
45 DEGREE
CONT. CHAMFER
AT TOP EDGE
4" 2'
- 9
4"
3'
- 1
1/ 2' 0'
1' 4'
4' 8'
4' 2'
2'
1/ 8' 0'
1' 0' 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
8' 8'
1/ 0'
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
B20
Sheet of
ISSUED FOR CONSTRUCTION
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc
B
D en ta l\0
5- C
A
SE
R
VI
C
ES
\0 9_
As -B ui lt\
-0
_3
- V
AN
C D en ta l B
C
PS
.rv t
4/
/2
1:
:5
PM
A-601
ROOM FINISH AND WALL SCHEDULE AND
CASEWORK DETAILSBLUE TRIDENT, LLC
900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110
(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME
Renovate Building 20 in Vancouver to Consolidate Dental Services
VANCOUVER, WA
648-22-100
15 AUG 2024
EB LMS
ROOM FINISH SCHEDULE
RM NUM ROOM NAME FLOOR BASE
WALLS
CEILING COMMENTS / NOTESNORTH -A EAST - B SOUTH - C WEST - D
200 STORAGE SVT1 B1 P1 P1 P1 P1 ACT1
201 TRTMNT SVT1 B1 SC1 SC1 SC1 SC1 ACT2 NOTE 3
202 PANO LVT1 B1 P1/ W2 P1/ W2 P2/ W2 P1/W2 ACT1
203 TRTMNT SVT1 B1 SC1 SC1 SC1 SC1 ACT2 NOTE 3
204 STERILE
INSTRUMENTS
SVT1 B1 SC1 SC1 SC1 SC1 ACT2
205 OFFICE CPT1 B1 P1 P1 P2 P1 ACT1
206 OMNICELL
SUPPLY
SVT1 B1 SC1 SC1 SC1 SC1 ACT2
207 TRTMNT SVT1 B1 SC1 SC1 SC1 SC1 ACT2 NOTE 3
208 SOILED SVT1 SVT1 SC1/ W2 SC1/ W2 SC1/ W2 SC1/ W2 ACT2
209 TRTMNT SVT1 B1 SC1 SC1 SC1 SC1 ACT2 NOTE 3
210 LAB SVT1 SVT1 SC1/ W2 SC1/ W2 SC1/ W2 SC1 ACT2
211 SURGERY SVT1 B1 SC1 SC1 SC1 SC1 ACT2 NOTE 3
212 STAFF TOILET CT3 B3 P5/CT1,CT2 P5/CT1,CT2 P5/CT1,CT2 P5/CT1,CT2 ACT1
213 MEDS SVT1 B1 P1/ W2 P1/ W2 P1/ W2 P1/W2 ACT1
214 TOILET CT3 B3 P5/CT1,CT2 P5/CT1,CT2 P5/CT1,CT2 P5/CT1,CT2 ACT1
215 TOILET CT3 B3 P5/CT1,CT2 P5/CT1,CT2 P5/CT1,CT2 P5/CT1,CT2 ACT1
C2.01 ALCOVE 1 LVT2 B1 P3 P3 P3 P3 ACT1
C2.02 CORR LVT1 B1/ B2 -- P1/ W1 P5 P1/ W1 ACT1/ GYP/ P1
C2.03 CORR LVT1 B1 P1 P1/ W1 P2/ W1 P1 ACT1
C2.04 ALCOVE 2 LVT2 B2 P3 P3 P3 P3 ACT1
SCHEDULE for FINISHES
MARK MATERIAL MANUFACTURER STYLE / PRODUCT COLOR SIZE FINISH NOTES
ACT1 ACOUSTICAL CEILING TILE ARMSTRONG CORTEGA- SQUARE LAY-IN WHITE 24 X 24" x 5/8" - ACT2 ACOUSTICAL CEILING TILE ARMSTRONG CLEAN ROOM VL WHITE 24 X 24" x 5/8" -
ACTG CEILING TILE SUSPENSION GRID ARMSTRONG PRELUDE 15/16" WHITE 15/16" -
B1 RESILIENT RUBBER BASE FLEXCO TS WALLFLOWERS, COVE 023 PEBBLE 4" AND 6" - 6" IN TREATMENT AND SURGERY ROOMS, MEDS ROOM - 4" ELSEWHERE. PREFORMED CORNERS
AT 4” BASE (N/A FOR 6”). COVE STYLE AT ALL FLOORING TYPES EXCEPT BEHIND SLIDING DOORS, USE STRAIGHT BASE
B2 WALL BASE - STAINLESS STEEL TO MATCH EXISTING - - - TOP 1/4" CORNER MITERED AT 45 DEGREES
B3 METAL COVE BASE SCHLUTER DILEX-AHK ANNODIZED ALUMINUM -
CG1 CORNER GUARD CS ACROVYN FS-20/FS-20R OZARK #314 FULL HEIGHT MOUNT AT TOP OF WALL BASE TO BOTT OF CEILING CG2 CORNER GUARD - STAINLESS TO MATCH EXISTING N/A - - - SALVAGE EXISTING FOR REUSE OR PROVIDE NEW
CPT1 CARPET - TILE PATCRAFT IO353- HOMEROOM V. 3.0; SOLUTION Q EXTREME
NYLON; 100% SOLUTION DYED
00770- FINAL EXAM 24" x 24" QUARTER TURN TRANSITION STRIP REQUIRED AT FLOORING CHANGE TO CARPET TILE
CR PLASTIC CRASH RAIL CS ACROVYN SCR-40N – 3/4" WALL OFFSET WHITE #949 4" X 3/4" PROVIDE END CAPS AT ALL TERMINATIONS CT-1 CERAMIC WALL TILE FIELD DAL TILE COLOR WHEEL COLLECTION- CLASSIC MATTE ARCTIC WHITE 0790 3x6 STACK BOND SEE D7/A-602 FOR TILE PATTERN - BULLNOSE TILE AT TOP FINISH COURSE - GROUT: CUSTOM
BUILDING PRODUCTS FUSION PRO #542 GREYSTONE
CT-2 CERAMIC WALL TILE ACCENT DAL TILE COLOR WHEEL COLLECTION- CLASSIC MATTE ARCHITECTURAL GRAY 0709 3x6 ACCENT BAND SEE D7/A-602 FOR TILE PATTERN - 1 COURSE BELOW TOP FINISH COURSE - GROUT: CUSTOM
BUILDING PRODUCTS FUSION PRO #542 GREYSTONE
CT-3 CERAMIC FLOOR TILE DAL TILE VOLUME 1 GLAZED PORCELAIN W/ STEPWISE
TECHNOLOGY
VL74 REVERB ASH 6x6 GROUT: CUSTOM BUILDING PRODUCTS FUSION PRO #542 GREYSTONE
HR PLASTIC HANDRAIL CS ACROVYN HRB-4CN - ROUND HANDRAIL OZARK #314 5 1/2" X 3" PROVIDE MANF. STANDARD QUICK LOCK BRACKETS AND END CAPS AT ALL TERMINATIONS LVT1 MANNINGTON AMTICO SIGNATURE COLLECTION LIGHT CHERRY AROW 7060 3" x 36" PLANK SQUARE EDGE
LVT2 MANNINGTON AMTICO STONE STRIA BASALT (AROSMS43) 18" X 18" SQUARE EDGE
P1 PAINT-1 (P1) PPG SEMI-GLOSS (GENERAL PAINT) PPG14-16 WINTER MOOD - - FLAT FINISH AT GYP CEILING
P2 PAINT-2 (P2) PPG SEMI-GLOSS (ACCENT) PPG11-27 SAFARI - -
P3 PAINT-3 (P3) PPG MATCH ADJACENT -
P5 PAINT-5 (P5) PPG DTM SATIN (DOOR FRAMES) PPG1025-4 SHARKSKIN SEMIGLOSS ON DOOR FRAMES PL1 PLASTIC LAMINATE WILSONART FINE VELVET FINISH GREY MESH 4877-38 - - ALL PLAM VENEER CABINETS AND SHELVES AS NOTED
SC1 SPECIAL COATING PPG AQUAPON WB EP PORCELAIN WHITE, GLOSS WALL FINISH
SS1 SOLID SURFACE DUPONT CORIAN - SPARKLING GRANITA - - WINDOW SILLS
SVT1 SOLID VINYL TILE FLEXCO DELANE ESD 065 WARM GRAY 36” X 36” WELDED SEAM/ SELF COVE PER ROOM FINISH SCHEDULE W1 RIGID WALL COVERING CS ACROVYN ACROVYN SOLID COLORS- SHEET OZARK #314 .060 THICK W2 RIGID WALL COVERING CS ACROVYN ACROVYN SOLID COLORS- SHEET WHITE #949 .060 THICK WD WOOD (DOOR FINISH) RED OAK- PLAIN SLICE CLEAR FINISH DOORS- TO MATCH EXISTING FACILITY STANDARD
3" = 1'-0"E7 CORNER GUARDS
ACT ACOUSTICAL CEILING TILE
ACTG ACOUSTIC CEILING TILE
SUSPENSION GRID
ALUM ALUMINUM
ANOD ANODIZED
AP ACOUSTICAL PANEL
B BASE
BBT BIOBASED TILE
BD BOARD
CONC CONCRETE
CPT CARPET
CT CERAMIC TILE
FF FACTORY FINISHED
FIN FINISH
FLRG FLOORING
GALV GLAVANIZED
GB GYPSUM BOARD
GL GLASS
HDO HIGH DENSITY OVERLAY
HDWD HARDWOOD
HM HOLLOW METAL
JAN JANITOR
JST JOIST
JT JOINT
LAM LAMINATE
LIN LINOLEUM
MDF MEDIUM DENSITY FIBERBOARD
MDO MEDIUM DENSITY OVERLAY
MTL METAL
NA NOT APPLICABLE
NAT FIN NATURAL FINISH
NIC NOT IN CONTRACT
ORIG ORIGINAL
P PAINT
PBD PARTICLE BOARD
PL PLASTIC LAMINATE
PLAS PLASTER
PLWD PLYWOOD
PNL PANEL
PRCST PRECAST
PREFAB PREFABRICATED
PREFIN PREFINISHED
PVC POLYVINYLCHLORIDE
QT QUARRY TILE
RAF RAISED ACCESS FLOOR
RB RUBBER / RUBBER BASE
RSF RESILIENT SHEET FLOORING
RTF RESILIENT TILE FLOORING
RTR RUBBER TREAD & RISER
SC SOLID CORE
SCWD SOLID CORE WOOD
SHT SHEET
SS SOLID SURFACE
SST STAINLESS STEEL
STN STAIN
SUSP SUSPEND(ED)
SV SHEET VINYL
T&G TONGUE AND GROOVE
TZ TERRAZZO
UNFIN UNFINISHED
UON UNLESS OTHERWISE NOTED
VCT VINYL COMPOSITION TILE
WB WOOD BASE
WD WOOD
WSCT WAINSCOT 1 1/2" = 1'-0"D6 BUILT-IN LINEN CABINETS
3/4" = 1'-0"F1 CLEAN LINEN CABINET
1" = 1'-0"D1 ACCESSIBLE SINK BASE
3" = 1'-0"E9 TILE BASE
1 1/2" = 1'-0"F5 W1 - WAINSCOT IN CORRIDOR 1 1/2" = 1'-0"F3 W2 - WAINSCOT IN ROOMS
Revisions: Date:
1 RESPONSE TO PREBID QUESTIONS 4/22/2025
63 SF
PANO
47 SF
SOILED
203B201B 207B 209B
131 SF
TRTMNT
127 SF
TRTMNT
127 SF
TRTMNT
178 SF
OFFICE
127 SF
TRTMNT
43 SF
MEDS
210208204
199 SF
SURGERY
C2.02
C2.04
79 SF
LAB
59 SF
STAFF TOILET
48 SF
TOILET
50 SF
TOILET
79 SF
STORAGE
375 SF
CORR
C2.03
63 SF
STERILE
INSTRUMENTS
201A 203A 207A 209A
39 SF
CORR
C2.02
49 SF
ALCOVE 2
C2.04
5'
- 4
CPT1
CT3
LVT1
LVT2
SVT1
63 SF
OMNICELL
SUPPLY
E0948
A5077
593006
D3380
D3390
A5145A5145
D3565
D8850 D9060
A5077
D3380D3390
D3565
D8850 D9060
A5106
M8805
M7845
M2455
F0355
F2010
E0948
D3380
D3390
D0100
A5145
A5145
A5080
A5106
A5075
A5077
A1066
F0230F0230
F0230
A5077
A5145
A5145
591004
M2055
M2055
M2055
A5077
A5145
A5145
D3380D3390
591004
D3565
D8850
D9060 A5106
A5077
D3380 D3390
D3565
D8850
D9060 A5106
A5145
A5145
A5077
A5145
A5145
591004 A5077
A5145
A5145
A5077
A5145
A5145
F0
M2055
M3150
A1066
A1066
A1066
A5082
A5082
A5082
M3072 M3072
LINEN CABINETS
2'
- 0
E0703 E0703 E0703
E0703 E0703
WRIST BAND
PRINTER AND
TABLE
SPACE FOR FILES
WATER DISPENSER
591005
591004
591005
593006
591005
593006 593006
591005
591005
593006
591005
H H
CG1
CG1
CG2 CG2 CG2 CG2
F2000
A5106
M2055
E0912
E0912 E0912
E0912
EQ
EQ
5' - 6"
EQ EQEQ EQ
RELOCATED PANOGRAPHIC
XRAY UNTI FROM B15
M2016
E0912
E0912
E0912
E0912 D0904
D6250
D3390
CG1CG1
A5082
A5075
A5082 A5075
A1066
M1802
CG1
CG1
D0980
D4360
2'
- 8
2'
- 0
2'
- 2
EQ EQ
2'
- 8
EQ EQ
A5075 A5082
A6210
R6900
18 SF
ALCOVE 1
C2.01
1/ 2' 0'
1' 4'
4' 8'
4' 2'
2'
1/ 8' 0'
1' 0' 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
8' 8'
1/ 0'
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
B20
Sheet of
ISSUED FOR CONSTRUCTION
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc
B
D en ta l\0
5- C
A
SE
R
VI
C
ES
\0 9_
As -B ui lt\
-0
_3
- V
AN
C D en ta l B
C
PS
.rv t
4/
/2
1:
:5
PM
A-603
FF&E PLAN AND EQUIPMENT SCHEDULE
BLUE TRIDENT, LLC
900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110
(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME
Renovate Building 20 in Vancouver to Consolidate Dental Services
VANCOUVER, WA
648-22-100
15 AUG 2024
EB LMS
3/8" = 1'-0"F3 DENTAL 2nd FLOOR AREA A FF&E PLAN
SPECIALITY EQUIPMENT SCHEDULE C/C
JSN NAME QTY ACQ/INST DESCRIPTION MANUFACTURER MODEL Manufacturer
Website UTIL_1_WaterDr ain UTIL_2_Elec WIDTH HEIGHT DEPTH A1066 MIRROR, FLOAT GLASS, 18" X 36" 5 C / C MIRROR, FLOAT GLASS, 18" X 36" Bobrick Washrom
Equipment, Inc. B-290 1836 1' - 6" 3' - 0" 1"
A1200 Patient lift 1 C / C SEE SPECS Likorail 250ES 24 V, 12 A A5145 Hook, Garment, Double, SS, Surface
Mounted 18 C / C Satin Finish BRADLEY Model 9124
AED Semi-Recessed AED Cabinet with Audible Alarm 1 C / C Semi-Recessed AED Cabinet with Audible
Alarm AED Universe 180SR3-1
CG1 CORNER GUARD, 48" HIGH 7 C / C Acrovyn Flush Mount Corner Guard ACROVYN Construction Specialties FS-20N
CG2 CORNER GUARD, 48" HIGH 4 C / C Acrovyn Flush Mount Corner Guard ACROVYN Construction Specialties FS-20N
D0666 30x24x12 open shelf wall cabinet 2 C / C open shelf wall cabinet with 2 adjustable shelves CUSTOM
GB4615 ACCESSIBLE GRABBAR SET -
LENGTH AS SHOWN 3 C / C Sidewall and Rear Wall Grab Bars Bobrick Washrom
Equipment, Inc. B-4615
M1802 WALL MOUNTED COMPUTER
CABINET W/ FOLD DOWN DESK 1 C / C
MATTE BLACK, DESIGNED TO
ACCOMODATE 24" DISPLAY ANND MINI
PC
ERGOTRON 61-367-060
POWER + DATA
OUTLET
WS1 ROLLER WINDOW SHADES 17 C / C Ceiling/ Jamb Mount Mecho Mecho 5 Doubleshades
SPECIALITY EQUIPMENT SCHEDULE V/V
JSN NAME QTY ACQ/INST MANUFACTUR
ER MODEL UTIL_1_WaterDrain UTIL_2_Elec Comments 511B DENTAL CHAIR WITH CHAIR MOUNTED DELIVERY SYSTEM 5 V / V A-DEC A-DEC 511 1.5 GPM WATER, 1.5" DRAIN, 80-125 PSI DA POWER <varies>
591004 TWELVE O'CLOCK CABINET WITH MOINITOR MOUNT - PROVIDE
WITH ASSISTANTS INSTRUMENTATION 4 V / V A-Dec 591004 POWER WATER/ DRAIN/ VENT/ POWER/ DATA PROVIDED AND INSTALLED BY GC FOR VA
FURNISHED EQUIPMENT
591005 SIDE CABINET WITH MONITOR MOUNT (ADD ASSISTANTS
INSTRUMENTATION AT SURGERY ROOM) 6 V / V A-Dec 591005 1.5 GPM WATER, 80-125 PSI DA, VACCUUM POWER WATER/ DRAIN/ VENT/ POWER/ DATA PROVIDED AND INSTALLED BY GC FOR VA
FURNISHED EQUIPMENT
593006 Assisstant side cabinet 5 V / V A-Dec 593005 1.5 GPM WATER, 1.5" DRAIN, 80-125 PSI DA POWER WATER/ DRAIN/ VENT/ POWER/ DATA PROVIDED AND INSTALLED BY GC FOR VA
FURNISHED EQUIPMENT, GAS BIBB AT THIS CABINET
A5075 Dispenser, Soap, Disposable 14 V / V georgia pacific #52060KB POWER A5077 Dispenser, Hand Sanitizer, Hands-Free 10 V / V georgia pacific #52060KB A5080 Dispenser, Paper Towel, SS, Surface Mounted 11 V / V georgia pacific 59466A A5082 Dispenser, Paper Towel, Sensor, Hands Free 6 V / V georgia pacific #59471 + 59466A BATTERY OPERATED A5106 Waste Disposal Unit, Sharps w/Glove Dispenser 5 V / V A6210 Uninterruptible Power Supply 1 V / V POWER B2890 Toilet Paper Dispenser, double roll 3 V / V georgia pacific 56753 D0100 Analgesia Unit, Inhalation, Central Gases-Vacuum 1 V / V D0904 Work Station Dental 1 V / V MEDICAL GAS, DA, DUST EXTRACTION
SYSTEM
POWER WATER/ DRAIN/ VENT/ POWER/ DATA PROVIDED AND INSTALLED BY GC FOR VA
FURNISHED EQUIPMENT, GAS BIBB AT THIS CABINET
D0980 32" LAB POLISHING STATION 1 V / V DA, 1.5 GPM WATER WATER/ DRAIN/ VENT/ POWER/ DATA PROVIDED AND INSTALLED BY GC FOR VA
FURNISHED EQUIPMENT
D2520 oregon cart 5 V / V A-DEC A-DEC Oregon Cart D3380 Stool, Operating, Dental, Doctor 5 V / V D3390 Stool, Operating, Dental, Assistant 6 V / V D3565 Resin Curing Unit, Visible Light 4 V / V POWER WATER/ DRAIN/ VENT/ POWER/ DATA PROVIDED AND INSTALLED BY GC FOR VA
FURNISHED EQUIPMENT
D4360 SAND BLASTER WITH DUST EXHAUST IN CABINET BELOW 1 V / V POWER
D6050 OVERHEAD TRACK LIGHTING 4 V / V POWER
D6155 Mobile Spotlight, Mobile Stand 1 V / V POWER D6250 Bench Mounted Dental Lathe 1 V / V POWER D8850 Amalgamator, Dental 4 V / V POWER D9060 Prophylaxis Unit, Ultrasonic 4 V / V DA, 1.5 GPM WATER WATER/ DRAIN/ VENT/ POWER/ DATA PROVIDED AND INSTALLED BY GC FOR VA
FURNISHED EQUIPMENT
E0703 Table, Process, Adj Height, 5 Drawer, 48W x 24D 5 V / V E0912 Locker, Supply, Med Surg, Wall Mtd 8 V / V E0948 Cart, General Storage, Mobile, 42"H x 32"W x 22"D 3 V / V F0230 Chair, Drafting, Rotary 4 V / V F0355 Footstool, Straight 1 V / V F2000 Basket, Wastepaper, Fire Resistant 4 V / V F2010 Basket, Wastepaper, Step-On 1 V / V F3200 Clock, Battery, 12" Diameter 6 V / V M184 Printer, Copier, Fax combination 1 V / V POWER + DATA OUTLET M2016 Flammables Storage Cabinet, Single door 1 V / V M2055 Shelving, Storage, Wire, CRS, w/Adjustable Shelves 5 V / V M2455 Stand, IV, Adjustable 1 V / V M3072 Frame, Infectious Waste Bag w/Lid 3 V / V M3150 Distribution System, Medication, Automatic 1 V / V POWER + DATA OUTLET M4266 Pump, Volumetric, Infusion, Multiple Line 1 V / V M7845 Monitor, Physiological, Bedside, 4 Channel 1 V / V POWER + DATA OUTLET M8805 Table, Instrument, Straddle 1 V / V R6900 Refrigerator 1 V / V POWER X6600 Radiographic Unit, Dental, Wall Mounted, 7 mAl 5 V / V POWER X6610 Sensor, Dental Imaging System 6 V / V POWER + DATA OUTLET
Revisions: Date:
1 RESPONSE TO PREBID QUESTIONS 4/22/2025
| AD101 - DEMOLITION CEILING PLAN |
| A-601 - ROOM FINISH AND WALL SCHEDULE AND CASEWORK DETAILS |
| A-603 - FF&E PLAN AND EQUIPMENT SCHEDULE |