Attachment 9 VANC Dental B20 Drawings AD101 A-601 and A-603 response to prebid questions.pdf

PDF 3 MB Posted

Attached to
Z1DA--VISN 20 General Construction MATOC Replacement Construction Services
Solicitation number
36C26024R0087
Issued by

About this file

These documents are architectural drawings for the VA Portland Health Care System (VAPORCS), specifically a dental services renovation project located in Vancouver, Washington. The drawings include a demolition ceiling plan, room finish and wall schedule, casework details, and a floor plan with equipment schedule for a medical/dental facility.

Key details include a comprehensive demolition plan to remove existing ceiling tiles, suspended acoustical grids, and permanently installed ceiling-mounted equipment. The project involves multiple room types such as treatment rooms, storage, surgical spaces, staff areas, and support spaces like an Omnicell supply room and sterile instrument area. The specialty equipment schedule lists numerous items including patient lifts, garment hooks, AED cabinets, corner guards, wall-mounted computer cabinets, grab bars, mirrors, and roller window shades. The floor plan uses color-coded flooring types (CPT1, LVT1, LVT2, SVT1) across different room zones, indicating specific material requirements for each space.

View the file

Other files

File Type Posted
36C26024R0087 0013.docx DOCX document
36C26024R0087 0013 Attach 1 RFP Questions 7.9.25.docx DOCX document
36C26024R0087 0012 - SF 1442 Block 19 Continuation Page .docx DOCX document
36C26024R0087 0012.docx DOCX document
36C26024R0087 0011.docx DOCX document
36C26024R0087 0010 Attachment 3 Red Line As builts - existing receway.pdf PDF
36C26024R0087 0010 Attachment 7 Specification Section 275223 Nurse Call.pdf PDF
36C26024R0087 0010.docx DOCX document
36C26024R0087 0010 Attachment 5 Ceiling Plan -A7.1.pdf PDF
36C26024R0087 0010 Attachment 1 Seed Project questions and Answers 6.16.25.docx DOCX document
36C26024R0087 0010 Attachment 2 VAAR 852.219-75 VA notice of LOS.docx DOCX document
36C26024R0087 0010 Attachment 6 Specification Section 232500 HVAC Water Treatment.pdf PDF
36C26024R0087 0010 Attachment 8 Vancouver Site for 648-22-100 Dental.pdf PDF
36C26024R0087 0010 Attachment 4 Existing Plumbing P2.4.pdf PDF
Attachment 6 Seed Project Price Breakout Revised 6.16.25.xlsx XLSX spreadsheet
36C26024R0087 0009.docx DOCX document
36C26024R0087 0008 Attach 1 RFP Questions 5.29.25.docx DOCX document
36C26024R0087 0008.docx DOCX document
36C26024R0087 0007.docx DOCX document
36C26024R0087 0006 Attach 3 Site Visit Sign in Sheet.pdf PDF
Attachment 7 Dental Air Compressor AC-1specs.pdf PDF
Attachment 6 Seed Project Price Breakout Revised 5.6.25.xlsx XLSX spreadsheet
Attachment 5 Past Performance Questionnaire 5.9.25.docx DOCX document
36C26024R0087 0006 Attach 2 Photos of B20 Mech RM 237.pdf PDF
Attachment 1 648-22-100 VA Vancouver Consolidate Dental B20 4.23.25.pdf PDF
36C26024R0087 0006 Attach 4 Seed Project Question and Answers.docx DOCX document
36C26024R0087 0006 Attach 1 RFP Questions 5.7.25.docx DOCX document
Attachment 8 A-dec-DV5 Compressor and Dry Vacuum cut sheet.pdf PDF
36C26024R0087 0006.docx DOCX document
36C26024R0087 0005 Attach 1 RFP Questions 4 24 25.docx DOCX document
36C26024R0087 0005 Attach 2 VAAR 852.219-75 VA Notice of LOS - Certicate of Compliance for Services and Construction Jan 2023 Deviation.docx DOCX document
36C26024R0087 0005.docx DOCX document
36C26024R0087 0004 Attachment 1 RFP Questions 4 22 25.docx DOCX document
36C26024R0087 0004 Attachment 2 CON MATOC pre-proposal meeting attendees.docx DOCX document
36C26024R0087 0004.docx DOCX document
RFP Questions 4.14.25.docx DOCX document
36C26024R0087 0003.docx DOCX document
36C26024R0087 Conformed 4.10.25.docx DOCX document
Attachment 5 Past Performance Questionnaire 4.10.25.docx DOCX document
Panographic backing detail.docx DOCX document
RFP Questions 4.10.25.docx DOCX document
36C26024R0087 0002.docx DOCX document
36C26024R0087 0001.docx DOCX document
36C26024R0087 4.1.25.docx DOCX document
Attachment 1 648-22-100 VA Vancouver Consolidate Dental B20-Specs.pdf PDF
Attachment 6 Seed Project Price Breakout.xlsx XLSX spreadsheet
Attachment 4 648-22-100 Vancouver WA consolidate Dental Building B20 - MATOC Seed Project SOW 10.9.24.docx DOCX document
36C26024R0087.docx DOCX document
Attachment 2 648-22-100 VA Vancouver Consolidate Dental B20 Drawing signatures.pdf PDF
Attachment 5 Past Performance Questionnaire 11.5.24.docx DOCX document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S S SS S S

BA.8 B.5 B.9 C C.4 C.5 DA.7

REMOVE ALL CEILINGS THIS AREA TO INCLUDE SUSPENDED

ACOUSTICAL TILES AND GRIDS, SUSPENDED AND STRUCTURE MOUNTED

GYPSUM BOARD, AND ALL SOFFITS OVER CASEWORK.

REMOVE ALL PERMANENTLY INSTALLED CEILING MOUNTED EQUIPMENT AND

TURN OVER TO THE OWNER - NOT SHOWN FOR CLARITY - VERIFY IN FIELD

SEE ELECTRICAL AND MECHANICAL DRAWINGS FOR OTHER CEILING

MOUNTED ITEMS TO BE REMOVED AND EITHER REINSTALLED IN NEW

LOCATIONS, OR REPLACED WITH NEW MATERIALS.

PHASE 2 DEMOLITION -

SHADED - IS TO REMAIN

OPERATIONAL DURING

PHASE 1 DEMOLITION

AND CONSTRUCTION

PHASE 1 DEMOLITION

CONSTRUCT TEMPORARY WALL AS SHOWN WITH BLUE

DASHED LINES PROR TO BEGINNING DEMOLITION - ADD

TEMP DOOR FOR CONTRACTORS ENTRANCE - AT

CONTRACTORS OPTION, THE PERMANANT WALL (TYPE AS

SCHEDULED) CAN BE INSTALLED THIS LOCATION.

ALIGN TEMPORARY WALL WITH CEILING GRID -

THIS CORRIDOR SHALL REMAIN OPEN DURING

CONSTRUCTION. THE TEMPORARY WALL

LOCATION IS FLEXIBLE BUT SHALL NOT REDUCE

THE WIDTH OF THE CORRIDOR TO LESS THAN 44".

REMOVE EXISTING CEILING TILES AND ALL OTHER

CEILING MOUNTED ITEMS AS NECESSARY BETWEEN

TEMP. AND EXISTING WALLS SUCH AS SIGNAGE AND

SALVAGE FOR REINSTALLATION IN THE SAME LOCATION

UPON COMPLETION OF CONSTRUCTION.

REMOVE EXISTING WALL MOUNTED

TELEVISION AND COORDINATE WITH

OWNER FOR NEW PERMANENT LOCATION

J

K

Ksim

F

L

Lsim opp

EXISTING CLERESTORY WINDOW TO BE

REMOVED AND WALL INFILLED

J K

GYPSUM BOARD SOFFIT AT

CORRIDOR CONNERS TO

BE REMOVED

TYPICAL CEILING FINISHES IN

OFFICE SPACES TO BE

DEMOLISHED AND REMOVED

TYPICAL EXISTING WINDOW

MULLION PATTERN - WINDOW

BILNDS TO REMAIN (REMOVE

DURING CONSTRUCTION

OPERATIONS AND REINSTALL)

L 1/ 2' 0'

1' 4'

4' 8'

4' 2'

2'

1/ 8' 0'

1' 0' 0'

1/ 4' 0'

1' 2'

1' 1/ 2'

2' 1/ 2'

1' 0'

3' 0'

1'

3/ 8' 0'

1'

2' 4'

1/ 2' 0'

2'

1/ 2'

1' 3'

6' 0'

1/ 4"

1/ 2"

8' 8'

1/ 0'

Project No.

Building Number Drawing No.

Project Title

Location

Date:

Checked By/Proj.Mgr Drawn By

Drawing Title

Approved: VAPORHCS Director

VA FORM 08 - 6231

A

VA Portland Health Care System

(VAPORHCS)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Approved: Chief Facilities MgmtApproved: Service Chief

Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.

B20

Sheet of

ISSUED FOR CONSTRUCTION

C :\U se rs

\la ur i\O ne

D riv e\ d2

L- Pr oj ec ts \2

7-

1_

Va nc

B

D en ta l\0

5- C

A

SE

R

VI

C

ES

\0 9_

As -B ui lt\

-0

_3

- V

AN

C D en ta l B

C

PS

.rv t

4/

/2

1:

:4

PM

AD101

DEMOLITION CEILING PLAN

BLUE TRIDENT, LLC

900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110

(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME

Renovate Building 20 in Vancouver to Consolidate Dental Services

VANCOUVER, WA

648-22-100

15 AUG 2024

EB LMS

3/8" = 1'-0"F3 2nd FLOOR CEILING PLAN DEMO

Revisions: Date:

1 RESPONSE TO PREBID QUESTIONS 4/22/2025

LD

A

T

1/

8"

5/8" TYPE 'X' GWB

CONT. METAL EDGE MOLD ALL

EXPOSED EDGES

FLUSH MOUNTED RESILIENT

CORNER GUARD SET AT TOP OF

BASE - SHIM AS REQUIRED TO

ACHIEVE FLUSH MOUNT - APPLY

TOP AND BOTTOM CLOSURES

CAULK JOINTS

B.9 C F1

A-601

C3

C3

A3

A4

HOLD FACE OF CABINET BACK FROM

FACE OF WALL TO ALLOW ADJACENT

SLIDING DOORS TO PASS IN FRONT

OF DOOR HANDLES

2'

- 0

3' - 0" 3' - 0" 3' - 0"

ALL CABINET DOORS TO BE LOCKABLE WITH VA

CORE - SF 7 PIN

2"

HOLD FACE OF CABINET

BACK FROM FACE OF

WALL TO ALLOW

ADJACENT SLIDING

DOORS TO PASS IN

FRONT OF CABINET DOOR

HANDLES

6"

SLIDING DOOR

BEYOND

ADJUSTABLE SHELVING

A4

C3

6'

- 8

2' - 5"

4"

CEILING AS

SCHEDULED

ALL CABINET

DOORS TO BE

LOCKABLE

WITH VA

CORE - SF 7 PIN

2" X 2"

STAINLESS

STEEL CORNER

GUARD

ADHERED ALL

AROUND

OPENING -

MITER

CORNERS

2" X 2"

STAINLESS

STEEL CORNER

GUARD

ADHERED ALL

AROUND

OPENING -

MITER

CORNERS

TOP MNT, STAINLESS STEEL SINK -

SET IN CONT BEAD OF SEALANT

(INTERGRAL SINK IN LAB AND SOILED)

P.LAM BASE CABINET WITH

REMOVABLE FRONT PANEL(S)

(NOT IN SOILED ROOM)

FAUCET W/ LEVER HANDLES (ADD

EYEWASH ATTACHMENT IN LAB)

FINISH END OF EXISTING

ADJ. BASE CABINET BEYOND

WITH SAME LAMINATE

1/2" SOLID SURFACE COUNTERTOP (STAINLESS

STEEL IN LAB AND SOILED) OVER 3/4" MARINE

GRADE PLYWOOD UNDERLAYMENT

FINISH WALL AND FLOOR

AT EXPOSED BY CABINET

1/2" SOLID SURFACE BACKSPLASH (&

SIDE SPLASHES WHERE OCCURS)

(STAINLESS STEEL IN LAB AND SOILED)

SEE ELEVATION FOR ACCESSORIES

KNEE SPC

TO

P

O F

FI

N

IS

H

ED

C

O U

N

TE

R

2'

1/

2" U

.N .O

6" 2'

1/ 2"

COUNTER WIDTH

VARIES - SEE PLAN

1/2" SOLID SURFACE

COUNTER EDGE

(STAINLESS STEEL

IN LAB AND SOILED)

2'

" M

AX

. S

IN

K

R

IM

9" (CABINET DIMS)

11" 6"

1' - 5"

4"

1" O.H.

1/ 2"

1'

- 1 1"

SOLIDS INTERCEPTOR

WITH BOTTOM CLEAN

OUT- LAB ONLY

CERAMIC TILE FINISH AS SCHEDULED

CERAMIC TILE

WALL AS SCHEDULED

METAL COVE BASE SCHLUTER DILEX-AHK OR EQUAL

FINISH PLAN NOTES

1. ALL WALLS AND COLUMNS TO BE PAINTED P-1, UON.

2. ALL GYP BD SOFFITS TO BE PAINTED P-1, FLAT FINISH @ UNDERSIDE SURFACE UON.

3. ALL WALLS TO RECEIVE BASE B1, 4" HIGH EXCEPT AT TREATMENT ROOMS AND

SURGERY ROOM PROVIDE 6" BASE, UON.

4. REFER TO INTERIOR ELEVATIONS FOR ADDITIONAL FINISH INFORMATION.

5. REFER TO DOOR SCHEDULE FOR DOOR & FRAME FINISHES.

6. DENOTES CHANGE IN FLOORING MATERIALS.

7. REFER TO PROJECT SPECIFICATIONS AND/OR MANUFACTURER'S PRODUCT

SPECIFICATIONS FOR GENERAL PRODUCT INFORMATION.

8. CONTRACTOR SHALL EXAMINE ALL SURFACES TO BE FINISHED AND VERIFY THAT THEY

ARE ACCEPTABLE TO RECEIVE SPECIFIED FINISHES.

9. SURFACE DEFECTS OR DEFICIENCIES WHICH MAY ADVERSELY AFFECT WORK SHALL BE

CORRECTED OR BROUGHT TO THE ATTENTION OF THE GENERAL CONTRACTOR AND COR

FOR CORRECTION PRIOR TO COMMENCEMENT OF WORK.

10. ALL SURFACES SHALL BE PREPARED AND PRIMED ACCORDING TO MANUFACTURERS'

DIRECTIONS AND RECOMMENDATIONS.

11. CONTRACTOR IS TO NOTIFY ARCHITECT OF ANY DISCREPANCIES OR CONFLICTS

REGARDING CONDITIONS OR LOCATIONS FOR APPLICATION OF MATERIALS PRIOR TO OR

DURING CONSTRUCTION/ INSTALLATION, OR TRADE RESPONSIBILE FOR CORRECTING

SUCH WORK AS DIRECTED BY THE ARCHITECT.

12. THE CONTRACTOR SHALL EXAMINE ALL AREAS OF CONSTRUCTION AFTER COMPLETION OF

WORK BY ALL TRADES AND APPROVE ALL NECESSARY TOUCH-UP PAINTING OR

PATCHING.

13. REFERENCE WAINSCOT DETAILS FOR HEIGHTS AND MATERIALS TO BE USED AT EACH TYPE.

14. PROVIDE STRAIGHT WALL BASE BEHIND SLIDING DOORS SO IT DOES NOT INTERFERE WITH

DOOR OPENING.

15. ALL RESILIENT AND CARPET FLOORING AREAS TO RECEIVE COVE BASE UON.

16. WHERE SEVERAL FINISHES OCCUR ON SAME WALL, SEE ELEVATION FOR

CLARIFICATION.

17. ALL EXPOSED DRYWALL SURFACES TO BE PAINTED UON.

18. NO RESILIENT BASE SEAM TO OCCUR WITHIN 12" OF A WALL CORNER.

19. ALL CHANGES IN FLOOR MATERIAL TO OCCUR AT CENTER LINE OF DOOR UON

20. REPLACE ALL SOLID SURFACE WINDOW STOOLS WITH NEW SOLID SURFACE WINDOW

STOOLS

CONT. SNAP-ON

PLASTIC HANDRAIL

(HR) BY CORNER

GUARD MANUF. -

MOUNTED TO FRP

3/8" FRP PANEL (RWC1)

ADHERED TO GYPSUM

BOARD PER

MANUFACTURES

RECOMMENDATIONS -

COLOR AS SCHEDULED

RESILIENT BASE AS

SCHEDULED

WALL TYPE AS SCHEDULED

2'

- 9

3 1 /2"

45 DEGREE CONT.

CHAMFER AT TOP

EDGE

3"

CONT. 3/4" X 4"

PLASTIC CRASH RAIL

(CR) BY CORNER

GUARD MANUF. -

MOUNTED TO FRP

3/8" FRP PANEL (RWC2)

ADHERED TO GYPSUM

BOARD PER

MANUFACTURES

RECOMMENDATIONS -

COLOR AS SCHEDULED

RESILIENT BASE AS

SCHEDULED

WALL TYPE AS

SCHEDULED

45 DEGREE

CONT. CHAMFER

AT TOP EDGE

4" 2'

- 9

4"

3'

- 1

1/ 2' 0'

1' 4'

4' 8'

4' 2'

2'

1/ 8' 0'

1' 0' 0'

1/ 4' 0'

1' 2'

1' 1/ 2'

2' 1/ 2'

1' 0'

3' 0'

1'

3/ 8' 0'

1'

2' 4'

1/ 2' 0'

2'

1/ 2'

1' 3'

6' 0'

1/ 4"

1/ 2"

8' 8'

1/ 0'

Project No.

Building Number Drawing No.

Project Title

Location

Date:

Checked By/Proj.Mgr Drawn By

Drawing Title

Approved: VAPORHCS Director

VA FORM 08 - 6231

A

VA Portland Health Care System

(VAPORHCS)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Approved: Chief Facilities MgmtApproved: Service Chief

Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.

B20

Sheet of

ISSUED FOR CONSTRUCTION

C :\U se rs

\la ur i\O ne

D riv e\ d2

L- Pr oj ec ts \2

7-

1_

Va nc

B

D en ta l\0

5- C

A

SE

R

VI

C

ES

\0 9_

As -B ui lt\

-0

_3

- V

AN

C D en ta l B

C

PS

.rv t

4/

/2

1:

:5

PM

A-601

ROOM FINISH AND WALL SCHEDULE AND

CASEWORK DETAILSBLUE TRIDENT, LLC

900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110

(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME

Renovate Building 20 in Vancouver to Consolidate Dental Services

VANCOUVER, WA

648-22-100

15 AUG 2024

EB LMS

ROOM FINISH SCHEDULE

RM NUM ROOM NAME FLOOR BASE

WALLS

CEILING COMMENTS / NOTESNORTH -A EAST - B SOUTH - C WEST - D

200 STORAGE SVT1 B1 P1 P1 P1 P1 ACT1

201 TRTMNT SVT1 B1 SC1 SC1 SC1 SC1 ACT2 NOTE 3

202 PANO LVT1 B1 P1/ W2 P1/ W2 P2/ W2 P1/W2 ACT1

203 TRTMNT SVT1 B1 SC1 SC1 SC1 SC1 ACT2 NOTE 3

204 STERILE

INSTRUMENTS

SVT1 B1 SC1 SC1 SC1 SC1 ACT2

205 OFFICE CPT1 B1 P1 P1 P2 P1 ACT1

206 OMNICELL

SUPPLY

SVT1 B1 SC1 SC1 SC1 SC1 ACT2

207 TRTMNT SVT1 B1 SC1 SC1 SC1 SC1 ACT2 NOTE 3

208 SOILED SVT1 SVT1 SC1/ W2 SC1/ W2 SC1/ W2 SC1/ W2 ACT2

209 TRTMNT SVT1 B1 SC1 SC1 SC1 SC1 ACT2 NOTE 3

210 LAB SVT1 SVT1 SC1/ W2 SC1/ W2 SC1/ W2 SC1 ACT2

211 SURGERY SVT1 B1 SC1 SC1 SC1 SC1 ACT2 NOTE 3

212 STAFF TOILET CT3 B3 P5/CT1,CT2 P5/CT1,CT2 P5/CT1,CT2 P5/CT1,CT2 ACT1

213 MEDS SVT1 B1 P1/ W2 P1/ W2 P1/ W2 P1/W2 ACT1

214 TOILET CT3 B3 P5/CT1,CT2 P5/CT1,CT2 P5/CT1,CT2 P5/CT1,CT2 ACT1

215 TOILET CT3 B3 P5/CT1,CT2 P5/CT1,CT2 P5/CT1,CT2 P5/CT1,CT2 ACT1

C2.01 ALCOVE 1 LVT2 B1 P3 P3 P3 P3 ACT1

C2.02 CORR LVT1 B1/ B2 -- P1/ W1 P5 P1/ W1 ACT1/ GYP/ P1

C2.03 CORR LVT1 B1 P1 P1/ W1 P2/ W1 P1 ACT1

C2.04 ALCOVE 2 LVT2 B2 P3 P3 P3 P3 ACT1

SCHEDULE for FINISHES

MARK MATERIAL MANUFACTURER STYLE / PRODUCT COLOR SIZE FINISH NOTES

ACT1 ACOUSTICAL CEILING TILE ARMSTRONG CORTEGA- SQUARE LAY-IN WHITE 24 X 24" x 5/8" - ACT2 ACOUSTICAL CEILING TILE ARMSTRONG CLEAN ROOM VL WHITE 24 X 24" x 5/8" -

ACTG CEILING TILE SUSPENSION GRID ARMSTRONG PRELUDE 15/16" WHITE 15/16" -

B1 RESILIENT RUBBER BASE FLEXCO TS WALLFLOWERS, COVE 023 PEBBLE 4" AND 6" - 6" IN TREATMENT AND SURGERY ROOMS, MEDS ROOM - 4" ELSEWHERE. PREFORMED CORNERS

AT 4” BASE (N/A FOR 6”). COVE STYLE AT ALL FLOORING TYPES EXCEPT BEHIND SLIDING DOORS, USE STRAIGHT BASE

B2 WALL BASE - STAINLESS STEEL TO MATCH EXISTING - - - TOP 1/4" CORNER MITERED AT 45 DEGREES

B3 METAL COVE BASE SCHLUTER DILEX-AHK ANNODIZED ALUMINUM -

CG1 CORNER GUARD CS ACROVYN FS-20/FS-20R OZARK #314 FULL HEIGHT MOUNT AT TOP OF WALL BASE TO BOTT OF CEILING CG2 CORNER GUARD - STAINLESS TO MATCH EXISTING N/A - - - SALVAGE EXISTING FOR REUSE OR PROVIDE NEW

CPT1 CARPET - TILE PATCRAFT IO353- HOMEROOM V. 3.0; SOLUTION Q EXTREME

NYLON; 100% SOLUTION DYED

00770- FINAL EXAM 24" x 24" QUARTER TURN TRANSITION STRIP REQUIRED AT FLOORING CHANGE TO CARPET TILE

CR PLASTIC CRASH RAIL CS ACROVYN SCR-40N – 3/4" WALL OFFSET WHITE #949 4" X 3/4" PROVIDE END CAPS AT ALL TERMINATIONS CT-1 CERAMIC WALL TILE FIELD DAL TILE COLOR WHEEL COLLECTION- CLASSIC MATTE ARCTIC WHITE 0790 3x6 STACK BOND SEE D7/A-602 FOR TILE PATTERN - BULLNOSE TILE AT TOP FINISH COURSE - GROUT: CUSTOM

BUILDING PRODUCTS FUSION PRO #542 GREYSTONE

CT-2 CERAMIC WALL TILE ACCENT DAL TILE COLOR WHEEL COLLECTION- CLASSIC MATTE ARCHITECTURAL GRAY 0709 3x6 ACCENT BAND SEE D7/A-602 FOR TILE PATTERN - 1 COURSE BELOW TOP FINISH COURSE - GROUT: CUSTOM

BUILDING PRODUCTS FUSION PRO #542 GREYSTONE

CT-3 CERAMIC FLOOR TILE DAL TILE VOLUME 1 GLAZED PORCELAIN W/ STEPWISE

TECHNOLOGY

VL74 REVERB ASH 6x6 GROUT: CUSTOM BUILDING PRODUCTS FUSION PRO #542 GREYSTONE

HR PLASTIC HANDRAIL CS ACROVYN HRB-4CN - ROUND HANDRAIL OZARK #314 5 1/2" X 3" PROVIDE MANF. STANDARD QUICK LOCK BRACKETS AND END CAPS AT ALL TERMINATIONS LVT1 MANNINGTON AMTICO SIGNATURE COLLECTION LIGHT CHERRY AROW 7060 3" x 36" PLANK SQUARE EDGE

LVT2 MANNINGTON AMTICO STONE STRIA BASALT (AROSMS43) 18" X 18" SQUARE EDGE

P1 PAINT-1 (P1) PPG SEMI-GLOSS (GENERAL PAINT) PPG14-16 WINTER MOOD - - FLAT FINISH AT GYP CEILING

P2 PAINT-2 (P2) PPG SEMI-GLOSS (ACCENT) PPG11-27 SAFARI - -

P3 PAINT-3 (P3) PPG MATCH ADJACENT -

P5 PAINT-5 (P5) PPG DTM SATIN (DOOR FRAMES) PPG1025-4 SHARKSKIN SEMIGLOSS ON DOOR FRAMES PL1 PLASTIC LAMINATE WILSONART FINE VELVET FINISH GREY MESH 4877-38 - - ALL PLAM VENEER CABINETS AND SHELVES AS NOTED

SC1 SPECIAL COATING PPG AQUAPON WB EP PORCELAIN WHITE, GLOSS WALL FINISH

SS1 SOLID SURFACE DUPONT CORIAN - SPARKLING GRANITA - - WINDOW SILLS

SVT1 SOLID VINYL TILE FLEXCO DELANE ESD 065 WARM GRAY 36” X 36” WELDED SEAM/ SELF COVE PER ROOM FINISH SCHEDULE W1 RIGID WALL COVERING CS ACROVYN ACROVYN SOLID COLORS- SHEET OZARK #314 .060 THICK W2 RIGID WALL COVERING CS ACROVYN ACROVYN SOLID COLORS- SHEET WHITE #949 .060 THICK WD WOOD (DOOR FINISH) RED OAK- PLAIN SLICE CLEAR FINISH DOORS- TO MATCH EXISTING FACILITY STANDARD

3" = 1'-0"E7 CORNER GUARDS

ACT ACOUSTICAL CEILING TILE

ACTG ACOUSTIC CEILING TILE

SUSPENSION GRID

ALUM ALUMINUM

ANOD ANODIZED

AP ACOUSTICAL PANEL

B BASE

BBT BIOBASED TILE

BD BOARD

CONC CONCRETE

CPT CARPET

CT CERAMIC TILE

FF FACTORY FINISHED

FIN FINISH

FLRG FLOORING

GALV GLAVANIZED

GB GYPSUM BOARD

GL GLASS

HDO HIGH DENSITY OVERLAY

HDWD HARDWOOD

HM HOLLOW METAL

JAN JANITOR

JST JOIST

JT JOINT

LAM LAMINATE

LIN LINOLEUM

MDF MEDIUM DENSITY FIBERBOARD

MDO MEDIUM DENSITY OVERLAY

MTL METAL

NA NOT APPLICABLE

NAT FIN NATURAL FINISH

NIC NOT IN CONTRACT

ORIG ORIGINAL

P PAINT

PBD PARTICLE BOARD

PL PLASTIC LAMINATE

PLAS PLASTER

PLWD PLYWOOD

PNL PANEL

PRCST PRECAST

PREFAB PREFABRICATED

PREFIN PREFINISHED

PVC POLYVINYLCHLORIDE

QT QUARRY TILE

RAF RAISED ACCESS FLOOR

RB RUBBER / RUBBER BASE

RSF RESILIENT SHEET FLOORING

RTF RESILIENT TILE FLOORING

RTR RUBBER TREAD & RISER

SC SOLID CORE

SCWD SOLID CORE WOOD

SHT SHEET

SS SOLID SURFACE

SST STAINLESS STEEL

STN STAIN

SUSP SUSPEND(ED)

SV SHEET VINYL

T&G TONGUE AND GROOVE

TZ TERRAZZO

UNFIN UNFINISHED

UON UNLESS OTHERWISE NOTED

VCT VINYL COMPOSITION TILE

WB WOOD BASE

WD WOOD

WSCT WAINSCOT 1 1/2" = 1'-0"D6 BUILT-IN LINEN CABINETS

3/4" = 1'-0"F1 CLEAN LINEN CABINET

1" = 1'-0"D1 ACCESSIBLE SINK BASE

3" = 1'-0"E9 TILE BASE

1 1/2" = 1'-0"F5 W1 - WAINSCOT IN CORRIDOR 1 1/2" = 1'-0"F3 W2 - WAINSCOT IN ROOMS

Revisions: Date:

1 RESPONSE TO PREBID QUESTIONS 4/22/2025

63 SF

PANO

47 SF

SOILED

203B201B 207B 209B

131 SF

TRTMNT

127 SF

TRTMNT

127 SF

TRTMNT

178 SF

OFFICE

127 SF

TRTMNT

43 SF

MEDS

210208204

199 SF

SURGERY

C2.02

C2.04

79 SF

LAB

59 SF

STAFF TOILET

48 SF

TOILET

50 SF

TOILET

79 SF

STORAGE

375 SF

CORR

C2.03

63 SF

STERILE

INSTRUMENTS

201A 203A 207A 209A

39 SF

CORR

C2.02

49 SF

ALCOVE 2

C2.04

5'

- 4

CPT1

CT3

LVT1

LVT2

SVT1

63 SF

OMNICELL

SUPPLY

E0948

A5077

593006

D3380

D3390

A5145A5145

D3565

D8850 D9060

A5077

D3380D3390

D3565

D8850 D9060

A5106

M8805

M7845

M2455

F0355

F2010

E0948

D3380

D3390

D0100

A5145

A5145

A5080

A5106

A5075

A5077

A1066

F0230F0230

F0230

A5077

A5145

A5145

591004

M2055

M2055

M2055

A5077

A5145

A5145

D3380D3390

591004

D3565

D8850

D9060 A5106

A5077

D3380 D3390

D3565

D8850

D9060 A5106

A5145

A5145

A5077

A5145

A5145

591004 A5077

A5145

A5145

A5077

A5145

A5145

F0

M2055

M3150

A1066

A1066

A1066

A5082

A5082

A5082

M3072 M3072

LINEN CABINETS

2'

- 0

E0703 E0703 E0703

E0703 E0703

WRIST BAND

PRINTER AND

TABLE

SPACE FOR FILES

WATER DISPENSER

591005

591004

591005

593006

591005

593006 593006

591005

591005

593006

591005

H H

CG1

CG1

CG2 CG2 CG2 CG2

F2000

A5106

M2055

E0912

E0912 E0912

E0912

EQ

EQ

5' - 6"

EQ EQEQ EQ

RELOCATED PANOGRAPHIC

XRAY UNTI FROM B15

M2016

E0912

E0912

E0912

E0912 D0904

D6250

D3390

CG1CG1

A5082

A5075

A5082 A5075

A1066

M1802

CG1

CG1

D0980

D4360

2'

- 8

2'

- 0

2'

- 2

EQ EQ

2'

- 8

EQ EQ

A5075 A5082

A6210

R6900

18 SF

ALCOVE 1

C2.01

1/ 2' 0'

1' 4'

4' 8'

4' 2'

2'

1/ 8' 0'

1' 0' 0'

1/ 4' 0'

1' 2'

1' 1/ 2'

2' 1/ 2'

1' 0'

3' 0'

1'

3/ 8' 0'

1'

2' 4'

1/ 2' 0'

2'

1/ 2'

1' 3'

6' 0'

1/ 4"

1/ 2"

8' 8'

1/ 0'

Project No.

Building Number Drawing No.

Project Title

Location

Date:

Checked By/Proj.Mgr Drawn By

Drawing Title

Approved: VAPORHCS Director

VA FORM 08 - 6231

A

VA Portland Health Care System

(VAPORHCS)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Approved: Chief Facilities MgmtApproved: Service Chief

Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.

B20

Sheet of

ISSUED FOR CONSTRUCTION

C :\U se rs

\la ur i\O ne

D riv e\ d2

L- Pr oj ec ts \2

7-

1_

Va nc

B

D en ta l\0

5- C

A

SE

R

VI

C

ES

\0 9_

As -B ui lt\

-0

_3

- V

AN

C D en ta l B

C

PS

.rv t

4/

/2

1:

:5

PM

A-603

FF&E PLAN AND EQUIPMENT SCHEDULE

BLUE TRIDENT, LLC

900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110

(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME

Renovate Building 20 in Vancouver to Consolidate Dental Services

VANCOUVER, WA

648-22-100

15 AUG 2024

EB LMS

3/8" = 1'-0"F3 DENTAL 2nd FLOOR AREA A FF&E PLAN

SPECIALITY EQUIPMENT SCHEDULE C/C

JSN NAME QTY ACQ/INST DESCRIPTION MANUFACTURER MODEL Manufacturer

Website UTIL_1_WaterDr ain UTIL_2_Elec WIDTH HEIGHT DEPTH A1066 MIRROR, FLOAT GLASS, 18" X 36" 5 C / C MIRROR, FLOAT GLASS, 18" X 36" Bobrick Washrom

Equipment, Inc. B-290 1836 1' - 6" 3' - 0" 1"

A1200 Patient lift 1 C / C SEE SPECS Likorail 250ES 24 V, 12 A A5145 Hook, Garment, Double, SS, Surface

Mounted 18 C / C Satin Finish BRADLEY Model 9124

AED Semi-Recessed AED Cabinet with Audible Alarm 1 C / C Semi-Recessed AED Cabinet with Audible

Alarm AED Universe 180SR3-1

CG1 CORNER GUARD, 48" HIGH 7 C / C Acrovyn Flush Mount Corner Guard ACROVYN Construction Specialties FS-20N

CG2 CORNER GUARD, 48" HIGH 4 C / C Acrovyn Flush Mount Corner Guard ACROVYN Construction Specialties FS-20N

D0666 30x24x12 open shelf wall cabinet 2 C / C open shelf wall cabinet with 2 adjustable shelves CUSTOM

GB4615 ACCESSIBLE GRABBAR SET -

LENGTH AS SHOWN 3 C / C Sidewall and Rear Wall Grab Bars Bobrick Washrom

Equipment, Inc. B-4615

M1802 WALL MOUNTED COMPUTER

CABINET W/ FOLD DOWN DESK 1 C / C

MATTE BLACK, DESIGNED TO

ACCOMODATE 24" DISPLAY ANND MINI

PC

ERGOTRON 61-367-060

POWER + DATA

OUTLET

WS1 ROLLER WINDOW SHADES 17 C / C Ceiling/ Jamb Mount Mecho Mecho 5 Doubleshades

SPECIALITY EQUIPMENT SCHEDULE V/V

JSN NAME QTY ACQ/INST MANUFACTUR

ER MODEL UTIL_1_WaterDrain UTIL_2_Elec Comments 511B DENTAL CHAIR WITH CHAIR MOUNTED DELIVERY SYSTEM 5 V / V A-DEC A-DEC 511 1.5 GPM WATER, 1.5" DRAIN, 80-125 PSI DA POWER <varies>

591004 TWELVE O'CLOCK CABINET WITH MOINITOR MOUNT - PROVIDE

WITH ASSISTANTS INSTRUMENTATION 4 V / V A-Dec 591004 POWER WATER/ DRAIN/ VENT/ POWER/ DATA PROVIDED AND INSTALLED BY GC FOR VA

FURNISHED EQUIPMENT

591005 SIDE CABINET WITH MONITOR MOUNT (ADD ASSISTANTS

INSTRUMENTATION AT SURGERY ROOM) 6 V / V A-Dec 591005 1.5 GPM WATER, 80-125 PSI DA, VACCUUM POWER WATER/ DRAIN/ VENT/ POWER/ DATA PROVIDED AND INSTALLED BY GC FOR VA

FURNISHED EQUIPMENT

593006 Assisstant side cabinet 5 V / V A-Dec 593005 1.5 GPM WATER, 1.5" DRAIN, 80-125 PSI DA POWER WATER/ DRAIN/ VENT/ POWER/ DATA PROVIDED AND INSTALLED BY GC FOR VA

FURNISHED EQUIPMENT, GAS BIBB AT THIS CABINET

A5075 Dispenser, Soap, Disposable 14 V / V georgia pacific #52060KB POWER A5077 Dispenser, Hand Sanitizer, Hands-Free 10 V / V georgia pacific #52060KB A5080 Dispenser, Paper Towel, SS, Surface Mounted 11 V / V georgia pacific 59466A A5082 Dispenser, Paper Towel, Sensor, Hands Free 6 V / V georgia pacific #59471 + 59466A BATTERY OPERATED A5106 Waste Disposal Unit, Sharps w/Glove Dispenser 5 V / V A6210 Uninterruptible Power Supply 1 V / V POWER B2890 Toilet Paper Dispenser, double roll 3 V / V georgia pacific 56753 D0100 Analgesia Unit, Inhalation, Central Gases-Vacuum 1 V / V D0904 Work Station Dental 1 V / V MEDICAL GAS, DA, DUST EXTRACTION

SYSTEM

POWER WATER/ DRAIN/ VENT/ POWER/ DATA PROVIDED AND INSTALLED BY GC FOR VA

FURNISHED EQUIPMENT, GAS BIBB AT THIS CABINET

D0980 32" LAB POLISHING STATION 1 V / V DA, 1.5 GPM WATER WATER/ DRAIN/ VENT/ POWER/ DATA PROVIDED AND INSTALLED BY GC FOR VA

FURNISHED EQUIPMENT

D2520 oregon cart 5 V / V A-DEC A-DEC Oregon Cart D3380 Stool, Operating, Dental, Doctor 5 V / V D3390 Stool, Operating, Dental, Assistant 6 V / V D3565 Resin Curing Unit, Visible Light 4 V / V POWER WATER/ DRAIN/ VENT/ POWER/ DATA PROVIDED AND INSTALLED BY GC FOR VA

FURNISHED EQUIPMENT

D4360 SAND BLASTER WITH DUST EXHAUST IN CABINET BELOW 1 V / V POWER

D6050 OVERHEAD TRACK LIGHTING 4 V / V POWER

D6155 Mobile Spotlight, Mobile Stand 1 V / V POWER D6250 Bench Mounted Dental Lathe 1 V / V POWER D8850 Amalgamator, Dental 4 V / V POWER D9060 Prophylaxis Unit, Ultrasonic 4 V / V DA, 1.5 GPM WATER WATER/ DRAIN/ VENT/ POWER/ DATA PROVIDED AND INSTALLED BY GC FOR VA

FURNISHED EQUIPMENT

E0703 Table, Process, Adj Height, 5 Drawer, 48W x 24D 5 V / V E0912 Locker, Supply, Med Surg, Wall Mtd 8 V / V E0948 Cart, General Storage, Mobile, 42"H x 32"W x 22"D 3 V / V F0230 Chair, Drafting, Rotary 4 V / V F0355 Footstool, Straight 1 V / V F2000 Basket, Wastepaper, Fire Resistant 4 V / V F2010 Basket, Wastepaper, Step-On 1 V / V F3200 Clock, Battery, 12" Diameter 6 V / V M184 Printer, Copier, Fax combination 1 V / V POWER + DATA OUTLET M2016 Flammables Storage Cabinet, Single door 1 V / V M2055 Shelving, Storage, Wire, CRS, w/Adjustable Shelves 5 V / V M2455 Stand, IV, Adjustable 1 V / V M3072 Frame, Infectious Waste Bag w/Lid 3 V / V M3150 Distribution System, Medication, Automatic 1 V / V POWER + DATA OUTLET M4266 Pump, Volumetric, Infusion, Multiple Line 1 V / V M7845 Monitor, Physiological, Bedside, 4 Channel 1 V / V POWER + DATA OUTLET M8805 Table, Instrument, Straddle 1 V / V R6900 Refrigerator 1 V / V POWER X6600 Radiographic Unit, Dental, Wall Mounted, 7 mAl 5 V / V POWER X6610 Sensor, Dental Imaging System 6 V / V POWER + DATA OUTLET

Revisions: Date:

1 RESPONSE TO PREBID QUESTIONS 4/22/2025

AD101 - DEMOLITION CEILING PLAN
A-601 - ROOM FINISH AND WALL SCHEDULE AND CASEWORK DETAILS
A-603 - FF&E PLAN AND EQUIPMENT SCHEDULE

File details come from the government source that posted it. Updated .