This document is a Scope of Work (SOW) for a MATOC Seed Project to renovate Building 20 at the Vancouver, WA VA Medical Center, focusing on consolidating dental services. The project involves comprehensive renovations of 2,018 square feet, including five dental treatment rooms, supporting rooms, and restrooms, with a 365-day performance period. Work will be conducted during limited hours (4:30 p.m. to 5:00 a.m.) to minimize disruption to the active medical space, with the adjacent dental clinic remaining operational throughout construction.
The renovation encompasses multiple technical scope elements, including electrical work (wiring modifications), HVAC modifications (ductwork relocation/addition), fire sprinkler work (requiring a licensed fire protection contractor), and fire alarm system adjustments. Specific renovation elements include installing permanently mounted finishes like sliding doors, suspended acoustical panel ceilings, metal stud/gypsum board walls, and necessary connections for water, drain, dental air, and medical gas systems. The project is part of Solicitation Number 36C26024R0087 under the Department of Veterans Affairs Veterans Health Administration, specifically VISN 20 General Construction MATOC Replacement Construction Services.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work/Synopsis
MATOC Seed Project 648-22-100 Renovate Building 20, Consolidate Dental Services Vancouver WA VA Medical Center
The project scope is detailed in the attached drawings and specifications, refer to those documents for details. The project will have work hours of 4:30 p.m. to 5:00 a.m. due to the construction occurring in an active medical space.
In general, the project includes providing renovations, alterations and finishes to complete five dental treatment rooms, additional supporting rooms, and restroom:
· Period of performance for this project is 365 days
· Alterations to Building 20 vacant eye clinic space,
· Adjacent dental clinic space is to remain operational throughout construction.
· Storage and utility closets for dental medical gas, x-ray, soiled/clean linen, instrument storage, etc.
· All permanently installed finishes (i.e. sliding doors, suspended acoustical panel ceilings, metal stud/gypsum board walls, etc.).
· All connections for water, drain, dental air, etc.
· Electrical work (i.e. removing wiring, data, power, adding wiring, data power, etc.).
· HVAC work (i.e. relocating ducting, adding new, balancing, etc.)
· Fire sprinkler work (i.e. moved/replaced, addition of new, etc.). Must be performed by licensed fire protection contractor.
· Fire alarm work (i.e. addition/relocation of horns/strobes, addition of new, etc.). Fire watch is required when fire alarm system is not fully operational.
· That overall space for renovation is 2,018 square feet.