Attachment 5 Past Performance Questionnaire 4.10.25.docx

DOCX document 25 KB Posted

Attached to
Z1DA--VISN 20 General Construction MATOC Replacement Construction Services
Solicitation number
36C26024R0087
Issued by

About this file

This document is a Past Performance Questionnaire for a construction contract with the Department of Veterans Affairs (VA), Network Contracting Office (NCO) 20, associated with Solicitation #36C36024R0087. The form is designed to collect detailed performance evaluations from previous project references, with ratings across 18 performance categories ranging from Exceptional (E) to Unsatisfactory (U). Key elements assessed include project management, compliance with laws, quality control, problem-solving, communication, scheduling, cost management, and overall contractor performance.

The questionnaire requests respondents to provide comprehensive feedback by January XX, 2025, with completed forms to be emailed to wendy.duval@va.gov. The document includes sections for general contractor information, respondent details, and specific performance ratings covering technical abilities, regulatory compliance, project supervision, problem resolution, and financial management. Additional questions probe whether the contractor received any formal notices, would be recommended for future contracts, and if the work involved medical spaces requiring specialized infection control measures.

View the file

Other files

File Type Posted
36C26024R0087 0013 Attach 1 RFP Questions 7.9.25.docx DOCX document
36C26024R0087 0012.docx DOCX document
36C26024R0087 0012 - SF 1442 Block 19 Continuation Page .docx DOCX document
36C26024R0087 0011.docx DOCX document
36C26024R0087 0010 Attachment 4 Existing Plumbing P2.4.pdf PDF
36C26024R0087 0010 Attachment 5 Ceiling Plan -A7.1.pdf PDF
36C26024R0087 0010 Attachment 8 Vancouver Site for 648-22-100 Dental.pdf PDF
Attachment 6 Seed Project Price Breakout Revised 6.16.25.xlsx XLSX spreadsheet
36C26024R0087 0010 Attachment 1 Seed Project questions and Answers 6.16.25.docx DOCX document
36C26024R0087 0010 Attachment 6 Specification Section 232500 HVAC Water Treatment.pdf PDF
36C26024R0087 0010 Attachment 7 Specification Section 275223 Nurse Call.pdf PDF
36C26024R0087 0010.docx DOCX document
36C26024R0087 0010 Attachment 2 VAAR 852.219-75 VA notice of LOS.docx DOCX document
36C26024R0087 0010 Attachment 3 Red Line As builts - existing receway.pdf PDF
36C26024R0087 0009.docx DOCX document
36C26024R0087 0008.docx DOCX document
36C26024R0087 0008 Attach 1 RFP Questions 5.29.25.docx DOCX document
36C26024R0087 0007.docx DOCX document
36C26024R0087 0006 Attach 1 RFP Questions 5.7.25.docx DOCX document
36C26024R0087 0006.docx DOCX document
Attachment 8 A-dec-DV5 Compressor and Dry Vacuum cut sheet.pdf PDF
36C26024R0087 0006 Attach 3 Site Visit Sign in Sheet.pdf PDF
Attachment 6 Seed Project Price Breakout Revised 5.6.25.xlsx XLSX spreadsheet
Attachment 7 Dental Air Compressor AC-1specs.pdf PDF
36C26024R0087 0006 Attach 2 Photos of B20 Mech RM 237.pdf PDF
Attachment 5 Past Performance Questionnaire 5.9.25.docx DOCX document
Attachment 1 648-22-100 VA Vancouver Consolidate Dental B20 4.23.25.pdf PDF
Attachment 9 VANC Dental B20 Drawings AD101 A-601 and A-603 response to prebid questions.pdf PDF
36C26024R0087 0006 Attach 4 Seed Project Question and Answers.docx DOCX document
36C26024R0087 0005 Attach 2 VAAR 852.219-75 VA Notice of LOS - Certicate of Compliance for Services and Construction Jan 2023 Deviation.docx DOCX document
36C26024R0087 0005 Attach 1 RFP Questions 4 24 25.docx DOCX document
36C26024R0087 0005.docx DOCX document
36C26024R0087 0004 Attachment 1 RFP Questions 4 22 25.docx DOCX document
36C26024R0087 0004.docx DOCX document
36C26024R0087 0004 Attachment 2 CON MATOC pre-proposal meeting attendees.docx DOCX document
RFP Questions 4.14.25.docx DOCX document
36C26024R0087 0003.docx DOCX document
36C26024R0087 Conformed 4.10.25.docx DOCX document
Panographic backing detail.docx DOCX document
RFP Questions 4.10.25.docx DOCX document
36C26024R0087 0002.docx DOCX document
36C26024R0087 0001.docx DOCX document
36C26024R0087 4.1.25.docx DOCX document
Attachment 2 648-22-100 VA Vancouver Consolidate Dental B20 Drawing signatures.pdf PDF
36C26024R0087.docx DOCX document
Attachment 6 Seed Project Price Breakout.xlsx XLSX spreadsheet
Attachment 5 Past Performance Questionnaire 11.5.24.docx DOCX document
Attachment 4 648-22-100 Vancouver WA consolidate Dental Building B20 - MATOC Seed Project SOW 10.9.24.docx DOCX document
Attachment 3 Seed Project Wage Determination WA20240120 09-06-2024.docx DOCX document
Attachment 1 648-22-100 VA Vancouver Consolidate Dental B20-Specs.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 5

PAST AND PRESENT PERFORMANCE QUESTIONNAIRE

Note: When completed this document is Source Selection Sensitive IAW FAR 2.101 and FAR 3.104

SUBJECT: Request for Past and Present Performance Evaluation

TO: ___________________________________ (to be completed by the Offeror)

You have been identified as a point of contact for a past and/or present performance evaluation of the firm listed on the questionnaire below. This firm is currently being considered for a construction contract with the Department of Veterans Affairs, Network Contracting Office (NCO) 20, Solicitation # 36C36024R0087).

Your prompt attention to this questionnaire will be greatly appreciated. Please submit completed questionnaire via e-mail to wendy.duval@va.gov NLT January XX, 2025. If you have any questions concerning this request, contact Wendy Duval at wendy.duval@va.gov. Please submit this completed form directly to the VA POC.

Sincerely, Peggy Corcoran Contract Officer

ATTACHMENT 2

PAST AND PRESENT PERFORMANCE QUESTIONNAIRE

A. GENERAL INFORMATION: (to be completed by the Offeror)

Contractor’s Name: ____________________Telephone Number: ___________________
Contract Number: ______________________Address: ____________________________
Point of Contact (POC): ______________________POC e-mail address: ___________________

Was work performed as a prime ___ contractor or as sub contractor___

If past and present performance information is provided for a subcontractor, indicate what major or critical aspects of the entire MATOC effort they will support.

Project Title and Brief Description of Work:

Awarded Dollar Amount: $___________ Final Dollar Amount: $___________ Contract Performance Period: ______________________ Contractor performed as the Prime Contractor Sub-Contractor

B. RESPONDENT INFORMATION:

Name of Respondent: _____________________ Title: ____________________________

Address: _____________________ Telephone Number: ___________________ _____________________________ Email Address: _____________________

C. E-MAIL COMPLETED SURVEY FORM TO: wendy.duval@va.gov

D. PERFORMANCE INFORMATION: Choose the appropriate letter on the scale (E, S, M, U, and N) that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF M or U.

E: Exceptional: Performance meets contractual requirements with many exceeded to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than a few minor problems for which corrective actions taken by the contractor were highly effective.

S: Satisfactory: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor were satisfactory.

M: Marginal: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.

U: Unsatisfactory: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

N: Neutral: Performance was not observed or not applicable to the current effort being reported against.

Place an “X” in the appropriate rating letter using the definitions matrix above.

The contractor:

1. Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.

E _____ S _____ M _____ U _____ N _____

2. Provided adequate project supervision.

E _____ S _____ M _____ U _____ N _____

3. Complied with all Federal and locals laws including OSHA, EPA, etc.

E _____ S _____ M _____ U _____ N _____

4. Provided effective inspection procedures which resulted in a quality finished project.

E _____ S _____ M _____ U _____ N _____

5. Corrected deficiencies in timely manner.

E _____ S _____ M _____ U _____ N _____

6. Provided timely resolution of contract discrepancies.

E _____ S _____ M _____ U _____ N _____

7. Identified problems as they occurred/ Suggested alternative approaches to problems.

E _____ S _____ M _____ U _____ N _____

8. Displayed initiative to solve problems.

E _____ S _____ M _____ U _____ N _____

9. Developed realistic project schedules.

E _____ S _____ M _____ U _____ N _____

10. Communicated with Government personnel to keep the project on schedule or minimize delays E _____ S _____ M _____ U _____ N _____

11. Was responsive to contract all changes.

E _____ S _____ M _____ U _____ N _____

12. Provided accurate, and complete records E _____ S _____ M _____ U _____ N _____

13. Complied with standards of good workmanship E _____ S _____ M _____ U _____ N _____

14. Was diligent in forecasting and controlling cost.

E _____ S _____ M _____ U _____ N _____

15. Provided timely and accurate billing.

E _____ S _____ M _____ U _____ N _____

16. Paid subcontractors/suppliers in a timely manner.

E _____ S _____ M _____ U _____ N _____

17. Submitted reasonably priced change proposals.

E _____ S _____ M _____ U _____ N _____

18. How would you rate the contractor's overall performance?

E _____ S _____ M _____ U _____ N _____

Please select Yes or No for the following questions:

19. Did you ever issued a letter of concern, cure notice or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”

Yes _____ No _____

20. Would you award another contract to this contractor? If not, explain in “remarks Yes _____ No _____

21. Was construction on/in an active Medical Space?

Yes _____ No _____

22. Were infection control measures required?

Yes _____ No _____

Remarks:

File details come from the government source that posted it. Updated .