This is a solicitation for Multiple Award Task Order Contracts (MATOCs) for general construction services across Washington, Oregon, Idaho, and Alaska, issued by the Department of Veterans Affairs Network Contracting Office 20. The VA intends to award up to 12 Indefinite Delivery Indefinite Quantity (IDIQ) contracts with a shared $500 million contract ceiling and a guaranteed minimum award of $2,000 per contract. The procurement is 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 236220 with a $45 million size standard.
The MATOC contracts will cover construction, maintenance, alterations, and repairs of buildings and real property at VA facilities, with task orders ranging from $2,000 to $30,000,000. The contract will have a base period of one year and two two-year option periods. A mandatory "seed project" for the VA Vancouver Consolidated Dental B20 facility is included, with a magnitude between $1,000,000 and $2,000,000, and contractors must participate in this project to be considered for award. A virtual pre-proposal conference is scheduled for April 17, 2025, and a site visit for the seed project is set for April 3, 2025, with proposals due by May 14, 2025.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C26024R0087 Section K
A.1 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)
The FAR clauses 52.236-2, Differing Site Conditions; 52.243-4, Changes; and 52.243-5, Changes and Changed Conditions, are supplemented as follows:
(a) Submission of request for equitable adjustment proposals. When directed by the Contracting Officer or requested by the Contractor, the Contractor shall, in accordance with FAR 15.403-5, submit proposals for changes in the work exceeding $500,000 in writing to the Contracting Officer or Administrative Contracting Officer (ACO), and to the resident engineer.
(1) The Contractor must provide an itemized breakdown for changes exceeding the micro-purchase threshold (see FAR 2.101).
(2) The itemized breakdown shall include materials, quantities, unit prices, labor costs (separated into trades), construction equipment, etc. Labor costs shall be identified with specific material placed or operation performed.
(3) Proposals shall be submitted to the Contracting Officer or ACO and the resident engineer as expeditiously as possible, but not later than 30 calendar days, after receipt of a written change order by the Contracting Officer.
(4) Proposals shall be signed by each subcontractor participating in the change.
(5) The Contracting Officer will consider issuing a settlement by determination to the contract if the Contractor's proposal required by paragraph (a)(3) of this clause is not received within the time period specified in paragraph (a)(3), or if agreement has not been reached.
(b) Paragraphs (a)(1) through (5) of this clause and the following paragraphs (b)(1) and (2) apply to proposals for changes in the work $500,000 or less:
(1) As a basis for negotiation, allowances not to exceed 10 percent each for overhead and profit for the party performing the work will be based on the value of labor, material, and equipment required to accomplish the change. As the value of the change increases, a declining scale will be used in negotiating the percentage of overhead and profit. This declining scale will also be used to negotiate the prime Contractor's or upper-tier subcontractor's fee when work is performed by lower-tier subcontractors (to a maximum of three tiers) and will be based on the net increased cost to the prime or upper-tier subcontractor, as applicable. Profit (fee) shall be computed by multiplying the profit percentage by the sum of the direct costs and computed overhead costs. Allowable percentages on changes will not exceed the following:
(i) 10 percent overhead and/or 10 percent profit (fee) on the first $20,000.
(ii) 7.5 percent overhead and/or 7.5 percent profit (fee) on the next $30,000.
(iii) 5 percent overhead and/or 5 percent profit (fee) on a balance over $50,000.
(2) The Contracting Officer will consider issuing a settlement by determination to the contract if the Contractor's proposal required by paragraph (3) is not received within 30 calendar days, or if agreement has not been reached.
(c)(1) Overhead and Contractor's fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the Contractor's overhead and/or fee percentage.
(2) Where the Contractor's or subcontractor's portion of a change involves credit items, such items must be deducted prior to adding overhead and profit for the party performing the work. The Contractor's fee is limited to the net increase to Contractor or subcontractors' portions of cost computed in accordance with this clause.
(3) Where a change involves credit items only, a proper measure of the amount of downward adjustment in the contract price is the reasonable cost to the Contractor if it had performed the deleted work. A reasonable allowance for overhead and profit are properly includable as part of the downward adjustment for a deductive change. The amount of such allowance is subject to negotiation.
(End of Clause)
A.2 52.203-14 DISPLAY OF HOTLINE POSTER(S) (NOV 2021)
(a) Definition.
United States, as used in this clause, means the 50 States, the District of Columbia, and outlying areas.
(b) Display of fraud hotline poster(s). Except as provided in paragraph (c)—
(1) During contract performance in the United States, the Contractor shall prominently display in common work areas within business segments performing work under this contract and at contract work sites-
(i) Any agency fraud hotline poster or Department of Homeland Security (DHS) fraud hotline poster identified in paragraph (b)(3) of this clause; and
(ii) Any DHS fraud hotline poster subsequently identified by the Contracting Officer.
(2) Additionally, if the Contractor maintains a company website as a method of providing information to employees, the Contractor shall display an electronic version of the poster(s) at the website.
(3) Any required posters may be obtained as follows:
| Poster(s) |
| Obtain from |
| VA OIG Hotline Poster |
| https://www.vaoig.gov/hotline/online-forms#:~:text |
(Contracting Officer shall insert—
(i) Appropriate agency name(s) and/or title of applicable Department of Homeland Security fraud hotline poster; and
(ii) The website(s) or other contact information for obtaining the poster(s).)
(c) If the Contractor has implemented a business ethics and conduct awareness program, including a reporting mechanism, such as a hotline poster, then the Contractor need not display any agency fraud hotline posters as required in paragraph (b) of this clause, other than any required DHS posters.
(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in all subcontracts that exceed the threshold specified in Federal Acquisition Regulation 3.1004(b)(1) on the date of subcontract award, except when the subcontract—
(1) Is for the acquisition of a commercial product or commercial service; or
(2) Is performed entirely outside the United States.
(End of Clause)
| FAR Number |
| Title |
| Date |
| 52.222-37 |
| EMPLOYMENT REPORTS ON VETERANS |
| JUN 2020 |
| 52.203-6 |
| RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT |
| JUN 2020 |
| 52.203-7 |
| ANTI-KICKBACK PROCEDURES |
| JUN 2020 |
| 52.203-17 |
| CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS |
| NOV 2023 |
| 52.203-19 |
| PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS |
| JAN 2017 |
| 52.204-18 |
| COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE |
| AUG 2020 |
A.3 52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,500.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor—
(1) Any order for a single item in excess of $30,000,000.00;
(2) Any order for a combination of items in excess of $120,000,000.00; or
(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 5 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of Clause)
| FAR Number |
| Title |
| Date |
| 52.202-1 |
| DEFINITIONS |
| JUN 2020 |
| 52.203-3 |
| GRATUITIES |
| APR 1984 |
| 52.203-10 |
| PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY |
| MAY 2014 |
| 52.203-12 |
| LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS |
| JUN 2020 |
| 52.204-10 |
| REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS |
| JUN 2020 |
| 52.204-13 |
| SYSTEM FOR AWARD MANAGEMENT MAINTENANCE |
| OCT 2018 |
| 52.222-27 |
| AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION |
| APR 2015 |
| 52.204-25 |
| PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT |
| NOV 2021 |
| 52.222-50 |
| COMBATING TRAFFICKING IN PERSONS |
| NOV 2021 |
| 52.222-54 |
| EMPLOYMENT ELIGIBILITY VERIFICATION |
| JAN 2025 |
| 52.225-13 |
| RESTRICTIONS ON CERTAIN FOREIGN PURCHASES |
| FEB 2021 |
| 52.226-7 |
| DRUG-FREE WORKPLACE |
| MAY 2024 |
| 52.227-2 |
| NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT |
| JUN 2020 |
| 52.228-2 |
| ADDITIONAL BOND SECURITY |
| OCT 1997 |
| 52.228-15 |
| PERFORMANCE AND PAYMENT BONDS—CONSTRUCTION |
| JUN 2020 |
| 52.229-3 |
| FEDERAL, STATE, AND LOCAL TAXES |
| FEB 2013 |
| 52.232-33 |
| PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM FOR AWARD MANAGEMENT |
| OCT 2018 |
| 52.232-39 |
| UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS |
| JUN 2013 |
| 52.236-2 |
| DIFFERING SITE CONDITIONS |
| APR 1984 |
| 52.236-3 |
| SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK |
| APR 1984 |
| 52.236-9 |
| PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS |
| APR 1984 |
| 52.236-10 |
| OPERATIONS AND STORAGE AREAS |
| APR 1984 |
A.4 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)
(a) Definition. for the Department of Veterans Affairs, ‘‘Service-disabled Veteran-owned small business concern or SDVOSB’’:
(1) Means a small business concern—
(i) Not less than 51 percent of which is owned by one or more service-disabled Veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled Veterans or eligible surviving spouses (see VAAR 802.201, Surviving Spouse definition);
(ii) The management and daily business operations of which are controlled by one or more service-disabled Veterans (or eligible surviving spouses) or, in the case of a service-disabled Veteran with permanent and severe disability, the spouse or permanent caregiver of such Veteran;
(iii) The business meets Federal small business size standards for the applicable North American Industry Classification System (NAICS) code identified in the solicitation document;
(iv) The business has been certified for ownership and control pursuant to 38 U.S.C. 8127, 13 CFR 128, and is listed as certified in the SBA certification database at https://veterans.certify.sba.gov/; and
(v) The business agrees to comply with VAAR subpart 819.70 and Small Business Administration (SBA) regulations regarding small business size, government contracting, and the Veteran Small Business Certification Program at 13 CFR parts 121, 125, and 128.
(2) The term ‘‘Service-disabled Veteran’’ means a Veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).
(3) The term ‘‘small business concern’’ has the meaning given that term under section 3 of the Small Business Act (15 U.S.C. 632).
(4) The term ‘‘small business concern owned and controlled by Veterans with service-connected disabilities’’ has the meaning given the term ‘‘small business concern owned and controlled by service-disabled veterans’’ under section 3(q)(2) of the Small Business Act (15 U.S.C. 632(q)(2)).
(5) The term “SDVOSB participant” or certified SDVOSB means a small business that has been certified in the SBA Veteran Small Business Certification Program and listed in the SBA certification database (see 13 CFR 128.102).
(b) General. In order for a concern to submit an offer and be eligible for the award of an SDVOSB set-aside or sole source contract, the concern must qualify as a small business concern under the size standard corresponding to the NAICS code assigned to the contract and be listed as an SDVOSB participant in the SBA certification database as set forth in 13 CFR 128.
(1) Offers received from entities that are not certified SDVOSBs and listed in the SBA certification database at the time of offer shall not be considered.
(2) Any award resulting from this solicitation shall be made to a certified SDVOSB listed in the SBA certification database who is eligible at the time of submission of offer(s) and at the time of award.
(3) The requirements in this clause apply to any contract, order or subcontract where the firm receives a benefit or preference from its designation as an SDVOSB, including set-asides, sole source awards, and evaluation preferences.
(c) Representation. Pursuant to 38 U.S.C. 8127(e), only certified SDVOSBs listed in the SBA certification database are considered eligible to receive award of a resulting contract. By submitting an offer, the prospective contractor represents that it is an eligible and certified SDVOSB as defined in this clause, 13 CFR 121, 125, and 128, and VAAR subpart 819.70.
(d) Agreement/LOS certification. When awarded a contract action, including orders under multipleaward contracts, an SDVOSB agrees that in the performance of the contract, the SDVOSB shall comply with requirements in VAAR subpart 819.70 and SBA regulations on small business size, and government contracting programs at 13 CFR part 121 and part 125, including the non-manufacturer rule and limitations on subcontracting (LOS) requirements in 13 CFR 121.406(b) and 13 CFR 125.6. For the purpose of limitations on subcontracting, only certified SDVOSBs listed in the SBA certification database (including independent contractors) shall be considered eligible and/or ‘‘similarly situated’’ (i.e., a firm that has the same small business program status as the prime contractor). An otherwise eligible firm further agrees to comply with the required LOS certification requirements in this solicitation (see 852.219–75 or 852.219–76 as applicable). These requirements are summarized as follows:
(1) Services. In the case of a contract for services (except construction), the SDVOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance to firms that are not certified SDVOSBs listed in the SBA certification database (excluding direct costs to the extent they are not the principal purpose of the acquisition and the SDVOSB/ VOSB does not provide the service, such as airline travel, cloud computing services, or mass media purchases). When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract.
(2) Supplies/products.
(i) In the case of a contract for supplies or products (other than from a non-manufacturer of such supplies), the SDVOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not certified SDVOSBs listed in the SBA certification database. When a contract includes both supply and services, the 50 percent limitation shall apply only to the supply portion of the contract.
(ii) In the case of a contract for supplies from a non-manufacturer, the SDVOSB prime contractor will supply the product of a domestic small business manufacturer or processor, unless a waiver as described in 13 CFR 121.406(b)(5) has been granted. Refer to 13 CFR 125.6(a)(2)(ii) for guidance pertaining to multiple item procurements.
(3) General construction. In the case of a contract for general construction, the SDVOSB prime contractor will not pay more than 85% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not certified SDVOSBs listed in the SBA certification database.
(4) Special trade construction contractors. In the case of a contract for special trade contractors, no more than 75% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, may be paid to firms that are not certified SDVOSBs listed in the SBA certification database.
(5) Subcontracting. An SDVOSB subcontractor must meet the NAICS size standard assigned by the prime contractor and be certified and listed in the SBA certification database to count as similarly situated. Any work that a first tier SDVOSB subcontractor further subcontracts will count towards the percent of subcontract amount that cannot be exceeded. For supply or construction contracts, the cost of materials is excluded and not considered to be subcontracted. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the portion of the contract with the preponderance of the expenditure upon which the assigned NAICS is based. For information and more specific requirements, refer to 13 CFR 125.6.
(e) Required limitations on subcontracting compliance measurement period. An SDVOSB shall comply with the limitations on subcontracting as follows:
[] By the end of the base term of the contract or order, and then by the end of each subsequent option period; or [X] By the end of the performance period for each order issued under the contract.
(f) Joint ventures. A joint venture may be considered eligible as an SDVOSB if the joint venture complies with the requirements in 13 CFR 128.402 and the managing joint venture partner makes the representations under paragraph (c) of this clause. A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (d) of this clause will be performed by the aggregate of the joint venture participants.
(g) Precedence. The VA Veterans First Contracting Program, as defined in VAAR 802.101, subpart 819.70, and this clause, takes precedence over any inconsistencies between the requirements of the SBA Veteran Small Business Certification Program and the VA Veterans First Contracting Program.
(h) Misrepresentation. Pursuant to 38 U.S.C. 8127(g), any business concern, including all its principals, that is determined by VA to have willfully and intentionally misrepresented a company’s SDVOSB status is subject to debarment from contracting with the Department for a period of not less than five years (see VAAR 809.406–2 Causes for Debarment).
(End of Clause) A.5 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (NOV 2022)
(a) Pursuant to 38 U.S.C. 8127(k)(2), the offeror certifies that—
(1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows:
(i) [] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219–73 or VOSBs as set forth in 852.219–74. Any work that a similarly situated VIP-listed subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6.
(ii) [] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219–73or VOSBs as set forth in 852.219–74. Any work that a similarly situated VIP-listed subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.
(iii) [] Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219–73 or VOSBs as set forth in 852.219–74. Any work that a similarly situated subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.
(2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution.
(3) If VA determines that an SDVOSB/ VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following:
(i) Referral to the VA Suspension and Debarment Committee;
(ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and
(iii) Prosecution for violating section 1001 of title 18.
(b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed.
(c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate.
(d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror’s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.
Certification I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror].
Printed Name of Signee: ___________ Printed Title of Signee: _____________ Signature: ____________ Date: ______________ Company Name and Address: _______________ (End of Clause)
A.6 VAAR 852.223-71 SAFETY AND HEALTH (SEP 2019)
(a) To help ensure the protection of the life and health of all persons, and to help prevent damage to property, the Contractor shall comply with all Federal, State, and local laws and regulations applicable to the work being performed under this contract. These laws are implemented or enforced by the Environmental Protection Agency (EPA), Occupational Safety and Health Administration (OSHA) and other regulatory/enforcement agencies at the Federal, State, and local levels.
(1) Additionally, the Contractor shall comply with the following regulations when developing and implementing health and safety operating procedures and practices for both personnel and facilities involving the use or handling of hazardous materials and the conduct of research, development, or test projects:
(i) 29 CFR 1910.1030, Bloodborne pathogens; 29 CFR 1910.1450, Occupational exposure to hazardous chemicals in laboratories. These regulations are available at https://www.osha.gov/.
(ii) Nuclear Regulatory Commission Standards and Regulations, pursuant to the Energy Reorganization Act of 1974 (42 U.S.C. 5801 et seq.) Copies are available from the U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
(2) The following Government guidelines are recommended for developing and implementing health and safety operating procedures and practices for both personnel and facilities:
(i) Biosafety in Microbiological and Biomedical Laboratories, Centers for Disease Control and Prevention (CDC), available at http://www.cdc.gov/biosafety/publications/index.htm.
(ii) Prudent Practices in the Laboratory, National Research Council, National Academy Press, Washington, DC 20001, available at http://www.nap.edu.
(b)(1) The Contractor shall maintain an accurate record of, and promptly report to the Contracting Officer, all accidents or incidents resulting in the exposure of persons to toxic substances, hazardous materials; the injury or death of any person; or damage to property incidental to work performed under the contract resulting from toxic or hazardous materials and resulting in any or all violations for which the Contractor has been cited by any Federal, State or local regulatory/enforcement agency.
(2) The report shall include a copy of the notice of violation and the findings of any inquiry or inspection, and an analysis addressing the impact these violations may have on the work remaining to be performed. The report shall also state the required action(s), if any, to be taken to correct any violation(s) noted by the Federal, State, or local regulatory/enforcement agency and the time frame allowed by the agency to accomplish the necessary corrective action.
(c) If the Contractor fails or refuses to comply with the Federal, State or local regulatory/enforcement agency's directive(s) regarding any violation(s) and prescribed corrective action(s), the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action (as approved by the Federal, State, or local regulatory/enforcement agencies) has been taken and documented to the Contracting Officer. No part of the time lost due to any such stop work order shall form the basis for a request for extension or costs or damages by the Contractor.
(d) The Contractor shall insert this clause in each subcontract involving toxic substances or hazardous materials. The Contractor is responsible for the compliance of its subcontractors with the provisions of this clause.
(End of Clause)
A.7 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)
(a) Any protest filed by an interested party shall—
(1) Include the name, address, fax number, email and telephone number of the protester;
(2) Identify the solicitation and/or contract number;
(3) Include an original signed by the protester or the protester’s representative and at least one copy;
(4) Set forth a detailed statement of the legal and factual grounds of the protest, including a description of resulting prejudice to the protester, and provide copies of relevant documents;
(5) Specifically request a ruling of the individual upon whom the protest is served;
(6) State the form of relief requested; and
(7) Provide all information establishing the timeliness of the protest.
(b) Failure to comply with the above may result in dismissal of the protest without further consideration.
(c) Bidders/offerors and Contracting Officers are encouraged to use alternative dispute resolution (ADR) procedures to resolve protests at any stage in the protest process. If ADR is used, the Department of Veterans Affairs will not furnish any documentation in an ADR proceeding beyond what is allowed by the Federal Acquisition Regulation.
(End of Provision) PLEASE NOTE: The correct mailing information for filing alternate protests is as follows:
| Deputy Assistant Secretary for Acquisition and Logistics, |
| Risk Management Team, Department of Veterans Affairs |
| 810 Vermont Avenue, N.W. |
| Washington, DC 20420 |
Or for solicitations issued by the Office of Construction and Facilities Management:
| Director, Office of Construction and Facilities Management |
| 811 Vermont Avenue, N.W. |
| Washington, DC 20420 |
A.8 52.216-18 ORDERING (AUG 2020)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from Date of Award through Will be established upon award.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) A delivery order or task order is considered "issued" when—
(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;
(2) If sent by fax, the Government transmits the order to the Contractor’s fax number; or
(3) If sent electronically, the Government either—
(i) Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or
(ii) Distributes the delivery order or task order via email to the Contractor’s email address.
(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.
(End of Clause)
| FAR Number |
| Title |
| Date |
| 52.236-17 |
| LAYOUT OF WORK |
| APR 1984 |
| 52.236-26 |
| PRECONSTRUCTION CONFERENCE |
| FEB 1995 |
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C26024R0087 X 04-01-2025 To be assigned upon award N/A Per Task Order 36C260 Network Contracting Office 20
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver
WA
98661 Network Contracting Office 20
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver
WA
98661 Wendy Duval 509-321-1919 This solicitation is for Multiple Award Task Order Contracts(MATOCs) for general construction covering eight (8) facilities across Washington, Oregon, Idaho, and Alaska. Task order (TO) work will include construction, maintenance, alterations, and repair of buildings and other real property belonging to the facilities.
The government intends to award up to 12 Indefinite Delivery Indefinite Quantity (IDIQ) contracts with firm fixed price task orders issued against the contract. The guaranteed minimum award amount for each contract is $2,000. The contract ceiling is a shared dollar value of $500M. The government does not guarantee that it will place any order under this contract(s) in excess of the guaranteed minimum award amount.
The IDIQ contracts awarded resulting from this solicitation shall include a base period of one year and two two-year options.
This acquisition shall be 100% set set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) authority of 38 U.S.C. 8127 (Public Law 109 109-461).
NAICS: 236220 - Commercial and Institutional Building Construction / SBA Size Standard: $45 Million
This acquisition features a "Seed Project" with a magnitude value between $1,000,000 and $ 2,000,000 per FAR36.204(c).
A bid bond is required for the Seed Project. NOTE: YOU MUST PARTICIPATE IN THE PROPOSAL PROCESS OF THE SEED PROJECT # 648-22-100, VA Vancouver Consolidate Dental B20 TO BE CONSIDERED AS AN AWARDEE FOR THE MATOC.
A virtual pre-proposal conference is scheduled for April 17, 2025 @ 9:00 AM PST. Offerors wishing to participate must e-mail wendy.duval@va.gov NLT April 16, 2025 4:30 PDT to receive the virtual meeting information.
A site visit for the seed project is scheduled for April 3,2025. See provision 52.236-27, Site Visit, for details.
All Contractors who intend to submit a proposal are strongly encouraged to attend the site visit to review existing site conditions and IDIQ procedures.
This is a competitive acquisition that shall utilize a Tradeoff Process IAW FAR 15.101-1
NOTE: Ensure all correspondence is e-mailed to wendy.duval@va.gov.
Wage Determination WA20240120 dated 9-6-2024 is applicable to the seed project only. Each task order will identify the wage determination applicable to that task order.
* any block or clause that include an asterisk will be completed per Task Order if applicable.
X X 52.211-10 X 15:00
PDT
05-14-2025 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
36C260 Network Contracting Office 20
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver
WA
98661 Dept of Veterans Affairs
FMS-VA-2(101)
Financial Services Center
PO BOX 149971
Austin
TX
78714-9971
Table of Contents
| A.1 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 1 |
| A.2 52.203-14 DISPLAY OF HOTLINE POSTER(S) (NOV 2021) | 2 |
| A.3 52.216-19 ORDER LIMITATIONS (OCT 1995) | 3 |
| A.4 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION) | 5 |
| A.5 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (NOV 2022) | 8 |
| A.6 VAAR 852.223-71 SAFETY AND HEALTH (SEP 2019) | 9 |
| A.7 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 10 |
| A.8 52.216-18 ORDERING (AUG 2020) | 11 |
| PART I - THE SCHEDULE | 13 |
| SECTION A - SOLICITATION/CONTRACT FORM | 13 |
| A.9 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 13 |
| A.10 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 14 |
| SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS | 18 |
| B.1 PRICE/COST SCHEDULE | 18 |
| ITEM INFORMATION | 18 |
| SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK | 19 |
| MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) STATEMENT OF WORK | 19 |
| PART II - CONTRACT CLAUSES | 30 |
| SECTION I - CONTRACT CLAUSES | 30 |
| I.1 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023) | 30 |
| I.2 52.216-1 TYPE OF CONTRACT (APR 1984) | 30 |
| I.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 30 |
| I.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 31 |
| I.5 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) ALTERNATE I (MAY 2014) AND ALTERNATE II (NOV 2023) | 32 |
| I.6 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 33 |
| SECTION M - EVALUATION FACTORS FOR AWARD | 35 |
| M.1 52.217-5 EVALUATION OF OPTIONS (JUL 1990) | 40 |
| M.2 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021) | 40 |
| M.3 52.233-2 SERVICE OF PROTEST (SEP 2006) | 40 |
| M.4 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 41 |
| M.5 VAAR 852.209-70 ORGANIZATIONAL CONFLICTS OF INTEREST (OCT 2020) | 41 |
| M.6 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 42 |
| M.7 52.236-28 PREPARATION OF PROPOSALS—CONSTRUCTION (OCT 1997) | 42 |
| SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS | 44 |
| PROPOSAL PREPARATION INSTRUCTIONS (MATOC) | 44 |
| L.1 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 48 |
| L.2 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018) | 48 |
| L.3 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 51 |
| L.4 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025) | 51 |
| L.5 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 55 |
| L.6 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 58 |
| L.7 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021) | 59 |
| L.8 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND REPRESENTATION (JUN 2020) | 61 |
| L.9 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984) | 62 |
| L.10 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (INCLUDES TABLE FOR SEPARATE PARTS OR STAGES) (SEPT 2000) | 63 |
| L.11 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984) | 63 |
| L.12 52.216-22 INDEFINITE QUANTITY (OCT 1995) | 64 |
| L.13 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) | 64 |
| L.14 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 64 |
| L.15 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022) | 65 |
| L.16 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025) | 67 |
| L.17 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (FEB 2021) | 70 |
| L.18 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022) | 71 |
| L.19 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (NOV 2023) ALTERNATE I (NOV 2023) | 76 |
| L.20 SUPPLEMENTAL INSURANCE REQUIREMENTS | 83 |
| L.21 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984) | 83 |
| L.22 52.236-4 PHYSICAL DATA (APR 1984) | 83 |
| L.23 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 84 |
| L.24 52.227-4 PATENT INDEMNITY—CONSTRUCTION CONTRACTS (DEC 2007) | 85 |
| L.25 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 86 |
| L.26 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 87 |
| L.27 VAAR 852.236-90 RESTRICTION ON SUBMISSION AND USE OF EQUAL PRODUCTS (APR 2019) | 88 |
| L.28 VAAR 852.239-76 INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY (FEB 2023) | 88 |
| L.29 MANDATORY WRITTEN DISCLOSURES | 89 |
| L.30 52.236-13 ACCIDENT PREVENTION (NOV 1991) | 89 |
| L.31 52.244-2 SUBCONTRACTS (JUN 2020) | 90 |
| L.32 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020) | 93 |
| L.33 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 93 |
| L.34 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 2019) | 94 |
| L.35 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 95 |
| L.36 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 95 |
| L.37 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022) | 95 |
| L.38 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 95 |
| PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS | 97 |
| SECTION J - LIST OF ATTACHMENTS | 97 |
| PART IV - REPRESENTATIONS AND INSTRUCTIONS | 98 |
| SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS | 98 |
| K.1 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 98 |
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS
B.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| EA |
| _____NA______ |
| _____NA______ |
MATOC IDIQ – Construction FFP – General SOW: Contractor shall provide general construction, renovation, maintenance, minor repair, and services ancillary to construction. All work will take place at VISN 20 facilities located in Alaska, Idaho, Oregon, & Washington.
Base Contract Period May 1, 2025 – April 30, 2026
| 1.00 |
| EA |
| _____NA______ |
| _____NA______ |
MATOC IDIQ – Construction FFP – General SOW: Contractor shall provide general construction, renovation, maintenance, minor repair, and services ancillary to construction. All work will take place at VISN 20 facilities located in Alaska, Idaho, Oregon, & Washington.
Option Period One May 1, 2026 – April 30, 2028
| 1.00 |
| EA |
| _____NA______ |
| _____NA______ |
MATOC IDIQ – Construction FFP – General SOW: Contractor shall provide general construction, renovation, maintenance, minor repair, and services ancillary to construction. All work will take place at VISN 20 facilities located in Alaska, Idaho, Oregon, & Washington.
Option Period Two May 1 2028 – April 30, 2030
GRAND TOTAL
36C26024R0087 Section B
Page 1 of Page 1 of
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) STATEMENT OF WORK
A. GENERAL INFORMATION
This procurement effort is for construction services at Veterans Integrated Service Network (VISN) 20 station locations in Washington, Idaho, Oregon, and Alaska. Contractors are expected to have the capability and qualifications to provide a wide array of construction services at locations specified.
1. This requirement consists of establishing a MATOC “pool” consisting of up to 12 Indefinite-Delivery Indefinite-Quantity (IDIQ) contracts with each IDIQ contract having a base period of one year, and two two-year options. The total guaranteed minimum under each awarded IDIQ contract is $2,000.00, which will be awarded in the FY which the contract is awarded and represents a bona fide need of the current fiscal year. The MATOC will require contractors to furnish all labor, materials, equipment, and expert supervision needed to accomplish the work in accordance with the Description / Specifications / Statement of Work provided with each task.
2. The MATOC awardees will then be eligible to submit proposals in response to a Task Order Proposal Request (TOPR) issued to the MATOC contractors. The MATOC TOs shall have a minimum value of $2,000.00 and a maximum value of $30,000,000.00 and no dollar limit per year up to a cumulative (all IDIQs inclusive) maximum of $500,000,000.00 for the entire MATOC IDIQ contract term. Firm Fixed Price Task Orders (TO) will vary in size and dollar amounts. TOs will be for general construction categories and may involve some or all of the following examples including maintenance, repair, alteration, mechanical, electrical, heating/air conditioning, demolition, painting, paving and earthwork, carpentry, concrete, roofing, site work, excavation, interior renovation, carpet-window and door installation, electrical, steam fitting, plumbing, exterior and interior painting, plaster/stucco, demolition, masonry or metal stud and sheetrock work, installation of acoustical ceilings and light fixtures, HVAC installation and flooring installation, etc..
3. Task orders shall have defined periods of performance. Each TOs shall have a separate Notice to Proceed (NTP) issued to commence construction activities.
4. Hours of Work and Scheduling: All work will be done during the normal work week Monday through Friday, except holidays, 7:00 AM to 4:30 PM unless otherwise scheduled with the COR, or identified in the TO SOW. If work hours will be different for any specific TO, it will be identified in the SOW for that action. Any contractor request to work outside the normal hours must be requested, in writing at least 48-hours in advance.
6. Federal Holidays: please see the U.S. Office of Personnel Management list of Federal Holidays here: Federal Holidays (opm.gov)
Note: Any of the listed holidays falling on Saturday will be observed on the preceding Friday; holidays falling on Sunday will be observed on the following Monday.
B. CONTRACT AWARD MEETING
The contractor shall not commence performance on the tasks in the MATOC contract or for each subsequently issued TO until the CO has conducted a Preconstruction Conference or has advised the contractor that a conference is waived.
C. GENERAL REQUIREMENTS
1. All written deliverables shall be phrased in layperson language. Statistical and other technical terminology shall not be used without providing a glossary of terms.
2. Where a written milestone deliverable is required in draft form, the VA will complete their review of the draft deliverable within 10-business days from the date of receipt. The contractor shall have 7-business days to deliver the final deliverable from date of receipt of the Government’s comments.
3. Contractor shall adhere to basic VA specifications for all work for all task orders. TIL documents can be found at the VA Technical Information Library (TIL) located at https://www.cfm.va.gov/TIL/spec.asp.
D. SPECIFIC MANDATORY TASKS AND ASSOCIATED DELIVERABLES
1. Description of Tasks and Associated Deliverables: The MATOC contractor(s) shall be responsible for the construction (including new work, additions, alterations, maintenance, and repairs) of commercial and institutional related structures. The primary NAICS code for the MATOC award is 236220 Commercial and Institutional Building Construction. NAICS Code 236220 has a Small Business Size Standard of $45M.
2. All work described above shall be completed in accordance with the construction documents for the individual TO projects.
E. GOVERNMENT FURNISHED PPOPERTY/EQUIPMENT (GFP/GFE)
The IDIQ contract does not have any GFP/GFE pre-designated for provision on a temporary or permanent basis to MATOC contractors. As each subsequently developed project requiring a task order is finalized Government shall evaluate its need to furnish any GFP/GPE.
F. CONTRACTOR EXPERIENCE REQUIREMENTS
1. The contractor must inform the TO project COR when personnel are removed from the contract for any reason.
2. If a TO key person becomes unavailable to complete the contract, proposed substitutions of key personnel shall be made to the COR and approved by the CO.
3. Contractor employees shall not be considered government employees for any purpose under this contract and subsequent TOs.
G. CLAUSES
Any and all FAR or VAAR clauses listed on supporting documents, e.g. specifications, are strictly for reference only and do not supersede, replace, or enhance those clauses or provisions, in full or reference, included in the solicitation or contract. FAR and VAAR clauses or provisions found in the solicitation or contract prevail.
END OF MATOC SOW
TASK ORDER PROCEDURES
A. GENERAL
1. When the Government has a need for a task order (TO), the Government will issue a Task Order Proposal Request (TOPR) using the procedures outlined in this contract and FAR subpart 16.505, Ordering.
2. TOs will be awarded on Standard Form 1442.
3. The Government will not be obligated to reimburse the contractor for work performed, items delivered, or any costs incurred, nor shall the contractor be obligated to perform, deliver, or otherwise incur costs, except as…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .