Attachment 2 648-22-100 VA Vancouver Consolidate Dental B20 Drawing signatures.pdf

PDF 19 MB Posted

Attached to
Z1DA--VISN 20 General Construction MATOC Replacement Construction Services
Solicitation number
36C26024R0087
Issued by

About this file

This file is a comprehensive architectural and engineering design package for renovating Building 20 at the VA Portland Healthcare System in Vancouver, Washington to consolidate dental services. The project involves a complete renovation of the second floor, transforming a vacant eye clinic space into a fully functional dental clinic with five treatment rooms, supporting utilities, and specialized spaces including a surgery room, sterile instruments room, lab, soiled room, and staff areas.

The renovation includes extensive modifications to mechanical, electrical, plumbing, and fire protection systems. Key technical specifications include installing new sliding doors with self-closers, suspended acoustical ceiling panels, metal stud walls with painted finishes, resilient flooring, and high-impact resistant wainscoting. The project will provide medical gas systems, x-ray equipment infrastructure, dental chairs, cabinets, sinks, and associated medical technology installations. The work is phased to minimize disruption, with construction occurring after hours between 4:30 PM and 5:00 AM, and is designed to ensure all medical center activities remain operational throughout the renovation process.

View the file

Other files

File Type Posted
36C26024R0087 0013.docx DOCX document
36C26024R0087 0013 Attach 1 RFP Questions 7.9.25.docx DOCX document
36C26024R0087 0012 - SF 1442 Block 19 Continuation Page .docx DOCX document
36C26024R0087 0012.docx DOCX document
36C26024R0087 0011.docx DOCX document
36C26024R0087 0010 Attachment 3 Red Line As builts - existing receway.pdf PDF
36C26024R0087 0010 Attachment 7 Specification Section 275223 Nurse Call.pdf PDF
36C26024R0087 0010.docx DOCX document
36C26024R0087 0010 Attachment 5 Ceiling Plan -A7.1.pdf PDF
36C26024R0087 0010 Attachment 1 Seed Project questions and Answers 6.16.25.docx DOCX document
36C26024R0087 0010 Attachment 2 VAAR 852.219-75 VA notice of LOS.docx DOCX document
36C26024R0087 0010 Attachment 6 Specification Section 232500 HVAC Water Treatment.pdf PDF
36C26024R0087 0010 Attachment 8 Vancouver Site for 648-22-100 Dental.pdf PDF
36C26024R0087 0010 Attachment 4 Existing Plumbing P2.4.pdf PDF
Attachment 6 Seed Project Price Breakout Revised 6.16.25.xlsx XLSX spreadsheet
36C26024R0087 0009.docx DOCX document
36C26024R0087 0008 Attach 1 RFP Questions 5.29.25.docx DOCX document
36C26024R0087 0008.docx DOCX document
36C26024R0087 0007.docx DOCX document
Attachment 9 VANC Dental B20 Drawings AD101 A-601 and A-603 response to prebid questions.pdf PDF
36C26024R0087 0006 Attach 3 Site Visit Sign in Sheet.pdf PDF
Attachment 7 Dental Air Compressor AC-1specs.pdf PDF
Attachment 6 Seed Project Price Breakout Revised 5.6.25.xlsx XLSX spreadsheet
Attachment 5 Past Performance Questionnaire 5.9.25.docx DOCX document
36C26024R0087 0006 Attach 2 Photos of B20 Mech RM 237.pdf PDF
Attachment 1 648-22-100 VA Vancouver Consolidate Dental B20 4.23.25.pdf PDF
36C26024R0087 0006 Attach 4 Seed Project Question and Answers.docx DOCX document
36C26024R0087 0006 Attach 1 RFP Questions 5.7.25.docx DOCX document
Attachment 8 A-dec-DV5 Compressor and Dry Vacuum cut sheet.pdf PDF
36C26024R0087 0006.docx DOCX document
36C26024R0087 0005 Attach 1 RFP Questions 4 24 25.docx DOCX document
36C26024R0087 0005 Attach 2 VAAR 852.219-75 VA Notice of LOS - Certicate of Compliance for Services and Construction Jan 2023 Deviation.docx DOCX document
36C26024R0087 0005.docx DOCX document
36C26024R0087 0004 Attachment 1 RFP Questions 4 22 25.docx DOCX document
36C26024R0087 0004 Attachment 2 CON MATOC pre-proposal meeting attendees.docx DOCX document
36C26024R0087 0004.docx DOCX document
RFP Questions 4.14.25.docx DOCX document
36C26024R0087 0003.docx DOCX document
36C26024R0087 Conformed 4.10.25.docx DOCX document
Attachment 5 Past Performance Questionnaire 4.10.25.docx DOCX document
Panographic backing detail.docx DOCX document
RFP Questions 4.10.25.docx DOCX document
36C26024R0087 0002.docx DOCX document
36C26024R0087 0001.docx DOCX document
36C26024R0087 4.1.25.docx DOCX document
Attachment 1 648-22-100 VA Vancouver Consolidate Dental B20-Specs.pdf PDF
Attachment 6 Seed Project Price Breakout.xlsx XLSX spreadsheet
Attachment 4 648-22-100 Vancouver WA consolidate Dental Building B20 - MATOC Seed Project SOW 10.9.24.docx DOCX document
36C26024R0087.docx DOCX document
Attachment 5 Past Performance Questionnaire 11.5.24.docx DOCX document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

Room Name

Ref

A101

A7.01 1

A7.024

ROOM NAME AND NUMBER

SECTION CALLOUT

MARK

DETAIL CALLOUT MARK

EXTERIOR OR INTERIOR

ELEVATION CALLOUT MARK

INTERIOR ELEVATION

CALLOUT MARK

DOOR TAG

MATERIAL FINISH TAG

WALL TYPE TAG

PHOTO TAG INDICATOR

A1 A-101

PL1

SIGNAGE TAGSN-X

1t 1' - 0" x 1' - 0"

1i

WINDOW TYPE TAG WITH SIZE (WxH)

EQUIPMENT TAG

TEMPORARY WALL CONSTRUCTION

ON RCP - INDICATES WALLS EXTEND

TO THE ROOF OR FLOOR DECK ABOVE

7"

EXISTING DIMENSIONS - TYP FROM

FINISH FACE OF EXG MATERIALS

FD FLOOR DRAIN - REF PLUMBING DWGS

B

THIS PROJECT GENERALLY CONSISTS OF PROVIDING ALTERATIONS AND

FINISHES TO BUILDING 20 SECOND FLOOR EYE CLINIC SUITE AT THE VA

PORTLAND HEALTHCARE SYSTEM, VANCOUVER CAMPUS

PROJECT WILL RE-CREATE THE 5 TREATMENT AND SUPPORTING ROOMS

FROM BLDG. 15 AT BLDG. 20. THE NEW ROOMS SHALL BE ENCLOSED FOR

RESPIRATORY ISOLATION WITH DOORS.

THE PROJECT WILL INCLUDE:

• ALTERATIONS OF THE VACANT EYE CLINIC SPACE IN BUILDING 20.

DENTAL WILL THEN OCCUPY ALL OF BUILDING 20 SECOND FLOOR.

• PROVIDE DENTAL MED GAS, PANOGRAPHIC X-RAY, SOILED AND CLEAN

LINEN UTILITY CLOSETS, INSTRUMENT STORAGE, OMNICELL STORAGE,

MEDS CLOSET, DENTAL LAB, AND DENTAL STAFF WORKSPACE.

• PROVIDE ALL PERMANENTLY INSTALLED FINISHES. IN GENERAL, DOORS

WILL BE SLIDING DOORS WITH SELF CLOSERS AND HOLD OPENS,

CEILINGS WILL BE SUSPENDED ACOUSTICAL PANELS, WALLS WILL BE

METAL STUD WITH GYPSUM BOARD AND PAINTED FINISH, STORAGE ROOM

AND CORRIDOR WALLS WILL HAVE HIGH IMPACT RESISTENT

WAINSCOTING, FLOOR WILL BE RESILIENT FLOORING. RESTROOMS WILL

HAVE CERAMIC TILE FLOORS AND WAINSCOTING.

• PROVIDE ALL WATER, DRAIN, DENTAL AIR, VACCUUM, GAS, POWER,

DATA, AND LOW VOLTAGE CONNECTIONS FOR VA PROVIDED EQUIPMENT

INCLUDING DENTAL CHAIRS, CABINETS WITH SINKS, X-RAY EQUIPMENT.

NEW ELECTRICAL WORK WILL INCLUDE REMOVING WIRING AND CONDUIT

CORRESPONDING TO WALLS BEING REMOVED; REMOVING DATA AND

POWER OUTLETS; AND ADDING NEW DATA AND POWER OUTLETS IN NEW

WALLS. NEW CIRCUITING WILL BE REQUIRED. ALL LIGHTING FIXTURES,

SWITCHES, AND OCCUPANCY SENSORS WILL BE REPLACED.

HVAC WORK INCLUDES RELOCATING EXISTING DUCTING AND CEILING

MOUNTED SUPPLY AND RETURN GRILLES, NEW SUPPLY AND RETURN

GRILLES WITH ASSOCIATED DUCTWORK AND BALANCING DAMPERS, AND

PRE AND POST CUSTRUCTION TESTING ADJUSTING AND BALANCING OF

VAV TERMINAL UNITS, AND SUPPLY AND RETURN GRILLES.

FIRE SPRINKLER HEADS WILL NEED TO BE MOVED AND/OR REPLACED TO

MATCH THE NEW ROOM CONFIGURATIONS. CALCULATIONS TO VERIFY

NEW HEAD LOCATIONS WILL BE REQUIRED. A LICENSED FIRW

PROTECTION CONTRACTOR WILL BE REQUIRED TO PERFORM THIS WORK.

FIRE ALARM SYSTEM WORK INCLUDES THE ADDITION AND RELOCATION

OF NOTIFICATION APPLIANCES (HORN/STROBES) AS NOTED ON PLANS.

PROVIDE ADDITIONAL FA SYSTEM COMPONENTS AND POWER SUPPLIES

AS REQUIRED. NEW EQUIPMENT SHALL MATCH EXISTING

MANUFACTURER, MODEL, AND DEVICE COLORS. PROVIDE RACEWAY,

BACKBOXES, WIRING, NOTIFICAITON APPLIANCES, FIELD TERMINATIONS,

PROGRAMMING, AND UPDATED BATTERY AND VOLTAGE DROP

CALCULATIONS. DURING THE CONSTRUCTION PERIOD, A FIRE

WATCH/GUARDS TOUR SHALL BE REQUIRED WHENEVER THE FIRE ALARM

SYSTEM IS NOT FULLY OPERATIONAL.

PROJECT

LOCATION

CONTRACTOR SHALL FURNISH THE RESIDENT ENGINEER WITH

A SCHEDULE OF PHASING DATES ON WHICH THE CONTRACTOR

INTENDS TO ACCOMPLISH WORK IN THE BUILDING OR PORTION

THEREOF. ARRANGE SUCH DATES TO INSURE

ACCOMPLISHMENT OF THIS WORK IN SUCCESSIVE PHASES

MUTUALLY AGREEABLE TO MEDICAL CENTER DIRECTOR USING

THE FOLLOWING PHASING OUTLINE:

Phase 1 – Majority of Demolition and New Construction .

1. Install temporary construction wall along the corridor, allowing access to both existing restrooms. Remove two windows for material disposal and negative air pressure.

2. Demolition in entire area behind the construction wall.

3. New construction in entire area behind the construction wall.

Phase 2 – New restroom and Meds room

1. Remove temporary construction wall and replace to allow use of the new West Restroom by the public.

2. Complete demolition where Meds room and new restroom will be built.

3. New Construction of Meds Room and East Restroom.

4. Reinstall glazing in removed windows.

5. Remove temporary construction wall.

1. THESE DRAWINGS ARE SUPPLIED TO THE CONTRACTOR AND

OTHERS FOR THEIR USE FOR THIS SPECIFIC PROJECT.

2. THE ORGANIZATION OF DOCUMENTS ARE NOT INTENDED TO

CONTROL THE DIVISION OF WORK. DIVISION OF WORK SHALL BE

THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

3. DIMENSIONS ARE TO FACE OF FINISH AT EXISTING REMAINING

WALLS, FACE OF STUD AT NEW WALLS, OR CENTERLINE OF

COLUMNS, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL VERIFY DIMENSIONS, REQUIRED

CLEARANCES, AND POWER AND HVAC REQUIREMENTS FOR ALL

ITEMS. NOTIFY COR AND ENGINEER OF RECORD OF ANY

DISCREPANCIES PRIOR TO COMMENCEMENT OF WORK.

5. DO NOT SCALE DRAWINGS; VERIFY ALL DIMENSIONS PRIOR TO

CONSTRUCTION.

6. NO CHANGES ARE BEING MADE TO THE STRUCTURE OF THE

BUILDING.

7. FIRE PROTECTION SYSTEM MUST REMAIN FULLY OPERATIONAL

DURING CONSTRUCTION.

8. THE FIRE SPRINKLER SYSTEM WILL REQUIRE CHANGES FOR

THE NEW LAYOUT. CONTRACTOR IS RESPONSIBLE FOR

REPAIRING ANY DAMAGE DONE TO SPRINKLER HEADS OR OTHER

SYSTEM APPURTANENCES DURING CONSTRUCTION.

CONTRACTOR IS RESPONSIBLE FOR RELOCATION OF HEADS

REQUIRED TO BE MOVED FOR NEW CONSTRUCTION. A LICENSED

FIRE PROTECTION CONTRACTOR SHALL BE RETAINED FOR ALL

WORK TO BE DONE ON THE FIRE PROTECTION SYSTEM.

9. A RATED CONSTRUCTION BARRIER MUST BE PROVIDED

UNLESS THE COR (AND/OR VISN SAFETY ENGINEER) CONCURS

THAT THE CONSTRUCTION WORK IS NO MORE HAZARDOUS THAN

NORMAL OPERATIONS. EXISTING WALLS CREDITED AS PART OF A

RATED CONSTRUCTION BARRIER MUST BE CONFIRMED TO

EXTEND TO THE DECK ABOVE WITH ALL PENETRATIONS

FIRESTOPPED. IF WALL UPGRADES ARE REQUIRED TO ESTABLISH

THE RATED CONSTRUCTION BARRIER, IDENTIFY THIS WORK ON

THE DRAWING.

(ICRA BARRIER REQUIREMENTS ARE DETERMINED BY THE

MEDICAL CENTER’S INFECTION CONTROL PROCESS.)

THE RATED BARRIER REQUIREMENT CAN BE ELIMINATED IF THE

SPRINKLERS IN THE CONSTRUCTION AREAS REMAIN IN SERVICE,

BUT CEILING REMOVAL WOULD RENDER THEM INEFFECTIVE SUCH

THAT TEMPORARY UPRIGHT SPRINKLERS WOULD HAVE TO BE

INSTALLED IF CEILING REMOVAL LASTS MORE THAN A SHIFT.

10. CONTRACTOR SHALL PATCH AND REPAIR ALL FINISHES

SCHEDULED TO REMAIN WHERE DEMOLITION AND/OR NEW WORK

IS TAKING PLACE. THIS INCLUDES WALL SUBSTRATES AND

FINISHES, CEILING MATERIALS AND FINISHES, AND FLOOR

SUBSTRATES AND FINISHES. WHERE NOT INDICATED

OTHERWISE, REPAIR SHALL MATCH ADJACENT SUBSTRATE,

MATERIALS, TEXTURE, PATTERN, COLOR, AND FINISH. WHERE

PATCHED AREA FINISHES DO NOT MATCH EXACTLY, THE ENTIRE

AREA SHALL BE REPAIRED / REPLACED / REFINISHED TO PROVIDE

A UNIFORM FINISH.

11. SYSTEMS FURNITURE DESKS, CHAIRS, FREE-STANDING

STORAGE UNITS, MOST MEDICAL EQUIPMENT, ETC ARE NOT

INCLUDED IN THE BASE CONTRACT, EXCEPT AS SHOWN.

CONTRACTOR FURNISHED AND INSTALLED EQUIPMENT IS

INDICATED ON THE PLANS AND IN THE EQUIPMENT SCHEDULE AS

C / C. VA FURNISHED AND INSTALLED EQUIPMENT IS SHWN IN THE

EQUIPMENT SCHEDULE AS V / V. EQUIPMENT MARKED AS V / C

WILL BE FURNISHED BY THE VA AND INSTALLED BY THE

CONTRACTOR.

1/ 2' 0'

1' 4'

4' 8'

4' 2'

2'

1/ 8' 0'

1' 0' 0'

1/ 4' 0'

1' 2'

1' 1/ 2'

2' 1/ 2'

1' 0'

3' 0'

1'

3/ 8' 0'

1'

2' 4'

1/ 2' 0'

2'

1/ 2'

1' 3'

6' 0'

1/ 4"

1/ 2"

8' 8'

1/ 0'

Project No.

Building Number Drawing No.

Project Title

Location

Date:

Checked By/Proj.Mgr Drawn By

Drawing Title

Approved: VAPORHCS Director

VA FORM 08 - 6231

A

VA Portland Health Care System

(VAPORHCS)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Approved: Chief Facilities MgmtApproved: Service Chief

Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.

B20

Sheet of

ISSUED FOR CONSTRUCTION

C :\U se rs

\la ur i\O ne

D riv e\ d2

L- Pr oj ec ts \2

7-

1_

Va nc

B

D en ta l\0

4- D

ES

IG

N \R

EV

IT

\2

7-

1_

VA

N C

D en ta l B

O

PT

n ew

.rv t

8/

/2

9:

:1

AM

G-101

COVER SHEET- GENERAL INFORMATION

BLUE TRIDENT, LLC

900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110

(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME

Renovate Building 20 in Vancouver to Consolidate Dental Services

VANCOUVER, WA

648-22-100

15 AUG 2024

EB LMS

DRAWING ABBREVIATIONS DRAWING SYMBOLS

A

ACT ACOUSTICAL CEILING TILE

ADJ ADJACENT

AFF ABOVE FINISH FLOOR

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANNODIZED

APPROX APPROXIMATE

B

BD BOARD

BF BRACE FRAME

BLDG BUILDING

BLKG BLOCKING

BOD BOTTOM OF DECK

BOT BOTTOM

C

C / C CONTRACTOR FURNISHED /

CONTRACTOR INSTALLED

CAB CABINET(S)

CFM CUBIC FEET PER MINUTE

CJ CONROL JOINT

CL CENTER LINE

CLG CEILING

CLO CLOSET

CLR CLEAR

COL COLUMN

CONC CONCRETE

COR CONTRACTING OFFICERS

REPRESENTATIVE

CORR CORRIDOR

CPT CARPET

CT CERAMIC TILE

D

DA DENTAL AIR

DBL DOUBLE

DEG DEGREE

DEMO DEMOLITION

DF DRINKING FOUNTAIN

DIA DIAMETER

DIFF DIFFERENCE

DIM DIMENSION

DISP DISPENSER / DISPOSAL

DN DOWN

DWG DRAWING(S)

E

EA EACH

G-101 COVER SHEET- GENERAL INFORMATION

G-102 OVERALL EXISTING FLOOR PLANS - FOR REFERENCE ONLY

G-103 LIFE SAFETY PLAN

AD100 DEMOLITION FLOOR PLAN

AD101 DEMOLITION CEILING PLAN

A-110 DENTAL CLINIC FLOOR PLAN

A-120 REFLECTED CEILING PLAN

A-130 ENLARGED PLANS

A-300 CLINIC SECTIONS

A-600 DOOR SCHEDULE AND MISC DETAILS

A-601 ROOM FINISH AND WALL SCHEDULE AND CASEWORK

DETAILS

A-602 SIGNAGE

A-603 FF&E PLAN AND EQUIPMENT SCHEDULE

A-801 INTERIOR ELEVATIONS

A-802 INTERIOR ELEVATIONS

A-803 INTERIOR ELEVATIONS

A-804 INTERIOR ELEVATIONS

S-101 GENERAL NOTES, FRAMING PLAN, AND DETAILS

P-000 GENERAL NOTES, ABBREVIATIONS AND SHEET INDEX

PD101 PLUMBING DEMOLITION - FIRST FLOOR PLAN

PD102 PLUMBING DEMOLITION - SECOND FLOOR PLAN

P-101 PLUMBING FIRST FLOOR PLAN

P-102 PLUMBING SECOND FLOOR PLAN

PG101 PLUMBING DENTAL GASES - FIRST FLOOR PLAN

PG102 PLUMBING DENTAL GASES - SECOND FLOOR PLAN

PG103 PLUMBING DENTAL GASES - SECOND FLOOR PLAN NORTH

PG104 PLUMBING DENTAL GASES - SECOND FLOOR PLAN SOUTH

P-501 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

M-000 GENERAL NOTES, ABBREVIATIONS AND SHEET INDEX

M-001 MECHANICAL LEGEND

MD101 MECHANICAL DEMOLITION - SECOND FLOOR PLAN

MH101 MECHANICAL - SECOND FLOOR PLAN

MH111 MECHANICAL - SECOND FLOOR ZONING PLAN

MP101 MECHANICAL PIPING - SECOND FLOOR PLAN

M-302 MECHANICAL SECTIONS

M-401 MECHANICAL ENLARGED PLANS

M-501 MECHANICAL DETAILS

M-550 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-801 MECHANICAL SEQUENCE OF OPERATIONS

M-802 MECHANICAL SEQUENCE OF OPERATIONS

E-000 GENERAL NOTES, ABBREVIATIONS AND SHEET INDEX

E-001 ELECTRICAL LEGEND

ED101 ELECTRICAL DEMOLITION - SECOND FLOOR PLAN

EL101 ELECTRICAL LIGHTING - SECOND FLOOR PLAN

EP100 ELECTRICAL EXISTING - OVERALL FLOOR PLANS

EP102 ELECTRICAL POWER - SECOND FLOOR PLAN

E-401 ELECTRICAL ENLARGED PLANS

EL601 ELECTRICAL LIGHTING SCHEDULE

EP602 ELECTRICAL SCHEDULES

FP000 GENERAL NOTES, ABBREVIATIONS AND SHEET INDEX

FPD102 FIRE PROTECTION DEMOLITION - SECOND FLOOR PLAN

FP102 FIRE PROTECTION - SECOND FLOOR PLAN

INDEX OF DRAWINGSGENERAL NOTES

RENOVATE BUILDING 20 IN VANCOUVER TO CONSOLIDATE DENTAL SERVICES

VA Portland Healthcare System

DEPARTMENT OF VETERANS AFFAIRS - VANCOUVER CAMPUS

PROJECT NUMBER 648-22-100

PROJECT TEAM

PRIME CONTRACT HOLDER,

BLUE TRIDENT, LLC

7829 NE ESPERIONE LN, BAINBRIDGE ISLAND, WA 98110

p.206-972-0645 P.O.C. Emmanuel (Manny) Bautista, PE, F.SAME

ELECTRICAL ENGINEER

SAZAN ENGINEERS, INC

600 STEWART ST, STE 1400, SEATTLE, WA 98101

p.206-267-1700

WWW.SAZAN.COM

MECHANICAL ENGINEER

SAZAN ENGINEERS, INC

600 STEWART ST, STE 1400, SEATTLE, WA 98101

p.206-267-1700

WWW.SAZAN.COM

ELEC ELECTRIC

EQ EQUAL

EQUIP EQUIPMENT

EXG EXISTING

EXP JT EXPANSION JOINT

EXT EXTERIOR

F

FACP FIRE ALARM CONTRL PANEL

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FLOOR

FIN FINISH

FLR FLOOR

FOC FACE OF CABINET

FOF FACE OF FINISH

FOS FACE OF STUD

FOW FACE OF WALL

G

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GEN GENERAL

GLU-LAM GLUE LAM BEAM

GWB GYPSUM WALL BOARD

GYP GUPSUM

H

HDWR HARDWARE

HM HOLLOW METAL

HOP HIGHEST OPERABLE PART

HORIZ HORIZONTAL

HVAC HEATING VENTILATION AIR

CONDITIONING

I

IBC INTERNATIONAL BUILDING

CODE

ID INTERIOR DESIGN

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

J

JAN JANITOR

JT JOINT

K

KIT KITCHEN

L

LAM LAMINATED

LAV LAVATORY

LF LINEAR FEET

LIN LINOLEUM

M

MATL MATERIAL

MAX MAXIMUM

MBL MARBLE

MDF MEDIUM DENSITY FIBERBOARD

MECH MECHANICAL

MFG MANUFACTURER

MIN MINIMUM

MIR MIRROR

MISC MISCELLANEOUS

MS METAL STUD

MTD MOUNTED

MTL METAL

N

NA NOT APPLICABLE

NAP NAPKIN

NIC NOT IN CONTRACT

NOM NOMINAL

NTS NOT TO SCALE

O

OC ON CENTER

OD OUTSIDE DIAMETER

OH OVERHEAD

OPNG OPENING

OPP OPPOSITE

ORIG ORIGINAL

P

PAF POWER ACTIVATED

FASTENERS

PLAM PLASTIC LAMINATE

PLWD PLYWOOD

PREFAB PRE FABRICATED

PREFIN PRE FINISHED

PT PAINT

PTD PAPER TOWEL DISPENSER

PTN PARTITION

Q

QT QUARRY TILE

R

R RETURN AIR

RAD RADIUS

RB RUBBER

RCP REFLECETED CEILING PLAN

REF REFERENCE

REINF REINFORCING

REQD REQUIRED

RESIL RESILIENT

S

S SUPPLY AIR

SAN SANITARY

SCHED SCHEDULE

SD SOAP DISPENSER

SF SQUARE FOOT

SHT SHEET

SHWR SHOWER

SIM SIMILAR

SLIN SHEET LINOLEUM

SND SANITARY NAPKIN DISPOSAL

SS SOLID SURFACE

SST STAINLESS STEEL

STD STANDARD

STL STEEL

STO STORAGE

STS SELF TAPPING SCREW

T

TAB TESTING, ADJUSTING,

BALANCING

TB TOWEL BAR

TEMP TEMPORARY

THK THICK

THRU THROUGH

TLT TOILET

TO TOP OF

TPD TOILET PAPER DISPENSER

TPTN TOILET PARTITION

TR TRASH RECEPTACLE

TYP TYPICAL

TZO TERRAZZO

U

UC UNDER COUNTER / UNDER

CABINET

UNFIN UNFINISHED

UON UNLESS OTHERWISE NOTED

V

V / C VA FURNISHED / CONTRACTOR

INSTALLED

V / V VA FURNISHED / VA INSTALLED

VAR VARIES

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

W

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WD WOOD

WR WATER RESISTANT

WWF WELDED WIRE FABRIC

COST ESTIMATOR

OCMI

2033 6TH AVE, SUITE 600 SEATTLE, WA 98121

P.206.395.9738

WWW.OCMI.COM

PLAN PERSPECTIVE

VICINITY MAP

PM, STRUCTURAL ENGINEER

BLUE TRIDENT, LLC

7829 NE ESPERIONE LN

BAINBRIDGE ISLAND, WA 98110

p.206-972-0645 P.O.C. Brian Moll, PE, SE

ARCHITECT

BLUE TRIDENT, LLC

7829 NE ESPERIONE LN

BAINBRIDGE ISLAND, WA 98110

p.206-972-0645 P.O.C. Lauri Strauss, AIA, LEED AP BD&C

SCOPE OF WORK

PHASING PLAN OUTLINE

Revisions: Date:

VHAPORMAJORM

Text Box ALL WORK TO OCCUR AFTER 4:30PM AND FINISH BY 5:00AM MONDAY THROUGH SUNDAY. ALL MEDICAL CENTER ACTIVITIES WILL REMAIN OPEN THROUGHOUT THE DURATION OF THE CONSTRUCTION. CONTRACTOR TO ENSURE THAT ALL MEDICAL CENTER ACTIVITIES REMAIN UNIMPEDED BY CONSTRUCTION ACTIVITIES.

BA.8 B.5 B.9 C C.4 C.5 D D.7 EA.7

BA.8 B.5 B.9 C C.4

C.5

C.5 D D.7 EA.7

3' - 1" 8' - 7" 16' - 7" 19' - 9" 2' - 8" 20' - 1" 1' - 4" 16' - 7" 14' - 2" 6' - 3 1/2"

77' - 0"

80' - 0"

1' - 6"1' - 6"

1'

- 6

8"

7"

1/ 2' 0'

1' 4'

4' 8'

4' 2'

2'

1/ 8' 0'

1' 0' 0'

1/ 4' 0'

1' 2'

1' 1/ 2'

2' 1/ 2'

1' 0'

3' 0'

1'

3/ 8' 0'

1'

2' 4'

1/ 2' 0'

2'

1/ 2'

1' 3'

6' 0'

1/ 4"

1/ 2"

8' 8'

1/ 0'

Project No.

Building Number Drawing No.

Project Title

Location

Date:

Checked By/Proj.Mgr Drawn By

Drawing Title

Approved: VAPORHCS Director

VA FORM 08 - 6231

A

VA Portland Health Care System

(VAPORHCS)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Approved: Chief Facilities MgmtApproved: Service Chief

Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.

B20

Sheet of

ISSUED FOR CONSTRUCTION

C :\U se rs

\la ur i\O ne

D riv e\ d2

L- Pr oj ec ts \2

7-

1_

Va nc

B

D en ta l\0

4- D

ES

IG

N \R

EV

IT

\2

7-

1_

VA

N C

D en ta l B

O

PT

n ew

.rv t

8/

/2

9:

:1

AM

G-102

OVERALL EXISTING FLOOR PLANS - FOR

REFERENCE ONLYBLUE TRIDENT, LLC

900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110

(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME

Renovate Building 20 in Vancouver to Consolidate Dental Services

VANCOUVER, WA

648-22-100

15 AUG 2024

EB LMS

1/8" = 1'-0"F6 FIRST FLOOR PLAN 1/8" = 1'-0"F3 OVERALL SECOND FLOOR PLAN

Revisions: Date:

FD FDFDFD

FD

B

FECe

FEC

A.8 B.5 B.9 C C.4C.5 D D.7A.7

131 SF

TRTMNT

127 SF

TRTMNT

199 SF

SURGERY

127 SF

TRTMNT

127 SF

TRTMNT

178 SF

OFFICE

375 SF

CORR

C2.03

49 SF

ALCOVE 2

C2.04

48 SF

TOILET

59 SF

STAFF TOILET

79 SF

LAB

47 SF

SOILED

43 SF

MEDS

63 SF

STERILE

INSTRUMENTS

63 SF

PANO

39 SF

CORR

C2.02

79 SF

STORAGE

200 63 SF

OMNICELL

SUPPLY

EXISTING STAIRS

EXISTING FRE PARTITION

EXISTING ONE-HOUR RATED FIRE PARTITION -

MAINTAIN INTEGRITY - NO NEW PENETRATIONS

FEC

2' - 1"1 1/4"

SMOKE PARTITION

REFERENCE NFPA 8.4

1-HR FIRE RESISTANT

RATED BARRIER

2-HR FIRE RESISTANT

RATED BARRIER

HORIZONTAL SMOKE

BARRIER CEILING

ASSEMBLY

HORIZONTAL 1-HR FIRE-

RESISTANT RATED

ASSEMBLY (ABOVE)

STAIRS

LIFE/SAFETY LEGEND

BUILDING EXIT

EXIT ROUTE

FEC (NEW)

FECe (EXISTING)

1/ 2' 0'

1' 4'

4' 8'

4' 2'

2'

1/ 8' 0'

1' 0' 0'

1/ 4' 0'

1' 2'

1' 1/ 2'

2' 1/ 2'

1' 0'

3' 0'

1'

3/ 8' 0'

1'

2' 4'

1/ 2' 0'

2'

1/ 2'

1' 3'

6' 0'

1/ 4"

1/ 2"

8' 8'

1/ 0'

Project No.

Building Number Drawing No.

Project Title

Location

Date:

Checked By/Proj.Mgr Drawn By

Drawing Title

Approved: VAPORHCS Director

VA FORM 08 - 6231

A

VA Portland Health Care System

(VAPORHCS)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Approved: Chief Facilities MgmtApproved: Service Chief

Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.

B20

Sheet of

ISSUED FOR CONSTRUCTION

C :\U se rs

\la ur i\O ne

D riv e\ d2

L- Pr oj ec ts \2

7-

1_

Va nc

B

D en ta l\0

4- D

ES

IG

N \R

EV

IT

\2

7-

1_

VA

N C

D en ta l B

O

PT

n ew

.rv t

8/

/2

9:

:1

AM

G-103

LIFE SAFETY PLAN

BLUE TRIDENT, LLC

900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110

(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME

Renovate Building 20 in Vancouver to Consolidate Dental Services

VANCOUVER, WA

648-22-100

15 AUG 2024

EB LMS

1/4" = 1'-0"F4 DENTAL 2nd FLOOR AREA A CODE PLAN

OCCUPANCY CALCULATIONS

RM

NUM ROOM NAME

NET

AREA

OCCUPANT

LOAD TOTAL

200 STORAGE 79 SF 300 1

201 TRTMNT 131 SF 60 3

202 PANO 63 SF 100 1

203 TRTMNT 127 SF 60 3

204 STERILE INSTRUMENTS 63 SF 300 1

205 OFFICE 178 SF 100 2

206 OMNICELL SUPPLY 63 SF 300 1

207 TRTMNT 127 SF 60 3

208 SOILED 47 SF 300 1

209 TRTMNT 127 SF 60 3

210 LAB 79 SF 300 1

211 SURGERY 199 SF 60 4

212 STAFF TOILET 59 SF

213 MEDS 43 SF 300 1

214 TOILET 50 SF

215 TOILET 48 SF

C2.01 ALCOVE 1 18 SF

C2.02 CORR 39 SF

C2.03 CORR 375 SF

C2.04 ALCOVE 2 49 SF

1962 SF

24 OCC's

2 2

CR

DCES

REX

REX

ES DC

CR

BA.8 B.5 B.9 C C.4 C.5 DA.7

3' - 1" 8' - 7" 16' - 7" 19' - 9" 2' - 8" 20' - 1" 1' - 4" 16' - 7"

77' - 0"

80' - 0"

1' - 6"1' - 6"

1'

- 6

9' - 6"

5'

- 7

6'

- 4

5'

- 3

1/ 2"

6'

- 5

4' - 0 1/2"5' - 9" 8' - 8 1/2" 3' - 0" 9' - 1" 8' - 9" 3' - 0" 9' - 2"

2'

- 9

5'

- 0

9'

- 4

15' - 11 1/2" 5' - 6" 13' - 10" 8' - 4" 6' - 0" 6' - 5" 5' - 11 1/2"

3'

- 1

1'

- 2

5' - 11"

5' - 0"

1'

- 6

3'

- 8

1'

- 4

4"

1'

- 4

3'

- 8

3' - 0" 3' - 8" 1' - 4" 3' - 8" 3' - 0"1' - 4"26' - 8" 1' - 4" 3' - 8" 1' - 4" 31' - 0"

3'

- 4

3'

- 8

1'

- 4

4"

1'

- 4

3'

- 8

3'

- 4

PHASE 1 DEMOLITION

PHASE 2 DEMOLITION -

SHADED - IS TO REMAIN

OPERATIONAL DURING

PHASE 1 DEMOLITION

AND CONSTRUCTION

DASHED LINES INDICATE EXTENT OF DEMOLITION INCLUDING

WALLS, DOORS, FRAMES, PLUMBING FIXTURES, CASEWORK,

AND OTHER WALL MOUNTED APPURTENANCES, TYPICAL

CONSTRUCT TEMPORARY WALL AS SHOWN WITH BLUE

DASHED LINES PRIOR TO BEGINNING DEMOLITION - ADD

TEMP DOOR FOR CONTRACTORS ENTRANCE - AT

CONTRACTORS OPTION, THE PERMANANT WALL (TYPE AS

SCHEDULED) CAN BE INSTALLED THIS LOCATION.

CONSTRUCT TEMPORARY WALL AS SHOW WITH BLUE DASHED LINES PROR

TO BEGINNING DEMOLITION

REMOVE ALL RESILIENT FLOOR FINISHES IN THIS AREA -

REMOVE TILE FLOOR, BASE AND WAINSCOT IN TOILET ROOM

CONTRACTOR MAY REMOVE THE GLASS

AND VERTICAL MULLION FROM THESE TWO

WINDOWS AND USE THE OPENING TO

BRING IN MATERIALS, EQUIPMENT, AND

CREATE NEGATIVE AIR PRESSURE FOR

SPACE DURING CONSTRUCTION - NOTE

THE GLASS WILL NEED TO BE

REINSTALLED WITH NEW GLAZING AND

SEALANT UPON CONSTRUCTION

COMPLETION

6'

- 0

MI

N

REMOVE EXISTING CLERESTORY WINDOWS ON THIS WALL AND

PREP OPENING FOR INFILL

REFERENCE MEP DEMOLITION DRAWINGS

FOR REMOVAL OF PLUMBING FIXTURES, AIR

GRILLS, OUTLETS AND DEVICES

EXISTING EXPOSED STRUCTURAL BRACING AND

COLUMNS TO REMAIN

PROVIDE PORTABLE FIRE EXTINGUISHER MOUNTED ON

TEMPORARY WALL FOR THE DURATION OF CONSTRUCTION

ACTIVITIES

REMOVE EXISTING ITEMS ON WALL SUCH AS WALL SCONCES, SIGNS, DISPLAY

CABINETS, ETC AND SALVAGE FOR REINSTALLATION UPON COMPLETION OF

CONSTRUCTION.

3' - 4"EXG FEC TO REMAIN

REMOVE TILE FLOOR, BASE AND

WAINSCOT IN TOILET ROOMS

PROTECT EXISTING FLOOR TO REMAIN DURING CONSTRUCITON

OPERATIONS THIS AREA

G

J

F

A

B

A

E

Dsim

D

Dsim

H

REMOVE EXISTING WINDOW SHADES AND

SALVAGE FOR REINSTALLATION UPON

COMPLETION OF CONSTRUCTION - SOME BLINDS

WILL BE MODIFIED AND REINSTALLED - SEND TO

MANUFACTURER FOR MODIFICATION

REMOVE EXISTING WINDOW SHADES

AND SALVAGE FOR REINSTALLATION

UPON COMPLETION OF

CONSTRUCTION - SOME BLINDS WILL

BE MODIFIED AND REINSTALLED -

SEND TO MANUFACTURER FOR

MODIFICATION

REMOVE EXISTING WINDOW SHADE AND SALVAGE FOR REINSTALLATION UPON

COMPLETION OF CONSTRUCTION - SOME BLINDS WILL BE MODIFIED AND

REINSTALLED - SEND TO MANUFACTURER FOR MODIFICATION

REMOVE EXISTING WINDOW SHADES - SOME

BLINDS WILL BE MODIFIED AND REINSTALLED -

SEND TO MANUFACTURER FOR MODIFICATION

REMOVE EXISTING WINDOW SHADES - SOME

BLINDS WILL BE MODIFIED AND REINSTALLED -

SEND TO MANUFACTURER FOR MODIFICATION

REMOVE EXISTING WINDOW SHADE -

SOME BLINDS WILL BE MODIFIED AND

REINSTALLED - SEND TO

MANUFACTURER FOR MODIFICATION

REMOVE EXISTING

WINDOW SHADES AND

SALVAGE FOR

REINSTALLATION

UPON COMPLETION OF

CONSTRUCTION

9' - 1 3/8" +/-5' - 6"40' - 6 1/2"8' - 3 83/256" 13' - 2 45/256"

CONSTRUCT TEMPORARY

WALL AS SHOWN WITH BLUE

DASHED LINES PROR TO

BEGINNING DEMOLITION

REMOVE EXISTING CEILING TILES

AND ALL OTHER CEILING

MOUNTED ITEMS BETWEEN

TEMP. AND EXISTING WALLS

SUCH AS SIGNAGE AND SALVAGE

FOR REINSTALLATION UPON

COMPLETION OF

CONSTRUCTION.

REMOVE EXISTING ITEMS ON

WALL SUCH AS WALL SCONCES,

SIGNS, DISPLAY CABINETS, ETC

AND SALVAGE FOR

REINSTALLATION UPON

COMPLETION OF CONSTRUCTION.

EXG FEC TO REMAIN - REMOVE

DURING CONSTRUCTION AND

REINSTALL

REMOVE EXISTING WINDOW

SHADES AND SALVAGE FOR

REINSTALLATION UPON

COMPLETION OF CONSTRUCTION,

TYP

SIMILAR FINISHES AND FIXTURES AT

EXISTING PUBLIC TOILET ROOM TO

REMAIN OPERATIONAL DURING

DEMOLITION AND RECONSTRUCTON

OF NEW CLINIC

ALL FIXTURES, FINISHES,

ACCESSORIES ETC TO BE

REMOVED FROM THIS ROOM

EXISTING PANO XRAY IN BUILDING

15 TO BE DISMANTLED AND

RELOCATED TO NEW CLINIC AREA

EXISTING SINK, COUNTER

AND ACCESSORIES TO BE

REMOVED FROM EXG

CORRIDOR

EXISTING BUILT-IN

CABINETS IN

CORRIDOR TO BE

REMOVED - TYP OF 2

EXG CABINET IN ROOM

200 TO BE

COMPLETELY

REMOVED INCLUDING

ACCESSORIES AND

SINK

A B C D E F

G H

EXG STEEL BRACING

TO REMAIN - PAINT TO

MATCH ROOM

1/ 2' 0'

1' 4'

4' 8'

4' 2'

2'

1/ 8' 0'

1' 0' 0'

1/ 4' 0'

1' 2'

1' 1/ 2'

2' 1/ 2'

1' 0'

3' 0'

1'

3/ 8' 0'

1'

2' 4'

1/ 2' 0'

2'

1/ 2'

1' 3'

6' 0'

1/ 4"

1/ 2"

8' 8'

1/ 0'

Project No.

Building Number Drawing No.

Project Title

Location

Date:

Checked By/Proj.Mgr Drawn By

Drawing Title

Approved: VAPORHCS Director

VA FORM 08 - 6231

A

VA Portland Health Care System

(VAPORHCS)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Approved: Chief Facilities MgmtApproved: Service Chief

Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.

B20

Sheet of

ISSUED FOR CONSTRUCTION

C :\U se rs

\la ur i\O ne

D riv e\ d2

L- Pr oj ec ts \2

7-

1_

Va nc

B

D en ta l\0

4- D

ES

IG

N \R

EV

IT

\2

7-

1_

VA

N C

D en ta l B

O

PT

n ew

.rv t

8/

/2

9:

:2

AM

AD100

DEMOLITION FLOOR PLAN

BLUE TRIDENT, LLC

900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110

(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME

Renovate Building 20 in Vancouver to Consolidate Dental Services

VANCOUVER, WA

648-22-100

15 AUG 2024

EB LMS

0 6' 9' 12'3'

Graphic Scale: 1 inch = 3 feet

3/8" = 1'-0"F3 DENTAL 2nd FLOOR AREA A DEMOLITION PLAN

S S SS S S

BA.8 B.5 B.9 C C.4 C.5 DA.7

REMOVE ALL CEILINGS THIS AREA TO INCLUDE SUSPENDED

ACOUSTICAL TILES AND GRIDS, SUSPENDED AND STRUCTURE MOUNTED

GYPSUM BOARD, AND ALL SOFFITS OVER CASEWORK.

REMOVE ALL PERMANENTLY INSTALLED CEILING MOUNTED EQUIPMENT AND

TURN OVER TO THE OWNER - NOT SHOWN FOR CLARITY - VERIFY IN FIELD

SEE ELECTRICAL AND MECHANICAL DRAWINGS FOR OTHER CEILING

MOUNTED ITEMS TO BE REMOVED AND EITHER REINSTALLED IN NEW

LOCATIONS, OR REPLACED WITH NEW MATERIALS.

PHASE 2 DEMOLITION -

SHADED - IS TO REMAIN

OPERATIONAL DURING

PHASE 1 DEMOLITION

AND CONSTRUCTION

PHASE 1 DEMOLITION

CONSTRUCT TEMPORARY WALL AS SHOWN WITH BLUE

DASHED LINES PROR TO BEGINNING DEMOLITION - ADD

TEMP DOOR FOR CONTRACTORS ENTRANCE - AT

CONTRACTORS OPTION, THE PERMANANT WALL (TYPE AS

SCHEDULED) CAN BE INSTALLED THIS LOCATION.

ALIGN TEMPORARY WALL WITH CEILING GRID

REMOVE EXISTING CEILING TILES AND ALL OTHER

CEILING MOUNTED ITEMS AS NECESSARY BETWEEN

TEMP. AND EXISTING WALLS SUCH AS SIGNAGE AND

SALVAGE FOR REINSTALLATION IN THE SAME LOCATION

UPON COMPLETION OF CONSTRUCTION.

REMOVE EXISTING WALL MOUNTED

TELEVISION AND COORDINATE WITH

OWNER FOR NEW PERMANENT LOCATION

J

K

Ksim

F

L

Lsim opp

EXISTING CLERESTORY WINDOW TO BE

REMOVED AND WALL INFILLED

J K

GYPSUM BOARD SOFFIT AT

CORRIDOR CONNERS TO

BE REMOVED

TYPICAL CEILING FINISHES IN

OFFICE SPACES TO BE

DEMOLISHED AND REMOVED

TYPICAL EXISTING WINDOW

MULLION PATTERN - WINDOW

BILNDS TO REMAIN (REMOVE

DURING CONSTRUCTION

OPERATIONS AND REINSTALL)

L 1/ 2' 0'

1' 4'

4' 8'

4' 2'

2'

1/ 8' 0'

1' 0' 0'

1/ 4' 0'

1' 2'

1' 1/ 2'

2' 1/ 2'

1' 0'

3' 0'

1'

3/ 8' 0'

1'

2' 4'

1/ 2' 0'

2'

1/ 2'

1' 3'

6' 0'

1/ 4"

1/ 2"

8' 8'

1/ 0'

Project No.

Building Number Drawing No.

Project Title

Location

Date:

Checked By/Proj.Mgr Drawn By

Drawing Title

Approved: VAPORHCS Director

VA FORM 08 - 6231

A

VA Portland Health Care System

(VAPORHCS)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Approved: Chief Facilities MgmtApproved: Service Chief

Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.

B20

Sheet of

ISSUED FOR CONSTRUCTION

C :\U se rs

\la ur i\O ne

D riv e\ d2

L- Pr oj ec ts \2

7-

1_

Va nc

B

D en ta l\0

4- D

ES

IG

N \R

EV

IT

\2

7-

1_

VA

N C

D en ta l B

O

PT

n ew

.rv t

8/

/2

9:

:2

AM

AD101

DEMOLITION CEILING PLAN

BLUE TRIDENT, LLC

900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110

(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME

Renovate Building 20 in Vancouver to Consolidate Dental Services

VANCOUVER, WA

648-22-100

15 AUG 2024

EB LMS

3/8" = 1'-0"F3 2nd FLOOR CEILING PLAN DEMO

FD FDFDFD

FD

BA.8 B.5 B.9 C C.4 C.5 D

A.7

A.7

D2 A-300

PANO

F7 A-300

SOILED

A-801

E5

E7

E9

E2

A-801

C4

C2

C8

C7

A-801

B5

B7

B9

B2 A-802

F5

F3

F9

F7 A-801

F5

F7F2

F9

TRTMNT

TRTMNT

OFFICE

TRTMNT

MEDS

5'

- 0

6' - 11" 5' - 5 1/2" 8' - 7 1/2" 6' - 10" 1' - 6" 6' - 4" 6' - 0" 6' - 4"

CFS 56x60 CFS 56x60

CFS 48x30

CFS 48x30

TRTMNT

SURGERY

LAB

STAFF TOILET

TOILET

TOILET

STORAGE

CORR

C2.03

STERILE

INSTRUMENTS

6"

11' - 1" 11' - 0" 16' - 9" 11' - 0" 11' - 0"

CFS 48x30

CFS 56x60

CFS 48x30

CFS 48

x30

CFS 48x30

7' - 0"6' - 0 1/2" 7' - 0"

1' - 10"

1'

- 2

CORR

C2.02

ALCOVE 2

C2.04 e218

203B201B 207B 209B

210208204

C2.02

C2.04

201A 203A 207A 209A

8'

- 7

A-802

E1

C9

B1

C7

A-130 F5

A-130 B1

A-130 D3

ALIGN

1'

- 6

7/ 8"

4'

- 5

1/ 8"

A-130 D7

1'

- 6

7/ 8"

4'

- 5

1/ 8"

1'

- 6

4'

- 4

1' - 0"

1'

- 0

ALIGN

A-130 D1

3' - 10 1/2" 3' - 9 1/2" 9 1/2" 3' - 9 1/2"

A-130 D9

A-130 D5

A-802C1

A3

A3

A4

A3

A3

A4

A3

C3

C3

A6

A1

A1 A1

A3

A6

A1

A1

A1

A4

A3 A4

A4

C3

C3 B3

B3

C3

C3

A4

C3

OMNICELL

SUPPLY

THIS AREA - IS TO

REMAIN OPERATIONAL

DURING PHASE 2

DEMOLITION AND

CONSTRUCTION

PHASE 2 DEMOLITION

AND CONSTRUCTION

TEMP WALL

B3

A-130 F1

9' - 0"

2'

- 1

3/ 8"

C3

C3

C6

2'

- 2

4'

- 1 1 1

/2"

1' - 0"

C3

C3

C3

C3

DUCT CHASE

DUCT CHASE

CLEAN LINEN CABINETS

DUCT CHASE

DUCT CHASE

9'

- 9

3/ 4"

C6

C3C3

1' - 9"

CF

S x3

3' - 10"

A-130 D4

A-803

A1

A-803 E1

C3

C1

E3

A-601 D6

5'

- 2

1/ 4"

FEC

EXISTING FEC TO

REMAIN

ALIGN FACE OF NEW

WALL WITH WINDOW

OPENING

7'

- 0

A-803 F3

A-130 F3

3' - 6 1/2" 3' - 4" 3' - 6 1/2" 3' - 4" 3' - 6 1/2"

C5

C3

C6

FEC

1' - 5" 1' - 5"

HAND SINK WITH

EYEWASH

F1

2' - 6"

A3

A3

A4A4

1' - 3 5/8"

A-804

E7

E9

A-804

F5

F7

F9

F3

1' - 6 1/2" 1' - 9 1/2" 2"1' - 9"1' - 7"1' - 11"

2 1/2" 9" 6' - 5" 5' - 6"8' - 5"2"

8' - 8" 9"3' - 3 1/2"3' - 4 1/2"3' - 4 1/2"3' - 0 1/2"9' - 11 1/2"7' - 4"3' - 0 1/2" 2 1/2"3' - 4 1/2" 3" 6"

3' - 4 1/2"3' - 0"

3' - 6"

W2

W2

W2

W2 W2

W2

W2

W2

W2

9"

1'

- 0

W2

W2

NOTES

FINISH MATERIALS SUCH AS CERAMIC

TILE, WALL COVERINGS, ETC. ARE NOT

TYPICALLY SHOWN AS AN INTEGRAL

PART OF THE ASSEMBLY. REFER TO

INTERIOR DRAWINGS AND / OR FINISH

SCHEDULES FOR FINISH MATERIALS.

PARTITIONS EXTENDING TO DECK

ABOVE ARE INDICATED ON RCP'S.

ALL PENETRATIONS THROUGH

ACOUSTICAL AND FULL HEIGHT

ASSEMBLIES TO BE ACOUSTICALLY

SEALED.

FIRE BLOCKING WILL BE INSTALLED IN

ACCORDANCE WITH IBC 717.2,

HORIZONTALLY AT INTERVALS NOT

EXCEEDING 10 FEET

1.

2.

3.

4.

A2 WALL TYPE

STC-53

(2) LAYERS STAGGERED 5/8" TYPE

'X' GWB - DOUBLE LAYER ON

SAME SIDE AS WALL TAG

20 GA METAL STUDS @ 16" O.C. 3

5/8" OR AS REQUIRED TO ALIGN

WITH EXISTING WALL THICKNESS

A1 WALL TYPE

NOT RATED

5/8" TYPE 'X' GWB

3-5/8" STUDS @16"

O.C. HT AS INDICATED

INTERIOR WALL TYPES

R-11 UNFACED,

FORMALDEHYDE FREE, BATT

INSULATION BETWEEN STUDS

5/8" TYPE 'X' GWB

SEAL ALL PENETRATIONS WITH

ACOUSTICAL SEALANT

C1 WALL TYPE

NOT RATED

1 1/2" 'Z' STUDS

@16" O.C.

5/8" TYPE 'X' GWB

A3 WALL TYPE

STC-53

(2) LAYERS STAGGERED 5/8" TYPE

'X' GWB - DOUBLE LAYER ON

SAME SIDE AS WALL TAG

5/8" TYPE 'X' GWB

20 GA METAL STUDS @ 16" O.C. 3

5/8" [4" STUDS AT A4] OR AS

REQUIRED TO ALIGN WITH EXISTING

WALL THICKNESS

R-11 UNFACED,

FORMALDEHYDE FREE, BATT

INSULATION BETWEEN STUDS

SEAL ALL PENETRATIONS WITH

ACOUSTICAL SEALANT

(2) LAYERS STAGGERED 5/8" TYPE

'X' GWB

C3 WALL TYPE

NOT RATED

3 5/8" STUDS @16" O.C.

5/8" TYPE 'X' GWB

EXG WALL

NOT RATED

SHADING INDICATES

EXISTING WALLS TO

REMAIN - WIDTH

VARIES - NOT TAGGED

PATCH HOLES AND

REPAIR DRYWALL

SURFACE AS

REQUIRED AND

REPAINT ENTIRE WALL

BOTH SIDES

C6 WALL TYPE

NOT RATED

6" STUDS @16" O.C.

5/8" TYPE 'X' GWB

B3 WALL TYPE

NOT RATED

3 5/8" STUDS @16" O.C. (OR AS

REQUIRED TO FIT IN FRONT

OF EXG WINDOW FRAME)

5/8" TYPE 'X' GWB - INSTALL

AFTER INFILL PIECE IS SET

1/4" TYPE 'X' GWB - PAINT

EXPOSED SIDE GLOSS WHITE

AND INSTALL ON STUDS

PRIOR TO FITTING IN WINDOW

WINDOW INFILLA4 SIM WITH 4" STUDS

R-11 UNFACED,

FORMALDEHYDE FREE, BATT

INSULATION BETWEEN STUDS

R-11 UNFACED,

FORMALDEHYDE

FREE, BATT

INSULATION BETWEEN

STUDS - WHERE

SHOWN ON PLANS

1/ 2' 0'

1' 4'

4' 8'

4' 2'

2'

1/ 8' 0'

1' 0' 0'

1/ 4' 0'

1' 2'

1' 1/ 2'

2' 1/ 2'

1' 0'

3' 0'

1'

3/ 8' 0'

1'

2' 4'

1/ 2' 0'

2'

1/ 2'

1' 3'

6' 0'

1/ 4"

1/ 2"

8' 8'

1/ 0'

Project No.

Building Number Drawing No.

Project Title

Location

Date:

Checked By/Proj.Mgr Drawn By

Drawing Title

Approved: VAPORHCS Director

VA FORM 08 - 6231

A

VA Portland Health Care System

(VAPORHCS)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Approved: Chief Facilities MgmtApproved: Service Chief

Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.

B20

Sheet of

ISSUED FOR CONSTRUCTION

C :\U se rs

\la ur i\O ne

D riv e\ d2

L- Pr oj ec ts \2

7-

1_

Va nc

B

D en ta l\0

4- D

ES

IG

N \R

EV

IT

\2

7-

1_

VA

N C

D en ta l B

O

PT

n ew

.rv t

8/

/2

9:

:2

AM

A-110

DENTAL CLINIC FLOOR PLAN

BLUE TRIDENT, LLC

900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110

(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME

Renovate Building 20 in Vancouver to Consolidate Dental Services

VANCOUVER, WA

648-22-100

15 AUG 2024

EB LMS

0 6' 9' 12'3'

Graphic Scale: 1 inch = 3 feet

3/8" = 1'-0"F3 DENTAL 2nd FLOOR AREA A FLOOR PLAN

OS OSOS

OS

OS

OS

REX

REX

S SS

OS

BA.8 B.5 B.9 C C.4 C.5 DA.7

D2 A-300

F7 A-300

THIS AREA - IS TO

REMAIN OPERATIONAL

DURING PHASE 2

DEMOLITION AND

CONSTRUCTION

PHASE 2

DEMOLITION AND

CONSTRUCTION

TEMP WALL

F3200

A1066

9' - 0"

9' - 0"

8' - 0"

8' - 0"

9' - 0" 9' - 0" 9' - 0"

9' - 0"

9' - 0" 9' - 0" 9' - 0" 9' - 0"

9' - 0"

8' - 0"

9' - 0"

7' - 10"

9' - 0" 9' - 0"

9' - 0"

9' - 0"9' - 0"

C2 C2 C1 C2 C2 C2

C1

C1

C1

C3

C1

C1C2C2C2C2

C3

C3

C1

C1

C3

63 SF

PANO

47 SF

SOILED

131 SF

TRTMNT

127 SF

TRTMNT

127 SF

TRTMNT

178 SF

OFFICE

127 SF

TRTMNT

43 SF

MEDS

199 SF

SURGERY

79 SF

LAB

59 SF

STAFF TOILET

48 SF

TOILET

50 SF

TOILET

79 SF

STORAGE

375 SF

CORR

C2.03

63 SF

STERILE

INSTRUMENTS

39 SF

CORR

C2.02

49 SF

ALCOVE 2

C2.04

63 SF

OMNICELL

SUPPLY

A1200

7' - 10"

INSTALL NEW ROLLER SHADES TO FIT NEW

OPENINGS UPON COMPLETION OF

CONSTRUCTION

INSTALL NEW ROLLER SHADES TO FIT NEW

OPENINGS UPON COMPLETION OF

CONSTRUCTION

INSTALL NEW ROLLER SHADES

TO FIT NEW OPENINGS UPON

COMPLETION OF

CONSTRUCTION

REINSTALL SALVAGED

ROLLER SHADES - MODIFY

SHADES (CLOTH AND

FRAME) TO FIT NEW

HEIGHT AT INFILL

REINSTALL SALVAGED

ROLLER SHADES

REINSTALL SALVAGED

ROLLER SHADES

INSTALL NEW ROLLER SHADES TO FIT NEW

OPENINGS UPON COMPLETION OF

CONSTRUCTION

COORDINATE WITH OWNER FOR NEW PERMANENT

LOCATION OF SALVAGED WALL MOUNTED

TELEVISION

CG1CG1

CG2 CG2

CG1

CG1

CG1

CG1

CG2

CG2

8' - 10" 11' - 0"

13' - 0" 13' - 0" 13' - 0" 8' - 4"

8' - 6"

AED SIGN

C1

C3

C3

D6155

D6050D6050D6050D6050

9' - 0"

CEILING TYPES LEGEND

C1 2 X 2 ACOUSTICAL CEILNG TILE (ACT1)

C2 2 X 2 ACOUSTICAL CEILING TILE - CLEAN ROOM (ACT2)

C3 5/8" GYPUM BOARD - PAINTED

INDICATES ACOUSTICAL WALLS THAT EXTEND UP TO THE

BOTTOM OF THE ROOF DECK ABOVE - SEAL ALL

PENETRATIONS WITH ACOUSTICAL SEALANT

1/ 2' 0'

1' 4'

4' 8'

4' 2'

2'

1/ 8' 0'

1' 0' 0'

1/ 4' 0'

1' 2'

1' 1/ 2'

2' 1/ 2'

1' 0'

3' 0'

1'

3/ 8' 0'

1'

2' 4'

1/ 2' 0'

2'

1/ 2'

1' 3'

6' 0'

1/ 4"

1/ 2"

8' 8'

1/ 0'

Project No.

Building Number Drawing No.

Project Title

Location

Date:

Checked By/Proj.Mgr Drawn By

Drawing Title

Approved: VAPORHCS Director

VA FORM 08 - 6231

A

VA Portland Health Care System

(VAPORHCS)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Approved: Chief Facilities MgmtApproved: Service Chief

Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.

B20

Sheet of

ISSUED FOR CONSTRUCTION

C :\U se rs

\la ur i\O ne

D riv e\ d2

L- Pr oj ec ts \2

7-

1_

Va nc

B

D en ta l\0

4- D

ES

IG

N \R

EV

IT

\2

7-

1_

VA

N C

D en ta l B

O

PT

n ew

.rv t

8/

/2

9:

:2

AM

A-120

REFLECTED CEILING PLAN

BLUE TRIDENT, LLC

900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110

(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME

Renovate Building 20 in Vancouver to Consolidate Dental Services

VANCOUVER, WA

648-22-100

15 AUG 2024

EB LMS

3/8" = 1'-0"F3 2nd FLOOR CEILING PLAN 0 6' 9' 12'3'

Graphic Scale: 1 inch = 3 feet

OS

OS

OS

T

T

T

CR

ESDC

4 4

2 4

FD FDFDFD

FD

LD

A

LDA

4 4

1 LD

A

T

T

4 T

LD

A

T

A1 A1

B.9 C C.4 C.5 D

D2 A-300

F7 A-300

A-803C5

A-803E5

A-803 F8 C8

C9

C7

E9

E8

E7

F9

F5

F7

C2.04

59 SF

STAFF TOILET

48 SF

TOILET

50 SF

TOILET

49 SF

ALCOVE 2

C2.04

79 SF

LAB

CFS 56x60 CFS 56x60

CFS 48x30

CFS 48x30

CFS 48x30

CFS 56x60

CFS 48x30

CFS 48

x30

6' - 4" 1' - 6" 6' - 4" 5' - 11 253/256" 6' - 4 3/256"

8'

- 4

4'

- 5

1/ 8"

CFS 60 DIAM CFS 60 DIAM CFS 60 DIAM

1' - 3 131/256"

4'

- 1

0"

1'

- 6

7/ 8"

4'

- 4

1'

- 6

4'

- 5

1/ 8"

1'

- 6

7/ 8"

A-802C1

SLOPE FLOOR TO

DRAIN

SLOPE

FLOOR TO

DRAIN

SLOPE

FLOOR TO

DRAIN

CG2 CG2

CG1H

H H

A-803 F3

C5

C3

C6

FEC

D0904

D6250

D3390

ELECT

PANEL

A5082

CG1

CG1

A1066

FAUCET

MOUNTED

EYEWASH

9' - 1 1/2"

A5077AED G

F1

3'-0" MIN.

A5082

A5075

2' - 0 5/8"

C3

5' - 5 1/2"

KNEE

WALL

C3

C3

FEC(e)ALIGN STUDS WITH

FACE OF EXG COLUMN

47 SF

SOILED

M3072 D0980

D4360

6'

- 1

0"

C'TOP

2' - 1"

3' - 0"

2'

- 9

/16

W2

W2

W2

W2

W2

B B.5

3' - 4 1/2" 2" 5" 2"

11' - 1"

3' - 8"

9"

FULL GLASS WOOD DOOR IN

HM FRAME

WALL MOUNTED SLIDING GLASS

DOOR

SLIDE

2"3' - 2 1/2"

SLIDE

3' - 10" 3' - 2"6 3/4" +/- 3' - 10 1/2"

3' - 10 1/2"

11' - 0"

3' - 4 1/2" 3' - 0 1/2"

PREFAB ALUMINUM GAP CLOSURE -

"MULLION MATE MM7" OR EQUAL

201A

201B 203B 203A

CAULK AND BACKER ROD AT GYPSUM BOARD

END, TYP

6 1/8"

F3 A-300

PREFAB ALUMINUM

GAP CLOSURE -

"MULLION MATE MM7"

OR EQUAL

EXG EXTERIOR

WALL AND

WINDOWS TO

REMAIN

CAULK AND BACKER

ROD AT GYPSUM

BOARD END, TYP

A3CLR FOR DUCT

1' - 4"

C6

DUCT CHASE

1' - 7" 1' - 10"

PREFAB ALUMINUM GAP CLOSURE - "MULLION

MATE MM7" OR EQUAL

REF MECHANICAL FOR

DUCTWORK

C6

A3

EXG EXTERIOR WALL AND WINDOWS

TO REMAIN

PAINT ALL EXPOSED SIDES

AND EDGES OF EXG STEEL

COLUMN AND BRACING

CAULK AND BACKER ROD

AT GYPSUM BOARD END,

TYP

ALIGN

B

1' - 0"

1'

- 0

C3

C3

C.4 C.5

PREFAB ALUMINUM GAP

CLOSURE - "MULLION MATE MM7"

OR EQUAL

A3

PAINT ALL EXPOSED SIDES

AND EDGES OF EXG STEEL

COLUMN AND BRACING

EXISTING INSULATED GLASS

WINDOW AND ALUMINUM FRAME

TO REMAIN

CAULK AND BACKER ROD AT

GYPSUM BOARD END

INFILL STEEL BEAM WITH

STEEL STUDS FOR GWB

FASTENING

C

A3

EXG EXTERIOR WALL AND WINDOWS

TO REMAIN

PAINT ALL EXPOSED SIDES AND

EDGES OF EXG STEEL COLUMN AND

BRACING

CAULK AND BACKER ROD AT GYPSUM

BOARD END, TYP

7"

B.5

PREFAB ALUMINUM GAP

CLOSURE - "MULLION MATE

MM7" OR EQUAL

C3

C3

C6

EXG EXTERIOR WALL

AND WINDOWS TO

REMAIN

CAULK AND BACKER ROD

AT GYPSUM BOARD END,

TYP

REF MECHANICAL FOR

DUCTWORK

9"

EXISTING WINDOW

MULLION

1' - 5 1/4" 4 1/4"

D

PREFAB ALUMINUM GAP

CLOSURE - "MULLION

MATE MM7" OR EQUAL

A4

B3

EXISTING INSULATED

GLASS WINDOW AND

ALUMINUM FRAME TO

REMAIN

NEW WALL AS SCHEDULED -

ALIGN WITH FACE OF EXG.

WALL AND WINDOW

FRAMING

REMOVE EXG WOOD

WINDOW STOOL

CAULK AND BACKER

ROD AT GYPSUM

BOARD END, TYP

D2 A-300

CENTER (1) LAYER 5/8" x 30" x

8' H. PLYWOOD BACKER ON

CENTERLINE OF

PANOGRAPHIC XRAY

COLUMN W/DOUBLE 6" [16GA

Fy=50KSI (600S162-54)] STUD

ON EACH SIDE - FULL

HEIGHT. PLACE BLOCKING

BETWEEN STUDS WITH

HEIGHT COORDINATED WITH

MFR FASTENING POINTS

A1

EXISTING, RELOCATED,

PANOGRAPHIC XRAY UNIT

C2.02

2'

- 6

CG1 CG1

1/ 2' 0'

1' 4'

4' 8'

4' 2'

2'

1/ 8' 0'

1' 0' 0'

1/ 4' 0'

1' 2'

1' 1/ 2'

2' 1/ 2'

1' 0'

3' 0'

1'

3/ 8' 0'

1'

2' 4'

1/ 2' 0'

2'

1/ 2'

1' 3'

6' 0'

1/ 4"

1/ 2"

8' 8'

1/ 0'

Project No.

Building Number Drawing No.

Project Title

Location

Date:

Checked By/Proj.Mgr Drawn By

Drawing Title

Approved: VAPORHCS Director

VA FORM 08 - 6231

A

VA Portland Health Care System

(VAPORHCS)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Approved: Chief Facilities MgmtApproved: Service Chief

Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.

B20

Sheet of

ISSUED FOR CONSTRUCTION

C :\U se rs

\la ur i\O ne

D riv e\ d2

L- Pr oj ec ts \2

7-

1_

Va nc

B

D en ta l\0

4- D

ES

IG

N \R

EV

IT

\2

7-

1_

VA

N C

D en ta l B

O

PT

n ew

.rv t

8/

/2

9:

:2

AM

A-130

ENLARGED PLANS

BLUE TRIDENT, LLC

900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110

(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME

Renovate Building 20 in Vancouver to Consolidate Dental Services

VANCOUVER, WA

648-22-100

15 AUG 2024

EB LMS

1/2" = 1'-0"F5 ENARGED TOILET AND LAB PLANS

1 1/2" = 1'-0"B1 ENLARGED PLAN AT SLIDING DOORS

1 1/2" = 1'-0"D3 PLAN DETAIL AT EXG WINDOW 1 1/2" = 1'-0"D7 PLAN DETAIL AT EXG WINDOW MULLION 1 1/2" = 1'-0"D1 DETAIL AT COL B/1 1 1/2" = 1'-0"D9 DETAIL AT COL C.5/11 1 1/2" = 1'-0"D5 DETAIL AT COL C/11 1 1/2" = 1'-0"D4 DETAIL AT COL B.5/11

1 1/2" = 1'-0"F1 INFILL AT WINDOW IN MEDS ROOM

1 1/2" = 1'-0"F3 PANO X-RAY SUPPORT WALL

FIRST FLOOR

PLAN

189' - 0 123/128"

B B.5 B.9 C C.4 C.5 D F7

A-300

PANO

SOILED

200 C2.04

LAB

STAFF TOILET

212 TOILET

TOILET

214STORAGE

M2055M2055

STERILE

INSTRUMENTS

CORR

C2.02

ALCOVE 2

C2.04

GB4615 GB4615A5082

B2890B2890

OMNICELL

SUPPLY

0"

0"

8'

- 0

NO ARCHITECTURAL WORK ON THE FIRST FLOOR - SHOWN

FOR REFERENCE ONLY

TOP OF DECK

218' - 0 123/128"

2nd FLOOR 203' - 0 123/128"

F3 A-300

M2055 E0912 E0912

E0948W2

D2 A-300

A1066

GB4615

A5082 M8805 A5106

E0948

199 SF

SURGERY

375 SF

CORR

C2.03

50 SF

TOILET

A-600 A3

TOP OF DECK

218' - 0 123/128"

SECOND FLOOR

203' - 0 123/128"

F3200

CG1

D2 A-300

SECOND FLOOR

203' - 0 123/128"

A5077

A5077

A5145

A5145

A4

A4

CG2

A1

CG1

EXISTING WAITING ROOM TO REMAIN

COORDINATE WITH OWNER FOR NEW

PERMANENT LOCATION OF SALVAGED

WALL MOUNTED TELEVISION

127 SF

TRTMNT

375 SF

CORR

C2.03

39 SF

CORR

C2.02

W1

WS1

1/ 2' 0'

1' 4'

4' 8'

4' 2'

2'

1/ 8' 0'

1' 0' 0'

1/ 4' 0'

1' 2'

1' 1/ 2'

2' 1/ 2'

1' 0'

3' 0'

1'

3/ 8' 0'

1'

2' 4'

1/ 2' 0'

2'

1/ 2'

1' 3'

6' 0'

1/ 4"

1/ 2"

8' 8'

1/ 0'

Project No.

Building Number Drawing No.

Project Title

Location

Date:

Checked By/Proj.Mgr Drawn By

Drawing Title

Approved: VAPORHCS Director

VA FORM 08 - 6231

A

VA Portland Health Care System

(VAPORHCS)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Approved: Chief Facilities MgmtApproved: Service Chief

Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.

B20

Sheet of

ISSUED FOR CONSTRUCTION

C :\U se rs

\la ur i\O ne

D riv e\ d2

L- Pr oj ec ts \2

7-

1_

Va nc

B

D en ta l\0

4- D

ES

IG

N \R

EV

IT

\2

7-

1_

VA

N C

D en ta l B

O

PT

n ew

.rv t

8/

/2

9:

:3

AM

A-300

CLINIC SECTIONS

BLUE TRIDENT, LLC

900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110

(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME

Renovate Building 20 in Vancouver to Consolidate Dental Services

VANCOUVER, WA

648-22-100

15 AUG 2024

EB LMS

3/8" = 1'-0"D2 SECTION 1

3/8" = 1'-0"F7 SECTION 2 3/8" = 1'-0"F3 SECTION 3

A

DOOR AND FRAME TYPES

SEE DOOR SCHEDULE FOR HEAD, JAMB AND SILL DETAILS.

FLOOR LEVEL

7'

- 0

3' - 0"

B

FLOOR LEVEL

2"

2 3

2"

2" 2"

C

2" 2"

2"

2" 2" 2" 2"

4 10

6'

- 2

2"

2" 1' - 8"

5' - 2"

6 3/4" 6 3/4"

6 3 /4"

3/

4"

7'

- 0

" ACTIVE

LEAF

5' - 0"

3'

- 6

3'

- 0

D

HOLLOW METAL FRAME

DOOR AS SCHEDULED

2"

CAULK, TYPICAL

BOTH SIDES

1/2"1/2"

WALL TYPE AS

SCHEDULED

FILL HM FRAME WITH FOAM

INSULATION

HOLLOW METAL FRAME AS

SCHEDULED

DOOR AS SCHEDULED

2"

SEALANT, TYPICAL BOTH

SIDES

1/2"1/2"

WALL ASSEMBLY AS

SCHEDULED - EXITING

WALL WHERE OCCURS

HOLLOW METAL FRAME AS

SCHEDULED

GLAZING AS SCHEDULED

APPLIED GLASS STOP

DOOR AS SCHEDULED

FILL HM FRAME WITH FOAM

INSULATION

METAL SLIDING DOOR FRAME AS

SCHEDULED

DOOR AS SCHEDULED

SEALANT, TYPICAL BOTH

SIDES

WALL ASSEMBLY AS

SCHEDULED

METAL STUD BOX HEADER FULL

WIDTH OF DOOR

METAL SLIDING DOOR FRAME AS

SCHEDULED

DOOR AS SCHEDULED

SEALANT, TYPICAL BOTH

SIDES

WALL ASSEMBLY AS

SCHEDULED

2"

DOUBLE STUD BOTH SIDES OF

OPENING

2"

METAL SLIDING DOOR FRAME AS

SCHEDULED

SEALANT, TYPICAL BOTH

SIDES

DOUBLE STUD BOTH SIDES OF

OPENING

WALL ASSEMBLY AS

SCHEDULED

DOOR AS SCHEDULED

METAL SLIDING DOOR FRAME AS

SCHEDULED

DOOR AS SCHEDULED

CONCEALED SILL GUIDE BY DOOR

MANUF

ACOUSTIC BOTTOM SEAL BY DOOR

MANUF

HOLLOW METAL FRAME AS

SCHEDULED

APPLIED GLASS STOP

CONCRETE FLOOR

BACKER ROD AND ACOUSTICAL

SEALANT

SHIM ON SILL SEALER

GLAZING AS SCHEDULED

FILL HM FRAME WITH FOAM

INSULATION

6 3/4"

DOOR WHERE OCCURS

CARPET TILE

TRANSITION STRIP SCHLUTER RENO-U 5/16";

CENTERLINE OF DOOR WHERE OCCURS

RESILIENT FLOORING

SUBFLOOR1/2

METAL SLIDING DOOR FRAME

BEYOND

DOOR AS SCHEDULED

SEALANT, TYPICAL BOTH

SIDES

WALL ASSEMBLY AS

SCHEDULED

METAL STUD BOX HEADER FULL

WIDTH OF DOOR

RELITE TYPES

FLOOR LEVEL

C

7'

- 0

1'

- 6

3' - 4"

G1

PAINT ALL HM

FRAMES P3

A101 F7

A600

A101 E7

A600

SEALANT, TYPICAL BOTH

SIDES

WALL ASSEMBLY AS

SCHEDULED

APPLIED GLASS STOP

GLAZING AS SCHEDULED

2"

5/8"5/8"

HOLLOW METAL FRAME

AS SCHEDULED

GLAZING AS SCHEDULED

2"

SEALANT, TYPICAL

BOTH SIDES

EQEQ

WALL ASSEMBLY AS

SCHEDULED

APPLIED GLASS STOP

FILL FRAME WITH FOAM

INSUL

6 3/4"

JAMB SIM

A4

C3

1'

- 2

6"

1' - 2 5/8"

CEILING AS SCHEDULED

A1

PLAM FACED WALL

MOUNTED UPPER CABINETS

W/ (2) ADJ SHELVES EACH -

ALL CABINETS TO BE

LOCKABLE

CEILING AS

SCHEDULED

3'

- 7

2'

- 1

0"

(3) PLASTER

STORAGE BINS

15"x24"x32.5" METAL

1'

- 2

2'

- 6

18GA SS SPLASH TO

BOTT OF UPPER

COUNTER

18GA SS UPPER COUNTER

1/4" WATER SUPPLY VALVE FOR

MODEL TRIMMER BEYOND

FAUCET MOUNTED EYEWASH

DOOR WHERE OCCURS

TILE

METAL EDGE TRANSITION STRIP

SCHLUTER RENO-U 1/2"; CENTERLINE

OF DOOR WHERE OCCURS

UNDERLAYMENT

RESILIENT FLOORING

1/2 " M

AX

IM

UM

WOOD SUBFLOOR

B3

EXISTING WINDOW AND FRAME TO REMAIN -

VERIFY FRAME DEPTH TO ENSURE INFILL

PIECE ALIGNS WITH FACE OF EXG WALL

REMOVE EXISTING LAMINATED WINDOW

STOOL AND APRON PRIOR TO INSTALLING

INFILL PIECE - FIT INFILL PIECE IN FRONT

OF WINDOW FRAME ON TOP OF EXISTING

WALL OPENING - SIMILAR AT JAMBS

ALUMINUM TRIM PIECE TO MATCH

ALUMINUM WINDOW FRAME -

FASTEN WITH ADHESIVE TO FACE

OF EXISTING MULLION FULL

WIDTH

1 1 /2"

4 3/4" 1 1/4"

CONT BEAD OF ADHESIVE ON

INTERIOR LEG OF TRIM TO SET INFILL

PIECE

LEAVE 3/4" GAP TO SET INFILL PIECE

FASTEN CHANNEL TRACK AND JAMB STUDS

TO WINDOW OPENING THRU GWB TO STUDS

REINSTALL SALVAGED (OR NEW AS

IDENTIFIED) WINDOW SHADE -

MODIFY SHADES (CLOTH AND FRAME)

TO FIT NEW HEIGHT AT INFILL

1/ 2' 0'

1' 4'

4' 8'

4' 2'

2'

1/ 8' 0'

1' 0' 0'

1/ 4' 0'

1' 2'

1' 1/ 2'

2' 1/ 2'

1' 0'

3' 0'

1'

3/ 8' 0'

1'

2' 4'

1/ 2' 0'

2'

1/ 2'

1' 3'

6' 0'

1/ 4"

1/ 2"

8' 8'

1/ 0'

Project No.

Building Number Drawing No.

Project Title

Location

Date:

Checked By/Proj.Mgr Drawn By

Drawing Title

Approved: VAPORHCS Director

VA FORM 08 - 6231

A

VA Portland Health Care System

(VAPORHCS)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Approved: Chief Facilities MgmtApproved: Service Chief

Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.

B20

Sheet of

ISSUED FOR CONSTRUCTION

C :\U se rs

\la ur i\O ne

D riv e\ d2

L- Pr oj ec ts \2

7-

1_

Va nc

B

D en ta l\0

4- D

ES

IG

N \R

EV

IT

\2

7-

1_

VA

N C

D en ta l B

O

PT

n ew

.rv t

8/

/2

9:

:3

AM

A-600

DOOR SCHEDULE AND MISC DETAILS

BLUE TRIDENT, LLC

900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110

(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME

Renovate Building 20 in Vancouver to Consolidate Dental Services

VANCOUVER, WA

648-22-100

15 AUG 2024

EB LMS

DOOR AND FRAME SCHEDULE

NUM

DOORS FRAMES

HARDWARE

GROUP

Door Label REMARKSTYPE MATL FINISH

GLASS

TYPE

SIZE

TYPE MATL

FINIS

H HEAD JAMB MULLION SILLWIDTH HT

200 A WD CLEAR - 36" 84" 1 HM P5 B4 / A600 B4 / A600 - - HW-5 20 MIN

201A B WD CLEAR G1 36" 84" 1 HM P5 B4 / A600 B4 / A600 - - HW-3G

201B B WD CLEAR G1 41" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A

203A B WD CLEAR G1 37" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A

203B B WD CLEAR G1 41" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A

204 A WD CLEAR - 41" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A

205 B WD CLEAR G1 41" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5, F5 / A600 HW-7A

206 A WD CLEAR - 41" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A

207A B WD CLEAR G1 37" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A

207B B WD CLEAR G1 41" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A

208 A WD CLEAR - 41" 84" 1 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A 20 MIN

209A B WD CLEAR G1 37" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A

209B B WD CLEAR G1 41" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A

210 A WD CLEAR - 36" 84" 1 HM P5 B4 / A600 B4 / A600 - - HW-3G 60 MIN

211 C WD CLEAR G1 60" 85" 3 HM P5 B4 / A600 B4 / A600 - - HW-10B

212 A WD CLEAR - 36" 84" 1 HM P5 B4 / A600 B4 / A600 - - HW-2G

213 A WD CLEAR - 36" 84" 1 HM P5 B4 / A600 B4 / A600 - - HW-SH-3D

214 A WD CLEAR - 36" 84" 1 HM P5 B4 / A600 B4 / A600 - - HW-2G

215 A WD CLEAR - 36" 84" 1 HM P5 B4 / A600 B4 / A600 - - HW-2G

C2.02 D WD CLEAR G1 42" 84" 4 HM P5 A4 / A600 A4, E7(SIM) /

A600

D4 / A600 E4 / A600 HW-SH-3D

C2.04 D WD CLEAR G1 48" 84" 1 HM P5 B4 / A600 B4 / A600 - - HW-SH-3D

3" = 1'-0"B4 INT DOOR HEAD (JAMB SIM)

3" = 1'-0"A4 HM INT DOOR HEAD (JAMB SIM)

3" = 1'-0"D4 HM WINDOW/DOOR MULLION

3" = 1'-0"A5 SLIDING INT DOOR HEAD

3" = 1'-0"D5 SLIDING INT DOOR JAMBS

3" = 1'-0"E5 SLIDING INT DOOR SILL 3" = 1'-0"E4 HM INTERIOR WINDOW SILL

6" = 1'-0"F5 TRANSITION - CPT / RTF

3" = 1'-0"B5 SLIDING DOOR HEAD CONT.

3" = 1'-0"F7 HM INT WINDOW SILL

3" = 1'-0"E7 HM INTERIOR WINDOW HEAD

1 1/2" = 1'-0"A3 CORRIDOR SOFFIT

1 1/2" = 1'-0"F3 LAB ROOM CASEWORK 6" = 1'-0"F4 TRANSITION - TILE / RTF 1 1/2" = 1'-0"F1 INFILL AT EXG WINDOW

LD

A

T

1/

8"

5/8" TYPE 'X' GWB

CONT. METAL EDGE MOLD ALL

EXPOSED EDGES

FLUSH MOUNTED RESILIENT

CORNER GUARD SET AT TOP OF

BASE - SHIM AS REQUIRED TO

ACHIEVE FLUSH MOUNT - APPLY

TOP AND BOTTOM CLOSURES

CAULK JOINTS

B.9 C F1

A-601

C3

C3

A3

A4

HOLD FACE OF CABINET BACK FROM

FACE OF WALL TO ALLOW ADJACENT

SLIDING DOORS TO PASS IN FRONT

OF DOOR HANDLES

2'

- 0

3' - 0" 3' - 0" 3' - 0"

ALL CABINET DOORS TO BE LOCKABLE WITH VA

CORE - SF 7 PIN

2"

HOLD FACE OF CABINET

BACK FROM FACE OF

WALL TO ALLOW

ADJACENT SLIDING

DOORS TO PASS IN

FRONT OF CABINET DOOR

HANDLES

6"

SLIDING DOOR

BEYOND

ADJUSTABLE SHELVING

A4

C3

6'

- 8

2' - 5"

4"

CEILING AS

SCHEDULED

ALL CABINET

DOORS TO BE

LOCKABLE

WITH VA

CORE - SF 7 PIN

2" X 2"

STAINLESS

STEEL CORNER

GUARD

ADHERED ALL

AROUND

OPENING -

MITER

CORNERS

2" X 2"

STAINLESS

STEEL CORNER

GUARD

ADHERED ALL

AROUND

OPENING -

MITER

CORNERS

TOP MNT, STAINLESS STEEL SINK -

SET IN CONT BEAD OF SEALANT

(INTERGRAL SINK IN LAB AND SOILED)

P.LAM BASE CABINET WITH

REMOVABLE FRONT PANEL(S)

(NOT IN SOILED ROOM)

FAUCET W/ LEVER HANDLES (ADD

EYEWASH ATTACHMENT IN LAB)

FINISH END OF EXISTING

ADJ. BASE CABINET BEYOND

WITH SAME LAMINATE

1/2" SOLID SURFACE COUNTERTOP (STAINLESS

STEEL IN LAB AND SOILED) OVER 3/4" MARINE

GRADE PLYWOOD UNDERLAYMENT

FINISH WALL AND FLOOR

AT EXPOSED BY CABINET

1/2" SOLID SURFACE BACKSPLASH (&

SIDE SPLASHES WHERE OCCURS)

(STAINLESS STEEL IN LAB AND SOILED)

SEE ELEVATION FOR ACCESSORIES

KNEE SPC

TO

P

O F

FI

N

IS

H

ED

C

O U

N

TE

R

2'

1/

2" U

.N .O

6" 2'

1/ 2"

COUNTER WIDTH

VARIES - SEE PLAN

1/2" SOLID SURFACE

COUNTER EDGE

(STAINLESS STEEL

IN LAB AND SOILED)

2'

" M

AX

. S

IN

K

R

IM

9" (CABINET DIMS)

11" 6"

1' - 5"

4"

1" O.H.

1/

2" 1'

- 1 1"

SOLIDS INTERCEPTOR

WITH BOTTOM CLEAN

OUT- LAB ONLY

CERAMIC TILE FINISH AS SCHEDULED

CERAMIC TILE

WALL AS SCHEDULED

METAL COVE BASE SCHLUTER DILEX-AHK OR EQUAL

FINISH PLAN NOTES

1. ALL WALLS AND COLUMNS TO BE PAINTED P-1, UON.

2. ALL GYP BD SOFFITS TO BE PAINTED P-1, FLAT FINISH @ UNDERSIDE SURFACE UON.

3. ALL WALLS TO RECEIVE BASE B1, 4" HIGH EXCEPT AT TREATMENT ROOMS AND

SURGERY ROOM PROVIDE 6" BASE, UON.

4. REFER TO INTERIOR ELEVATIONS FOR ADDITIONAL FINISH INFORMATION.

5. REFER TO DOOR SCHEDULE FOR DOOR & FRAME FINISHES.

6. DENOTES CHANGE IN FLOORING MATERIALS.

7. REFER TO PROJECT SPECIFICATIONS AND/OR MANUFACTURER'S PRODUCT

SPECIFICATIONS FOR GENERAL PRODUCT INFORMATION.

8. CONTRACTOR SHALL EXAMINE ALL SURFACES TO BE FINISHED AND VERIFY THAT THEY

ARE ACCEPTABLE TO RECEIVE SPECIFIED FINISHES.

9. SURFACE DEFECTS OR DEFICIENCIES WHICH MAY ADVERSELY AFFECT WORK SHALL BE

CORRECTED OR BROUGHT TO THE ATTENTION OF THE GENERAL CONTRACTOR AND COR

FOR CORRECTION PRIOR TO COMMENCEMENT OF WORK.

10. ALL SURFACES SHALL BE PREPARED AND PRIMED ACCORDING TO MANUFACTURERS'

DIRECTIONS AND RECOMMENDATIONS.

11. CONTRACTOR IS TO NOTIFY ARCHITECT OF ANY DISCREPANCIES OR CONFLICTS

REGARDING CONDITIONS OR LOCATIONS FOR APPLICATION OF MATERIALS PRIOR TO OR

DURING CONSTRUCTION/ INSTALLATION, OR TRADE RESPONSIBILE FOR CORRECTING

SUCH WORK AS DIRECTED BY THE ARCHITECT.

12. THE CONTRACTOR SHALL EXAMINE ALL AREAS OF CONSTRUCTION AFTER COMPLETION OF

WORK BY ALL TRADES AND APPROVE ALL NECESSARY TOUCH-UP PAINTING OR

PATCHING.

13. REFERENCE WAINSCOT DETAILS FOR HEIGHTS AND MATERIALS TO BE USED AT EACH TYPE.

14. PROVIDE STRAIGHT WALL BASE BEHIND SLIDING DOORS SO IT DOES NOT INTERFERE WITH

DOOR OPENING.

15. ALL RESILIENT AND CARPET FLOORING AREAS TO RECEIVE COVE BASE UON.

16. WHERE SEVERAL FINISHES OCCUR ON SAME WALL, SEE ELEVATION FOR

CLARIFICATION.

17. ALL EXPOSED DRYWALL SURFACES TO BE PAINTED UON.

18. NO RESILIENT BASE SEAM TO OCCUR WITHIN 12" OF A WALL CORNER.

19. ALL CHANGES IN FLOOR MATERIAL TO OCCUR AT CENTER LINE OF DOOR UON

20. REPLACE ALL SOLID SURFACE WINDOW STOOLS WITH NEW SOLID SURFACE WINDOW

STOOLS

CONT. SNAP-ON

PLASTIC HANDRAIL

(HR) BY CORNER

GUARD MANUF. -

MOUNTED TO FRP

3/8" FRP PANEL (RWC1)

ADHERED TO GYPSUM

BOARD PER

MANUFACTURES

RECOMMENDATIONS -

COLOR AS SCHEDULED

RESILIENT BASE AS

SCHEDULED

WALL TYPE AS SCHEDULED

2'

- 9

3 1 /2"

45 DEGREE CONT.

CHAMFER AT TOP

EDGE

3"

CONT. 3/4" X 4"

PLASTIC CRASH RAIL

(CR) BY CORNER

GUARD MANUF. -

MOUNTED TO FRP

3/8" FRP PANEL (RWC2)

ADHERED TO GYPSUM

BOARD PER

MANUFACTURES

RECOMMENDATIONS -

COLOR AS SCHEDULED

RESILIENT BASE AS

SCHEDULED

WALL TYPE AS

SCHEDULED

45 DEGREE

CONT. CHAMFER

AT TOP EDGE

4" 2'

- 9

4"

3'

- 1

1/ 2' 0'

1' 4'

4' 8'

4' 2'

2'

1/ 8' 0'

1' 0' 0'

1/ 4' 0'

1' 2'

1' 1/ 2'

2' 1/ 2'

1' 0'

3' 0'

1'

3/ 8' 0'

1'

2' 4'

1/ 2' 0'

2'

1/ 2'

1' 3'

6' 0'

1/ 4"

1/ 2"

8' 8'

1/ 0'

Project No.

Building Number Drawing No.

Project Title

Location

Date:

Checked By/Proj.Mgr Drawn By

Drawing Title

Approved: VAPORHCS Director

VA FORM 08 - 6231

A

VA Portland Health Care System

(VAPORHCS)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT/ENGINEER

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Approved: Chief Facilities MgmtApproved: Service Chief

Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.

B20

Sheet of

ISSUED FOR CONSTRUCTION

C :\U se rs

\la ur i\O ne

D riv e\ d2

L- Pr…