This file is a comprehensive architectural and engineering design package for renovating Building 20 at the VA Portland Healthcare System in Vancouver, Washington to consolidate dental services. The project involves a complete renovation of the second floor, transforming a vacant eye clinic space into a fully functional dental clinic with five treatment rooms, supporting utilities, and specialized spaces including a surgery room, sterile instruments room, lab, soiled room, and staff areas.
The renovation includes extensive modifications to mechanical, electrical, plumbing, and fire protection systems. Key technical specifications include installing new sliding doors with self-closers, suspended acoustical ceiling panels, metal stud walls with painted finishes, resilient flooring, and high-impact resistant wainscoting. The project will provide medical gas systems, x-ray equipment infrastructure, dental chairs, cabinets, sinks, and associated medical technology installations. The work is phased to minimize disruption, with construction occurring after hours between 4:30 PM and 5:00 AM, and is designed to ensure all medical center activities remain operational throughout the renovation process.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X
Room Name
Ref
A101
A7.01 1
A7.024
ROOM NAME AND NUMBER
SECTION CALLOUT
MARK
DETAIL CALLOUT MARK
EXTERIOR OR INTERIOR
ELEVATION CALLOUT MARK
INTERIOR ELEVATION
CALLOUT MARK
DOOR TAG
MATERIAL FINISH TAG
WALL TYPE TAG
PHOTO TAG INDICATOR
A1 A-101
PL1
SIGNAGE TAGSN-X
1t 1' - 0" x 1' - 0"
1i
WINDOW TYPE TAG WITH SIZE (WxH)
EQUIPMENT TAG
TEMPORARY WALL CONSTRUCTION
ON RCP - INDICATES WALLS EXTEND
TO THE ROOF OR FLOOR DECK ABOVE
7"
EXISTING DIMENSIONS - TYP FROM
FINISH FACE OF EXG MATERIALS
FD FLOOR DRAIN - REF PLUMBING DWGS
B
THIS PROJECT GENERALLY CONSISTS OF PROVIDING ALTERATIONS AND
FINISHES TO BUILDING 20 SECOND FLOOR EYE CLINIC SUITE AT THE VA
PORTLAND HEALTHCARE SYSTEM, VANCOUVER CAMPUS
PROJECT WILL RE-CREATE THE 5 TREATMENT AND SUPPORTING ROOMS
FROM BLDG. 15 AT BLDG. 20. THE NEW ROOMS SHALL BE ENCLOSED FOR
RESPIRATORY ISOLATION WITH DOORS.
THE PROJECT WILL INCLUDE:
• ALTERATIONS OF THE VACANT EYE CLINIC SPACE IN BUILDING 20.
DENTAL WILL THEN OCCUPY ALL OF BUILDING 20 SECOND FLOOR.
• PROVIDE DENTAL MED GAS, PANOGRAPHIC X-RAY, SOILED AND CLEAN
LINEN UTILITY CLOSETS, INSTRUMENT STORAGE, OMNICELL STORAGE,
MEDS CLOSET, DENTAL LAB, AND DENTAL STAFF WORKSPACE.
• PROVIDE ALL PERMANENTLY INSTALLED FINISHES. IN GENERAL, DOORS
WILL BE SLIDING DOORS WITH SELF CLOSERS AND HOLD OPENS,
CEILINGS WILL BE SUSPENDED ACOUSTICAL PANELS, WALLS WILL BE
METAL STUD WITH GYPSUM BOARD AND PAINTED FINISH, STORAGE ROOM
AND CORRIDOR WALLS WILL HAVE HIGH IMPACT RESISTENT
WAINSCOTING, FLOOR WILL BE RESILIENT FLOORING. RESTROOMS WILL
HAVE CERAMIC TILE FLOORS AND WAINSCOTING.
• PROVIDE ALL WATER, DRAIN, DENTAL AIR, VACCUUM, GAS, POWER,
DATA, AND LOW VOLTAGE CONNECTIONS FOR VA PROVIDED EQUIPMENT
INCLUDING DENTAL CHAIRS, CABINETS WITH SINKS, X-RAY EQUIPMENT.
NEW ELECTRICAL WORK WILL INCLUDE REMOVING WIRING AND CONDUIT
CORRESPONDING TO WALLS BEING REMOVED; REMOVING DATA AND
POWER OUTLETS; AND ADDING NEW DATA AND POWER OUTLETS IN NEW
WALLS. NEW CIRCUITING WILL BE REQUIRED. ALL LIGHTING FIXTURES,
SWITCHES, AND OCCUPANCY SENSORS WILL BE REPLACED.
HVAC WORK INCLUDES RELOCATING EXISTING DUCTING AND CEILING
MOUNTED SUPPLY AND RETURN GRILLES, NEW SUPPLY AND RETURN
GRILLES WITH ASSOCIATED DUCTWORK AND BALANCING DAMPERS, AND
PRE AND POST CUSTRUCTION TESTING ADJUSTING AND BALANCING OF
VAV TERMINAL UNITS, AND SUPPLY AND RETURN GRILLES.
FIRE SPRINKLER HEADS WILL NEED TO BE MOVED AND/OR REPLACED TO
MATCH THE NEW ROOM CONFIGURATIONS. CALCULATIONS TO VERIFY
NEW HEAD LOCATIONS WILL BE REQUIRED. A LICENSED FIRW
PROTECTION CONTRACTOR WILL BE REQUIRED TO PERFORM THIS WORK.
FIRE ALARM SYSTEM WORK INCLUDES THE ADDITION AND RELOCATION
OF NOTIFICATION APPLIANCES (HORN/STROBES) AS NOTED ON PLANS.
PROVIDE ADDITIONAL FA SYSTEM COMPONENTS AND POWER SUPPLIES
AS REQUIRED. NEW EQUIPMENT SHALL MATCH EXISTING
MANUFACTURER, MODEL, AND DEVICE COLORS. PROVIDE RACEWAY,
BACKBOXES, WIRING, NOTIFICAITON APPLIANCES, FIELD TERMINATIONS,
PROGRAMMING, AND UPDATED BATTERY AND VOLTAGE DROP
CALCULATIONS. DURING THE CONSTRUCTION PERIOD, A FIRE
WATCH/GUARDS TOUR SHALL BE REQUIRED WHENEVER THE FIRE ALARM
SYSTEM IS NOT FULLY OPERATIONAL.
PROJECT
LOCATION
CONTRACTOR SHALL FURNISH THE RESIDENT ENGINEER WITH
A SCHEDULE OF PHASING DATES ON WHICH THE CONTRACTOR
INTENDS TO ACCOMPLISH WORK IN THE BUILDING OR PORTION
THEREOF. ARRANGE SUCH DATES TO INSURE
ACCOMPLISHMENT OF THIS WORK IN SUCCESSIVE PHASES
MUTUALLY AGREEABLE TO MEDICAL CENTER DIRECTOR USING
THE FOLLOWING PHASING OUTLINE:
Phase 1 – Majority of Demolition and New Construction .
1. Install temporary construction wall along the corridor, allowing access to both existing restrooms. Remove two windows for material disposal and negative air pressure.
2. Demolition in entire area behind the construction wall.
3. New construction in entire area behind the construction wall.
Phase 2 – New restroom and Meds room
1. Remove temporary construction wall and replace to allow use of the new West Restroom by the public.
2. Complete demolition where Meds room and new restroom will be built.
3. New Construction of Meds Room and East Restroom.
4. Reinstall glazing in removed windows.
5. Remove temporary construction wall.
1. THESE DRAWINGS ARE SUPPLIED TO THE CONTRACTOR AND
OTHERS FOR THEIR USE FOR THIS SPECIFIC PROJECT.
2. THE ORGANIZATION OF DOCUMENTS ARE NOT INTENDED TO
CONTROL THE DIVISION OF WORK. DIVISION OF WORK SHALL BE
THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
3. DIMENSIONS ARE TO FACE OF FINISH AT EXISTING REMAINING
WALLS, FACE OF STUD AT NEW WALLS, OR CENTERLINE OF
COLUMNS, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL VERIFY DIMENSIONS, REQUIRED
CLEARANCES, AND POWER AND HVAC REQUIREMENTS FOR ALL
ITEMS. NOTIFY COR AND ENGINEER OF RECORD OF ANY
DISCREPANCIES PRIOR TO COMMENCEMENT OF WORK.
5. DO NOT SCALE DRAWINGS; VERIFY ALL DIMENSIONS PRIOR TO
CONSTRUCTION.
6. NO CHANGES ARE BEING MADE TO THE STRUCTURE OF THE
BUILDING.
7. FIRE PROTECTION SYSTEM MUST REMAIN FULLY OPERATIONAL
DURING CONSTRUCTION.
8. THE FIRE SPRINKLER SYSTEM WILL REQUIRE CHANGES FOR
THE NEW LAYOUT. CONTRACTOR IS RESPONSIBLE FOR
REPAIRING ANY DAMAGE DONE TO SPRINKLER HEADS OR OTHER
SYSTEM APPURTANENCES DURING CONSTRUCTION.
CONTRACTOR IS RESPONSIBLE FOR RELOCATION OF HEADS
REQUIRED TO BE MOVED FOR NEW CONSTRUCTION. A LICENSED
FIRE PROTECTION CONTRACTOR SHALL BE RETAINED FOR ALL
WORK TO BE DONE ON THE FIRE PROTECTION SYSTEM.
9. A RATED CONSTRUCTION BARRIER MUST BE PROVIDED
UNLESS THE COR (AND/OR VISN SAFETY ENGINEER) CONCURS
THAT THE CONSTRUCTION WORK IS NO MORE HAZARDOUS THAN
NORMAL OPERATIONS. EXISTING WALLS CREDITED AS PART OF A
RATED CONSTRUCTION BARRIER MUST BE CONFIRMED TO
EXTEND TO THE DECK ABOVE WITH ALL PENETRATIONS
FIRESTOPPED. IF WALL UPGRADES ARE REQUIRED TO ESTABLISH
THE RATED CONSTRUCTION BARRIER, IDENTIFY THIS WORK ON
THE DRAWING.
(ICRA BARRIER REQUIREMENTS ARE DETERMINED BY THE
MEDICAL CENTER’S INFECTION CONTROL PROCESS.)
THE RATED BARRIER REQUIREMENT CAN BE ELIMINATED IF THE
SPRINKLERS IN THE CONSTRUCTION AREAS REMAIN IN SERVICE,
BUT CEILING REMOVAL WOULD RENDER THEM INEFFECTIVE SUCH
THAT TEMPORARY UPRIGHT SPRINKLERS WOULD HAVE TO BE
INSTALLED IF CEILING REMOVAL LASTS MORE THAN A SHIFT.
10. CONTRACTOR SHALL PATCH AND REPAIR ALL FINISHES
SCHEDULED TO REMAIN WHERE DEMOLITION AND/OR NEW WORK
IS TAKING PLACE. THIS INCLUDES WALL SUBSTRATES AND
FINISHES, CEILING MATERIALS AND FINISHES, AND FLOOR
SUBSTRATES AND FINISHES. WHERE NOT INDICATED
OTHERWISE, REPAIR SHALL MATCH ADJACENT SUBSTRATE,
MATERIALS, TEXTURE, PATTERN, COLOR, AND FINISH. WHERE
PATCHED AREA FINISHES DO NOT MATCH EXACTLY, THE ENTIRE
AREA SHALL BE REPAIRED / REPLACED / REFINISHED TO PROVIDE
A UNIFORM FINISH.
11. SYSTEMS FURNITURE DESKS, CHAIRS, FREE-STANDING
STORAGE UNITS, MOST MEDICAL EQUIPMENT, ETC ARE NOT
INCLUDED IN THE BASE CONTRACT, EXCEPT AS SHOWN.
CONTRACTOR FURNISHED AND INSTALLED EQUIPMENT IS
INDICATED ON THE PLANS AND IN THE EQUIPMENT SCHEDULE AS
C / C. VA FURNISHED AND INSTALLED EQUIPMENT IS SHWN IN THE
EQUIPMENT SCHEDULE AS V / V. EQUIPMENT MARKED AS V / C
WILL BE FURNISHED BY THE VA AND INSTALLED BY THE
CONTRACTOR.
1/ 2' 0'
1' 4'
4' 8'
4' 2'
2'
1/ 8' 0'
1' 0' 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
8' 8'
1/ 0'
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
B20
Sheet of
ISSUED FOR CONSTRUCTION
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc
B
D en ta l\0
4- D
ES
IG
N \R
EV
IT
\2
7-
1_
VA
N C
D en ta l B
O
PT
n ew
.rv t
8/
/2
9:
:1
AM
G-101
COVER SHEET- GENERAL INFORMATION
BLUE TRIDENT, LLC
900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110
(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME
Renovate Building 20 in Vancouver to Consolidate Dental Services
VANCOUVER, WA
648-22-100
15 AUG 2024
EB LMS
DRAWING ABBREVIATIONS DRAWING SYMBOLS
A
ACT ACOUSTICAL CEILING TILE
ADJ ADJACENT
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANNODIZED
APPROX APPROXIMATE
B
BD BOARD
BF BRACE FRAME
BLDG BUILDING
BLKG BLOCKING
BOD BOTTOM OF DECK
BOT BOTTOM
C
C / C CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
CAB CABINET(S)
CFM CUBIC FEET PER MINUTE
CJ CONROL JOINT
CL CENTER LINE
CLG CEILING
CLO CLOSET
CLR CLEAR
COL COLUMN
CONC CONCRETE
COR CONTRACTING OFFICERS
REPRESENTATIVE
CORR CORRIDOR
CPT CARPET
CT CERAMIC TILE
D
DA DENTAL AIR
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DF DRINKING FOUNTAIN
DIA DIAMETER
DIFF DIFFERENCE
DIM DIMENSION
DISP DISPENSER / DISPOSAL
DN DOWN
DWG DRAWING(S)
E
EA EACH
G-101 COVER SHEET- GENERAL INFORMATION
G-102 OVERALL EXISTING FLOOR PLANS - FOR REFERENCE ONLY
G-103 LIFE SAFETY PLAN
AD100 DEMOLITION FLOOR PLAN
AD101 DEMOLITION CEILING PLAN
A-110 DENTAL CLINIC FLOOR PLAN
A-120 REFLECTED CEILING PLAN
A-130 ENLARGED PLANS
A-300 CLINIC SECTIONS
A-600 DOOR SCHEDULE AND MISC DETAILS
A-601 ROOM FINISH AND WALL SCHEDULE AND CASEWORK
DETAILS
A-602 SIGNAGE
A-603 FF&E PLAN AND EQUIPMENT SCHEDULE
A-801 INTERIOR ELEVATIONS
A-802 INTERIOR ELEVATIONS
A-803 INTERIOR ELEVATIONS
A-804 INTERIOR ELEVATIONS
S-101 GENERAL NOTES, FRAMING PLAN, AND DETAILS
P-000 GENERAL NOTES, ABBREVIATIONS AND SHEET INDEX
PD101 PLUMBING DEMOLITION - FIRST FLOOR PLAN
PD102 PLUMBING DEMOLITION - SECOND FLOOR PLAN
P-101 PLUMBING FIRST FLOOR PLAN
P-102 PLUMBING SECOND FLOOR PLAN
PG101 PLUMBING DENTAL GASES - FIRST FLOOR PLAN
PG102 PLUMBING DENTAL GASES - SECOND FLOOR PLAN
PG103 PLUMBING DENTAL GASES - SECOND FLOOR PLAN NORTH
PG104 PLUMBING DENTAL GASES - SECOND FLOOR PLAN SOUTH
P-501 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
M-000 GENERAL NOTES, ABBREVIATIONS AND SHEET INDEX
M-001 MECHANICAL LEGEND
MD101 MECHANICAL DEMOLITION - SECOND FLOOR PLAN
MH101 MECHANICAL - SECOND FLOOR PLAN
MH111 MECHANICAL - SECOND FLOOR ZONING PLAN
MP101 MECHANICAL PIPING - SECOND FLOOR PLAN
M-302 MECHANICAL SECTIONS
M-401 MECHANICAL ENLARGED PLANS
M-501 MECHANICAL DETAILS
M-550 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-801 MECHANICAL SEQUENCE OF OPERATIONS
M-802 MECHANICAL SEQUENCE OF OPERATIONS
E-000 GENERAL NOTES, ABBREVIATIONS AND SHEET INDEX
E-001 ELECTRICAL LEGEND
ED101 ELECTRICAL DEMOLITION - SECOND FLOOR PLAN
EL101 ELECTRICAL LIGHTING - SECOND FLOOR PLAN
EP100 ELECTRICAL EXISTING - OVERALL FLOOR PLANS
EP102 ELECTRICAL POWER - SECOND FLOOR PLAN
E-401 ELECTRICAL ENLARGED PLANS
EL601 ELECTRICAL LIGHTING SCHEDULE
EP602 ELECTRICAL SCHEDULES
FP000 GENERAL NOTES, ABBREVIATIONS AND SHEET INDEX
FPD102 FIRE PROTECTION DEMOLITION - SECOND FLOOR PLAN
FP102 FIRE PROTECTION - SECOND FLOOR PLAN
INDEX OF DRAWINGSGENERAL NOTES
RENOVATE BUILDING 20 IN VANCOUVER TO CONSOLIDATE DENTAL SERVICES
VA Portland Healthcare System
DEPARTMENT OF VETERANS AFFAIRS - VANCOUVER CAMPUS
PROJECT NUMBER 648-22-100
PROJECT TEAM
PRIME CONTRACT HOLDER,
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN, BAINBRIDGE ISLAND, WA 98110
p.206-972-0645 P.O.C. Emmanuel (Manny) Bautista, PE, F.SAME
ELECTRICAL ENGINEER
SAZAN ENGINEERS, INC
600 STEWART ST, STE 1400, SEATTLE, WA 98101
p.206-267-1700
WWW.SAZAN.COM
MECHANICAL ENGINEER
SAZAN ENGINEERS, INC
600 STEWART ST, STE 1400, SEATTLE, WA 98101
p.206-267-1700
WWW.SAZAN.COM
ELEC ELECTRIC
EQ EQUAL
EQUIP EQUIPMENT
EXG EXISTING
EXP JT EXPANSION JOINT
EXT EXTERIOR
F
FACP FIRE ALARM CONTRL PANEL
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FIN FINISH
FLR FLOOR
FOC FACE OF CABINET
FOF FACE OF FINISH
FOS FACE OF STUD
FOW FACE OF WALL
G
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GEN GENERAL
GLU-LAM GLUE LAM BEAM
GWB GYPSUM WALL BOARD
GYP GUPSUM
H
HDWR HARDWARE
HM HOLLOW METAL
HOP HIGHEST OPERABLE PART
HORIZ HORIZONTAL
HVAC HEATING VENTILATION AIR
CONDITIONING
I
IBC INTERNATIONAL BUILDING
CODE
ID INTERIOR DESIGN
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
J
JAN JANITOR
JT JOINT
K
KIT KITCHEN
L
LAM LAMINATED
LAV LAVATORY
LF LINEAR FEET
LIN LINOLEUM
M
MATL MATERIAL
MAX MAXIMUM
MBL MARBLE
MDF MEDIUM DENSITY FIBERBOARD
MECH MECHANICAL
MFG MANUFACTURER
MIN MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MS METAL STUD
MTD MOUNTED
MTL METAL
N
NA NOT APPLICABLE
NAP NAPKIN
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
O
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
ORIG ORIGINAL
P
PAF POWER ACTIVATED
FASTENERS
PLAM PLASTIC LAMINATE
PLWD PLYWOOD
PREFAB PRE FABRICATED
PREFIN PRE FINISHED
PT PAINT
PTD PAPER TOWEL DISPENSER
PTN PARTITION
Q
QT QUARRY TILE
R
R RETURN AIR
RAD RADIUS
RB RUBBER
RCP REFLECETED CEILING PLAN
REF REFERENCE
REINF REINFORCING
REQD REQUIRED
RESIL RESILIENT
S
S SUPPLY AIR
SAN SANITARY
SCHED SCHEDULE
SD SOAP DISPENSER
SF SQUARE FOOT
SHT SHEET
SHWR SHOWER
SIM SIMILAR
SLIN SHEET LINOLEUM
SND SANITARY NAPKIN DISPOSAL
SS SOLID SURFACE
SST STAINLESS STEEL
STD STANDARD
STL STEEL
STO STORAGE
STS SELF TAPPING SCREW
T
TAB TESTING, ADJUSTING,
BALANCING
TB TOWEL BAR
TEMP TEMPORARY
THK THICK
THRU THROUGH
TLT TOILET
TO TOP OF
TPD TOILET PAPER DISPENSER
TPTN TOILET PARTITION
TR TRASH RECEPTACLE
TYP TYPICAL
TZO TERRAZZO
U
UC UNDER COUNTER / UNDER
CABINET
UNFIN UNFINISHED
UON UNLESS OTHERWISE NOTED
V
V / C VA FURNISHED / CONTRACTOR
INSTALLED
V / V VA FURNISHED / VA INSTALLED
VAR VARIES
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
W
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WR WATER RESISTANT
WWF WELDED WIRE FABRIC
COST ESTIMATOR
OCMI
2033 6TH AVE, SUITE 600 SEATTLE, WA 98121
P.206.395.9738
WWW.OCMI.COM
PLAN PERSPECTIVE
VICINITY MAP
PM, STRUCTURAL ENGINEER
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
p.206-972-0645 P.O.C. Brian Moll, PE, SE
ARCHITECT
BLUE TRIDENT, LLC
7829 NE ESPERIONE LN
BAINBRIDGE ISLAND, WA 98110
p.206-972-0645 P.O.C. Lauri Strauss, AIA, LEED AP BD&C
SCOPE OF WORK
PHASING PLAN OUTLINE
Revisions: Date:
VHAPORMAJORM
Text Box ALL WORK TO OCCUR AFTER 4:30PM AND FINISH BY 5:00AM MONDAY THROUGH SUNDAY. ALL MEDICAL CENTER ACTIVITIES WILL REMAIN OPEN THROUGHOUT THE DURATION OF THE CONSTRUCTION. CONTRACTOR TO ENSURE THAT ALL MEDICAL CENTER ACTIVITIES REMAIN UNIMPEDED BY CONSTRUCTION ACTIVITIES.
BA.8 B.5 B.9 C C.4 C.5 D D.7 EA.7
BA.8 B.5 B.9 C C.4
C.5
C.5 D D.7 EA.7
3' - 1" 8' - 7" 16' - 7" 19' - 9" 2' - 8" 20' - 1" 1' - 4" 16' - 7" 14' - 2" 6' - 3 1/2"
77' - 0"
80' - 0"
1' - 6"1' - 6"
1'
- 6
8"
7"
1/ 2' 0'
1' 4'
4' 8'
4' 2'
2'
1/ 8' 0'
1' 0' 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
8' 8'
1/ 0'
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
B20
Sheet of
ISSUED FOR CONSTRUCTION
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc
B
D en ta l\0
4- D
ES
IG
N \R
EV
IT
\2
7-
1_
VA
N C
D en ta l B
O
PT
n ew
.rv t
8/
/2
9:
:1
AM
G-102
OVERALL EXISTING FLOOR PLANS - FOR
REFERENCE ONLYBLUE TRIDENT, LLC
900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110
(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME
Renovate Building 20 in Vancouver to Consolidate Dental Services
VANCOUVER, WA
648-22-100
15 AUG 2024
EB LMS
1/8" = 1'-0"F6 FIRST FLOOR PLAN 1/8" = 1'-0"F3 OVERALL SECOND FLOOR PLAN
Revisions: Date:
FD FDFDFD
FD
B
FECe
FEC
A.8 B.5 B.9 C C.4C.5 D D.7A.7
131 SF
TRTMNT
127 SF
TRTMNT
199 SF
SURGERY
127 SF
TRTMNT
127 SF
TRTMNT
178 SF
OFFICE
375 SF
CORR
C2.03
49 SF
ALCOVE 2
C2.04
48 SF
TOILET
59 SF
STAFF TOILET
79 SF
LAB
47 SF
SOILED
43 SF
MEDS
63 SF
STERILE
INSTRUMENTS
63 SF
PANO
39 SF
CORR
C2.02
79 SF
STORAGE
200 63 SF
OMNICELL
SUPPLY
EXISTING STAIRS
EXISTING FRE PARTITION
EXISTING ONE-HOUR RATED FIRE PARTITION -
MAINTAIN INTEGRITY - NO NEW PENETRATIONS
FEC
2' - 1"1 1/4"
SMOKE PARTITION
REFERENCE NFPA 8.4
1-HR FIRE RESISTANT
RATED BARRIER
2-HR FIRE RESISTANT
RATED BARRIER
HORIZONTAL SMOKE
BARRIER CEILING
ASSEMBLY
HORIZONTAL 1-HR FIRE-
RESISTANT RATED
ASSEMBLY (ABOVE)
STAIRS
LIFE/SAFETY LEGEND
BUILDING EXIT
EXIT ROUTE
FEC (NEW)
FECe (EXISTING)
1/ 2' 0'
1' 4'
4' 8'
4' 2'
2'
1/ 8' 0'
1' 0' 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
8' 8'
1/ 0'
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
B20
Sheet of
ISSUED FOR CONSTRUCTION
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc
B
D en ta l\0
4- D
ES
IG
N \R
EV
IT
\2
7-
1_
VA
N C
D en ta l B
O
PT
n ew
.rv t
8/
/2
9:
:1
AM
G-103
LIFE SAFETY PLAN
BLUE TRIDENT, LLC
900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110
(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME
Renovate Building 20 in Vancouver to Consolidate Dental Services
VANCOUVER, WA
648-22-100
15 AUG 2024
EB LMS
1/4" = 1'-0"F4 DENTAL 2nd FLOOR AREA A CODE PLAN
OCCUPANCY CALCULATIONS
RM
NUM ROOM NAME
NET
AREA
OCCUPANT
LOAD TOTAL
200 STORAGE 79 SF 300 1
201 TRTMNT 131 SF 60 3
202 PANO 63 SF 100 1
203 TRTMNT 127 SF 60 3
204 STERILE INSTRUMENTS 63 SF 300 1
205 OFFICE 178 SF 100 2
206 OMNICELL SUPPLY 63 SF 300 1
207 TRTMNT 127 SF 60 3
208 SOILED 47 SF 300 1
209 TRTMNT 127 SF 60 3
210 LAB 79 SF 300 1
211 SURGERY 199 SF 60 4
212 STAFF TOILET 59 SF
213 MEDS 43 SF 300 1
214 TOILET 50 SF
215 TOILET 48 SF
C2.01 ALCOVE 1 18 SF
C2.02 CORR 39 SF
C2.03 CORR 375 SF
C2.04 ALCOVE 2 49 SF
1962 SF
24 OCC's
2 2
CR
DCES
REX
REX
ES DC
CR
BA.8 B.5 B.9 C C.4 C.5 DA.7
3' - 1" 8' - 7" 16' - 7" 19' - 9" 2' - 8" 20' - 1" 1' - 4" 16' - 7"
77' - 0"
80' - 0"
1' - 6"1' - 6"
1'
- 6
9' - 6"
5'
- 7
6'
- 4
5'
- 3
1/ 2"
6'
- 5
4' - 0 1/2"5' - 9" 8' - 8 1/2" 3' - 0" 9' - 1" 8' - 9" 3' - 0" 9' - 2"
2'
- 9
5'
- 0
9'
- 4
15' - 11 1/2" 5' - 6" 13' - 10" 8' - 4" 6' - 0" 6' - 5" 5' - 11 1/2"
3'
- 1
1'
- 2
5' - 11"
5' - 0"
1'
- 6
3'
- 8
1'
- 4
4"
1'
- 4
3'
- 8
3' - 0" 3' - 8" 1' - 4" 3' - 8" 3' - 0"1' - 4"26' - 8" 1' - 4" 3' - 8" 1' - 4" 31' - 0"
3'
- 4
3'
- 8
1'
- 4
4"
1'
- 4
3'
- 8
3'
- 4
PHASE 1 DEMOLITION
PHASE 2 DEMOLITION -
SHADED - IS TO REMAIN
OPERATIONAL DURING
PHASE 1 DEMOLITION
AND CONSTRUCTION
DASHED LINES INDICATE EXTENT OF DEMOLITION INCLUDING
WALLS, DOORS, FRAMES, PLUMBING FIXTURES, CASEWORK,
AND OTHER WALL MOUNTED APPURTENANCES, TYPICAL
CONSTRUCT TEMPORARY WALL AS SHOWN WITH BLUE
DASHED LINES PRIOR TO BEGINNING DEMOLITION - ADD
TEMP DOOR FOR CONTRACTORS ENTRANCE - AT
CONTRACTORS OPTION, THE PERMANANT WALL (TYPE AS
SCHEDULED) CAN BE INSTALLED THIS LOCATION.
CONSTRUCT TEMPORARY WALL AS SHOW WITH BLUE DASHED LINES PROR
TO BEGINNING DEMOLITION
REMOVE ALL RESILIENT FLOOR FINISHES IN THIS AREA -
REMOVE TILE FLOOR, BASE AND WAINSCOT IN TOILET ROOM
CONTRACTOR MAY REMOVE THE GLASS
AND VERTICAL MULLION FROM THESE TWO
WINDOWS AND USE THE OPENING TO
BRING IN MATERIALS, EQUIPMENT, AND
CREATE NEGATIVE AIR PRESSURE FOR
SPACE DURING CONSTRUCTION - NOTE
THE GLASS WILL NEED TO BE
REINSTALLED WITH NEW GLAZING AND
SEALANT UPON CONSTRUCTION
COMPLETION
6'
- 0
MI
N
REMOVE EXISTING CLERESTORY WINDOWS ON THIS WALL AND
PREP OPENING FOR INFILL
REFERENCE MEP DEMOLITION DRAWINGS
FOR REMOVAL OF PLUMBING FIXTURES, AIR
GRILLS, OUTLETS AND DEVICES
EXISTING EXPOSED STRUCTURAL BRACING AND
COLUMNS TO REMAIN
PROVIDE PORTABLE FIRE EXTINGUISHER MOUNTED ON
TEMPORARY WALL FOR THE DURATION OF CONSTRUCTION
ACTIVITIES
REMOVE EXISTING ITEMS ON WALL SUCH AS WALL SCONCES, SIGNS, DISPLAY
CABINETS, ETC AND SALVAGE FOR REINSTALLATION UPON COMPLETION OF
CONSTRUCTION.
3' - 4"EXG FEC TO REMAIN
REMOVE TILE FLOOR, BASE AND
WAINSCOT IN TOILET ROOMS
PROTECT EXISTING FLOOR TO REMAIN DURING CONSTRUCITON
OPERATIONS THIS AREA
G
J
F
A
B
A
E
Dsim
D
Dsim
H
REMOVE EXISTING WINDOW SHADES AND
SALVAGE FOR REINSTALLATION UPON
COMPLETION OF CONSTRUCTION - SOME BLINDS
WILL BE MODIFIED AND REINSTALLED - SEND TO
MANUFACTURER FOR MODIFICATION
REMOVE EXISTING WINDOW SHADES
AND SALVAGE FOR REINSTALLATION
UPON COMPLETION OF
CONSTRUCTION - SOME BLINDS WILL
BE MODIFIED AND REINSTALLED -
SEND TO MANUFACTURER FOR
MODIFICATION
REMOVE EXISTING WINDOW SHADE AND SALVAGE FOR REINSTALLATION UPON
COMPLETION OF CONSTRUCTION - SOME BLINDS WILL BE MODIFIED AND
REINSTALLED - SEND TO MANUFACTURER FOR MODIFICATION
REMOVE EXISTING WINDOW SHADES - SOME
BLINDS WILL BE MODIFIED AND REINSTALLED -
SEND TO MANUFACTURER FOR MODIFICATION
REMOVE EXISTING WINDOW SHADES - SOME
BLINDS WILL BE MODIFIED AND REINSTALLED -
SEND TO MANUFACTURER FOR MODIFICATION
REMOVE EXISTING WINDOW SHADE -
SOME BLINDS WILL BE MODIFIED AND
REINSTALLED - SEND TO
MANUFACTURER FOR MODIFICATION
REMOVE EXISTING
WINDOW SHADES AND
SALVAGE FOR
REINSTALLATION
UPON COMPLETION OF
CONSTRUCTION
9' - 1 3/8" +/-5' - 6"40' - 6 1/2"8' - 3 83/256" 13' - 2 45/256"
CONSTRUCT TEMPORARY
WALL AS SHOWN WITH BLUE
DASHED LINES PROR TO
BEGINNING DEMOLITION
REMOVE EXISTING CEILING TILES
AND ALL OTHER CEILING
MOUNTED ITEMS BETWEEN
TEMP. AND EXISTING WALLS
SUCH AS SIGNAGE AND SALVAGE
FOR REINSTALLATION UPON
COMPLETION OF
CONSTRUCTION.
REMOVE EXISTING ITEMS ON
WALL SUCH AS WALL SCONCES,
SIGNS, DISPLAY CABINETS, ETC
AND SALVAGE FOR
REINSTALLATION UPON
COMPLETION OF CONSTRUCTION.
EXG FEC TO REMAIN - REMOVE
DURING CONSTRUCTION AND
REINSTALL
REMOVE EXISTING WINDOW
SHADES AND SALVAGE FOR
REINSTALLATION UPON
COMPLETION OF CONSTRUCTION,
TYP
SIMILAR FINISHES AND FIXTURES AT
EXISTING PUBLIC TOILET ROOM TO
REMAIN OPERATIONAL DURING
DEMOLITION AND RECONSTRUCTON
OF NEW CLINIC
ALL FIXTURES, FINISHES,
ACCESSORIES ETC TO BE
REMOVED FROM THIS ROOM
EXISTING PANO XRAY IN BUILDING
15 TO BE DISMANTLED AND
RELOCATED TO NEW CLINIC AREA
EXISTING SINK, COUNTER
AND ACCESSORIES TO BE
REMOVED FROM EXG
CORRIDOR
EXISTING BUILT-IN
CABINETS IN
CORRIDOR TO BE
REMOVED - TYP OF 2
EXG CABINET IN ROOM
200 TO BE
COMPLETELY
REMOVED INCLUDING
ACCESSORIES AND
SINK
A B C D E F
G H
EXG STEEL BRACING
TO REMAIN - PAINT TO
MATCH ROOM
1/ 2' 0'
1' 4'
4' 8'
4' 2'
2'
1/ 8' 0'
1' 0' 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
8' 8'
1/ 0'
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
B20
Sheet of
ISSUED FOR CONSTRUCTION
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc
B
D en ta l\0
4- D
ES
IG
N \R
EV
IT
\2
7-
1_
VA
N C
D en ta l B
O
PT
n ew
.rv t
8/
/2
9:
:2
AM
AD100
DEMOLITION FLOOR PLAN
BLUE TRIDENT, LLC
900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110
(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME
Renovate Building 20 in Vancouver to Consolidate Dental Services
VANCOUVER, WA
648-22-100
15 AUG 2024
EB LMS
0 6' 9' 12'3'
Graphic Scale: 1 inch = 3 feet
3/8" = 1'-0"F3 DENTAL 2nd FLOOR AREA A DEMOLITION PLAN
S S SS S S
BA.8 B.5 B.9 C C.4 C.5 DA.7
REMOVE ALL CEILINGS THIS AREA TO INCLUDE SUSPENDED
ACOUSTICAL TILES AND GRIDS, SUSPENDED AND STRUCTURE MOUNTED
GYPSUM BOARD, AND ALL SOFFITS OVER CASEWORK.
REMOVE ALL PERMANENTLY INSTALLED CEILING MOUNTED EQUIPMENT AND
TURN OVER TO THE OWNER - NOT SHOWN FOR CLARITY - VERIFY IN FIELD
SEE ELECTRICAL AND MECHANICAL DRAWINGS FOR OTHER CEILING
MOUNTED ITEMS TO BE REMOVED AND EITHER REINSTALLED IN NEW
LOCATIONS, OR REPLACED WITH NEW MATERIALS.
PHASE 2 DEMOLITION -
SHADED - IS TO REMAIN
OPERATIONAL DURING
PHASE 1 DEMOLITION
AND CONSTRUCTION
PHASE 1 DEMOLITION
CONSTRUCT TEMPORARY WALL AS SHOWN WITH BLUE
DASHED LINES PROR TO BEGINNING DEMOLITION - ADD
TEMP DOOR FOR CONTRACTORS ENTRANCE - AT
CONTRACTORS OPTION, THE PERMANANT WALL (TYPE AS
SCHEDULED) CAN BE INSTALLED THIS LOCATION.
ALIGN TEMPORARY WALL WITH CEILING GRID
REMOVE EXISTING CEILING TILES AND ALL OTHER
CEILING MOUNTED ITEMS AS NECESSARY BETWEEN
TEMP. AND EXISTING WALLS SUCH AS SIGNAGE AND
SALVAGE FOR REINSTALLATION IN THE SAME LOCATION
UPON COMPLETION OF CONSTRUCTION.
REMOVE EXISTING WALL MOUNTED
TELEVISION AND COORDINATE WITH
OWNER FOR NEW PERMANENT LOCATION
J
K
Ksim
F
L
Lsim opp
EXISTING CLERESTORY WINDOW TO BE
REMOVED AND WALL INFILLED
J K
GYPSUM BOARD SOFFIT AT
CORRIDOR CONNERS TO
BE REMOVED
TYPICAL CEILING FINISHES IN
OFFICE SPACES TO BE
DEMOLISHED AND REMOVED
TYPICAL EXISTING WINDOW
MULLION PATTERN - WINDOW
BILNDS TO REMAIN (REMOVE
DURING CONSTRUCTION
OPERATIONS AND REINSTALL)
L 1/ 2' 0'
1' 4'
4' 8'
4' 2'
2'
1/ 8' 0'
1' 0' 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
8' 8'
1/ 0'
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
B20
Sheet of
ISSUED FOR CONSTRUCTION
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc
B
D en ta l\0
4- D
ES
IG
N \R
EV
IT
\2
7-
1_
VA
N C
D en ta l B
O
PT
n ew
.rv t
8/
/2
9:
:2
AM
AD101
DEMOLITION CEILING PLAN
BLUE TRIDENT, LLC
900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110
(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME
Renovate Building 20 in Vancouver to Consolidate Dental Services
VANCOUVER, WA
648-22-100
15 AUG 2024
EB LMS
3/8" = 1'-0"F3 2nd FLOOR CEILING PLAN DEMO
FD FDFDFD
FD
BA.8 B.5 B.9 C C.4 C.5 D
A.7
A.7
D2 A-300
PANO
F7 A-300
SOILED
A-801
E5
E7
E9
E2
A-801
C4
C2
C8
C7
A-801
B5
B7
B9
B2 A-802
F5
F3
F9
F7 A-801
F5
F7F2
F9
TRTMNT
TRTMNT
OFFICE
TRTMNT
MEDS
5'
- 0
6' - 11" 5' - 5 1/2" 8' - 7 1/2" 6' - 10" 1' - 6" 6' - 4" 6' - 0" 6' - 4"
CFS 56x60 CFS 56x60
CFS 48x30
CFS 48x30
TRTMNT
SURGERY
LAB
STAFF TOILET
TOILET
TOILET
STORAGE
CORR
C2.03
STERILE
INSTRUMENTS
6"
11' - 1" 11' - 0" 16' - 9" 11' - 0" 11' - 0"
CFS 48x30
CFS 56x60
CFS 48x30
CFS 48
x30
CFS 48x30
7' - 0"6' - 0 1/2" 7' - 0"
1' - 10"
1'
- 2
CORR
C2.02
ALCOVE 2
C2.04 e218
203B201B 207B 209B
210208204
C2.02
C2.04
201A 203A 207A 209A
8'
- 7
A-802
E1
C9
B1
C7
A-130 F5
A-130 B1
A-130 D3
ALIGN
1'
- 6
7/ 8"
4'
- 5
1/ 8"
A-130 D7
1'
- 6
7/ 8"
4'
- 5
1/ 8"
1'
- 6
4'
- 4
1' - 0"
1'
- 0
ALIGN
A-130 D1
3' - 10 1/2" 3' - 9 1/2" 9 1/2" 3' - 9 1/2"
A-130 D9
A-130 D5
A-802C1
A3
A3
A4
A3
A3
A4
A3
C3
C3
A6
A1
A1 A1
A3
A6
A1
A1
A1
A4
A3 A4
A4
C3
C3 B3
B3
C3
C3
A4
C3
OMNICELL
SUPPLY
THIS AREA - IS TO
REMAIN OPERATIONAL
DURING PHASE 2
DEMOLITION AND
CONSTRUCTION
PHASE 2 DEMOLITION
AND CONSTRUCTION
TEMP WALL
B3
A-130 F1
9' - 0"
2'
- 1
3/ 8"
C3
C3
C6
2'
- 2
4'
- 1 1 1
/2"
1' - 0"
C3
C3
C3
C3
DUCT CHASE
DUCT CHASE
CLEAN LINEN CABINETS
DUCT CHASE
DUCT CHASE
9'
- 9
3/ 4"
C6
C3C3
1' - 9"
CF
S x3
3' - 10"
A-130 D4
A-803
A1
A-803 E1
C3
C1
E3
A-601 D6
5'
- 2
1/ 4"
FEC
EXISTING FEC TO
REMAIN
ALIGN FACE OF NEW
WALL WITH WINDOW
OPENING
7'
- 0
A-803 F3
A-130 F3
3' - 6 1/2" 3' - 4" 3' - 6 1/2" 3' - 4" 3' - 6 1/2"
C5
C3
C6
FEC
1' - 5" 1' - 5"
HAND SINK WITH
EYEWASH
F1
2' - 6"
A3
A3
A4A4
1' - 3 5/8"
A-804
E7
E9
A-804
F5
F7
F9
F3
1' - 6 1/2" 1' - 9 1/2" 2"1' - 9"1' - 7"1' - 11"
2 1/2" 9" 6' - 5" 5' - 6"8' - 5"2"
8' - 8" 9"3' - 3 1/2"3' - 4 1/2"3' - 4 1/2"3' - 0 1/2"9' - 11 1/2"7' - 4"3' - 0 1/2" 2 1/2"3' - 4 1/2" 3" 6"
3' - 4 1/2"3' - 0"
3' - 6"
W2
W2
W2
W2 W2
W2
W2
W2
W2
9"
1'
- 0
W2
W2
NOTES
FINISH MATERIALS SUCH AS CERAMIC
TILE, WALL COVERINGS, ETC. ARE NOT
TYPICALLY SHOWN AS AN INTEGRAL
PART OF THE ASSEMBLY. REFER TO
INTERIOR DRAWINGS AND / OR FINISH
SCHEDULES FOR FINISH MATERIALS.
PARTITIONS EXTENDING TO DECK
ABOVE ARE INDICATED ON RCP'S.
ALL PENETRATIONS THROUGH
ACOUSTICAL AND FULL HEIGHT
ASSEMBLIES TO BE ACOUSTICALLY
SEALED.
FIRE BLOCKING WILL BE INSTALLED IN
ACCORDANCE WITH IBC 717.2,
HORIZONTALLY AT INTERVALS NOT
EXCEEDING 10 FEET
1.
2.
3.
4.
A2 WALL TYPE
STC-53
(2) LAYERS STAGGERED 5/8" TYPE
'X' GWB - DOUBLE LAYER ON
SAME SIDE AS WALL TAG
20 GA METAL STUDS @ 16" O.C. 3
5/8" OR AS REQUIRED TO ALIGN
WITH EXISTING WALL THICKNESS
A1 WALL TYPE
NOT RATED
5/8" TYPE 'X' GWB
3-5/8" STUDS @16"
O.C. HT AS INDICATED
INTERIOR WALL TYPES
R-11 UNFACED,
FORMALDEHYDE FREE, BATT
INSULATION BETWEEN STUDS
5/8" TYPE 'X' GWB
SEAL ALL PENETRATIONS WITH
ACOUSTICAL SEALANT
C1 WALL TYPE
NOT RATED
1 1/2" 'Z' STUDS
@16" O.C.
5/8" TYPE 'X' GWB
A3 WALL TYPE
STC-53
(2) LAYERS STAGGERED 5/8" TYPE
'X' GWB - DOUBLE LAYER ON
SAME SIDE AS WALL TAG
5/8" TYPE 'X' GWB
20 GA METAL STUDS @ 16" O.C. 3
5/8" [4" STUDS AT A4] OR AS
REQUIRED TO ALIGN WITH EXISTING
WALL THICKNESS
R-11 UNFACED,
FORMALDEHYDE FREE, BATT
INSULATION BETWEEN STUDS
SEAL ALL PENETRATIONS WITH
ACOUSTICAL SEALANT
(2) LAYERS STAGGERED 5/8" TYPE
'X' GWB
C3 WALL TYPE
NOT RATED
3 5/8" STUDS @16" O.C.
5/8" TYPE 'X' GWB
EXG WALL
NOT RATED
SHADING INDICATES
EXISTING WALLS TO
REMAIN - WIDTH
VARIES - NOT TAGGED
PATCH HOLES AND
REPAIR DRYWALL
SURFACE AS
REQUIRED AND
REPAINT ENTIRE WALL
BOTH SIDES
C6 WALL TYPE
NOT RATED
6" STUDS @16" O.C.
5/8" TYPE 'X' GWB
B3 WALL TYPE
NOT RATED
3 5/8" STUDS @16" O.C. (OR AS
REQUIRED TO FIT IN FRONT
OF EXG WINDOW FRAME)
5/8" TYPE 'X' GWB - INSTALL
AFTER INFILL PIECE IS SET
1/4" TYPE 'X' GWB - PAINT
EXPOSED SIDE GLOSS WHITE
AND INSTALL ON STUDS
PRIOR TO FITTING IN WINDOW
WINDOW INFILLA4 SIM WITH 4" STUDS
R-11 UNFACED,
FORMALDEHYDE FREE, BATT
INSULATION BETWEEN STUDS
R-11 UNFACED,
FORMALDEHYDE
FREE, BATT
INSULATION BETWEEN
STUDS - WHERE
SHOWN ON PLANS
1/ 2' 0'
1' 4'
4' 8'
4' 2'
2'
1/ 8' 0'
1' 0' 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
8' 8'
1/ 0'
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
B20
Sheet of
ISSUED FOR CONSTRUCTION
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc
B
D en ta l\0
4- D
ES
IG
N \R
EV
IT
\2
7-
1_
VA
N C
D en ta l B
O
PT
n ew
.rv t
8/
/2
9:
:2
AM
A-110
DENTAL CLINIC FLOOR PLAN
BLUE TRIDENT, LLC
900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110
(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME
Renovate Building 20 in Vancouver to Consolidate Dental Services
VANCOUVER, WA
648-22-100
15 AUG 2024
EB LMS
0 6' 9' 12'3'
Graphic Scale: 1 inch = 3 feet
3/8" = 1'-0"F3 DENTAL 2nd FLOOR AREA A FLOOR PLAN
OS OSOS
OS
OS
OS
REX
REX
S SS
OS
BA.8 B.5 B.9 C C.4 C.5 DA.7
D2 A-300
F7 A-300
THIS AREA - IS TO
REMAIN OPERATIONAL
DURING PHASE 2
DEMOLITION AND
CONSTRUCTION
PHASE 2
DEMOLITION AND
CONSTRUCTION
TEMP WALL
F3200
A1066
9' - 0"
9' - 0"
8' - 0"
8' - 0"
9' - 0" 9' - 0" 9' - 0"
9' - 0"
9' - 0" 9' - 0" 9' - 0" 9' - 0"
9' - 0"
8' - 0"
9' - 0"
7' - 10"
9' - 0" 9' - 0"
9' - 0"
9' - 0"9' - 0"
C2 C2 C1 C2 C2 C2
C1
C1
C1
C3
C1
C1C2C2C2C2
C3
C3
C1
C1
C3
63 SF
PANO
47 SF
SOILED
131 SF
TRTMNT
127 SF
TRTMNT
127 SF
TRTMNT
178 SF
OFFICE
127 SF
TRTMNT
43 SF
MEDS
199 SF
SURGERY
79 SF
LAB
59 SF
STAFF TOILET
48 SF
TOILET
50 SF
TOILET
79 SF
STORAGE
375 SF
CORR
C2.03
63 SF
STERILE
INSTRUMENTS
39 SF
CORR
C2.02
49 SF
ALCOVE 2
C2.04
63 SF
OMNICELL
SUPPLY
A1200
7' - 10"
INSTALL NEW ROLLER SHADES TO FIT NEW
OPENINGS UPON COMPLETION OF
CONSTRUCTION
INSTALL NEW ROLLER SHADES TO FIT NEW
OPENINGS UPON COMPLETION OF
CONSTRUCTION
INSTALL NEW ROLLER SHADES
TO FIT NEW OPENINGS UPON
COMPLETION OF
CONSTRUCTION
REINSTALL SALVAGED
ROLLER SHADES - MODIFY
SHADES (CLOTH AND
FRAME) TO FIT NEW
HEIGHT AT INFILL
REINSTALL SALVAGED
ROLLER SHADES
REINSTALL SALVAGED
ROLLER SHADES
INSTALL NEW ROLLER SHADES TO FIT NEW
OPENINGS UPON COMPLETION OF
CONSTRUCTION
COORDINATE WITH OWNER FOR NEW PERMANENT
LOCATION OF SALVAGED WALL MOUNTED
TELEVISION
CG1CG1
CG2 CG2
CG1
CG1
CG1
CG1
CG2
CG2
8' - 10" 11' - 0"
13' - 0" 13' - 0" 13' - 0" 8' - 4"
8' - 6"
AED SIGN
C1
C3
C3
D6155
D6050D6050D6050D6050
9' - 0"
CEILING TYPES LEGEND
C1 2 X 2 ACOUSTICAL CEILNG TILE (ACT1)
C2 2 X 2 ACOUSTICAL CEILING TILE - CLEAN ROOM (ACT2)
C3 5/8" GYPUM BOARD - PAINTED
INDICATES ACOUSTICAL WALLS THAT EXTEND UP TO THE
BOTTOM OF THE ROOF DECK ABOVE - SEAL ALL
PENETRATIONS WITH ACOUSTICAL SEALANT
1/ 2' 0'
1' 4'
4' 8'
4' 2'
2'
1/ 8' 0'
1' 0' 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
8' 8'
1/ 0'
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
B20
Sheet of
ISSUED FOR CONSTRUCTION
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc
B
D en ta l\0
4- D
ES
IG
N \R
EV
IT
\2
7-
1_
VA
N C
D en ta l B
O
PT
n ew
.rv t
8/
/2
9:
:2
AM
A-120
REFLECTED CEILING PLAN
BLUE TRIDENT, LLC
900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110
(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME
Renovate Building 20 in Vancouver to Consolidate Dental Services
VANCOUVER, WA
648-22-100
15 AUG 2024
EB LMS
3/8" = 1'-0"F3 2nd FLOOR CEILING PLAN 0 6' 9' 12'3'
Graphic Scale: 1 inch = 3 feet
OS
OS
OS
T
T
T
CR
ESDC
4 4
2 4
FD FDFDFD
FD
LD
A
LDA
4 4
1 LD
A
T
T
4 T
LD
A
T
A1 A1
B.9 C C.4 C.5 D
D2 A-300
F7 A-300
A-803C5
A-803E5
A-803 F8 C8
C9
C7
E9
E8
E7
F9
F5
F7
C2.04
59 SF
STAFF TOILET
48 SF
TOILET
50 SF
TOILET
49 SF
ALCOVE 2
C2.04
79 SF
LAB
CFS 56x60 CFS 56x60
CFS 48x30
CFS 48x30
CFS 48x30
CFS 56x60
CFS 48x30
CFS 48
x30
6' - 4" 1' - 6" 6' - 4" 5' - 11 253/256" 6' - 4 3/256"
8'
- 4
4'
- 5
1/ 8"
CFS 60 DIAM CFS 60 DIAM CFS 60 DIAM
1' - 3 131/256"
4'
- 1
0"
1'
- 6
7/ 8"
4'
- 4
1'
- 6
4'
- 5
1/ 8"
1'
- 6
7/ 8"
A-802C1
SLOPE FLOOR TO
DRAIN
SLOPE
FLOOR TO
DRAIN
SLOPE
FLOOR TO
DRAIN
CG2 CG2
CG1H
H H
A-803 F3
C5
C3
C6
FEC
D0904
D6250
D3390
ELECT
PANEL
A5082
CG1
CG1
A1066
FAUCET
MOUNTED
EYEWASH
9' - 1 1/2"
A5077AED G
F1
3'-0" MIN.
A5082
A5075
2' - 0 5/8"
C3
5' - 5 1/2"
KNEE
WALL
C3
C3
FEC(e)ALIGN STUDS WITH
FACE OF EXG COLUMN
47 SF
SOILED
M3072 D0980
D4360
6'
- 1
0"
C'TOP
2' - 1"
3' - 0"
2'
- 9
/16
W2
W2
W2
W2
W2
B B.5
3' - 4 1/2" 2" 5" 2"
11' - 1"
3' - 8"
9"
FULL GLASS WOOD DOOR IN
HM FRAME
WALL MOUNTED SLIDING GLASS
DOOR
SLIDE
2"3' - 2 1/2"
SLIDE
3' - 10" 3' - 2"6 3/4" +/- 3' - 10 1/2"
3' - 10 1/2"
11' - 0"
3' - 4 1/2" 3' - 0 1/2"
PREFAB ALUMINUM GAP CLOSURE -
"MULLION MATE MM7" OR EQUAL
201A
201B 203B 203A
CAULK AND BACKER ROD AT GYPSUM BOARD
END, TYP
6 1/8"
F3 A-300
PREFAB ALUMINUM
GAP CLOSURE -
"MULLION MATE MM7"
OR EQUAL
EXG EXTERIOR
WALL AND
WINDOWS TO
REMAIN
CAULK AND BACKER
ROD AT GYPSUM
BOARD END, TYP
A3CLR FOR DUCT
1' - 4"
C6
DUCT CHASE
1' - 7" 1' - 10"
PREFAB ALUMINUM GAP CLOSURE - "MULLION
MATE MM7" OR EQUAL
REF MECHANICAL FOR
DUCTWORK
C6
A3
EXG EXTERIOR WALL AND WINDOWS
TO REMAIN
PAINT ALL EXPOSED SIDES
AND EDGES OF EXG STEEL
COLUMN AND BRACING
CAULK AND BACKER ROD
AT GYPSUM BOARD END,
TYP
ALIGN
B
1' - 0"
1'
- 0
C3
C3
C.4 C.5
PREFAB ALUMINUM GAP
CLOSURE - "MULLION MATE MM7"
OR EQUAL
A3
PAINT ALL EXPOSED SIDES
AND EDGES OF EXG STEEL
COLUMN AND BRACING
EXISTING INSULATED GLASS
WINDOW AND ALUMINUM FRAME
TO REMAIN
CAULK AND BACKER ROD AT
GYPSUM BOARD END
INFILL STEEL BEAM WITH
STEEL STUDS FOR GWB
FASTENING
C
A3
EXG EXTERIOR WALL AND WINDOWS
TO REMAIN
PAINT ALL EXPOSED SIDES AND
EDGES OF EXG STEEL COLUMN AND
BRACING
CAULK AND BACKER ROD AT GYPSUM
BOARD END, TYP
7"
B.5
PREFAB ALUMINUM GAP
CLOSURE - "MULLION MATE
MM7" OR EQUAL
C3
C3
C6
EXG EXTERIOR WALL
AND WINDOWS TO
REMAIN
CAULK AND BACKER ROD
AT GYPSUM BOARD END,
TYP
REF MECHANICAL FOR
DUCTWORK
9"
EXISTING WINDOW
MULLION
1' - 5 1/4" 4 1/4"
D
PREFAB ALUMINUM GAP
CLOSURE - "MULLION
MATE MM7" OR EQUAL
A4
B3
EXISTING INSULATED
GLASS WINDOW AND
ALUMINUM FRAME TO
REMAIN
NEW WALL AS SCHEDULED -
ALIGN WITH FACE OF EXG.
WALL AND WINDOW
FRAMING
REMOVE EXG WOOD
WINDOW STOOL
CAULK AND BACKER
ROD AT GYPSUM
BOARD END, TYP
D2 A-300
CENTER (1) LAYER 5/8" x 30" x
8' H. PLYWOOD BACKER ON
CENTERLINE OF
PANOGRAPHIC XRAY
COLUMN W/DOUBLE 6" [16GA
Fy=50KSI (600S162-54)] STUD
ON EACH SIDE - FULL
HEIGHT. PLACE BLOCKING
BETWEEN STUDS WITH
HEIGHT COORDINATED WITH
MFR FASTENING POINTS
A1
EXISTING, RELOCATED,
PANOGRAPHIC XRAY UNIT
C2.02
2'
- 6
CG1 CG1
1/ 2' 0'
1' 4'
4' 8'
4' 2'
2'
1/ 8' 0'
1' 0' 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
8' 8'
1/ 0'
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
B20
Sheet of
ISSUED FOR CONSTRUCTION
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc
B
D en ta l\0
4- D
ES
IG
N \R
EV
IT
\2
7-
1_
VA
N C
D en ta l B
O
PT
n ew
.rv t
8/
/2
9:
:2
AM
A-130
ENLARGED PLANS
BLUE TRIDENT, LLC
900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110
(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME
Renovate Building 20 in Vancouver to Consolidate Dental Services
VANCOUVER, WA
648-22-100
15 AUG 2024
EB LMS
1/2" = 1'-0"F5 ENARGED TOILET AND LAB PLANS
1 1/2" = 1'-0"B1 ENLARGED PLAN AT SLIDING DOORS
1 1/2" = 1'-0"D3 PLAN DETAIL AT EXG WINDOW 1 1/2" = 1'-0"D7 PLAN DETAIL AT EXG WINDOW MULLION 1 1/2" = 1'-0"D1 DETAIL AT COL B/1 1 1/2" = 1'-0"D9 DETAIL AT COL C.5/11 1 1/2" = 1'-0"D5 DETAIL AT COL C/11 1 1/2" = 1'-0"D4 DETAIL AT COL B.5/11
1 1/2" = 1'-0"F1 INFILL AT WINDOW IN MEDS ROOM
1 1/2" = 1'-0"F3 PANO X-RAY SUPPORT WALL
FIRST FLOOR
PLAN
189' - 0 123/128"
B B.5 B.9 C C.4 C.5 D F7
A-300
PANO
SOILED
200 C2.04
LAB
STAFF TOILET
212 TOILET
TOILET
214STORAGE
M2055M2055
STERILE
INSTRUMENTS
CORR
C2.02
ALCOVE 2
C2.04
GB4615 GB4615A5082
B2890B2890
OMNICELL
SUPPLY
0"
0"
8'
- 0
NO ARCHITECTURAL WORK ON THE FIRST FLOOR - SHOWN
FOR REFERENCE ONLY
TOP OF DECK
218' - 0 123/128"
2nd FLOOR 203' - 0 123/128"
F3 A-300
M2055 E0912 E0912
E0948W2
D2 A-300
A1066
GB4615
A5082 M8805 A5106
E0948
199 SF
SURGERY
375 SF
CORR
C2.03
50 SF
TOILET
A-600 A3
TOP OF DECK
218' - 0 123/128"
SECOND FLOOR
203' - 0 123/128"
F3200
CG1
D2 A-300
SECOND FLOOR
203' - 0 123/128"
A5077
A5077
A5145
A5145
A4
A4
CG2
A1
CG1
EXISTING WAITING ROOM TO REMAIN
COORDINATE WITH OWNER FOR NEW
PERMANENT LOCATION OF SALVAGED
WALL MOUNTED TELEVISION
127 SF
TRTMNT
375 SF
CORR
C2.03
39 SF
CORR
C2.02
W1
WS1
1/ 2' 0'
1' 4'
4' 8'
4' 2'
2'
1/ 8' 0'
1' 0' 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
8' 8'
1/ 0'
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
B20
Sheet of
ISSUED FOR CONSTRUCTION
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc
B
D en ta l\0
4- D
ES
IG
N \R
EV
IT
\2
7-
1_
VA
N C
D en ta l B
O
PT
n ew
.rv t
8/
/2
9:
:3
AM
A-300
CLINIC SECTIONS
BLUE TRIDENT, LLC
900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110
(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME
Renovate Building 20 in Vancouver to Consolidate Dental Services
VANCOUVER, WA
648-22-100
15 AUG 2024
EB LMS
3/8" = 1'-0"D2 SECTION 1
3/8" = 1'-0"F7 SECTION 2 3/8" = 1'-0"F3 SECTION 3
A
DOOR AND FRAME TYPES
SEE DOOR SCHEDULE FOR HEAD, JAMB AND SILL DETAILS.
FLOOR LEVEL
7'
- 0
3' - 0"
B
FLOOR LEVEL
2"
2 3
2"
2" 2"
C
2" 2"
2"
2" 2" 2" 2"
4 10
6'
- 2
2"
2" 1' - 8"
5' - 2"
6 3/4" 6 3/4"
6 3 /4"
3/
4"
7'
- 0
" ACTIVE
LEAF
5' - 0"
3'
- 6
3'
- 0
D
HOLLOW METAL FRAME
DOOR AS SCHEDULED
2"
CAULK, TYPICAL
BOTH SIDES
1/2"1/2"
WALL TYPE AS
SCHEDULED
FILL HM FRAME WITH FOAM
INSULATION
HOLLOW METAL FRAME AS
SCHEDULED
DOOR AS SCHEDULED
2"
SEALANT, TYPICAL BOTH
SIDES
1/2"1/2"
WALL ASSEMBLY AS
SCHEDULED - EXITING
WALL WHERE OCCURS
HOLLOW METAL FRAME AS
SCHEDULED
GLAZING AS SCHEDULED
APPLIED GLASS STOP
DOOR AS SCHEDULED
FILL HM FRAME WITH FOAM
INSULATION
METAL SLIDING DOOR FRAME AS
SCHEDULED
DOOR AS SCHEDULED
SEALANT, TYPICAL BOTH
SIDES
WALL ASSEMBLY AS
SCHEDULED
METAL STUD BOX HEADER FULL
WIDTH OF DOOR
METAL SLIDING DOOR FRAME AS
SCHEDULED
DOOR AS SCHEDULED
SEALANT, TYPICAL BOTH
SIDES
WALL ASSEMBLY AS
SCHEDULED
2"
DOUBLE STUD BOTH SIDES OF
OPENING
2"
METAL SLIDING DOOR FRAME AS
SCHEDULED
SEALANT, TYPICAL BOTH
SIDES
DOUBLE STUD BOTH SIDES OF
OPENING
WALL ASSEMBLY AS
SCHEDULED
DOOR AS SCHEDULED
METAL SLIDING DOOR FRAME AS
SCHEDULED
DOOR AS SCHEDULED
CONCEALED SILL GUIDE BY DOOR
MANUF
ACOUSTIC BOTTOM SEAL BY DOOR
MANUF
HOLLOW METAL FRAME AS
SCHEDULED
APPLIED GLASS STOP
CONCRETE FLOOR
BACKER ROD AND ACOUSTICAL
SEALANT
SHIM ON SILL SEALER
GLAZING AS SCHEDULED
FILL HM FRAME WITH FOAM
INSULATION
6 3/4"
DOOR WHERE OCCURS
CARPET TILE
TRANSITION STRIP SCHLUTER RENO-U 5/16";
CENTERLINE OF DOOR WHERE OCCURS
RESILIENT FLOORING
SUBFLOOR1/2
METAL SLIDING DOOR FRAME
BEYOND
DOOR AS SCHEDULED
SEALANT, TYPICAL BOTH
SIDES
WALL ASSEMBLY AS
SCHEDULED
METAL STUD BOX HEADER FULL
WIDTH OF DOOR
RELITE TYPES
FLOOR LEVEL
C
7'
- 0
1'
- 6
3' - 4"
G1
PAINT ALL HM
FRAMES P3
A101 F7
A600
A101 E7
A600
SEALANT, TYPICAL BOTH
SIDES
WALL ASSEMBLY AS
SCHEDULED
APPLIED GLASS STOP
GLAZING AS SCHEDULED
2"
5/8"5/8"
HOLLOW METAL FRAME
AS SCHEDULED
GLAZING AS SCHEDULED
2"
SEALANT, TYPICAL
BOTH SIDES
EQEQ
WALL ASSEMBLY AS
SCHEDULED
APPLIED GLASS STOP
FILL FRAME WITH FOAM
INSUL
6 3/4"
JAMB SIM
A4
C3
1'
- 2
6"
1' - 2 5/8"
CEILING AS SCHEDULED
A1
PLAM FACED WALL
MOUNTED UPPER CABINETS
W/ (2) ADJ SHELVES EACH -
ALL CABINETS TO BE
LOCKABLE
CEILING AS
SCHEDULED
3'
- 7
2'
- 1
0"
(3) PLASTER
STORAGE BINS
15"x24"x32.5" METAL
1'
- 2
2'
- 6
18GA SS SPLASH TO
BOTT OF UPPER
COUNTER
18GA SS UPPER COUNTER
1/4" WATER SUPPLY VALVE FOR
MODEL TRIMMER BEYOND
FAUCET MOUNTED EYEWASH
DOOR WHERE OCCURS
TILE
METAL EDGE TRANSITION STRIP
SCHLUTER RENO-U 1/2"; CENTERLINE
OF DOOR WHERE OCCURS
UNDERLAYMENT
RESILIENT FLOORING
1/2 " M
AX
IM
UM
WOOD SUBFLOOR
B3
EXISTING WINDOW AND FRAME TO REMAIN -
VERIFY FRAME DEPTH TO ENSURE INFILL
PIECE ALIGNS WITH FACE OF EXG WALL
REMOVE EXISTING LAMINATED WINDOW
STOOL AND APRON PRIOR TO INSTALLING
INFILL PIECE - FIT INFILL PIECE IN FRONT
OF WINDOW FRAME ON TOP OF EXISTING
WALL OPENING - SIMILAR AT JAMBS
ALUMINUM TRIM PIECE TO MATCH
ALUMINUM WINDOW FRAME -
FASTEN WITH ADHESIVE TO FACE
OF EXISTING MULLION FULL
WIDTH
1 1 /2"
4 3/4" 1 1/4"
CONT BEAD OF ADHESIVE ON
INTERIOR LEG OF TRIM TO SET INFILL
PIECE
LEAVE 3/4" GAP TO SET INFILL PIECE
FASTEN CHANNEL TRACK AND JAMB STUDS
TO WINDOW OPENING THRU GWB TO STUDS
REINSTALL SALVAGED (OR NEW AS
IDENTIFIED) WINDOW SHADE -
MODIFY SHADES (CLOTH AND FRAME)
TO FIT NEW HEIGHT AT INFILL
1/ 2' 0'
1' 4'
4' 8'
4' 2'
2'
1/ 8' 0'
1' 0' 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
8' 8'
1/ 0'
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
B20
Sheet of
ISSUED FOR CONSTRUCTION
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr oj ec ts \2
7-
1_
Va nc
B
D en ta l\0
4- D
ES
IG
N \R
EV
IT
\2
7-
1_
VA
N C
D en ta l B
O
PT
n ew
.rv t
8/
/2
9:
:3
AM
A-600
DOOR SCHEDULE AND MISC DETAILS
BLUE TRIDENT, LLC
900 Winslow Way E, Suite 130 Bainbridge Island, WA 98110
(206) 972-0645 Emmanuel (Manny) Bautista, PE*, F.SAME
Renovate Building 20 in Vancouver to Consolidate Dental Services
VANCOUVER, WA
648-22-100
15 AUG 2024
EB LMS
DOOR AND FRAME SCHEDULE
NUM
DOORS FRAMES
HARDWARE
GROUP
Door Label REMARKSTYPE MATL FINISH
GLASS
TYPE
SIZE
TYPE MATL
FINIS
H HEAD JAMB MULLION SILLWIDTH HT
200 A WD CLEAR - 36" 84" 1 HM P5 B4 / A600 B4 / A600 - - HW-5 20 MIN
201A B WD CLEAR G1 36" 84" 1 HM P5 B4 / A600 B4 / A600 - - HW-3G
201B B WD CLEAR G1 41" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A
203A B WD CLEAR G1 37" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A
203B B WD CLEAR G1 41" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A
204 A WD CLEAR - 41" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A
205 B WD CLEAR G1 41" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5, F5 / A600 HW-7A
206 A WD CLEAR - 41" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A
207A B WD CLEAR G1 37" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A
207B B WD CLEAR G1 41" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A
208 A WD CLEAR - 41" 84" 1 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A 20 MIN
209A B WD CLEAR G1 37" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A
209B B WD CLEAR G1 41" 84" 2 HM P5 A5, B5 / A600 D5 / A600 - E5 / A600 HW-7A
210 A WD CLEAR - 36" 84" 1 HM P5 B4 / A600 B4 / A600 - - HW-3G 60 MIN
211 C WD CLEAR G1 60" 85" 3 HM P5 B4 / A600 B4 / A600 - - HW-10B
212 A WD CLEAR - 36" 84" 1 HM P5 B4 / A600 B4 / A600 - - HW-2G
213 A WD CLEAR - 36" 84" 1 HM P5 B4 / A600 B4 / A600 - - HW-SH-3D
214 A WD CLEAR - 36" 84" 1 HM P5 B4 / A600 B4 / A600 - - HW-2G
215 A WD CLEAR - 36" 84" 1 HM P5 B4 / A600 B4 / A600 - - HW-2G
C2.02 D WD CLEAR G1 42" 84" 4 HM P5 A4 / A600 A4, E7(SIM) /
A600
D4 / A600 E4 / A600 HW-SH-3D
C2.04 D WD CLEAR G1 48" 84" 1 HM P5 B4 / A600 B4 / A600 - - HW-SH-3D
3" = 1'-0"B4 INT DOOR HEAD (JAMB SIM)
3" = 1'-0"A4 HM INT DOOR HEAD (JAMB SIM)
3" = 1'-0"D4 HM WINDOW/DOOR MULLION
3" = 1'-0"A5 SLIDING INT DOOR HEAD
3" = 1'-0"D5 SLIDING INT DOOR JAMBS
3" = 1'-0"E5 SLIDING INT DOOR SILL 3" = 1'-0"E4 HM INTERIOR WINDOW SILL
6" = 1'-0"F5 TRANSITION - CPT / RTF
3" = 1'-0"B5 SLIDING DOOR HEAD CONT.
3" = 1'-0"F7 HM INT WINDOW SILL
3" = 1'-0"E7 HM INTERIOR WINDOW HEAD
1 1/2" = 1'-0"A3 CORRIDOR SOFFIT
1 1/2" = 1'-0"F3 LAB ROOM CASEWORK 6" = 1'-0"F4 TRANSITION - TILE / RTF 1 1/2" = 1'-0"F1 INFILL AT EXG WINDOW
LD
A
T
1/
8"
5/8" TYPE 'X' GWB
CONT. METAL EDGE MOLD ALL
EXPOSED EDGES
FLUSH MOUNTED RESILIENT
CORNER GUARD SET AT TOP OF
BASE - SHIM AS REQUIRED TO
ACHIEVE FLUSH MOUNT - APPLY
TOP AND BOTTOM CLOSURES
CAULK JOINTS
B.9 C F1
A-601
C3
C3
A3
A4
HOLD FACE OF CABINET BACK FROM
FACE OF WALL TO ALLOW ADJACENT
SLIDING DOORS TO PASS IN FRONT
OF DOOR HANDLES
2'
- 0
3' - 0" 3' - 0" 3' - 0"
ALL CABINET DOORS TO BE LOCKABLE WITH VA
CORE - SF 7 PIN
2"
HOLD FACE OF CABINET
BACK FROM FACE OF
WALL TO ALLOW
ADJACENT SLIDING
DOORS TO PASS IN
FRONT OF CABINET DOOR
HANDLES
6"
SLIDING DOOR
BEYOND
ADJUSTABLE SHELVING
A4
C3
6'
- 8
2' - 5"
4"
CEILING AS
SCHEDULED
ALL CABINET
DOORS TO BE
LOCKABLE
WITH VA
CORE - SF 7 PIN
2" X 2"
STAINLESS
STEEL CORNER
GUARD
ADHERED ALL
AROUND
OPENING -
MITER
CORNERS
2" X 2"
STAINLESS
STEEL CORNER
GUARD
ADHERED ALL
AROUND
OPENING -
MITER
CORNERS
TOP MNT, STAINLESS STEEL SINK -
SET IN CONT BEAD OF SEALANT
(INTERGRAL SINK IN LAB AND SOILED)
P.LAM BASE CABINET WITH
REMOVABLE FRONT PANEL(S)
(NOT IN SOILED ROOM)
FAUCET W/ LEVER HANDLES (ADD
EYEWASH ATTACHMENT IN LAB)
FINISH END OF EXISTING
ADJ. BASE CABINET BEYOND
WITH SAME LAMINATE
1/2" SOLID SURFACE COUNTERTOP (STAINLESS
STEEL IN LAB AND SOILED) OVER 3/4" MARINE
GRADE PLYWOOD UNDERLAYMENT
FINISH WALL AND FLOOR
AT EXPOSED BY CABINET
1/2" SOLID SURFACE BACKSPLASH (&
SIDE SPLASHES WHERE OCCURS)
(STAINLESS STEEL IN LAB AND SOILED)
SEE ELEVATION FOR ACCESSORIES
KNEE SPC
TO
P
O F
FI
N
IS
H
ED
C
O U
N
TE
R
2'
1/
2" U
.N .O
6" 2'
1/ 2"
COUNTER WIDTH
VARIES - SEE PLAN
1/2" SOLID SURFACE
COUNTER EDGE
(STAINLESS STEEL
IN LAB AND SOILED)
2'
" M
AX
. S
IN
K
R
IM
9" (CABINET DIMS)
11" 6"
1' - 5"
4"
1" O.H.
1/
2" 1'
- 1 1"
SOLIDS INTERCEPTOR
WITH BOTTOM CLEAN
OUT- LAB ONLY
CERAMIC TILE FINISH AS SCHEDULED
CERAMIC TILE
WALL AS SCHEDULED
METAL COVE BASE SCHLUTER DILEX-AHK OR EQUAL
FINISH PLAN NOTES
1. ALL WALLS AND COLUMNS TO BE PAINTED P-1, UON.
2. ALL GYP BD SOFFITS TO BE PAINTED P-1, FLAT FINISH @ UNDERSIDE SURFACE UON.
3. ALL WALLS TO RECEIVE BASE B1, 4" HIGH EXCEPT AT TREATMENT ROOMS AND
SURGERY ROOM PROVIDE 6" BASE, UON.
4. REFER TO INTERIOR ELEVATIONS FOR ADDITIONAL FINISH INFORMATION.
5. REFER TO DOOR SCHEDULE FOR DOOR & FRAME FINISHES.
6. DENOTES CHANGE IN FLOORING MATERIALS.
7. REFER TO PROJECT SPECIFICATIONS AND/OR MANUFACTURER'S PRODUCT
SPECIFICATIONS FOR GENERAL PRODUCT INFORMATION.
8. CONTRACTOR SHALL EXAMINE ALL SURFACES TO BE FINISHED AND VERIFY THAT THEY
ARE ACCEPTABLE TO RECEIVE SPECIFIED FINISHES.
9. SURFACE DEFECTS OR DEFICIENCIES WHICH MAY ADVERSELY AFFECT WORK SHALL BE
CORRECTED OR BROUGHT TO THE ATTENTION OF THE GENERAL CONTRACTOR AND COR
FOR CORRECTION PRIOR TO COMMENCEMENT OF WORK.
10. ALL SURFACES SHALL BE PREPARED AND PRIMED ACCORDING TO MANUFACTURERS'
DIRECTIONS AND RECOMMENDATIONS.
11. CONTRACTOR IS TO NOTIFY ARCHITECT OF ANY DISCREPANCIES OR CONFLICTS
REGARDING CONDITIONS OR LOCATIONS FOR APPLICATION OF MATERIALS PRIOR TO OR
DURING CONSTRUCTION/ INSTALLATION, OR TRADE RESPONSIBILE FOR CORRECTING
SUCH WORK AS DIRECTED BY THE ARCHITECT.
12. THE CONTRACTOR SHALL EXAMINE ALL AREAS OF CONSTRUCTION AFTER COMPLETION OF
WORK BY ALL TRADES AND APPROVE ALL NECESSARY TOUCH-UP PAINTING OR
PATCHING.
13. REFERENCE WAINSCOT DETAILS FOR HEIGHTS AND MATERIALS TO BE USED AT EACH TYPE.
14. PROVIDE STRAIGHT WALL BASE BEHIND SLIDING DOORS SO IT DOES NOT INTERFERE WITH
DOOR OPENING.
15. ALL RESILIENT AND CARPET FLOORING AREAS TO RECEIVE COVE BASE UON.
16. WHERE SEVERAL FINISHES OCCUR ON SAME WALL, SEE ELEVATION FOR
CLARIFICATION.
17. ALL EXPOSED DRYWALL SURFACES TO BE PAINTED UON.
18. NO RESILIENT BASE SEAM TO OCCUR WITHIN 12" OF A WALL CORNER.
19. ALL CHANGES IN FLOOR MATERIAL TO OCCUR AT CENTER LINE OF DOOR UON
20. REPLACE ALL SOLID SURFACE WINDOW STOOLS WITH NEW SOLID SURFACE WINDOW
STOOLS
CONT. SNAP-ON
PLASTIC HANDRAIL
(HR) BY CORNER
GUARD MANUF. -
MOUNTED TO FRP
3/8" FRP PANEL (RWC1)
ADHERED TO GYPSUM
BOARD PER
MANUFACTURES
RECOMMENDATIONS -
COLOR AS SCHEDULED
RESILIENT BASE AS
SCHEDULED
WALL TYPE AS SCHEDULED
2'
- 9
3 1 /2"
45 DEGREE CONT.
CHAMFER AT TOP
EDGE
3"
CONT. 3/4" X 4"
PLASTIC CRASH RAIL
(CR) BY CORNER
GUARD MANUF. -
MOUNTED TO FRP
3/8" FRP PANEL (RWC2)
ADHERED TO GYPSUM
BOARD PER
MANUFACTURES
RECOMMENDATIONS -
COLOR AS SCHEDULED
RESILIENT BASE AS
SCHEDULED
WALL TYPE AS
SCHEDULED
45 DEGREE
CONT. CHAMFER
AT TOP EDGE
4" 2'
- 9
4"
3'
- 1
1/ 2' 0'
1' 4'
4' 8'
4' 2'
2'
1/ 8' 0'
1' 0' 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2' 1/ 2'
1' 0'
3' 0'
1'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
2'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
8' 8'
1/ 0'
Project No.
Building Number Drawing No.
Project Title
Location
Date:
Checked By/Proj.Mgr Drawn By
Drawing Title
Approved: VAPORHCS Director
VA FORM 08 - 6231
A
VA Portland Health Care System
(VAPORHCS)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Approved: Chief Facilities MgmtApproved: Service Chief
Approved: Proj Eng Approved: Infect Cont Approved: Chief P&O Approved: Chief M&R Approved: Safety Mgr.
B20
Sheet of
ISSUED FOR CONSTRUCTION
C :\U se rs
\la ur i\O ne
D riv e\ d2
L- Pr…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .