Attachment 6 - Schedule-of-Values-Sample Template.xlsx
XLSX spreadsheet 78 KB Posted
- Solicitation number
- 36C24923R0046
About this file
This document contains a schedule of values sample template and details of a federal contract opportunity to replace flooring at a Veterans Affairs medical center. The schedule of values template provides a format for contractors to track costs by work item, amount billed to date, percentage completed, and balance remaining on a construction project.
The related federal contract opportunity is a solicitation from the Department of Veterans Affairs to replace damaged and deteriorating flooring and doors in the Emergency Department at the Troy Bowling Campus of the Lexington Veterans Affairs Medical Center in Lexington, Kentucky. The contractor will be responsible for demolishing and removing existing flooring and doors, furnishing all labor, materials and equipment to install new flooring and doors per the drawings and specifications provided.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Daily Construction Schedule-1
| Schedule of Values | |||||||||
| Project Name: | Application Number: | ||||||||
| Project Number: | Application Date: | ||||||||
| Contractor: | Period to: | ||||||||
| Item # | Work Item Description | Item Value | Amount Previously Billed | Amount Billed This Period | Amount Of Stored Materials (Not In D or E) | Percent Completed | Total Completed And Stored To Date | Balance Remaining | Rentention _% |
| Division 1 | General Requirements | ||||||||
| 01 00 00 | Bonds & Insurance | ||||||||
| 01 00 00 | Superintendent and General Labor | ||||||||
| 01 32 16.15 | Project Schedules | ||||||||
| 01 33 23 | Shop Drawings, Product Data, Samples | ||||||||
| 01 35 26 | Job Site Safety Officer & ICRA Requirments | ||||||||
| 01 45 00 | Quality Control Officer | ||||||||
| 01 74 19 | Construction Waste Management | ||||||||
| Division 2 | Existing Conditions | ||||||||
| 02 41 00 | Demolition | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| Equipment | |||||||||
| DIVISION 7 | THERMAL/MOISTURE PROTECTION | ||||||||
| 07 84 00 | Firestopping | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 07 92 00 | Joint Sealants | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| DIVISION 9 | FINISHES | ||||||||
| 09 22 16 | Non Struct Metal Framing | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 09 29 00 | Gypsum Board & Framing | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 09 51 00 | C/R Acoustical Ceilings | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 09 65 16 | Resilient Sheet Flooring | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 09 91 00 | High Build Glazed Coatings | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| DIVISION 11 | Equipment | ||||||||
| 11 26 10 | Custom Fabricated Electrical Panels | ||||||||
| DIVISION 26 | ELECTRICAL | ||||||||
| 26 05 11 | Requirements (Electrical Installations) | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 26 05 19 | Low-Voltage Electrical Power Conductors/Cables | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 26 05 26 | Grounding/Bonding (Electrical Systems) | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 26 05 33 | Raceways/Boxes (Electrical Systems) | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 26 20 11 | Isolated Power Systems | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 26 27 26 | Wiring Devices | ||||||||
| Labor | |||||||||
| Materials |
Totals