This document contains an amendment to a solicitation for a construction project at the Troy Bowling Campus of the Lexington Veterans Affairs Medical Center in Lexington, Kentucky. The scope of work involves demolishing and removing existing flooring and doors in the Emergency Department, and installing new flooring and doors. Fifteen tri-fold doors and flooring throughout the ED need replacement due to damage and deterioration, including holes and cracks in the existing flooring. The amendment extends the proposal due date from April 12, 2023 to April 26, 2023, and provides responses to additional questions from offerors. Work hours and areas will be phased and coordinated with the VA. A cost loaded schedule is required to be submitted with proposals.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(Such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 4
0005 596-23-5821-0002 596A4-19-108
90C
Department of Veterans Affairs Network Contracting Office 9 (90C)
NCO 9
1639 Medical Center Parkway, Suite 400 Murfreesboro TN 37129
90C
Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129
To all Offerors/Bidders
36C24923R0046
04-12-2023
X
X X
April 26, 2023 - 1400 EDT
X 1 Electronic
The purpose of this amendment is to add Government response to additional RFI’s and extend the proposal due date from April 12, 2023, to April 26, 2023.
****SEE ATTACHED REVISED RFI RESPONSES****
Replace Flooring & Exam Room Doors in ED Suite Lexington, Kentucky
REPLACE FLOORING & EXAM ROOM DOORS IN ED SUITE
PROJECT FOR THE
TROY BOWLING LEXINGTON VA MEDICAL CENTER
PROJECT NUMBER: 596A4-19-108
UPDATED SPECIFICATIONS AND DRAWINGS WITH EXPLANATION OF REVISIONS
QUESTIONS AND ANSWERS (RFIs)
TO SOLICITATION NUMBER
36C24923R0046
QUESTIONS AND ANSWERS
RFI Question:
1. This area is restricted to key card access, how will workers move in and out?
Request key for back door coming from parking garage stairwell. Once one worker accesses thru that door, they can let other workers in thru main ED doors.
There will also be ED personnel there at all times to allow access.
2. Please confirm the trash route to the dumpster, will we be using Service elevator S6.
Yes, S6 or S7.
3. Please confirm on map contractor laydown area and job trailer location/hookups.
Reference 01 00 00 section 1.5 subsection E which states “Contractor staging will be limited to area(s) assigned by COR. The exact location and size of staging area will be as determined by COR based on project complexity and availability at time of award.”
4. Will the contractor laydown area fit a 20- or 30-yard dumpster?
Reference 01 00 00 section 1.5 subsection E which states “Contractor staging will be limited to area(s) assigned by COR. The exact location and size of staging area will be as determined by COR based on project complexity and availability at time of award.”
5. Confirm number of sliding doors and swinging doors to be replaced.
15 Tri-fold doors
6. Will the metal strip along the walls (where flooring terminates) remain in place or will it be replaced with a new product?
New metal strip will be needed in areas called out to receive cove base with resilient sheet flooring.
7. Please confirm if painting or drywall patching will be the contractor’s responsibility around doors.
Reference Updated Drawing AE101 General Note C. which states “All miscellaneous painting not identified in the drawings but necessary for the completion of the work shall be included in the project and match existing adjacent paint in color and finish. Contractor means and methods may result in a varying degree of paint required.”
8. What will the approved working hours be?
For work occurring in the ED the contractor will be permitted to work between the hours of 6 AM to 6 PM Monday thru Friday except for noise-generating work which will need to occur between 5PM and 6AM. Parking garage work will need to occur between 7PM and 7AM on weekdays and between 8AM and 6AM on weekends. All parking garage work must be coordinated with the VA COR.
9. Is a cost loaded schedule required or is a CPM schedule acceptable?
Cost loaded is required.
10. Is the Site Superintendent allowed to be the SSHO and QC if they hold the necessary certifications?
Yes, SSHO, Superintendent, and QC may be the same person.
11. When the cove base removed are we responsible for fixing the damages to the wall?
Yes, Reference Updated Drawing AE101 General Note C. which states “All miscellaneous painting not identified in the drawings but necessary for the completion of the work shall be included in the project and match existing adjacent paint in color and finish. Contractor means and methods may result in a varying degree of paint required.”
12. Where can negative air within the containment be exhausted?
If no exhaust duct is available, may exhaust into hallway.
13. How long will the VA take to turn over an area for renovation after we request it?
Reference 01 00 00 section 1.6 subsection I.2 Phasing which states “VA relocated out of proposed space – see phasing drawings for areas. This is estimated to be 3 days prior to the start of each phase.”
14. For Factor 3 – Past Performance, are CPARS acceptable instead of Past Performance Questionnaires?
Refer Amendment 0003