Attachment 9 - GC105 - PHASING PLAN.pdf
PDF 537 KB Posted
- Solicitation number
- 36C24923R0046
About this file
This document includes a phasing plan drawing and details for a federal contract opportunity to replace flooring and doors in the Emergency Department at the Troy Bowling Campus of the Lexington VA Medical Center in Lexington, Kentucky. The scope of work involves demolishing and removing existing doors and flooring, and installing new doors and flooring per the furnished drawings and specifications. Justification for the project is provided, stating the current flooring has holes and cracks throughout and needs replacing to avoid injury to patients and staff. The solicitation number is 36C24923R0046 and opportunity type is listed as a solicitation. The estimated value is $58,210. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
M
M
M
M
UP
UP
CONTRACTOR ACCESS
EGRESS
PHASE 5
1050 SF
STAFF WORK
C130
TRIAGE 01
C121B
TRIAGE 02
C121A
EKG/LAB
C121C
TLT
C121D
PASSAGE
CH121A
SOILD UTIL
C122
EMS
C123
SPECIMEN
C124
SUB-WAITING
CH121B
PASSAGE
CH121
PASSAGE
CH125A
EXAM 11
C125A
EXAM 12
C125B
EXAM 13
C125C
EXAM 14
C125D
STORAGE
C125E
EXAM 15
C125F
EXAM 16
C125G
TOILET
C126A
PHYS WORK
C126C
ON CALL
C126D
PASSAGE
CH126
CART STORAGE
C125K
PASSAGE
CH125
STAFF WORK
C125
PASSAGE
CH125B
NOUR PREP
C125J
CLEAN UTILITY
C125HE CYL
C125I
MED RM
C129
STORAGE
C127
STAIR
CS104
MENTAL 17
C130A
OFFICE
C130B
EXAM 18
C130C
EXAM 19
C130D
EXAM 1
C130E
EXAM (NEG) 2
C130FVESTIBULE
CH130A
PASSAGE
CH132
TLT
C128TLT
C131
EXAM 6
C132A
STAFF / WORK RM
C133
TLT/SHOWER
C134
SOILD UTIL
C135
IT
C136
CLEAN UTIL
C137
EMS
C138
EXAM 7
C132B
EXAM 8
C132C
EXAM 5
C132D
OFFICE 3
C140
ER OFFICE 2
C141
STAFF TLT
C142
ER NURSE MGR
C143
EMPLOYEE TRAINING RM
C144
PASSAGE
CH140
PASSAGE
CH132A
EXAM (NEG) 3
C130H
EXAM (NEG) 4
C130I
EXAM (NEG) 9
C130J
EXAM 10
C130K
STAIRWELL
CS109
EC
CU100
ELEVATOR
P7
ELEVATOR
P6 IT
C121
1B
1A
G E N E R A L N O T E S
A. EACH PHASE INCLUDES OWNER MOVE OUT, TEMPORARY BARRIERS, CONSTRUCTION, PUNCH LIST, CLEANING, AND OWNER MOVE IN BEFORE NEXT PHASE STARTS. SEE DETAILED PHASING PLAN OUTLINED
IN SPECIFICATION SECTION 01 00 00.
B. CONTRACTOR TO PROVIDE FIRE EXTINGUISHER WITHIN CONSTRUCTION AREA PER SPEC 01 03 26.
C. SEE NO EXIT SIGN SHEET GC101 - TYPICAL ALL PHASES.
CURRENT PHASE
COMPLETED PHASE
FUTURE PHASE
OUTSIDE OF SCOPE
PHASE LEGEND
NO WORK
COMPLETED FLOORING
IN CURRENT PHASE
EXISTING EXIT SIGN
TEMPORARY EXIT SIGN
MANUAL FIRE PULL
SYMBOL LEGEND
M
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
12/31/2023
C U s e rs
\d u n n t\ D o c u m e n ts
\R e v it \2
\F F
E L e x in g to n
R e p la c e
E D
F lo o ri n g
(2 tj .d u n n
.r v t
/1
/2
:5
:0
A
M
GC105
PHASING PLAN
Owner
3/17/2023 PH TD
REPLACE FLOORING & EXAM ROOM
DOORS IN ED SUITE
596A4-19-108
LEXINGTON, KY
CONSTRUCTION
DOCUMENTS B-1A
TROY BOWLING
CAMPUS
EMERGENCY
ROOM
1/8" = 1'-0"
PHASING FIRST FLOOR PLAN - PHASE 5
1/16" = 1'-0"
PHASING FIRST FLOOR PLAN - OVERALL
D R A W I N G N O T E S
1 TEMPORARY CONSTRUCTION BARRIER AS REQUIRED TO ALLOW FOR CONTINUATION OF NEW FLOOR WHILE
MAINTAINING SEPARATION FOR ICRA REQUIREMENTS AND PHASING - OPAQUE 10 MIL FIRE RETARDANT
POLYETHYLENE SHEET PLASTIC PER SPECIFICATION 01 35 26.
2 SEAL BOTH SIDES OF DOOR WITH 10 MIL FIRE RETARDANT POLYETHYLENE SHEET PLASTIC PER
SPECIFICATION 01 35 26. THIS DOOR IS NOT TO BE USED IN THIS PHASE.
3 REMOVE EXISTING FIRE EXTINGUISHER FROM CABINET AND RELOCATE.
4 MOUNT RELOCATED FIRE EXTINGUISHER TO TEMPORARY WALL 3'-6" A.F.F. - TEMPORARY FIRE
EXTINGUISHER SIGN SHALL BE PLACED ABOVE - RETURN FIRE EXTINGUISHER UPON THE COMPLETION OF
THIS PHASE.
5 TEMPORARY SIGNAGE STATING "NO EXIT" ON DOOR - REMOVE UPON COMPLETION OF PHASE.
K E Y P L A N
No. Revisions: Date:
1 ADDENDUM 01 03/17/2023
| Sheets |
| GC105 - PHASING PLAN |
File details come from the government source that posted it. Updated .