Attachment 11 - AD102 - LOWER-LEVEL DEMOLITION PLAN.pdf

PDF 5 MB Posted

Attached to
Z1DA--Project 596A4-19-108 - Replace ED Flooring - 596-23-2-5821-0002
Solicitation number
36C24923R0046
Issued by

About this file

This document includes an attachment to a solicitation for a construction project and the related federal contract opportunity details. The project scope of work involves demolishing and removing existing doors and flooring in the Emergency Department at the Troy Bowling Campus of the Lexington VAMC in Lexington, Kentucky. The contractor will furnish all labor, materials and equipment to install new doors and flooring according to the provided drawings and specifications. The solicitation number is 36C24923R0046 for opportunity Z1DA--Project 596A4-19-108 - Replace ED Flooring - 596-23-2-5821-0002 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The justification provided is that the current ED flooring has holes, cracks and other damage throughout, necessitating replacement to avoid patient and staff injury.

View the file

Other files

File Type Posted
36C24923R0046 0005.pdf PDF
36C24923R0046 - A0004.pdf PDF
36C24923R0046-A0003.pdf PDF
Attachment 1 - G000 - COVER SHEET.pdf PDF
Attachment 13 - AE501 - DETAILS.pdf PDF
Attachment 20 - 096519 Resilent Tile Flooring.pdf PDF
Attachment 18 - 090600 Schedule for Finishes.pdf PDF
Attachment 10 - AD101 - DEMOLITION PLAN.pdf PDF
Attachment 19 - 096516 RESILIENT SHEET FLOORING.pdf PDF
Attachment 14 - AE601 - DOOR DETAILS.pdf PDF
Attachment 12 - AE101 - ENLARGED FIRST FLOOR PLAN - NEW WORK.pdf PDF
Attachment 16 - 010000 General Requirements.pdf PDF
Attachment 7 - GC103 - PHASING PLAN.pdf PDF
Attachment 6 - GC102 - PHASING PLAN.pdf PDF
Attachment 4 - G003 - FIRST FLOOR PLAN - OVERALL.pdf PDF
36C4923R0046-A0002.pdf PDF
Attachment 5 - GC101 - PHASING PLAN.pdf PDF
Attachment 9 - GC105 - PHASING PLAN.pdf PDF
Attachment 3 - G002 - CODE SHEET.pdf PDF
Attachment 8 - GC104 - PHASING PLAN.pdf PDF
Attachment 17 - 013526 Safety Requirements.pdf PDF
Attachment 2 - G001 - GENERAL NOTES.pdf PDF
Attachment 15 - AF101 - ENLARGED FIRST FLOOR PLAN - FINISHES.pdf PDF
36C4923R0046-A0001.pdf PDF
Attachment 3 - Wage Rates 01-13-2023.pdf PDF
Attachment 6 - Schedule-of-Values-Sample Template.xlsx XLSX spreadsheet
Attachment 7 - Past Performance Questionnaire.docx DOCX document
Attachment 2 - 596A4-19-108 Replace ED Flooring - Drawings.pdf PDF
Attachment 4 - Calc. of Self Performed Work General Contractor.xlsx XLSX spreadsheet
Attachment 1 - 596A4-19-108 Replace ED Flooring Specifications.pdf PDF
Attachment 5 - Contractor EMR Certification Form.docx DOCX document
36C24923R0046_1.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOTOR

CYCLE PARKING

WHEEL

CHAIR PARKING

A006F

A008

PA07PA02

PAE05

PAE04

AH003

PAS04

A006

A006B

A006CA006A

A005A

HAC

STORAGE

STORAGEELEVATOR LOBBY

ELEVATOR

ELEVATOR

CORRIDOR

RETAIL STORE

STAIRWELL

KITCHEN

REFR WALK INPREFAB REFRIG

FOOD

STORAGE

BURGER KING

1B

PLENUM

PAM03

1A

SLOPED RAMP - CEILING MAINTAINS HORIZONTAL PLANE

7'-6" TO ACT

10'-5" TO CONCRETE DECK

8'-7" TO ACT

11'-4" TO ACT

7'-6" TO ACT

11'-6" TO CONCRETE DECK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

12/31/2023

C U s e rs

\d u n n t\ D o c u m e n ts

\R e v it \2

\F F

E L e x in g to n

R e p la c e

E D

F lo o ri n g

(2 tj .d u n n

.r v t

/1

/2

:5

:0

A

M

AD102

LOWER-LEVEL DEMOLITION PLAN

Owner

3/17/2023 PH TD

REPLACE FLOORING & EXAM ROOM

DOORS IN ED SUITE

596A4-19-108

LEXINGTON, KY

CONSTRUCTION

DOCUMENTS B-1A

TROY BOWLING

CAMPUS

EMERGENCY

ROOM

1/8" = 1'-0"

LOWER LEVEL DEMOLITION PLAN

D R A W I N G N O T E S

1 FILL AND REPAIR CONCRETE SLAB ON FLOOR ABOVE. SEE DETAILS 4 AND 5 ON AE501.

G E N E R A L N O T E S

A. CONTRACTOR TO VISIT THE SITE AND RECORD CONDITIONS PRIOR TO START OF DEMOLITION.

B. SEE PHASING PLANS FOR CONSTRUCTION PHASING AND TEMPORARY WALL REQUIREMENTS.

C. REMOVE PREVIOUS FLOOR PENETRATIONS AND PATCH WITH DETAIL ON AE501.

D. NO BUILDING TRASH FACILITIES SHALL BE UTILIZED TO DISPOSE OF DEMOLITION DEBRIS.

E. PROVIDE AND MAINTAIN PROTECTION FOR ALL OTHER REMAINING ITEMS AND AREAS. TAKE EXTRA CAUTION

TO PROTECT FREQUENT USED ACCESS WAYS TO WORK AREA FROM UNUSUAL WEAR AND TEAR.

F. GC TO NOTIFY VA IF ANY HAZARDOUS MATERIALS ARE ENCOUNTERED OR SUSPECTED, AND IS TO EVACUATE AFFECTED WORK AREA IMMEDIATELY AND NOT RETURN TO AREA UNTIL VA HAS CERTIFIED THAT

AREA IS FREE OF HAZARDOUS MATERIALS.

G. WORK ON THIS SHEET WILL NEED TO OCCUR ON NIGHTS OR WEEKENDS TO AVOID TRAFFIC.

H. EXISTING CEILING THROUGHOUT GARAGE IS 2x4 ACOUSTIC CEILING TILE AT APPROXIMATELY 7'-6" A.F.F UNLESS NOTED OTHERWISE. EXISTING BATT INSULATION IS CUT TO 4FT LENGTHS ABOVE THE CEILING TILE.

TEMPORARILY RELOCATE TILE, GRID, AND BATT INSULATION AS NEEDED TO COMPLETE THE WORK.

I. CONTRACTOR MEANS AND METHODS MAY VARY. REINSTALL ANY CEILING TILE AND/OR CEILING GRID RELOCATED TO ACCESS ABOVE CEILING SPACES. REPLACE ANY CEILING TILES AND/OR GRID DAMAGED

DURING CONSTRUCTION.

J. NO ICRA REQUIREMENT FROM GARAGE LEVEL.

KEY PLAN

R E F E R E N C E I M A G E S

A B

No. Revisions: Date:

1 ADDENDUM 01 03/17/2023

Sheets
AD102 - LOWER-LEVEL DEMOLITION PLAN

File details come from the government source that posted it. Updated .