Attachment 4 - Calc. of Self Performed Work General Contractor.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Z1DA--Project 596A4-19-108 - Replace ED Flooring - 596-23-2-5821-0002
Solicitation number
36C24923R0046
Issued by

About this file

This document contains a template for calculating the percentage of self-performed work on a federal construction contract and details for a related solicitation to replace flooring and doors in the Emergency Department at the Troy Bowling Campus of the Lexington VA Medical Center in Lexington, Kentucky. The template requires prime contractors for NAICS code 236220 construction projects to self-perform at least 15% of total contract costs using their own employees. It includes a table to calculate the breakdown of personnel and material/equipment costs by specification division for both prime and subcontractor work. The solicitation seeks to completely demolish and remove existing doors and flooring then furnish and install new doors and flooring per drawings and specifications. The justification is that current flooring has holes, cracks and needs replacement to avoid patient and staff injury. The contracting agency is the Department of Veterans Affairs Veterans Health Administration VISN 9.

View the file

Other files

File Type Posted
36C24923R0046 0005.pdf PDF
36C24923R0046 - A0004.pdf PDF
36C24923R0046-A0003.pdf PDF
Attachment 1 - G000 - COVER SHEET.pdf PDF
Attachment 13 - AE501 - DETAILS.pdf PDF
Attachment 20 - 096519 Resilent Tile Flooring.pdf PDF
Attachment 18 - 090600 Schedule for Finishes.pdf PDF
Attachment 10 - AD101 - DEMOLITION PLAN.pdf PDF
Attachment 19 - 096516 RESILIENT SHEET FLOORING.pdf PDF
Attachment 14 - AE601 - DOOR DETAILS.pdf PDF
Attachment 12 - AE101 - ENLARGED FIRST FLOOR PLAN - NEW WORK.pdf PDF
Attachment 16 - 010000 General Requirements.pdf PDF
Attachment 7 - GC103 - PHASING PLAN.pdf PDF
Attachment 6 - GC102 - PHASING PLAN.pdf PDF
Attachment 4 - G003 - FIRST FLOOR PLAN - OVERALL.pdf PDF
36C4923R0046-A0002.pdf PDF
Attachment 5 - GC101 - PHASING PLAN.pdf PDF
Attachment 9 - GC105 - PHASING PLAN.pdf PDF
Attachment 11 - AD102 - LOWER-LEVEL DEMOLITION PLAN.pdf PDF
Attachment 3 - G002 - CODE SHEET.pdf PDF
Attachment 8 - GC104 - PHASING PLAN.pdf PDF
Attachment 17 - 013526 Safety Requirements.pdf PDF
Attachment 2 - G001 - GENERAL NOTES.pdf PDF
Attachment 15 - AF101 - ENLARGED FIRST FLOOR PLAN - FINISHES.pdf PDF
36C4923R0046-A0001.pdf PDF
Attachment 3 - Wage Rates 01-13-2023.pdf PDF
Attachment 6 - Schedule-of-Values-Sample Template.xlsx XLSX spreadsheet
Attachment 7 - Past Performance Questionnaire.docx DOCX document
Attachment 2 - 596A4-19-108 Replace ED Flooring - Drawings.pdf PDF
Attachment 1 - 596A4-19-108 Replace ED Flooring Specifications.pdf PDF
Attachment 5 - Contractor EMR Certification Form.docx DOCX document
36C24923R0046_1.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
Offerors for Contractors (NAICS code 236220) must provide
at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the prime contractor's employees. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing. Below is a suggested format.
Specification DivisionSB Vendor (Y or N)Personnel CostMaterial/Equipment Costs
PrimeY$0.00$0.00Change SB Vendor to Y or N based on vendor size. Add costs to gray areas only.
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
(Add additional lines as necessary for each Division applicable to this project)$$
$ - 0$0.00
$$
Sub Total (Personnel Costs, Material/Equipment Costs)$0.00Add percentage to gray areas only.
Percentage0Profit$0.00
Percentage0Home Office Overhead$0.00
Percentage0Bond$0.00
Grand Total$0.00
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors:$0.00
2. Subtract all subcontractor personnel costs* companies that will perform work
on this contract:$0.00
3. Remainder is ‘Total amount of work to be self-performed under the
Contract’:$0.00
4. Self-performed work = Line 3/Line 1 x 100 =ERROR:#DIV/0!
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to
the project (includes project manager, job superintendent, administrative, estimators, etc.)
I certify the above representations are true and correct to the best of my knowledge.

(Signature and Typed Name of Authorized Representative) Date

(Title of Authorized Representative)