Attachment 10 - AD101 - DEMOLITION PLAN.pdf

PDF 4 MB Posted

Attached to
Z1DA--Project 596A4-19-108 - Replace ED Flooring - 596-23-2-5821-0002
Solicitation number
36C24923R0046
Issued by

About this file

This document package includes a demolition plan and a federal contract opportunity solicitation. The demolition plan outlines the removal of existing flooring and doors in the Emergency Department at the Troy Bowling Campus of the Lexington VA Medical Center in Lexington, Kentucky. Contractors are to visit the site, protect remaining items, dispose of debris offsite, and maintain fire protection. The opportunity solicitation seeks a contractor to prepare the site for and perform the installation of new doors and flooring per drawings and specifications. The justification provided is that the current flooring has holes and cracks throughout and needs replacement to avoid patient and staff injury. The solicitation number is 36C24923R0046 and the agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.

View the file

Other files

File Type Posted
36C24923R0046 0005.pdf PDF
36C24923R0046 - A0004.pdf PDF
36C24923R0046-A0003.pdf PDF
Attachment 1 - G000 - COVER SHEET.pdf PDF
Attachment 13 - AE501 - DETAILS.pdf PDF
Attachment 20 - 096519 Resilent Tile Flooring.pdf PDF
Attachment 18 - 090600 Schedule for Finishes.pdf PDF
Attachment 19 - 096516 RESILIENT SHEET FLOORING.pdf PDF
Attachment 14 - AE601 - DOOR DETAILS.pdf PDF
Attachment 12 - AE101 - ENLARGED FIRST FLOOR PLAN - NEW WORK.pdf PDF
Attachment 16 - 010000 General Requirements.pdf PDF
Attachment 7 - GC103 - PHASING PLAN.pdf PDF
Attachment 6 - GC102 - PHASING PLAN.pdf PDF
Attachment 4 - G003 - FIRST FLOOR PLAN - OVERALL.pdf PDF
36C4923R0046-A0002.pdf PDF
Attachment 5 - GC101 - PHASING PLAN.pdf PDF
Attachment 9 - GC105 - PHASING PLAN.pdf PDF
Attachment 11 - AD102 - LOWER-LEVEL DEMOLITION PLAN.pdf PDF
Attachment 3 - G002 - CODE SHEET.pdf PDF
Attachment 8 - GC104 - PHASING PLAN.pdf PDF
Attachment 17 - 013526 Safety Requirements.pdf PDF
Attachment 2 - G001 - GENERAL NOTES.pdf PDF
Attachment 15 - AF101 - ENLARGED FIRST FLOOR PLAN - FINISHES.pdf PDF
36C4923R0046-A0001.pdf PDF
Attachment 3 - Wage Rates 01-13-2023.pdf PDF
Attachment 6 - Schedule-of-Values-Sample Template.xlsx XLSX spreadsheet
Attachment 7 - Past Performance Questionnaire.docx DOCX document
Attachment 2 - 596A4-19-108 Replace ED Flooring - Drawings.pdf PDF
Attachment 4 - Calc. of Self Performed Work General Contractor.xlsx XLSX spreadsheet
Attachment 1 - 596A4-19-108 Replace ED Flooring Specifications.pdf PDF
Attachment 5 - Contractor EMR Certification Form.docx DOCX document
36C24923R0046_1.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

TRIAGE 01

C121B

TRIAGE 02

C121A

EKG/LAB

C121C

TLT

C121D

PASSAGE

CH121A

SOILD UTIL

C122

EMS

C123

SPECIMEN

C124

SUB-WAITING

CH121B

PASSAGE

CH121

PASSAGE

CH125A

EXAM 11

C125A

EXAM 12

C125B

EXAM 13

C125C

EXAM 14

C125D

STORAGE

C125E

EXAM 15

C125F

EXAM 16

C125G

TOILET

C126A

PHYS WORK

C126C

ON CALL

C126D

PASSAGE

CH126

CART STORAGE

C125K

PASSAGE

CH125

STAFF WORK

C125

PASSAGE

CH125B

NOUR PREP

C125J

CLEAN UTILITY

C125H

E CYL

C125I

MED RM

C129

STORAGE

C127

STAIR

CS104

MENTAL 17

C130A

OFFICE

C130B

EXAM 18

C130C

EXAM 19

C130D

EXAM 1

C130E

EXAM (NEG) 2

C130F

VESTIBULE

CH130A

PASSAGE

CH132

TLT

C128

TLT

C131

EXAM 6

C132A

STAFF / WORK RM

C133

TLT/SHOWER

C134

SOILD UTIL

C135

IT

C136

CLEAN UTIL

C137

EMS

C138

EXAM 7

C132B

EXAM 8

C132C

EXAM 5

C132D

OFFICE 3

C140

ER OFFICE 2

C141

STAFF TLT

C142

ER NURSE MGR

C143

EMPLOYEE TRAINING RM

C144

PASSAGE

CH140

PASSAGE

CH132A

EXAM (NEG) 3

C130H

EXAM (NEG) 4

C130I

EXAM (NEG) 9

C130J

EXAM 10

C130K

STAIRWELL

CS109

EC

CU100

ELEVATOR

P7

ELEVATOR

P6 IT

C121

PASSAGE

CH130B

2 2 2

22222

4 44

STAFF WORK

C130

1/8" = 1'-0"

DEMOLITION PLAN - FIRST FLOOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

12/31/2023

C U s e rs

\d u n n t\ D o c u m e n ts

\R e v it \2

\F F

E L e x in g to n

R e p la c e

E D

F lo o ri n g

(2 tj .d u n n

.r v t

/1

/2

:5

:0

A

M

AD101

DEMOLITION PLAN

Owner

3/17/2023 PH TD

REPLACE FLOORING & EXAM ROOM

DOORS IN ED SUITE

596A4-19-108

LEXINGTON, KY

CONSTRUCTION

DOCUMENTS B-1A

TROY BOWLING

CAMPUS

EMERGENCY

ROOM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

12/31/2023

C U s e rs

\d u n n t\ D o c u m e n ts

\R e v it \2

\F F

E L e x in g to n

R e p la c e

E D

F lo o ri n g

(2 tj .d u n n

.r v t

/1

/2

:5

:0

A

M

AD101

DEMOLITION PLAN

Owner

3/17/2023 PH TD

REPLACE FLOORING & EXAM ROOM

DOORS IN ED SUITE

596A4-19-108

LEXINGTON, KY

CONSTRUCTION

DOCUMENTS B-1A

TROY BOWLING

CAMPUS

EMERGENCY

ROOM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

12/31/2023

C U s e rs

\d u n n t\ D o c u m e n ts

\R e v it \2

\F F

E L e x in g to n

R e p la c e

E D

F lo o ri n g

(2 tj .d u n n

.r v t

/1

/2

:5

:0

A

M

AD101

DEMOLITION PLAN

Owner

3/17/2023 PH TD

REPLACE FLOORING & EXAM ROOM

DOORS IN ED SUITE

596A4-19-108

LEXINGTON, KY

CONSTRUCTION

DOCUMENTS B-1A

TROY BOWLING

CAMPUS

EMERGENCY

ROOM

D R A W I N G N O T E S

1 REMOVE EXISTING SLIP RESISTANT SHEET FLOORING AND INTEGRAL BASE

2 DEMOLISH EXISTING ALUMINUM ICU DOOR AND FRAME.

3 EXISTING FLOOR EXPANSION JOINT TO REMAIN - PROTECT FROM DAMAGE DURING CONSTRUCTION - REMOVE COVER AS

REQUIRED FOR FLOOR INSTALLATION AND REINSTALL AT THE CONCLUSION OF WORK.

4 FILL AND REPAIR CONCRETE SLAB - PREPARE CONCRETE FOR LVT TILE - SEE DETAILS 4 AND 5 ON AE501.

5 DISCONNECT LOCKERS FROM WALL / FLOOR AND RELOCATE AS REQUIRED WITHIN WORK AREA TO DEMOLISH FLOORING

UNDERNEATH

G E N E R A L N O T E S

A. CONTRACTOR TO VISIT THE SITE AND RECORD CONDITIONS PRIOR TO START OF DEMOLITION.

B. SEE PHASING PLANS FOR CONSTRUCTION PHASING AND TEMPORARY WALL REQUIREMENTS.

C. ALL ROOMS ARE SHEET WELDED FLOORING UNLESS NOTED OTHERWISE. REMOVE SHEET FLOORING AND INTEGRAL BASE IN ALL ROOMS UNLESS NOTED OTHERWISE INCLUDING OFF CASEWORK. PREP FOR NEW

BASE IN EXISTING LOCATIONS.

D. REMOVE ALL FINISH FLOORING INCLUDING MASTIC TO SUBFLOOR. REMOVE ALL DEBRIS AND RESIDUE

FROM CONCRETE. PREPARE SUB FLOOR TO RECEIVE SCHEDULED NEW MATERIAL.

E. GRIND EDGES OF FLOORING IMPERFECTIONS.

F. REMOVE PREVIOUS FLOOR PENETRATIONS AND PATCH WITH DETAIL ON AE501.

G. APPLY 2-3 LAYERS OF SKIM COAT TO EVEN OUT FLOOR. ASSUME 100% OF RENOVATED FLOOR TO BE

REPAIRED AND TO RECEIVE SKIM COAT.

H. NO BUILDING TRASH FACILITIES SHALL BE UTILIZED TO DISPOSE OF DEMOLITION DEBRIS.

I. PROVIDE AND MAINTAIN PROTECTION FOR ALL OTHER REMAINING ITEMS AND AREAS. TAKE EXTRA CAUTION

TO PROTECT FREQUENT USED ACCESS WAYS TO WORK AREA FROM UNUSUAL WEAR AND TEAR.

J. PROTECT ALL AREA OUTSIDE THE CONSTRUCTION FROM DUST AND DEBRIS.

K. CONTRACTOR TO NOTIFY VA IF ANY HAZARDOUS MATERIALS ARE ENCOUNTERED OR SUSPECTED, AND IS TO EVACUATE AFFECTED WORK AREA IMMEDIATELY AND NOT RETURN TO AREA UNTIL VA HAS CERTIFIED

THAT AREA IS FREE OF HAZARDOUS MATERIALS.

L. CONTRACTOR PROVIDED FIRE EXTINGUISHERS IN WORK AREAS.

M. MAINTAIN EGRESS ACCESSIBILITY & OPERATION OF ALL FIRE PROTECTION & DETECTION SYSTEMS

THROUGHOUT THE DEMOLITION AND CONSTRUCTION.

EXISTING FLOOR SLAB TO BE REPAIRED - TYP. EXISTING DOOR AND FLOORING TO BE DEMOLISHED - TYP.EXISTING SLIP RESISTANT SHEET FLOORING

KEY PLAN

No. Revisions: Date:

1 ADDENDUM 01 03/17/2023

No. Revisions: Date:

1 ADDENDUM 01 03/17/2023

No. Revisions: Date:

1 ADDENDUM 01 03/17/2023

Sheets
AD101 - DEMOLITION PLAN

File details come from the government source that posted it. Updated .