Attachment 3 - G002 - CODE SHEET.pdf

PDF 442 KB Posted

Attached to
Z1DA--Project 596A4-19-108 - Replace ED Flooring - 596-23-2-5821-0002
Solicitation number
36C24923R0046
Issued by

About this file

This document contains a federal contract opportunity for replacing flooring and doors in the Emergency Department at the Troy Bowling Campus of the Lexington VA Medical Center in Lexington, Kentucky. The scope of work involves completely preparing the site for demolition and removal of existing doors and flooring in the ED. The contractor will furnish all labor, materials, and equipment to perform the installation of new doors and flooring per the drawings and specifications. The justification provided is that the current ED flooring has holes and cracks throughout and needs replacing to avoid injury to patients and staff. The solicitation number is 36C24923R0046 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.

View the file

Other files

File Type Posted
36C24923R0046 0005.pdf PDF
36C24923R0046 - A0004.pdf PDF
36C24923R0046-A0003.pdf PDF
Attachment 1 - G000 - COVER SHEET.pdf PDF
Attachment 13 - AE501 - DETAILS.pdf PDF
Attachment 20 - 096519 Resilent Tile Flooring.pdf PDF
Attachment 18 - 090600 Schedule for Finishes.pdf PDF
Attachment 10 - AD101 - DEMOLITION PLAN.pdf PDF
Attachment 19 - 096516 RESILIENT SHEET FLOORING.pdf PDF
Attachment 14 - AE601 - DOOR DETAILS.pdf PDF
Attachment 12 - AE101 - ENLARGED FIRST FLOOR PLAN - NEW WORK.pdf PDF
Attachment 16 - 010000 General Requirements.pdf PDF
Attachment 7 - GC103 - PHASING PLAN.pdf PDF
Attachment 6 - GC102 - PHASING PLAN.pdf PDF
Attachment 4 - G003 - FIRST FLOOR PLAN - OVERALL.pdf PDF
36C4923R0046-A0002.pdf PDF
Attachment 5 - GC101 - PHASING PLAN.pdf PDF
Attachment 9 - GC105 - PHASING PLAN.pdf PDF
Attachment 11 - AD102 - LOWER-LEVEL DEMOLITION PLAN.pdf PDF
Attachment 8 - GC104 - PHASING PLAN.pdf PDF
Attachment 17 - 013526 Safety Requirements.pdf PDF
Attachment 2 - G001 - GENERAL NOTES.pdf PDF
Attachment 15 - AF101 - ENLARGED FIRST FLOOR PLAN - FINISHES.pdf PDF
36C4923R0046-A0001.pdf PDF
Attachment 3 - Wage Rates 01-13-2023.pdf PDF
Attachment 6 - Schedule-of-Values-Sample Template.xlsx XLSX spreadsheet
Attachment 7 - Past Performance Questionnaire.docx DOCX document
Attachment 2 - 596A4-19-108 Replace ED Flooring - Drawings.pdf PDF
Attachment 4 - Calc. of Self Performed Work General Contractor.xlsx XLSX spreadsheet
Attachment 1 - 596A4-19-108 Replace ED Flooring Specifications.pdf PDF
Attachment 5 - Contractor EMR Certification Form.docx DOCX document
36C24923R0046_1.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

M

M

M

M

TRIAGE 01

C121B

TRIAGE 02

C121A

EKG/LAB

C121C

TLT

C121D

PASSAGE

CH121A

SOILD UTIL

C122

EMS

C123

SPECIMEN

C124

SUB-WAITING

CH121B

PASSAGE

CH121

PASSAGE

CH125A

EXAM 11

C125A

EXAM 12

C125B

EXAM 13

C125C

EXAM 14

C125D

STORAGE

C125E

EXAM 15

C125F

EXAM 16

C125G

TOILET

C126A

PHYS WORK

C126C

ON CALL

C126D

PASSAGE

CH126

CART STORAGE

C125K

PASSAGE

CH125

STAFF WORK

C125

PASSAGE

CH125B

NOUR PREP

C125J

CLEAN UTILITY

C125H

E CYL

C125I

MED RM

C129

STORAGE

C127

STAIR

CS104

MENTAL 17

C130A

OFFICE

C130B

EXAM 18

C130C

EXAM 19

C130D

EXAM 1

C130E

EXAM (NEG) 2

C130F

VESTIBULE

CH130A

PASSAGE

CH132

TLT

C128

TLT

C131

EXAM 6

C132A

STAFF / WORK RM

C133

TLT/SHOWER

C134

SOILD UTIL

C135

IT

C136

CLEAN UTIL

C137

EMS

C138

EXAM 7

C132B

EXAM 8

C132C

EXAM 5

C132D

OFFICE 3

C140

ER OFFICE 2

C141

STAFF TLT

C142

ER NURSE MGR

C143

EMPLOYEE TRAINING RM

C144

PASSAGE

CH140

PASSAGE

CH132A

EXAM (NEG) 3

C130H

EXAM (NEG) 4

C130I

EXAM (NEG) 9

C130J

EXAM 10

C130K

STAIRWELL

CS109

EC

CU100

ELEVATOR

P7

ELEVATOR

P6 IT

C121

PASSAGE

CH130B

EGRESS ROUTE - 120' < 300'

EXISTING LOCKING

SUITE DOOR

EXISTING LOCKING

SUITE DOOR

EGRESS ROUTE - 125' < 300'

EGRESS ROUTE - 120' < 300'

EGRESS ROUTE - 175' < 300'

EGRESS ROUTE - 60' > 300'

EGRESS ROUTE - 50' < 300'

EX

EX

EX

STAFF WORK

C130

1 HOUR FIRE BARRIER

MEANS OF EGRESS

2 HOUR FIRE WALL

SMOKE BARRIER

LEGEND

EX EXIT

HAZARDOUS

ROOM

EXIT STAIR OR PASSAGEWAY

EXIT SIGN

FIRE EXTINGUISHER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

12/31/2023

C U s e rs

\d u n n t\ D o c u m e n ts

\R e v it \2

\F F

E L e x in g to n

R e p la c e

E D

F lo o ri n g

(2 tj .d u n n

.r v t

/1

/2

:5

:3

A

M

G002

CODE SHEET

Owner

3/17/2023 PH TD

REPLACE FLOORING & EXAM ROOM

DOORS IN ED SUITE

596A4-19-108

LEXINGTON, KY

CONSTRUCTION

DOCUMENTS B-1A

TROY BOWLING

CAMPUS

EMERGENCY

ROOM

C O D E N O T E S

2018 NFPA 101 LIFE SAFETY CODE REVIEW

BUILDING B1A, 1st FLOOR

AREA OF WORK = 8,927 SF

EXISTING FLOOR IS AMBULATORY HEALTH CARE OCCUPANCY - CHAPTER 21

CHAPTER 3 DEFINITIONS

3.3.283.2 PATIENT CARE NON-SLEEPING SUITE (HEALTH CARE OCCUPANCIES)

EXISTING EMERGENCY DEPARTMENT SUITE ENVELOPE TO REMAIN REORGANIZED

EMERGENCY DEPARTMENT. NO CHANGES TO FIRE WALLS, EGRESS, ETC.

CHAPTER 6 - CLASSIFICATION OF OCCUPANCY AND HAZARD OF CONTENT

6.1.11 RENOVATED AREA REVIEWED UNDER BUSINESS (CHAPTER 39)

6.2.2 HAZARD CLASSIFICATION: ORDINARY - NO CHANGE

CHAPTER 7- MEANS OF EGRESS: NO CHANGE

T7.3.1.2 OCCUPANT LOAD OF SPACE: AREA = 8,927 SF

AMBULATORY OCCUPANCY SPACE - 8,927 / 150 = 60 MAX OCCUPANTS

CHAPTER 8 - FEATURES OF FIRE PROTECTION: NO CHANGE

CHAPTER 9 - BUILDING SERVICE AND FIRE PROTECTION EQUIPMENT: NO CHANGE

CHAPTER 10 - INTERIOR FINISH, CONTENTS, AND FURNISHES

10.2.3.1

INTERIOR WALL AND CEILING FINISH MATERIALS TESTED IN ACCORDANCE

WITH NFPA 286.

10.2.3.1

INTERIOR WALL AND CEILING FINISH MATERIALS SHALL BE CLASSIFIED IN

ACCORDANCE WITH NFPA 286 AND COMPLY WITH 10.2.3.2.

10.2.3.1.2

MATERIALS TESTED IN ACCORDANCE WITH 10.2.3.1.1 AND COMPLYING

WITH 10.2.3.2 SHALL BE CONSIDERED ALSO TO COMPLY WITH THE

REQUIREMENTS OF CLASS A, CLASS B, OR CLASS AC IN ACCORDANCE WITH

10.2.3.3.

(1) DURING THE 40 KW EXPOSURE, FLAMES SHALL NOT SPREAD TO THE CEILING.

(2) THE FLAME SHALL NOT SPREAD TO THE OUTER EXTREMITY OF THE SAMPLE

ON ANY WALL OR CEILING.

(3) FLASHOVER, AS DESCRIBED IN NFPA 286, SHALL NOT OCCUR.

(4) THE PEAK HEAT RELEASE RATE THROUGHOUT THE TEST SHALL NOT EXCEED

800 KW.

(5) FOR NEW INSTALLATIONS, THE TOTAL SMOKE RELEASED THROUGH-OUT THE

TEST SHALL NOT EXCEED 1000 M2.

10.2.3.3

WALL AND CEILING- CLASSIFICATIONS CHARACTERISTICS.

(1) CLASS A: FLAME SPREAD: 0-25; SMOKE DEV. : 0-450.

(2) CLASS B: FLAME SPREAD: 26-75; SMOKE DEV. : 0-450

(3) CLASS C: FLAME SPREAD: 76-200; SMOKE DEV. : 0-450

10.2.7.3

INTERIOR FLOOR FINISH- SHALL BE CLASSIFIED BASED ON NFPA 253 OR

ASTEM E 648.

10.2.3.4

INTERIOR FLOOR- CLASSIFICATIONS CHARACTERISTICS:

(1) CLASS I: RAD FLUX: FIN .45 W/CM2

(2) CLASS II: RAD FLUX: FIN .22 W/CM2, AND MAX. .45 W/CM2

10.2.8.1

WALL AND CEILING FINISHES, WHERE SPRINKLED:

CLASS C PERMITTED IN ANY LOCATION WHERE CLASS B IS REQ’D.

CLASS B PERMITTED IN ANY LOCATION WHERE CLASS A IS REQ’D.

10.2.8.2

FLOOR FINISHES, WHERE SPRINKLED:

CLASS II PERMITTED IN ANY LOCATION WHERE CLASS I IS REQ’D.

NO CRITICAL RAD. FLUX PERMITTED IN ANY LOCATION WHERE CLASS II IS

REQ’D.

20.3.5.3 AND NFPA 10 SECTION 9.9 FIRE EXTINGUISHERS ARE REQUIRED WITHIN

75’ OF ANY POINT IN THE SPACE - MAXIMUM TRAVEL ~65'

CHAPTER 21 - EXISTING AMBULATORY HEALTHCARE OCCUPANCIES:

21.1.1.1

THE REQUIREMENTS OF THIS CHAPTER SHALL APPLY TO EXISTING BUILDINGS

OR PORTIONS THEREOF CURRENTLY OCCUPIED AS AMBULATORY HEALTHCARE OCCUPANCIES.

21.2.2.2.9

SENSOR- RELEASE OF ELECTRICAL LOCKING SYSTEMS COMPLYING WITH

7.2.1.6.2 SHALL BE PERMITTED.

21.2.5.2

DEAD END CORRIDORS SHALL NOT EXCEED 50 FT.

21.2.5.3

LIMITATIONS ON COMMON PATH OF TRAVEL SHALL BE IN ACCORDANCE WITH

39.2.5.3.1.

21.2.5.3.1

COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FT. ON A STORY

PROTECTED THROUGHOUT BY AN APPROVED AUTOMATIC SPRINKLER SYSTEM IN

ACCORDANCE WITH 9.7.1.1 (1).

21.2.6

TRAVEL DISTANCE TO EXITS. TRAVEL DISTANCE SHALL COMPLY WITH 21.2.6.2.1

THROUGH 21.2.6.1.2.

21.2.6.2.2 THE MAXIMUM TRAVEL DISTANCE IN 21.2.6.2.1 SHALL BE PERMITTED TO BE INCREASED 50 FT. IN

BUILDINGS PROTECTED THROUGHOUT BY AN APPROVED AUTOMATIC SPRINKLER SYSTEM IN

ACCORDANCE WITH 9.7.

21.2.9.1

EMERGENCY LIGHTING SHALL BE PROVIDED IN ACCORDANCE WITH SECTION

7.9

21.3.3.1

INTERIOR FINISH SHALL BE IN ACCORDANCE WITH SECTION 10.2.

21.3.3.2.1

INTERIOR WALL AND CEILING FINISH MATERIALS COMPLYING SECTION

10.2 SHALL BE CLASS A OR CLASS B IN EXITS AND IN EXIT ACCESS CORRIDORS.

21.3.3.2.2

INTERIOR WALL AND CEILING SHALL BE CLASS A, CLASS B, CLASS C IN

AREAS OTHER THAN THOSE SPECIFIED IN 39.3.3.2.1.

21.3.4.1

AMBULATORY HEALTH CARE FACILITIES SHALL BE PROVIDED WITH FIRE ALARM SYSTEMS IN

ACCORDANCE WITH SECTION 9.6, EXCEPT ASS MODIFIED BY 21.3.4.2 THROUGH 21.3.4.4.

21.3.4.2 INITIATION OF THE REQUIRED FIRE ALARM SYSTEM SHALL BE BY MANUAL MEANS IN ACCORDANCE

WITH 9.6.2 AND BY MEANS OF ANY DETECTION DEVICES OR DETECTION SYSTEMS REQUIRED.

21.3.5.3 PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED IN EVERY AMBULATORY HEALTH CARE OCCUPANCY

IN ACCORDANCE WITH SECTION 9.7.4.1

C O D E L E G E N D

G E N E R A L N O T E S

1/8" = 1'-0"

FIRST FLOOR PLAN - LIFE SAFETY

INTERIM LIFE SAFETY MEASURES PLAN

A REVIEW OF TEMPORARY CONSTRUCTION BARRIERS, EXIT SIGNAGE, PATHWAYS TO AN EGRESS POINT, EMERGENCY LIGHTING, FIRE PROTECTION SYSTEMS INCLUDING SMOKE DETECTORS, FIRE SUPPRESSION, FIRE EXTINGUISHERS, FIRE ALARMS SYSTEMS, SMOKE BARRIERS, EMERGENCY EVACUATION PLANS, AND OTHER FEATURES THAT CONTRIBUTE TO THE SAFETY OF OCCUPANTS SHOULD BE MADE TO DETERMINE THE IMPACT OF CONSTRUCTION ACTIVITIES ON LIFE SAFETY SYSTEMS AND EGRESS FROM THE FACILITY

DURING EACH PHASE OF CONSTRUCTION.

• COVER ALL AFFECTED ILLUMINATED EXIT SIGNS SO THEY CANNOT MISLEAD BUILDING OCCUPANTS TO

AN UNUSABLE EXIT

• POST SIGNAGE THAT DIRECTS BUILDING OCCUPANTS TO THE ALTERNATE EXIT

• COMMUNICATE THE TEMPORARY CHANGES TO ALL BUILDING OCCUPANTS THROUGH APPROPRIATE

MEANS SUCH AS NOTICES AND NEWSLETTERS

• CONDUCT A FIRE OR EVACUATION DRILL TO DETERMINE IF THE CHANGES SUFFICIENTLY ENSURE

EVERYONE’S SAFETY IN AN EMERGENCY.

K E Y P L A N

No. Revisions: Date:

1 ADDENDUM 01 03/17/2023

Sheets
G002 - CODE SHEET

File details come from the government source that posted it. Updated .