Attachment 3 - G002 - CODE SHEET.pdf
PDF 442 KB Posted
- Solicitation number
- 36C24923R0046
About this file
This document contains a federal contract opportunity for replacing flooring and doors in the Emergency Department at the Troy Bowling Campus of the Lexington VA Medical Center in Lexington, Kentucky. The scope of work involves completely preparing the site for demolition and removal of existing doors and flooring in the ED. The contractor will furnish all labor, materials, and equipment to perform the installation of new doors and flooring per the drawings and specifications. The justification provided is that the current ED flooring has holes and cracks throughout and needs replacing to avoid injury to patients and staff. The solicitation number is 36C24923R0046 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
M
M
M
M
TRIAGE 01
C121B
TRIAGE 02
C121A
EKG/LAB
C121C
TLT
C121D
PASSAGE
CH121A
SOILD UTIL
C122
EMS
C123
SPECIMEN
C124
SUB-WAITING
CH121B
PASSAGE
CH121
PASSAGE
CH125A
EXAM 11
C125A
EXAM 12
C125B
EXAM 13
C125C
EXAM 14
C125D
STORAGE
C125E
EXAM 15
C125F
EXAM 16
C125G
TOILET
C126A
PHYS WORK
C126C
ON CALL
C126D
PASSAGE
CH126
CART STORAGE
C125K
PASSAGE
CH125
STAFF WORK
C125
PASSAGE
CH125B
NOUR PREP
C125J
CLEAN UTILITY
C125H
E CYL
C125I
MED RM
C129
STORAGE
C127
STAIR
CS104
MENTAL 17
C130A
OFFICE
C130B
EXAM 18
C130C
EXAM 19
C130D
EXAM 1
C130E
EXAM (NEG) 2
C130F
VESTIBULE
CH130A
PASSAGE
CH132
TLT
C128
TLT
C131
EXAM 6
C132A
STAFF / WORK RM
C133
TLT/SHOWER
C134
SOILD UTIL
C135
IT
C136
CLEAN UTIL
C137
EMS
C138
EXAM 7
C132B
EXAM 8
C132C
EXAM 5
C132D
OFFICE 3
C140
ER OFFICE 2
C141
STAFF TLT
C142
ER NURSE MGR
C143
EMPLOYEE TRAINING RM
C144
PASSAGE
CH140
PASSAGE
CH132A
EXAM (NEG) 3
C130H
EXAM (NEG) 4
C130I
EXAM (NEG) 9
C130J
EXAM 10
C130K
STAIRWELL
CS109
EC
CU100
ELEVATOR
P7
ELEVATOR
P6 IT
C121
PASSAGE
CH130B
EGRESS ROUTE - 120' < 300'
EXISTING LOCKING
SUITE DOOR
EXISTING LOCKING
SUITE DOOR
EGRESS ROUTE - 125' < 300'
EGRESS ROUTE - 120' < 300'
EGRESS ROUTE - 175' < 300'
EGRESS ROUTE - 60' > 300'
EGRESS ROUTE - 50' < 300'
EX
EX
EX
STAFF WORK
C130
1 HOUR FIRE BARRIER
MEANS OF EGRESS
2 HOUR FIRE WALL
SMOKE BARRIER
LEGEND
EX EXIT
HAZARDOUS
ROOM
EXIT STAIR OR PASSAGEWAY
EXIT SIGN
FIRE EXTINGUISHER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
12/31/2023
C U s e rs
\d u n n t\ D o c u m e n ts
\R e v it \2
\F F
E L e x in g to n
R e p la c e
E D
F lo o ri n g
(2 tj .d u n n
.r v t
/1
/2
:5
:3
A
M
G002
CODE SHEET
Owner
3/17/2023 PH TD
REPLACE FLOORING & EXAM ROOM
DOORS IN ED SUITE
596A4-19-108
LEXINGTON, KY
CONSTRUCTION
DOCUMENTS B-1A
TROY BOWLING
CAMPUS
EMERGENCY
ROOM
C O D E N O T E S
2018 NFPA 101 LIFE SAFETY CODE REVIEW
BUILDING B1A, 1st FLOOR
AREA OF WORK = 8,927 SF
EXISTING FLOOR IS AMBULATORY HEALTH CARE OCCUPANCY - CHAPTER 21
CHAPTER 3 DEFINITIONS
3.3.283.2 PATIENT CARE NON-SLEEPING SUITE (HEALTH CARE OCCUPANCIES)
EXISTING EMERGENCY DEPARTMENT SUITE ENVELOPE TO REMAIN REORGANIZED
EMERGENCY DEPARTMENT. NO CHANGES TO FIRE WALLS, EGRESS, ETC.
CHAPTER 6 - CLASSIFICATION OF OCCUPANCY AND HAZARD OF CONTENT
6.1.11 RENOVATED AREA REVIEWED UNDER BUSINESS (CHAPTER 39)
6.2.2 HAZARD CLASSIFICATION: ORDINARY - NO CHANGE
CHAPTER 7- MEANS OF EGRESS: NO CHANGE
T7.3.1.2 OCCUPANT LOAD OF SPACE: AREA = 8,927 SF
AMBULATORY OCCUPANCY SPACE - 8,927 / 150 = 60 MAX OCCUPANTS
CHAPTER 8 - FEATURES OF FIRE PROTECTION: NO CHANGE
CHAPTER 9 - BUILDING SERVICE AND FIRE PROTECTION EQUIPMENT: NO CHANGE
CHAPTER 10 - INTERIOR FINISH, CONTENTS, AND FURNISHES
10.2.3.1
INTERIOR WALL AND CEILING FINISH MATERIALS TESTED IN ACCORDANCE
WITH NFPA 286.
10.2.3.1
INTERIOR WALL AND CEILING FINISH MATERIALS SHALL BE CLASSIFIED IN
ACCORDANCE WITH NFPA 286 AND COMPLY WITH 10.2.3.2.
10.2.3.1.2
MATERIALS TESTED IN ACCORDANCE WITH 10.2.3.1.1 AND COMPLYING
WITH 10.2.3.2 SHALL BE CONSIDERED ALSO TO COMPLY WITH THE
REQUIREMENTS OF CLASS A, CLASS B, OR CLASS AC IN ACCORDANCE WITH
10.2.3.3.
(1) DURING THE 40 KW EXPOSURE, FLAMES SHALL NOT SPREAD TO THE CEILING.
(2) THE FLAME SHALL NOT SPREAD TO THE OUTER EXTREMITY OF THE SAMPLE
ON ANY WALL OR CEILING.
(3) FLASHOVER, AS DESCRIBED IN NFPA 286, SHALL NOT OCCUR.
(4) THE PEAK HEAT RELEASE RATE THROUGHOUT THE TEST SHALL NOT EXCEED
800 KW.
(5) FOR NEW INSTALLATIONS, THE TOTAL SMOKE RELEASED THROUGH-OUT THE
TEST SHALL NOT EXCEED 1000 M2.
10.2.3.3
WALL AND CEILING- CLASSIFICATIONS CHARACTERISTICS.
(1) CLASS A: FLAME SPREAD: 0-25; SMOKE DEV. : 0-450.
(2) CLASS B: FLAME SPREAD: 26-75; SMOKE DEV. : 0-450
(3) CLASS C: FLAME SPREAD: 76-200; SMOKE DEV. : 0-450
10.2.7.3
INTERIOR FLOOR FINISH- SHALL BE CLASSIFIED BASED ON NFPA 253 OR
ASTEM E 648.
10.2.3.4
INTERIOR FLOOR- CLASSIFICATIONS CHARACTERISTICS:
(1) CLASS I: RAD FLUX: FIN .45 W/CM2
(2) CLASS II: RAD FLUX: FIN .22 W/CM2, AND MAX. .45 W/CM2
10.2.8.1
WALL AND CEILING FINISHES, WHERE SPRINKLED:
CLASS C PERMITTED IN ANY LOCATION WHERE CLASS B IS REQ’D.
CLASS B PERMITTED IN ANY LOCATION WHERE CLASS A IS REQ’D.
10.2.8.2
FLOOR FINISHES, WHERE SPRINKLED:
CLASS II PERMITTED IN ANY LOCATION WHERE CLASS I IS REQ’D.
NO CRITICAL RAD. FLUX PERMITTED IN ANY LOCATION WHERE CLASS II IS
REQ’D.
20.3.5.3 AND NFPA 10 SECTION 9.9 FIRE EXTINGUISHERS ARE REQUIRED WITHIN
75’ OF ANY POINT IN THE SPACE - MAXIMUM TRAVEL ~65'
CHAPTER 21 - EXISTING AMBULATORY HEALTHCARE OCCUPANCIES:
21.1.1.1
THE REQUIREMENTS OF THIS CHAPTER SHALL APPLY TO EXISTING BUILDINGS
OR PORTIONS THEREOF CURRENTLY OCCUPIED AS AMBULATORY HEALTHCARE OCCUPANCIES.
21.2.2.2.9
SENSOR- RELEASE OF ELECTRICAL LOCKING SYSTEMS COMPLYING WITH
7.2.1.6.2 SHALL BE PERMITTED.
21.2.5.2
DEAD END CORRIDORS SHALL NOT EXCEED 50 FT.
21.2.5.3
LIMITATIONS ON COMMON PATH OF TRAVEL SHALL BE IN ACCORDANCE WITH
39.2.5.3.1.
21.2.5.3.1
COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FT. ON A STORY
PROTECTED THROUGHOUT BY AN APPROVED AUTOMATIC SPRINKLER SYSTEM IN
ACCORDANCE WITH 9.7.1.1 (1).
21.2.6
TRAVEL DISTANCE TO EXITS. TRAVEL DISTANCE SHALL COMPLY WITH 21.2.6.2.1
THROUGH 21.2.6.1.2.
21.2.6.2.2 THE MAXIMUM TRAVEL DISTANCE IN 21.2.6.2.1 SHALL BE PERMITTED TO BE INCREASED 50 FT. IN
BUILDINGS PROTECTED THROUGHOUT BY AN APPROVED AUTOMATIC SPRINKLER SYSTEM IN
ACCORDANCE WITH 9.7.
21.2.9.1
EMERGENCY LIGHTING SHALL BE PROVIDED IN ACCORDANCE WITH SECTION
7.9
21.3.3.1
INTERIOR FINISH SHALL BE IN ACCORDANCE WITH SECTION 10.2.
21.3.3.2.1
INTERIOR WALL AND CEILING FINISH MATERIALS COMPLYING SECTION
10.2 SHALL BE CLASS A OR CLASS B IN EXITS AND IN EXIT ACCESS CORRIDORS.
21.3.3.2.2
INTERIOR WALL AND CEILING SHALL BE CLASS A, CLASS B, CLASS C IN
AREAS OTHER THAN THOSE SPECIFIED IN 39.3.3.2.1.
21.3.4.1
AMBULATORY HEALTH CARE FACILITIES SHALL BE PROVIDED WITH FIRE ALARM SYSTEMS IN
ACCORDANCE WITH SECTION 9.6, EXCEPT ASS MODIFIED BY 21.3.4.2 THROUGH 21.3.4.4.
21.3.4.2 INITIATION OF THE REQUIRED FIRE ALARM SYSTEM SHALL BE BY MANUAL MEANS IN ACCORDANCE
WITH 9.6.2 AND BY MEANS OF ANY DETECTION DEVICES OR DETECTION SYSTEMS REQUIRED.
21.3.5.3 PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED IN EVERY AMBULATORY HEALTH CARE OCCUPANCY
IN ACCORDANCE WITH SECTION 9.7.4.1
C O D E L E G E N D
G E N E R A L N O T E S
1/8" = 1'-0"
FIRST FLOOR PLAN - LIFE SAFETY
INTERIM LIFE SAFETY MEASURES PLAN
A REVIEW OF TEMPORARY CONSTRUCTION BARRIERS, EXIT SIGNAGE, PATHWAYS TO AN EGRESS POINT, EMERGENCY LIGHTING, FIRE PROTECTION SYSTEMS INCLUDING SMOKE DETECTORS, FIRE SUPPRESSION, FIRE EXTINGUISHERS, FIRE ALARMS SYSTEMS, SMOKE BARRIERS, EMERGENCY EVACUATION PLANS, AND OTHER FEATURES THAT CONTRIBUTE TO THE SAFETY OF OCCUPANTS SHOULD BE MADE TO DETERMINE THE IMPACT OF CONSTRUCTION ACTIVITIES ON LIFE SAFETY SYSTEMS AND EGRESS FROM THE FACILITY
DURING EACH PHASE OF CONSTRUCTION.
• COVER ALL AFFECTED ILLUMINATED EXIT SIGNS SO THEY CANNOT MISLEAD BUILDING OCCUPANTS TO
AN UNUSABLE EXIT
• POST SIGNAGE THAT DIRECTS BUILDING OCCUPANTS TO THE ALTERNATE EXIT
• COMMUNICATE THE TEMPORARY CHANGES TO ALL BUILDING OCCUPANTS THROUGH APPROPRIATE
MEANS SUCH AS NOTICES AND NEWSLETTERS
• CONDUCT A FIRE OR EVACUATION DRILL TO DETERMINE IF THE CHANGES SUFFICIENTLY ENSURE
EVERYONE’S SAFETY IN AN EMERGENCY.
K E Y P L A N
No. Revisions: Date:
1 ADDENDUM 01 03/17/2023
| Sheets |
| G002 - CODE SHEET |
File details come from the government source that posted it. Updated .