Attachment 15 - AF101 - ENLARGED FIRST FLOOR PLAN - FINISHES.pdf

PDF 4 MB Posted

Attached to
Z1DA--Project 596A4-19-108 - Replace ED Flooring - 596-23-2-5821-0002
Solicitation number
36C24923R0046
Issued by

About this file

This document includes a federal contract solicitation and related project documents for replacing flooring and doors in an Emergency Department at a Veterans Affairs medical center. The solicitation calls for contractors to demolish and remove existing flooring and doors in the ED at the Troy Bowling Campus of the Lexington VAMC in Lexington, Kentucky. Contractors must furnish all labor, materials, and equipment to install new flooring and doors per the drawings and specifications provided. The project documents include an enlarged first floor plan indicating the finish materials to be installed in each area, as well as a legend defining the flooring types. The justification states that the current ED flooring has holes and cracks throughout and needs replacement to avoid injury to patients and staff. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 9.

View the file

Other files

File Type Posted
36C24923R0046 0005.pdf PDF
36C24923R0046 - A0004.pdf PDF
36C24923R0046-A0003.pdf PDF
Attachment 1 - G000 - COVER SHEET.pdf PDF
Attachment 13 - AE501 - DETAILS.pdf PDF
Attachment 20 - 096519 Resilent Tile Flooring.pdf PDF
Attachment 18 - 090600 Schedule for Finishes.pdf PDF
Attachment 10 - AD101 - DEMOLITION PLAN.pdf PDF
Attachment 19 - 096516 RESILIENT SHEET FLOORING.pdf PDF
Attachment 14 - AE601 - DOOR DETAILS.pdf PDF
Attachment 12 - AE101 - ENLARGED FIRST FLOOR PLAN - NEW WORK.pdf PDF
Attachment 16 - 010000 General Requirements.pdf PDF
Attachment 7 - GC103 - PHASING PLAN.pdf PDF
Attachment 6 - GC102 - PHASING PLAN.pdf PDF
Attachment 4 - G003 - FIRST FLOOR PLAN - OVERALL.pdf PDF
36C4923R0046-A0002.pdf PDF
Attachment 5 - GC101 - PHASING PLAN.pdf PDF
Attachment 9 - GC105 - PHASING PLAN.pdf PDF
Attachment 11 - AD102 - LOWER-LEVEL DEMOLITION PLAN.pdf PDF
Attachment 3 - G002 - CODE SHEET.pdf PDF
Attachment 8 - GC104 - PHASING PLAN.pdf PDF
Attachment 17 - 013526 Safety Requirements.pdf PDF
Attachment 2 - G001 - GENERAL NOTES.pdf PDF
36C4923R0046-A0001.pdf PDF
Attachment 3 - Wage Rates 01-13-2023.pdf PDF
Attachment 6 - Schedule-of-Values-Sample Template.xlsx XLSX spreadsheet
Attachment 7 - Past Performance Questionnaire.docx DOCX document
Attachment 2 - 596A4-19-108 Replace ED Flooring - Drawings.pdf PDF
Attachment 4 - Calc. of Self Performed Work General Contractor.xlsx XLSX spreadsheet
Attachment 1 - 596A4-19-108 Replace ED Flooring Specifications.pdf PDF
Attachment 5 - Contractor EMR Certification Form.docx DOCX document
36C24923R0046_1.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

TRIAGE 01

C121B

LVT

TRIAGE 02

C121A

LVT

EKG/LAB

C121C

LVT

TLT

C121D

EPOXY

PASSAGE

CH121A

LVT

SOILD UTIL

C122

EPOXY

EMS

C123

EPOXY

SPECIMEN

C124

LVT

SUB-WAITING

CH121B

LVT

PASSAGE

CH121

LVT

PASSAGE

CH125A

LVT

EXAM 11

C125A

WSF

EXAM 12

C125B

WSF

EXAM 13

C125C

WSF

EXAM 14

C125D

WSF

STORAGE

C125E

LVT

EXAM 15

C125F

WSF

EXAM 16

C125G

WSF

TOILET

C126A

EPOXY

PHYS WORK

C126C

LVT

ON CALL

C126D

LVT

PASSAGE

CH126

LVT

CART STORAGE

C125K

LVT

PASSAGE

CH125

LVT

PASSAGE

CH125B

LVT

NOUR PREP

C125J

LVT

CLEAN UTILITY

C125H

WSF

E CYL

C125I

LVT

MED RM

C129

WSF

STORAGE

C127

EXISTING

STAIR

CS104

EXISTING

MENTAL 17

C130A

WSF

OFFICE

C130B

LVT

EXAM 18

C130C

EXISTING

EXAM 19

C130D

WSF

EXAM 1

C130E

WSF

EXAM (NEG) 2

C130F

WSF

VESTIBULE

CH130A

LVT

PASSAGE

CH132

LVT

TLT

C128

EPOXYTLT

C131

EPOXY

EXAM 6

C132A

WSF

STAFF / WORK RM

C133

LVT

TLT/SHOWER

C134

EPOXY

SOILD UTIL

C135

EPOXY

IT

C136

EXISTING

CLEAN UTIL

C137

WSF

EMS

C138

LVT

EXAM 7

C132B

WSF

EXAM 8

C132C

WSF

EXAM 5

C132D

WSF

OFFICE 3

C140

LVT

ER OFFICE 2

C141

LVT

STAFF TLT

C142

EPOXY

ER NURSE MGR

C143

LVT

EMPLOYEE TRAINING RM

C144

LVT

PASSAGE

CH140

LVT

PASSAGE

CH132A

LVT

EXAM (NEG) 3

C130H

WSF

EXAM (NEG) 4

C130I

WSF

EXAM (NEG) 9

C130J

WSF

EXAM 10

C130K

WSF

EC

CU100

EXISTING

ELEVATOR

P7

EXISTING

ELEVATOR

P6

EXISTING IT

C121

EXISTING

PASSAGE

CH130B

LVT

STAIRWELL

CS109

EXISTING

A L

IG

N

ALIGN

A L

IG

N A

L

IG

N

ALIGN

A L

IG

N

1'-9" +/-

STAFF WORK

C130

STAFF WORK

C125

LVT

LVT

LVT1

(RESILIENT TILE SECTION 09 65 19)

WSF

(RESILIENT SHEET FLOORING SECTION 09 65 16)

LVT2

(RESILIENT TILE SECTION 09 65 19)

EXISTING TO REMAIN

FINISH LEGEND

EPOXY

(RESINOUS URETHANE AND EPOXY MORTAR FLOORING

SECTION 09 67 23.60)

NOT IN SCOPE

EXISTING WALL

4" INTEGRAL BASE

EPOXY

EXISTING CONCRETE FLOORING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

12/31/2023

C U s e rs

\d u n n t\ D o c u m e n ts

\R e v it \2

\F F

E L e x in g to n

R e p la c e

E D

F lo o ri n g

(2 tj .d u n n

.r v t

/1

/2

:5

:2

A

M

AF101

ENLARGED FIRST FLOOR PLAN -

FINISHES

Owner

3/17/2023 PH TD

REPLACE FLOORING & EXAM ROOM

DOORS IN ED SUITE

596A4-19-108

LEXINGTON, KY

CONSTRUCTION

DOCUMENTS B-1A

TROY BOWLING

CAMPUS

EMERGENCY

ROOM

G E N E R A L N O T E S

A. TRANSITION BETWEEN LOCKERS AND LOBBY - PROVIDE CTA-XX-HL TRANSITION STRIP.

B. TRANSITION BETWEEN NURSE STATION AND ENTRANCE RAMP - PROVIDE RRS-XX-B TRANSITION STRIP.

C. TRANSITION BETWEEN EXAM 18 AND OFFICE - PROVIDE RUBBER TRANSITION STRIP TO MATCH EXISTING.

D. TRANSITION BETWEEN STAIRWELL AND EXPANSION JOINT - PROVIDE METAL TRANSITION STRIP.

E. 6" RUBBER BASE ON WALLS, 4" RUBBER BASE ON CASEWORK IN ROOMS WITH LVT.

F. 6" FLASH COVE BASE IN ROOMS WITH WSF.

G. 6" INTEGRAL BASE IN ROOMS WITH EPOXY.

1/8" = 1'-0"

FIRST FLOOR PLAN - NEW WORK FINISH PLAN

EXISTING TRANSITIONS

A. B. C. D.

A

B

C

D

KEY PLAN

D R A W I N G N O T E S

1 RELOCATE AND RECONNECT EXISTING LOCKERS UPON COMPLETION OF THE FLOOR REPLACEMENT.

2 EXISTING FLOOR EXPANSION JOINT TO REMAIN - PROTECT FROM DAMAGE DURING CONSTRUCTION - REMOVE COVER AS

REQUIRED FOR FLOOR INSTALLATION AND REINSTALL AT THE CONCLUSION OF WORK.

3" = 1'-0"

INTEGRAL EPOXY BASE DETAIL

No. Revisions: Date:

1 ADDENDUM 01 03/17/2023

Sheets
AF101 - ENLARGED FIRST FLOOR PLAN - FINISHES

File details come from the government source that posted it. Updated .