Attachment 14 - AE601 - DOOR DETAILS.pdf

PDF 285 KB Posted

Attached to
Z1DA--Project 596A4-19-108 - Replace ED Flooring - 596-23-2-5821-0002
Solicitation number
36C24923R0046
Issued by

About this file

This document package includes construction drawings and specifications for a federal contract opportunity to replace flooring and doors in an emergency department at a Veterans Affairs medical center. The scope of work involves demolishing and removing existing flooring and doors in the emergency department at the Troy Bowling Campus of the Lexington VAMC in Lexington, Kentucky. The contractor will then furnish all labor, materials, and equipment to install new doors and flooring according to the drawings and specifications provided. The justification given for the project is that the current emergency department flooring has holes and cracks throughout and needs replacement to avoid injuries to patients and staff. The work will be performed at the Troy Bowling Campus of the Lexington Veterans Affairs Medical Center located in Lexington, Kentucky.

View the file

Other files

File Type Posted
36C24923R0046 0005.pdf PDF
36C24923R0046 - A0004.pdf PDF
36C24923R0046-A0003.pdf PDF
Attachment 1 - G000 - COVER SHEET.pdf PDF
Attachment 13 - AE501 - DETAILS.pdf PDF
Attachment 20 - 096519 Resilent Tile Flooring.pdf PDF
Attachment 18 - 090600 Schedule for Finishes.pdf PDF
Attachment 10 - AD101 - DEMOLITION PLAN.pdf PDF
Attachment 19 - 096516 RESILIENT SHEET FLOORING.pdf PDF
Attachment 12 - AE101 - ENLARGED FIRST FLOOR PLAN - NEW WORK.pdf PDF
Attachment 16 - 010000 General Requirements.pdf PDF
Attachment 7 - GC103 - PHASING PLAN.pdf PDF
Attachment 6 - GC102 - PHASING PLAN.pdf PDF
Attachment 4 - G003 - FIRST FLOOR PLAN - OVERALL.pdf PDF
36C4923R0046-A0002.pdf PDF
Attachment 5 - GC101 - PHASING PLAN.pdf PDF
Attachment 9 - GC105 - PHASING PLAN.pdf PDF
Attachment 11 - AD102 - LOWER-LEVEL DEMOLITION PLAN.pdf PDF
Attachment 3 - G002 - CODE SHEET.pdf PDF
Attachment 8 - GC104 - PHASING PLAN.pdf PDF
Attachment 17 - 013526 Safety Requirements.pdf PDF
Attachment 2 - G001 - GENERAL NOTES.pdf PDF
Attachment 15 - AF101 - ENLARGED FIRST FLOOR PLAN - FINISHES.pdf PDF
36C4923R0046-A0001.pdf PDF
Attachment 3 - Wage Rates 01-13-2023.pdf PDF
Attachment 6 - Schedule-of-Values-Sample Template.xlsx XLSX spreadsheet
Attachment 7 - Past Performance Questionnaire.docx DOCX document
Attachment 2 - 596A4-19-108 Replace ED Flooring - Drawings.pdf PDF
Attachment 4 - Calc. of Self Performed Work General Contractor.xlsx XLSX spreadsheet
Attachment 1 - 596A4-19-108 Replace ED Flooring Specifications.pdf PDF
Attachment 5 - Contractor EMR Certification Form.docx DOCX document
36C24923R0046_1.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

V .I .F

V.I.F.

7' - 10"

1 3/4"

EXISTING METAL STUD

NEW 6" DOOR JAMB AND PIVOT PLATESEAL PERIMETER

EXISTING DRYWALL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

12/31/2023

C U s e rs

\d u n n t\ D o c u m e n ts

\R e v it \2

\F F

E L e x in g to n

R e p la c e

E D

F lo o ri n g

(2 tj .d u n n

.r v t

/1

/2

:5

:1

A

M

AE601

DOOR DETAILS

Owner

3/17/2023 PH TD

REPLACE FLOORING & EXAM ROOM

DOORS IN ED SUITE

596A4-19-108

LEXINGTON, KY

CONSTRUCTION

DOCUMENTS B-1A

TROY BOWLING

CAMPUS

EMERGENCY

ROOM

DOOR SCHEDULE

DOOR NO. COUNT DOOR TYPE WIDTH HEIGHT

FRAME HEAD

HEIGHT JAMB DEPTH

FRAME JAMB

WIDTH MATERIAL

PHASE 1

C125A 1 TRI-PANEL 7' - 10" 7' - 4" 0' - 6" 0' - 6" 0' - 1 3/4" ALUM.

C125B 1 TRI-PANEL 7' - 10" 7' - 4" 0' - 6" 0' - 6" 0' - 1 3/4" ALUM.

C125C 1 TRI-PANEL 7' - 10" 7' - 4" 0' - 6" 0' - 6" 0' - 1 3/4" ALUM.

C125F 1 TRI-PANEL 7' - 10" 7' - 4" 0' - 6" 0' - 6" 0' - 1 3/4" ALUM.

C125G 1 TRI-PANEL 7' - 10" 7' - 4" 0' - 6" 0' - 6" 0' - 1 3/4" ALUM.

PHASE 2

C130K 1 TRI-PANEL 7' - 10" 7' - 4" 0' - 6" 0' - 6" 0' - 1 3/4" ALUM.

C130J 1 TRI-PANEL 7' - 10" 7' - 4" 0' - 6" 0' - 6" 0' - 1 3/4" ALUM.

PHASE 3

C130E 1 TRI-PANEL 7' - 10" 7' - 4" 0' - 6" 0' - 6" 0' - 1 3/4" ALUM.

C130F 1 TRI-PANEL 7' - 10" 7' - 4" 0' - 6" 0' - 6" 0' - 1 3/4" ALUM.

C130H 1 TRI-PANEL 7' - 10" 7' - 4" 0' - 6" 0' - 6" 0' - 1 3/4" ALUM.

PHASE 4

C132C 1 TRI-PANEL 7' - 10" 7' - 4" 0' - 6" 0' - 6" 0' - 1 3/4" ALUM.

C132B 1 TRI-PANEL 7' - 10" 7' - 4" 0' - 6" 0' - 6" 0' - 1 3/4" ALUM.

C132A 1 TRI-PANEL 7' - 10" 7' - 4" 0' - 6" 0' - 6" 0' - 1 3/4" ALUM.

C132D 1 TRI-PANEL 7' - 10" 7' - 4" 0' - 6" 0' - 6" 0' - 1 3/4" ALUM.

C130I 1 TRI-PANEL 7' - 10" 7' - 4" 0' - 6" 0' - 6" 0' - 1 3/4" ALUM.

1/2" = 1'-0"

3 DOOR - FRONT ELEVATION

3" = 1'-0"

DOOR - WALL AND JAMB DETAIL

NOTES:

ALL DOOR TO HAVE SEAL AND LATCHING

BASIS OF DESIGN:

ASSA ABLOY VERSAMAX - 3 DOOR

PACKAGE WIDTH

CLEAR DOOR OPENING

ACTIVE AND SIDELITE WIDTH

BREAKOUT NOMINAL WIDTH

ROUGH OPENING WIDTH

94" 52 7/16" 31 13/16" 80 1/2"" 94 1/2"

No. Revisions: Date:

1 ADDENDUM 01 03/17/2023

Existing doors E-C132E E-C132G have been removed from the Door Schedule as a part of Addendum 01. Doors have been updated to be included in the phase consolidation in Addendum 1.

Sheets
AE601 - DOOR DETAILS

File details come from the government source that posted it. Updated .