Attachment 12 - AE101 - ENLARGED FIRST FLOOR PLAN - NEW WORK.pdf

PDF 491 KB Posted

Attached to
Z1DA--Project 596A4-19-108 - Replace ED Flooring - 596-23-2-5821-0002
Solicitation number
36C24923R0046
Issued by

About this file

This solicitation is for replacing flooring and doors in the Emergency Department at the Troy Bowling Campus of the Lexington VA Medical Center in Lexington, Kentucky. The scope of work involves completely preparing the site for demolition and removal of existing doors and flooring in the ED. The contractor will furnish all labor, materials, and equipment to install new doors and flooring per the furnished drawings and specifications. The justification provided is that the current ED flooring has holes and cracks throughout and needs replacing to avoid injury to patients and staff. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.

View the file

Other files

File Type Posted
36C24923R0046 0005.pdf PDF
36C24923R0046 - A0004.pdf PDF
36C24923R0046-A0003.pdf PDF
Attachment 1 - G000 - COVER SHEET.pdf PDF
Attachment 13 - AE501 - DETAILS.pdf PDF
Attachment 20 - 096519 Resilent Tile Flooring.pdf PDF
Attachment 18 - 090600 Schedule for Finishes.pdf PDF
Attachment 10 - AD101 - DEMOLITION PLAN.pdf PDF
Attachment 19 - 096516 RESILIENT SHEET FLOORING.pdf PDF
Attachment 14 - AE601 - DOOR DETAILS.pdf PDF
Attachment 16 - 010000 General Requirements.pdf PDF
Attachment 7 - GC103 - PHASING PLAN.pdf PDF
Attachment 6 - GC102 - PHASING PLAN.pdf PDF
Attachment 4 - G003 - FIRST FLOOR PLAN - OVERALL.pdf PDF
36C4923R0046-A0002.pdf PDF
Attachment 5 - GC101 - PHASING PLAN.pdf PDF
Attachment 9 - GC105 - PHASING PLAN.pdf PDF
Attachment 11 - AD102 - LOWER-LEVEL DEMOLITION PLAN.pdf PDF
Attachment 3 - G002 - CODE SHEET.pdf PDF
Attachment 8 - GC104 - PHASING PLAN.pdf PDF
Attachment 17 - 013526 Safety Requirements.pdf PDF
Attachment 2 - G001 - GENERAL NOTES.pdf PDF
Attachment 15 - AF101 - ENLARGED FIRST FLOOR PLAN - FINISHES.pdf PDF
36C4923R0046-A0001.pdf PDF
Attachment 3 - Wage Rates 01-13-2023.pdf PDF
Attachment 6 - Schedule-of-Values-Sample Template.xlsx XLSX spreadsheet
Attachment 7 - Past Performance Questionnaire.docx DOCX document
Attachment 2 - 596A4-19-108 Replace ED Flooring - Drawings.pdf PDF
Attachment 4 - Calc. of Self Performed Work General Contractor.xlsx XLSX spreadsheet
Attachment 1 - 596A4-19-108 Replace ED Flooring Specifications.pdf PDF
Attachment 5 - Contractor EMR Certification Form.docx DOCX document
36C24923R0046_1.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

TRIAGE 01

C121B

TRIAGE 02

C121A

EKG/LAB

C121C

TLT

C121D

PASSAGE

CH121A

SOILD UTIL

C122

EMS

C123

SPECIMEN

C124

SUB-WAITING

CH121B

PASSAGE

CH121

PASSAGE

CH125A

EXAM 11

C125A

EXAM 12

C125B

EXAM 13

C125C

EXAM 14

C125D

STORAGE

C125E

EXAM 15

C125F

EXAM 16

C125G

TOILET

C126A

PHYS WORK

C126C

ON CALL

C126D

PASSAGE

CH126

CART STORAGE

C125K

PASSAGE

CH125

STAFF WORK

C125

PASSAGE

CH125B

NOUR PREP

C125J

CLEAN UTILITY

C125H

E CYL

C125I

MED RM

C129

STORAGE

C127

STAIR

CS104

MENTAL 17

C130A

OFFICE

C130B

EXAM 18

C130C

EXAM 19

C130D

EXAM 1

C130E

EXAM (NEG) 2

C130F

VESTIBULE

CH130A

PASSAGE

CH132

TLT

C128

TLT

C131

EXAM 6

C132A

STAFF / WORK RM

C133

TLT/SHOWER

C134

SOILD UTIL

C135

IT

C136

CLEAN UTIL

C137

EMS

C138

EXAM 7

C132B

EXAM 8

C132C

EXAM 5

C132D

OFFICE 3

C140

ER OFFICE 2

C141

STAFF TLT

C142

ER NURSE MGR

C143

EMPLOYEE TRAINING RM

C144

PASSAGE

CH140

PASSAGE

CH132A

EXAM (NEG) 3

C130H

EXAM (NEG) 4

C130I

EXAM (NEG) 9

C130J

EXAM 10

C130K

STAIRWELL

CS109

EC

CU100

ELEVATOR

P7

ELEVATOR

P6 IT

C121

PASSAGE

CH130B

C125A C125B C125C

C125F

C125G

C130E

C130F

C130H

C130I

C130KC130J

C132CC132B

C132A

C132D

AE501

AE501

AE501

AE501

AE501

AE501

AE501

AE501

AE501

AE501

AE501

AE501

AE501

AE501

AE501

AE501

AE501

AE501

AE501

AE501

AE501

AE101

STAFF WORK

C130

3' - 5 3/4"

3' - 3 1/4" 3' - 3 1/4"

MIN.

4' - 4 1/2"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

12/31/2023

C U s e rs

\d u n n t\ D o c u m e n ts

\R e v it \2

\F F

E L e x in g to n

R e p la c e

E D

F lo o ri n g

(2 tj .d u n n

.r v t

/1

/2

:5

:0

A

M

AE101

ENLARGED FIRST FLOOR PLAN -

NEW WORK

Owner

3/17/2023 PH TD

REPLACE FLOORING & EXAM ROOM

DOORS IN ED SUITE

596A4-19-108

LEXINGTON, KY

CONSTRUCTION

DOCUMENTS B-1A

TROY BOWLING

CAMPUS

EMERGENCY

ROOM

1/8" = 1'-0"

FIRST FLOOR PLAN - NEW WORK

G E N E R A L N O T E S

A. SEE PHASING PLANS FOR LIMITS OF WORK PER PHASE

B. REFER TO SHEET G001 FOR DRAWING SYMBOLS, INFORMATION AND ABBREVIATIONS.

C. ALL MISCELLANEOUS PAINTING NOT IDENTIFIED IN THE DRAWINGS BUT NECESSARY FOR THE COMPLETION OF THE WORK SHALL BE INCLUDED IN THE PROJECT AND MATCH EXISTING ADJACENT PAINT IN COLOR AND FINISH. CONTRACTOR MEANS AND METHODS MAY RESULT IN A VARYING DEGREE OF PAINT REQUIRED.

SPOT PAINT TO AN ACCEPTABLE LEVEL BY THE VA.

D. CAULKING AND SEALANT ARE TO MATCH ADJACENT SURFACE COLOR. MIN. FLAME SPREAD 76-200, SMOKE

DEVELOPED 0-450).

E. ALL RENOVATED INTERIOR FINISHES SHALL BE CLASS A.

F. ENSURE SURFACES TO RECEIVE FINISHES ARE CLEAN, TRUE AND FREE OF IRREGULARITIES. DO NOT PROCEED WITH WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. STARTING WORK

SHALL INDICATE APPLICATOR'S ACCEPTANCE OF SUBSTRATE.

G. ALL FLOORING SURFACES SHALL BE SLIP RESISTANT PER ADA/ABA RECOMMENDATIONS AND

REQUIREMENTS.

H. REFER TO APPLICABLE FLOORING SPECIFICATIONS FOR FLOOR LEVELNESS REQUIREMENTS. FLASH PATCH

UNEVEN FLOOR AREAS AS REQUIRED.

I. FLOOR FINISHES TO EXTEND UNDER MILLWORK WHEREVER CABINET SPACES ARE OPEN TO FLOOR.

J. ENSURE SURFACES TO RECEIVE FINISHES ARE CLEAN, TRUE AND FREE OF IRREGULARITIES. DO NOT PROCEED WITH WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. STARTING WORK

SHALL INDICATE APPLICATOR'S ACCEPTANCE OF SUBSTRATE.

K. PREPARE FLOOR AREAS AS REQUIRED TO RECEIVE FLOOR FINISHES, INCLUDING FLASH PATCHING REQUIRED TO LEVEL AND SMOOTH FLOOR TO 1/4” IN 20' - 0” NON-CUMULATIVE. CONCRETE FLOORS SHALL BE FREE FROM SCALING AND IRREGULARITIES AND SHALL EXHIBIT NEUTRALITY RELATIVE TO ACIDITY AND

ALKALINITY.

1/4" = 1'-0"

FIRST FLOOR PLAN - EXISTING DOOR DIAGRAM

1/4" = 1'-0"

FIRST FLOOR PLAN - NEW DOOR DIAGRAM

D R A W I N G N O T E S

1 EXISTING FLOOR EXPANSION JOINT TO REMAIN - PROTECT FROM DAMAGE DURING CONSTRUCTION - REMOVE COVER AS

REQUIRED FOR FLOOR INSTALLATION AND REINSTALL AT THE CONCLUSION OF WORK.

2 RELOCATE AND RECONNECT EXISTING LOCKERS UPON COMPLETION OF THE FLOOR REPLACEMENT.

KEY PLAN

No. Revisions: Date:

1 ADDENDUM 01 03/17/2023

VA REFERENCE ONLY VA REFERENCE ONLY

Sheets
AE101 - ENLARGED FIRST FLOOR PLAN - NEW WORK

File details come from the government source that posted it. Updated .