Attachment 6 - Final Drawing Set - 5 of 8.pdf
PDF 11 MB Posted
- Attached to
- Project 573A4-21-700 EHRM Infrastructure Upgrades construction project at the Lake City, FL VAMC
- Solicitation number
- 36C77625B0006
About this file
This file is a detailed set of technology infrastructure upgrade drawings for the Lake City VA Medical Center. The project, numbered 573A4-21-700, involves comprehensive telecommunications infrastructure upgrades across multiple buildings, including replacing existing network cabling, installing new data outlets, upgrading fiber optic backbone cabling, and implementing new wireless access points and security cameras. The drawings specify technical details for basement, first floor, and other levels of Buildings 64, 38, 19, 82, 06, 62, 74, 27, 37, 18, 42, 44, and 92.
The project is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with a construction value between $20 million and $50 million. The scope includes replacing existing telecommunications infrastructure with new Category 6A cabling, installing new patch panels, upgrading wireless networks, and implementing new fiber optic backbone cabling. The technical specifications require careful coordination of cable routing, penetration of fire-rated barriers, and minimal network downtime during the transition. The work will be performed for the Department of Veterans Affairs Technology Acquisition Center Austin at the Lake City VA Medical Center located in Lake City, Florida.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXTERIOR ELEVATION
INTERIOR ELEVATION
SECTION/DETAIL NUMBER
DRAWING NUMBER
EQUIPMENT TAG
COLUMN GRID
NOTE
WINDOW OPENING
DOOR OPENING
ROOM NAME
ROOM NUMBER
WALL TYPE
CEILING HEIGHT
FINISH DESIGNATION
X
10'-8"
X X
XX.X-X
XX
X
1/A101
X
A101
XX
TOILET ACCESSORY TAGX SIGNAGE TAG
A101
SIM
X
SE Pine Dr
SE Oak St
SE D
ivision Ave
SE Baya Dr
S M ar io n Av e
SW Baya Dr
SW
M ai n
Bl vd
SW
M cF ar la ne
A ve
W Duval St
NW Lake Jeffery Rd
NE Bonds St
NE Track Dr
E Duval St
SE
C ou nt ry C lu b
R d
SW Bascom Norris Dr
N M ar io n Av e N E
Pa tte rs on
A ve
NE Bascom Norris Dr
Alligator Lake
La ke
H am bu rg
Lake City Veteran's Affairs Medical Center
N
B38
S1
B85
B64
B82
B19
B84
B03
B91
B86
B06
B83 B62
B74
B95
B92
B05
B18
B78
B37
B27
B70
B93
B42
B44
B41
SE Baya Dr
S M ar io n Av e
SE D
ivision Ave
B94
B69
B79
B66
S T
AT
E
OF FLOR
I D A
R
EGISTERED ARCH
IT
EC
T
J A
SO
N H. ROS
S
AR101907
VA Project No.
RDC/JPA Project No.
Department of Veterans Affairs Medical Center
ABOVE GROUP INC.
MECHANICAL ELECTRICAL PLUMBING TECHNOLOGY
305 EAST DRIVE, SUITE H
MELBOURNE, FL 32904
321.345.9026 P
ARCHITECTURE PLANNING INTERIOR DESIGN
524 FERNWOOD AVENUE
ALTAMONTE SPRINGS, FLORIDA 32701
407.830.6522 P
RDC / JPA ARCHITECTURE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
TERRACON
ENVIRONMENTAL
16200 NW 59TH AVE, SUITE 201
MIAMI LAKES, FL 33014
786.329.4062 P
/2
4/
:2 7:
P
M
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
10/25/2024
COVER SHEET - VOLUME 02
G004
ACKR
573A4-21-700
LAKE CITY FL
LAKE CITY VAMC EHRM INFRASTRUCTURE
UPGRADES DESIGN
619 S. MARION AVE, LAKE CITY FL, 32025 PROJECT #: 573A4-21-700
STATION CHIEF - EDWIN BURNETT
100% CONSTRUCTION
DOCUMENTS
22011
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
GENERAL CONSTRUCTION NOTES
* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS
TO THE CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.).
1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE
SAFETY CODE, INTERNATIONAL BUILDING CODE, AND OTHER
CODES AS IDENTIFIED IN VHA PROGRAM GUIDE PG-18-3, TOPIC
01, CODES, STANDARDS AND EXECUTIVE ORDERS WHICH CAN
BE FOUND ON THE DEPARTMENT OF VETERAN AFFAIRS,
TECHNICAL INFORMATION LIBRARY WEBSITE.
2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE
LATEST ARCHITECTURAL BARRIERS ACT ACCESSIBILITY
STANDARD (ABAAS) AND DEPARTMENT OF VETERANS AFFAIRS
BARRIER FREE DESIGN GUIDE PG-18-13 WHICH CAN BE FOUND
ON THE DEPARTMENT OF VETERANS AFFAIRS TECHNICAL
INFORMATION LIBRARY WEBSITE.
3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE
AND ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE
VISITS TO BE COORDINATED WITH THE CONTRACTING
OFFICER'S REPRESENTATIVE.
4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH,
TO MATCH ADJACENT EXISTING SURFACES, ANY EXISTING
MATERIALS TO REMAIN THAT ARE DAMAGED DURING THE
COURSE OF DEMOLITION OR NEW WORK.
5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR
INSTALLATION OF NEW WORK, CONTRACTOR SHALL REPAIR
EXISTING CONSTRUCTION TO REMAIN OR PROVIDE NEW
CONSTRUCTION TO MATCH EXISTING ADJACENT SURFACES TO
REMAIN.
6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL
CONDITIONS AND DIMENSIONS PRIOR TO ORDERING,
FABRICATING OR INSTALLING NEW MATERIALS.
7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL
EQUIPMENT, ETC. TO BE INSTALLED AS PART OF THIS
PROJECT, AND WHERE NECESSARY, MAKE SPECIAL
PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO
FIT THROUGH FINISHED OPENINGS.
8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET
ACCESSORIES, HAND RAILS, BUMPER RAILS, SHELVING,
CASEWORK, MOUNTING BRACKETS AND OTHER WALL
MOUNTED ITEMS, AS INDICATED IN THE CONTRACT
DOCUMENTS AND AS RECOMMENDED BY PRODUCT
MANUFACTURERS. ALL WOOD BLOCKING SHALL BE FIRE
RETARDANT TREATED.
9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES
UNLESS SPECIFICALLY NOTED OTHERWISE. IF NO FINISH IS
INDICATED AT A PARTICULAR SURFACE, CONTRACTOR SHALL
PROVIDE FINISH(S) AS INDICATED AT SIMILAR CONDITIONS.
10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY
OPERATIONAL SYSTEMS WHICH COMPLY WITH STATED CODES
AND REGULATIONS. WHERE THE OMISSION OF A PART OR
ELEMENT OF A SYSTEM WOULD RESULT IN THE
NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM,
CONTRACTOR SHALL INCLUDE SAID PART OR ELEMENT AS
PART OF THE WORK.
11. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE
OR FIRE RATED WALLS SHALL BE SMOKE/FIRE STOPPED AS
REQUIRED BY THE RATING OF THE WALL.
12. FIRE PROTECTION CONTRACTOR'S SPRINKLER DESIGN WILL BE
SUBJECT TO AN INDEPENDENT REVIEW BY A CERTIFIED FIRE
PROTECTION ENGINEER RETAINED BY THE OWNER. THE FIRE
PROTECTION CONTRACTOR IS RESPONSIBLE FOR MAKING ANY
REQUIRED CHANGES TO THE DESIGN AS IDENTIFIED BY THE
OWNER'S FIRE PROTECTION ENGINEER AS NECESSARY FOR
COMPLIANCE WITH SPECIFIED NFPA REQUIREMENTS.
13. CONTRACTOR IS RESPONSIBLE FOR IDENTIFICATION AND
REMOVAL OF HAZARDOUS MATERIALS ENCOUNTERED DURING
CONSTRUCTION.
Scale: 1" = 100'-0"
REGIONAL MAP
Scale: 1" = 50'-0"
VICINITY MAP
Revisions Date 10/25/202412/31/2024
S T
AT
E
OF FLOR
I D A
R
EGISTERED ARCH
IT
EC
T
J A
SO
N H. ROS
S
AR101907
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/2
5/
:0 8:
P
M
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
10/25/2024
DRAWING INDEX
G005
ACKR
573A4-21-700
LAKE CITY FL
STATION CHIEF - EDWIN BURNETT
100% CONSTRUCTION
DOCUMENTS
22011
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
G001 COVER SHEET - VOLUME 01
G002 DRAWING INDEX
G003 CODE DATA
A1.B BASEMENT - ZONES
A1.1 FIRST FLOOR - ZONES
A1.2 SECOND FLOOR - ZONES
A1.3 THIRD FLOOR - ZONES
A1.4 FOURTH FLOOR - ZONES
A1.B.1 BLDG 64 - LV B - ZONES 2,3,6
A1.B.2 BLDG 19 & 82 - LV B - ZONES 7 & 9
A1.B.3 BLDG 66 - LV B - ZONE 11
A1.1.1 BLDG 38 & 64 - LV 1 - ZONES 2,3,5
A1.1.2 BLDG 19, 64, 82 - LV 1 - ZONES 6,7,9
A1.2.1 BLDG 38 & 64 - LV 2 - ZONES 2,3,5
A1.2.2 BLDG 82 - LV 2 - ZONE 9
A1.3.1 BLDG 38, 64, 82 - LV 3 - ZONES 3,5,9
A1.4.1 BLDG 64 - LV 4 - ZONE 3
A1.1.3 BLDG 62 & 74 - ZONE 12 & 13
A1.1.4 BLDGS 27 & 37 - ZONE 14
A1.1.5 BLDG 18, 42, 44 - ZONE 15
A1.1.6 BLDG 92 - ZONE 15
A600 SCHEDULES, DETAILS & WALL TYPES
S-001 STRUCTURAL GENERAL NOTES AND ABBREVIATIONS
SS1.B.3 BLDG 64A - LV B - ZONE 3 - STRUCTURAL FOUNDATION PLAN
SS1.B.11A BLDG 64A - LV B - ZONE 11 - STRUCTURAL FOUNDATION PLAN
SS1.B.11B BLDG 66 - LV B - ZONE 11 - STRUCTURAL FOUNDATION PLAN
SS1.B.12B BLDG 62 - LV B - ZONE 12B - STRUCTURAL FOUNDATION PLAN
SS1.B.13 BLDG 74 - LV B - ZONE 13 - STRUCTURAL FOUNDATION PLAN
SS1.1.11 BLDG 06 - LV 1 - ZONE 11 - STRUCTURAL FOUNDATION PLAN
SS1.1.14A BLDG 27 - LV 1 - ZONE 14 - STRUCTURAL FOUNDATION
SS1.1.14B BLDG 37 - LV 1 - ZONE 14 - STRUCTURAL FOUNDATION PLAN
SS1.1.15 BLDG 18, 42, 44, & 92 - LV1 - ZONE 15 - STRUCT FOUNDATION PLAN
SS1.2.3 BLDG 91 - LV 2 - ZONE 3 - STRUCTURAL FRAMING PLAN
SS1.2.11 BLDG 66 - LV 2 - ZONE 11 STRUCTURAL CEILING SUPPORT
S-301 DETAILS AND SECTIONS
FA001 FIRE ALARM LEGENDS & SYMBOLS
FA101 BASEMENT - ZONES - NEW
FA400 ENLARGED DATA CENTER
FP-001 FIRE PROTECTION NOTES, LEGENDS, & SYMBOLS
FP1.B BASEMENT - ZONES - FIRE PROTECTION
FP1.B.1 FIRE PROTECTION PLANS - LV B - BLDG 19, 62, 64 & 82
FP1.B.2 FIRE PROTECTION PLANS - LV B - BLDG 66
FP1.1 FIRST FLOOR - ZONES - FIRE PROTECTION
FP1.1.1 FIRE PROTECTION PLANS - LV 1 - BLDG 6, 19, 38 & 64
FP1.1.2 FIRE PROTECTION PLANS - LV 1 - BLDG 18, 27, 37, 42, 44, 62, 82 & 92
FP1.2 SECOND FLOOR - ZONES - FIRE PROTECTION
FP1.2.1 FIRE PROTECTION PLANS - LV 2 - BLDG 38, 62, 64, 82
FP1.3 THIRD FLOOR - ZONES - FIRE PROTECTION
FP1.3.1 FIRE PROTECTION PLANS - LV 3 - BLDG 38, 64 & 82
FP1.4 FOURTH FLOOR - ZONES - FIRE PROTECTION
FP1.4.1 FIRE PROTECTION PLANS - LV 3 - BLDG 64
M-001 MECHANICAL NOTES, LEGENDS, & SYMBOLS
MH1.B BASEMENT - ZONES - MECHANICAL
MH1.B.1 BLDG 64 - LV B - ZONES 2 & 3 - MECHANICAL PLANS
MH1.B.2 BLDG 19 & 64 - LV B - ZONES 6 & 7 - MECHANICAL PLANS
MH1.B.3 BLDG 74 & 82 - LV B - ZONES 9 & 12a - MECHANICAL PLANS
MH1.B.4 BLDG 66 - LV B - ZONE 11 - MECHANICAL PLANS
MH1.1 FIRST FLOOR - ZONES - MECHANICAL
MH1.1.1 BLDG 64-A, B, & 91 - LV 1 - ZONE 2 & 3 - MECHANICAL PLANS
MH1.1.2 BLDG 38 & 64 - LV 1 - ZONE 5 & 6 - MECHANICAL PLANS
MH1.1.3 BLDG 19 & 82 - LV 1 - ZONE 7 & 9 - MECHANICAL PLANS
MH1.1.4 BLDG 6, 27, 37, 62 - LV 1 - ZONES 11, 12, 14 - MECHANICAL PLANS
MH1.1.5 BLDG 18, 42, 44, 92 - LV 1 - ZONE 15 - MECHANICAL PLANS
MH1.2 SECOND FLOOR - ZONES - MECHANICAL
MH1.2.1 BLDG 64 - LV 2 - ZONE 2 & 3 - MECHANICAL PLANS
MH1.2.2 BLDG 38, 62, 82 - LV 2 - ZONES 5, 9, 12 - MECHANICAL PLANS
MH1.3 THIRD FLOOR - ZONES - MECHANICAL
MH1.3.1 BLDG 38, 64, 82 - LV 3 - ZONES 3, 5, 9 - MECHANICAL PLANS
MH1.4 FOURTH FLOOR - ZONES - MECHANICAL
MH1.4.1 BLDG 64 - LV 4 - ZONE 2 - MECHANICAL PLANS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-701 MECHANICAL CONTROLS
M-801 MECHANICAL SCHEDULES
E-001 ELECTRICAL LEGENDS & SYMBOLS
E-002 ELECTRICAL GENERAL NOTES
E1.B BASEMENT - ZONES - NEW
E1.B.2 BLDG 64 - LV B - ZONE 2 - NEW
E1.B.3 BLDG 64 - LV B - ZONE 3 - NEW
E1.B.6 BLDG 64 - LV B - ZONE 6 - NEW
E1.B.7 BLDG 19 - LV B - ZONE 7 - NEW
E1.B.9 BLDG 82 - LV B - ZONE 9 - NEW
E1.B.11 BLDG 66 - LV B - ZONE 11 - NEW
E1.B.12 BLDG 62 - LV B - ZONE 12B - NEW
E1.1 FIRST FLOOR LEVEL - ZONES - NEW
E1.1.2 BLDG 64 - LV 1 - ZONE 2 - NEW
E1.1.3 BLDG 64 - LV 1 - ZONE 3 - NEW
E1.1.5 BLDG 38 - LV 1 - ZONE 5 - NEW
E1.1.6 BLDG 64 - LV 1 - ZONE 6 - NEW
E1.1.7 BLDG 19 - LV 1 - ZONE 7 - NEW
E1.1.9 BLDG 82 - LV 1 - ZONE 9 - NEW
E1.1.12 BLDG 62 - LV 1 - ZONE 12B - NEW
E1.1.14 BLDG 27 & 37 - ZONE 14 - NEW
E1.1.15 BLDG 18, 42, 44 & 92 - ZONE 15 - NEW
E1.2 SECOND FLOOR - ZONES - NEW
E1.2.2 BLDG 64 - LV 2 - ZONE 2 - NEW
E1.2.3 BLDG 64 - LV 2 - ZONE 3 - NEW
E1.2.5 BLDG 38 - LV 2 - ZONE 5 NEW
E1.2.9 BLDG 82 - LV 2 - ZONE 9 - NEW
E1.2.12 BLDG 62 - LV 2 - ZONE 12B - NEW
E1.3 THIRD FLOOR - ZONES - NEW
E1.3.3 BLDG 64 - LV 3 - ZONE 3 - NEW
E1.3.5 BLDG 38 - LV 3 - ZONE 5 - NEW
E1.3.9 BLDG 82 - LV 3 -ZONE 9 - NEW
E1.4 FOURTH FLOOR - ZONES - NEW
E1.4.3 BLDG 64A - LV 4 - ZONE 3 - NEW
E-400 DATA CENTER
E-401 ENLARGED ROOM PLANS
E-402 ENLARGED ROOM PLANS
DRAWING INDEX
E-403 ENLARGED ROOM PLANS
E-404 ENLARGED ROOM PLANS
E-405 ENLARGED ROOM PLANS
E-406 ENLARGED ROOM PLANS
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-601 ELECTRICAL DIAGRAMS
E-602 ELECTRICAL DIAGRAMS
E-603 ELECTRICAL DIAGRAMS
E-604 ELECTRICAL DIAGRAMS
E-605 ELECTRICAL DIAGRAMS
E-606 ELECTRICAL DIAGRAMS
E-607 ELECTRICAL DIAGRAMS
E-608 ELECTRICAL DIAGRAMS
E-801 ELECTRICAL SCHEDULES
E-802 ELECTRICAL SCHEDULES
E-803 ELECTRICAL SCHEDULES
E-804 ELECTRICAL SCHEDULES
E-805 ELECTRICAL SCHEDULES
E-806 ELECTRICAL SCHEDULES
E-807 ELECTRICAL SCHEDULES
E-808 ELECTRICAL SCHEDULES
E-809 ELECTRICAL SCHEDULES
E-810 ELECTRICAL SCHEDULES
G004 COVER SHEET - VOLUME 02
G005 DRAWING INDEX
T-001 TECHNOLOGY LEGEND, ABBREV & GENERAL NOTES
T-002 PHASING NOTES
TN100 TECHNOLOGY SITE PLAN
TN101 TECHNOLOGY SITE PLAN
TN1.B LOWER LEVEL - ZONES - NEW
TN1.B.1 BLDG 64 - LV B -ZONE 1 - NEW
TN1.B.2 BLDG 64 - LV B - ZONE 2 - NEW
TN1.B.3 BLDG 64 - LV B - ZONE 3 - NEW
TN1.B.4 BLDG 64 - LV B - ZONE 4 - NEW
TN1.B.5 BLDG 38 - LV B - ZONE 5 - NEW
TN1.B.6 BLDG 64 - LV B - ZONE 6 - NEW
TN1.B.7 BLDG 19 - LV B - ZONE 7 - NEW
TN1.B.8 BLDG 82-4 LV B-01 - ZONE 8 - NEW
TN1.B.9 BLDG 82 - LV B - ZONE 9 - NEW
TN1.B.10 BLDG 64 - LV B - ZONE 10 - NEW
TN1.B.11 BLDG 06 - LV B - ZONE 11 - NEW
TN1.B.12 BLDG 62 - LV B - ZONE 12 - NEW
TN1.B.13 BLDG 74 - LV 1 - ZONE 13 - NEW
TN1.BD BASEMENT - DIAMOND COVERAGE
TN1.1 FIRST FLOOR LEVEL - ZONES - NEW
TN1.1.1 BLDG 64 - LV 1 - ZONE 1 - NEW
TN1.1.2 BLDG 64 - LV 1 - ZONE 2 - NEW
TN1.1.3 BLDG 64 - LV 1 - ZONE 3 - NEW
TN1.1.4 BLDG 64 - LV 1 - ZONE 4 - NEW
TN1.1.5 BLDG 38 - LV 1 - ZONE 5 - NEW
TN1.1.6 BLDG 64 - LV 1 - ZONE 6 - NEW
TN1.1.7 BLDG 19 - LV 1 - ZONE 7 - NEW
TN1.1.8 BLDG 82 - LV 1 - ZONE 8 - NEW
TN1.1.9 BLDG 82 - LV 1 - ZONE 9 - NEW
TN1.1.10 BLDG 64D & 67 - LV 1 - ZONE 10 - NEW
TN1.1.11 BLDG 06 - LV 1 - ZONE 11 - NEW
TN1.1.12 BLDG 62 - LV 1 - ZONE 12 - NEW
TN1.1.13 BLDG 74 - LV 1 - ZONE 13 - NEW
TN1.1.14 BLDG 27 & 37 - ZONE 14 - NEW
TN1.1.14D BLDG 27 & 37 - ZONE 14 - DIAMOND COVERAGE
TN1.1.15 BLDG 18, 42, 44 & 92 - ZONE 15 - NEW
TN1.1.15D BLDG 18, 42, 44 & 92 - ZONE 15 - DIAMOND COVERAGE
TN1.1D FIRST FLOOR - DIAMOND COVERAGE
TN1.2 SECOND FLOOR - ZONES - NEW
TN1.2.1 BLDG 64 - LV 2 - ZONE 1 - NEW
TN1.2.2 BLDG 64 - LV 2 - ZONE 2 - NEW
TN1.2.3 BLDG 64 - LV 2 - ZONE 3 - NEW
TN1.2.4 BLDG 64 - LV 2 - ZONE 4 - NEW
TN1.2.5 BLDG 38 - LV 2 - ZONE 5 NEW
TN1.2.8 BLDG 82 - LV 2 - ZONE 8 - NEW
TN1.2.9 BLDG 82 - LV 2 - ZONE 9 - NEW
TN1.2.12 BLDG 62 - LV 2 - ZONE 12 - NEW
TN1.2D SECOND FLOOR - DIAMOND COVERAGE
TN1.3 THIRD FLOOR - ZONES - NEW
TN1.3.2 BLDG 64 - LV 3 - ZONE 2 - NEW
TN1.3.3 BLDG 64 - LV 3 - ZONE 3 - NEW
TN1.3.4 BLDG 64 - LV 3 - ZONE 4 - NEW
TN1.3.5 BLDG 38 - LV 3 - ZONE 5 - NEW
TN1.3.8 BLDG 82 - LV 3 -ZONE 8 - NEW
TN1.3.9 BLDG 82 - LV 3 -ZONE 9 - NEW
TN1.3D THIRD FLOOR - DIAMOND COVERAGE
TN1.4 FOURTH FLOOR - ZONES - NEW
TN1.4.2 BLDG 64 - LV 4 - ZONE 2 - NEW
TN1.4.3 BLDG 64A - LV 4 - ZONE 3 - NEW
TN1.4.4 BLDG 64 - LV 4 - ZONE 4 - NEW
TN1.4D FOURTH FLOOR - DIAMOND COVERAGE
TD401 ENLARGED DEMOLITION PLANS
TD401A ENLARGED DEMOLITION PLAN PHOTOS
TD402 ENLARGED DEMOLITION PLANS
TD402A ENLARGED DEMOLITION PLAN PHOTOS
TD403 ENLARGED DEMOLITION PLANS
TD403A ENLARGED DEMOLITION PLAN PHOTOS
TD404 ENLARGED DEMOLITION PLANS
TD404A ENLARGED DEMOLITION PLAN PHOTOS
T-300 DATA CENTER CONSTRUCTION PHASING
T-400 DATA CENTER
T-401 ENLARGED ROOM PLANS
T-402 ENLARGED ROOM PLANS
T-403 ENLARGED ROOM PLANS
T-404 ENLARGED ROOM PLANS
T-405 ENLARGED ROOM PLANS
T-406 ENLARGED ROOM PLANS
T-407 ENLARGED ROOM PLANS
T-500 TECHNOLOGY - SCHEDULES
T-501 TECHNOLOGY - TYPICAL RACK ELEVATIONS
T-502 TECHNOLOGY - TYPICAL DATA CENTER RACK ELEVATIONS
T-503 TECHNOLOGY - DETAILS
T-504 TECHNOLOGY - DETAILS
T-601 TECHNOLOGY DIAGRAMS
TELEPHONE BACKBOARD (WALL MOUNTED)
OUTLET DATA ONLY - (1) CAT6A CABLE PER PORT.
# = NUMBER OF PORTS, CH = COUNTER HEIGHT
WORK AREA OUTLET, COMBINATION TELEPHONE/DATA COMMUNICATION
OUTLET -NUMBER OF OUTLETS AS INDICATED ON PLAN.
TTB
COMMUNICATION SYMBOLS
CH = COUNTER HEIGHT
W = WALL MOUNTED TELEPHONE OUTLET AT 48" AFF
#D = QUANTITY OF DATA OUTLETS - (1) CAT6A CABLE
#V = QUANTITY OF ANALOG PHONE OUTLETS - NOT IN CONTRACT
CH
PULL SCHEDULE REQUIREMENTS
CONTRACTOR SHALL PROVIDE PULL SCHEDULE WITH TELECOM SHOP DRAWINGS. TELECOM SHOP DRAWINGS WILL NOT BE REVIEWED
UNLESS THEY INCLUDE PULL SCHEDULES.
CAT6A COPPER CABLE COLOR CODING
WHITE
YELLOW
GREEN/GREY
VIOLET
BLUE
RED
BLACK
- VOICE
- WIFI (MEDICAL/GUEST/VA)
- DATA
- VIDEO SURVEILLANCE
- NURSE CALL
- FIRE ALARM
- BAS & DAS
SYMBOL DESCRIPTION
CEILING MOUNTED WIRELESS ACCESS POINT (WAP) - (2) CAT6A CABLES
PROXIMITY CARD READER, MTD. 4'-0" AFF UNLESS OTHERWISE NOTED.CR
NUMERIC KEYPAD, MTD. 4'-0" AFF UNLESS OTHERWISE NOTED.KP
REQUEST TO EXIT DEVICE IN DOOR HARDWARE. RE
SECURITY ACCESS, VIDEO CAMERA WITH LENS
### - CAMERA ID, REFER TO CAMERA SCHEDULE FOR
MOUNTING AND CAMERA REQUIERMENTS
EX - EXISTING CAMERA
REQUEST TO EXIT DEVICE MOUNTED ABOVE DOOR.RE
TELECOMM GROUND BUS BAR, COPPER
COMBINATION CARD READER/NUMERIC KEYPAD, MTD. 4'-0" AFF
UNLESS OTHERWISE NOTED.
CP
4-POST NETWORK EQUIPMENT RACK.
CABLE TRAY; TYPE, SIZE AND MOUNTING HEIGHT AS INDICATED ON PLANS.
VERTICAL CABLE MANAGEMENT.
TELECOMMUNICATIONS ABBREVIATIONS
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAP ALARM ANNUNCIATOR PANEL
AC ALTERNATING CURRENT OR ARMORED CABLE
ACC ACCESSIBLE
ADDL ADDITIONAL
ADJ ADJACENT, ADJOINING
ADO AUTOMATIC DOOR OPENER
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
ALT ALTERNATE
AMB OR A AMBIENT
ARCH ARCHITECT
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
BAT BATTERY
BBC BONDING BACKBONE CONDUCTOR
BC BARE COPPER
BD BOARD
BFF BELOW FINISH FLOOR
BLDG BUILDING
BPIP BOILER PLANT INSTRUMENTATION PANEL
BYP BY PASS
C CONDUIT
CAB CABINET
CALC CALCULATE
CAP CAPACITY
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCR CONTROL CONTACTOR
SSTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CLG CEILING
CMU CONCRETE MASONRY UNIT
COAX COAX CABLE
COMM COMMUNICATION
COMPT COMPARTMENT
CONC CONCRETE
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CTV CABLE TELEVISION
CU COPPER
CU FT CUBIC FEET
CUR CURRENT
DB DECIBEL OR DIRECT BURIAL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DIAG DIAGRAM
DISTR DISTRIBUTION
DN DOWN
DRSW DOOR SWITCH
DWG DRAWING
EC EMPTY CONDUIT
EG EQUIPMENT GROUND
EL ELEVATION
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
ESMT EASEMENT
EXIST EXISTING
FLEX FLEXIBLE METALLIC CONDUIT
FOUTT TELEPHONE FLOOR OUTLET
FP FIRE PROTECTION
FT FEET OR FOOT
G OR GND GROUND OR GENERATOR
GEN GENERATOR
GTB GROUND TERMINAL BOX
HT HEIGHT
HZ HERTZ
IMC INTERMEDIATE METAL CONDUIT
IR INFRARED
J-BOX JUNCTION BOX
LF LINEAR FEET (FOOT)
LTNG LIGHTNING
LV LOW VOLTAGE
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MT MOUNT
MTD MOUNTED
MTG MOUNTING
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEUT OR N NEUTRAL
NIC NOT IN CONTRACT
NS NO SCALE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
P POLE
PA PUBLIC ADDRESS
PB PANELBOARD, PULL BOX, OR PUSHBUTTON
PBB PRIMARY BONDING BUSBAR
PBPU PREFABRICATED BEDSIDE PATIENT UNIT
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PNL PANEL
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
RCP REFLECTED CEILING PLAN
REC RECESSED
RECPT RECEPTACLE
RGS RIGID GALVANIZED STEEL
RM ROOM
REQD REQUIRED
SF SQUARE FOOT (FEET)
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SURF SURFACE
SW SWITCH
TBC TELECOMMUNICATIONS BONDING BUSBAR
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TR TELECOMMUNICATIONS ROOM
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
MSB MAIN SWITCH BOARD
UFD UNDERFLOOR DUCT
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
V VOLT
WAO WORK AREA OUTLET
WP WEATHERPROOF
STRUCTURED CABLING SYSTEM (SCS):
THE SCS CONTRACTOR (SCSC) SHALL PROVIDE ALL BACKBONE AND HORIZONTAL CABLING, COMPONENTS AND TERMINATIONS AS REQUIRED FOR A COMPLETE AND OPERATIONAL CABLING SYSTEM PER INDUSTRY BEST PRACTICES AS PRESCRIBED BY BICSI AND NEC.
THE SCSC SHALL BE RESPONSIBLE FOR COORDINATION WITH THE ELECTRICAL CONTRACTOR (EC) FOR SPECIFIC LOCATIONS OF ALL TELECOMMUNICATIONS SYSTEM DEVICES, INCLUDING ANCILLARY SYSTEM COMPONENTS AND ASSOCIATED CONDUITS PROVIDED BY THE
EC.
THE ELECTRICAL CONTRACTOR (EC) SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL ROUGH-IN COMPONENTS ASSOCIATED WITH THE TELECOMMUNICATIONS SYSTEM COMPONENTS AS NOTED ON THE DRAWINGS AND SPECIFICATIONS, INCLUDING BUT NOT LIMITED TO, CONDUIT AND BACK-BOXES. THE EC SHALL COORDINATE ALL REQUIREMENTS WITH THE SCS CONTRACTOR.
TELECOM ROOM (TR) EQUIPMENT RACKS:
THE SCS CONTRACTOR (SCS) SHALL FURNISH AND INSTALL ALL EQUIPMENT RACKS. THE SCS CONTRACTOR SHALL FURNISH AND INSTALL ALL CABLING PATCH PANELS (COPPER AND FIBER) WITH RACK, AND SHALL BE RESPONSIBLE FOR ALL CABLE TERMINATIONS AT THE
PATCH PANELS.
THE VA OIT SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL ACTIVE EQUIPMENT, CONTROLLERS, SWITCHES, ETC. THAT
RESIDE WITHIN THESE RACKS.
ACCESS CONTROL:
THE SCS CONTRACTOR (SCS) SHALL BE RESPONSIBLE FOR INSTALLING ALL CABLING AND DEVICES TO SUPPORT THE VA PROVIDED SECURITY HEAD END EQUIPMENT. VA SHALL INSTALL, CONNECT AND CONFIGURE FINAL SECURITY HEAD END EQUIPMENT.
THE ELECTRICAL CONTRACTOR (EC) SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL ROUGH-IN COMPONENTS ASSOCIATED WITH THE SECURITY SYSTEM AS NOTED ON THE DRAWINGS AND SPECIFICATIONS, INCLUDING BUT NOT LIMITED TO, CONDUIT AND BACK-
BOXES. THE EC SHALL COORDINATE WITH THE SCS CONTRACTORS.
GROUNDING AND BONDING:
THE EC SHALL BE RESPONSIBLE FOR PROVIDINGR THE GROUNDING BUSBAR(S) AS ILLUSTRATED ON THE DRAWINGS AND SPECIFICATIONS, AND CONNECTING IT TO THE BUILDING MAIN ELECTRICAL SERVICE GROUND. THE EC SHALL BE RESPONSIBLE FOR
GROUNDING ALL BACKBONE CONDUIT AND CABLE TRAY.
THE SCSC SHALL BE RESPONSIBLE FOR GROUNDING ALL RACKS, CABINETS, ENCLOSURES, PROTECTOR BLOCKS AND CABLE LADDER-
RACK INSIDE TELECOMMUNICATIONS ROOMS.
FIRESTOPPING:
THE EC SHALL BE RESPONSIBLE FOR FIRE-STOPPING SLEEVE ASSEMBLIES TO OBTAIN A UL RATING.
THE SCSC SHALL BE RESPONSIBLE FOR FIRE-STOPPING INSIDE THE SLEEVES AFTER CABLE INSTALLATION IS COMPLETE.
CASEWORK / ,MILLWORK:
THE SCSC SHALL BE RESPONSIBLE FOR INSTALLING TELECOMMUNICATIONS OUTLETS IN CASEWORK, AS REQUIRED. CABLES SHALL BE
CONCEALED IN CASEWORK.
THE EC SHALL BE RESPONSIBLE FOR INSTALLING ASSOCIATED CONDUIT AND BACK-BOXES AND SHALL STUB CONDUIT TO THE ABOVE
ACCESSIBLE CEILING SPACE.
CONDUIT:
THE EC SHALL BE RESPONSIBLE TO PROVIDE AND INSTALL ALL BACKBONE AND HORIZONTAL CABLING PATHWAYS. THIS SHALL INCLUDE ALL INTERIOR CONDUITS, PATHWAY COMPONENTS SUCH AS JUNCTION BOXES, PULL BOXES, WALL/CEILING PENETRATIONS AND CONDUIT SLEEVES, WHETHER SHOWN ON THE DRAWINGS OR AS REQUIRED TO PENETRATE FULL-HEIGHT PARTITIONS AS SHOWN ON THE DRAWINGS. THE EC SHALL PROVIDE AND INSTALL ALL BUSHINGS ON TELECOMMUNICATIONS CONDUITS PRIOR TO INSTALLATION OF
CABLING.
THE SCSC SHALL BE RESPONSIBLE FOR ALL WIRE RACEWAYS, CABLE RUNWAY (LADDER RACK) AND OTHER REQUIREMENTS FOR ROUTING AND SECURING CABLE INSIDE THE MAIN TELECOMMUNICATIONS ROOM (MTR) AND ALL TR'S.
TELECOMMUNICATIONS COMMUNICATIONS OUTLETS (C.O.'S) AND DEVICES:
THE EC SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL CONDUIT AND BACK-BOXES ASSOCIATED WITH THE
TELECOMMUNICATIONS C.O.'S AND DEVICES.
THE SCSC SHALL BE RESPONSIBLE FOR INSTALLATION OF ALL STRUCTURED CABLING, JACKS, FACEPLATES AND JUMPER/PATCH CORDS.
BACKBOARDS:
THE EC SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL BACKBOARDS AS ILLUSTRATED ON THE DRAWINGS AND AS REQUIRED FOR A COMPLETE SYSTEM AS ILLUSTRATED IN THE SPECIFICATIONS. THE EC SHALL BE RESPONSIBLE FOR ROUGH-IN OF ALL
CONDUIT AND BACK-BOXES. POWER CONDUITS SHALL BE CONCEALED BEHIND ALL BACKBOARDS.
#D #V
FLOOR RECEPTACLE, COMBINATION TELEPHONE/DATA COMMUNICATION OUTLET -
NUMBER OF OUTLETS AS INDICATED ON PLAN.
#D #V
#D = QUANTITY OF DATA OUTLETS - (1) CAT6A CABLE
#V = QUANTITY OF ANALOG PHONE OUTLETS - NOT IN CONTRACT
CONDUIT SIZE
(ID)
MAX NUMBER OF FIBER OPTIC CABLES
PER CONDUIT
CONDUIT FILL
1.00"
1.25"
1.50"
2.00"
2.50"
3.00"
4.00"
53%
40%
40%
40%
40%
CONDUIT: 24-STRAND
ARMORED OS2 FIBER OPTIC
CABLE FILL CHART
PRECAST CONCRETE, TRAFFIC RATED HANDHOLE. SIZE AS INDICATED ON PLANSHH
MAGNETIC DOOR CONTACT, MTD. IN TOP OF DOOR FRAME.DC
CEILING MOUNTED, DUAL TECHNOLOGY MOTION SENSOR FOR
INTRUSION DETECTION SYSTEM.
WALL MOUNTED AT 7' AFF, DUAL TECHNOLOGY MOTION
SENSOR FOR INTRUSION DETECTION SYSTEM.
CONDUIT SIZE
(ID)
MAX NUMBER OF CAT6A CABLES PER
CONDUIT
CONDUIT FILL
1.10"
1.25"
1.50"
2.00"
2.50"
3.00"
4.00"
34.7%
39.7%
38.8%
38.0%
38.9%
39.7%
39.9%
CONDUIT: CAT6A
CABLE FILL CHART
BASIS OF DESIGN CAT6A CABLE NOMINAL OUTTER DIAMETER IS 0.35".
CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING CABLE FILL FOR CABLES
WITH LARGER OR SMALLER NOMINAL OUTTER DIAMETER.
BASIS OF DESIGN OS2 24-STRAND ARMORED FIBER OPTIC CABLE NOMINAL OUTTER
DIAMETER IS 0.77". CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING CABLE
FILL FOR CABLES WITH LARGER OR SMALLER NOMINAL OUTTER DIAMETER.
COORDINATION NOTES:
CONDUIT SIZE
(ID)
MAX NUMBER OF FIBER OPTIC CABLES
PER CONDUIT
CONDUIT FILL
1.00"
1.25"
1.50"
2.00"
2.50"
3.00"
4.00"
53%
31%
40%
40%
40%
40%
40%
CONDUIT: 12-STRAND
ARMORED OS2 FIBER OPTIC
CABLE FILL CHART
BASIS OF DESIGN OS2 12-STRAND ARMORED FIBER OPTIC CABLE NOMINAL OUTTER
DIAMETER IS 0.53". CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING CABLE
FILL FOR CABLES WITH LARGER OR SMALLER NOMINAL OUTTER DIAMETER.
CONDUIT SIZE
(ID)
MAX NUMBER OF FIBER OPTIC CABLES
PER CONDUIT
CONDUIT FILL
1.00"
1.25"
1.50"
2.00"
2.50"
3.00"
4.00"
53%
31%
40%
40%
40%
40%
CONDUIT: 24-STRAND
ARMORED OM4 FIBER OPTIC
CABLE FILL CHART
BASIS OF DESIGN OM4 24-STRAND ARMORED FIBER OPTIC CABLE NOMINAL OUTTER
DIAMETER IS 0.644". CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING CABLE
FILL FOR CABLES WITH LARGER OR SMALLER NOMINAL OUTTER DIAMETER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a
L a k e
C it y V
A /0
V
A L a k e
C it y
E H
R M
I n fr a s tr u c tu re
R
M
E P
F P
T .r v t
/2 /2
:5
:4
A
M
T-001
TECHNOLOGY LEGEND, ABBREV &
GENERAL NOTES
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
LAKE CITY FL
573A4-21-700
STATION CHIEF - EDWIN BURNETT
10/25/2024 BMS CVM
100% CONSTRUCTION
DOCUMENTS
CHRISTOPHER VAN METER
RCDD Reg. No. 285002
SHEET LIST
SHEET NUMBER SHEET NAME
T-001 TECHNOLOGY LEGEND, ABBREV & GENERAL NOTES
T-002 PHASING NOTES
TN100 TECHNOLOGY SITE PLAN
TN101 TECHNOLOGY SITE PLAN
TN1.B LOWER LEVEL - ZONES - NEW
TN1.B.1 BLDG 64 - LV B -ZONE 1 - NEW
TN1.B.2 BLDG 64 - LV B - ZONE 2 - NEW
TN1.B.3 BLDG 64 - LV B - ZONE 3 - NEW
TN1.B.4 BLDG 64 - LV B - ZONE 4 - NEW
TN1.B.5 BLDG 38 - LV B - ZONE 5 - NEW
TN1.B.6 BLDG 64 - LV B - ZONE 6 - NEW
TN1.B.7 BLDG 19 - LV B - ZONE 7 - NEW
TN1.B.8 BLDG 82-4 LV B-01 - ZONE 8 - NEW
TN1.B.9 BLDG 82 - LV B - ZONE 9 - NEW
TN1.B.10 BLDG 64 - LV B - ZONE 10 - NEW
TN1.B.11 BLDG 06 - LV B - ZONE 11 - NEW
TN1.B.12 BLDG 62 - LV B - ZONE 12 - NEW
TN1.B.13 BLDG 74 - LV 1 - ZONE 13 - NEW
TN1.BD BASEMENT - DIAMOND COVERAGE
TN1.1 FIRST FLOOR LEVEL - ZONES - NEW
TN1.1.1 BLDG 64 - LV 1 - ZONE 1 - NEW
TN1.1.2 BLDG 64 - LV 1 - ZONE 2 - NEW
TN1.1.3 BLDG 64 - LV 1 - ZONE 3 - NEW
TN1.1.4 BLDG 64 - LV 1 - ZONE 4 - NEW
TN1.1.5 BLDG 38 - LV 1 - ZONE 5 - NEW
TN1.1.6 BLDG 64 - LV 1 - ZONE 6 - NEW
TN1.1.7 BLDG 19 - LV 1 - ZONE 7 - NEW
TN1.1.8 BLDG 82 - LV 1 - ZONE 8 - NEW
TN1.1.9 BLDG 82 - LV 1 - ZONE 9 - NEW
TN1.1.10 BLDG 64D & 67 - LV 1 - ZONE 10 - NEW
TN1.1.11 BLDG 06 - LV 1 - ZONE 11 - NEW
TN1.1.12 BLDG 62 - LV 1 - ZONE 12 - NEW
TN1.1.13 BLDG 74 - LV 1 - ZONE 13 - NEW
TN1.1.14 BLDG 27 & 37 - ZONE 14 - NEW
TN1.1.14D BLDG 27 & 37 - ZONE 14 - DIAMOND COVERAGE
TN1.1.15 BLDG 18, 42, 44 & 92 - ZONE 15 - NEW
TN1.1.15D BLDG 18, 42, 44 & 92 - ZONE 15 - DIAMOND COVERAGE
TN1.1D FIRST FLOOR - DIAMOND COVERAGE
TN1.2 SECOND FLOOR - ZONES - NEW
TN1.2.1 BLDG 64 - LV 2 - ZONE 1 - NEW
TN1.2.2 BLDG 64 - LV 2 - ZONE 2 - NEW
TN1.2.3 BLDG 64 - LV 2 - ZONE 3 - NEW
TN1.2.4 BLDG 64 - LV 2 - ZONE 4 - NEW
TN1.2.5 BLDG 38 - LV 2 - ZONE 5 NEW
TN1.2.8 BLDG 82 - LV 2 - ZONE 8 - NEW
TN1.2.9 BLDG 82 - LV 2 - ZONE 9 - NEW
TN1.2.12 BLDG 62 - LV 2 - ZONE 12 - NEW
TN1.2D SECOND FLOOR - DIAMOND COVERAGE
TN1.3 THIRD FLOOR - ZONES - NEW
TN1.3.2 BLDG 64 - LV 3 - ZONE 2 - NEW
TN1.3.3 BLDG 64 - LV 3 - ZONE 3 - NEW
TN1.3.4 BLDG 64 - LV 3 - ZONE 4 - NEW
TN1.3.5 BLDG 38 - LV 3 - ZONE 5 - NEW
TN1.3.8 BLDG 82 - LV 3 -ZONE 8 - NEW
TN1.3.9 BLDG 82 - LV 3 -ZONE 9 - NEW
TN1.3D THIRD FLOOR - DIAMOND COVERAGE
TN1.4 FOURTH FLOOR - ZONES - NEW
TN1.4.2 BLDG 64 - LV 4 - ZONE 2 - NEW
TN1.4.3 BLDG 64A - LV 4 - ZONE 3 - NEW
TN1.4.4 BLDG 64 - LV 4 - ZONE 4 - NEW
TN1.4D FOURTH FLOOR - DIAMOND COVERAGE
TD401 ENLARGED DEMOLITION PLANS
TD401A ENLARGED DEMOLITION PLAN PHOTOS
TD402 ENLARGED DEMOLITION PLANS
TD402A ENLARGED DEMOLITION PLAN PHOTOS
TD403 ENLARGED DEMOLITION PLANS
TD403A ENLARGED DEMOLITION PLAN PHOTOS
TD404 ENLARGED DEMOLITION PLANS
TD404A ENLARGED DEMOLITION PLAN PHOTOS
T-300 DATA CENTER CONSTRUCTION PHASING
T-400 DATA CENTER
T-401 ENLARGED ROOM PLANS
T-402 ENLARGED ROOM PLANS
T-403 ENLARGED ROOM PLANS
T-404 ENLARGED ROOM PLANS
T-405 ENLARGED ROOM PLANS
T-406 ENLARGED ROOM PLANS
T-407 ENLARGED ROOM PLANS
T-500 TECHNOLOGY - SCHEDULES
T-501 TECHNOLOGY - TYPICAL RACK ELEVATIONS
T-502 TECHNOLOGY - TYPICAL DATA CENTER RACK ELEVATIONS
T-503 TECHNOLOGY - DETAILS
T-504 TECHNOLOGY - DETAILS
T-601 TECHNOLOGY DIAGRAMS
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
1. CONTRACTOR MUST COORDINATE WITH VA OIT PRIOR TO ALL PLANNED NETWORK OUTAGES AND MAKE ALL EFFORTS TO MINIMIZE DURATION OF ANY
PLANNED OR UN PLANNED NETWORK OUTAGE.
2. PRODUCTS SHALL BE OF MATERIALS THAT ARE SUITABLE FOR THE ENVIRONMENT IN WHICH THEY ARE TO BE INSTALLED.
3. WORKING CLEARANCES AROUND ELECTRICAL EQUIPMENT SHALL BE MAINTAINED IN COMPLIANCE WITH THE NATIONAL ELECTRICAL CODE ARTICLE 110, COORDINATE EQUIPMENT INSTALLATION TO MAINTAIN REQUIRED CLEARANCES.
4. IF AN OUTLET BOX IS REQUIRED TO BE LOCATED IN AN ASSEMBLY OR PARTITION RATED AS "FIRE/SMOKE" OR "SMOKE" OR IDENTIFIED AS EITHER
"FIRE/SMOKE" OR "SMOKE", THEN ALL OF THE FOLLOWING CONDITIONS SHALL BE MET:
A. THE OUTLET BOX SHALL BE METALLIC.
B. THE OUTLET BOX OPENINGS SHALL OCCUR ONLY ON ONE SIDE OF THE FRAMING SPACE.
C. THE OUTLET BOX OPENINGS SHALL NOT EXCEED 16 SQUARE INCHES.
D. ALL CLEARANCES BETWEEN THE OUTLET BOX AND THE WALL BOARD MATERIAL SHALL BE COMPLETELY SEALED WITH APPROVED MATERIALS IN
ACCORDANCE WITH THE APPLICABLE CODES AND STANDARDS FOR THE PROJECT.
E. PROVIDE A SUPPLEMENTAL BARRIER AROUND OUTLETS LARGER THAN 16 INCHES SO THAT THE ORIGINAL RATING OF THE PENETRATION IS
MAINTAINED.
F. THE TOTAL AGGREGATE SURFACE AREA OF THE OUTLET BOX SHALL NOT EXCEED 100 SQUARE INCHES PER 100 SQUARE FEET.
G. THE OUTLET BOX SHALL BE SEPARATED FROM OPENINGS ON THE OPPOSITE SIDE OF THE RATED PARTITION BY A MINIMUM HORIZONTAL DISTANCE
OF 24 INCHES.
H. THE OUTLET BOX SHALL BE SECURELY FASTENED TO A PARTITION FRAMING MEMBER BY MEANS OF AN APPROVED ATTACHMENT METHOD.
I. OPENINGS CUT INTO THE WALL BOARD MATERIAL SHALL NOT EXCEED 1/8 INCH BETWEEN THE EDGES OF THE OUTLET BOX AND THE EDGES OF THE
OPENING.
5. LOCATIONS OF EQUIPMENT SHOWN ON THE DRAWINGS ARE APPROXIMATE, COORDINATE EXACT EQUIPMENT LOCATION AND CONNECTION
REQUIREMENTS WITH THE APPROPRIATE TRADE PRIOR TO INSTALLATION.
6. EXACT OUTLET LOCATIONS AND EXACT QUANTITIES ARE APPROXIMATE AND ARE BASED ON LIMITED SITE INVESTIGATIONS. CONTRACTOR SHALL
DOCUMENT QUANTITY AND LOCATION VARIANCES ON AS-BUILT DRAWINGS.
7. FOR EXACT LOCATION OF CEILING MOUNTED EQUIPMENT REFER TO THE ARCHITECTURAL REFLECTED CEILING PLAN. LOCATIONS OF EQUIPMENT NOT INCLUDED ON THE REFLECTED CEILING PLAN SHALL BE COORDINATED WITH THOSE ITEMS SHOWN. COORDINATION OF CEILING MOUNTED EQUIPMENT
SHALL BE PRIOR TO ANY ROUGH-IN. NOTIFY ARCHITECT OF ANY DISCREPANCY.
8. NOT ALL EXISTING EQUIPMENT IS INDICATED ON CONSTRUCTION DOCUMENTS FOR CLARITY. CONTRACTOR TO FIELD VERIFY ALL NETWORK DATA DEVICES AND ASSOCIATED RACEWAYS AS REQUIRED. EXISTING RACEWAYS, FOUND TO BE IN SERVICEABLE CONDITION, MAY BE REUSED AS APPLICABLE. CONTRACTOR SHALL REMOVE ABANDONED RACEWAYS THAT ARE NOT REUSED, UNLESS SPECIFICALLY NOTED OTHERWISE.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING EQUIPMENT, NOT ASSOCIATED WITH THIS CONTRACT, THAT IS LOCATED IN AREAS OF WORK. ANY DAMAGE TO EXISTING SYSTEMS, EQUIPMENT, CABLING, MATERIALS OR FINISHES MUST BE REPAIRED OR REPLACED AT CONTRACTORS EXPENSE. REPAIRS AND REPLACEMENT MUST BE APPROVED AND ACCEPTED BY THE VA.
10. PROVIDE FINAL CONNECTIONS TO OWNER PROVIDED EQUIPMENT WHERE INDICATED ON THE PLAN DRAWINGS.
11. PRIOR TO ROUGH-IN AND INSTALLATION OF ANY FLOOR MOUNTED DEVICE, VERIFY LOCATION WITH THE ARCHITECT.
12. VERIFY AND COORDINATE THE LOCATION OF REQUIRED DIVISION 27 OUTLETS WITH OTHER TRADE DRAWINGS AND OWNER PROVIDED EQUIPMENT.
13. ALL RACEWAY SYSTEMS SHOWN TO SUPPORT THE INSTALLATION OF THE DIVISION 27 EQUIPMENT SHALL BE PROVIDED BY THE ELECTRICAL CONTRACTOR. PROVIDE COORDINATION FOR THE INSTALLATION OF THIS RACEWAY SYSTEM WITH THE ELECTRICAL CONTRACTOR.
14. ALL BONDING AND GROUNDING ELEMENTS UTILIZED FOR STRUCTURED CABLING SYSTEM SHALL BE IN COMPLIANCE WITH SPECIFICATION SECTION 270526.
15. CABLE INSTALLED BELOW SLAB SHALL HAVE INDOOR/OUTDOOR RATED JACKET FOR PROTECTION OF STRUCTURED CABLE.
16. TELECOMMUNICATIONS ROOM SHALL BE BONDED AND GROUNDED IN ACCORDANCE WITH TIA-607D.
17. ALL TELECOMMUNICATIONS CONDUITS SHALL BE PROVIDED WITH BUSHINGS AT EACH END FOR PROTECTION OF STRUCTURED CABLE.
18. CAT6A CABLE BUNDLE SIZES AND CABLES ENCLOSED IN CONDUITS SHALL NOT EXCEED CABLE QUANTITIES INDICATED IN NEC TABLE 725.144, UNLESS CABLES ARE UL LISTED AS X-LP (0.5A). TYPE 4 POE CABLES WITHOUT LP CERTIFICATION ARE SUBJECT TO INSPECTION TO ENSURE BUNDLE SIZE AND
CURRENT LIMITATIONS PER NEC TABLE 725.144 ARE NOT EXCEEDED.
19. PROVIDE FACTORY PRE-TERMINATED CAT6A AND FIBER OPTIC CABLES WHEN DISTANCES ARE KNOWN. FIELD TERMINATED CABLES ARE ALLOWED IF
KNOWN DISTANCES ARE NOT ABLE TO BE DETERMINED.
20. BUNDLE CABLES TOGETHER IN GROUPS OF RELEVANCE (FOR EXAMPLE, CABLES TO A SINGLE EQUIPMENT DISTRIBUTOR OR UPLINKS TO CORE
DEVICES), AS THIS WILL EASE MANAGEMENT AND TROUBLESHOOTING.
21. BUNDLES OF CABLES, WHEN NECESSARY, SHOULD BE BUILT FROM SUB-BUNDLES OF NO MORE THAN 6-8 INDIVIDUAL CABLES. THE LARGER BUNDLES
SHOULD NOT EXCEED FOUR SUB-BUNDLES OF LIKE QUANTITY.
22. WHEN BUNDLING OR SECURING CABLES, USE VELCRO-BASED TIES NOT MORE THAN EVERY 3 FT TO 6 FT, AND MORE FREQUENTLY AS NEEDED TO MAINTAIN A CLEAN INSTALLATION. DO NOT USE ZIP TIES OR TWIST TIES FOR CABLE BUNDLING OR SECURING, AS THESE APPLY PRESSURE AT
CONCENTRATED LOCATIONS ON THE CABLES AND WILL CAUSE DAMAGE.
23. ONLY BUNDLE LIKE CABLE TYPES. DO NOT BUNDLE FIBER, POWER, AND UTP TOGETHER.
24. PROVIDE CONDUITS, SLEEVES, AND J-HOOKS AS REQUIRED FOR COMPLETE INSTALLATION OF HORIZONTAL AND BACKBONE CABLING.
25. PROVIDE UL LISTED FIRE/SMOKE SYSTEMS OR ASSEMBLIES IN AND AROUND ALL RATED BARRIER PENETRATIONS AS REQUIRED BY CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR FIRE AND SMOKE BARRIER RATINGS.
26. CONTRACTOR SHALL REMOVE ALL NETWORK CABLING, WORK AREA OUTLETS, PORTS, JACKS, AND ASSOCIATED PATCH PANELS RATED CAT6 AND BELOW (EXCLUDING ANALOG TELEPHONE OUTLETS AND CABLING) AS INDICATED ON PLANS, UNLESS NOTED OTHERWISE.
27. CONTRACTOR SHALL REUSE EXISTING J-HOOKS, CONDUIT AND OTHER EXISTING NETWORK PATHWAYS AS CABLE FILL ALLOWS. NEW HORIZONTAL
CABLE INSTALLATION MUST BE IN AN ORGANIZED AND CONSOLIDATED MANOR.
28. NETWORK OUTLET UPGRADE INCLUDES, BUT NOT LIMITED TO: REMOVAL AND DISPOSAL OF EXISTING NETWORK OUTLET/JACK, FACE PLATE, AND CABLING. PROVIDING ALL REQUIRE MATERIALS, TOOLS, TESTING EQUIPMENT, LABOR AND CONSUMABLES REQUIRED FOR COMPLETE INSTALLATION, LABELING, TESTING AND CERTIFICATION OF COMPLETE CAT6A NETWORK LINK FROM OUTLET TO PATCH PANEL.
29. CONTRACTOR SHALL PROVIDE PULL BOXES AS REQUIRED AND SIZED PER ANSI/TIA 569. MAXIMUM SPACING BETWEEN PULL BOXES SHALL NOT EXCEED 100' FOR STRAIGHT CONDUIT RUNS, AND AT A CUMULATIVE MAXIMUM OF 180 DEGREES OF CONDUIT BEND.
30. NETWORK CABLING SHALL BE SEGREGATED FROM ALL OTHER SYSTEMS CABLING INCLUDING, BUT NOT LIMITED TO: ACCESS CONTROL, SECURITY, SSTV, NURSE CALL AND FIRE ALARM SYSTEMS. WHEN ROUTING NETWORK CABLING IN CONDUIT, NETWORK CABLING SHALL BE ROUTED IN DEDICATED NETWORK CONDUITS. WHEN ROUTED IN CABLE TRAYS, NETWORK CABLING MUST BE BUNDLED WITH NETWORK CABLING ONLY.
31. CONTRACTOR SHALL REPLACE ALL CEILING TILES AT THE END OF EACH SHIFT FOR WORK AREAS OUTSIDE OF A RATED CONSTRUCTION BARRIER. IF TILES CANNOT BE REPLACED, A 1-HOUR FIRE RATED SEPARATION WILL BE REQUIRED BETWEEN THE CONSTRUCTION AREA AND THE OCCUPIED
PORTIONS OF THE BUILDING.
32. CONTRACTOR SHALL PROVIDE TEMPORARY FIRESTOPPING (MINERAL WOOL) AT THE END OF THE WORK SHIFT IF ADDITIONAL CABLING WILL BE PULLED
THROUGH A FIRE RATED PENETRATION AT A LATER WORK SHIFT.
GENERAL PROJECT NOTES
PHASE 1:
1. EXISTING RACK MOUNTED EQUIPMENT TO BE PROTECTED IN PLACE; RACK J7 TO BE SHIFTED TO ACCOMMODATE INSTALLATION OF NEW RACK LAYOUT
AS INDICATED ON PLANS. TEMPORARY PROTECTIVE STRUCTURES TO BE CONSTRUCTED FOR PROTECTION OF EXISTING RACKS AND EQUIPMENT. .
2. DEMOLISH WALLS, CEILING, AND RAISED FLOOR SYSTEM PER ARCHITECTURAL CONSTRUCTION DOCUMENTS.
A. REMOVE OLD RAISED FLOORING AND INSTALL NEW FOR AREAS THAT ARE CLEARED OF EQUIPMENT.
B. DISCONNECT AND REMOVE EXISTING DEVICES NOT SUPPORTING EXISTING RACKS.
3. INSTALL NEW STRUCTURAL SUPPORT ELEMENTS PER CONSTRUCTION DOCUMENTS.
4. NEW FLOOR AND CEILING TO BE INSTALLED.
A. INSTALL ADDITIONAL INSULATION ADDED ABOVE CEILING PER ARCHITECTURAL CONSTRUCTION DOCUMENTS.
B. INSTALL NEW RAISED FLOORING FOR AREAS FREE OF EXISTING EQUIPMENT TO CREATE SPACE FOR NEW EQUIPMENT INSTALLATION.
5. INSTALL DATA CENTER NEW EQUIPMENT.
A. INSTALL NEW ELECTRICAL EQUIPMENT, UPS EQUIPMENT AND ASSOCIATED DEVICES AND ACCESSORIES PER CONSTRUCTION DOCUMENTS.
B. INSTALL NEW MECHANICAL EQUIPMENT PER CONSTRUCTION DOCUMENTS.
a. ONE CRAC UNIT WOULD REMAIN TO BE INSTALLED AFTER THIS PHASE.
C. INSTALL NEW NETWORK AND SERVER CABINETS.
D. INSTALL NEW CABLE TRAY SYSTEM.
6. INSTALL RACK MOUNTED EQUIPMENT. - CORE-A AND CORE-B ARE TO REMAIN OPERATIONAL DURING TRANSITION FROM EXISTING TO NEW RACKS.
A. COORDINATE WITH VA FOR INSTALLATION OF OWNER PROVIDED AND INSTALLED CABINET MOUNTED EQUIPMENT.
B. INSTALL, TERMINATE AND TEST NEW DATA CENTER HDA/MDA CABLING.
C. TRANSITION CORE-A OVER TO NEW CABINETS.
a. BEGIN TRANSITION OF SYSTEMS FROM OLD EQUIPMENT TO NEW DATA CENTER EQUIPMENT WITH NON-CRITICAL SYSTEMS. COORDIANTE WITH
LOCAL VA PERSONNEL PRIOR TO BEGNING TRANSITION.
D. PROVIDE TEMPORARY UMBILICAL CONNECTION BETWEEN NEW CORE-A LOCATION AND EXISTING CORE-B.
E. PROVIDE TEMPORARY FIBER OPTIC AND COPPER PATCH CABLES AS REQUIRED FOR RENOVATION WORK.
F. ACQUIRE APPROVAL FROM VA FOR CABLING AND EQUIPMENT INSTALLATION AND TESTING.
7. COORDINATE TRANSITION OF DEMARC CABLING TO NEW EQUIPMENT WITH VA PRIOR TO TRANSITION. CORE-A IN NEW EQUIPMENT AND CORE-B IN OLD
EQUIPMENT SHALL BOTH BE CONNECTED TO EXISTING DEMARC DURING TRANSITION.
8. CONNECT NEW TR EQUIPMENT TO CORE-A IN NEW DATA CENTER EQUIPMENT WHILE EXISTING TR EQUIPMENT IS CONNECTED TO CORE-B IN OLD DATA
CETNER EQUIPMENT.
PHASE 3:
1. FINALIZATION OF DATA CENTER SPACE.
A. DECOMMISSIONED EXISTING RACKS ARE REMOVED.
B. REMOVE EXISTING UPS SYSTEM AND TURN OVER TO VA.
C. REPLACE REMAINING EXISTING FLOORING SYSTEM WITH NEW FLOORING SYSTEM.
D. REMAINING CRAC IS INSTALLED AND BROUGHT ON-LINE.
SUGGESTED PHASING SEQUENCE OF WORK FOR DATA
CENTER CONSTRUCTION AND DEMOLITION
PHASE 1:
1. CONSTRUCT NEW TR - MAXIMUM OF TRANSITIONING (2) TRS AT THE SAME TIME. VA TO PROVIDE MAXIMUM OF (10) TRANSITIONAL SWITCHES FOR
TRANSITION OF TRS.
A. INSTALL NEW NETWORK RACKS, CABLE TRAY, PLYWOOD, ACCESS CONTROL AND SECURITY DEVICES.
B. INSTALL NEW ELECTRICAL AND MECHANICAL EQUIPMENT AND DEVICES.
C. INSTALL NEW NETWORK AND POWER EQUIPMENT INTO NEW NETWORK RACKS.
D. PROVIDE TEMPORARY FIBER OPTIC PATCH CABLES DURING TRANSITION FROM OLD TR TO NEW TR.
E. CONNECT NEW FIBER OPTIC BACKBONE CABLING FROM NEW CORE-A DATA CENTER EQUIPMENT TO NEW RACK MOUNTED FIBER OPTIC PATCH
EQUIPMENT.
F. PERFORM TESTING OF FIBER OPTIC BACKBONE CABLING AND TERMINATIONS.
G. TERMINATE NEW HORIZONTAL CAT6A CABLING FROM NEW DATA OUTLETS AT NEW PATCH PANELS.
H. TEST HORIZONTAL CAT6A CABLING AND TERMINATIONS.
I. VERIFY ALL EXISTING TCO LOCATIONS, INDICATED ON CONSTRUCTION DOCUMENTS OR DISCOVERED DURING CONSTRUCTION, HAVE BEEN
CONNECTED TO NEW TR EQUIPMENT WITH NEW CAT6A CABLING.
J. UPON COMPETITION OF DATA CENTER RENOVATION CORE-B RELOCATION AND TESTING, CUT-OVER TO CORE-B CONNECTIONS FROM NEW DATA
CENTER EQUIPMENT.
PHASE 3:
1. UPON VERIFICATION THAT ALL OUTLETS ARE FULLY FUNCTIONAL, BEGIN DEMOLITION OF EXISTING TR.
A. REMOVE ALL DECOMMISSIONED HORIZONTAL CABLING FROM DEVICE TO SOURCE.
B. REMOVE DECOMMISSIONED FIBER OPTIC BACKBONE CABLING FROM TR TO SOURCE.
C. IF ALL EQUIPMENT INSTALLED IN EXISTING RACK IS NETWORK EQUIPMENT AND ALL EQUIPMENT HAS BEEN REMOVED, REMOVE RACK AND RETURN
TO VA IT.
D. IF NON-NETWORK EQUIPMENT (WIRELESS NETWORK, PHONE, BDA, ETC.) IS INSTALLED INTO EXISTING RACK, RACK AND EQUIPMENT ARE TO REMAIN
AS INSTALLED.
SUGGESTED PHASING SEQUENCE OF WORK FOR TELECOM
ROOM CONSTRUCTION AND DEMOLITION
PHASE 2:
1. CONTRACTOR TO COORDINATE AREAS OF OUTAGE FOR HORIZONTAL CAT6A CABLING REPLACEMENT WITH VA A MINIMUM OF 14 DAYS PRIOR TO
OUTAGE.
A. CONTRACTOR TO COORDINATE EXTENTS OF AREA OF OUTAGE WITH VA FOR TEMPORARY RELOCATION OF PERSONNEL, OR AFTER-HOURS WORK AS
REQUIRED BY THE VA.
2. BOTH NEW TR AND EXISTING TR WILL NEED TO BE OPERATIONAL FOR REPLACEMENT OF HORIZONTAL CABLING.
A. DEMOLITION OF EXISTING TR EQUIPMENT MAY COMMENCE ONLY AFTER ALL HORIZONTAL CABLING HAS BEEN REPLACED WITH NEW CABLING FROM
NEW TR.
3. CONTRACTOR TO REPLACE EXISTING HORIZONTAL CABLING TO ALL DATA OUTLETS IN PLANNED AREA OF OUTAGE.
A. CONTRACTOR SHALL WALK THE SPACE OF PLANNED OUTAGE TO VERIFY EXACT LOCATION AND QUANTITY OF ALL EXISTING DATA OUTLETS.
CONTRACT DOCUMENTS MAY NOT HAVE CAPTURED ALL EXISTING LOCATIONS DUE TO EXISTING OCCUPIED SPACES AND FURNITURE.
B. REMOVE CABLING FROM DATA OUTLET TO EXISTING PATCH PANEL.
C. INSTALL NEW CABLING FROM NEW TR PATCH PANEL TO NEW DATA OUTLET IN EXISTING LOCATION.
SUGGESTED PHASING SEQUENCE OF WORK FOR
HORIZONTAL CABLING REPLACEMENT
PHASE 1:
• RELOCATE EXISTING DATA CENTER RACKS/CABINETS PER PHASING DRAWINGS FOR RENOVATION OF EXISTING DATA CENTER SPACE AND
INSTALLATION OF NEW HVAC EQUIPMENT.
• CONSTRUCT TEMPORARY BARRIERS PER ARCHITECTURAL CONSTRUCTION DOCUMENTS.
• INSTALL STRUCTURAL REINFORCEMENT MODIFICATIONS TO THE DATA CENTER SPACE.
• INSTALL NEW DATA CENTER EQUIPMENT AND HVAC EQUIPMENT PER CONSTRUCTION DOCUMENTS.
• CONSTRUCT NEW TRS AND INSTALLATION OF NEW TR EQUIPMENT.
• INSTALL NEW REDUNDANT FIBER OPTIC BACKBONES FROM NEW DATA CENTER TO NEW TRS.'
PHASE 2:
• INSTALL NEW HORIZONTAL CABLING PER CONSTRUCTION DOCUMENTS.
PHASE 3:
• REMOVE OLD FIBER OPTIC BACKBONE CABLING, OLD TR EQUIPMENT AND OLD HORIZONTAL CABLING.
OVERALL SUGGESTED PHASING SEQUENCE OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a
L a k e
C it y V
A /0
V
A L a k e
C it y
E H
R M
I n fr a s tr u c tu re
R
M
E P
F P
T .r v t
/2 /2
:5
:4
A
M
T-002
PHASING NOTES LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
LAKE CITY FL
573A4-21-700
STATION CHIEF - EDWIN BURNETT
10/25/2024 BMS CVM
100% CONSTRUCTION
DOCUMENTS
CHRISTOPHER VAN METER
RCDD Reg. No. 285002524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
E
D
IV
IS
IO
N
A V
E
LT PL
LT PL
LT PL
PP
PP
PP
PP
PPANCH ANCHPP
FIBER OPTIC
CABLE
MANHOLE
C O N C
C O N C
C O N C
C O N C
C O N C
CONC
CONC
C O N C
C O N C
TELPED
TELPED
TELPED
TELJB
FH
WM
WV
FH
WV
(N
'4 W
.8
(S
'4
E
1.
N
'5
.0 1'
DECK
TANK
AC
AC
TANKS
SIGN
SIGN
AC
RAMP
O H
PL
OHP
L
O H P L
O H P L
O H P L
O H P L
O H P L
S E
D
IV
IS
IO
N
A V
E
LT PL
LT PL
LT PL
PP
PP
PP
PP
PPANCH ANCHPP
FIBER OPTIC
CABLE
MANHOLE
C O N C
C O N C
C O N C
C O N C
C O N C
CONC
CONC
C O N C
C O N C
TELPED
TELPED
TELPED
TELJB
FH
WM
WV
FH
WV
(N
'4
.8
(S
'4
1.
N
'5
.0 1'
DECK
TANK
AC
AC
TANKS
SIGN
SIGN
AC
RAMP
O H
PL
OHP
L
O H P L
O H P L
O H P L
O H P L
O H P L
REFER TO SHEET
TN1.B.11 FOR
INFORMATION IN
THIS AREA
CT
BUILDING
M
IN
IM
U
M
(3) 4" CONDUITS, (2) SPARE WITH PULL STRING.
CONDUITS ROUTED BELOW GRADE.
(3) 4" CONDUITS, (2) SPARE WITH PULL
STRING. CONDUITS ROUTED BELOW GRADE.
HH
(3) 4" CONDUITS, (2) SPARE
WITH PULL STRING.
CONDUITS ROUTED IN
CRAWL SPACE
HH
HH
(3) 4" CONDUITS, (2) SPARE WITH
PULL STRING. CONDUITS ROUTED
BELOW GRADE.
(3) 2" CONDUITS, (2) SPARE WITH
PULL STRINGS. CONDUITS ROUTED
BELOW GRADE
HH
(3) 4" CONDUITS, (2) SPARE WITH
PULL STRING. CONDUITS ROUTED
BELOW GRADE.
(3) 4" CONDUITS, (2) SPARE WITH
PULL STRING. CONDUITS ROUTED
BELOW GRADE..
1 TYPICAL
(3) 4" CONDUITS, (2) SPARE WITH
PULL STRING. CONDUITS ROUTED
BELOW GRADE.
(3) 4" CONDUITS, (2)
SPARE WITH PULL
STRING. CONDUITS
ROUTED IN CRAWL
SPACE
(3) 4" CONDUITS, (2) SPARE WITH
PULL STRING. CONDUITS ROUTED
BELOW GRADE
HH
HH
M
IN
IM
U M
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a
L a k e
C it y V
A /0
V
A L a k e
C it y
E H
R M
I n fr a s tr u c tu re
R
M
E P
F P
T .r v t
/2 /2
:0
:1
P
M
TN100
TECHNOLOGY SITE PLAN LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
LAKE CITY FL
573A4-21-700
STATION CHIEF - EDWIN BURNETT
10/25/2024 BMS CVM
100% CONSTRUCTION
DOCUMENTS
CHRISTOPHER VAN METER
RCDD Reg. No. 285002
CODED NOTES:
DRAWING NOTES:
1. UNDERGROUND CONDUIT ROUTING AND HANDHOLE LOCATIONS INDICATED ON THIS PLAN ARE
DIAGRAMATIC. CONTRACTOR TO COORDINATE EXACT CONDUIT ROUTING AND HANDHOLE
PLACEMENT WITH EXISTING FILED CONDITIONS AND CIVIL PLANS PRIOR TO CONSTRUCTION.
MAXIMUM CONDUIT LENGTH BETWEEN HANDHOLES IS NOT TO EXCEED 250' OR CUMULATIVE 180
DEGREES OF CONDUIT BEND. REFER TO DETAIL 10 ON SHEET T-503 FOR ADDITIONAL INFORMATION.
2. REFER TO FIBER BACKBONE RISER DIAGRAM ON SHEET T-601 FOR ADDITIONAL INFORMATION ON
FIBER OPTIC CABLE TYPES AND QUANTITIES.
3. REFER TO CONCRETE ENCASED DUCTBANK DETAIL ON SHEET T-504.
REFER TO DETAIL 1 ON SHEET T-504 AND DETAIL 10 ON SHEET T-503 FOR ADDITIONAL INFORMATION.
COORDINATE EXACT ENTRY POINT INTO BUILDING WITH ARCHITECTURAL AND STRUCTURAL PRIOR TO CONSTRUCTION. FIBER OPTIC CABLE CONDUITS ARE NOT PERMITTED TO BE EXPOSED ABOVE GRADE.
SAW CUT, PATCH AND REPAIR ROADWAY TO MATCH SURROUNDING AREA FOR INSTALLATION OF
DUCTBANK.
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
NN
0 15' 30' 60' 90'
1" = 30'
1" = 30'-0"2
TECHNOLOGY SITE PLAN - NORTH
M
A R
IO
N
A V
E
LT PL
ANCH(2)
PP
FOCJB
C O N C
C O N C
C O N C
C O N C
C O N C
C O N C
C O N C
TELPED
TELPED
F H
FH
N
1°
'3
.4 C (N
1°
' 1
.3
RUIN
STAIRS
AC
AC
AC
AC
PUMPS
STAIRS
TANK
POOL
SIGN
TANK
TANK
TANK
SIGN
SIGN
OHPL
OHPL
O H P L
O H P L
O H P L
O H P L
S M
A R
IO
N
A V
E
LT PL
ANCH(2)
PP
FOCJB
C O N C
C O N C
C O N C
C O N C
C O N C
C O N C
C O N C
TELPED
TELPED
F H
FH
N
1°
'3
.4 C (N
1°
' 1
.3
RUIN
STAIRS
AC
AC
AC
AC
PUMPS
STAIRS
TANK
POOL
SIGN
TANK
TANK
TANK
SIGN
SIGN
OHPL
OHPL
O H P L
O H P L
O H P L
O H P L
HH
(3) 4" CONDUITS, (2) SPARE WITH
PULL STRING. CONDUITS ROUTED
BELOW GRADE.
(3) 4" CONDUITS, (2) SPARE WITH PULL
STRING. CONDUITS ROUTED BELOW GRADE.
HH
(4) 4" CONDUITS, (1) WITH CORE-A FIBER
OPTIC CABLE, (1) WITH CORE-B FIBER OPTIC
CABLE AND (2) SPARE WITH PULL STRING.
CONDUITS ROUTED BELOW GRADE.
(3) 4" CONDUITS, (2) SPARE WITH
PULL STRING. CONDUITS ROUTED
BELOW GRADE.
(3) 4" CONDUITS, (2) SPARE WITH
PULL STRING. CONDUITS ROUTED
BELOW GRADE.
(3) 4" CONDUITS, (2) SPARE WITH
PULL STRING. CONDUITS ROUTED
BELOW GRADE.
(3) 4" CONDUITS, (2) SPARE WITH
PULL STRING. CONDUITS ROUTED
BELOW GRADE.
(4) 4" CONDUITS, (1) WITH CORE-A FIBER OPTIC
CABLE, (1) WITH CORE-B FIBER OPTIC CABLE
AND (2) SPARE WITH PULL STRING. CONDUITS
ROUTED BELOW GRADE.
(3) 4" CONDUITS, (2) SPARE WITH PULL
STRING. CONDUITS ROUTED BELOW GRADE.
(4) 4" CONDUITS, (1) WITH CORE-A FIBER
OPTIC CABLE, (1) WITH CORE-B FIBER OPTIC
CABLE AND (2) SPARE WITH PULL STRING.
CONDUITS ROUTED BELOW GRADE.
(3) 4" CONDUITS, (2) SPARE WITH
PULL STRING. CONDUITS ROUTED
BELOW GRADE.
(4) 4" CONDUITS, (1) WITH CORE-A
FIBER OPTIC CABLE, (1) WITH CORE-B
FIBER OPTIC CABLE AND (2) SPARE
WITH PULL STRING. CONDUITS
ROUTED BELOW GRADE.
(3) 4" CONDUITS, (2) SPARE WITH
PULL STRING. CONDUITS ROUTED
BELOW GRADE.
(3) 4" CONDUITS, (2) SPARE WITH PULL
STRING. CONDUITS ROUTED BELOW GRADE.
(3) 4" CONDUITS, (2) SPARE
WITH PULL STRING. CONDUITS
ROUTED BELOW GRADE.
(3) 4" CONDUITS, (2) SPARE WITH
PULL STRING. CONDUITS ROUTED
BELOW GRADE.
HH
HH
HH
HH
HH
HH
(3) 4" CONDUITS, (2) SPARE WITH
PULL STRING. CONDUITS ROUTED
BELOW GRADE.
HH
HH
1 TYPICAL
(3) 4" CONDUITS, (2) SPARE WITH PULL
STRING. CONDUITS ROUTED BELOW GRADE.
(3) 4" CONDUITS, (2) SPARE WITH
PULL STRING. CONDUITS ROUTED
BELOW GRADE
HH
(3) 4" CONDUITS, (2) SPARE WITH
PULL STRING. CONDUITS ROUTED
BELOW GRADE.
50'
MINIMUM
HH
(1) 4" CONDUIT. CONDUITS
ROUTED BELOW GRADE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a
L a k e
C it y V
A /0
V
A L a k e
C it y
E H
R M
I n fr a s tr u c tu re
R
M
E P
F P
T .r v t
/2 /2
:0
:2
P
M
TN101
TECHNOLOGY SITE PLAN LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
LAKE CITY FL
573A4-21-700
STATION CHIEF - EDWIN BURNETT
10/25/2024 BMS CVM
100% CONSTRUCTION
DOCUMENTS
CHRISTOPHER VAN METER
RCDD Reg. No. 285002
CODED NOTES:
DRAWING NOTES:
1. UNDERGROUND CONDUIT ROUTING AND HANDHOLE/MANHOLE LOCATIONS INDICATED ON THIS PLAN
ARE DIAGRAMATIC. CONTRACTOR TO COORDINATE EXACT CONDUIT ROUTING AND
HANDHOLE/MANHOLE PLACEMENT WITH EXISTING FILED CONDITIONS AND CIVIL PLANS PRIOR TO
CONSTRUCTION. MAXIMUM CONDUIT LENGTH BETWEEN HANDHOLES IS NOT TO EXCEED 250' OR
CUMULATIVE 180 DEGREES OF CONDUIT BEND. REFER TO DETAIL 10 ON SHEET T-503 FOR
ADDITIONAL INFORMATION.
2. REFER TO FIBER BACKBONE RISER DIAGRAM ON SHEET T-601 FOR ADDITIONAL INFORMATION ON
FIBER OPTIC CABLE TYPES AND QUANTITIES.
3. REFER TO CONCRETE ENCASED DUCTBANK DETAIL ON SHEET T-504.
REFER TO DETAIL 1 ON SHEET T-504 AND DETAIL 10 ON SHEET T-503 FOR ADDITIONAL INFORMATION.
COORDINATE EXACT ENTRY POINT INTO BUILDING WITH ARCHITECTURAL AND STRUCTURAL PRIOR TO
CONSTRUCTION.
SAW CUT, PATCH AND REPAIR ROADWAY TO MATCH SURROUNDING AREA FOR INSTALLATION OF
DUCTBANK.
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
NN
0 15' 30' 60' 90'
1" = 30'
1" = 30'-0"1
TECHNOLOGY SITE PLAN - SOUTH
ELECTRICAL
B2
MECHANICAL
B1
STAIR 1
4A1
AREA IS PART OF
THE PIPE BASEMENT
AND IS NOT
CONDITIONED. IF
DROPS ARE NEEDED,
EXCEPTION WILL BE
REQUIRED.
57a
S1
Q1RST
B62[12A]
B74[13]
B66[11]
B64-A[3] B64-B[2]
B82[9]
B82[8]
B64-D[10]
B19[7]
B64-2[1]B64-A[4]
B64-2[6]
B38[5]
B64-A[11]
TR B10
TR C10B
TR BB01
TR 164D
TR
AB02A
TR 110A
3 4
4 3
REFER TO SHEET
TN100 AND TN101
FOR CONTINUATION
REFER TO SHEET
TN100 AND TN101
FOR CONTINUATION
LOCATION OF
TR ON FLOOR
ABOVE
LOCATION OF
TR ON FLOOR
ABOVE
LOCATION OF
TR ON FLOOR
ABOVE
REFER TO SHEET
TN100 AND TN101
FOR CONTINUATION
REFER TO SHEET
TN100 AND TN101
F…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .