Attachment 10 - Final Drawing Set - 7c of 8.pdf

PDF 58 MB Posted

Attached to
Project 573A4-21-700 EHRM Infrastructure Upgrades construction project at the Lake City, FL VAMC
Solicitation number
36C77625B0006
Issued by

View the file

Other files

File Type Posted
Online Bid Opening Meeting Info.docx DOCX document
Amendment 5 - 36C77625B0006 0005 6-30-25.pdf PDF
Construction Wage Rates - Columbia 6-27-2025.pdf PDF
Brand Name Justification - Lake City - Rev 2 0 - Redacted.pdf PDF
Amendment 4 - 36C77625B0006 0004 6-25-25.pdf PDF
Brand Name Justification - Lake City EHRM - SIGNED_Redacted.pdf PDF
Amendment 3 - 36C77625B0006 0003 6-11-25.pdf PDF
573A4-21-700 Lake City - RFI TRACKING SHEET REV2 36C77625B0006 6-10-25.xlsx XLSX spreadsheet
573A4-21-700 Lake City - Addendum No. 1.pdf PDF
260526-EDITED Grnd shop marked up.docx DOCX document
260533-EDITED Raceway shop marked up.docx DOCX document
260519-EDITED Low Volt cond cab shop marked updocx.docx DOCX document
262726-EDITED Wire Dev shop marked up.docx DOCX document
Construction Wage Rates - Columbia 5-2-2025.pdf PDF
262416-EDITED Panelboards shop marked up.docx DOCX document
Amendment 2 - 36C77625B0006 0002 5-27-2025.pdf PDF
Site Visit Sign-in - 573A4-21-700 Attendance 250423.pdf PDF
Amendment 1 - 36C77625B0006 0001 4-24-25.pdf PDF
Attachment 15 - Construction Wage Rates - Columbia.pdf PDF
Attachment 8 - Final Drawing Set - 7a of 8.pdf PDF
Attachment 4 - Final Drawing Set - 3 of 8.pdf PDF
Attachment 14 - PreConstruction Risk Assessment - Lake City.docx DOCX document
Attachment 5 - Final Drawing Set - 4 of 8.pdf PDF
Attachment 9 - Final Drawing Set - 7b of 8.pdf PDF
Attachment 7 - Final Drawing Set - 6 of 8.pdf PDF
Attachment 6 - Final Drawing Set - 5 of 8.pdf PDF
Attachment 12 - Final Drawing Set - 8 of 8.pdf PDF
Attachment 1 - Final Specs Set - R4.pdf PDF
Attachment 13 - Asbestos and Lead Paint Survey Report.pdf PDF
Attachment 11 - Final Drawing Set - 7d of 8.pdf PDF
Attachment 17 - Site Visit Instructions.pdf PDF
Attachment 3 - Final Drawing Set - 2 of 8.pdf PDF
Attachment 16 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 2 - Final Drawing Set - 1 of 8.pdf PDF
IFB 36C77625B0006.pdf PDF
Attachment 18 - RFI TRACKING SHEET - SOLICITATION 36C77625B0006 - Project 573A4-21-700.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .