Attachment 2 - Final Drawing Set - 1 of 8.pdf
PDF 9 MB Posted
- Attached to
- Project 573A4-21-700 EHRM Infrastructure Upgrades construction project at the Lake City, FL VAMC
- Solicitation number
- 36C77625B0006
About this file
This document is a comprehensive architectural drawing set for the VA Lake City VAMC EHRM Infrastructure Upgrades project. The drawings, prepared by RDC/JPA Architecture, provide detailed demolition and construction plans for multiple buildings (B64, B19, B82, B66, B38, B62, B74, B27, B37, B18, B42, B44, and B92) across basement through fourth floor levels. The project involves extensive infrastructure upgrades, including removing and replacing telecom rooms, modifying existing spaces, upgrading electrical and technology systems, and ensuring compliance with VA construction standards such as NFPA 101 Life Safety Code and Architectural Barriers Act Accessibility Standards.
The drawings specify comprehensive demolition and reconstruction requirements, including wall removals, ceiling replacements, floor refinishing, door modifications, and installation of new technological infrastructure. Key technical specifications include fully sprinklered facilities, fire-rated wall installations, acoustic treatments, and specific finish requirements for different spaces. The project is competitively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with a construction magnitude between $20 million and $50 million, located at the Lake City VA Medical Center in Florida. The design emphasizes infrastructure modernization while maintaining existing building integrity and meeting strict VA technical and safety standards.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXTERIOR ELEVATION
INTERIOR ELEVATION
SECTION/DETAIL NUMBER
DRAWING NUMBER
EQUIPMENT TAG
COLUMN GRID
NOTE
WINDOW OPENING
DOOR OPENING
ROOM NAME
ROOM NUMBER
WALL TYPE
CEILING HEIGHT
FINISH DESIGNATION
X
10'-8"
X X
XX.X-X
XX
X
1/A101
X
A101
XX
TOILET ACCESSORY TAGX SIGNAGE TAG
A101
SIM
X
B38
S1
B85
B64
B82
B19
B84
B03
B91
B86
B06
B83 B62
B74
B95
B92
B05
B18
B78
B37
B27
B70
B93
B42
B44
B41
SE Baya Dr
S M ar io n Av e
SE D
ivision Ave
B94
B69
B79
B66
SE Pine Dr
SE Oak St
SE D
ivision Ave
SE Baya Dr
S M ar io n Av e
SW Baya Dr
SW
M ai n
Bl vd
SW
M cF ar la ne
A ve
W Duval St
NW Lake Jeffery Rd
NE Bonds St
NE Track Dr
E Duval St
SE
C ou nt ry C lu b
R d
SW Bascom Norris Dr
N M ar io n Av e N E
Pa tte rs on
A ve
NE Bascom Norris Dr
Alligator Lake
La ke
H am bu rg
Lake City Veteran's Affairs Medical Center
N
S T
AT
E
OF FLOR
I D A
R
EGISTERED ARCH
IT
EC
T
J A
SO
N H. ROS
S
AR101907
VA Project No.
RDC/JPA Project No.
Department of Veterans Affairs Medical Center
ABOVE GROUP INC.
MECHANICAL ELECTRICAL PLUMBING TECHNOLOGY
305 EAST DRIVE, SUITE H
MELBOURNE, FL 32904
321.345.9026 P
ARCHITECTURE PLANNING INTERIOR DESIGN
524 FERNWOOD AVENUE
ALTAMONTE SPRINGS, FLORIDA 32701
407.830.6522 P
RDC / JPA ARCHITECTURE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
TERRACON
ENVIRONMENTAL
16200 NW 59TH AVE, SUITE 201
MIAMI LAKES, FL 33014
786.329.4062 P
/2
4/
:2 6:
P
M
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
10/25/2024
COVER SHEET - VOLUME 01
G001
ACKR
573A4-21-700
LAKE CITY FL
LAKE CITY VAMC EHRM INFRASTRUCTURE
UPGRADES DESIGN
619 S. MARION AVE, LAKE CITY FL, 32025 PROJECT #: 573A4-21-700
STATION CHIEF - EDWIN BURNETT
100% CONSTRUCTION
DOCUMENTS
22011
GENERAL CONSTRUCTION NOTES
* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS
TO THE CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.).
1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE
SAFETY CODE, INTERNATIONAL BUILDING CODE, AND OTHER
CODES AS IDENTIFIED IN VHA PROGRAM GUIDE PG-18-3, TOPIC
01, CODES, STANDARDS AND EXECUTIVE ORDERS WHICH CAN
BE FOUND ON THE DEPARTMENT OF VETERAN AFFAIRS,
TECHNICAL INFORMATION LIBRARY WEBSITE.
2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE
LATEST ARCHITECTURAL BARRIERS ACT ACCESSIBILITY
STANDARD (ABAAS) AND DEPARTMENT OF VETERANS AFFAIRS
BARRIER FREE DESIGN GUIDE PG-18-13 WHICH CAN BE FOUND
ON THE DEPARTMENT OF VETERANS AFFAIRS TECHNICAL
INFORMATION LIBRARY WEBSITE.
3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE
AND ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE
VISITS TO BE COORDINATED WITH THE CONTRACTING
OFFICER'S REPRESENTATIVE.
4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH,
TO MATCH ADJACENT EXISTING SURFACES, ANY EXISTING
MATERIALS TO REMAIN THAT ARE DAMAGED DURING THE
COURSE OF DEMOLITION OR NEW WORK.
5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR
INSTALLATION OF NEW WORK, CONTRACTOR SHALL REPAIR
EXISTING CONSTRUCTION TO REMAIN OR PROVIDE NEW
CONSTRUCTION TO MATCH EXISTING ADJACENT SURFACES TO
REMAIN.
6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL
CONDITIONS AND DIMENSIONS PRIOR TO ORDERING,
FABRICATING OR INSTALLING NEW MATERIALS.
7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL
EQUIPMENT, ETC. TO BE INSTALLED AS PART OF THIS
PROJECT, AND WHERE NECESSARY, MAKE SPECIAL
PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO
FIT THROUGH FINISHED OPENINGS.
Scale: 1" = 50'-0"
VICINITY MAP
Scale: 1" = 100'-0"
REGIONAL MAP
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET
ACCESSORIES, HAND RAILS, BUMPER RAILS, SHELVING,
CASEWORK, MOUNTING BRACKETS AND OTHER WALL
MOUNTED ITEMS, AS INDICATED IN THE CONTRACT
DOCUMENTS AND AS RECOMMENDED BY PRODUCT
MANUFACTURERS. ALL WOOD BLOCKING SHALL BE FIRE
RETARDANT TREATED.
9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES
UNLESS SPECIFICALLY NOTED OTHERWISE. IF NO FINISH IS
INDICATED AT A PARTICULAR SURFACE, CONTRACTOR SHALL
PROVIDE FINISH(S) AS INDICATED AT SIMILAR CONDITIONS.
10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY
OPERATIONAL SYSTEMS WHICH COMPLY WITH STATED CODES
AND REGULATIONS. WHERE THE OMISSION OF A PART OR
ELEMENT OF A SYSTEM WOULD RESULT IN THE
NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM,
CONTRACTOR SHALL INCLUDE SAID PART OR ELEMENT AS
PART OF THE WORK.
11. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE
OR FIRE RATED WALLS SHALL BE SMOKE/FIRE STOPPED AS
REQUIRED BY THE RATING OF THE WALL.
12. FIRE PROTECTION CONTRACTOR'S SPRINKLER DESIGN WILL BE
SUBJECT TO AN INDEPENDENT REVIEW BY A CERTIFIED FIRE
PROTECTION ENGINEER RETAINED BY THE OWNER. THE FIRE
PROTECTION CONTRACTOR IS RESPONSIBLE FOR MAKING ANY
REQUIRED CHANGES TO THE DESIGN AS IDENTIFIED BY THE
OWNER'S FIRE PROTECTION ENGINEER AS NECESSARY FOR
COMPLIANCE WITH SPECIFIED NFPA REQUIREMENTS.
13. CONTRACTOR IS RESPONSIBLE FOR IDENTIFICATION AND
REMOVAL OF HAZARDOUS MATERIALS ENCOUNTERED DURING
CONSTRUCTION.
Revisions Date 12/31/2024
S T
AT
E
OF FLOR
I D A
R
EGISTERED ARCH
IT
EC
T
J A
SO
N H. ROS
S
AR101907
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/2
5/
:0 8:
P
M
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
10/25/2024
DRAWING INDEX
G002
ACKR
573A4-21-700
LAKE CITY FL
STATION CHIEF - EDWIN BURNETT
100% CONSTRUCTION
DOCUMENTS
22011
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
G001 COVER SHEET - VOLUME 01
G002 DRAWING INDEX
G003 CODE DATA
A1.B BASEMENT - ZONES
A1.1 FIRST FLOOR - ZONES
A1.2 SECOND FLOOR - ZONES
A1.3 THIRD FLOOR - ZONES
A1.4 FOURTH FLOOR - ZONES
A1.B.1 BLDG 64 - LV B - ZONES 2,3,6
A1.B.2 BLDG 19 & 82 - LV B - ZONES 7 & 9
A1.B.3 BLDG 66 - LV B - ZONE 11
A1.1.1 BLDG 38 & 64 - LV 1 - ZONES 2,3,5
A1.1.2 BLDG 19, 64, 82 - LV 1 - ZONES 6,7,9
A1.2.1 BLDG 38 & 64 - LV 2 - ZONES 2,3,5
A1.2.2 BLDG 82 - LV 2 - ZONE 9
A1.3.1 BLDG 38, 64, 82 - LV 3 - ZONES 3,5,9
A1.4.1 BLDG 64 - LV 4 - ZONE 3
A1.1.3 BLDG 62 & 74 - ZONE 12 & 13
A1.1.4 BLDGS 27 & 37 - ZONE 14
A1.1.5 BLDG 18, 42, 44 - ZONE 15
A1.1.6 BLDG 92 - ZONE 15
A600 SCHEDULES, DETAILS & WALL TYPES
S-001 STRUCTURAL GENERAL NOTES AND ABBREVIATIONS
SS1.B.3 BLDG 64A - LV B - ZONE 3 - STRUCTURAL FOUNDATION PLAN
SS1.B.11A BLDG 64A - LV B - ZONE 11 - STRUCTURAL FOUNDATION PLAN
SS1.B.11B BLDG 66 - LV B - ZONE 11 - STRUCTURAL FOUNDATION PLAN
SS1.B.12B BLDG 62 - LV B - ZONE 12B - STRUCTURAL FOUNDATION PLAN
SS1.B.13 BLDG 74 - LV B - ZONE 13 - STRUCTURAL FOUNDATION PLAN
SS1.1.11 BLDG 06 - LV 1 - ZONE 11 - STRUCTURAL FOUNDATION PLAN
SS1.1.14A BLDG 27 - LV 1 - ZONE 14 - STRUCTURAL FOUNDATION
SS1.1.14B BLDG 37 - LV 1 - ZONE 14 - STRUCTURAL FOUNDATION PLAN
SS1.1.15 BLDG 18, 42, 44, & 92 - LV1 - ZONE 15 - STRUCT FOUNDATION PLAN
SS1.2.3 BLDG 91 - LV 2 - ZONE 3 - STRUCTURAL FRAMING PLAN
SS1.2.11 BLDG 66 - LV 2 - ZONE 11 STRUCTURAL CEILING SUPPORT
S-301 DETAILS AND SECTIONS
FA001 FIRE ALARM LEGENDS & SYMBOLS
FA101 BASEMENT - ZONES - NEW
FA400 ENLARGED DATA CENTER
FP-001 FIRE PROTECTION NOTES, LEGENDS, & SYMBOLS
FP1.B BASEMENT - ZONES - FIRE PROTECTION
FP1.B.1 FIRE PROTECTION PLANS - LV B - BLDG 19, 62, 64 & 82
FP1.B.2 FIRE PROTECTION PLANS - LV B - BLDG 66
FP1.1 FIRST FLOOR - ZONES - FIRE PROTECTION
FP1.1.1 FIRE PROTECTION PLANS - LV 1 - BLDG 6, 19, 38 & 64
FP1.1.2 FIRE PROTECTION PLANS - LV 1 - BLDG 18, 27, 37, 42, 44, 62, 82 & 92
FP1.2 SECOND FLOOR - ZONES - FIRE PROTECTION
FP1.2.1 FIRE PROTECTION PLANS - LV 2 - BLDG 38, 62, 64, 82
FP1.3 THIRD FLOOR - ZONES - FIRE PROTECTION
FP1.3.1 FIRE PROTECTION PLANS - LV 3 - BLDG 38, 64 & 82
FP1.4 FOURTH FLOOR - ZONES - FIRE PROTECTION
FP1.4.1 FIRE PROTECTION PLANS - LV 3 - BLDG 64
M-001 MECHANICAL NOTES, LEGENDS, & SYMBOLS
MH1.B BASEMENT - ZONES - MECHANICAL
MH1.B.1 BLDG 64 - LV B - ZONES 2 & 3 - MECHANICAL PLANS
MH1.B.2 BLDG 19 & 64 - LV B - ZONES 6 & 7 - MECHANICAL PLANS
MH1.B.3 BLDG 74 & 82 - LV B - ZONES 9 & 12a - MECHANICAL PLANS
MH1.B.4 BLDG 66 - LV B - ZONE 11 - MECHANICAL PLANS
MH1.1 FIRST FLOOR - ZONES - MECHANICAL
MH1.1.1 BLDG 64-A, B, & 91 - LV 1 - ZONE 2 & 3 - MECHANICAL PLANS
MH1.1.2 BLDG 38 & 64 - LV 1 - ZONE 5 & 6 - MECHANICAL PLANS
MH1.1.3 BLDG 19 & 82 - LV 1 - ZONE 7 & 9 - MECHANICAL PLANS
MH1.1.4 BLDG 6, 27, 37, 62 - LV 1 - ZONES 11, 12, 14 - MECHANICAL PLANS
MH1.1.5 BLDG 18, 42, 44, 92 - LV 1 - ZONE 15 - MECHANICAL PLANS
MH1.2 SECOND FLOOR - ZONES - MECHANICAL
MH1.2.1 BLDG 64 - LV 2 - ZONE 2 & 3 - MECHANICAL PLANS
MH1.2.2 BLDG 38, 62, 82 - LV 2 - ZONES 5, 9, 12 - MECHANICAL PLANS
MH1.3 THIRD FLOOR - ZONES - MECHANICAL
MH1.3.1 BLDG 38, 64, 82 - LV 3 - ZONES 3, 5, 9 - MECHANICAL PLANS
MH1.4 FOURTH FLOOR - ZONES - MECHANICAL
MH1.4.1 BLDG 64 - LV 4 - ZONE 2 - MECHANICAL PLANS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-701 MECHANICAL CONTROLS
M-801 MECHANICAL SCHEDULES
E-001 ELECTRICAL LEGENDS & SYMBOLS
E-002 ELECTRICAL GENERAL NOTES
E1.B BASEMENT - ZONES - NEW
E1.B.2 BLDG 64 - LV B - ZONE 2 - NEW
E1.B.3 BLDG 64 - LV B - ZONE 3 - NEW
E1.B.6 BLDG 64 - LV B - ZONE 6 - NEW
E1.B.7 BLDG 19 - LV B - ZONE 7 - NEW
E1.B.9 BLDG 82 - LV B - ZONE 9 - NEW
E1.B.11 BLDG 66 - LV B - ZONE 11 - NEW
E1.B.12 BLDG 62 - LV B - ZONE 12B - NEW
E1.1 FIRST FLOOR LEVEL - ZONES - NEW
E1.1.2 BLDG 64 - LV 1 - ZONE 2 - NEW
E1.1.3 BLDG 64 - LV 1 - ZONE 3 - NEW
E1.1.5 BLDG 38 - LV 1 - ZONE 5 - NEW
E1.1.6 BLDG 64 - LV 1 - ZONE 6 - NEW
E1.1.7 BLDG 19 - LV 1 - ZONE 7 - NEW
E1.1.9 BLDG 82 - LV 1 - ZONE 9 - NEW
E1.1.12 BLDG 62 - LV 1 - ZONE 12B - NEW
E1.1.14 BLDG 27 & 37 - ZONE 14 - NEW
E1.1.15 BLDG 18, 42, 44 & 92 - ZONE 15 - NEW
E1.2 SECOND FLOOR - ZONES - NEW
E1.2.2 BLDG 64 - LV 2 - ZONE 2 - NEW
E1.2.3 BLDG 64 - LV 2 - ZONE 3 - NEW
E1.2.5 BLDG 38 - LV 2 - ZONE 5 NEW
E1.2.9 BLDG 82 - LV 2 - ZONE 9 - NEW
E1.2.12 BLDG 62 - LV 2 - ZONE 12B - NEW
E1.3 THIRD FLOOR - ZONES - NEW
E1.3.3 BLDG 64 - LV 3 - ZONE 3 - NEW
E1.3.5 BLDG 38 - LV 3 - ZONE 5 - NEW
E1.3.9 BLDG 82 - LV 3 -ZONE 9 - NEW
E1.4 FOURTH FLOOR - ZONES - NEW
E1.4.3 BLDG 64A - LV 4 - ZONE 3 - NEW
E-400 DATA CENTER
E-401 ENLARGED ROOM PLANS
E-402 ENLARGED ROOM PLANS
DRAWING INDEX
E-403 ENLARGED ROOM PLANS
E-404 ENLARGED ROOM PLANS
E-405 ENLARGED ROOM PLANS
E-406 ENLARGED ROOM PLANS
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-601 ELECTRICAL DIAGRAMS
E-602 ELECTRICAL DIAGRAMS
E-603 ELECTRICAL DIAGRAMS
E-604 ELECTRICAL DIAGRAMS
E-605 ELECTRICAL DIAGRAMS
E-606 ELECTRICAL DIAGRAMS
E-607 ELECTRICAL DIAGRAMS
E-608 ELECTRICAL DIAGRAMS
E-801 ELECTRICAL SCHEDULES
E-802 ELECTRICAL SCHEDULES
E-803 ELECTRICAL SCHEDULES
E-804 ELECTRICAL SCHEDULES
E-805 ELECTRICAL SCHEDULES
E-806 ELECTRICAL SCHEDULES
E-807 ELECTRICAL SCHEDULES
E-808 ELECTRICAL SCHEDULES
E-809 ELECTRICAL SCHEDULES
E-810 ELECTRICAL SCHEDULES
G004 COVER SHEET - VOLUME 02
G005 DRAWING INDEX
T-001 TECHNOLOGY LEGEND, ABBREV & GENERAL NOTES
T-002 PHASING NOTES
TN100 TECHNOLOGY SITE PLAN
TN101 TECHNOLOGY SITE PLAN
TN1.B LOWER LEVEL - ZONES - NEW
TN1.B.1 BLDG 64 - LV B -ZONE 1 - NEW
TN1.B.2 BLDG 64 - LV B - ZONE 2 - NEW
TN1.B.3 BLDG 64 - LV B - ZONE 3 - NEW
TN1.B.4 BLDG 64 - LV B - ZONE 4 - NEW
TN1.B.5 BLDG 38 - LV B - ZONE 5 - NEW
TN1.B.6 BLDG 64 - LV B - ZONE 6 - NEW
TN1.B.7 BLDG 19 - LV B - ZONE 7 - NEW
TN1.B.8 BLDG 82-4 LV B-01 - ZONE 8 - NEW
TN1.B.9 BLDG 82 - LV B - ZONE 9 - NEW
TN1.B.10 BLDG 64 - LV B - ZONE 10 - NEW
TN1.B.11 BLDG 06 - LV B - ZONE 11 - NEW
TN1.B.12 BLDG 62 - LV B - ZONE 12 - NEW
TN1.B.13 BLDG 74 - LV 1 - ZONE 13 - NEW
TN1.BD BASEMENT - DIAMOND COVERAGE
TN1.1 FIRST FLOOR LEVEL - ZONES - NEW
TN1.1.1 BLDG 64 - LV 1 - ZONE 1 - NEW
TN1.1.2 BLDG 64 - LV 1 - ZONE 2 - NEW
TN1.1.3 BLDG 64 - LV 1 - ZONE 3 - NEW
TN1.1.4 BLDG 64 - LV 1 - ZONE 4 - NEW
TN1.1.5 BLDG 38 - LV 1 - ZONE 5 - NEW
TN1.1.6 BLDG 64 - LV 1 - ZONE 6 - NEW
TN1.1.7 BLDG 19 - LV 1 - ZONE 7 - NEW
TN1.1.8 BLDG 82 - LV 1 - ZONE 8 - NEW
TN1.1.9 BLDG 82 - LV 1 - ZONE 9 - NEW
TN1.1.10 BLDG 64D & 67 - LV 1 - ZONE 10 - NEW
TN1.1.11 BLDG 06 - LV 1 - ZONE 11 - NEW
TN1.1.12 BLDG 62 - LV 1 - ZONE 12 - NEW
TN1.1.13 BLDG 74 - LV 1 - ZONE 13 - NEW
TN1.1.14 BLDG 27 & 37 - ZONE 14 - NEW
TN1.1.14D BLDG 27 & 37 - ZONE 14 - DIAMOND COVERAGE
TN1.1.15 BLDG 18, 42, 44 & 92 - ZONE 15 - NEW
TN1.1.15D BLDG 18, 42, 44 & 92 - ZONE 15 - DIAMOND COVERAGE
TN1.1D FIRST FLOOR - DIAMOND COVERAGE
TN1.2 SECOND FLOOR - ZONES - NEW
TN1.2.1 BLDG 64 - LV 2 - ZONE 1 - NEW
TN1.2.2 BLDG 64 - LV 2 - ZONE 2 - NEW
TN1.2.3 BLDG 64 - LV 2 - ZONE 3 - NEW
TN1.2.4 BLDG 64 - LV 2 - ZONE 4 - NEW
TN1.2.5 BLDG 38 - LV 2 - ZONE 5 NEW
TN1.2.8 BLDG 82 - LV 2 - ZONE 8 - NEW
TN1.2.9 BLDG 82 - LV 2 - ZONE 9 - NEW
TN1.2.12 BLDG 62 - LV 2 - ZONE 12 - NEW
TN1.2D SECOND FLOOR - DIAMOND COVERAGE
TN1.3 THIRD FLOOR - ZONES - NEW
TN1.3.2 BLDG 64 - LV 3 - ZONE 2 - NEW
TN1.3.3 BLDG 64 - LV 3 - ZONE 3 - NEW
TN1.3.4 BLDG 64 - LV 3 - ZONE 4 - NEW
TN1.3.5 BLDG 38 - LV 3 - ZONE 5 - NEW
TN1.3.8 BLDG 82 - LV 3 -ZONE 8 - NEW
TN1.3.9 BLDG 82 - LV 3 -ZONE 9 - NEW
TN1.3D THIRD FLOOR - DIAMOND COVERAGE
TN1.4 FOURTH FLOOR - ZONES - NEW
TN1.4.2 BLDG 64 - LV 4 - ZONE 2 - NEW
TN1.4.3 BLDG 64A - LV 4 - ZONE 3 - NEW
TN1.4.4 BLDG 64 - LV 4 - ZONE 4 - NEW
TN1.4D FOURTH FLOOR - DIAMOND COVERAGE
TD401 ENLARGED DEMOLITION PLANS
TD401A ENLARGED DEMOLITION PLAN PHOTOS
TD402 ENLARGED DEMOLITION PLANS
TD402A ENLARGED DEMOLITION PLAN PHOTOS
TD403 ENLARGED DEMOLITION PLANS
TD403A ENLARGED DEMOLITION PLAN PHOTOS
TD404 ENLARGED DEMOLITION PLANS
TD404A ENLARGED DEMOLITION PLAN PHOTOS
T-300 DATA CENTER CONSTRUCTION PHASING
T-400 DATA CENTER
T-401 ENLARGED ROOM PLANS
T-402 ENLARGED ROOM PLANS
T-403 ENLARGED ROOM PLANS
T-404 ENLARGED ROOM PLANS
T-405 ENLARGED ROOM PLANS
T-406 ENLARGED ROOM PLANS
T-407 ENLARGED ROOM PLANS
T-500 TECHNOLOGY - SCHEDULES
T-501 TECHNOLOGY - TYPICAL RACK ELEVATIONS
T-502 TECHNOLOGY - TYPICAL DATA CENTER RACK ELEVATIONS
T-503 TECHNOLOGY - DETAILS
T-504 TECHNOLOGY - DETAILS
T-601 TECHNOLOGY DIAGRAMS
Project Name: VA Lake City EHRM Infrastructure Upgrades
Project Number: VA# 573A4-21-700 / RDCJPA# 22011.00
Project Address: Lake City (VAMC) 619 S. Marion Ave, Lake City FL, 32025
Project Description:
Project will replace all data infrastructure for the campus. This will include new data center equipment, new telecom rooms/equipment and new data drops to all existing data outlets. Existing equipment and cabling will be removed from existing TR rooms. In most cases existing rooms contain other systems not being addressed in this project and rooms cannot be reused for other functions.
Applicable Codes:
VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (HYPERLINK "http://www.cfm.va.gov/til/"www.cfm.va.gov/til/) 2024 NFPA 101, Life Safety Code (LSC) NFPA National Fire Codes, with the exception of NFPA 5000 and NFPA 900 2021 International Building Code (IBC), only when specifically referenced in VA Design Documents Occupational, Safety and Health Administration (OSHA) Standards.
VA Seismic Design Requirements, H-18-8 Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13), rev. 06/01/2024
2024 NFPA 101, LIFE SAFETY CODE SUMMARY - BUSINESS:
Given the nature of the work there is no impact to existing life safety egress features.
Chapter 6, Classification of Occupancy and Hazard Contents
6.1.11 Business, Chapters 38 and 39
Chapter 7, Means of Egress Table 7.3.1.2, Occupant Load Factor:
Business: 150 s.f. / person x X s.f. = Y occupants
Table A.7.6, Common Path, Dead-End, and Travel Distance Limits (by Occupancy):
Business Use:
Common path: 100 feet Dead end: 50 feet Travel distance: 300 feet
Chapter 9, Building Service, Fire Protection, and Life Safety Equipment The building is sprinklered throughout by an approved, supervised automatic sprinkler system in accordance with 2024 NFPA 101 LSC, sections 9.7
Chapter 10, Interior Finish, Contents and Furnishings Table A.10.2.2, Interior Finish Classification Limitations:
Business Use:
Exits: Class A or B Exit access corridors: Class A or B Other spaces: Class A, B or C
2024 NFPA 101, LIFE SAFETY CODE SUMMARY - AMBULATORY HEALTH CARE:
Given the nature of the work there is no impact to existing life safety egress features.
6.1.6 Ambulatory Health Care, Chapters 20 and 21
Table A.7.6, Common Path, Dead-End, and Travel Distance Limits (by Occupancy):
Abmulatory Health Care Use:
Common path: 100 feet Dead end: 30 feet Travel distance: 200 feet
Chapter 9, Building Service, Fire Protection, and Life Safety Equipment The building is sprinklered throughout by an approved, supervised automatic sprinkler system in accordance with 2024 NFPA 101 LSC, sections 9.7
Chapter 10, Interior Finish, Contents and Furnishings Table A.10.2.2, Interior Finish Classification Limitations:
Ambulatory Health Care Use:
Exits: Class A or B Exit access corridors: Class A or B Other spaces: Class A, B, or C
2024 NFPA 101, LIFE SAFETY CODE SUMMARY - HEALTH CARE:
Given the nature of the work there is no impact to existing life safety egress features.
6.1.5 Health Care, Chapters 18 and 19
Table 7.3.1.2, Occupant Load Factor:
Health Care: 240 s.f. / person x X s.f. = Y occupants Table A.7.6, Common Path, Dead-End, and Travel Distance Limits (by Occupancy):
Business Use:
Common path: 100 feet Dead end: 30 feet Travel distance: 200 feet
Chapter 9, Building Service, Fire Protection, and Life Safety Equipment The building is sprinklered throughout by an approved, supervised automatic sprinkler system in accordance with 2024 NFPA 101 LSC, sections 9.7
Chapter 10, Interior Finish, Contents and Furnishings Table A.10.2.2, Interior Finish Classification Limitations: Health Care Use Exits: Class A Exit access corridors: Class A (Class B on lower portion of corridor) Other spaces: Class A (Class B in small individual rooms) New interior finishes on walls and ceilings are limited to Class A materials, except for small rooms (see 18.3.3.2.1) and lower portion of corridor walls (see 18.3.3.2.2).
0-HR Smoke Partition - NFPA 101-8.4
1-HR Smoke Barrier - NFPA 101-8.5
1-HR Fire Barrier - NFPA 101-8.3
2-HR Fire Barrier - NFPA 101-8.3
Fire Extinguisher
Existing Wall to Remain
New Wall
CODE LEGEND
S T
AT
E
OF FLOR
I D A
R
EGISTERED ARCH
IT
EC
T
J A
SO
N H. ROS
S
AR101907
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/2
4/
:2 6:
P
M
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
10/25/2024
CODE DATA
G003
ACKR
573A4-21-700
LAKE CITY FL
STATION CHIEF - EDWIN BURNETT
100% CONSTRUCTION
DOCUMENTS
22011
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
EX
LV
BA
SE
M
EN
T
- 6
LV
BA
SE
M
EN
T
- 6
B66[11]
B64-A[3]
B64-A[4]
B64-B[2]
B64-2[1] B64-D[10]
B64-2[6]
B19[7]
B82[9] B82[8]
B38 [5]
A1.B.1
A1.B.1
A1.B.1
A1.B.2
A1.B.2
A1.B.3
MATCHLINE -
ZONE 11 TO ZONE 13
LV
BA
SE
M
EN
T
- 6
LV01 - 82
BASEMENT - 64
LV
BA
SE
M
EN
T
- 6
TELECOM RM
B-10
TELECOM RM
C10A
TELECOM RM
BB01
TELECOM RM
DATA CENTER
AB18H
2.55
2.55
2.55
FIRE ALARM
SYSTEM /
ENGINEERING
STORAGE
AB02
MECH
AB18K
STORAGE
AB18J
TELECOM RM
B-9B
TELECOM RM
CB2A
1-4
7-9
5-8
2-5
4-6
1-3
TELECOM RM
UPS
AB18FA600
A600
TELECOM RM
AB02A
B82[8]
B62[12A]
B74[13]
B62[12B]
B66[11] 2.55
TELECOM RM
8A
1-3
TELECOM RM
110A
CLEAN
STORAGE
A1.1.3
S T
AT
E
OF FLOR
I D A
R
EGISTERED ARCH
IT
EC
T
J A
SO
N H. ROS
S
AR101907
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
1 REVISED 100% 12/31/2024
/1
9/
:3 3:
P
M
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
12/31/2024
BASEMENT - ZONES
A1.B
ACKR
573A4-21-700
LAKE CITY FL
STATION CHIEF - EDWIN BURNETT
100% CONSTRUCTION
DOCUMENTS
22011
N Scale: 1" = 30'-0"2 LOWER LEVEL - ZONES
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. All partitions shall be type 'S1.0' unless noted otherwise.
E. See sheet A600 for finishes legend.
GENERAL NOTES
NOTES
KEY PLAN
B38
B19
B62
B74
B82
B84
B64A
B64B
B64D B64-67
B64-2
B64-3
B64C
B64-66
B64CC
Scale: 1" = 30'-0"1 B82 - BASEMENT ZONE Scale: 1" = 30'-0"3 B62 - LOWER LEVEL ZONE
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
2.55 Remove existing telecom racks and equipment as required.
See technology drawings.
LV1
LV
CP
LV
M.S.D.
STORAGE
BB07
CONFERENCE
ROOM &
TRAINING
BB01
TOILET MEN
BB02
CORRIDOR
CB-7
2.70
B64-2[1] B64-B[2]
2.63 2.75
M.S.D.
STORAGE
BB07
TOILET MEN
BB02
CORRIDOR
CB-7
B64-2[1] B64-B[2]
'-1
11'-5 1/4"
TELECOM RM
BB01
BB01
P-1 P-2
EP-1
RB-1
2' -3
8.73
B64-2[1] B64-B[2]
2.64 2.75
CORRIDOR
CB-7
TOILET MEN
BB02
CONFERENCE
ROOM &
TRAINING
BB01
M.S.D.
STORAGE
BB07
2.70 ELEC
AB03
FIRE ALARM
SYSTEM /
ENGINEERING
STORAGE
AB02
EMS
STORAGE
AB01
CORRIDOR
CB-3
MECH
AB09E
B64-A[3] B64-A[4]
2.63 2.75
2.80
CORRIDOR
CB-6
COMPUTER
STORAGE
C10A
CORRIDOR
CB-5
MECHANICAL
ROOM
CB10
2.70
2.63
2.75
CORRIDOR
CB-6
19' - 4"
TELECOM RM
C10A
CORRIDOR
CB-5
MECHANICAL
ROOM
CB10
10'-0"
8' -6
P-1 P-2
EP-1
RB-1
C1 0A
8.73
ELEC
AB03
EMS
STORAGE
AB01
CORRIDOR
CB-3
MECH
AB09E
B64-A[3] B64-A[4]
15' - 1 1/2"
FIRE ALARM
SYSTEM /
ENGINEERING
STORAGE
AB02
AB02A
P-1 P-2
EP-1
RB-1
8.76
'-5
13'-6 1/2"
1' -0
/2
'-7
8' -8
/4
AB02
TELECOM
RM
AB02A
8.76
S1.0
FIRE ALARM
SYSTEM /
ENGINEERING
STORAGE
AB02
EMS
STORAGE
AB01
CORRIDOR
CB-3
ELEC
AB03
MECH
AB09E
B64-A[3] B64-A[4]
2.65
2.62
2.75
CORRIDOR
CB-5
CORRIDOR
CB-6
MECHANICAL
ROOM
CB10
COMPUTER
STORAGE
C10A
2.64 B66[11]
B64-A[3]
B64-A[4]
B64-B[2]
B64-2[1] B64-D[10]
B64-2[6]
B19[7]
B82[9]
B82[8]
B38 [5]
B74[13]
B62[12A]
B62[12B]
S T
AT
E
OF FLOR
I D A
R
EGISTERED ARCH
IT
EC
T
J A
SO
N H. ROS
S
AR101907
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/2
4/
:2 6:
P
M
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
10/25/2024
BLDG 64 - LV B - ZONES 2,3,6
A1.B.1
ACKR
573A4-21-700
LAKE CITY FL
B64
STATION CHIEF - EDWIN BURNETT
100% CONSTRUCTION
DOCUMENTS
22011
NOTES
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
A. Remove all existing partitions shown with dashed line. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.
B. Remove all existing borrowed lights, doors and hollow metal frames where indicated with dashed line. Package unused door hardware and turn over to owner.
C. Remove wall-hung toilet room accessories and medical equipment as required and turn over to Owner.
D. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.
E. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process. Coordinate any required changes to these systems with the C.O.R.
F. Repair existing surfaces to match adjacent undisturbed surfaces where cabinets, countertops, etc. are shown to be removed.
G. Prepare surfaces and floor slabs as required to receive new fininsh materials where existing finish is indicated to be removed.
H. Remove existing corner guards in areas to be remodeled.
J. Temporary wall barriers (wall type T-1) shall be installed between work areas and regions out-of-scope where debris from demolition may impact hospital operations. Demolition of walls in corridors must be separated for dust control.
GENERAL DEMOLITION NOTES
2.52 Remove existing wall.
2.62 Remove existing soffit and ceiling above.
2.63 Remove existing vinyl floor tile and wall base as required and prepare surfaces to receive new finishes. See finish schedule on sheet A600.
2.64 Remove existing ACT ceiling grid and tiles.
2.65 Remove existing plaster ceiling.
2.70 Remove existing door panel(s), frame, and hardware set.
See door schedule.
2.75 See abatement specification for removal.
2.80 Remove existing CMU wall.
8.73 New door panel(s), frame, and hardware set. Repair
existing CMU wall as required. See door schedule.
8.76 New door panel(s), frame, and hardware set. Repair
existing concrete wall as required. See door schedule.
N Scale: 1/8" = 1'-0"1 BB01 - DEMO PLAN Scale: 1/8" = 1'-0"3 BB01 - NOTE PLAN
Scale: 1/8" = 1'-0"2 BB01 - RCP DEMO
N Scale: 1/8" = 1'-0"4 AB02 - DEMO PLAN
B64-B[2]
B64-A[3]
B64-2[6]
N Scale: 1/8" = 1'-0"7 C10A - DEMO PLAN Scale: 1/8" = 1'-0"9 C10A - NOTE PLAN
Scale: 1/8" = 1'-0"6 AB02 - NOTE PLAN Scale: 1/8" = 1'-0"5 AB02 - RCP DEMO
Scale: 1/8" = 1'-0"8 C10A - RCP DEMO
KEY PLAN - BASEMENT
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. All partitions shall be type 'S1.0' unless noted otherwise.
E. See sheet A600 for finishes legend.
GENERAL NEW PLAN NOTES
CP
LV
DC
OS
RE
EX
DC
OS
OS
CP
RE
A&B SECTION
B-11
CORRIDOR
CB-4
OFFICE
B-10
PLUMBING
SHOP
B-12
CORRIDOR
CB-5
2.70
2.63
2.75
2.52 2.70
TELECOM RM
B-10
A&B SECTION
B-11
CORRIDOR
CB-4
PLUMBING
SHOP
B-12
CORRIDOR
CB-5
/2
B-
RB-1
EP-1
P-2 P-1
8.75
9'-0"
2'-4 7/8" 1'-4 7/8" 12'-1 3/8"
8.71
9.17
B-
B
'-6
/8
P-1
LVT-1
RB-1
ACT-1
S1.0 9.42
9.42
STORAGE
LOBBY
C1-3
ALCOVE
C1-6CORRIDOR
C1-5
ELEVATOR
P-4/82
CORRIDOR
C1-4
OCCUPATIONAL
ACTIVITIES
2.562.56
2.56 2.70
2.53 2.52
2.522.52
B82[8] B82[8]
B82[9]
B82[9]
2.63 2.752.63
2.75
LOBBY
C1-3
ALCOVE
C1-6CORRIDOR
C1-5
ELEVATOR
P-4/82
CORRIDOR
C1-4
OCCUPATIONAL
ACTIVITIES
TELECOM RM
S1.0S1.0
11' - 4"
B82[8] B82[8]
B82[9]
B82[9]
P-1 P-2
EP-1
RB-1
8.70
S2.0S2.0
A&B SECTION
B-11
CORRIDOR
CB-4
OFFICE
B-10
PLUMBING
SHOP
B-12
CORRIDOR
CB-5
2.54
2.54
2.54
B82[8] B82[8]
B82[9]
B82[9]
+/- 9'-4 7/8"
- 1 1'
1/ 4"
2.64
2.64
2.75
2.75
TRASH ROOM
STORAGE
LOBBY
C1-3
ALCOVE
C1-6CORRIDOR
C1-5
ELEVATOR
P-4/82
CORRIDOR
C1-4
OCCUPATIONAL
ACTIVITIES
ELEVATOR
P-3/82
2.652.652.652.65
B66[11]
B64-A[3]
B64-A[4]
B64-B[2]
B64-2[1] B64-D[10]
B64-2[6]
B19[7]
B82[9]
B82[8]
B38 [5]
B74[13]
B62[12A]
B62[12B]
B82[8] B82[8]
B82[9]
B82[9]
TRASH ROOM
9'-0"
TELECOM RM
ALCOVE
C1-6
CORRIDOR
C1-5
OCCUPATIONAL
ACTIVITIES
CORRIDOR
C1-4
LOBBY
C1-3
ELEVATOR
P-4/82
ELEVATOR
P-3/82
9.419.419.419.41
ACT-1
A&B SECTION
B-11
CORRIDOR
CB-4
PLUMBING
SHOP
B-12
CORRIDOR
CB-5
S T
AT
E
OF FLOR
I D A
R
EGISTERED ARCH
IT
EC
T
J A
SO
N H. ROS
S
AR101907
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/2
4/
:2 6:
P
M
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
10/25/2024
BLDG 19 & 82 - LV B - ZONES 7 & 9
A1.B.2
ACKR
573A4-21-700
LAKE CITY FL
B19 & B82
STATION CHIEF - EDWIN BURNETT
100% CONSTRUCTION
DOCUMENTS
22011
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
B19[7]
B82[9] N Scale: 1/8" = 1'-0"1 B-10 - DEMO PLAN
Scale: 1/8" = 1'-0"3 B-10 - NOTE PLAN
N Scale: 1/8" = 1'-0"5 166 - DEMO PLAN
Scale: 1/8" = 1'-0"7 166 - NOTE PLAN
Scale: 1/8" = 1'-0"2 B-10 - RCP DEMO
Scale: 1/8" = 1'-0"6 166 - RCP DEMO
KEY PLAN - BASEMENT
B82 LV1 = B64 BASEMENT
NOTES
A. Remove all existing partitions shown with dashed line. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.
B. Remove all existing borrowed lights, doors and hollow metal frames where indicated with dashed line. Package unused door hardware and turn over to owner.
C. Remove wall-hung toilet room accessories and medical equipment as required and turn over to Owner.
D. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.
E. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process. Coordinate any required changes to these systems with the C.O.R.
F. Repair existing surfaces to match adjacent undisturbed surfaces where cabinets, countertops, etc. are shown to be removed.
G. Prepare surfaces and floor slabs as required to receive new fininsh materials where existing finish is indicated to be removed.
H. Remove existing corner guards in areas to be remodeled.
J. Temporary wall barriers (wall type T-1) shall be installed between work areas and regions out-of-scope where debris from demolition may impact hospital operations. Demolition of walls in corridors must be separated for dust control.
GENERAL DEMOLITION NOTES
2.51 Remove existing window.
2.52 Remove existing wall.
2.53 Remove existing sink.
2.54 Remove existing ceiling.
2.56 Remove existing casework as required.
2.63 Remove existing vinyl floor tile and wall base as required and prepare surfaces to receive new finishes. See finish schedule on sheet A600.
2.64 Remove existing ACT ceiling grid and tiles.
2.65 Remove existing plaster ceiling.
2.70 Remove existing door panel(s), frame, and hardware set.
See door schedule.
2.75 See abatement specification for removal.
8.70 New door panel(s), frame, and hardware set. See door
schedule.
8.71 New door panel(s) and hardware set. Existing frame to
remain. See door schedule.
8.75 New door panel(s), frame, and hardware set. Repair
existing stud and gypsum wall as required. See door schedule.
9.17 Repaint face of wall and replace base to match existing wall conditions. Paint entire wall from nearest corner to corner and replace entire section of base as required.
9.41 Suspended acoustic ceiling tile/grid. See Room Finish
Schedule.
9.42 Repair surfaces and prep for new finishes.
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. All partitions shall be type 'S1.0' unless noted otherwise.
E. See sheet A600 for finishes legend.
GENERAL NEW PLAN NOTES
Scale: 1/8" = 1'-0"8 166 - RCP NEW
Scale: 1/8" = 1'-0"4 B-10 - RCP NOTE
CP
J J
J
J
P
P P
P
P
P
SDSD
DCDC
DC
DCDC
OS
OS
OS
OS
OS
RE
RE
RE
RE
RE
WORKROOM
AB18G
CORRIDOR
AB18F
DATA CENTER
AB18H
MECH
AB18K
U. P. S.
AB18J
CORRIDOR
CB-4
OFFICE
AB18
2.70
2.70
2.522.52
2.52
2.52
2.56
2.57
2.57
2.70
2.66 2.75
2.09
2.09
2.51
2.51
2.672.672.672.67
53 53
54 54
55 55
56 56
57 57
57a
S1
Q1RST
A1.B.3
DATA CENTER
AB18H
MECH
AB18K
CORRIDOR
CB-4
OFFICE
AB18
UPS - B
UPS - A
/4
29'-8 7/8"
STORAGE
AB18J
AB
P-1
AFP-1
RB-1
ACT-2
8' -1
1/
8"
10'-8 1/4"
9.13
8.75
8.75
AB
H S7.0-F
S7.0-FS7.0-F
'-0
/4
7'-1 3/4" 12'-0 1/8"
UPS
AB18F
AB18F
11'-6"
'-0
S4.0-FS4.0-F
A600
A600
SimS4.0-F
ACT-1
EP-1
P-1
RB-1
10.42
53 53
54 54
55 55
56 56
57 57
57a 57a
S1 Q1
Q1RST
B66 - LOWER LEVEL
175'-0"
B66 - BEAM LEVEL
184'-0"
B66 - TOP OF ROOF
188'-4"
B66 - SLAB
174'-0"
SL
AB
T O
B O
TT
O
M O
F
BE
AM
'-0
" V .I.
F.
4'
-4
3'
1/
2" 2'
-1 " 29' - 8 7/8"
8'
1/
2"
9' -0
" V .I.
F.
'-5
" V .I.
F.
8' -6
2.029.14
2.05
9.13
S7.0-F
2.09
7.05 7.06
+/- 6'-11 1/8"
A1.B.3 1a 9.142.73
U. P. S.
AB18J
MECH
AB18K
DATA CENTER
AB18H
WORKROOM
AB18G
CORRIDOR
AB18F
OFFICE
AB18
CORRIDOR
CB-4
2.64
2.64
2.64
2.64
B66[11]
B64-A[3]
B64-A[4]
B64-B[2]
B64-2[1] B64-D[10]
B64-2[6]
B19[7]
B82[9]
B82[8]
B38 [5]
B74[13]
B62[12A]
B62[12B]
MECH
AB18K
DATA CENTER
AB18H
OFFICE
AB18
CORRIDOR
CB-4
8'-6"
STORAGE
AB18J
9.14
UPS
AB18F
8'-10"
8'-0"
- 1
/8
- 1
/4
9.149.14
7.06
7.05
2.73
5.50
S T
AT
E
OF FLOR
I D A
R
EGISTERED ARCH
IT
EC
T
J A
SO
N H. ROS
S
AR101907
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
1 REVISED 100% 12/31/2024
/1
9/
:3 4:
P
M
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
12/31/2024
BLDG 66 - LV B - ZONE 11
A1.B.3
ACKR
573A4-21-700
LAKE CITY FL
B66
STATION CHIEF - EDWIN BURNETT
100% CONSTRUCTION
DOCUMENTS
22011
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
B66[11]
N Scale: 1/8" = 1'-0"4 AB18H - DEMO PLAN
Scale: 1/8" = 1'-0"2 AB18H - NOTE PLAN Scale: 3/16" = 1'-0"1 SECTION
Scale: 1/8" = 1'-0"5 AB18H - RCP DEMO
KEY PLAN - BASEMENT
NOTES
A. Remove all existing partitions shown with dashed line. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.
B. Remove all existing borrowed lights, doors and hollow metal frames where indicated with dashed line. Package unused door hardware and turn over to owner.
C. Remove wall-hung toilet room accessories and medical equipment as required and turn over to Owner.
D. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.
E. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process. Coordinate any required changes to these systems with the C.O.R.
F. Repair existing surfaces to match adjacent undisturbed surfaces where cabinets, countertops, etc. are shown to be removed.
G. Prepare surfaces and floor slabs as required to receive new fininsh materials where existing finish is indicated to be removed.
H. Remove existing corner guards in areas to be remodeled.
J. Temporary wall barriers (wall type T-1) shall be installed between work areas and regions out-of-scope where debris from demolition may impact hospital operations. Demolition of walls in corridors must be separated for dust control.
GENERAL DEMOLITION NOTES
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. All partitions shall be type 'S1.0' unless noted otherwise.
E. See sheet A600 for finishes legend.
GENERAL NEW PLAN NOTES
Scale: 1/8" = 1'-0"3 AB18H - RCP
2.02 Existing structure to remain.
2.05 Existing slab to remain.
2.09 Existing raised floor grid modified to permit new rated wall to extend from slab to deck.
2.51 Remove existing window.
2.52 Remove existing wall.
2.56 Remove existing casework as required.
2.57 Remove existing raised floor panels. Existing pedestal and stringer system to remain in place for reuse.
2.64 Remove existing ACT ceiling grid and tiles.
2.66 Remove existing wall base and prepare surfaces to receive new finishes. See finish schedule on sheet A600.
2.67 Remove existing carpet and wall base as required and
prepare surfaces to receive new finishes. See finish schedule on sheet A600.
2.70 Remove existing door panel(s), frame, and hardware set.
See door schedule.
2.73 Existing 8" purlins.
2.75 See abatement specification for removal.
5.50 Angled metal flashing installed above ceiling soffit.
Coordinate with MEP drawings.
7.05 New 8" batt insulation between existing purlins. 25 R-Value min.
7.06 3" rigid insulation fastened to bottom of existing purlins.
R-Value 13 min.
8.75 New door panel(s), frame, and hardware set. Repair
existing stud and gypsum wall as required. See door schedule.
9.13 New raised floor panels to be installed in existing pedestal and stringer system. Finished floor level to be maintained as before at 1' above slab.
9.14 New ceiling suspension system and tiles to be installed and aligned to floor grid system. Product must be of equal or greater quality to Armstrong's Dynamax Plus Ceiling System. Use the Dynamax Plus Ceiling System as a basis-of-design.
10.42 Bracket mounted fire extinguisher
Scale: 3/4" = 1'-0"1a DETAIL
TELECOM RM
C128
TELECOM RM
B103
TELECOM RM
251A
TELECOM RM
TELECOM RM
B06[11]
B64-A[3]
B64-A[4]
B64-B[2]
B64-2[1] B64-D[10]
B64-2[6]
B19[7]
B82[9] B82[8]
B38 [5]
A1.1.1
A1.1.1
A1.1.1
A1.1.2
A1.1.2
A1.1.2
MATCHLINE -
ZONE 11 TO ZONE 13
LV
LV
LV
LV
LV02 - 82
LV01 - 64
LV
LV
TELECOM RM
BH101
2.55
2.55
2.55
2.55
TELECOM RM
101A
2.04
2.55
7-9
1-3
4-6
TELECOM RM
C143A
TELECOM RM
C117TELECOM RM
TELECOM RM
BH100
TELECOM RM
4-6
1-3
7-9
A600
B66[11]
TELECOM RM
128A
B62[12A]
B74[13]
B62[12B]
A1.1.3
2.55
EMPLOYEE
EDUCATION
TELECOM RM
4-6
A1.1.4 1-3
CONTINGENCY
SUPPLIES
27.00
B27 & B37[14]
2.55
STORAGE
B1
OFFICE
3A27.00
A1.1.4 2.55
TELECOM RM
6A
4-6
A1.1.5 1-3
BREAKROOM
27.00
OFFICE
A1.1.6
2.55
27.00
1-3
VEST/ELEC
TELECOM RM
112C
B18, B42, B44, & B92[15] A1.1.5
2.55
MECHANICAL
ROOM
4-6
TELECOM RM
A1.1.5
2.55
MECHANICAL
ROOM
7-9
S T
AT
E
OF FLOR
I D A
R
EGISTERED ARCH
IT
EC
T
J A
SO
N H. ROS
S
AR101907
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
1 REVISED 100% 12/31/2024
/1
9/
:3 3:
P
M
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
12/31/2024
FIRST FLOOR - ZONES
A1.1
ACKR
573A4-21-700
LAKE CITY FL
STATION CHIEF - EDWIN BURNETT
100% CONSTRUCTION
DOCUMENTS
22011
N Scale: 1" = 30'-0"1 FIRST FLOOR LEVEL - ZONES
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. All partitions shall be type 'S1.0' unless noted otherwise.
E. See sheet A600 for finishes legend.
GENERAL NOTES
NOTES
Scale: 1" = 30'-0"2 B62 - FIRST FLOOR ZONE
KEY PLAN
B38
B06
B18
B19
B27
B37
B42
B44 B62
B74
B82
B86
B91
B92
B64A
B64B
B64D B64-67
B64-2
B64-3
B64C
B64-66
B64CC
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
2.04 Existing telecom room to remain. See technology drawings.
2.55 Remove existing telecom racks and equipment as required.
See technology drawings.
27.00 Telecom enclosure to be added. See Technology drawings.
N Scale: 1" = 30'-0"3 B27N Scale: 1" = 30'-0"4 B37
N Scale: 1" = 30'-0"5 B18 N Scale: 1" = 30'-0"6 B92
N Scale: 1" = 30'-0"7 B42
N Scale: 1" = 30'-0"8 B44
PROGRAM
SUPPORT
ASSISTANT
B102
CHIEF,
NUTRITION &
FOOD
SERVICE
B103
ELEC
B104
F.E.C.
B105
CORRIDOR
STAIR #5
S5.1
B64-2[1] B64-B[2]
2.70
2.70
2.63
2.75
TELECOM RM
B103
PROGRAM
SUPPORT
ASSISTANT
B102
ELEC
B104
F.E.C.
B105
CORRIDOR
STAIR #5
S5.1
B64-2[1] B64-B[2]
11'-3"
'-6
/2
4'-4" 6'-11"
'-1
1/
2"
2' -7
B1
P-1 P-2
EP-1
RB-1
8.74
9.19 9.17
TELECOM RM
BH101
CONFERENCE
ROOM
A123
WAITING
ROOM
A125
B64-A[4] B64-A[3]
2.70
2.63
2.75
TELECOM RM
BH101
CONFERENCE
ROOM
A123
WAITING
ROOM
A125
B64-A[4] B64-A[3]
'-3
9'-2" P-1 P-2
EP-1
RB-1
BH
8.75
3'
4"
B64-A[4] B64-A[3]
2.06
TELECOM RM
BH101
CONFERENCE
ROOM
A123
WAITING
ROOM
A125
STAIR #5
S5.1
PROGRAM
SUPPORT
ASSISTANT
B102
CORRIDOR
ELEC
B104
F.E.C.
B105
CHIEF,
NUTRITION &
FOOD
SERVICE
B103
B64-2[1] B64-B[2]
2.64
2.75
OFFICE
ICE MACHINE
OFFICE
CORRIDOR
C1-5
OFFICE
2.70
2.63
TELECOM RM
ICE MACHINE
OFFICE
CORRIDOR
C1-5
OFFICE
9' - 5 3/4"
1'
1/
8"
10 3/4"
P-1 P-2
EP-1
RB-1
8.75
8.14 S2.0
1/ 8"
2.64
OFFICE
ICE MACHINE
OFFICE
CORRIDOR
C1-5
OFFICE
B66[11]
B64-A[3]
B64-A[4]
B64-B[2]
B64-2[1] B64-D[10]
B64-2[6]
B19[7]
B82[9]
B82[8]
B38 [5]
B74[13]
B62[12A]
B62[12B]
S T
AT
E
OF FLOR
I D A
R
EGISTERED ARCH
IT
EC
T
J A
SO
N H. ROS
S
AR101907
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
1 REVISED 100% 12/31/2024
/1
9/
:3 3:
P
M
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
12/31/2024
BLDG 38 & 64 - LV 1 - ZONES 2,3,5
A1.1.1
ACKR
573A4-21-700
LAKE CITY FL
B64, B91, & B38
STATION CHIEF - EDWIN BURNETT
100% CONSTRUCTION
DOCUMENTS
22011
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
B64-B[2]
B91[3]
B38[5]
N Scale: 1/8" = 1'-0"1 B103 - DEMO PLAN Scale: 1/8" = 1'-0"3 B103 - NOTE PLAN
N Scale: 1/8" = 1'-0"4 BH101 - DEMO PLAN Scale: 1/8" = 1'-0"6 BH101 - NOTE PLAN
Scale: 1/8" = 1'-0"5 BH101 - RCP DEMO
Scale: 1/8" = 1'-0"2 B103 - RCP DEMO
N Scale: 1/8" = 1'-0"7 115 - DEMO PLAN Scale: 1/8" = 1'-0"9 115 - NOTE PLAN
Scale: 1/8" = 1'-0"8 115 - RCP DEMO
KEY PLAN - FIRST FLOOR
NOTES
A. Remove all existing partitions shown with dashed line. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.
B. Remove all existing borrowed lights, doors and hollow metal frames where indicated with dashed line. Package unused door hardware and turn over to owner.
C. Remove wall-hung toilet room accessories and medical equipment as required and turn over to Owner.
D. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.
E. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process. Coordinate any required changes to these systems with the C.O.R.
F. Repair existing surfaces to match adjacent undisturbed surfaces where cabinets, countertops, etc. are shown to be removed.
G. Prepare surfaces and floor slabs as required to receive new fininsh materials where existing finish is indicated to be removed.
H. Remove existing corner guards in areas to be remodeled.
J. Temporary wall barriers (wall type T-1) shall be installed between work areas and regions out-of-scope where debris from demolition may impact hospital operations. Demolition of walls in corridors must be separated for dust control.
GENERAL DEMOLITION NOTES
2.06 Existing ceiling to remain.
2.63 Remove existing vinyl floor tile and wall base as required and prepare surfaces to receive new finishes. See finish schedule on sheet A600.
2.64 Remove existing ACT ceiling grid and tiles.
2.70 Remove existing door panel(s), frame, and hardware set.
See door schedule.
2.75 See abatement specification for removal.
8.14 Install security film to interior side of glass. Film must be blast and forced entry resistant. Use S-140 by 3M as a basis of design.
8.74 New door panel(s), frame, and hardware set. Repair
existing plaster wall as required. See door schedule.
8.75 New door panel(s), frame, and hardware set. Repair
existing stud and gypsum wall as required. See door schedule.
9.17 Repaint face of wall and replace base to match existing wall conditions. Paint entire wall from nearest corner to corner and replace entire section of base as required.
9.19 Infill wall opening with stud wall as shown. Match thickness and existing wall finish material on both sides of wall partition.
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. All partitions shall be type 'S1.0' unless noted otherwise.
E. See sheet A600 for finishes legend.
GENERAL NEW PLAN NOTES
OS
CORRIDOR
C1-7
CORRIDOR
C1-5
EXAM ROOM
#28
C128
SATELLITE
LAB
C130
2.70
2.63
2.75
TELECOM RM
C128
CORRIDOR
C1-7
CORRIDOR
C1-5
SATELLITE
LAB
C130
10' - 8"
9'
C1
P-1 P-2
EP-1
RB-1
8.75
HAC
STORAGE
CORRIDOR
C1-5
CORRIDOR
C1-6
DISTANCE
LEARNING
CENTER
110A
DRY
STORAGE
2.70
2.70
2.67
2.75TELECOM RM
HAC
CORRIDOR
C1-5
CORRIDOR
C1-6
DISTANCE
LEARNING
CENTER
110A
DRY
STORAGE
/4
9' - 7 1/2"
P-1 P-2
EP-1
RB-1
8.75
9.19
9.17
DISHWASHER
KITCHEN
CONFERENCE
ROOM
B82[9] B82[8]
PHARMACY
BARBER
SHOP
251A
OFFICE
251B
CORRIDOR
C2-4
TELECOM RM
C2-4
CORRIDOR
C2-2
2.52 2.70 2.70
2.52
2.63
2.75
2.63
B82[9] B82[8]
TELECOM RM
251A
PHARMACY
OFFICE
251B
CORRIDOR
C2-4
TELECOM RM
C2-4
CORRIDOR
C2-2
12' - 6 5/8"
9'
7"
7' - 10 1/2"
S1.0
1B
1A
P-1 P-2
EP-1
RB-1
8.75 8.75
P-1
ACT-1
LVT-1
RB-1
9.199.19 9.17
2.64
2.75
CORRIDOR
C1-7
CORRIDOR
C1-5
TELECOM RM
C128
SATELLITE
LAB
C130
2.64
HAC
TELECOM RM
CORRIDOR
C1-5
CORRIDOR
C1-6
DISTANCE
LEARNING
CENTER
110A
DRY
STORAGE
B82[9] B82[8]
2.642.64
PHARMACY
TELECOM RM
251A
OFFICE
251B
CORRIDOR
C2-4
TELECOM RM
C2-4
CORRIDOR
C2-2
B66[11]
B64-A[3]
B64-A[4]
B64-B[2]
B64-2[1] B64-D[10]
B64-2[6]
B19[7]
B82[9]
B82[8]
B38 [5]
B74[13]
B62[12A]
B62[12B]
S T
AT
E
OF FLOR
I D A
R
EGISTERED ARCH
IT
EC
T
J A
SO
N H. ROS
S
AR101907
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/2
4/
:2 3:
P
M
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
10/25/2024
BLDG 19, 64, 82 - LV 1 - ZONES 6,7,9
A1.1.2
ACKR
573A4-21-700
LAKE CITY FL
B64, B19, & B82
STATION CHIEF - EDWIN BURNETT
100% CONSTRUCTION
DOCUMENTS
22011
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
B64-2[6]
B19[7]
B82[9]
N Scale: 1/8" = 1'-0"1 C128 - DEMO PLAN Scale: 1/8" = 1'-0"3 C128 - NOTE PLAN
N Scale: 1/8" = 1'-0"4 109 - DEMO PLAN Scale: 1/8" = 1'-0"6 109 - NOTE PLAN
N Scale: 1/8" = 1'-0"7 251A - DEMO PLAN Scale: 1/8" = 1'-0"9 251A - NOTE PLAN
Scale: 1/8" = 1'-0"2 C128 - RCP DEMO
Scale: 1/8" = 1'-0"5 109 - RCP DEMO
Scale: 1/8" = 1'-0"8 251A - RCP DEMO
KEY PLAN - FIRST FLOOR
B82 LV2 = B64 LV1
NOTES
A. Remove all existing partitions shown with dashed line. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.
B. Remove all existing borrowed lights, doors and hollow metal frames where indicated with dashed line. Package unused door hardware and turn over to owner.
C. Remove wall-hung toilet room accessories and medical equipment as required and turn over to Owner.
D. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.
E. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process. Coordinate any required changes to these systems with the C.O.R.
F. Repair existing surfaces to match adjacent undisturbed surfaces where cabinets, countertops, etc. are shown to be removed.
G. Prepare surfaces and floor slabs as required to receive new fininsh materials where existing finish is indicated to be removed.
H. Remove existing corner guards in areas to be remodeled.
J. Temporary wall barriers (wall type T-1) shall be installed between work areas and regions out-of-scope where debris from demolition may impact hospital operations. Demolition of walls in corridors must be separated for dust control.
GENERAL DEMOLITION NOTES
2.52 Remove existing wall.
2.63 Remove existing vinyl floor tile and wall base as required and prepare surfaces to receive new finishes. See finish schedule on sheet A600.
2.64 Remove existing ACT ceiling grid and tiles.
2.67 Remove existing carpet and wall base as required and
prepare surfaces to receive new finishes. See finish schedule on sheet A600.
2.70 Remove existing door panel(s), frame, and hardware set.
See door schedule.
2.75 See abatement specification for removal.
8.75 New door panel(s), frame, and hardware set. Repair
existing stud and gypsum wall as required. See door schedule.
9.17 Repaint face of wall and replace base to match existing wall conditions. Paint entire wall from nearest corner to corner and replace entire section of base as required.
9.19 Infill wall opening with stud wall as shown. Match thickness and existing wall finish material on both sides of wall partition.
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. All partitions shall be type 'S1.0' unless noted otherwise.
E. See sheet A600 for finishes legend.
GENERAL NEW PLAN NOTES
B207
TELECOM RM
TELECOM RM
317B64-A[3]
B64-A[4]
B64-B[2]
B64-2[1]
B82[9] B82[8]
B38 [5]
B62[12A]
B62[12B]
A1.2.1
A1.2.1
A1.2.1
A1.2.2
A1.1.3
LV
LV
LV
LV
LV03 - 82
LV02 - 64
TELECOM RM
227A
2.55
2.55
2.55
2.55
2.55
7-9
TELECOM RM
TELECOM RM
B217A
TELECOM RM
TELECOM RM
C225
TELECOM RM
7-9
4-6 1-3
1-3
S T
AT
E
OF FLOR
I D A
R
EGISTERED ARCH
IT
EC
T
J A
SO
N H. ROS
S
AR101907
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/2
4/
:2 4:
P
M
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
10/25/2024
SECOND FLOOR - ZONES
A1.2
ACKR
573A4-21-700
LAKE CITY FL
STATION CHIEF - EDWIN BURNETT
100% CONSTRUCTION
DOCUMENTS
22011
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. All partitions shall be type 'S1.0' unless noted otherwise.
E. See sheet A600 for finishes legend.
GENERAL NOTES
NOTES
N Scale: 1" = 30'-0"1 SECOND FLOOR - ZONES
KEY PLAN
B38
B62
B82
B64A
B64B
B64D
B64-2
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
2.55 Remove existing telecom racks and equipment as required.
See technology drawings.
OS
CP
LV
CP
LV1
PULMONARY
LAB
This is the start of the file's text. The full file is on GovTribe.