Online Bid Opening Meeting Info.docx

DOCX document 15 KB Posted

Attached to
Project 573A4-21-700 EHRM Infrastructure Upgrades construction project at the Lake City, FL VAMC
Solicitation number
36C77625B0006
Issued by

View the file

Other files

File Type Posted
Amendment 5 - 36C77625B0006 0005 6-30-25.pdf PDF
Construction Wage Rates - Columbia 6-27-2025.pdf PDF
Brand Name Justification - Lake City - Rev 2 0 - Redacted.pdf PDF
Amendment 4 - 36C77625B0006 0004 6-25-25.pdf PDF
Brand Name Justification - Lake City EHRM - SIGNED_Redacted.pdf PDF
Amendment 3 - 36C77625B0006 0003 6-11-25.pdf PDF
573A4-21-700 Lake City - RFI TRACKING SHEET REV2 36C77625B0006 6-10-25.xlsx XLSX spreadsheet
573A4-21-700 Lake City - Addendum No. 1.pdf PDF
260526-EDITED Grnd shop marked up.docx DOCX document
260533-EDITED Raceway shop marked up.docx DOCX document
260519-EDITED Low Volt cond cab shop marked updocx.docx DOCX document
262726-EDITED Wire Dev shop marked up.docx DOCX document
Construction Wage Rates - Columbia 5-2-2025.pdf PDF
262416-EDITED Panelboards shop marked up.docx DOCX document
Amendment 2 - 36C77625B0006 0002 5-27-2025.pdf PDF
Site Visit Sign-in - 573A4-21-700 Attendance 250423.pdf PDF
Amendment 1 - 36C77625B0006 0001 4-24-25.pdf PDF
Attachment 15 - Construction Wage Rates - Columbia.pdf PDF
Attachment 8 - Final Drawing Set - 7a of 8.pdf PDF
Attachment 4 - Final Drawing Set - 3 of 8.pdf PDF
Attachment 14 - PreConstruction Risk Assessment - Lake City.docx DOCX document
Attachment 5 - Final Drawing Set - 4 of 8.pdf PDF
Attachment 9 - Final Drawing Set - 7b of 8.pdf PDF
Attachment 10 - Final Drawing Set - 7c of 8.pdf PDF
Attachment 7 - Final Drawing Set - 6 of 8.pdf PDF
Attachment 6 - Final Drawing Set - 5 of 8.pdf PDF
Attachment 12 - Final Drawing Set - 8 of 8.pdf PDF
Attachment 1 - Final Specs Set - R4.pdf PDF
Attachment 13 - Asbestos and Lead Paint Survey Report.pdf PDF
Attachment 11 - Final Drawing Set - 7d of 8.pdf PDF
Attachment 17 - Site Visit Instructions.pdf PDF
Attachment 3 - Final Drawing Set - 2 of 8.pdf PDF
Attachment 16 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 2 - Final Drawing Set - 1 of 8.pdf PDF
IFB 36C77625B0006.pdf PDF
Attachment 18 - RFI TRACKING SHEET - SOLICITATION 36C77625B0006 - Project 573A4-21-700.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .