Attachment 4 - Final Drawing Set - 3 of 8.pdf
PDF 12 MB Posted
- Attached to
- Project 573A4-21-700 EHRM Infrastructure Upgrades construction project at the Lake City, FL VAMC
- Solicitation number
- 36C77625B0006
About this file
This document is a comprehensive mechanical (HVAC) design drawing set for the Lake City VA Medical Center's EHRM Infrastructure Upgrades project. The drawings detail mechanical system replacements across multiple buildings, focusing on replacing existing HVAC equipment in telecom rooms with new ductless split systems, fan coil units, and computer room air conditioning (CRAC) units. The project involves installing numerous Mitsubishi ductless split system units with wall-mounted indoor units and outdoor condensing units, ranging from 12,000 to 36,000 BTU capacities, across basement, first, second, third, and fourth floor locations in buildings B18, B19, B37, B38, B42, B44, B62, B64, B74, B82, B91, and B92.
The solicitation is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside competitive procurement with a construction value between $20 million and $50 million. The project requires comprehensive HVAC infrastructure upgrades, including removing existing equipment, routing new refrigerant and condensate piping, installing new air handling units, and integrating systems with the building automation system. The mechanical designs specify detailed requirements for equipment mounting, piping routing, control systems, and compliance with various codes including VA design manuals, International Building Code, and ASHRAE standards. The project is being managed by the Department of Veterans Affairs Technology Acquisition Center Austin and is located at 619 South Marion Avenue, Lake City, FL.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPIN-IN TAKE-OFF
RECTANGLE-TO-ROUND TAKE-OFF
DNUP
CEILING EXHAUST
CEILING RETURN
STANDARD BRANCH TAKE-OFF
FLEXIBLE DUCT
CHANGE OF ELEVATION
TRANSITION, CONCENTRIC
RECTANGULAR/ROUND BRANCH TAKE-OFF
OR ROUND/ROUND BRANCH TAKE-OFF
SUPPLY DIFFUSER OR GRILLE (VERTICAL
MOUNT, SIDEWALL)
RETURN/EXHAUST REGISTER OR GRILLE
(VERTICAL MOUNT, SIDEWALL)
CEILING DIFFUSER, ROUND NECK
(CEILING DIFFUSERS ARE 4-WAY THROW UNO)
CEILING DIFFUSER, RECTANGULAR OR SQUARE
NECK (CEILING DIFFUSERS ARE 4-WAY THROW
UNO)
HVAC ABBREVIATIONSHVAC SYMBOL LEGEND
SYMBOLSYMBOL DESCRIPTION SYMBOL SYMBOL DESCRIPTION
CONDENSATE
CHILLED WATER RETURN
HEATING HOT WATER SUPPLY
CHILLED WATER SUPPLY
HEATING HOT WATER RETURN
PIPING LEGEND
SYMBOLSYMBOL DESCRIPTION
HHWS
HHWR
CHWS
CHWR
CND
ELBOW, TURNED DOWN
CAP
ELBOW, 90°
ELBOW, TURNED UP
TEE, OUTLET DOWN
ELBOW, 45°
TEE, OUTLET UP
45° PIPE RISE (R)/DROP (D)
CONCENTRIC REDUCER
R R
FLANGES
FLOW DIRECTION
UNION
THERMOMETER
MANUAL VENT
EQUIP. P-TRAP
CONTROLS LEGEND
FLOW SWITCH
PRESSURE SWITCH
AUTOMATIC AIR VENT
MANUAL BALANCING DAMPER
DOOR GRILLE
UNDERCUT DOOR
DUCT ELBOW, RETURN AIR
DUCT ELBOW, EXHAUST AIR
DUCT ELBOW, SUPPLY OR OUTSIDE AIR
NEW DUCTWORK, FIRST DIMENSION IS
SIDE SHOWN
TEMPERATURE SENSOR
MOTORIZED CONTROL DAMPER
HUMIDISTAT / HUMIDITY SENSOR
THERMOSTAT / TEMPERATURE SENSOR
STATIC PRESSURE SENSOR
DUCT SMOKE DETECTOR
BACKDRAFT DAMPER
CEILING MOUNTED ACCESS DOOR
T
H
DOWN UP
UC
M
T
SP
BD
HUMIDITY SENSOR (DUCT MOUNTED)H
1. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE
COMPONENTS INDICATED IN DETAILS, RISER DIAGRAMS, CONTROL DIAGRAMS, AND/OR FLOW
DIAGRAMS WHETHER OR NOT INDICATED ON PLANS AND VICE VERSA. WHERE A DISCREPANCY OR
CONFLICT IS FOUND BETWEEN ONE DRAWING AND ANOTHER, OR BETWEEN A DRAWING AND
APPLICABLE SPECIFICATIONS, NOTIFY THE COR IMMEDIATELY IN WRITTEN FORM. IN GENERAL, THE
MOST STRINGENT REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY CONFLICTS WITH
APPLICABLE CODES OR OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR OWNER'S DESIGN
STANDARDS SHALL GOVERN.
2. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS.
TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.
3. DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR
FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS
SUCH AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO
OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST.
4. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA HVAC
DUCT CONSTRUCTION STANDARD.
5. PROVIDE 1.5R ELBOWS IN DUCTWORK AS INDICATED. IF 1.5R ELBOWS DO NOT FIT, PROVIDE 1.0R ELBOWS. IF 1.0R ELBOWS DO NOT FIT, PROVIDE 90 DEGREE RECTANGULAR DUCT ELBOWS WITH
TURNING VANES.
6. LOCATE THERMOSTATS, TEMPERATURE SENSORS, HUMIDISTATS, AND HUMIDITY SENSORS AT 48" +/- 6" ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE. COORDINATE LOCATIONS WITH OTHER
EQUIPMENT, FURNITURE, AND DOOR SWINGS.
7. ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED.
PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID
INSTALLATION.
8. ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS.
9. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT.
10. TRAPPED CONDENSATE DRAINS FROM ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED FOR
PROPER DRAINAGE TO SUIT EQUIPMENT FURNISHED.
11. ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR
OPERATION, BALANCING OR MAINTENANCE OF ALL MECHANICAL EQUIPMENT.
12. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING
VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL
TRANSITION TO FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT.
13. PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTWORK CONNECTING TO FANS, AIR HANDLING
UNITS, AND FAN COIL UNITS.
14. PROVIDE TRANSITIONS AT DIFFUSER NECKS AS REQUIRED TO MATCH SIZES OF FLEX DUCTS TO BE
CONNECTED.
15. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS.
16. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND
ALL FIRE RATED AND FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED
WALLS.
17. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE INDEPENDENTLY PIPED
FULL SIZE TO THE NEAREST PLUMBING DRAIN.
MECHANICAL GENERAL NOTES
AIRFLOW SENSOR/STATIONF
24x12
VD
APPLICABLE CODES
1. VA HVAC DESIGN MANUAL - MAY 1, 2023 EDITION
2. VA PLUMBING DESIGN MANUAL - JAN 1, 2023 EDITION
3. VA FIRE PROTECTION DESIGN MANUAL - JUNE 1, 2021 EDITION
4. VA INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES - JUNE 1, 2023 EDITION
5. GENERIC SMALL CAMPUS SUPPORT CENTER DESIGN PORTFOLIO - MAY 17, 2021
6. HEFP SEP (SOCAMES 6) DESIGN ALERT 8
7. INTERNATIONAL BUILDING CODE (IBC) 2021 EDITION
8. INTERNATIONAL MECHANICAL CODE (IMC) 2021 EDITION
9. INTERNATIONAL PLUMBING CODE (IPC) 2021 EDITION
10. INTERNATIONAL FUEL AND GAS CODE (IFGC) 2021 EDITION
11. INTERNATIONAL ENERGY CONSERVATION CODE (IECC) 2021 EDITION
12. AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR-CONDITIONING ENGINEERS (ASHRAE):
A. SAFETY STANDARD FOR REFRIGERATION SYSTEMS (ASHRAE 15 & 34) 2022 EDITION
B. VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY (ASHRAE 62.1) 2022 EDITION
C. ENERGY STANDARD FOR BUILDINGS (ASHRAE 90.1) 2022 EDITION
D. VENTILATION OF HEALTH CARE FACILITIES (ASHRAE 170) 2021 2017 EDITION
13. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), INCLUDING (BUT NOT LIMITED TO):
A. COMPRESSED GASES AND CRYOGENIC FLUIDS CODE, NFPA 55 2023 EDITION
B. NATIONAL ELECTRICAL CODE (NEC) 2023 EDITION
C. NATIONAL FIRE ALARM CODE (NFPA 72) 2022 EDITION
D. STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS (NFPA
90A) 2021 EDITION
E. HEALTH CARE FACILITIES CODE (NFPA 99) 2021 EDITION
F. LIFE SAFETY CODE (NFPA 101) 2021 EDITION
G. CLEAN AGENT FIRE EXTINGUISHING SYSTEMS (NFPA 2001) 2022 EDITION
14. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), INCLUDING (BUT NOT LIMITED TO):
A. OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEMS (Z10) 2019 EDITION
15. SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION (SMACNA)
16. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
17. AMERICANS WITH DISABILITIES ACT (ADA)
18. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)
19. AIR MOVEMENT AND CONTROL ASSOCIATION (AMCA)
20. APPLICABLE STANDARDS, REGULATIONS, AND PRACTICES OF THE VA SUSTAINABLE DESIGN
MANUAL 2017 EDITION
DESCRIPTIONDESCRIPTION
ADA -AMERICANS WITH DISABILITIES ACT
AFF -ABOVE FINISHED FLOOR
AFR -ABOVE FINISHED ROOF
AHU -AIR HANDLING UNIT
AP -ACCESS PANEL
APPROX -APPROXIMATE
ASTM -AMERICAN STANDARDS TESTING MATERIALS
BAS -BUILDING AUTOMATION SYSTEM
BOP -BOTTOM OF PIPE
BHP -BRAKE HORSEPOWER
BFV -BUTTERFLY VALVE
BTU -BRITISH THERMAL UNIT
CAV -CONSTANT AIR VOLUME
CFM -CUBIC FEET PER MINUTE
CD -CONDENSATE
CL -CENTER LINE
CO -CLEAN OUT
COR -CONTRACTING OFFICER'S REPRESENTATIVE
CRAC -COMPUTER ROOM AIR CONDITIONER
CU -CONDENSING UNIT
DB -DRY BULB
DDC -DIRECT DIGITAL CONTROLS
DN -DOWN
EA -EXHAUST AIR
EAT -ENTERING AIR TEMPERATURE
ECC -ENGINEERING CONTROL CENTER
EER -ENERGY EFFICIENCY RATING
EQUIP -EQUIPMENT
ESP -EXTERNAL STATIC PRESSURE
ETR -EXISTING TO REMAIN
EWT -ENTERING WATER TEMPERATURE
EX -EXISTING
ºF -DEGREES FAHRENHEIT
FAS -FIRE ALARM SYSTEM
FCU -FAN COIL UNIT
FD -FLOOR DAMPER
FE -FLUE EXHAUST
FLA -FULL LOAD AMPS
FPM -FEET PER MINUTE
FT -FEET
GPM -GALLONS PER MINUTE
HP -HORSEPOWER
HR -HOUR
HZ -HERTZ
IDU -INDOOR UNIT
IPLV -INTEGRATED PART-LOAD VALUE
IN -INCHES
KW -KILOWATT
LAT -LEAVING AIR TEMPERATURE
LWT -LEAVING WATER TEMPERATURE
MAX -MAXIMUM
MBH -THOUSAND BTUs PER HOUR
MCA -MINIMUM CIRCUIT AMPS
MIN -MINIMUM
MOCP -MAXIMUM OVER CURRENT PROTECTION
MOD -MOTORIZED CONTROL DAMPER
NA -NOT APPLICABLE
NC -NORMALLY CLOSED
NIC -NOT IN CONTRACT
NO -NORMALLY OPEN
NTS -NOT TO SCALE
OA -OUTSIDE AIR
OAT -OUTSIDE AIR TEMPERATURE
ODU -OUTDOOR UNIT
PH -PHASE
PRV -PRESSURE REDUCING VALVE
PRS -PRESSURE REDUCING STATION
PSI -POUNDS PER SQUARE INCH
PSIG -PSI GAUGE
PTAC -PACKAGED TERMINAL AIR CONDITIONER
PVC -POLYVINYL CHLORIDE PIPE
RA -RETURN AIR
RH -RELATIVE HUMIDITY
RHP -ROOFTOP HEAT PUMP
RPM -REVOLUTIONS PER MINUTE
RS/L -REFRIGERANT SUCTION & LIQUID LINES
RTU -ROOFTOP AIR CONDITIONING UNIT
RX -REMOVE EXISTING
SA -SUPPLY AIR
SF -SQUARE FEET
SP -STATIC PRESSURE
SPEC -SPECIFICATION
SS -STAINLESS STEEL
STD -STANDARD
TA -TRANSFER AIR
TDH -TOTAL DYNAMIC HEAD
TEMP -TEMPERATURE
TSP -TOTAL STATIC PRESSURE
TU -TERMINAL UNIT
TYP -TYPICAL
UL -UNDERWRITER'S LABORATORY
U/G -UNDERGROUND
UNO -UNLESS NOTED OTHERWISE
V/PH -VOTS/PHASE
VA -U.S. DEPARTMENT OF VETERANS AFFAIRS
VAV -VARIABLE AIR VOLUME
VFD -VARIABLE FREQUENCY DRIVE
VRF -VARIABLE REFRIGERANT FLOW
W -WATTS
W/ -WITH
WB -WET BULB
NOTE: SOME SYMBOLS SHOWN MAY NOT PERTAIN TO THIS PROJECT
DOMESTIC COLD WATERCW
TEE, SIDE CONNECTION
CIRCUIT SETTER VALVE
CHECK VALVE
GATE VALVE
BALL VALVE
GLOBE VALVE
MOTORIZED ACTUATOR
SOLENOID VALVE (2-POSTION
W/ ACTUATOR)
STRAINER
DESCRIPTION
REFRIGERANT SENSORR
BASIC MATERIALS
EXISTING TO BE REMOVED (HEAVY, DASHED LINE)
EXISTING TO REMAIN (THIN, HALFTONED, SOLID LINE)
NEW (HEAVY, SOLID LINE)
1. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE COMPONENTS INDICATED IN DETAILS AND/OR RISER DIAGRAMS WHETHER OR NOT INDICATED ON PLANS AND VICE VERSA. WHERE A DISCREPANCY OR CONFLICT IS FOUND BETWEEN ONE DRAWING
AND ANOTHER, OR BETWEEN A DRAWING AND APPLICABLE SPECIFICATIONS, NOTIFY THE COR
IMMEDIATELY IN WRITTEN FORM. IN GENERAL, THE MOST STRINGENT REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY CONFLICTS WITH APPLICABLE CODES OR OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR OWNER'S DESIGN STANDARDS SHALL GOVERN.
2. LOCATE VALVES IN ACCESSIBLE AREAS WHERE NECESSARY. (12"X12" MIN.)
3. COORDINATE ACTUAL LOCATIONS OF MECHANICAL FLOOR DRAINS WITH FINAL EQUIPMENT
LOCATIONS ON SHOP DRAWINGS.
4. VENT PIPING SHOWN IS ONLY FOR DIAGRAMMATIC PURPOSES. COORDINATE VTRS WITH HVAC AIR
INTAKES.
5. PROVIDE BACKWATER VALVES FOR CONDENSATE PIPING CONNECTIONS TO STORM SEWER.
6. PROVIDE PIPE MARKER FOR ALL PIPING ABOVE THE CEILING SPACES IN ACCORDANCE WITH DIVISION
22 SPECIFICATION SECTION. "IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT".
7. LABEL VALVES ABOVE CEILINGS AND IN CONCEALED SPACES AT CEILING TILE WITH METAL CEILING
TACKS INDICATING VALVE # AND TYPE OF WATER. (i.e.; BLUE= COLD WATER, LETTERING CW
VLV1-001).
8. FIRE CAULK AND SLEEVE PENETRATIONS THROUGH FIRE RATED ASSEMBLIES. REFER TO LIFE SAFETY PLANS FOR RATED ASSEMBLY LOCATIONS. REFER TO ARCHITECTURAL SHEETS FOR DETAILS AND UL
ASSEMBLY NUMBERS.
9. VALVES AND FITTINGS SHALL BE THE SAME SIZE AS THE PIPING WHERE THEY ARE LOCATED UNLESS
NOTED OTHERWISE.
10. PROVIDE ALL NECESSARY SUPPORTING DEVICES FOR FIXTURES PER MANUFACTURER INSTALLATION
INSTRUCTIONS.
11. SHOP DRAWING SUBMITTALS SHALL BE FULLY COORDINATED PRIOR TO SUBMITTAL.
PLUMBING NOTES
FIRE MAINFM
REFRIGERANT LIQUID AND SUCTION LINESRL/RS
DOMESTIC HOT WATERHW
DOMESTIC HOT WATER RETURNHWR
SANITARY VENTV
SANITARY WASTESAN
STORM DRAINST
ABBREVIATIONS
ADJ ADJUSTABLE
AI ANALOG INPUT
AO ANALOG OUTPUT
AV ANALOG VIRTUAL
AFS AIRFLOW STATION
AF AFTER FILTER
BAS BUILDING AUTOMATION SYSTEM
BI BINARY INPUT
BO BINARY OUTPUT
BV BINARY VIRTUAL
BP BUILDING PRESSURE
BPC BUILDING PRESSURE CONTROL
CC COOLING COIL
CP CIRCULATING PUMP
CT CURRENT TRANSMITTER
DD DIRECT DRIVE
DX DIRECT EXPANSION
DP DIFFERENTIAL PRESSURE
EAT ENTERING AIR TEMPERATURE
ECM ELECTRONICALLY COMMUTATED MOTOR
EF EXHAUST FAN
ER ENERGY RECOVERY
FF FINAL FILTER
FSD FIRE SMOKE DAMPER
HC HEATING COIL
IFB INTEGRAL FACE AND BYPASS
LAT LEAVING AIR TEMPERATURE
LWT LEAVING WATER TEMPERATURE
MAT MIXED AIR TEMPERATURE
MOA MINIMUM OUTSIDE AIR
OBC ON BOARD CONTROLS
OCC OCCUPANCY
PF PREFILTER
PHC PREHEAT COIL
RA RETURN AIR
RF RETURN FAN
RHC REHEAT COIL
R/E RETURN/EXHAUST
R/R RETURN/RELIEF
SF SUPPLY FAN
SD SMOKE DAMPER
TCC TEMPERATURE CONTROL CONTRACTOR
TCP TEMPERATURE CONTROL PANEL
TMV THERMOSTATIC MIXING VALVE
TCV TEMPERATURE CONTROL VALVE
UV ULTRAVIOLET
HUMIDIFIER DISPERSION GRID
FILTER
BLOWER FAN
XX XXXX
POINT TYPE
POINT NAME
T - ZONE TEMPERATURE SENSOR
H - ZONE HUMIDITY SENSOR
O - ZONE OCCUPANCY SENSORT
SD
AFS
T
H
H
L
H
L
FRZ
H L
SUPPLY AIR DUCT STATIC PRESSURE
SENSOR
RETURN/EXHAUST AIR DUCT STATIC
PRESSURE SENSOR
DIFFERENTIAL PRESSURE SENSOR
DAMPER POSITION INDICATOR
HUMIDITY SENSOR
FREEZESTAT
TEMPERATURE SENSOR
SMOKE DETECTOR
AIRFLOW STATION
AIRFLOW SENSOR
MODULATING VAV CONTROL
DAMPER
M
DIRECT EXPANSION COOLING COILD
X
CC / HC
CHILLED WATER COOLING /
HEATING HOT WATER COIL
M MOTORIZED CONTROL VALVE
DESIGN CRITERIA
LOCATION -LAKE CITY, FL
WEATHER STATION -GAINESVILLE REGIONAL AP
SUMMER DESIGN (0.4%) -93.4°F DB / 76.4°F WB
DEHUMIDIFICATION (0.4%) -82.8°F DB / 77.3°F DP
WINTER DESIGN (99.6%) -29.6°F DB
ANNUAL EXTREME (MEAN) -97.3°F DB MAX. / 23.4°F DB MIN.
INDOOR RELATIVE HUMIDITY -60% MAX. / 30% MIN.
TELECOM ROOM SETPOINTS -81°F DB MAX. / 64°F DB MIN.
TELEPHONE ROOM SETPOINTS -81°F DB MAX. / 64°F DB MIN.
DATA CENTER SETPOINTS -79°F DB MAX. / 72°F DB MIN.
CONNECT TO EXISTING
DEMOLISH TO POINT INDICATED
B64-3-IDU-1-300
B19-TU-8-1-200
VIEW NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NUMBER; IDU NO. 1, SERVING ROOM 300, LOCATED ON
LEVEL 3, LOCATED IN BLDG. 2
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
ROOM NUMBER
EQUIPMENT ABBREVIATION. AN "EX" SHOWN IN FRONT OF EQUIPMENT
TAGS NOTIFIES THAT EQUIPMENT IS EXISTING.
ROOM NUMBER
ITEM (TERMINAL UNIT SHOWN)
BUILDING NO. WHERE EQUIPMENT IS LOCATED
H1
H1
A
SHEET NUMBER
S1 200
DEVICE MARK AND NUMBER (S = SUPPLY, R = RETURN, E = EXHAUST)
DEVICE FLOW RATE (CFM)
12X10 SA
DUCT DIMENSION (INCHES). FIRST DIMENSION IS SIDE SHOWN.
TYPICAL AIR DISTRIBUTION DEVICE TAG
TYPICAL DUCTWORK TAG
SYSTEM TYPE (SA = SUPPLY AIR , RA = RETURN AIR, OA = OUTSIDE AIR,
EA = EXHAUST AIR)
LEVEL EQUIPMENT LOCATED ON / LEVEL IT SERVES
DRAWING SYMBOLS
REVISION REFERENCE1
SHEET NOTE CALLOUT1
SERVED BY AIR HANDLER UNIT NO. 8
ITEM NUMBER (TERMINAL UNIT NO. 1)
TYPICAL UNIT NUMBER; TU NO. 1, SERVING ROOM 200, SERVED BY
AHU-8, LOCATED IN BLDG. 19
UNIT NUMBER
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
SHEET LIST
SHEET NUMBER SHEET NAME
M-001 MECHANICAL NOTES, LEGENDS, & SYMBOLS
MH1.B BASEMENT - ZONES - MECHANICAL
MH1.B.1 BLDG 64 - LV B - ZONES 2 & 3 - MECHANICAL PLANS
MH1.B.2 BLDG 19 & 64 - LV B - ZONES 6 & 7 - MECHANICAL PLANS
MH1.B.3 BLDG 74 & 82 - LV B - ZONES 9 & 12a - MECHANICAL PLANS
MH1.B.4 BLDG 66 - LV B - ZONE 11 - MECHANICAL PLANS
MH1.1 FIRST FLOOR - ZONES - MECHANICAL
MH1.1.1 BLDG 64-A, B, & 91 - LV 1 - ZONE 2 & 3 - MECHANICAL PLANS
MH1.1.2 BLDG 38 & 64 - LV 1 - ZONE 5 & 6 - MECHANICAL PLANS
MH1.1.3 BLDG 19 & 82 - LV 1 - ZONE 7 & 9 - MECHANICAL PLANS
MH1.1.4 BLDG 6, 27, 37, 62 - LV 1 - ZONES 11, 12, 14 - MECHANICAL PLANS
MH1.1.5 BLDG 18, 42, 44, 92 - LV 1 - ZONE 15 - MECHANICAL PLANS
MH1.2 SECOND FLOOR - ZONES - MECHANICAL
MH1.2.1 BLDG 64 - LV 2 - ZONE 2 & 3 - MECHANICAL PLANS
MH1.2.2 BLDG 38, 62, 82 - LV 2 - ZONES 5, 9, 12 - MECHANICAL PLANS
MH1.3 THIRD FLOOR - ZONES - MECHANICAL
MH1.3.1 BLDG 38, 64, 82 - LV 3 - ZONES 3, 5, 9 - MECHANICAL PLANS
MH1.4 FOURTH FLOOR - ZONES - MECHANICAL
MH1.4.1 BLDG 64 - LV 4 - ZONE 2 - MECHANICAL PLANS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-701 MECHANICAL CONTROLS
M-801 MECHANICAL SCHEDULES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a
L a k e
C it y V
A /0
V
A L a k e
C it y
E H
R M
I n fr a s tr u c tu re
R
M
E P
F P
T .r v t
/2 /2
:0
:3
P
M
M-001
MECHANICAL NOTES, LEGENDS, &
SYMBOLS
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
LAKE CITY FL
573A4-21-700
STATION CHIEF - EDWIN BURNETT
10/25/2024 GSC CSC
100% CONSTRUCTION
DOCUMENTS
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date
12/31/2024
57a
S1
Q1RST
MH1.B.4
MH1.B.3
MH1.B.2
MH1.B.1
MH1.B.1
MH1.B.2
B38 [5]
B64-A[4]
B64-2[6]
B64-2 [1]
B64-B [2] B64-A [3]
B82 [9] B82 [8]
B19 [7]
B64-D[10]
B66 [11]
B74 [13]
B62 [12B]
B62 [12A]
MH1.B.2
MH1.B.2
MH1.B.1
MH1.B.1
MH1.B.3
MH1.B.4
TELECOM RM
BB01
TELECOM RM
TELECOM RM
6B
TELECOM RM
B-10
TELECOM RM
164D
DATA CENTER
AB18H
MH1.B.3
MH1.B.3
ELECTRICAL
B2
MECHANICAL
B1
STAIR 1
4A1
B82 [8]
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a
L a k e
C it y V
A /0
V
A L a k e
C it y
E H
R M
I n fr a s tr u c tu re
R
M
E P
F P
T .r v t
/2 /2
:0
:5
P
M
MH1.B
BASEMENT - ZONES -
MECHANICAL
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
LAKE CITY FL
573A4-21-700
STATION CHIEF - EDWIN BURNETT
10/25/2024 GSC CSC
100% CONSTRUCTION
DOCUMENTS
NN
0 15' 30' 60' 90'
1" = 30'
DRAWING NOTES:
1. FLOOR PLAN SHOWN FOR INFORMATIONAL PURPOSES ONLY. REFER TO ENLARGED PLANS FOR
ADDITIONAL INFORMATION.
1" = 30'-0"
LOWER LEVEL - ZONES - MECHANICAL
1" = 30'-0"2
B82 - ZONE 8 - BASEMENT - MECHANICAL
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
KEY PLAN
B38
B19
B62
B74
B82
B64A
B64B
B64D
B64-2
B64-66
T/H
B64-IDU-B-AB02A
B64-A[4]
B64-A[3]
EX 14x14 SA
EX 18x10 RA
RL
RS
1" CND
T T-05
T
MECH
AB09E
OFFICE
AB09B
EMS STORAGE
AB01
TELECOM RM
AB02A
FA SYSTEM/ENG
STOR
AB02
CORRIDOR
CB-3
CORRIDOR
CB-3
ELEC
AB03
ELEC
AB24
MECH EQUIP
AB05
3/4" CND
TOILET MEN
BB02
TOILET WOMEN
BB04
CORRIDOR
CB-7
H.A.C.
BB05
ELEVATOR LOBBY
CB-8
M.S.D. STORAGE
BB07
EQUIPMENT
CB2A
TOILET MEN
CB4
TOILET WOMEN
CB5
CORRIDOR
CB-2
ELEVATOR LOBBY
CB-1
T/H
EX 2" STM
EX 2" CHWS
EX 2" CHWR
EX 2" HHWR
EX 2" HHWS
B64-FCU-B-BB01
B64-2[1]
B64-B[2]
1" CHWS
1" CHWR
1" CND
T
1" CND
S
TELECOM RM
BB01
1" HW
1 1/2" CW
1 1/2" HW
TOILET MEN
BB02
TOILET WOMEN
BB04
CORRIDOR
CB-7
H.A.C.
BB05
ELEVATOR LOBBY
CB-8
M.S.D. STORAGE
BB07
CONFERENCE ROOM
& TRAINING
BB01
EQUIPMENT
CB2A
TOILET MEN
CB4
TOILET WOMEN
CB5
CORRIDOR
CB-2
ELEVATOR LOBBY
CB-1
B64-2[1]
B64-B[2]
R X
3/ 4"
R X
3/ 4"
RX 1 1/2"
RX 1 1/2"
EX 2" STM
EX 2" CHWS
EX 2" CHWR
EX 2" HHWS
EX 2" HHWR103
128 RX 1"
RX 1"
1" CW
1" HW
1" CW
CORRIDOR
CORRIDOR
EMS STORAGE
AB01OFFICE
AB09B
ELEC
AB03
T T-05
B64-A[4]
B64-A[3]
FIRE ALARM
SYSTEM /
ENGINEERING
STORAGE
AB02
EX 3/4" CND
MECH
AB09E
B66[11]
B64-A[3]
B64-A[4]
B64-B[2]
B64-2[1] B64-D[10]
B64-2[6]
B19[7]
B82[9]
B82[8]
B38 [5]
B74[13]
B62[12A]
B62[12B]
DRAWING NOTES:
1. FINAL TESTING, ADJUSTING, AND BALANCING (TAB) FOR HVAC SHALL INCLUDE ALL HYDRONIC AND AIR SYSTEMS SHOWN IN DRAWINGS. REFER TO SECTION 23 05 93 FOR ADDITIONAL TAB REQUIREMENTS.
2. SPACE TEMPERATURE AND HUMIDITY SENSORS SHALL BE 48" +/- 6" AFF.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING REQUIRED TO PROVIDE A COMPLETE
AND FUNCTIONING SYSTEM.
4. ROUTE ALL PIPING CONCEALED IN WALLS, CHASES, OR CEILING SPACES.
5. UNLESS OTHERWISE INDICATED, DEMOLITION OF EXISTING PIPING SHALL INCLUDE ALL DEVICES, HANGERS, SUPPORTS, ETC. ALL EXISTING PIPING WHICH WILL NO LONGER REMAIN IN SERVICE SHALL BE REMOVED. ALL EXISTING PIPING TO REMAIN IN SERVICE SHALL BE CAPPED WHERE INDICATED. NO EXISTING PIPING SHALL BE LEFT OPEN. ANY IDENTIFIED DEADEND PIPING SHALL BE REMOVED BACK TO
THE MAINS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a
L a k e
C it y V
A /0
V
A L a k e
C it y
E H
R M
I n fr a s tr u c tu re
R
M
E P
F P
T .r v t
/2 /2
:0
:0
P
M
MH1.B.1
BLDG 64 - LV B - ZONES 2 & 3 -
MECHANICAL PLANS
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
LAKE CITY FL
573A4-21-700
B64
STATION CHIEF - EDWIN BURNETT
10/25/2024 GSC CSC
100% CONSTRUCTION
DOCUMENTS
NN
0 4' 8' 12' 16'
3/16" = 1'-0"
3/16" = 1'-0"4
B64 ZONE 3 - LEVEL B - TELECOM RM AB02A - MECHANICAL - NEW
3/16" = 1'-0"
B64 ZONE 2 - LEVEL B - TELECOM RM BB01 - NEW
3/16" = 1'-0"
B64 ZONE 2 - LEVEL B - CONFERENCE RM BB01 - DEMOLITION
3/16" = 1'-0"3
B64 ZONE 3 - LEVEL B - TELECOM RM AB02A - DEMOLITION
CODED NOTES:
102 PROVIDE DRAIN PANS WITH OVERFLOW SWITCH BENEATH ALL EXPOSED PIPING INSIDE DATA / TELECOM
ROOMS. FABRICATE DRAIN PANS SO THEY SLOPE TO THE HORIZONTAL CONNECTION POINT SHOWN.
CONDENSATE ROUTING AND TERMINATION SHALL BE AS SHOWN AND/OR NOTED ON DRAWINGS. SEE DRAIN
PAN DETAIL 8/M-501.
103 REMOVE EXISTING PIPING ROUTED THROUGH DATA / TELECOM ROOM AND REROUTE WITH NEW PIPING AS SHOWN. COORDINATE THE SHUTDOWN OF SYSTEMS AND SPACES AFFECTED WITH THE VA CONSTRUCTION
REPRESENTATIVE. ROUTE ALL RELOCATED PIPING CONCEALED ABOVE CEILING.
104 ROUTE CONDENSATE PIPING TO NEAREST FLOOR DRAIN. REFER TO DETAIL 11/M-501.
105 ROUTE REFRIGERANT PIPING UP TO CONDENSING UNIT ON ROOF OF B91. ROUTE ABOVE EXISTING DUCT INTO CHASE AND UP THROUGH ROOF. INSTALL, ROUTE, AND SIZE LINESET PER MANUFACTURER'S
RECOMMENDATIONS.
109 CONNECT NEW CHILLED WATER PIPING TO EXISTING PIPING IN WALL OR ABOVE CEILING. PROVIDE
ISOLATION VALVES AT CONNECTION TO EXISTING. REFER TO DETAILS FOR COIL CONNECTION
INFORMATION.
125 ROUTE CONDENSATE PIPING TO MOP SINK. SEE CONDENSATE MOP SINK DETAIL 5/M-502.
126 PROVIDE A WATER SENSOR AT THE LOWEST POINT OF THE DRAIN PAN. SENSOR SHALL ALARM TO THE BAS
IF WATER IS DETECTED. SEE DRAIN PAN DETAIL 8/M-501.
128 REMOVE EXISTING SUPPLY/RETURN/EXHAUST GRILLE AND ASSOCIATED DUCTWORK BACK TO ACTIVE MAIN.
CAP AND SEAL DUCTWORK AT POINT OF REMOVAL.
133 INSTALL BOTTOM OF DUCTLESS SPLIT INDOOR UNIT 88" ABOVE FINISHED FLOOR. COORDINATE EXACT
LOCATION WITH TELECOM CONTRACTOR.
134 INSTALL FAN COIL UNIT 24" ABOVE FINISHED FLOOR. ROUTE CHILLED WATER PIPING DOWN IN WALL TO FCU CHILLED WATER PIPING CONNECTIONS. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. ROUTE 1"
CONDENSATE FROM INTEGRAL CONDENSATE PUMP TO LOCATION SHOWN.
158 EXISTING CONDENSATE PIPING IS TO REMAIN AND IS ROUTED AT APPROXIMATELY 36" AFF.
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
H.A.C.
CB13
ELEC
CB14
CORRIDOR
CB-6
CORRIDOR
CB-5
PHARMACY SUPPLY
CB11
LABOR RELATIONS
CB12
MECHANICAL ROOM
CB10
T/H
T
S126 ø
S A x1
R
A
B64-FCU-C10B
COMPUTER
STORAGE
C10A
TELECOM RM
6B
1" CND
EX 3" CW
H.A.C.
CB13
ELEC
CB14
CORRIDOR
CB-6
CORRIDOR
CB-5
PHARMACY SUPPLY
CB11
LABOR RELATIONS
CB12
MECHANICAL ROOM
CB10
RX FCU-66
E X
8ø
S A
COMPUTER
STORAGE
C10A
E X
6x
R
A
1 1/2" HW
2" CW
EX 3" CW
TELECOM RM
B-10
A&B SECTION
B-11
OFFICE
B-11A
OFFICE
B-9
TELECOM RM
B-9B
OFFICE
B-8
OFFICE
B-7
CORRIDOR
OFFICE
B-6
STORAGE RM
B-9A
CORRIDOR
T
T/H
T x1
S
A x1
R
A
1" CHWS
B19-FCU-B-B10
1" CHWR 1" CND
1" HHWR
1" HHWS
A&B SECTION
B-11
OFFICE
B-11A
OFFICE
B-9
TELECOM RM
B-9B
OFFICE
B-8
OFFICE
B-7
CORRIDOR
OFFICE
B-6
STORAGE RM
B-9A
CORRIDOR
OFFICE
B-10
B19-XFCU-B11
x1
S
A x1
R
A 141
1" CND
1" HHWR
1" HHWS
1" CHWR
1" CHWS
B66[11]
B64-A[3]
B64-A[4]
B64-B[2]
B64-2[1] B64-D[10]
B64-2[6]
B19[7]
B82[9]
B82[8]
B38 [5]
B74[13]
B62[12A]
B62[12B]
DRAWING NOTES:
1. FINAL TESTING, ADJUSTING, AND BALANCING (TAB) FOR HVAC SHALL INCLUDE ALL HYDRONIC AND AIR SYSTEMS SHOWN IN DRAWINGS. REFER TO SECTION 23 05 93 FOR ADDITIONAL TAB REQUIREMENTS.
2. SPACE TEMPERATURE AND HUMIDITY SENSORS SHALL BE 48" +/- 6" AFF.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING REQUIRED TO PROVIDE A COMPLETE
AND FUNCTIONING SYSTEM.
4. ROUTE ALL PIPING CONCEALED IN WALLS, CHASES, OR CEILING SPACES.
5. UNLESS OTHERWISE INDICATED, DEMOLITION OF EXISTING PIPING SHALL INCLUDE ALL DEVICES, HANGERS, SUPPORTS, ETC. ALL EXISTING PIPING WHICH WILL NO LONGER REMAIN IN SERVICE SHALL BE REMOVED. ALL EXISTING PIPING TO REMAIN IN SERVICE SHALL BE CAPPED WHERE INDICATED. NO EXISTING PIPING SHALL BE LEFT OPEN. ANY IDENTIFIED DEADEND PIPING SHALL BE REMOVED BACK TO
THE MAINS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a
L a k e
C it y V
A /0
V
A L a k e
C it y
E H
R M
I n fr a s tr u c tu re
R
M
E P
F P
T .r v t
/2 /2
:0
:1
P
M
MH1.B.2
BLDG 19 & 64 - LV B - ZONES 6 & 7 -
MECHANICAL PLANS
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
LAKE CITY FL
573A4-21-700
B19, B64
STATION CHIEF - EDWIN BURNETT
10/25/2024 GSC CSC
100% CONSTRUCTION
DOCUMENTS
NN
0 4' 8' 12' 16'
3/16" = 1'-0"
3/16" = 1'-0"2
B64 ZONE 6 - LEVEL B - TELECOM RM C10B - NEW
3/16" = 1'-0"1
B64 ZONE 6 - LEVEL B - COMPUTER STORAGE C10 - DEMOLITION
3/16" = 1'-0"4
B19 ZONE 7 - LEVEL B - TELECOM RM B-10 - NEW
3/16" = 1'-0"3
B19 ZONE 7 - LEVEL B - TELECOM RM B-9B - DEMOLITION
CODED NOTES:
102 PROVIDE DRAIN PANS WITH OVERFLOW SWITCH BENEATH ALL EXPOSED PIPING INSIDE DATA / TELECOM
ROOMS. FABRICATE DRAIN PANS SO THEY SLOPE TO THE HORIZONTAL CONNECTION POINT SHOWN.
CONDENSATE ROUTING AND TERMINATION SHALL BE AS SHOWN AND/OR NOTED ON DRAWINGS. SEE DRAIN
PAN DETAIL 8/M-501.
125 ROUTE CONDENSATE PIPING TO MOP SINK. SEE CONDENSATE MOP SINK DETAIL 5/M-502.
126 PROVIDE A WATER SENSOR AT THE LOWEST POINT OF THE DRAIN PAN. SENSOR SHALL ALARM TO THE BAS
IF WATER IS DETECTED. SEE DRAIN PAN DETAIL 8/M-501.
128 REMOVE EXISTING SUPPLY/RETURN/EXHAUST GRILLE AND ASSOCIATED DUCTWORK BACK TO ACTIVE MAIN.
CAP AND SEAL DUCTWORK AT POINT OF REMOVAL.
134 INSTALL FAN COIL UNIT 24" ABOVE FINISHED FLOOR. ROUTE CHILLED WATER PIPING DOWN IN WALL TO FCU CHILLED WATER PIPING CONNECTIONS. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. ROUTE 1"
CONDENSATE FROM INTEGRAL CONDENSATE PUMP TO LOCATION SHOWN.
141 RECORD EXISTING SUPPLY/RETURN/EXHAUST AIRFLOW AT EACH GRILLE PRIOR TO DEMOLITION.
142 REBALANCE EXISITNG SUPPLY/RETURN/EXHAUST GRILLES TO VALUE RECORDED IN PRE-DEMOLITION TEST
AND BALANCE.
151 REMOVE EXISITNG FAN COIL UNIT AND ALL ASSOCIATED PIPING, DUCTWORK, AND CONTROLS. PREPARE CHILLED WATER AND CONDENSATE PIPING IN WALL FOR CONNECTION TO NEW FCU IN NEW WORK PHASE.
157 INSTALL FAN COIL UNIT IN PLACE OF EXISTING FAN COIL UNIT TO BE REMOVED IN DEMOLITION PHASE.
CONNECT 1" CHILLED WATER AND 1" CONDENSATE PIPING TO PIPING PREPARED IN WALL IN DEMOLITION
PHASE. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
159 REMOVE EXISTING CHILLED AND HEATING WATER AND CONDENSATE PIPING BACK TO POINT INDICATED.
PROVIDE ISOLATION VALVES AND 6" PIPE STUB WITH CAP WHILE NEW PIPING IS BEING ROUTED.
COORDINATE UTILITY SHUTDOWN WITH COR PRIOR TO COMENCEMENT OF WORK IN THIS AREA.
160 PROVIDE NEW PIPING AND VALVE PACKAGES, TO INCLUDE CONTROL VALVES, FOR CHILLED AND HEATING WATER CONNECTIONS TO EXISTING FCU. REFER TO DETAIL 5/M-501 FOR COIL PIPING DETAIL.
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
CORRIDOR
OCCUPATIONAL
ACTIVITIES
ALCOVE
LOBBY
CORRIDOR
TRASH ROOM
MEDICATION RM
SOILED LINENH.A.C.
ALCOVE
OFFICE
STORAGE
NURSES STATION
ELEVATOR
P-4/82
ELEVATOR
P-3/82
TELECOM RM
TELECOM RM
T/H
EX 1 1/2" HHWR
EX 1 1/2" HHWS
EX 2" CHWR
EX 2" CHWS
B82[9]
B82[8]
B82[9] B82[8]
2 1/2" CW
2 1/2" HW
2" HWR
1/2" CW
1/2" HW
EX 1/2" CW
EX 1/2" HW
T
B82-FCU-B-164D
1" CND
S 126
B82-ODU-1-251A
MH1.B.3
CONTRACTOR SHALL FIELD VERIFY SPACE
ABOVE CEILING (SPECIFICALLY TRASH
CHUTES) AND COORDINATE THE WALL
PENETRATIONS TO AVOID OBSTACLES.
CORRIDOR
OCCUPATIONAL
ACTIVITIES
STORAGE
ALCOVE
LOBBY
CORRIDOR
TRASH ROOM
MEDICATION RM
CORRIDOR
C1-04
SOILED LINEN
H.A.C.
ALCOVE OFFICE
STORAGE
NURSES STATION
ELEVATOR
P-4/82
ELEVATOR
P-3/82T
EX 1 1/2" HHWR
EX 1 1/2" HHWS
EX 2" CHWR
EX 2" CHWS
B82[9]
B82[8]
B82[9] B82[8]
EX 2 1/2" CW
EX 2 1/2" HW
EX 2" HWR
EX 1/2" CW
EX 1/2" HW
RX FCU
CLEAN STORAGE
TELECOM RM
110A
MECHANICAL
EQUIPMENT
EX 16x16 SA
E X
6x
S
A
16x16 SA x1
S
A
B74-IDU-1-110A
B74-ODU-1-110A
RL
RS
CLEAN STORAGE
MECHANICAL
EQUIPMENT
EX 16x16 SA
EX 16x16 SA
B82-ODU-1-251A
RL
RS
B66[11]
B64-A[3]
B64-A[4]
B64-B[2]
B64-2[1] B64-D[10]
B64-2[6]
B19[7]
B82[9]
B82[8]
B38 [5]
B74[13]
B62[12A]
B62[12B]
DRAWING NOTES:
1. FINAL TESTING, ADJUSTING, AND BALANCING (TAB) FOR HVAC SHALL INCLUDE ALL HYDRONIC AND AIR SYSTEMS SHOWN IN DRAWINGS. REFER TO SECTION 23 05 93 FOR ADDITIONAL TAB REQUIREMENTS.
2. SPACE TEMPERATURE AND HUMIDITY SENSORS SHALL BE 48" +/- 6" AFF.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING REQUIRED TO PROVIDE A COMPLETE
AND FUNCTIONING SYSTEM.
4. ROUTE ALL PIPING CONCEALED IN WALLS, CHASES, OR CEILING SPACES.
5. UNLESS OTHERWISE INDICATED, DEMOLITION OF EXISTING PIPING SHALL INCLUDE ALL DEVICES, HANGERS, SUPPORTS, ETC. ALL EXISTING PIPING WHICH WILL NO LONGER REMAIN IN SERVICE SHALL BE REMOVED. ALL EXISTING PIPING TO REMAIN IN SERVICE SHALL BE CAPPED WHERE INDICATED. NO EXISTING PIPING SHALL BE LEFT OPEN. ANY IDENTIFIED DEADEND PIPING SHALL BE REMOVED BACK TO
THE MAINS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a
L a k e
C it y V
A /0
V
A L a k e
C it y
E H
R M
I n fr a s tr u c tu re
R
M
E P
F P
T .r v t
/2 /2
:0
:2
P
M
MH1.B.3
BLDG 74 & 82 - LV B - ZONES 9 &
12a - MECHANICAL PLANS
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
LAKE CITY FL
573A4-21-700
B62, B82
STATION CHIEF - EDWIN BURNETT
10/25/2024 GSC CSC
100% CONSTRUCTION
DOCUMENTS
NN
0 4' 8' 12' 16'
3/16" = 1'-0"
3/16" = 1'-0"2
B82 - ZONE 9 - LOWER LEVEL - TELECOM RM 164D - MECHANICAL - NEW
3/16" = 1'-0"1 B82 - ZONE 9 - LOWER LEVEL - OCCUPATIONAL ACTIVITIES 164 - MECHANICAL - DEMOLITION
CODED NOTES:
102 PROVIDE DRAIN PANS WITH OVERFLOW SWITCH BENEATH ALL EXPOSED PIPING INSIDE DATA / TELECOM
ROOMS. FABRICATE DRAIN PANS SO THEY SLOPE TO THE HORIZONTAL CONNECTION POINT SHOWN.
CONDENSATE ROUTING AND TERMINATION SHALL BE AS SHOWN AND/OR NOTED ON DRAWINGS. SEE
DRAIN PAN DETAIL 8/M-501.
103 REMOVE EXISTING PIPING ROUTED THROUGH DATA / TELECOM ROOM AND REROUTE WITH NEW PIPING AS
SHOWN. COORDINATE THE SHUTDOWN OF SYSTEMS AND SPACES AFFECTED WITH THE VA
CONSTRUCTION REPRESENTATIVE. ROUTE ALL RELOCATED PIPING CONCEALED ABOVE CEILING.
109 CONNECT NEW CHILLED WATER PIPING TO EXISTING PIPING IN WALL OR ABOVE CEILING. PROVIDE
ISOLATION VALVES AT CONNECTION TO EXISTING. REFER TO DETAILS FOR COIL CONNECTION
INFORMATION.
112 ROUTE CONDENSATE PIPING DOWN EXTERIOR WALL AND TERMINATE AT SPLASHBLOCK. REFER TO DETAIL 4/M-501.
113 DROP REFRIGERANT PIPING DOWN THROUGH FLOOR TO CEILING OF TR BELOW. ROUTE PIPING ABOVE
CEILING TO WALL MOUNTED OUTDOOR UNITS. REFER TO 3/MH1.B.3.
122 TIE CONDENSATE PIPING TO EXISTING CONDENSATE LINE FROM REMOVED FAN COIL UNIT.
126 PROVIDE A WATER SENSOR AT THE LOWEST POINT OF THE DRAIN PAN. SENSOR SHALL ALARM TO THE BAS
IF WATER IS DETECTED. SEE DRAIN PAN DETAIL 8/M-501.
131 REMOVE EXISITNG FAN COIL UNIT AND ALL ASSOCIATED PIPING, DUCTWORK, AND CONTROLS. REMOVE
PIPING BACK TO ACTIVE MAIN. CAP AND SEAL EXISTING DUCTWORK AT POINT OF REMOVAL.
134 INSTALL FAN COIL UNIT 24" ABOVE FINISHED FLOOR. ROUTE CHILLED WATER PIPING DOWN IN WALL TO FCU CHILLED WATER PIPING CONNECTIONS. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. ROUTE
1" CONDENSATE FROM INTEGRAL CONDENSATE PUMP TO LOCATION SHOWN.
137 INSTALL NEW REFRIGERANT LINESET AND SIZE PER MANUFACTURER'S REQUIREMENTS.
156 ROUTE REFRIGERANT PIPING DOWN TO WALL MOUNTED CONDENSING UNIT. COORDINATE PIPING
INSULATION COLOR WITH ARCHITECT. SEE SECTION VIEW 5 ON SHEET MH1.B.3.
161 DETERMINE AIRFLOW OF EXISTING AIR DEVICE. REMOVE DUCT TAP AND DUCT RUN-OUT TO EXISTING
SUPPLY GRILLE. RETAIN AND RE-USE EXISTING GRILLE IN NEW DUCT LAYOUT.
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
3/16" = 1'-0"5
B74 - ZONE 13 - LOWER LEVEL - TELECOM RM 110A - MECHANICAL - NEW
3/16" = 1'-0"4
B74 - ZONE 13 - LOWER LEVEL - TELECOM RM 110A - MECHANICAL - DEMOLITION
3/16" = 1'-0"3
B82 - OUTDOOR UNIT SECTION
DATA CENTER
AB18H
WORKROOM
AB18G
CORRIDOR
AB18F
MECH
AB18K
U. P. S.
AB18J
RX
AHU-1
RX
AHU-2
T
T
T
EX
FCU
RX
AHU-5
RX
AHU-4
EX 1 1/2" FM
EX 1" FM
RX-CU-2
RX-CU-1
RX-CU-5
EXISTING CARDBOARD
COMPACTOR
MH1.B.4
EX 1 1/2" HHWR
EX 1 1/2" HHWS
EX 1 1/2" CHWR
EX 1 1/2" CHWS
EX 1" FM
EXISTING
AREA DRAIN
EXISTING AREA
DRAIN
REMOVE ABANDONED
LIGHT POLE AND BASE
EXISTING STEAM
TUNNEL
REMOVE EXISTING
TREE STUMP
R X
6x
R
X
6x
EX 16x16
EX 8ø
EX 1" FM
P2
P1
RX
EF
PATCH AND
REPAIR WALL
TEMPORARY
WALL
P2
P2
EX 3/4" CHWS
EX 3/4" CHWR
57a
S1
B66-CRAC-B-AB18HA
B66-CRAC-B-AB18HB
DATA CENTER
AB18H
B66-ACU-B-AB18HA
EX
FCU
SECT. / RECPT.
AB20
CHIEF EMS
AB20A
1" CND
SP1 800
SP1 800
SP1 800
SP1 800
SP1 800
SP1 800
SP1 800
SP1 800
SP1 800
SP1 800
SP1 800
SP1 800
SP1 800
SP1 800
SP1 800
SP1 800
EX 1 1/2" HHWR
EX 1 1/2" HHWS
EX 1 1/2" CHWS
EX 1 1/2" CHWR
EXISTING CARDBOARD
COMPACTOR
1" CND
MH1.B.4
OFFICE
AB18
1" CND
1" CND
1/4" CW
1/2" CW
1/2" CW
CONNECT NEW 1/2" DOMESTIC WATER LINE TO EXISTING
COLD WATER PIPING ABOVE CEILING IN TOILET 107A, IN B74
APPROXIMATELY 100 FEET AWAY.
UPS
AB18F
B66-ODU-B-AB18FA
SP1 800
SP1 800
SP1 800
SP1 800
RS
RL
B66-IDU-B-AB18FA
B66-IDU-B-AB18FB
B66-ODU-B-AB18FB
T/H
T/H
B66-EF-01
8x8 EA
S
TR 280
TR 280
EXISTING AREA
DRAIN
EXISTING AREA
DRAIN
EXISTING STEAM
TUNNEL
10ø SA
3/4" CND 1" CND
3/4" CND
RS
RL
NEW CONCRETE
EQUIPMENT PAD
NEW CONCRETE
EQUIPMENT PAD
B66-ACU-B-AB18HB
STORAGE
AB18JVEST
AB18L
MECH
AB18K
EX 3/4" CHWR
EX 3/4" CHWS
SD4 150
SD4 100
SD4 150
10x10 SA
T
B66-IDU-B-AB18K
B66-ODU-B-AB18K
P3
57a
S1
B66 - LOWER
LEVEL
132' - 10 7/16"
B66-CRAC-B-AB18HB
ABOVE CEILING
RETURN AIR PLENUM
UNDERFLOOR AIR
DISTRIBUTION
FLOOR DIFFUSER
RACK DISCHARGE FLUE
DUCT CONNECTION
FROM CRAC TO PLENUM
EH-1
B66[11]
B64-A[3]
B64-A[4]
B64-B[2]
B64-2[1] B64-D[10]
B64-2[6]
B19[7]
B82[9]
B82[8]
B38 [5]
B74[13]
B62[12A]
B62[12B]
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a
L a k e
C it y V
A /0
V
A L a k e
C it y
E H
R M
I n fr a s tr u c tu re
R
M
E P
F P
T .r v t
/2 /2
:4
:2
P
M
MH1.B.4
BLDG 66 - LV B - ZONE 11 -
MECHANICAL PLANS
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
LAKE CITY FL
573A4-21-700
B66
STATION CHIEF - EDWIN BURNETT
10/25/2024 GSC CSC
100% CONSTRUCTION
DOCUMENTS
NN
0 4' 8' 12' 16'
3/16" = 1'-0"
DRAWING NOTES:
1. FINAL TESTING, ADJUSTING, AND BALANCING (TAB) FOR HVAC SHALL INCLUDE ALL HYDRONIC AND
AIR SYSTEMS SHOWN IN DRAWINGS. REFER TO SECTION 23 05 93 FOR ADDITIONAL TAB
REQUIREMENTS.
2. SPACE TEMPERATURE AND HUMIDITY SENSORS SHALL BE 48" +/- 6" AFF.
3. CRAC UNITS SHALL MAINTAIN AN AVERAGE RACK-FACE INLET TEMPERATURE RANGE OF 72°F TO 80.6°F. TOP (12" FROM TOP OF CABINET), MIDDLE (48" +/- 6" AFF), AND BOTTOM (12" AFF) SENSORS
MEASURING 2" FROM THE EQUIPMENT INLET SHALL BE AVERAGED TO MAINTAIN RACK INLET
TEMPERATURE.
4. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING REQUIRED TO PROVIDE A COMPLETE
AND FUNCTIONING SYSTEM.
5. ROUTE ALL PIPING CONCEALED IN WALLS, CHASES, OR CEILING SPACES.
3/16" = 1'-0"
B66 - LOWER LEVEL - COMPUTER RM AB18H - MECHANICAL - DEMOLITION
3/16" = 1'-0"
B66 - LOWER LEVEL - COMPUTER RM AB18H - MECHANICAL - NEW
CODED NOTES:
104 ROUTE CONDENSATE PIPING TO NEAREST FLOOR DRAIN. REFER TO DETAIL 11/M-501.
112 ROUTE CONDENSATE PIPING DOWN EXTERIOR WALL AND TERMINATE AT SPLASHBLOCK. REFER TO DETAIL 4/M-501.
117 PROVIDE HYDROGEN GAS MONITOR SIMILAR TO CTI CALIBRATION TECHNOLOGIES MODEL: GG-H2-EC-10000 ELECTROCHEMICAL. INTERLOCK GAS SENSOR WITH EXHAUST FAN (B66-EF-01) TO OPERATE WHEN HYDROGEN GAS LEVELS REACH 1% OF THE TOTAL VOLUME OF THE UPS ROOM PER NFPA 1, CHAPTER
52.3.6. INTERLOCK CONTROL DAMPER IN TRANSFER AIR DUCT TO OPEN WHEN EXHAUST FAN IS IN
OPERATION.
118 CLEAN AGENT FIRE PROTECTION PRESSURE RELIEF BACKDRAFT DAMPER AND ASSOCIATED DUCTWORK UP TO RELIEF AIR VENT ON ROOF. INITIAL BACKDRAFT DAMPER SHALL BE SET TO 0.2"WC. FINAL SETTING SHALL BE ADJUSTED AS DETERMINED BY THE TAB CONTRACTOR. RELIEF DAMPER TO MEET ALL NFPA
REQUIREMENTS.
121 INSTALL NEW REFRIGERANT LINESET AND SIZE PER MANUFACTURER'S REQUIREMENTS. ROUTE REFRIGERANT PIPING CONCEALED ABOVE CEILING. ROUTE CONDENSATE PIPING TO NEAREST FLOOR
DRAIN.
146 REMOVE EXISTING AIR HANDLING UNIT AND ALL ASSOCIATED PIPING, CONTROLS, AND OUTDOOR UNIT.
PATCH EXTERIOR PENETRATIONS TO MATCH EXISTING MATERIALS AND COLORS.
148 REMOVE ALL EXISTING DIFFUSERS/GRILLES, DUCTWORK, AIR HANDLERS, AND PIPING SERVING THE DATA CENTER. RELOCATE ALL EXISTING SERVICES PASSING THROUGH DATA CENTER OUTSIDE OF NEW DATA CENTER. EXISTING UNDERFLOOR DISTRIBUTION TO REMAIN FOR REUSE IN NEW WORK PHASE. REPARE
AND PATCH UNDERFLOOR DISTRIBUTION PLENUM AS NECESSARY.
149 INSTALL CRAC UNIT TO DISCHARGE AIR INTO UNDERFLOOR AIR DISTRIBUTION SYSTEM AND INTAKE AIR FROM ABOVE CEILING RETURN PLENUM. SIZE AND ROUTE REFRIGERANT PIPING TO CORRESPONDING CONDENSING UNIT PER MANUFACTURER'S RECOMMENDATIONS. DO NOT ROUTE PIPING DIRECTLY ABOVE
RACKS. SEE CRAC DOWNFLOW DETAIL 2/M-501.
150 RACK MOUNTED WIRED THERMOSTAT. PROVIDE ONE THERMOSTAT PER RACK. COORDINATE WITH
TELECOM CONTRACTOR.
163 REMOVE CHILLED WATER PIPING BACK TO THIS APPROXIMATE LOCATION AND CAP. PIPING TO EXISTING
FAN COIL UNIT IS TO REMAIN.
164 DUE TO LIMITED ACCESS, EXCAVATION FOR EQUIPMENT PAD PREPARATION SHALL BE DONE BY HAND.
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
3/16" = 1'-0"3
B66 0 COMPUTER RM AB18H - SECTION VIEW - MECHANICAL - NEW
Revisions Date
PHASING NOTES:
REMOVE AHU-1 AND AHU-2 AFTER RACKS ARE RELOCATED INSIDE TEMPORARY WALL. AHU-4 AND
AHU-5 SHALL REMAIN TO CONDITION TEMPORARY SPACE.
CAP EXISTING DUCT AND REDISTRIBUTE AIR TO EXISTING AIR DEVICES REMAINING INSIDE TEMPORARY WALL. REMOVE AHU-4 AND AHU-5 ONLY AFTER CRAC UNIT B66-CRAC-B-AB18HA HAS BEEN INSTALLED
AND THE TEMPORARY WALL HAS BEEN REMOVED.
IN ADDITION TO THE EXISTING HVAC UNITS TO REMAIN IN SERVICE DURING THE RELOCATION OF EXISTING RACKS AND INSTALLATION OF NEW RACKS, PROVIDE A TEMPORARY PORTABLE HVAC UNIT.
P1
P2
P3
UP
MH1.1.2
MH1.1.2
MH1.1.3
MH1.1.1
MH1.1.1
MH1.1.3
B38 [5]
B64-A[4]
B64-2[6]
B64-2 [1]
B64-B [2] B64-A [3]
B82 [9] B82 [8]
B19 [7] B64-D[10]
B74 [13]
B62 [12B]
B62 [12A]
MH1.1.1
MH1.1.2
MH1.1.2
MH1.1.3
MH1.1.1
MH1.1.3
MH1.1.4
MH1.1.4
B6 [11]
TELECOM RM
B103
TELECOM RM
BH101
TELECOM RM
TELECOM RM
C128
TELECOM RM
TELECOM RM
251A
TELECOM RM
128A
B91-1[3]
5757a
S1
MH1.1.4
MH1.1.4
TELECOM ROOM
MH1.1.4
MH1.1.4
TELECOM ROOM
MH1.1.5
MH1.1.5
TELECOM RM
6A
MH1.1.5
MH1.1.5
4TELECOM RM
MH1.1.5
MH1.1.5
TELECOM ROOM
MH1.1.5
MH1.1.5
TELECOM RM
112C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a
L a k e
C it y V
A /0
V
A L a k e
C it y
E H
R M
I n fr a s tr u c tu re
R
M
E P
F P
T .r v t
/2 /2
:0
:0
P
M
MH1.1
FIRST FLOOR - ZONES -
MECHANICAL
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
LAKE CITY FL
573A4-21-700
STATION CHIEF - EDWIN BURNETT
10/25/2024 GSC CSC
100% CONSTRUCTION
DOCUMENTS
NN
0 15' 30' 60' 90'
1" = 30'
1" = 30'-0"
FIRST FLOOR - ZONES - MECHANICAL
DRAWING NOTES:
1. FLOOR PLAN SHOWN FOR INFORMATIONAL PURPOSES ONLY. REFER TO ENLARGED PLANS FOR
ADDITIONAL INFORMATION.
1" = 30'-0"
B27 - ZONE 14 - FIRST FLOOR - MECHANICAL
1" = 30'-0"
B37 - ZONE 14 - FIRST FLOOR - MECHANICAL
NN
N N
1" = 30'-0"4
B18 - ZONE 15 - FIRST FLOOR - MECHANICAL
N
1" = 30'-0"
B42 - ZONE 15 - FIRST FLOOR - MECHANICAL
NN
B27 & B37[14]
B18, B42, B44 & B92[15]
1" = 30'-0"
B44 - ZONE 15 - FIRST FLOOR - MECHANICAL
NN
1" = 30'-0"
B92 - ZONE 15 - FIRST FLOOR - MECHANICAL
NN
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
KEY PLAN
B38
B06
B18
B19
B27
B37
B42
B44
B62
B74
B82
B91
B92
B64A
B64B
B64-2
EQUIPMENT
STORAGE
C138N
ELEC
C143
DATA
C141
EQUIPMENT
C143A
CORRIDOR
C1-19
OFFICE
B101
PROGRAM SUPPORT
ASSISTANT
B102
TELECOM RM
B103
ELEC
B104
STAIR #5
S5.1
CORRIDOR
6Q CORRIDOR
C1-16
T/H
B64-2 [1]
B64-B[2]
EX 2" CHWS
EX 2" CHWR
EX 1 1/2" V
EX 1/2" HW
EX 1/2" CW
B64-FCU-1-B103
T
122S
1" CND
EX 2" CND
EQUIPMENT
STORAGE
C138N
ELEC
C143
DATA
C141
EQUIPMENT
C143A
CORRIDOR
C1-19
OFFICE
B101
PROGRAM SUPPORT
ASSISTANT
B102
ELEC
B104
STAIR #5
S5.1
CORRIDOR
6Q CORRIDOR
C1-16
CHIEF, NUTRITION &
FOOD SERVICE
B103
EX 2" CHWR
EX 2" CHWS
B64-2 [1]
B64-B[2]
RX 14x14
CONFERENCE ROOM
A123
OFFICE
A119
OFFICE
A122
OFFICE
A121
T/H
B64-A[4]
B64-A[3]
TELECOM RM
BH101
B91-IDU-1-BH101B
T/H T/H T/H
B91-IDU-1-BH101C
B91-IDU-1-BH101A
B91-IDU-1-BH101D
1" CND
3/4" CND
3/4" CND
3/4" CND
1" CND
1" CND
3/4" CND
RL
RS
RL
RS
RS
RL
RS
RL
CONFERENCE ROOM
A123
OFFICE
A119
OFFICE
A122
OFFICE
A121
WAITING ROOM
A125
T
B64-A[4]
B64-A[3]EXIST
AHU-10
EXIST
AHU-9
TELECOM
BH101
RX-RTU-2
RX-RTU-1
RX-CU-AHU-10
B64-ODU-B-AB02A
B91-ODU-1-BH101A
B91-ODU-1-BH101B
B91-ODU-1-BH101C
B91-ODU-1-BH101D
RS
RL
B66[11]
B64-A[3]
B64-A[4]
B64-B[2]
B64-2[1] B64-D[10]
B64-2[6]
B19[7]
B82[9]
B82[8]
B38 [5]
B74[13]
B62[12A]
B62[12B]
B91[3]
DRAWING NOTES:
1. FINAL TESTING, ADJUSTING, AND BALANCING (TAB) FOR HVAC SHALL INCLUDE ALL HYDRONIC AND AIR SYSTEMS SHOWN IN DRAWINGS. REFER TO SECTION 23 05 93 FOR ADDITIONAL TAB REQUIREMENTS.
2. SPACE TEMPERATURE AND HUMIDITY SENSORS SHALL BE 48" +/- 6" AFF.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING REQUIRED TO PROVIDE A COMPLETE
AND FUNCTIONING SYSTEM.
4. ROUTE ALL PIPING CONCEALED IN WALLS, CHASES, OR CEILING SPACES.
5. UNLESS OTHERWISE INDICATED, DEMOLITION OF EXISTING PIPING SHALL INCLUDE ALL DEVICES, HANGERS, SUPPORTS, ETC. ALL EXISTING PIPING WHICH WILL NO LONGER REMAIN IN SERVICE SHALL BE REMOVED. ALL EXISTING PIPING TO REMAIN IN SERVICE SHALL BE CAPPED WHERE INDICATED. NO EXISTING PIPING SHALL BE LEFT OPEN. ANY IDENTIFIED DEADEND PIPING SHALL BE REMOVED BACK TO
THE MAINS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a
L a k e
C it y V
A /0
V
A L a k e
C it y
E H
R M
I n fr a s tr u c tu re
R
M
E P
F P
T .r v t
/2 /2
:0
:1
P
M
MH1.1.1
BLDG 64-A, B, & 91 - LV 1 - ZONE 2
& 3 - MECHANICAL PLANS
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
LAKE CITY FL
573A4-21-700
B64-A, B64-B
STATION CHIEF - EDWIN BURNETT
10/25/2024 GSC CSC
100% CONSTRUCTION
DOCUMENTS
NN
0 4' 8' 12' 16'
3/16" = 1'-0"
3/16" = 1'-0"
B64-B ZONE 2 - FIRST FLOOR - TELECOM RM B103 - MECHANICAL - NEW
3/16" = 1'-0"
B64-B ZONE 2 - FIRST FLOOR - TELECOM RM B103 - MECHANICAL - DEMOLITION
3/16" = 1'-0"4
B91 ZONE 3 - FIRST FLOOR - TELECOM RM A120 - MECHANICAL - NEW
3/16" = 1'-0"3
B91 ZONE 3 - FIRST FLOOR - TELECOM RM A120 - MECHANICAL - DEMOLITION
CODED NOTES:
102 PROVIDE DRAIN PANS WITH OVERFLOW SWITCH BENEATH ALL EXPOSED PIPING INSIDE DATA / TELECOM
ROOMS. FABRICATE DRAIN PANS SO THEY SLOPE TO THE HORIZONTAL CONNECTION POINT SHOWN.
CONDENSATE ROUTING AND TERMINATION SHALL BE AS SHOWN AND/OR NOTED ON DRAWINGS. SEE
DRAIN PAN DETAIL 8/M-501.
105 ROUTE REFRIGERANT PIPING UP TO CONDENSING UNIT ON ROOF OF B91. ROUTE ABOVE EXISTING DUCT INTO CHASE AND UP THROUGH ROOF. INSTALL, ROUTE, AND SIZE LINESET PER MANUFACTURER'S
RECOMMENDATIONS.
114 REPAIR HOLE IN WALL AND PATCH TO MATCH EXISTING EXTERIOR FINISHES.
122 TIE CONDENSATE PIPING TO EXISTING CONDENSATE LINE FROM REMOVED FAN COIL UNIT.
126 PROVIDE A WATER SENSOR AT THE LOWEST POINT OF THE DRAIN PAN. SENSOR SHALL ALARM TO THE BAS
IF WATER IS DETECTED. SEE DRAIN PAN DETAIL 8/M-501.
127 EXISTING CHILLED WATER SUPPLY AND RETURN PIPING UP TO FLOOR ABOVE WITH ISOLATION VALVES TO
REMAIN.
128 REMOVE EXISTING SUPPLY/RETURN/EXHAUST GRILLE AND ASSOCIATED DUCTWORK BACK TO ACTIVE
MAIN. CAP AND SEAL DUCTWORK AT POINT OF REMOVAL.
129 REMOVE EXISITNG FAN COIL UNIT AND ALL ASSOCIATED PIPING AND CONTROLS. REMOVE PIPING BACK TO
ACTIVE MAIN. CAP AND SEAL EXISTING DUCTWORK AT POINT OF REMOVAL.
145 REMOVE EXISTING ROOFTOP UNIT AND ASSOCIATED CONTROLS, DUCTWORK, AND DIFFUSERS/GRILLES.
PROVIDE WEATHER TIGHT CAPS FOR EXISTING ABANDONED CURBS.
146 REMOVE EXISTING AIR HANDLING UNIT AND ALL ASSOCIATED PIPING, CONTROLS, AND OUTDOOR UNIT.
PATCH EXTERIOR PENETRATIONS TO MATCH EXISTING MATERIALS AND COLORS.
147 ROUTE NEW REFRIGERANT PIPING UP THROUGH NEW CURB CAP. UTILIZE CURB CAP AS PITCH PAN FOR
NEW REFRIGERANT PIPING UP TO NEW OUTDOOR UNITS.
151 REMOVE EXISITNG FAN COIL UNIT AND ALL ASSOCIATED PIPING, DUCTWORK, AND CONTROLS. PREPARE CHILLED WATER AND CONDENSATE PIPING IN WALL FOR CONNECTION TO NEW FCU IN NEW WORK PHASE.
157 INSTALL FAN COIL UNIT IN PLACE OF EXISTING FAN COIL UNIT TO BE REMOVED IN DEMOLITION PHASE.
CONNECT 1" CHILLED WATER AND 1" CONDENSATE PIPING TO PIPING PREPARED IN WALL IN DEMOLITION
PHASE. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
3/16" = 1'-0"5
B91 ZONE 3 - ROOF - TELECOM RM A120 - MECHANICAL - NEW
OFFICE
OFFICE
ICE MACHINE
CORRIDOR
T/H
EX 1" HHWS
EX 1" HHWR
EX 1" CHWS
EX 1" CHWR
T
B38-FCU-1-115
1" CND
S
1" CHWS
1" CHWR
TELECOM RM
OFFICE
OFFICE
OFFICE
ICE MACHINE
CORRIDOR
RX 18x10
EX 1" HHWS
EX 1" HHWR EX 1" CHWR
EX 1" CHWS
RX 18x6
B64-IDU-1-C128
T/H
B64-ODU-1-C128
RL
RS
EX 1/2" CW
EX 1/2" HW
T
1" CNDS
B64-2-VAV-C130
10x12 SA x1
S
A
OPTICAL SHOP
C131
EXAM #20
C120
CORR
C1-5
SUPPLY RM
C121
TLT STAFF
C122
TOILET
C123A
WORKROOM
C123
CORR
C1-5
SATELLITE LAB
C130
TELECOM RM
C128
EX 12x12 EA
T
EX 1/2" HW
EX 1/2" CW
RX 8ø
OPTICAL SHOP
C131
EXAM #20
C120
CORR
C1-5
SUPPLY RM
C121
TLT STAFF
C122
TOILET
C123A
WORKROOM
C123
SATELLITE LAB
C130
B64-2-VAV-C130
10x12 SA x1
S
A
T
152 EX 2" V
141 C128
DATA
B66[11]
B64-A[3]
B64-A[4]
B64-B[2]
B64-2[1] B64-D[10]
B64-2[6]
B19[7]
B82[9]
B82[8]
B38 [5]
B74[13]
B62[12A]
B62[12B]
B91[3]
DRAWING NOTES:
1. FINAL TESTING, ADJUSTING, AND BALANCING (TAB) FOR HVAC SHALL INCLUDE ALL HYDRONIC AND AIR SYSTEMS SHOWN IN DRAWINGS. REFER TO SECTION 23 05 93 FOR ADDITIONAL TAB REQUIREMENTS.
2. SPACE TEMPERATURE AND HUMIDITY SENSORS SHALL BE 48" +/- 6" AFF.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN THE INDOOR AND OUTDOOR UNIT(S). THIS SINGLE LINE REPRESENTS ALL PIPING REQUIRED TO PROVIDE A COMPLETE
AND FUNCTIONING SYSTEM.
4. ROUTE ALL PIPING CONCEALED IN WALLS, CHASES, OR CEILING SPACES.
5. UNLESS OTHERWISE INDICATED, DEMOLITION OF EXISTING PIPING SHALL INCLUDE ALL DEVICES, HANGERS, SUPPORTS, ETC. ALL EXISTING PIPING WHICH WILL NO LONGER REMAIN IN SERVICE SHALL BE REMOVED. ALL EXISTING PIPING TO REMAIN IN SERVICE SHALL BE CAPPED WHERE INDICATED. NO EXISTING PIPING SHALL BE LEFT OPEN. ANY IDENTIFIED DEADEND PIPING SHALL BE REMOVED BACK TO
THE MAINS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a
L a k e
C it y V
A /0
V
A L a k e
C it y
E H
R M
I n fr a s tr u c tu re
R
M
E P
F P
T .r v t
/2 /2
:0
:3
P
M
MH1.1.2
BLDG 38 & 64 - LV 1 - ZONE 5 & 6 -
MECHANICAL PLANS
LAKE CITY VAMC EHRM
INFRASTRUCTURE
UPGRADES DESIGN
LAKE CITY FL
573A4-21-700
B38, B64-2
STATION CHIEF - EDWIN BURNETT
10/25/2024 GSC CSC
100% CONSTRUCTION
DOCUMENTS
NN
0 4' 8' 12' 16'
3/16" = 1'-0"
3/16" = 1'-0"
B38 ZONE 5 - FIRST FLOOR - TELECOM RM 115 - MECHANICAL - NEW
3/16" = 1'-0"
B38 ZONE 5 - FIRST FLOOR - TELECOM RM 115 - MECHANICAL - DEMOLITION
3/16" = 1'-0"
B64-2 ZONE 6 - FIRST FLOOR - TELECOM RM C128 - MECHANICAL - NEW
3/16" = 1'-0"
B64-2 ZONE 6 - FIRST FLOOR - TELECOM RM C128 - MECHANICAL - DEMOLITION
CODED NOTES:
102 PROVIDE DRAIN PANS WITH OVERFLOW SWITCH BENEATH ALL EXPOSED PIPING INSIDE DATA / TELECOM
ROOMS. FABRICATE DRAIN PANS SO THEY SLOPE TO THE HORIZONTAL CONNECTION POINT SHOWN.
CONDENSATE ROUTING AND TERMINATION SHALL BE AS SHOWN AND/OR NOTED ON DRAWINGS. SEE
DRAIN PAN DETAIL 8/M-501.
107 INSTALL NEW REFRIGERANT LINESET AND SIZE PER MANUFACTURER'S REQUIREMENTS. ROUTE REFRIGERANT PIPING CONCEALED ABOVE CEILING. ROUTE CONDENSATE PIPING TO MOP SINK OR WYE
BRANCH TAIL PIECE.
109 CONNECT NEW CHILLED WATER PIPING TO EXISTING PIPING IN WALL OR ABOVE CEILING. PROVIDE
ISOLATION VALVES AT CONNECTION TO EXISTING. REFER TO DETAILS FOR COIL CONNECTION
INFORMATION.
123 ROUTE CONDENSATE PIPING TO FLOOR DRAIN IN ICE MACHINE ROOM. SEE CONDENSATE FLOOOR DRAIN
DETAIL 11/M-501.
126 PROVIDE A WATER SENSOR AT THE LOWEST POINT OF THE DRAIN PAN. SENSOR SHALL ALARM TO THE BAS
IF WATER IS DETECTED. SEE DRAIN PAN DETAIL 8/M-501.
128 REMOVE EXISTING SUPPLY/RETURN/EXHAUST GRILLE AND ASSOCIATED DUCTWORK BACK TO ACTIVE
MAIN. CAP AND SEAL DUCTWORK AT POINT OF REMOVAL.
133 INSTALL BOTTOM OF DUCTLESS SPLIT INDOOR UNIT 88" ABOVE FINISHED FLOOR. COORDINATE EXACT
LOCATION WITH TELECOM CONTRACTOR.
134 INSTALL FAN COIL UNIT 24" ABOVE FINISHED FLOOR. ROUTE CHILLED WATER PIPING DOWN IN WALL TO FCU CHILLED WATER PIPING CONNECTIONS. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. ROUTE
1" CONDENSATE FROM INTEGRAL CONDENSATE PUMP TO LOCATION SHOWN.
141 RECORD EXISTING SUPPLY/RETURN/EXHAUST AIRFLOW AT EACH GRILLE PRIOR TO DEMOLITION.
142 REBALANCE EXISITNG SUPPLY/RETURN/EXHAUST GRILLES TO VALUE RECORDED IN PRE-DEMOLITION TEST
AND BALANCE.
143 INSTALL CONDENSING UNIT ON 3" THICK PREFABRICATED CONCRETE PAD. SECURE UNIT PER FLORIDA
HURRICANE REQUIREMENTS. SEE SPECIFICATIONS.
152 RELOCATE EXISTING THERMOSTAT / TEMPERATURE SENSOR TO LOCATION SHOWN ON PLANS.
155 ROUTE PIPING THROUGH EXTERIOR WALL. SEE PIPING EXTERIOR BIRCK WALL PENETRATION DETAIL 6/M-502.