Amendment 4 - 36C77625B0006 0004 6-25-25.pdf

PDF 125 KB Posted

Attached to
Project 573A4-21-700 EHRM Infrastructure Upgrades construction project at the Lake City, FL VAMC
Solicitation number
36C77625B0006
Issued by

About this file

This document is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for a Department of Veterans Affairs construction project. Amendment 0004, effective 06-25-2025, pertains to the Lake City EHRM Infrastructure Upgrades project (Solicitation Number 36C77625B0006), which is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside opportunity. The primary purpose of this amendment is to provide brand name justification, with the contracting officer Bridget May issuing the modification to all offerors/bidders. The project involves infrastructure upgrades at the Lake City VA Medical Center, with a construction magnitude between $20 million and $50 million, located at 619 South Marion Avenue, Lake City, FL 32025-5808.

The amendment indicates that after bid opening, the architectural-engineering (A-E) firm will provide a clean version of specifications and drawings to the VA, incorporating all addendums and responses to technical questions that resulted in changes to the specs and drawings. A separate "Brand Name Justification" document is referenced but not included in the visible pages, suggesting additional details about specific brand requirements or justifications for the project are contained in that attached document.

View the file

Other files

File Type Posted
Online Bid Opening Meeting Info.docx DOCX document
Amendment 5 - 36C77625B0006 0005 6-30-25.pdf PDF
Construction Wage Rates - Columbia 6-27-2025.pdf PDF
Brand Name Justification - Lake City - Rev 2 0 - Redacted.pdf PDF
Brand Name Justification - Lake City EHRM - SIGNED_Redacted.pdf PDF
Amendment 3 - 36C77625B0006 0003 6-11-25.pdf PDF
573A4-21-700 Lake City - RFI TRACKING SHEET REV2 36C77625B0006 6-10-25.xlsx XLSX spreadsheet
573A4-21-700 Lake City - Addendum No. 1.pdf PDF
260526-EDITED Grnd shop marked up.docx DOCX document
260533-EDITED Raceway shop marked up.docx DOCX document
260519-EDITED Low Volt cond cab shop marked updocx.docx DOCX document
262726-EDITED Wire Dev shop marked up.docx DOCX document
Construction Wage Rates - Columbia 5-2-2025.pdf PDF
262416-EDITED Panelboards shop marked up.docx DOCX document
Amendment 2 - 36C77625B0006 0002 5-27-2025.pdf PDF
Site Visit Sign-in - 573A4-21-700 Attendance 250423.pdf PDF
Amendment 1 - 36C77625B0006 0001 4-24-25.pdf PDF
Attachment 15 - Construction Wage Rates - Columbia.pdf PDF
Attachment 8 - Final Drawing Set - 7a of 8.pdf PDF
Attachment 4 - Final Drawing Set - 3 of 8.pdf PDF
Attachment 14 - PreConstruction Risk Assessment - Lake City.docx DOCX document
Attachment 5 - Final Drawing Set - 4 of 8.pdf PDF
Attachment 9 - Final Drawing Set - 7b of 8.pdf PDF
Attachment 10 - Final Drawing Set - 7c of 8.pdf PDF
Attachment 7 - Final Drawing Set - 6 of 8.pdf PDF
Attachment 6 - Final Drawing Set - 5 of 8.pdf PDF
Attachment 12 - Final Drawing Set - 8 of 8.pdf PDF
Attachment 1 - Final Specs Set - R4.pdf PDF
Attachment 13 - Asbestos and Lead Paint Survey Report.pdf PDF
Attachment 11 - Final Drawing Set - 7d of 8.pdf PDF
Attachment 17 - Site Visit Instructions.pdf PDF
Attachment 3 - Final Drawing Set - 2 of 8.pdf PDF
Attachment 16 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 2 - Final Drawing Set - 1 of 8.pdf PDF
IFB 36C77625B0006.pdf PDF
Attachment 18 - RFI TRACKING SHEET - SOLICITATION 36C77625B0006 - Project 573A4-21-700.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

0004 06-25-2025

573A4-21-700

36C776

Department of Veterans Affairs

Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490

Independence OH 44131

36C776

Department of Veterans Affairs

Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490

Independence OH 44131

To all Offerors/Bidders

36C77625B0006

04-11-2025

X

X X

The purpose of this amendment is to provide the brand name justification.

Bridget May

Contracting Officer

Be advised that after the bid opening, the A-E will provide a clean version (for construction) of the specifications and drawings to the VA to be incorporated into the awarded contract. This will incorporate all addendums and any responses to the technical questions that resulted in changes to the specs and drawings.

See attached document: Brand Name Justification - Lake City EHRM - SIGNED_Redacted.

File details come from the government source that posted it. Updated .