Attachment 4 - Thor Demolition Technical Questionnaire.pdf

PDF 108 KB Posted

Attached to
Demolition of Buildings 13140 and 13143 (Thor Dormitories) - VSFB, CA
Solicitation number
FA461026Q1314
Issued by

About this file

Technical Capability Questionnaire Summary

This is a Technical Capability Questionnaire (Attachment 4) for federal contract solicitation FA461026Q1314 regarding demolition of Buildings 13140 and 13143 (Thor Dormitories) at Vandenberg Space Force Base, California. Offerors must provide narrative responses limited to 20 pages plus a separate Gantt Schedule attachment. The solicitation requires demolition work within a 240-day overall performance period, with actual structural demolition restricted to the bird non-nesting season (August 15 – February 15), totaling 184 calendar days.

The evaluation criteria encompass four primary factors: (1) Technical Approach, addressing project phasing and schedule management; hazardous materials (HAZMAT) management including asbestos-containing materials (ACM) and lead-based paint (LBP) compliance with NESHAP, Cal-OSHA, and Santa Barbara County Air Pollution Control District regulations; utility coordination involving the 30th Civil Engineer Squadron, SLD 30 SC Communications, and American Water; and structural demolition methodology for a multi-story concrete/masonry dormitory with site restoration to 90% soil compaction and hydroseeding warranty; (2) Past Performance and Corporate Experience, requiring up to five examples of similar multi-story demolition projects with integrated HAZMAT abatement on active military or secure federal installations completed within five years; (3) Project Management and Teaming, including subcontractor vetting and management for specified scopes (HAZMAT survey, HAZMAT abatement, earthwork, trucking) and key personnel qualifications for the Site Superintendent and Site Safety and Health Officer with federal installation experience; and (4) Safety Record and Quality Control, requiring demonstration of critical hazard identification and resolution on past demolition projects.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 4: TECHNICAL CAPABILITY QUESTIONNAIRE

Solicitation Number: FA461026Q1314 Project: Demolition of Buildings 13140 & 13143 (Thor Dormitories), Vandenberg SFB, CA

INSTRUCTIONS TO OFFERORS:

Offerors shall provide narrative responses to the questions below. Responses must be specific to the requirements detailed in the Performance Work Statement (PWS). General marketing material will not be evaluated. Please limit your total response to this questionnaire to 20 pages. In addition to narrative responses, offerors shall include a Gantt Schedule as a separate attachment to the response.

FACTOR 1: TECHNICAL APPROACH

Sub-Factor 1.1: Project Phasing and Schedule Management The PWS dictates a 240-day overall period of performance and restricts the actual building demolition to the bird non-nesting season (August 15 – February 15) which is 184 calendar days.

1. Provide a detailed narrative explaining how you will phase this project to ensure all pre-demolition requirements (submittals, independent HAZMAT survey, utility disconnects, and HAZMAT abatement) are completed in time to execute the structural demolition within the environmental window. Additionally, offerors must provide a Gantt Schedule as a separate attachment to the narrative.

2. Identify what you consider to be the top two scheduling risks for this project and describe your specific mitigation strategies for each.

Sub-Factor 1.2: Hazardous Materials (HAZMAT) Management The PWS requires an independent third-party survey for Asbestos Containing Material (ACM) and Lead-Based Paint (LBP) prior to abatement and demolition.

1. Describe your process for selecting, hiring, and managing the independent third-party environmental consulting firm. How will you ensure strict separation of duties between the survey firm and the abatement contractor to avoid conflicts of interest?

2. Detail your procedures for the containment, removal, transportation, and legal disposal of ACM and LBP in a manner that complies with NESHAP, Cal-OSHA, and Santa Barbara County Air Pollution Control District (SBCAPCD) regulations.

Sub-Factor 1.3: Utility Coordination and Deactivation This project requires complex utility cut, cap, and termination coordination involving the 30th Civil Engineer Squadron (30 CES), SLD 30 SC (Communications), and American Water.

1. Describe your step-by-step approach to identifying, isolating, and deactivating live utilities safely.

2. Provide your strategy for coordinating utility outages with multiple base agencies to minimize disruption to Vandenberg SFB operations.

3. Confirm your capability and outline your process for providing the required final as-built drawings and GIS data for all utility termination points.

Sub-Factor 1.4: Structural Demolition and Site Restoration

1. Building 13140 is a multi-story concrete/masonry dormitory. Describe your specific structural demolition methodology (e.g., top-down, specialized heavy equipment) and how you will safely manage dust, noise, and vibration on an active military installation.

2. Detail your plan for maximizing the diversion and recycling of Construction and Demolition (C&D) debris.

3. Explain your quality control process for meeting the site restoration requirements, specifically achieving 90% soil compaction and ensuring the success of the hydroseeding to meet the 1-year vegetation warranty.

FACTOR 2: PAST PERFORMANCE & CORPORATE EXPERIENCE

Sub-Factor 2.1: Relevant Project Experience Provide up to five (5) examples of projects completed by your firm within the last five (5) years as a Prime or Sub-Contractor that are similar in size, scope, and complexity to this requirement.

Note to Offeror: "Similar complexity" includes multi-story structural demolition, integrated HAZMAT abatement, and work on active military or secure federal installations.

Sub-Factor 2.2: Safety Record and Quality Control

1. Describe a specific instance on a past demolition project where your site safety or environmental quality control plan identified a critical hazard or compliance issue.

Explain how your team successfully resolved it.

FACTOR 3: PROJECT MANAGEMENT & TEAMING

Sub-Factor 3.1: Subcontractor Management

1. Identify the specific scopes of work (e.g., HAZMAT survey, HAZMAT abatement, earthwork, trucking) that you intend to subcontract.

2. Describe your methodology for vetting, selecting, and managing subcontractors to ensure they meet the rigorous safety, security (base access), and quality standards required for Vandenberg SFB.

Sub-Factor 3.2: Key Personnel

1. Provide a brief overview of the qualifications and experience of the proposed Site Superintendent and Site Safety and Health Officer (SSHO) who will be assigned to this project full-time. Highlight their specific experience managing HAZMAT demolition projects on federal installations.