This document is a set of demolition plans and specifications for the demolition of Building B13140 (Thor Dormitory), with a completion date of 30 September 2025. The project is identified as XUMU243600.
The scope of work includes complete demolition of Building B13140 and abatement and removal of all equipment and connections supporting that building. Building B13143 (Mechanical Building) is to remain in place to support Building B13135, but all equipment and connections from B13143 to B13140 must be removed. The demolition work encompasses multiple infrastructure systems: removal of concrete surfaces with field-verified sawcuts as indicated; disconnection and removal of the electrical transformer and underground primary feed from B13143, with all power connections between B13143 and B13140 eliminated; removal of all natural gas connections, equipment (regulator and meter), and underground lateral back to the gas main valve; removal of water service lines from B13140 to the water main serving B13143, with repairs to the connection at B13143 to be contracted with American Water; removal of sanitary sewer laterals from both B13140 and B13143 to the main line, with repairs to the manhole after removal, also to be contracted with American Water; preservation of storm sewer infrastructure with adjustments as needed; removal of overhead cable back to the power pole in coordination with the cable service provider and SLD 30 SCS/SCX approval; and removal of underground copper and fiber optic communication lines to locations approved by SLD 30/SCX. All communication system removals require prior coordination and approval from SLD 30 SCS/SCX before work commences.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
XU
M
U
, D em ol is h Th or D or m
, B
Bu ild in g
D em ol iti on
S ep
NOTE: Demolish B13140 Thor Dormitory. B13143 Mechanical Bldg to remain to support B13135 but all equipment/connections supporting B13140 to be abated, demolished and removed.
U
, D em ol is h Th or D or m
, B
Si te
D em ol iti on
S ep
NOTE: Remove all concrete in red with suggested sawcuts at red lines. Field verify all sawcuts.
U
, D em ol is h Th or D or m
, B
El ec tr ic al
S ep
NOTE: Remove transformer at B13143 and UG Primary electrical feed back to power pole, connection at overhead line.
Remove all power connection from B13143 to B13140
U
, D em ol is h Th or D or m
, B
N at ur al
G as
S ep
5 NOTE: Remove all natural gas connection between B13140 and B13143, all equipment (regulator, meter if applicable) and UG lateral back to gas main, at existing gas valve to remain.
U
, D em ol is h Th or D or m
, B
W at er (A m er ic an
W at er
S ep
NOTE: Remove water line from B13140 to water main connecting to and supporting B13143. Repair connection to water main/lateral to remain at B13143. All work to be contracted with American Water.
U
, D em ol is h Th or D or m
, B
Se w er (A m er ic an
W at er
S ep
NOTE: Remove sanitary sewer laterals from B13140 to sewer main behind building. Some sewer main and hand hole access needs to remain in place to support B13135 and B13147. Repair connection to manhole after removing sewer lateral. Remove sewer lateral from B13143 to sewer main. All work to be contracted with American Water.
U
, D em ol is h Th or D or m
, B
St or m S ew er
S ep
NOTE: Preserve/protect storm sewer inlet and pipe to remain.
Adjust inlet if needed to support any new grading work done to support demolition of B13140
U
, D em ol is h Th or D or m
, B
C om m un ic at io n, C ab le
S ep
NOTE: Remove OH cable back to power pole. NOTE: System is owned by cable service provider.
Coordinate and receive approval for removal with SLD 30 SCS/SCX before taking any action!!!
U
, D em ol is h Th or D or m
, B
C om m un ic at io n, C op pe r C om m
L in es , F ib er
O pt ic
L in es
S ep
NOTE: Remove UG copper and fiber optic lines to location as identified/approved by SLD 30/SCX. Protect commNOTE:
Coordinate and receive approval for removal with SLD 30 SCS/SCX before taking any action!!!
U
, D em ol is h Th or D or m
, B
Si te
B ac kg ro un d
M ap
S ep
INFORMATIONAL PURPOSES ONLY
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
File details come from the government source that posted it. Updated .