Attachment 4 - Buyspeed Submittal Instructions.pdf

PDF 2 MB Posted

Attached to
Elevator Modernization Services
Solicitation number
00002596
Issued by
Oregon

About this file

This file contains electronic submittal instructions for the City of Portland's BuySpeed procurement system, specifically for the CBWTP Main Substation Equipment Procurement project (Project E10897). The instructions guide vendors through an eight-step process for uploading bids, proposals, or quotes electronically. The process begins with logging into the BuySpeed system at procure.portlandoregon.gov and navigating to the solicitation number, followed by creating a quote through the quote wizard. Vendors must complete the General tab, Items tab, Terms & Conditions tab, and Attachments tab before final submission. The submittal process requires vendors to enter a total bid amount in the Unit Cost field (or use $10 as a placeholder if no total amount is included) and ensure that "No Bid" and "No Charge" checkboxes are cleared. All vendors must accept the terms and conditions of the solicitation before proceeding with submission.

The instructions emphasize that vendors should allocate at least 30 minutes to complete the submission process and submit their bids at least one business day before the deadline. The BuySpeed system requires vendors to upload all required attachments with descriptions in the Attachments tab and complete the final submission by clicking the "Submit Quote" button on the Summary tab. The document notes that many fields in the BuySpeed system are not necessary for City of Portland submittals, and the instructions highlight only those fields essential for proper submission. Failure to complete the final submission step will result in the quote not being submitted to the City.

View the file

Other files

File Type Posted
Addendum 02 ITB 00002596 Update Close Date and Documents.pdf PDF
Addendum 01 ITB 00002596 Update PreBid Meeting and Close Date.pdf PDF
Exhibit A Standard Goods and Services Contract.pdf PDF
Exhibit C1 City East Precinct Building As Builts.pdf PDF
Exhibit F Alternate 1 - St. Johns Building Technical Specification.pdf PDF
ITB 00002596 Elevator Modernization Construction.pdf PDF
ITB 00002596 Elevator Modernization Summary.pdf PDF
Exhibit D1 North Precinct Building As Builts.pdf PDF
Exhibit E Portland Communication Center Technical Specifications.pdf PDF
Addendum 03 ITB 00002596 Add Attachment 6.pdf PDF
Attachment 5 PPB Background Check Forms.pdf PDF
Exhibit E1 Portland Communication Center As Builts.pdf PDF
Exhibit D North Precinct Building Technical Specifications.pdf PDF
Attachment 6 - Exceptions and Deviations to the Sample Contract.docx DOCX document
Notice of Cancellation for ITB 2596.pdf PDF
Addendum 04 ITB 00002596 Scope of Work Clarifications.pdf PDF
Notice of Intent to Award ITB 2596.pdf PDF
Exhibit C City East Precinct Building Technical Specifications.pdf PDF
Exhibit B City 1900 Building Technical Specifications.pdf PDF
ITB 00002596 Elevator Modernization Bid Receipt Record.pdf PDF
Attachment 2 - ITB 00002596 Bid Pricing Form.xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CBWTP Main Substation Equipment Procurement, Project E10897 Page 1 of 8

BuySpeed Electronic Submittal Instructions These instructions are for uploading electronic attachments to a BuySpeed solicitation. The process is not intuitive, and the nomenclature of the system can sometimes be misleading. There are also a number of fields that are not necessary for City of Portland submittals, so these instructions will highlight only those fields that are necessary for City submittals. Please plan at least 30 minutes to submit your proposal, and when possible, submit your bid at least one business day before it is due.

Step 1: log in to the BuySpeed system. https://procure.portlandoregon.gov. Make sure you are in the “seller” not the “seller admin” role by clicking on this icon on the top right corner of the page:

and select “seller.”

Then navigate to the solicitation number. Click the solicitation number link to open the solicitation page containing a summary of the solicitation information. The resulting page should look similar to the image below.

https://procure.portlandoregon.gov/

CBWTP Main Substation Equipment Procurement, Project E10897 Page 2 of 8

Step 2: Click the “Create Quote” button at the bottom of the page to start the quote wizard. “Quote” is a generic term in the BuySpeed environment for a solicitation submittal. City solicitation documents generally refer to submittals as “Bid”, “Proposal”, or “Quote”, depending on the type of solicitation.

Step 3: The screen will open to the “General” tab. If you would like to insert contact info or comments for your own reference, you can do that in the appropriate boxes, but additional information in this tab is not required. Click the “Save & Continue” button when ready to move to the next step.

CBWTP Main Substation Equipment Procurement, Project E10897 Page 3 of 8

Step 4: You’ll now see a warning at the top of the page stating that the terms and conditions are not acknowledged. Ignore that for now as the error will be addressed in Step 6.

CBWTP Main Substation Equipment Procurement, Project E10897 Page 4 of 8

Step 4a: Click the “Items” tab. This tab is important because there are fields here that must be completed in order to submit a quote.

Step 5b: Enter the total amount from your bid, quote or proposal, in the “Unit Cost” field. If your submittal does not include a total amount, use $10 as the value.

After entering an amount, click the “Save & Continue” button.

CBWTP Main Substation Equipment Procurement, Project E10897 Page 5 of 8

Step 5c: Both the “No Bid” and “No Charge” checkboxes should be cleared, and the “Quote Response Total” has been calculated. Uncheck each checkbox if still checked.

Step 6a: Click the “Terms & Conditions” tab.

Click the “Yes” radio button to accept the terms and conditions of the solicitation, and then click the “Save & Continue” button.

CBWTP Main Substation Equipment Procurement, Project E10897 Page 6 of 8

Step 6b: You’ll see that the terms & conditions warning message is gone.

Step 7a: Click the “Attachments” tab. Then click the “Add File” button.

Step 7b: Type a description for the file in the “Description” field. Then click the “Browse…” button and navigate to the file location. When the file is attached, click the “Save & Exit” button to upload it.

Repeat this as necessary for any additional files.

CBWTP Main Substation Equipment Procurement, Project E10897 Page 7 of 8

Step 7c: After a document is uploaded, it will appear with its details under the “Attachments” tab.

The number in parentheses appended to the tab label denotes how many files have been uploaded.

You can also delete files by clicking the “Delete” checkbox next to the appropriate file and then clicking the “Save & Continue” button.

CBWTP Main Substation Equipment Procurement, Project E10897 Page 8 of 8

Step 8: Click the “Summary” tab, and then click the “Submit Quote” button to complete the quote process.

Note: If this last step is NOT completed, the quote will not have been submitted.