Addendum 04 ITB 00002596 Scope of Work Clarifications.pdf
PDF 170 KB Posted
- Attached to
- Elevator Modernization Services
- Solicitation number
- 00002596
- Issued by
- Oregon
About this file
This is an Addendum 04 to Invitation to Bid (ITB) 00002596 providing scope of work clarifications for elevator modernization services in Oregon. The addendum addresses multiple clarifications and modifications to the original solicitation requirements. Key clarifications include specifications regarding elevator pit depth requirements, handrail installations, machine room ventilation standards, hoistway lighting provisions, and door operator specifications. The document provides detailed technical guidance on modernization standards, including requirements for cab finishes, landing door hardware, and safety equipment installations. Additional clarifications address the scope of work for various building locations and elevator systems included in the modernization project. The addendum confirms bidders must address all technical specifications and requirements outlined in the original ITB documents as supplemented by this addendum.
The addendum does not specify pricing terms, set-aside provisions, incumbent contractor information, or funding sources within its scope. Rather, it functions as a technical clarification document to ensure all bidders have a uniform understanding of the modernization requirements and standards that must be met. Bidders are required to incorporate these scope clarifications into their proposals and pricing in accordance with the original ITB timeline and submission requirements. The addendum maintains the competitive bidding process while reducing ambiguity regarding technical specifications and installation standards for the elevator modernization services.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page | 1
Procurement Services City Operations City of Portland, Oregon
@PortlandGov portlandgov
PortlandORGov
October 20, 2025
ADDENDUM NO. 04
ITB No. 00002596
FOR
Elevator Modernization Services
Responses Due: October 31, 2025 By: 4:00 pm
This Addendum provides changes to the specifications for the above-entitled project to be considered by each respondent. Any changes made by this Addendum to said specifications offset only the portion of the words or paragraphs specifically mentioned herein, and the balance of the specifications remain in full force. It is the responsibility of all respondents to conform to this addendum.
This Addendum shall:
1. Add the following technical information into the solicitation. New language is in bold and underline.
Section 1.2 Scope of Work
In addition to the services outlined in the Exhibits, Contractor shall incorporate this information regarding elevator sites and e-power into the solicitation and provide the following services:
A. 1900 Building – Elevators will be on generator power and intention is for contractor to provide Emergency power signal, Emergency Power jewel indicator, Automatic Transfer switch pre-signal and all cabling and terminations. City of Portland is still working to determine generator connections and locations, so all of this scope will be negotiated with the awarded contractor after bid. Do not include this scope or related pricing in bid.
Sylvester Donelson, Jr. Sara Morrissey Michael Jordan Chief Procurement Officer Deputy City Administrator Chief Administrative Officer https://twitter.com/PortlandGov https://www.instagram.com/PortlandGov/ https://www.facebook.com/PortlandORGov
Page | 2
B. Portland Communication Center – Elevators are on generator power, contractor to provide the following:
i. Emergency power signal: Normally open contact closes to send signal to elevator controller indicating it is on emergency power.
ii. Emergency Power jewel indicator: An illuminated signal marked "ELEVATOR EMERGENCY POWER" shall be provided in the elevator lobby at the designated level for each group of elevators or for any single elevator not in a group.
iii. Automatic Transfer switch pre-signal: Normally open contact closes on pre-transfer signal for a pre-determined length of time, letting the controller know a transfer of power source is incoming.
C. East Precinct - Elevators are on generator power, contractor to provide the following:
i. Emergency power signal: Normally open contact closes to send signal to elevator controller indicating it is on emergency power.
ii. Emergency Power jewel indicator: An illuminated signal marked "ELEVATOR EMERGENCY POWER" shall be provided in the elevator lobby at the designated level for each group of elevators or for any single elevator not in a group.
iii. Automatic Transfer switch pre-signal: Normally open contact closes
D. North Precinct - Elevators are on generator power, contractor to provide the following:
i. Emergency power signal: Normally open contact closes to send signal to elevator controller indicating it is on emergency power.
ii. Emergency Power jewel indicator: An illuminated signal marked "ELEVATOR EMERGENCY POWER" shall be provided in the elevator lobby at the designated level for each group of elevators or for any single elevator not in a group.
iii. Automatic Transfer switch pre-signal: Normally open contact closes
E. St. John’s Building – Elevators are not on generator; neither e-power signal, e-power jewel indicator nor pre-transfer signal is required.
Page | 3
Please direct all questions and concerns to Kristina Kolata, Senior Procurement Specialist at 971-509-0713.
End of Addendum bt :kmk