Attachment 3a - Harris Project Drawings 90 Percent.pdf
PDF 5 MB Posted
- Attached to
- Petersburg Office Consolidation
- Solicitation number
- 1240BJ24R0018
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains project drawings for the Petersburg Office Consolidation and Work Center Replacement - Harris Building project in Petersburg, Alaska. The project involves changes to the use, alteration, and repair of an existing two-story building south of downtown Petersburg. The building is classified as Type V-B construction and is not sprinklered, with non-separated occupancies of Groups B, F-1, and S-1.
The related federal contract opportunity is for the Petersburg Office Consolidation and Work Center Replacement project. The solicitation number is 1240BJ24R0018, and the opportunity is being issued by the U.S. Department of Agriculture Forest Service. A virtual pre-proposal meeting is scheduled for July 25, 2024, and the deadline for submitting questions (RFIs) is August 9, 2024. No substitution requests will be considered prior to award, and offerors must respond as described in Sections L and M of the solicitation. Proposals that fail to provide a complete response to the Technical Evaluation Factors may be rejected.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Petersburg
Juneau
ALASKA
Anchorage
PROJECT LOCATION
MITKOF HIGHWAY
0 - TITLESHEET
G0.00 TITLESHEET
1 - GENERAL
G1.01 GENERAL INFO
G1.02 CODE ANALYSIS
G1.03 CODE PLANS
4 - ARCHITECTURAL
A0.01 SHEET SPECIFICATIONS
A0.02 SHEET SPECIFICATIONS
A0.03 SHEET SPECIFICATIONS
A1.02 MOUNTING HEIGHTS & TYP. CLEARANCES
A2.11 DEMO FLOOR PLAN LEVEL 1
A2.12 DEMO FLOOR PLAN LEVEL 2
A2.13 FLOOR PLAN LEVEL 1
A2.14 FLOOR PLAN LEVEL 2
A2.15 ROOF PLAN
A4.01 EXTERIOR ELEVATIONS
A4.02 EXTERIOR ELEVATIONS
A9.03 REFLECTED CEILING PLAN LEVEL 1
A12.01 SCHEDULES & DETAILS
ALASKAALASKA
PETERSBURG BOROUGHPETERSBURG BOROUGH
R10 ALASKAR10 ALASKA
TONGASS NATIONAL FORESTTONGASS NATIONAL FOREST
PETERSBURG DISTRICT OFFICEPETERSBURG DISTRICT OFFICE
United States Department of AgricultureUnited States Department of Agriculture Forest ServiceForest Service
VICINITY MAPVICINITY MAP
TRAVEL DIRECTIONS:
FOREST LOCATIONFOREST LOCATION
FOREST ENGINEER
RECOMMENDED BY:RECOMMENDED BY:
DISTRICT RANGER
FOREST SUPERVISOR
RO FACILITIES PROGRAM MANAGER
APPROVED:APPROVED:
DIRECTOR OF ENGINEERING DATE
DATE
DATE
DATE
DATE
SHEET 001 OF XXXSHEET 001 OF XXX
DIRECTOR OF RECREATION DATE
PETERSBURG OFFICE CONSOLIDATIONPETERSBURG OFFICE CONSOLIDATION
& WORK CENTER REPLACEMENT -& WORK CENTER REPLACEMENT -
HARRIS BUILDINGHARRIS BUILDING
FROM THE USFS PETERSBURG RANGER DISTRICT OFFICE, TRAVEL SOUTH ON S NORDIC DRIVE WHICH TURNS INTO THE MITKOF HIGHWAY FOR 3 MILES, TURN RIGHT WESTBOUND ON SCOW BAY LOOP ROAD, TURN RIGHT AT 123 SCOW BAY LOOP ROAD, PETERSBURG, ALASKA 99833. 56°46'46.2"N 132°58'02.6"W
DRAWING INDEX
connors Text Box
ABBREVIATIONS
ABV ABOVE
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ANO ANODIZED
ARCH ARCHITECTURAL
BD BOARD
BLDG BUILDING
BLK BLOCK
BLW BELOW
BO BOTTOM OF
BOF BOTTOM OF FINISH
BCS BABY CHANGING STATION
CIP CAST IN PLACE
CF CUBIC FOOT
CFOI CONTRACTOR FURNISHED OWNER INSTALLED
CL CENTERLINE
CONC CONCRETE
CONT CONTINUOUS
CTR CENTER
DIA DIAMETER
DIM DIMENSION
DWG DRAWING
EA EACH
EL ELEVATION
ELEC ELECTRICAL
EQ EQUAL
EQUIP EQUIPMENT
FAF FLUID APPLIED FLOORING
FD FRAME DIMENSION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISHED FLOOR
FO FACE OF
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOS FACE OF STUD
FRT FIRE RETARDANT TREATED
FT FOOT, FEET
FURR FURRING
GA GUAGE
GALV GALVANIZED
GB GRAB BAR
INCL INCLUDE, INCLUDED
INSUL INSULATION
INT INTERIOR
LSG LAMINATED SAFETY GLAZING
LH LEFT HAND
MAX MAXIMUM
MFR MANUFACTURER
MKBD MARKERBOARD
MIN MINIMUM
MIRR MIRROR
MTL METAL
NA NOT APPLICABLE
NIC NOT IN CONTRACT
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED CONTRACTOR INSTALLED
OFOI OWNER FURNISHED OWNER INSTALLED
OH OVERHEAD
PAR PARTITION
PERF PERFORATED
PLAM PRESSURE TREATED LAMINATE
PLY PLYWOOD
PTD PAPER TOWEL DISPENSER
PT PAINT
RCP REFLECTED CEILING PLAN
REBAR/RB REINFORCING BARS
REF REFERENCE
REQD REQUIRED
RO ROUGH OPENING
SD SOAP DISPENSER
SECT SECTION
SCHED SCHEDULE
SIM SIMILAR
SND SANITARY NAPKIN DISPOSAL
SPEC SPECIFICATION
SS STAINLESS STEEL
GWB GYPSUM WALL BOARD
GYP GYPSUM WALL BOARD
HD HAND DRYER
HDWR HARDWARE
HR HOUR
HT HEIGHT
ID INSIDE DIAMETER
STD STANDARD
STL STEEL
STRUCT STRUCTURAL
TBD TO BE DETERMINED
TDWR TOWEL DISPENSER/WASTE RECEPTICAL
THERM THERMOSTAT
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOS TOP OF STEEL
TTD TOILET TISSUE DISPENSER
TSCD TOILET SEAT COVER DISPENSER
TYP TYPICAL
UL UNDERWRITERS LABORATORY CERTIFIED
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VIF VERIFY IN FIELD
WD WOOD
SYMBOLS
GRID LINE INDICATION
ROOM IDENTIFICATION
ROOM NAME
ROOM NUMBER
AREA / OCCUPANCY
A
INTERIOR / EXTERIOR ELEVATION
DASH INDICATES NO ELEVATION
BUILDING SECTION
SECTION NUMBER
SECTION SHEET
DETAIL
DETAIL NUMBER
DETAIL SHEET
DOOR NUMBER
REFER TO DOOR SCHEDULE
JJ
WINDOW TYPE
REFER TO WINDOW SCHEDULE
A1
WALL TYPE INDICATOR
REFER TO WALL LEGEND
WORK POINT
(CONTROL or DATUM POINT)
WALL SECTION
SECTION NUMBER
SECTION SHEET
FLOOR, CEILING, ROOF TYPE INDICATOR
REFER TO FLOOR, CEILING, ROOF LEGENDF1
KEYNOTE
REFER TO NOTES LISTED ON SHEET1
XXXX -
XX
XX
XX
XX
XX
XX
OFFICE
4 OCC
CEILING TYPE
REFER TO ASSEMBLIES; ELEVATION NOTED ABOVE SLAB10'-0"
C3
MATERIALS
METAL (SECTION)
WOOD, CONTINUOUS (SECTION)
WOOD, BLOCKING (SECTION)
FILL (SECTION)
PLYWOOD (SECTION)
EARTH (SECTION)
FINISH CARPENTRY (SECTION)
GYPSUM BOARD (SECTION)
INSULATION, BATT (PLAN & SECTION)
INSULATION, RIGID (PLAN & SECTION)
CONCRETE (SECTION)
STONE (PLAN)
MINERAL WOOD INSULATION (PLAN & SECTION)
1.
2.
A.
B.
C.
D.
E.
3.
4.
5.
6.
7.
8.
9.
CONSTRUCTION TO BE IN COMPLIANCE WITH ALL FEDERAL,
STATE, AND LOCAL BUILDING CODES AND REGULATIONS.
EXISTING CONDITIONS:
CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS
PRIOR TO COMMENCEMENT OF WORK AND NOTIFY
CONTRACTING OFFICER OF ANY DISCREPANCIES WITH
CONDITIONS AS SHOWN IN DOCUMENTS.
ALL DIMENSIONS OF EXISTING CONSTRUCTION SHOWN
ON THE DRAWINGS ARE INTENDED AS GUIDELINES ONLY
AND MUST BE VERIFIED.
THE EXISTING CONDITIONS SHOWN ON THE DRAWINGS
ARE BASED ON EITHER LIMITED AS-BUILTS AND/OR
LIMITED ORIGINAL DRAWINGS. IF THE EXISTING
CONDITIONS DO NOT CLOSELY MATCH THE CONDITIONS
SHOWN ON THE DRAWINGS, OR IF THE EXISTING
MATERIALS ARE OF QUESTIONABLE OR SUBSTANDARD
QUALITY, NOTIFY THE CONTRACTING OFFICER PRIOR TO
COMMENCING WORK.
PROTECT ANY EXISTING CONSTRUCTION FROM DAMAGE
AT ALL TIMES DURING WORK.
SALVAGE ALL ITEMS THAT ARE TO BE REMOVED BUT
NOT REPURPOSED AND THAT ARE IN GOOD CONDITION
ARE TO BE PROTECTED AND DONATED.
ALL DIMENSIONS ARE TO GRIDLINE OR FACE OF STUD UNLESS
OTHERWISE NOTED. "CLR" REFERS TO FACE OF FINISH EACH
SIDE.
WORK AREAS TO BE LEFT CLEAN AND FREE OF ANY DEBRIS AT
THE END OF EACH SHIFT.
PROVIDE CONCEALED FRAMING WHERE HEIGHT EXCEEDS
LIMITING HEIGHT OF STUD SIZE.
PROVIDE BACKING AS REQUIRED FOR CASEWORK AND OTHER
ITEMS THAT ARE WALL SUPPORTED.
SEE MECHANICAL AND PLUMBING DRAWINGS FOR LOCATION
AND TYPE OF PLUMBING FIXTURES.
IN CASE OF A CONFLICT IN THE DOCUMENTS, THE
CONTRACTOR SHALL ASSUME THE GREATER VALUE OF SUCH
CIRCUMSTANCES.
DOORS ROUGH OPENING SHALL BE LOCATED 6" FROM
ADJACENT WALL FINISH UNLESS NOTED OTHERWISE.
GENERAL NOTES & EXISTING
CONDITIONS
ADA MOUNTING HEIGHTS
THERM
THERM-
OSTAT
LIGHT SWITCH
FEC
ELEC/TEL/DATA
OUTLET @ DOOR
MP
E/DT E/DT
ELEC/TEL/DATA
OUTLET @
WALL
LS
FIRE
EXTINGUISHER
CABINET
3'
7" 5'
0" 4'
6"
T O
F E
M O
U N
T
4'
0" M
AX
T
O H
D W
R
8"
AL
IG
N W
/ T .O
. D O
O R
T R
IM
U
.O .N
" M
IN
) 7
/2
3'
7" 1'
6" 3'
7"
1'
6"
NOTIFICATION OF POTENTIAL HAZARDS
ASBESTOS, LEAD, AND OTHER HAZARDOUS MATERIALS ARE PRESENT IN THE BUILDING
AND MAY IMPACT THE WORK OF ALL TRADES. REGULATED AIR CONTAMINANTS,
INCLUDING ASBESTOS AND LEAD, ARE ALSO PRESENT IN SETTLED AND CONCEALED
DUST IN AND ON ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND ELECTRICAL
COMPONENTS OR SYSTEMS THROUGHOUT THE BUILDING. ALL TRADES SHALL
COORDINATE WITH OTHER TRADES AND CONDUCT THEIR WORK TO PREVENT WORKER
EXPOSURE OR SITE CONTAMINATION. REFER TO SPECIFICATION DIVISIONS 0, 1, AND 2
FOR SPECIFIC INFORMATION CONCERNING DISTURBING, REMOVING, AND DISPOSING OF
THESE MATERIALS AND THE INSTALLATION OF THE NEW MATERIALS OR COMPONENTS.
THIS NOTIFICATION IS PROVIDED IN ACCORDANCE WITH EPA AND OSHA REQUIREMENTS.
PR
EL
IM
INA
RY
NO
T F
OR
CO
NS
TR
UC
TIO
N
N S
TR
EE
T, S
UI
TE
A N C
HO
RA
G E, A
LA
SK
A
7.
1.
E
CI
/H ye r, In c.
C
HE
C
KE
D
A
UT
HO
R:
PR
O
JE
C T N O
IS
SU
E D A
TE
RE
V
IS
IO
N
FULL SIZE PRINTED ON 22 x 34
O W N
ER
C O N
TR
A C T:
G1.01
G
EN
ER
A L
IN
FO
-0 6.
C W R
JM
S
.1 7.
PE
TE
RS
BU
RG
O
FF
IC
E C O N
SO
LI
DA
TIO
N
W O
RK
C
EN
TE
R
RE
PL
A C
EM
EN
T - H A
RR
IS
BU
IL
DI
N G
D
RA
FT
C O N
ST
RU
C
TIO
N D O C
UM
EN
TS
1/4" = 1'-0"
ADA MOUNTING HEIGHTS
NOTIFICATION OF POTENTIAL HAZARDS
ASBESTOS, LEAD, AND OTHER HAZARDOUS MATERIALS ARE PRESENT IN THE BUILDING
AND MAY IMPACT THE WORK OF ALL TRADES. REGULATED AIR CONTAMINANTS,
INCLUDING ASBESTOS AND LEAD, ARE ALSO PRESENT IN SETTLED AND CONCEALED
DUST IN AND ON ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND ELECTRICAL
COMPONENTS OR SYSTEMS THROUGHOUT THE BUILDING. ALL TRADES SHALL
COORDINATE WITH OTHER TRADES AND CONDUCT THEIR WORK TO PREVENT WORKER
EXPOSURE OR SITE CONTAMINATION. REFER TO SPECIFICATION DIVISIONS 0, 1, AND 2
FOR SPECIFIC INFORMATION CONCERNING DISTURBING, REMOVING, AND DISPOSING OF
THESE MATERIALS AND THE INSTALLATION OF THE NEW MATERIALS OR COMPONENTS.
THIS NOTIFICATION IS PROVIDED IN ACCORDANCE WITH EPA AND OSHA REQUIREMENTS.
PR
EL
IM
INA
RY
NO
T F
OR
CO
NS
TR
UC
TIO
N
N S
TR
EE
T, S
UI
TE
A N C
HO
RA
G E, A
LA
SK
A
7.
1.
E
CI
/H ye r, In c.
C
HE
C
KE
D
A
UT
HO
R:
PR
O
JE
C T N O
IS
SU
E D A
TE
RE
V
IS
IO
N
FULL SIZE PRINTED ON 22 x 34
O W N
ER
C O N
TR
A C T:
G1.02
C O
DE
A N A
LY
SI
S
-0 6.
C W R
JM
S
.1 7.
PE
TE
RS
BU
RG
O
FF
IC
E C O N
SO
LI
DA
TIO
N
W O
RK
C
EN
TE
R
RE
PL
A C
EM
EN
T - H A
RR
IS
BU
IL
DI
N G
D
RA
FT
C O N
ST
RU
C
TIO
N D O C
UM
EN
TS
AUTHORITY HAVING JURISDICTION: US FOREST SERVICE
PROJECT DESCRIPTION: THIS PROJECT IS TO CHANGE THE USE, ALTER,
AND REPAIR AN EXISTING TWO-STORY BUILDING SOUTH OF DOWNTOWN
PETERSBURG. THE BUILDING IS TYPE V-B AND UNSPRINKLERED WITH
NONSEPARATED OCCUPANCIES OF GROUPS B, F-1, AND S-1. LAST
PERMITTED AND CONSTRUCTED UNDER THE 2000 IBC IN 2004.
OWNER: U.S. FOREST SERVICE
PROPERTY LEGAL DESCRIPTION: STEVEN ERICKSON TRACT, LOT FRAG
GOV'T LOTS 1 & 9, SECTIONS 4 & 9, T59S, R79E, CRM
PROPERTY ADDRESS: 123 SCOW BAY LOOP RD, PETERSBURG, AK 99833
APPLICABLE CODES
PETERSBURG CITY CODE TITLE 19 - ZONING
2024 INTERNATIONAL BUILDING CODE
2024 INTERNATIONAL FIRE CODE
2024 INTERNATIONAL EXISTING BUILDING CODE
2024 INTERNATIONAL ENERGY CONSERVATION CODE
2024 INTERNATIONAL MECHANICAL CODE
MORE RESTRICTIVE OF 2024 INTERNATIONAL PLUMBING CODE &
2018 UNIFORM PLUMBING CODE
1968 ARCHITECTURAL BARRIERS ACT, 2017 ICC/ANSI A117.1, IBC
CHAPTER 11 FOR ACCESSIBILITY, 2010 ADA STANDARDS FOR
ACCESSIBLE DESIGN
2024 NFPA
CODE ANALYSIS
2021 INTERNATIONAL EXISTING BUILDING CODE
202 GENERAL DEFINITIONS:
REPAIR. THE RECONSTRUCTION, REPLACEMENT, OR RENEWAL OF
ANY PART OF AN EXISTING BUILDING FOR THE PURPOSE OF ITS
MAINTENANCE OR TO CORRECT DAMAGE.
THIS PROJECT CONSTITUES REPAIRS TO EXTERIOR ELEMENTS ON
BUILDING. BROKEN OR MISSING ELEMENTS ARE BEING REPLACED
OR RECONSTRUCTED IN KIND AND EXISTING ELEMENTS IN GOOD
CONDITION ARE BEING RENEWED.
ALTERATION. ANY CONSTRUCTION OR RENOVATION TO AN
EXISTING STRUCTURE OTHER THAN A REPAIR OR ADDITION.
PROJECT DOES NOT INCREASE FLOOR AREA, NUMBER OF
STORIES, OR HEIGHT OF BUILDING. PROJECT DOES PROPOSE
WORK WITHIN THE BUILDING THAT CONSTITUTES NEW
CONSTRUCTION.
301.2 REPAIRS:
REPAIRS SHALL COMPLY WITH REQUIREMENTS OF CHAPTER 4.
SEE DISCUSSION BELOW.
301.3 ALTERATION, ADDITION, OR CHANGE OF OCCUPANCY:
PROJECT USES METHOD DESCRIBED IN SECTION 301.3.1. SEE
DISCUSSION BELOW.
301.3.1 PRESCRIPTIVE COMPLIANCE METHOD:
BUILDING COMPLIES WITH 2021 IFC. SEE DISCUSSION BELOW.
306.2 DESIGN:
BUILDINGS AND FACILITIES SHALL BE DESIGNED AND
CONSTRUCTED TO BE ACCESSIBLE IN ACCORDANCE WITH THIS
CODE AND THE ALTERATION AND EXISTING BUILDING CONDITIONS
IN ICC A117.1, AS APPLICABLE. SEE DISCUSSION BELOW.
306.3 MAINTENANCE AND REPAIR:
PROJECT WILL MAINTAIN EXISTING ACCESSIBILITY TO BUILDING.
SEE DISCUSSION BELOW.
309.2 [EXTERIOR WALL COVERINGS] ADDITIONS AND REPLACEMENTS:
PROJECT INVOLVES REPAIRS OF EXTERIOR WALL ENVELOPE FOR
LESS THAN 15% OF ANY ONE SIDE OF THE BUILDING.NEW
MATERIALS WILL COMPLY WITH CHAPTERS 14 AND 26 OF THE IBC.
401.2 COMPLIANCE:
REPAIRS MAINTAIN THE EXISTING LEVEL OF SAFETY AND FIRE
PROTECTION.
503.1 [ALTERATIONS] GENERAL:
PROJECT DOES NOT PROPOSE ALTERATIONS THAT MAKE
EXISTING BUILDING LESS COMPLYING.
BUILDING AREA (IBC CODE)
AREA TYPE NAME GROSS AREA
LEVEL 1 INTERIOR FACTORY F-1 1748 SF
LEVEL 1 INTERIOR STORAGE S-1 4118 SF
LEVEL 1 INTERIOR ACCESSORY UTILITY 717 SF
LEVEL 1 INTERIOR BUSINESS 421 SF
LEVEL 1 INTERIOR STORAGE S-1 113 SF
LEVEL 1 INTERIOR STORAGE S-1 127 SF
LEVEL 1 EXTERIOR BUSINESS 54 SF
LEVEL 1 EXTERIOR BUSINESS 151 SF
LEVEL 1 EXTERIOR FACTORY F-1 13 SF
LEVEL 1 EXTERIOR STORAGE S-1 63 SF
100-L1-(39.2')-AFF 7525 SF
LEVEL 2 INTERIOR BUSINESS 3700 SF
LEVEL 2 INTERIOR ACCESSORY S-1 351 SF
LEVEL 2 INTERIOR ACCESSORY S-1 83 SF
LEVEL 2 EXTERIOR BUSINESS 42 SF
200-L2-AFF 4177 SF
Grand total 11703 SF
TITLE 19
19.44.020 [I-1 DISTRICT, INDUSTRIAL DISTRICT] PRINCIPAL USES
PERMITTED:
BUILDING CONTAINS OFFICES AND STORAGE FACILITIES, AS WELL
AS MANUFACTURING.
19.44.050 SCREENING OF STORAGE REQUIRED:
SEE SITE PLAN. STORAGE SCREENED FROM VIEW WITH HEDGE.
19.32.080 LOT, YARD, AND HEIGHT:
SEE BUILDING ELEVATIONS. BUILDING IS BELOW MAXIMUM HEIGHT.
19.64.010 PARKING AREAS - REQUIREMENTS ACCORDING TO USE:
BUILDING HAS APPRAISED VALUE OF $12,600. PROJECT COST
EXCEEDS 50% OF VALUE. BUILDING IS 11,650 SF AND REQUIRES 10
OFF-STREET PARKING SPACES. SITE PROVIDES 25 PARKING
SPACES.
19.64.040 DESIGN STANDARDS:
A. EACH PARKING SPACE SHALL CONTAIN NOT LESS THAN 8 FT
WIDE BY 20 FT LONG IN AREA EXCLUSIVE OF ACCESS AND
CIRCULATION AISLES. […] C. ANY LIGHTING OF PARKING LOTS
SHALL BE ARRANGED TO REFLECT AWAY FROM PUBLIC RIGHTS-
OF-WAY AND FROM ANY ADJOINING RESIDENTIAL AREA. SEE SITE
PLAN.
19.64.070 PARKING AREAS - ACCESS:
[…] NO DRIVEWAY, PARKING LOT OR CURB CUTS IN ANY DISTRICT
SHALL EXCEED […] FOURTY FEET IN WIDTH FOR COMMERCIAL […]
STRUCTURES, AND DETAILED PLANS FOR ALL CURB CUTS SHALL
BE SUBMITTED TO THE CITY ENGINEERING DEPARTMENT OR
DESIGNATED REPRESENTATIVE FOR APPROVAL BEFORE A PERMIT
SHALL BE ISSUED THEREFORE. SEE SITE PLAN.
19.64.080 LOADING AREAS - WHERE REQUIRED:
LOADING AREAS PROVIDED.
19.64.100 LOADING AREAS - ACCESS:
LOADING AREAS ACCESS STREET.
506.1 [CHANGE OF OCCUPANCY] COMPLIANCE:
PROJECT CHANGES OCCUPANCY OF BUILDING FROM B TO
NONSEPARATED B, F-1, S-1 CONSTITUTING A GREATER FIRE RISK
BUT NOT LIFE RISK. HOWEVER, THE BUILDING IS MADE TO COMPLY
WITH THE REQUIREMENTS OF THE IBC FOR THOSE OCCUPANCIES.
506.3 STAIRWAYS:
EXISTING STAIRS COMPLY WITH 2021 IBC REQUIREMENTS IN
SECTION 1011.
2021 INTERNATIONAL BUILDING CODE
202 DEFINITIONS:
AREA, BUILDING. THE AREA INCLUDED WITHIN SURROUNDING
EXTERIOR WALLS EXCLUSIVE OF VENT SHAFTS AND COURTS.
AREAS OF THE BUILDING NOT PROVIDED WITH SURROUNDING
WALLS SHALL BE INCLUDED IN THE BUILDING AREA IF SUCH AREAS
ARE INCLUDED WITHIN THE HORIZONTAL PROJECTION OF THE
ROOF OR FLOOR ABOVE.
FIRE AREA. THE AGGREGATE FLOOR AREA ENCLOSED AND
BOUNDED BY FIRE WALLS, FIRE BARRIERS, EXTERIOR WALLS, OR
HORIZONTAL ASSEMBLIES OF A BUILDING. AREAS OF THE
BUILDING NOT PROVIDED WITH SURROUNDING WALLS SHALL BE
INCLUDED IN THE FIRE AREA IF SUCH AREAS ARE INCLUDED
WITHIN THE HORIZONTAL PROJECTION OF THE ROOF OR FLOOR
NEXT ABOVE.
SEE DISCUSSION BELOW. FIRE AREA IS UNDER 12,000 SF AND
EXTERIOR AREAS NOT PROVIDED WITH SURROUNDING WALLS BUT
INCLUDED WITHIN HORIZONTAL PROJECTION OF ROOF ABOVE.
PRIVATE GARAGE. A BUILDING OR PORTION OF A BUILDING IN
WHICH MOTOR VEHICLES USED BY THE OWNER OR TENANTS OF
THE BUILDING […] ON THE PREMISES ARE STORED OR KEPT,
WITHOUT PROVISIONS FOR REPAIRING OR SERVICING SUCH
VEHICLES FOR PROFIT.
BUILDING INCLUDES PRIVATE GARAGE AREA FOR THE STORAGE
OF VEHICLES OWNED BY BUILDING OWNER AND REPAIRS OR
SERVICES ARE NOT CONDUCTED FOR PROFIT.
302.1 [OCCUPANCY CLASSIFICATION AND USE] GENERAL:
BUILDING CONTAINS GROUPS B, F-1, AND S-1 NONSEPARATED
OCCUPANCIES. SEE BUILDING AREA TABLE FOR OCCUPANCY
CLASSIFICATIONS.
304.1 BUSINESS GROUP B:
PORTION OF BUILDING USED FOR OFFICE PURPOSES.
311.2 MODERATE-HAZARD FACTORY INDUSTRIAL, GROUP F-1:
SHOP AREAS CONTAIN ACTIVITIES INCLUDING SERVICE OF BOAT
ENGINES, SMALL ENGINE REPAIR, WOOD CONSTRUCTION, AND
WELDING.
312.1 [UTILITY AND MISCELLANEOUS GROUP U] GENERAL:
BUILDING CONTAINS A PRIVATE GARAGE. THIS IS AN ACCESSORY
USE.
312.2 PRIVAGE GARAGES AND CARPORTS:
PRIVATE GARAGES […] SHALL COMPLY WITH SECTION 406.3. SEE
DISCUSSION BELOW.
406.2.2 [MOTOR-VEHICLE-RELATED OCCUPANCIES] CLEAR HEIGHT:
CEILING HEIGHT EXCEEDS 7 FT IN VEHICLE AREA.
406.2.4 FLOOR SURFACES:
FLOOR SURFACE IS CONCRETE AND IS EXISITING. NO SLOPING
COMPONENT OR FLOOR DRAIN IS PROPOSED. NO FLUIDS WORK
WILL OCCUR IN PRIVATE GARAGE.
406.3.1 CLASSIFICATION:
GARAGE HAS AN AREA OF 717 SF.
406.3.2 SEPARATION:
BUILDING DOES NOT CONTAIN DWELLING UNITS. SEE DISCUSSION
BELOW, BUT BUILDING HAS NONSEPARATED OCCUPANCIES.
502.1 ADDRESS IDENTIFICATION:
SEE ELEVATIONS FOR ADDRESS NUMBERS.
504.3 HEIGHT IN FEET:
SEE TABLE 504.3. BUILDING COMPLIES WITH TABLE ALLOWANCES.
SEE ELEVATIONS FOR BUILDING HEIGHT.
504.4 NUMBER OF STORIES:
SEE TABLE 504.4. BUILDING COMPLIES WITH TABLE ALLOWANCES.
506.2 ALLOWABLE AREA DETERMINATION:
SEE TABLE 506.2. BUILDING COMPLIES WITH TABLE ALLOWANCES.
SEE BUILDING AREA SUMMARY AND CODE PLANS FOR LEVEL
AREAS.
506.2.2 MIXED-OCCUPANCY BUILDINGS:
SEE TABULATION INCLUDED WITH TABLE 506.2. SEE DISCUSSION
BELOW.
TABLE 504.3: ALLOWABLE BLDG HEIGHT IN FT ABOVE GRADE PLANE
OCC CLASS SPRINKLER TYPE VALUE
B/S/F NS V-B 40
TABLE 504.4: ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLANE
OCC CLASS SPRINKLER TYPE VALUE
B NS V-B 2
S-1/F-1 NS V-B 1
TABLE 506.2: ALLOWABLE AREA FACTOR (At) IN SQUARE FEET
OCC CLASS SPRINKLER TYPE VALUE
B/S/F NS V-B 9,000
506.2.1: MAXIMUM ALLOWABLE AREA AA IN SQUARE FEET
AA = 15,750 SF PER STORY
At = 9,000
NS = 9,000
If = 0.75
506.3.1 [FRONTAGE INCREASE] MINIMUM PERCENTAGE OF PERIMETER:
BUILDING IS 75% SURROUNDED BY OPEN SPACE OR PUBLIC WAY
506.3.2 MINIMUM FRONTAGE DISTANCE:
BUILDING HAS THREE SIDES FACING AN OPEN SPACE AND PUBLIC
WAY THAT EXCEEDS THE MINIMUM DISTANCES FOR (W).
506.3.3 AMOUNT OF INCREASE:
PER TABLE 506.3.3, IF EQUALS 0.75.
508.2.1 [ACCESSORY] OCCUPANCY CLASSIFICATION:
BUILDING HAS A PRIVATE GARAGE WITH U OCCUPANCY ON LEVEL
1 AND STORAGE AREAS ON LEVEL 2 WITH S-1 OCCUPANCY.
508.2.2 ALLOWABLE BUILDING HEIGHT:
ALLOWABLE HEIGHT AND NUMBER OF STORIES FOR GROUPS S-1
AND B USED PER SECTION 504. MAIN OCCUPACY OF LEVEL 1 IS
GROUP S-1, LIMITED TO 1 STORY. MAIN OCCUPANCY OF LEVEL 2 IS
GROUP B, LIMITED TO 2 STORIES.
508.2.3 ALLOWABLE BUILDING AREA:
ALLOWABLE AREA FOR GROUP S-1 FOR LEVEL 1 AND B FOR LEVEL
2 USED PER SECTION 506. ACCESSORY OCCUPANCIES DO NOT
CONSTITUTE GREATER THAN 10% OF THE FLOOR AREA OF EACH
STORY AND DO NOT EXCEED VALUES IN TABLE 506.2 FOR
NONSPRINKLERED U OR S-1. LEVEL 1 HAS NONSEPARATED
OCCUPANCIES AND PRIVATE GARAGE IS CLASSIFIED AS S-1.
STORAGE ROOMS WITH S-1 OCCUPANCIES ON LEVEL 2 DO NOT
EXCEED 10% OF THE FLOOR AREA OF THAT FLOOR. PRIMARY
OCCUPANCY CLASSIFICATION OF STORY IS GROUP B.
508.2.4 SEPARATION OF OCCUPANCIES:
NO SEPARATION PROVIDED.
508.3.1 [NONSEPARATED OCCUPANCIES] OCCUPANCY CLASSIFICATION:
NO SEPARATE PROVIDED BETWEEN OCCUPANCIES. CODE
APPLIED TO EACH PORTION OF THE BUILDING EXCEPT THAT THE
MOST RESTRICTIVE PROVISIONS OF CHAPTER 9 APPLY TO THE
THE TOTAL AREA.
508.3.2 ALLOWABLE BUILDING AREA, HEIGHT, AND NUMBER OF STORIES:
SEE TABLES 504.3, 504.4, 506.2. AREA OF EACH STORY IS BELOW
THE MINIMUM AREA, HEIGHT, AND STORY NUMBER FOR THE MOST
RESTRICTIVE GROUP UNDER CONSIDERATION FOR THAT STORY.
TABLE 705.5: FIRE-RESISTANCE RATING REQUIREMENTS FOR EXTERIOR
WALLS BASED ON FIRE SEPARATION DISTANCE
FSD TYPE OF GROUP B/F-1/S-1
(FT) CONSTRUCTION
10≤X<30 V-B 0 HRS
X≥30 ALL 0 HRS
TABLE 601: FIRE-RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS (HOURS)
TYPE V-B:
PRIMARY STRUCTURAL FRAME: 0 HRS
BEARING WALLS:
EXTERIOR: 0 HRS
INTERIOR: 0 HRS
NONBEARING WALLS & PARTITIONS:
EXTERIOR: SEE TBL 705.5
INTERIOR: 0 HRS
FLOOR CONSTRUCTION, ETC: 0 HRS
ROOF CONSTRUCTION, ETC: 0 HRS
601 [TYPES OF CONSTRUCTION] GENERAL:
SEE TABLE 601. BUILDING IS TYPE V-B CONSTRUCTION. SEE
DISCUSSION BELOW.
602.5 TYPE V:
BUILDING IS CONSIDERED TYPE V-B CONSTRUCTION.
705.2 PROJECTIONS:
PROJECTIONS DO NOT EXTEND TO WITHIN 40 INCHES OF LINE
USED TO DETERMINE FSD.
705.2.2 TYPE III, IV, OR V CONSTRUCTION:
PROJECTIONS CONSTRUCTED FROM APPROVED MATERIALS.
705.8.1 ALLOWABLE AREA OF OPENINGS:
EXTERIOR WALLS WITH FSD BETWEEN 15 AND 20 FEET HAVE
UNPROTECTED OPENINGS THAT DO NOT MAKE UP GREATER THAN
25% OF THE WALL AREA. THOSE WALLS WITH GREATER THAN 30
FEET FSD HAVE UNLIMITED UNPROTECTED OPENING AREAS.
705.11 PARAPETS:
TABLE 705.5 ALLOWS ALL WALLS TO HAVE NO FIRE-RESISTANCE
RATING. NO PARAPET PROVIDED AT EXTERIOR WALLS.
708.5 EXTERIOR WALLS:
SEE TABLE 705.5. EXTERIOR WALLS OF BOILER ROOM HAVE
GREATER THAN 10 FT FSD SO REQUIRE 0 HR FIRE-RESISTANCE
RATING. EXTERIOR WALLS OF BOILER ROOM NOT RATED.
712.1.9 TWO-STORY OPENINGS:
VERTICAL OPENING IN SECOND STORY CONNECTS ONLY TWO
STORIES, THERE IS NO HORIZONTAL ASSEMBLY BETWEEN THE
STORIES, THE SPACE IS OPEN AND OCCUPIED AND SURROUNDED
BY COMPLETE WALL ASSEMBLIES, THE BUILDING DOES NOT
CONTAIN I OR R OCCUPANCIES, THE OPENING DOES NOT OPEN TO
A CORRIDOR, AND THE OPENING HAS SEPARATIONS TO SHAFT
ENCLOSURES.
803.13 INTERIOR FINISH REQUIREMENTS BASED ON OCCUPANCY:
SEE TABLE 803.13. ALL NEW FINISHES MEET FLAME SPREAD INDEX
REQUIREMENTS.
TABLE 803.13: INTERIOR WALL AND CEILING FINISH REQUIREMENTS BY
OCCUPANCY (NONSPRINKLERED)
GROUP: INT EXIT EXIT ACCESS ROOMS
STAIRS EXIT STAIRS/RAMPS
B & S B B C F B C C
U NR NR NR
804.4.2 [INTERIOR FLOOR FINISH] MINIMUM CRITICAL RADIANT FLUX:
ALL NEW INTERIOR FLOORS HAVE MINIMUM CRITICAL RADIANT
FLUX OF NOT LESS THAN CLASS II.
806.7 INTERIOR TRIM:
EXISTING INTERIOR TRIM THAT IS COMBUSTIBLE DOES NOT
EXCEED 10% OF WALL OR CEILING AREA. ALL NEW TRIM HAS
MINIMUM CLASS C FLAME SPREAD OR IS COMBUSTIBLE AND DOES
NOT EXCEED THE AREA LIMIT.
806.8 INTERIOR FLOOR-WALL BASE:
FLOORS REQUIRED TO BE CLASS II; FLOOR BASE IS LESS THAN 6"
IN HEIGHT AND IS CLASS II.
903.2.4 GROUP F-1:
NO AUTOMATIC SPRINKLER SYSTEM PROVIDED. BUILDING
CONTAINS F-1 OCCUPANCY BUT FIRE AREA OF BUILDING IS NOT
GREATER THAN 12,000 SF.
903.2.4.1 WOODWORKING OPERATIONS:
NO AUTOMATIC SPRINKLER SYSTEM PROVIDED. SHOP AREAS
INCLUDE WOODWORKING OPERATIONS BUT AREA DOES NOT
EXCEED 2,500 SF. MECHANICAL WOODWORKING EQUIPMENT
PROVIDED WITH CLOSED DUST COLLECTION SYSTEM.
903.2.9 GROUP S-1:
NO AUTOMATIC SPRINKLER SYSTEM PROVIDED. BUILDING
CONTAINS S-1 OCCUPANCY BUT FIRE AREA OF BUILDING IS NOT
GREATER THAN 12,000 SF.
906.1 [PORTABLE FIRE EXTINGUISHERS] WHERE REQUIRED:
PORTABLE FIRE EXTINGUISHERS SHALL BE INSTALLED IN THE
FOLLOWING LOCATIONS. 1. IN [GROUP B, F, AND S] OCCUPANCIES;
[…] 3. IN AREAS WHERE FLAMMABLE OR COMBUSTIBLE LIQUIDS
ARE STORED, USED OR DISPENSED; 4. ON EACH FLOOR OF
STRUCTURES UNDER CONSTRUCTION [...]; 6. SPECIAL-HAZARD
AREAS, INCLUDING BUT NOT LIMITED TO [...] WHERE REQUIRED BY
THE FIRE CODE OFFICIAL. SEE CODE PLANS.
[F] TABLE 906.3(1) FIRE EXTINGUISHERS FOR CLASS A FIRE HAZARDS:
LIGHT HAZARD (B) OCCUPANCY: 2-A PER 3,000 SF PER UNIT OF A,
11,250 SF PER EXTINGUISHER, 75 FT TRAVEL DISTANCE. ORDINARY
HAZARD (S-1, F-1) OCCUPANCY: 2-A PER 1,500 SF PER UNIT OF A,
11,250 SF PER EXTINGUISHER, 75 FT TRAVEL DISTANCE. SEE CODE
PLANS. BUILDING HAS EXTINGUISHERS PROVIDED THROUGHOUT.
1003.2 [GENERAL MEANS OF EGRESS] CEILING HEIGHT:
CEILING HAS PROTRUDING ELEMENTS THAT REDUCE HEADROOM.
SEE DISCUSSION BELOW.
1003.3.2 [PROTRUDING OBJECTS] HEADROOM:
SOME PROTRUDING OBJECTS EXTEND BELOW MINIMUM CEILING
HEIGHT. THESE DO NOT COMPRISE MORE THAN 50% OF CEILING
AREA AND PROVIDE A HEADROOM OF GREATER THAN 80".
BARRIER PROVIDED AT AREAS WHERE CIRCULATION PATH HAS A
CLEARANCE LESS THAN 80".
1003.3.3 HORIZONTAL PROJECTIONS:
OBJECTS BETWEEN 27" AND 80" ABOVE FINISHED FLOOR DO NOT
PROJECT GREATER THAN 4" INTO THE CIRCULATION PATH.
1003.3.4 CLEAR WIDTH:
PROTRUDING OBJECTS DO NOT REDUCE THE MINIMUM CLEAR
WIDTH OF ACCESSIBLE ROUTES.
1003.4 SLIP-RESISTANT SURFACE:
FLOORS IN CIRCULATION PATHS ARE NON-SLIP AND SECURELY
ATTACHED.
1004.2.1 [CUMULATIVE OCCUPANT LOADS] INTERVENING SPACES OR
ACCESSORY AREAS:
WHERE OCCUPANTS EGRESS FROM ONE OR MORE ROOMS,
AREAS, OR SPACES THROUGH OTHERS, THE DESIGN OCCUPANT
LOAD SHALL BE THE COMBINED OCCUPANT LOAD OF
INTERCONNECTED ACCESSORY OR INTERVENING SPACES.
DESIGN OF EGRESS PATH CAPACITY SHALL BE BASED ON THE
CUMULATIVE PORTION OF OCCUPANT LOADS OF ALL ROOMS,
AREAS, OR SPACES TO THAT POINT ALONG THE PATH OF EGRESS
TRAVEL. SEE CODE PLANS.
1004.5 AREAS WITHOUT FIXED SEATING:
SEE ROOM OCCUPANT LOAD TABLE.
OCCUPANT LOAD CALCULATION SUMMARY:
RM OCC AREA OCC AREA OCC
CLASSIFICATION (SF) LOAD FACTOR TYPE LOAD
BUSINESS: 421 150 GROSS 2.8
FACTORY: 1681 100 GROSS 16.8
WAREHOUSE STORAGE: 4358 500 GROSS 8.7
ACCESSORY GARAGE: 717 200 GROSS 3.6
MECH: 67 300 GROSS 0.2
EXTERIOR AREAS: 229 300 GROSS 0.8
LEVEL 1 TOTAL: 7473 32.9
BUSINESS: 3678 150 GROSS 24.5
MECH/STORAGE: 456 300 GROSS 1.5
EXTERIOR AREAS: 42 300 GROSS 0.1
LEVEL 2 TOTAL: 4176 26.1
BUILDING TOTAL: 59
1004.7 OUTDOOR AREAS:
BUILDINGS HAVE COVERED EXTERIOR AREAS ASSOCIATED WITH
THE BUILDING USE. THESE ARE FREE AND OPEN TO A PUBLIC
WAY.
1005.1 [MEANS OF EGRESS SIZING] GENERAL:
BUILDINGS ARE EXISTING AND EXISTING MEANS OF EGRESS WILL
BE MAINTAINED. EXISTING MEANS OF EGRESS COMPLY WITH
STANDARDS OF IBC.
1005.3.1 STAIRWAYS:
SEE CODE PLANS. EXISTING EXIT STAIRWAYS COMPLY WITH
STANDARD BUT ARE NOT MODIFIED WITH PROJECT.
1005.3.2 OTHER EGRESS COMPONENTS:
SEE CODE PLANS. EXISTING COMPONENTS OF EGRESS COMPLY
WITH STANDARD AND WILL NOT BE MODIFIED WITH PROJECT.
NEW COMPONENTS OF EGRESS WILL COMPLY WITH STANDARD.
1005.4 CONTINUITY:
EXISTING COMPONENTS OF EGRESS MEET STANDARDS FOR
CAPACITY. LEVEL OF PROTECTION IS NOT REDUCED BY WORK.
1005.5 DISTRIBUTION OF MINIMUM WIDTH AND REQUIRED CAPACITY:
STORIES OF BUILDING AND SPACES REQUIRE MORE THAN ONE
EXIT. LOSS OF ONE EXIT DOES NOT REDUCE THE AVAILABLE
CAPACITY TO LESS THAN 50% OF THE REQUIRED CAPACITY.
1005.7.1 [ENCROACHMENT] DOORS:
SEE CODE PLANS. DOORS WHEN FULLY OPENED DO NOT REDUCE
REQUIRED WIDTH BY MORE THAN 7".
1005.7.2 OTHER PROJECTIONS:
HANDRAILS PROJECT INTO REQUIRED WIDTH PER SECTION 1014.8.
1006 NUMBER OF EXITS AND EXIT ACCESS DOORWAYS:
BUILDING IS EXISTING. WORK DOES NOT REDUCE NUMBER OR
CAPACITY OF EXITS.
TABLE 1020.3: MINIMUM CORRIDOR WIDTH (IN)
ANY FACILITY NOT LISTED 44
MECH ACCESS 24
<50 OCC 36
1020.5 DEAD ENDS:
SEE ARCHITECTURAL DRAWINGS. CORRIDORS DO NOT HAVE
GREATER THAN 20 FT DEAD-ENDS.
1023.1 [INTERIOR EXIT STAIRWAYS AND RAMPS] GENERAL:
INTERIOR EXIT STAIR IS EXISTING AND NOT MODIFIED. STAIR MAY
MAINTAIN THE EXISTING LEVEL OF PROTECTION PER THE IEBC.
1027.3 [EXTERIOR EXIT STAIRWAYS AND RAMPS] OPEN SIDE:
BUILDING HAS EXISTING EXTERIOR EXIT STAIRWAY NOT ALTERED
WITH PROJECT. ALL WORK CONDUCTED TO THESE ELEMENTS
CONSTITUTES REPAIRS. ELEMENTS CONSIDERED CONFORMING
WITH 2000 IBC. EXISTING WIDTHS ACCOMMODATE REQUIRED
CAPACITIES.
1028.5 ACCESS TO A PUBLIC WAY:
SEE SITE PLAN. ALL EXITS DISCHARGE TO PUBLIC WAY.
1104.1 SITE ARRIVAL POINTS:
SEE SITE PLAN. ACCESSIBLE ROUTE PROVIDED FROM ACCESSIBLE
PARKING TO ACCESSIBLE BUILDING ENTRANCES. BUILDING IS
EXISTING AND HAS ACCESSIBLE ENTRANCE NOT BEING MODIFIED
IN PROJECT. MODIFIED ENTRANCES NOT REQUIRED TO BE
ACCESSIBLE. NEW ENTRANCE WILL BE ON ACCESSIBLE ROUTE.
1104.2 WITHIN A SITE:
SEE SITE PLAN. ACCESSIBLE ROUTE PROVIDED ON-SITE TO ALL
ACCESSIBLE FACILITIES, ELEMENTS, AND SPACES.
1104.3 CONNECTED SPACES:
SEE ARCHITECTURAL DRAWINGS. BUILDING HAS AN ACCESSIBLE
ROUTE TO ALL ACCESSIBLE SPACES. SEE DISCUSSION BELOW.
1104.4 MULTISTORY BUILDINGS AND FACILITIES:
EACH STORY HAS ACCESSIBLE SPACES AND AN ACCESSIBLE
ROUTE IS PROVIDED TO EACH STORY.
1104.5 LOCATION:
ACCESSIBLE ROUTE PROVIDED WITHIN BUILDING WITH EXISTING
ELEVATOR.
1105.1 [ACCESSIBLE ENTRANCES] PUBLIC ENTRANCES:
BUILDING IS NOT OPEN TO THE PUBLIC. MAIN ENTRANCE
COMPLIES WITH STANDARDS FOR ACCESSIBLE ENTRANCES.
1105.1.1 AUTOMATIC DOORS:
BUILDING OCCUPANT LOAD IS LESS THAN 500, THE NUMBER
REQUIRING AUTOMATIC DOOR OPERATION.
1105.1.4 RESTRICTED ENTRANCES:
ONE RESTRICTED ENTRANCE IS ACCESSIBLE.
1106.2 [PARKING AND PASSENGER LOADING FACILITIES] REQUIRED:
SEE SITE PLAN. PARKING AREA PROVIDES TWO ACCESSIBLE
PARKING SPACES.
1106.6 VAN SPACES:
SEE SITE PLAN. AT LEAST ONE VAN-ACCESSIBLE PARKING SPACE
PROVIDED.
1110.2 TOILET AND BATHING FACILITIES:
EACH FLOOR PROVIDED WITH ONE EXISTING ACCESSIBLE SINGLE-
USER TOILET ROOM PER GENDER. NO WORK PROPOSED IN TOILET
ROOMS.
2021 INTERNATIONAL PLUMBING CODE
TABLE 403.1 MINIMUM NUMBER OF REQUIRED FIXTURES:
EXISTING FACILITIES MEET REQUIREMENTS FOR 2021 IPC. NO
CHANGES REQUIRED. SEE TABLE 403.1.
1009.1 ACCESSIBLE MEANS OF EGRESS REQUIRED:
BUILDINGS HAVE ACCESSIBLE MEANS OF EGRESS PER THE 2000
IBC. NEW WORK DOES NOT REDUCE ACCESSIBLE MEANS OF
EGRESS.
1010.1.1 SIZE OF DOORS:
PROJECT PROPOSES REPAIRING AND REPLACING EGRESS
DOORS. ALL EGRESS DOORS ARE REPLACED IN-KIND WITH THE
SAME DIMENSIONS PER IEBC. PROJECT DOES NOT REDUCE THE
EXISTING LEVEL OF PROTECTION.
1010.2.2 HARDWARE:
SEE HARDWARE SCHEDULE. NEW DOORS OR EXISTING DOORS
MODIFIED AND REQUIRED TO BE ACCESSIBLE WILL HAVE
HARDWARE COMPLYING WITH THIS PROVISION.
1010.2.3 HARDWARE HEIGHT:
SEE DOOR SCHEDULE. BUILDING IS EXISTING AND AND EXISTING
HARDWARE WILL BE RETAINED WHERE NOT ALTERED. NEW
HARDWARE WILL COMPLY WITH THIS PROVISION.
1011 STAIRWAYS:
STAIRWAYS MAINTAIN EXISTING LEVELS OF PROTECTION PER
IEBC AND MEET CAPACITY REQUIREMENTS OF NEW USE.
1012 RAMPS:
NEW RAMPS COMPLY WITH SECTION 1012.
1014.2 [HANDRAILS] HEIGHT:
EXISTING HANDRAILS NOT MODIFIED BY WORK AND ALLOWED TO
REMAIN PER IEBC. NEW HANDRAILS COMPLY WITH THE
STANDARD.
1014.3 HANDRAIL GRASPABILITY:
EXISTING HANDRAILS NOT MODIFIED BY WORK AND ALLOWED TO
REMAIN PER IEBC. NEW HANDRAILS COMPLY WITH THE
STANDARD.
1014.4 HANDRAIL EXTENSIONS:
EXISTING HANDRAILS NOT MODIFIED BY WORK AND ALLOWED TO
REMAIN PER IEBC. NEW HANDRAILS COMPLY WITH THE
STANDARD.
1014.7 CLEARANCE:
EXISTING HANDRAILS NOT MODIFIED BY WORK AND ALLOWED TO
REMAIN PER IEBC. NEW HANDRAILS COMPLY WITH THE
STANDARD.
1016.2 EGRESS THROUGH INTERVENING SPACES:
SEE CODE PLANS. SOME EGRESS PATHS IN BUILDING PASS
THROUGH VESTIBULES OR ADJACENT ROOMS THAT ARE
ACCESSORY TO ONE OR THE OTHER.
1017.2 [EXIT ACCESS TRAVEL DISTANCE] LIMITATIONS:
SEE CODE PLANS FOR EXIT ACCESS TRAVEL DISTANCE.
1017.3 MEASUREMENT:
SEE CODE PLANS FOR EXIT ACCESS TRAVEL DISTANCE.
1018.5 AISLES IN OTHER THAN ASSEMBLY SPACES AND GROUPS B AND M:
SEE TABLE 1020.3 FOR CORRIDOR AND AISLE WIDTH
REQUIREMENTS.
1019.1 [EXIT ACCESS STAIRWAYS] GENERAL:
EXISTING INTERIOR AND EXTERIOR EXIT STAIR NOT MODIFIED BY
PROJECT. NEW EXTERIOR RAMP IS FULLY EXTERIOR TO BUILDING.
1019.3 OCCUPANCIES OTHER THAN GROUPS I-2 AND I-3:
EXISTING STAIRWAY CONNECTS ONLY TWO ADJACENT STORIES.
NO SHAFT ENCLOSURE PROVIDED PER EXCEPTION 1.
1020 CORRIDORS:
STANDARDS APPLY TO NEW CORRIDORS.
1020.2 [CORRIDORS] CONSTRUCTION:
NEW CORRIDORS PROVIDED WITH 0-HR FIRE-RESISTANCE RATING
PER TABLE AS CORRIDORS SERVE FEWER THAN 30 OCCUPANTS.
1020.3 WIDTH AND CAPACITY:
SEE ARCHITECTURAL DRAWINGS. NEW CORRIDORS HAVE WIDTHS
MEETING OR EXCEEDING MINIMUM WIDTH.
TABLE 1006.2.1: SPACES WITH ONE EXIT OR EXIT ACCESS DOORWAY
(NONSPRINKLERED)
GROUP: MAX OCC LOAD OCC MAX COMMON PATH OF
OF SPACE EGRESS TRAVEL DISTANCE (FT)
B 49 1-30 100
>30 75 F 49 1-30 75
>30 75 S 29 1-30 100
>30 75 U 49 1-30 75
>30 75
TABLE 403.1: MIN NUMBER OF REQUIRED PLUMBING FIXTURES
GROUP: OCC WC WC U U LAV LAV DF DF
REQ'D M/W ALLOWED M REQ'D M/W REQ'D
LEVEL 1: 33
B 3 1 PER 25 < 50 0.1/0.1 2/3RD MAX 0.0 1 PER 40 <80 0.0/0.0 1 PER 100 0.0
F-1 16 1 PER 100 0.1/0.1 2/3RD MAX 0.1 1 PER 100 0.1/0.1 1 PER 400 0.0
S-1 14 1 PER 100 0.1/0.1 2/3RD MAX 0.1 1 PER 100 0.1/0.1 1 PER 1000 0.0
LEVEL 1 TOTAL: 0.3/0.3 0.2 0.2/0.2 0.0
LEVEL 2: 26
B 26 1 PER 25 < 50 0.5/0.5 2/3RD MAX 0.4 1 PER 40 <80 0.3/0.3 1 PER 100 0.3
LEVEL 2 TOTAL: 0.5/0.5 0.3 0.3/0.3 0.3
LEVEL 1 TOTALS PROVIDED: 1/1 0 1/1 2
LEVEL 2 TOTALS PROVIDED: 1/1 0 1/1 2
OTHER: 1 SERVICE SINK REQUIRED
2021 UNIFORM PLUMBING CODE
TABLE 422.1 MINIMUM PLUMBING FIXTURES:
BUILDING DOES NOT CHANGE OCCCUPANCY OR MAKE CHANGES
TO NUMBER OF TOILET ROOMS PROVIDED. 2021 IPC TABLE 403.1 IS
THE MORE RESTRICTIVE CODE BUT EXISTING FACILITIES MEET
REQUIREMENTS.
UP
DN
DN
DN
1 1
A B C D E F G H J
'-6
132'-0"
'-5
'-2
'-5
5'
-0
7' -6
7' -6
'-6
'-0
'-0
'-6
'-0
21'-8" 21'-8" 21'-8" 16'-6" 9'-6" 9'-0" 16'-0" 16'-0"
SHOP
101A
17 OCC
STORAGE
1 OCC
MUD ROOM
3 OCC
COMPUTER
107A
STAIR
110 HERITAGE SECURE
ROOM
STORAGE
3 OCC
STORAGE
4 OCC
MUD ROOM
101C
1 OCC
JAN
WOMEN
MEN
MECH
1748 SF
FACTORY F-1
54 SF
BUSINESS
151 SF
BUSINESS
13 SF
FACTORY F-1
4118 SF
STORAGE S-1
VEST
101B
GARAGE
4 OCC
717 SF
ACCESSORY UTILITY 19 8.
5"
4 0.
8"
3 0.
6"
3.4
13 OCC
13 OCC
63 SF
STORAGE S-1
421 SF
BUSINESS
CAGE 1
101A.1
CAGE 2
101A.2
CAGE 3
101A.3
FIRE CACHE
0.6"
113 SF
STORAGE S-1
127 SF
STORAGE S-1
8' -0
P.L.P.L.
DISTANCE TO
PROPERTY LINE
OPEN COVERED UNOCCUPIED STORAGE STRUCTURE
'-3
*2-A
*2-A
*2-A
*2-A
1 1
A B C D E F G H J
'-6
132'-0"
'-5
'-2
'-5
5'
-0
7' -6
7' -6
'-6
'-0
'-0
'-6
'-0
21'-8" 21'-8" 21'-8" 16'-6" 9'-6" 9'-0" 16'-0" 16'-0"
MECH
MEN
BREAK
2 OCC
WOMEN
GEN OFFICE
16 OCC
STAIR
OFFICE
1 OCC
LEO STORAGE
GEN OFFICE
2 OCC
GEN OFFICE
1 OCC
3700 SF
BUSINESS
42 SF
BUSINESS
DISPATCH
2 OCC
13 2.
6"
13 2.
6"
351 SF
ACCESSORY S-1
83 SF
ACCESSORY S-1
CAGE
206C
CODE LEGEND
EXIT
GROUP B
COMMON PATH OF EGRESS
EXIT ACCESS TRAVEL DISTANCE
BEYOND COMMON PATH
F.E.*255
68.4"
OCC
REQ'D CAPACITY 2-A
GROUP
S-1
GROUP
F-1
ACCESSORY
U
ACCESSORY
S-1
1/16" = 1'-0"1 LEVEL 1 CODE PLAN
1/16" = 1'-0"2 LEVEL 2 CODE PLAN
NOTIFICATION OF POTENTIAL HAZARDS
ASBESTOS, LEAD, AND OTHER HAZARDOUS MATERIALS ARE PRESENT IN THE BUILDING
AND MAY IMPACT THE WORK OF ALL TRADES. REGULATED AIR CONTAMINANTS,
INCLUDING ASBESTOS AND LEAD, ARE ALSO PRESENT IN SETTLED AND CONCEALED
DUST IN AND ON ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND ELECTRICAL
COMPONENTS OR SYSTEMS THROUGHOUT THE BUILDING. ALL TRADES SHALL
COORDINATE WITH OTHER TRADES AND CONDUCT THEIR WORK TO PREVENT WORKER
EXPOSURE OR SITE CONTAMINATION. REFER TO SPECIFICATION DIVISIONS 0, 1, AND 2
FOR SPECIFIC INFORMATION CONCERNING DISTURBING, REMOVING, AND DISPOSING OF
THESE MATERIALS AND THE INSTALLATION OF THE NEW MATERIALS OR COMPONENTS.
THIS NOTIFICATION IS PROVIDED IN ACCORDANCE WITH EPA AND OSHA REQUIREMENTS.
PR
EL
IM
INA
RY
NO
T F
OR
CO
NS
TR
UC
TIO
N
N S
TR
EE
T, S
UI
TE
A N C
HO
RA
G E, A
LA
SK
A
7.
1.
E
CI
/H ye r, In c.
C
HE
C
KE
D
A
UT
HO
R:
PR
O
JE
C T N O
IS
SU
E D A
TE
RE
V
IS
IO
N
FULL SIZE PRINTED ON 22 x 34
O W N
ER
C O N
TR
A C T:
G1.03
C O
DE
P
LA
N S
-0 6.
C W R
JM
S
.1 7.
PE
TE
RS
BU
RG
O
FF
IC
E C O N
SO
LI
DA
TIO
N
W O
RK
C
EN
TE
R
RE
PL
A C
EM
EN
T - H A
RR
IS
BU
IL
DI
N G
D
RA
FT
C O N
ST
RU
C
TIO
N D O C
UM
EN
TS
AND MAY IMPACT THE WORK OF ALL TRADES. REGULATED AIR CONTAMINANTS,
INCLUDING ASBESTOS AND LEAD, ARE ALSO PRESENT IN SETTLED AND CONCEALED
DUST IN AND ON ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND ELECTRICAL
COMPONENTS OR SYSTEMS THROUGHOUT THE BUILDING. ALL TRADES SHALL
COORDINATE WITH OTHER TRADES AND CONDUCT THEIR WORK TO PREVENT WORKER
EXPOSURE OR SITE CONTAMINATION. REFER TO SPECIFICATION DIVISIONS 0, 1, AND 2
FOR SPECIFIC INFORMATION CONCERNING DISTURBING, REMOVING, AND DISPOSING OF
THESE MATERIALS AND THE INSTALLATION OF THE NEW MATERIALS OR COMPONENTS.
THIS NOTIFICATION IS PROVIDED IN ACCORDANCE WITH EPA AND OSHA REQUIREMENTS.
PR
EL
IM
INA
RY
NO
T F
OR
CO
NS
TR
UC
TIO
N
N S
TR
EE
T, S
UI
TE
A N C
HO
RA
G E, A
LA
SK
A
7.
1.
E
CI
/H ye r, In c.
C
HE
C
KE
D
A
UT
HO
R:
PR
O
JE
C T N O
IS
SU
E D A
TE
RE
V
IS
IO
N
FULL SIZE PRINTED ON 22 x 34
O W N
ER
C O N
TR
A C T:
A0.01
SH
EE
T S
PE
C
IF
IC
A
TIO
N S
-0 6.
C W R
JM
S
.1 7.
PE
TE
RS
BU
RG
O
FF
IC
E C O N
SO
LI
DA
TIO
N
W O
RK
C
EN
TE
R
RE
PL
A C
EM
EN
T - H A
RR
IS
BU
IL
DI
N G
D
RA
FT
C O N
ST
RU
C
TIO
N D O C
UM
EN
TS
SPECIFICATIONS
TABLE OF CONTENTS
SECTION 01 07 32.9 - CUTTING AND PATCHING
SECTION 01 30 00 - ADMINISTRATIVE REQUIREMENTS
SECTION 01 32 16 - CONSTRUCTION PROGRESS SCHEDULE
SECTION 01 35 45 - AIRBORNE CONTAMINANT CONTROL
SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS
SECTION 01 57 19 - TEMPORARY ENVIRONMENTAL CONTROLS
SECTION 01 60 00 - PRODUCT REQUIREMENTS
SECTION 01 61 16 - VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
SECTION 01 70 00 - EXECUTION AND CLOSEOUT REQUIREMENTS
SECTION 01 74 19 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
SECTION 01 78 00 - CLOSEOUT SUBMITTALS
SECTION 01 79 00 - DEMONSTRATION AND TRAINING
SECTION 02 41 00 - DEMOLITION
SECTION 03 30 00 - CAST-IN-PLACE CONCRETE (SEE CIVIL AND STRUCTURAL) - INCLUDED IN
CONSTRUCTION DOCUMENTS
SECTION 06 10 53 - MISCELLANEOUS ROUGH CARPENTRY - INCLUDED IN CONSTRUCTION
DOCUMENTS
SECTION 06 10 63 - EXTERIOR ROUGH CARPENTRY - INCLUDED IN CONSTRUCTION DOCUMENTS
SECTION 06 16 36 - WOOD PANEL PRODUCT SHEATHING - INCLUDED IN CONSTRUCTION
DOCUMENTS
SECTION 06 41 00 - ARCHITECTURAL WOOD CASEWORK - INCLUDED IN CONSTRUCTION
DOCUMENTS
SECTION 06 46 00 - WOOD TRIM - INCLUDED IN CONSTRUCTION DOCUMENTS
SECTION 07 46 16 - ALUMINUM SIDING - INCLUDED IN CONSTRUCTION DOCUMENTS
SECTION 07 60 00 - FLASHING AND SHEET METAL - INCLUDED IN CONSTRUCTION DOCUMENTS
SECTION 07 61 13 - STANDING SEAM SHEET METAL ROOFING - INCLUDED IN CONSTRUCTION
DOCUMENTS
SECTION 07 65 00 - SELF-ADHERING SHEET FLASHING - INCLUDED IN CONSTRUCTION DOCUMENTS SECTION 07 71 23 - MANUFACTURED GUTTERS AND DOWNSPOUTS - INCLUDED IN CONSTRUCTION
DOCUMENTS
SECTION 08 13 13 - HOLLOW METAL DOORS - INCLUDED IN CONSTRUCTION DOCUMENTS
SECTION 08 33 23 - OVERHEAD COILING DOORS - INCLUDED IN CONSTRUCTION DOCUMENTS
SECTION 08 71 00 - DOOR HARDWARE
SECTION 08 84 00 - PLASTIC GLAZING - INCLUDED IN CONSTRUCTION DOCUMENTS
SECTION 09 29 00 - GYPSUM BOARD - INCLUDED IN CONSTRUCTION DOCUMENTS
SECTION 09 65 13 - RESILIENT BASE AND ACCESSORIES - INCLUDED IN CONSTRUCTION DOCUMENTS
SECTION 09 65 16 - RESILIENT SHEET FLOORING - INCLUDED IN CONSTRUCTION DOCUMENTS
SECTION 09 67 13 - ELASTOMERIC LIQUID FLOORING - INCLUDED IN CONSTRUCTION DOCUMENTS
SECTION 09 77 00 - FIBERGLASS REINFORCED WALL PANELS - INCLUDED IN CONSTRUCTION
DOCUMENTS
SECTION 09 90 00 - PAINTING - INCLUDED IN CONSTRUCTION DOCUMENTS
SECTION 09 96 53 - ELASTOMERIC COATINGS - INCLUDED IN CONSTRUCTION DOCUMENTS
SECTION 10 44 13 - FIRE PROTECTION CABINETS - INCLUDED IN CONSTRUCTION DOCUMENTS
SECTION 10 44 16 - FIRE EXTINGUISHERS - INCLUDED IN CONSTRUCTION DOCUMENTS
SECTION 10 51 13 - METAL LOCKERS
SECTION 10 56 13 - METAL STORAGE SHELVING - INCLUDED IN CONSTRUCTION DOCUMENTS
SECTION 11 30 13 - RESIDENTIAL APPLIANCES - INCLUDED IN CONSTRUCTION DOCUMENTS
SECTION 22 10 00 - PLUMBING PIPING (SEE MECHANICAL)
SECTION 23 00 00 - HVAC (SEE MECHANICAL) - INCLUDED IN CONSTRUCTION DOCUMENTS
SECTION 26 00 00 - ELECTRICAL (SEE ELECTRICAL) - INCLUDED IN CONSTRUCTION DOCUMENTS
A.
B.
A.
B.
A.
B.
A.
B.
C.
A.
1.
2.
3.
B.
1.
2.
3.
4.
5.
SECTION 01 07 32.9 - CUTTING AND PATCHING
PART 1 - GENERAL
1.1 SUBMITTALS
SUBMIT A PROPOSAL DESCRIBING PROCEDURES AT LEAST 10 DAYS BEFORE
THE TIME CUTTING AND PATCHING WILL BE PERFORMED, REQUESTING
APPROVAL TO PROCEED. INCLUDE EXTENTS, CHANGES TO IN-PLACE
CONSTRUCTION, PRODUCTS USED, DATES, UTLITY SERVICES &
MECHANICAL/ELECTRICAL SYSTEMS, STRUCTURAL ELEMENTS INVOLVED.
APPROVAL FROM CONTRACTING OFFICER REQUIRED TO PROCEED.
1.2 QUALITY ASSURANCE
DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT
COULD CHANGE THEIR LOAD-CARRYING CAPACITY OR LOAD-DEFLECTION
RATIO.
DO NOT CUT AND PATCH CONSTRUCTION IN A MANNER THAT RESULTS IN
VISUAL EVIDENCE OF CUTTING AND PATCHING. DO NOT CUT AND PATCH
CONSTRUCTION EXPOSED ON THE EXTERIOR OR IN OCCUPIED SPACES IN A
MANNER THAT WOULD, IN ARCHITECT'S/ENGINEER ’S OPINION, REDUCE THE
BUILDING'S AESTHETIC QUALITIES. REMOVE AND REPLACE CONSTRUCTION
THAT HAS BEEN CUT AND PATCHED IN A VISUALLY UNSATISFACTORY
MANNER.
PART 2 - PRODUCTS
2.1 MATERIALS
COMPLY WITH REQUIREMENTS SPECIFIED IN OTHER SECTIONS.
USE MATERIALS IDENTICAL TO IN-PLACE MATERIALS. FOR EXPOSED
SURFACES, USE MATERIALS THAT VISUALLY MATCH IN-PLACE ADJACENT
SURFACES TO THE FULLEST EXTENT POSSIBLE.
PART 3 - EXECUTION
3.1 PREPARATION
PROVIDE TEMPORARY SUPPORT OF WORK TO BE CUT.
PROTECT IN-PLACE CONSTRUCTION DURING CUTTING AND PATCHING TO
PREVENT DAMAGE. PROVIDE PROTECTION FROM ADVERSE WEATHER
CONDITIONS FOR PORTIONS OF PROJECT THAT MIGHT BE EXPOSED DURING
CUTTING AND PATCHING OPERATIONS.
WHERE EXISTING SERVICES/SYSTEMS ARE REQUIRED TO BE REMOVED,
RELOCATED, OR ABANDONED, BYPASS SUCH SERVICES/SYSTEMS BEFORE
CUTTING TO PREVENT INTERRUPTION TO OCCUPIED AREAS.
3.2 PERFORMANCE
CUTTING:
CUT IN-PLACE CONSTRUCTION BY SAWING, DRILLING, BREAKING,
CHIPPING, GRINDING, AND SIMILAR OPERATIONS, INCLUDING
EXCAVATION, USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS
RETAINED OR ADJOINING CONSTRUCTION. IF POSSIBLE, REVIEW
PROPOSED PROCEDURES WITH ORIGINAL INSTALLER; COMPLY WITH
ORIGINAL INSTALLER'S WRITTEN RECOMMENDATIONS.
IN GENERAL, USE HAND OR SMALL POWER TOOLS DESIGNED FOR
SAWING AND GRINDING, NOT HAMMERING AND CHOPPING. CUT
HOLES AND SLOTS AS SMALL AS POSSIBLE, NEATLY TO SIZE
REQUIRED, AND WITH MINIMUM DISTURBANCE OF ADJACENT
SURFACES. TEMPORARILY COVER OPENINGS WHEN NOT IN USE.
CUT OFF PIPE OR CONDUIT IN WALLS OR PARTITIONS TO BE
REMOVED. CAP, VALVE, OR PLUG AND SEAL REMAINING PORTION OF
PIPE OR CONDUIT TO PREVENT ENTRANCE OF MOISTURE OR OTHER
FOREIGN MATTER AFTER CUTTING.
PATCHING:
PATCH CONSTRUCTION BY FILLING, REPAIRING, REFINISHING,
CLOSING UP, AND SIMILAR OPERATIONS FOLLOWING PERFORMANCE
OF OTHER WORK. PATCH WITH DURABLE SEAMS THAT ARE AS
INVISIBLE AS POSSIBLE. PROVIDE MATERIALS AND COMPLY WITH
INSTALLATION REQUIREMENTS SPECIFIED IN OTHER SECTIONS.
RESTORE EXPOSED FINISHES OF PATCHED AREAS AND EXTEND
FINISH RESTORATION INTO RETAINED ADJOINING CONSTRUCTION IN
A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND
REFINISHING.
WHERE WALLS OR PARTITIONS THAT ARE REMOVED EXTEND ONE
FINISHED AREA INTO ANOTHER, PATCH AND REPAIR FLOOR AND
WALL SURFACES IN THE NEW SPACE. PROVIDE AN EVEN SURFACE
OF UNIFORM FINISH, COLOR, TEXTURE, AND APPEARANCE. REMOVE
IN-PLACE FLOOR AND WALL COVERINGS AND REPLACE WITH NEW
MATERIALS, IF NECESSARY, TO ACHIEVE UNIFORM COLOR AND
APPEARANCE.
PATCH, REPAIR, OR RE-HANG IN-PLACE CEILINGS AS NECESSARY TO
PROVIDE AN EVEN- PLANE SURFACE OF UNIFORM APPEARANCE.
PATCH COMPONENTS IN A MANNER THAT RESTORES ENCLOSURE TO
A WEATHER-TIGHT CONDITION.
A.
B.
C.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
A.
B.
C.
A.
B.
A.
B.
A.
B.
A.
A.
1.
B.
1.
C.
1.
2.
3.
a.
b.
c.
d.
e.
4.
5.
SECTION 01 30 00 - ADMINISTRATIVE REQUIREMENTS
PART 1 - GENERAL
1.1 GENERAL EDMINISTRATIVE REQUIREMENTS
COMPLY WITH REQUIREMENTS OF SECTION 01 70 00 - EXECUTION AND
CLOSEOUT REQUIREMENTS FOR COORDINATION OF EXECUTION OF
ADMINISTRATIVE TASKS WITH TIMING OF CONSTRUCTION ACTIVITIES.
COMPLY WITH REQUIREMENTS OF THE CONTRACT DOCUMENTS.
MAKE THE FOLLOWING TYPES OF SUBMITTALS TO OWNER'S
REPRESENTATIVE:
REQUESTS FOR INTERPRETATION (RFI).
REQUESTS FOR SUBSTITUTION.
SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
TEST AND INSPECTION REPORTS.
DESIGN DATA.
MANUFACTURER'S INSTRUCTIONS AND FIELD REPORTS.
APPLICATIONS FOR PAYMENT AND CHANGE ORDER REQUESTS.
PROGRESS SCHEDULES.
COORDINATION DRAWINGS.
CORRECTION PUNCH LIST AND FINAL CORRECTION PUNCH LIST FOR
SUBSTANTIAL COMPLETION.
CLOSEOUT SUBMITTALS.
PART 2 - NOT USED
PART 3 - EXECUTION
3.1 ELECTRONIC DOCUMENT SUBMITTALS
ALL DOCUMENTS TRANSMITTED FOR PURPOSES OF ADMINISTRATION OF
THE CONTRACT ARE TO BE IN ELECTRONIC (PDF) FORMAT SENT VIA EMAIL
OR UPLOADED TO FILE SERVER.
COST: THE COST OF THE SERVICE IS TO BE PAID BY CONTRACTOR; INCLUDE
THE COST OF THE SERVICE IN THE CONTRACT SUM.
PROJECT CLOSEOUT: CONTRACTING OFFICER WILL DETERMINE WHEN TO
TERMINATE THE SERVICE FOR THE PROJECT AND IS RESPONSIBLE FOR
OBTAINING ARCHIVE COPIES OF FILES FOR OWNER.
3.2 PRECONSTRUCTION MEETING
OWNER'S REPRESENTATIVE WILL SCHEDULE MEETING AFTER NOTICE OF
AWARD.
CONTRACTOR WILL RECORD MINUTES AND DISTRIBUTE COPIES WITHIN FIVE
DAYS AFTER MEETING TO PARTICIPANTS, WITH COPIES TO OWNER,
CONTRACTING O, CONTRACTOR, PARTICIPANTS, AND THOSE AFFECTED
3.3 PROGRESS MEETINGS
CONTRACTOR WILL SCHEDULE AND ADMINISTER MEETINGS THROUGHOUT
PROGRESS OF THE WORK AT MAXIMUM WEEKLY INTERVALS.
CONTRACTOR WILL RECORD MINUTES AND DISTRIBUTE COPIES WITHIN FIVE
DAYS AFTER MEETING TO PARTICIPANTS, WITH COPIES TO PARTICIPANTS,
AND THOSE AFFECTED BY DECISIONS MADE.
3.4 CONSTRUCTION REPORTS
PREPARE A DAILY CONSTRUCTION REPORT ("DAILY REPORTS") RECORDING
THE FOLLOWING INFORMATION CONCERNING EVENTS AT PROJECT SITE AND
PROJECT PROGRESS: DATE, PICTURES, SUBCONTRACTORS ON SITE,
APPROX. COUNT OF PERSONNEL, MAJOR EQUIPMENT, MATERIAL
DELIVERIES, SAFETY, ENVIRONMENTAL, OR INDUSTRIAL INCIDENTS;
MEETINGS, VISITORS, UNUSUAL EVENTS, STOPPAGES OR DELAYS,
EMERGENCY PROCEDURES, CHANGE ORDERS, TESTING OR INSPECTIONS
PERFORMED, ANTICIPATED RFI OR CHANGE ORDER CONCERNS, SIGNATURE
OF CONTRACTOR'S AUTHORIZED REPRESENTATIVE.
POST DAILY LOGS TO THE ELECTRONIC DOCUMENT SITE WITHIN TWO DAYS
3.5 REQUESTS FOR INTERPRETATION (RFI)
THE CONTRACTOR IS REQUIRED TO PREPARE AN RFI IMMEDIATELY UPON
DISCOVERY OF A NEED FOR INTERPRETATION OF THE CONTRACT
DOCUMENTS. FAILURE TO SUBMIT A RFI IN A TIMELY MANNER IS NOT A
LEGITIMATE CAUSE FOR CLAIMING ADDITIONAL COSTS OR DELAYS IN
EXECUTION OF THE WORK.
3.6 SUBMITTALS
SCHEDULE
SUBMIT TO CONTRACTING OFFICER FOR REVIEW A SCHEDULE FOR
SUBMITTALS IN TABULAR FORMAT.
SUBMITTALS FOR REVIEW - GENERAL
WHEN PRODUCTS OR FABRICATIONS ARE SPECIFIED OR IDENTIFIED
IN DRAWING, SUBMIT THE FOLLOWING FOR REVIEW, AS REQUESTED
FOR PRODUCT: PRODUCT DATA, SHOP DRAWINGS, SAMPLES,
MANUFACTURER'S INSTRUCTIONS, WARRANTY INFORMATION, TEST
REPORTS AND CERTIFICATES
SUBMITTALS FOR PROJECT CLOSEOUT
AT LEAST THREE DAYS PRIOR TO SCHEDULED DEADLINE FOR
SUBSTANTIAL COMPLETION, SUBMIT CONTRACTOR'S CORRECTION
PUNCH LIST FOR SUBSTANTIAL COMPLETION.
AT LEAST THREE DAYS PRIOR TO SCHEDULED FINAL INSPECTION,
SUBMIT FINAL CORRECTION PUNCH LIST INDICATING HOW AND WHEN
ALL PUNCH LIST ITEMS HAVE BEEN ADDRESSED, WITH EACH ITEM
SIGNED OFF BY THE RESPONSIBLE SUBCONTRACTOR'S FOREMAN
AND GENERAL CONTRACTOR'S SUPERINTENDENT.
FOR EACH SPECIFICATION, AS APPLICABLE, SUBMIT AT PROJECT
CLOSEOUT:
PROJECT RECORD DOCUMENTS.
OPERATION AND MAINTENANCE DATA.
WARRANTIES.
BONDS.
OTHER TYPES AS INDICATED.
CONTRACTING OFFICER TO HAVE A MINIMUM OF 10 WORKING DAYS
TO REVIEW EACH SUBMITTAL.
RESUBMITTALS SHALL BE COMPLETE AND INCLUDE ALL PREVIOUS
MARKUPS OR CLEARLY IDENTIFY ANY NEW OR REPLACED
INFORMATION TO BE REVIEWED.
A.
B.
C.
SECTION 01 32 16 - CONSTRUCTION PROGRESS SCHEDULE
PART 1 - GENERAL
1.1 SUBMITTALS
WITHIN 10 DAYS AFTER DATE OF AGREEMENT, SUBMIT PRELIMINARY SCHEDULE
DEFINING PLANNED OPERATIONS FOR THE FIRST 30 DAYS OF WORK, WITH A
GENERAL OUTLINE FOR REMAINDER OF WORK .
WITHIN 10 DAYS AFTER JOINT REVIEW, SUBMIT COMPLETE SCHEDULE.
SUBMIT UPDATED SCHEDULE WITH EACH APPLICATION FOR PAYMENT.PART 2 - NOT
USED
A.
A.
B.
SECTION 01 35 45 - AIRBORNE CONTAINMENT CONTROL
PART 1 - GENERAL
1.1 DEFINITIONS
“AIRBORNE CONTAMINANTS” ARE THOSE CONTAMINANTS LISTED IN 29 CFR 1926.55
AND 8 AAC 61.1100 THAT HAVE THE POTENTIAL TO BECOME AIRBORNE DUE TO
VARIOUS WORK ACTIVITIES BEING PERFORMED BY THE CONTRACTOR.
ADDITIONALLY, AIRBORNE CONTAMINANTS INCLUDE THOSE FUMES AND ODORS
THAT MAY BE OBJECTIONABLE TO PERSONNEL IN OCCUPIED AREAS OF THE
FACILITY EVEN THOUGH THEY ARE NOT LISTED IN THE REFERENCE REGULATIONS.
AIRBORNE CONTAMINANTS MAY BE BROADLY CATEGORIZED AS PRE-EXISTING OR
ACTIVITY GENERATED. WITHIN 10 DAYS AFTER DATE OF AGREEMENT, SUBMIT
PRELIMINARY SCHEDULE DEFINING PLANNED OPERATIONS FOR THE FIRST 30 DAYS
OF WORK, WITH A GENERAL OUTLINE FOR REMAINDER OF WORK .
1.2 AIRBORNE CONTAMINANT CONTROL
CONTRACTOR SHALL ESTABLISH AND MAINTAIN CONTROL OVER THE GENERATION
AND CONTAINMENT OF ALL POTENTIAL AIRBORNE CONTAMINANTS SO THAT
WORKERS, FACILITIES, STAFF, PROGRAMS, EQUIPMENT, AND OPERATIONS ARE NOT
ADVERSELY AFFECTED,
THE CONTRACTOR SHALL ENSURE WORKERS HAVE THE PROPER PROTECTIVE
EQUIPMENT NEEDED FOR THE JOB BEING PERFORMED.
A.
B.
A.
B.
A.
B.
C.
A.
A.
A.
B.
C.
A.
B.
A.
B.
C.
D.
E.
A.
B.
A.
B.
C.
SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL
1.1 TEMPORARY UTILITIES
CONTRACTOR TO PAY FOR ALL ELECTRICAL POWER, LIGHTING, WATER, HEATING
AND COOLING, AND VENTILATION
REQUIRED FOR CONSTRUCTION PURPOSES.
CONTRACTOR TO COORDINATE WITH THE UTILITY SERVICE PROVIDER TO INSTALL
TEMPORARY SERVICES AND METERS. COSTS FOR SUCH INSTALLATIONS BY
CONTRACTOR.
1.2 TEMPORARY SANITARY FACILITIES
PROVIDE AND MAINTAIN REQUIRED FACILITIES AND ENCLOSURES. PROVIDE AT TIME
OF PROJECT MOBILIZATION.
MAINTAIN DAILY IN CLEAN AND SANITARY CONDITION.
1.3 BARRIERS
PROVIDE BARRIERS TO PREVENT UNAUTHORIZED ENTRY TO CONSTRUCTION
AREAS, TO PREVENT ACCESS TO AREAS THAT COULD BE HAZARDOUS TO WORKERS
OR THE PUBLIC AND TO PROTECT EXISTING FACILITIES AND ADJACENT SPACES
FROM DAMAGE FROM CONSTRUCTION OPERATIONS AND DEMOLITION.
PROVIDE PROTECTION FOR PLANTS DESIGNATED TO REMAIN. REPLACE DAMAGED
PLANTS.
PROTECT NON-OWNED VEHICULAR TRAFFIC, STORED MATERIALS, SITE, AND
STRUCTURES FROM DAMAGE.
1.4 FENCING
PROVIDE 6 FOOT HIGH FENCE AROUND CONSTRUCTION SITE; EQUIP WITH
VEHICULAR AND PEDESTRIAN GATES WITH LOCKS.
1.5 EXTERIOR ENCLOSURES
PROVIDE TEMPORARY INSULATED WEATHER TIGHT CLOSURE OF EXTERIOR
OPENINGS TO ACCOMMODATE ACCEPTABLE WORKING CONDITIONS AND
PROTECTION FOR PRODUCTS, TO ALLOW FOR TEMPORARY HEATING AND
MAINTENANCE OF REQUIRED AMBIENT TEMPERATURES, AND TO PREVENT ENTRY
OF UNAUTHORIZED PERSONS. PROVIDE ACCESS DOORS WITH SELF-CLOSING
HARDWARE AND LOCKS.
1.6 SECURITY
PROVIDE SECURITY AND FACILITIES TO PROTECT WORK, EXISTING FACILITIES, AND
OPERATIONS FROM UNAUTHORIZED ENTRY, VANDALISM, OR THEFT.
CONTRACTOR IS RESPONSIBLE FOR EXISTING AND NEW FACILITES FOR THE
DURATION OF THE PROJECT AND FOR THE CONTENTS OF THE BUILDING WHEN THE
OWNER IS NOT PHYSICALLY OCCUPYING THE BUILDING.
CONTRACTOR IS RESPONSIBLE TO SECURE WORK AREA FROM UNAUTHORIZED
ENTRY WHEN WORK IS OCCURING AND WHEN WORK IS PAUSED WITHOUT
WORKERS PHYSICALLY PRESENT.
1.7 VEHICULAR ACCESS AND PARKING
PROVIDE AND MAINTAIN ACCESS TO FIRE HYDRANTS, FREE OF OBSTRUCTIONS.
EXISTING PARKING AREAS MAY BE USED FOR CONSTRUCTION PARKING AS
APPROVED BY OWNER.
1.8 WASTE REMOVAL
PROVIDE WASTE REMOVAL FACILITIES AND SERVICES AS REQUIRED TO MAINTAIN
THE SITE IN CLEAN AND ORDERLY CONDITION.
PROVIDE CONTAINERS WITH LIDS. REMOVE TRASH FROM SITE PERIODICALLY.
DO NOT STORE ANY TRASH ON SITE OUTSIDE THE IMMEDIATE WORK AREA AT ANY
TIME.
IF MATERIALS TO BE RECYCLED OR RE-USED ON THE PROJECT MUST BE STORED
ON-SITE, PROVIDE SUITABLE NON-COMBUSTIBLE CLIMATE CONTROLLED
CONTAINERS; LOCATE CONTAINERS HOLDING FLAMMABLE MATERIAL OUTSIDE THE
STRUCTURE UNLESS OTHERWISE APPROVED BY THE AUTHORITIES HAVING
JURISDICTION.
CONTRACTOR SHALL PAY FOR ALL WASTE SERVICES INCLUDING LANDFILL AND
TRANSPORTATION FEES.
1.9 PROJECT IDENTIFICATION
PROVIDE PROJECT IDENTIFICATION SIGN OF DESIGN, CONSTRUCTION, AND
LOCATION APPROVED BY OWNER.
NO OTHER SIGNS ARE ALLOWED WITHOUT OWNER PERMISSION EXCEPT THOSE
REQUIRED BY LAW.
1.10 REMOVAL OF UTILITIES, FACILITES, AND CONTROLS
REMOVE TEMPORARY UTILITIES, EQUIPMENT, FACILITIES, MATERIALS, PRIOR TO
DATE OF FINAL COMPLETION INSPECTION.
CLEAN AND REPAIR DAMAGE CAUSED BY INSTALLATION OR USE OF TEMPORARY
WORK.
RESTORE EXISTING AND FACILITIES USED DURING CONSTRUCTION TO ORIGINAL
CONDITION.
A.
B.
C.
D.
A.
A.
1.
2.
SECTION 01 57 19 - TEMPORARY ENVIRONMENTAL CONTROLS
PART 1 - GENERAL
1.1 PROJECT GOALS
PREVENT DEPOSITION OF DUST AND OTHER PARTICULATES IN HVAC DUCTS AND
EQUIPMENT.
AVOID CONSTRUCTION PRACTICES THAT COULD RESULT IN CONTAMINATION OF
INSTALLED PRODUCTS LEADING TO INDOOR AIR POLLUTION.
CONTRACTOR TO PAY FOR ALL ELECTRICAL POWER, LIGHTING, WATER, HEATING
AND COOLING, AND VENTILATION
REQUIRED FOR CONSTRUCTION PURPOSES.
CONTRACTOR TO COORDINATE WITH THE UTILITY SERVICE PROVIDER TO INSTALL
TEMPORARY SERVICES AND METERS. COSTS FOR SUCH INSTALLATIONS BY
CONTRACTOR.
PART 2 - NOT USED
PART 3 - EXECUTION
3.1 CONSTRUCTION PROCEDURES
PREVENT THE ABSORPTION OF MOISTURE AND HUMIDITY BY ADSORPTIVE
MATERIALS
3.2 BUILDING FLUSHOUT OR AIR CONTANIMANT TESTING
CONTRACTOR OPTION: EITHER:
PERFORM BUILDING FLUSH-OUT BEFORE OCCUPANCY BUT NOT BEFORE ALL
CONSTRUCTION IS COMPLETE, OR;
PERFORM AIR CONTAMINENT TESTING BEFORE OCCUPANCY BUT NOT
BEFORE ALL CONSTRUCTION IS COMPLETE
A.
1.
2.
A.
A.
1.
2.
3.
B.
1.
2.
3.
4.
5.
6.
A.
B.
A.
B.
C.
D.
E.
F.
G.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
SECTION 01 60 00 - PRODUCT REQUIREMENTS
PART 1 - GENERAL
1.1 QUALITY ASSURANCE
BIO-BASED CONTENT: OF VEGETABLE OR ANIMAL ORIGIN, NOT INCLUDING
PRODUCTS MADE BY KILLING THE
ANIMAL.
DETERMINE PERCENTAGE OF BIO-BASED CONTENT IN ACCORDANCE WITH
ASTM D6866.
BIO-BASED CONTENT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .