Attachment 19_Addendum to model change for heat pumps.pdf

PDF 190 KB Posted

Attached to
Petersburg Office Consolidation
Solicitation number
1240BJ24R0018
Issued by

About this file

This document is an Addendum to the solicitation for the Petersburg Office Consolidation contract opportunity, Solicitation #1240BJ24R0018. The addendum outlines several revisions to the mechanical and electrical drawings, including changes to the heat pump models, buffer tank sizes, circulation pump models, and electrical circuit breakers. The revisions are due to the discontinuation of the originally specified heat pump model. The federal contract opportunity is for the PDO Consolidation and Work Center Replacement project in Petersburg, Alaska on the Tongass National Forest. The solicitation includes a virtual pre-proposal meeting on July 25, 2024 and a question submission deadline of August 9, 2024. No substitution requests will be considered prior to award, and proposals must provide a complete response to the Technical Evaluation Factors to be considered further. The contract is being issued by the Department of Agriculture Forest Service.

View the file

Other files

File Type Posted
Attachment 17_AK0514ZZ 1988-06-14 - SPRINKLERS PLANS SECTION DETAIL.pdf PDF
Attachment 18_Wage Determination AK20240001 7.19.24.pdf PDF
Amendment 3 SF30 - 1240BJ24R0018.pdf PDF
Attachment 16_087100-DR-HDWR-SETS_REVISED_240813.pdf PDF
Attachment 15_RFIs_PDO Consolidation.pdf PDF
Attachment 14_Harris 100 percent drawings addendum.pdf PDF
Amendment 2 - Summary of Changes.pdf PDF
Amendment 2 SF30 - 1240BJ24R0018.pdf PDF
Attachment 13_Fram 100 percent drawings addendum.pdf PDF
1240BJ24R0018 Amendment 1 - Solicitation Packet.pdf PDF
Attachment 12 - Guiding Principles checklist for PDO_info only.pdf PDF
Attachment 9 - Drawings_Harris Bldg Renovation 100 Percent.pdf PDF
1240BJ24R0018 Amendment 1 - SF30.pdf PDF
Attachment 11 - 01 25 00-RIB-Substitution Procedures.pdf PDF
Attachment 10 - Drawings_Fram Parking Expansion 100 Percent.pdf PDF
Attachment 3a - Harris Project Drawings 90 Percent.pdf PDF
1240BJ24R0018 Solicitation Packet.pdf PDF
Attachment 1 - PDO Project Drawings.pdf PDF
Attachment 6 - Past Performance.pdf PDF
Attachment 3b - Harris Drawings Addendum 90 Percent.pdf PDF
Attachment 8 - SF24 Bid Bond.pdf PDF
Attachment 5 - Wage Determination AK20240001.pdf PDF
Attachment 4 - Fram Project Drawings 90 Percent.pdf PDF
Attachment 2 - PDO Project Specifications.pdf PDF
Attachment 7 - RFI Template for PDO_Harris_Fram.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #: 1240BJ24R0018

ATTACHMENT 19: Addendum to address model change for heat pumps HP-1, HP-2

Due to notification by the heat pump manufacturer, it has been learned the NRK model line has been discontinued. Therefore, the following changes to the drawings are implemented:

Mechanical Revisions:

1. Sheet M0.03: Revise model of heat pumps HP-1 and HP-2 to be Aermec

NYK500H**J7002.

2. Sheet M0.02: Revise size of buffer tanks BT-1 and BT-2 to be 350 gallons. Taco BTL0350.

3. Sheet M0.02: Revise model of heating circulation pumps PMP-H1A and PMP-H1B to be

Taco 1911. 120 GPM, 50 feet TDH, 5 HP, 208V, 3ph, with VSD.

4. Sheet M0.02: Revise model of cooling circulation pumps PMP-C1A and PMP-C1B to be

Taco 1935. 120 GPM, 60 feet TDH, 5 HP, 208V, 3ph, with VSD.

5. Sheet M4.02: Detail 3, revise the piping at HX-1 as follows. On the GHR out of HX-1 add a

Griswold automatic flow control valve (84 GPM). After this (downstream ) add a 3-way control valve. Normally open (NO) is heating mode, with flow through the heat exchanger.

On the normally closed (NC) port, add a bypass pipe that connects GHS with GHR (at the 3-way valve) upstream of the strainer. On this bypass pipe, add a balance valve, set to 36

GPM.

Electrical Revisions:

6. Sheet E0.03: Panel MDP, revise circuit breakers for HP-1 and HP-2 from 80A/3P to 110A/3P.

7. Sheet E0.04: Panel 1NPB, revise circuit breakers for PMP-H1A and PMP-H1B from 20A/3P to 35A/3P.

8. Sheet E0.04: Panel 1NPC, revise circuit breakers for PMP-C1A and PMP-C1B from 20A/3P to 35A/3P.

9. Sheet E1.00: Revise conductor size for HP-1 and HP-2 from #4 AWG to #2 AWG.

Other Electrical Revision:

10. Sheet E8.00: Provide sheet note 16 to read “PROVIDE UPS, MAINTENANCE BYPASS

SWITCH, AND EXTENDED RUNTIME BATTERIES. PROVIDE EATON 9355 10KVA UPS

WITH 120 MINUTES OF RUNTIME, OR APPROVED EQUAL.”