Attachment 3 Inventory Asset List 12-08-2020 (003).pdf

PDF 107 KB Posted

Attached to
Tactical Infrastructure (TI) Maintenance for Big Bend Sector and El Paso Sector in Texas
Solicitation number
70B01C21R00000007
Issued by

About this file

This document contains an inventory list of tactical infrastructure assets owned and maintained by Customs and Border Protection within the Big Bend and El Paso Sectors in Texas, as well as a solicitation notice seeking maintenance and repair services for those assets. The inventory list details 183 miles of pedestrian wall, 631 gates, 250 miles of roads, 184 culverts, and 107 lighting and electrical assets within the El Paso Sector, as well as smaller quantities of pedestrian wall, vehicle fence, gates, roads, drainage features, and vegetation control areas within the Big Bend Sector. The solicitation seeks contractor services such as road, bridge, fence, and gate maintenance; vegetation control; debris removal; and drainage system upkeep for tactical infrastructure located within the two sectors. Responses are due by March 11, 2021 for an optional site visit, with the contractor expected to perform maintenance, repair, and improvement work on assets falling under roads and bridges; fencing and gates; vegetation control; drainage systems; and tunnel remediation.

View the file

Other files

File Type Posted
Copy of Contractor Unit Pricing Sheet 04262021.xlsx XLSX spreadsheet
70B01C21R00000007 IT Maintenance Contractor Questions From Amendment 2 04072021 (revised).docx DOCX document
70B01C21R00000007 IT Maintenance Contractor Questions From Amendment 2 04072021.docx DOCX document
ATTACHMENT 4 - Notional Work Plan 04072021.xlsx XLSX spreadsheet
Contractor Unit Pricing Sheet 04072021.xlsx XLSX spreadsheet
ATTACHMENT 7 Work Order Form.xlsx XLSX spreadsheet
ATTACHMENT 4 -- Notional Work Plan 3-29-21.xlsx XLSX spreadsheet
ATTACHMENT 1 -- SOW EPT BBT North TI Maintenance IDIQ Rev 03292021.pdf PDF
70B01C21R00000007 ATTACHMENT 9 PM Checklist.pdf PDF
TI Maintenance Work Plan Development Process Flowchart_3-19-21.pdf PDF
ATTACHMENT 2 -- Line Item Summary EPT BBN 3-28-21.xlsx XLSX spreadsheet
70B01C21R00000007 IT Maintenance Contractor Questions Resp 03292021.pdf PDF
RFP 70B01C21R00000007 Amendment A0002 SF30.pdf PDF
ATTACHMENT 5 -- PAST PERFORMANCE INFORMATION SURVEY 3-29-21.docx DOCX document
ATTACHMENT 8 Estimate Form 70B01C21R00000007 3-29-21.xlsx XLSX spreadsheet
Site Visit Attendees.docx DOCX document
Meeting Location for Day 1 of the site vists.pdf PDF
70B01C21R00000007 Amendment 1.pdf PDF
Site Visit Signup El Paso and Big Bend Sector.xlsx XLSX spreadsheet
Attachment 6 Wage Determination DBA Presidio Hwy.pdf PDF
Attachment 1 SOW EPT BBT North TI Maintenance IDIQ 12012020.docx DOCX document
Attachment 4a TI Design Standards_v1_Chapter 1_Sept 2012.pdf PDF
Attachment 4 Boat Ramp Design Standards.pdf PDF
Attachment 6 Wage Determination DBA El Paso Hwy.pdf PDF
Attachment 4 Boat Ramp Detail.pdf PDF
CUS1449 - Commercial Items (SF1449).pdf PDF
Attachment 4 Submittal 01 Engineering Letter and Shop Drawings.pdf PDF
Attachment 4 TI Design Standards_v1_Chapter 3_Sept 2012.pdf PDF
RFP 70B01C21R00000007 Line Item Summary 01212021.xlsx XLSX spreadsheet
RFP 70B01C21R00000007 continuation pages.pdf PDF
Attachment 5 Notional Work Plan.xlsx XLSX spreadsheet
Attachment 4 TI Design Standards_v1_Sept 2012 - Roads Section.pdf PDF
Attachment 6 Wage Determination DBA Presidio Bldg.pdf PDF
Attachment 2 Contractor Unit Pricing Sheet final.xlsx XLSX spreadsheet
Attachment 6 Wage Determination SCA El Paso.pdf PDF
Attachment 4 TI Standards v2_Wall-Fence-Gates Drawing Updates_080618 (003).pdf PDF
Attachment 6 Wage Determination DBA El Paso Bldg.pdf PDF
Attachment 4 TI Design Standards_v1_Chapter 2_Sept 2012.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

El Paso Sector

Total Req.

Green Green

Not Green Green

Total Owned

Operation al

Green Green

Not Green Green

Total Non- Owned

Operation al

Pedestrian Wall (Miles) 183.1 0.0 183.1 0.0 0.0 0.0 183.1 Primary 165.7 0.0 165.7 0.0 0.0 0.0 165.7

Secondary 13.4 0.0 13.4 0.0 0.0 0.0 13.4 Tertiary 4.0 0.0 4.0 0.0 0.0 0.0 4.0

Vehicle Fence (Miles) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Gates (Count) 631.0 0.0 631.0 0.0 0.0 0.0 631.0 Road (Miles) 250.3 39.0 289.3 114.4 56.3 170.7 460.0

Bridges (Count) 5.0 0.0 5.0 0.0 0.0 0.0 5.0 Boat Ramps (Count) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Veg. Control (Acres) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Veg. Control (Miles) 169.0 0.0 169.0 4.9 0.3 5.2 174.2 Drainage- Culverts 184.0 0.0 184.0 0.0 0.0 0.0 184.0

Drainage- LWC 215.0 0.0 215.0 0.0 0.0 0.0 215.0 Drainage- Grates 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Lighting & Electrical (Count) 107.0 0.0 107.0 0.0 0.0 0.0 107.0

Owned Operational Non-Owned Operational

Big Bend sector

Total Req.

Green Green

Not Green Green

Total Owned

Operation al

Green Green

Not Green Green

Total Non- Owned

Operation al

Pedestrian Wall (Miles) 4.6 0.0 4.6 0.0 0.0 0.0 4.6 Primary 4.6 0.0 4.6 0.0 0.0 0.0 4.6

Secondary 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Tertiary 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Vehicle Fence (Miles) 0.2 0.0 0.2 0.0 0.0 0.0 0.2 Gates (Count) 3.0 0.0 3.0 8.0 25.0 33.0 36.0 Road (Miles) 4.6 0.0 4.6 128.7 688.5 817.2 821.8

Bridges (Count) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Boat Ramps (Count) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Veg. Control (Acres) 0.0 0.0 0.0 114.4 0.0 114.4 114.4 Veg. Control (Miles) 18.4 0.0 18.4 94.9 130.6 225.5 243.9 Drainage- Culverts 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage- LWC 6.0 2.0 8.0 0.0 3.0 3.0 11.0 Drainage- Grates 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Lighting & Electrical (Count) 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Owned Operational Non-Owned Operational

Sheet1

File details come from the government source that posted it. Updated .