RFP 70B01C21R00000007 Amendment A0002 SF30.pdf

PDF 19 KB Posted

Attached to
Tactical Infrastructure (TI) Maintenance for Big Bend Sector and El Paso Sector in Texas
Solicitation number
70B01C21R00000007
Issued by

About this file

This document is an amendment to a solicitation for tactical infrastructure maintenance services. The amendment provides updates to the statement of work and adds several attachments including the statement of work, line item summary, notional work plan, past performance survey, work order and estimate forms, a project manager checklist, and work plan development process flowchart. It also includes responses to questions submitted by contractors and notes from an attended site visit. The solicitation is seeking contractor services to perform maintenance, repair, and improvement activities for tactical infrastructure assets in the Big Bend and El Paso Sectors in Texas. Responsibilities include work on roads and bridges, fencing and gates, vegetation control, debris removal, border lighting and electrical systems, drainage infrastructure, and tunnel remediation. Interested offerors must submit any acknowledgements of this amendment by the hour and date specified in the solicitation.

View the file

Other files

File Type Posted
Copy of Contractor Unit Pricing Sheet 04262021.xlsx XLSX spreadsheet
70B01C21R00000007 IT Maintenance Contractor Questions From Amendment 2 04072021 (revised).docx DOCX document
70B01C21R00000007 IT Maintenance Contractor Questions From Amendment 2 04072021.docx DOCX document
ATTACHMENT 4 - Notional Work Plan 04072021.xlsx XLSX spreadsheet
Contractor Unit Pricing Sheet 04072021.xlsx XLSX spreadsheet
ATTACHMENT 7 Work Order Form.xlsx XLSX spreadsheet
ATTACHMENT 4 -- Notional Work Plan 3-29-21.xlsx XLSX spreadsheet
ATTACHMENT 1 -- SOW EPT BBT North TI Maintenance IDIQ Rev 03292021.pdf PDF
70B01C21R00000007 ATTACHMENT 9 PM Checklist.pdf PDF
TI Maintenance Work Plan Development Process Flowchart_3-19-21.pdf PDF
ATTACHMENT 2 -- Line Item Summary EPT BBN 3-28-21.xlsx XLSX spreadsheet
70B01C21R00000007 IT Maintenance Contractor Questions Resp 03292021.pdf PDF
ATTACHMENT 5 -- PAST PERFORMANCE INFORMATION SURVEY 3-29-21.docx DOCX document
ATTACHMENT 8 Estimate Form 70B01C21R00000007 3-29-21.xlsx XLSX spreadsheet
Site Visit Attendees.docx DOCX document
Meeting Location for Day 1 of the site vists.pdf PDF
70B01C21R00000007 Amendment 1.pdf PDF
Site Visit Signup El Paso and Big Bend Sector.xlsx XLSX spreadsheet
Attachment 6 Wage Determination DBA Presidio Hwy.pdf PDF
Attachment 1 SOW EPT BBT North TI Maintenance IDIQ 12012020.docx DOCX document
Attachment 4a TI Design Standards_v1_Chapter 1_Sept 2012.pdf PDF
Attachment 4 Boat Ramp Design Standards.pdf PDF
Attachment 6 Wage Determination DBA El Paso Hwy.pdf PDF
Attachment 3 Inventory Asset List 12-08-2020 (003).pdf PDF
Attachment 4 Boat Ramp Detail.pdf PDF
CUS1449 - Commercial Items (SF1449).pdf PDF
Attachment 4 Submittal 01 Engineering Letter and Shop Drawings.pdf PDF
Attachment 4 TI Design Standards_v1_Chapter 3_Sept 2012.pdf PDF
RFP 70B01C21R00000007 Line Item Summary 01212021.xlsx XLSX spreadsheet
RFP 70B01C21R00000007 continuation pages.pdf PDF
Attachment 5 Notional Work Plan.xlsx XLSX spreadsheet
Attachment 4 TI Design Standards_v1_Sept 2012 - Roads Section.pdf PDF
Attachment 6 Wage Determination DBA Presidio Bldg.pdf PDF
Attachment 2 Contractor Unit Pricing Sheet final.xlsx XLSX spreadsheet
Attachment 6 Wage Determination SCA El Paso.pdf PDF
Attachment 4 TI Standards v2_Wall-Fence-Gates Drawing Updates_080618 (003).pdf PDF
Attachment 6 Wage Determination DBA El Paso Bldg.pdf PDF
Attachment 4 TI Design Standards_v1_Chapter 2_Sept 2012.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

PAGE OF PAGES

3. EFF. DATE 5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO.

7. ADMINISTERED BY (If other than Item 6) CODE

FACILITY CODECODE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR(Number, street, county, State & Zip Code)

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

1. CONTRACT ID CODE

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES Such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

E. IMPORTANT: Contractor

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) copies to issuing office.

4. REQUISITION/PURCHASE REQ. NO.

A0002 03/29/2021 0020122341

DHS - Customs & Border Protection

Administration Facilities Training Contracting Division 6650 Telecom Drive

Intech 2, Suite 100 Indianapolis IN 46278

DHS - Customs & Border Protection

Administration Facilities Training Contracting Division

6650 Telecom Drive

Intech 2, Suite 100

Indianapolis IN 46278

70B01C21R00000007

02/04/2021

1 2 is required to sign this document and return is not

PREVIOUS EDITION UNUSABLE STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA 16C. DATE

SIGNED

15B. CONTRACTOR/OFFEROR 15C. DATE

SIGNED

BY

(Signature of Contracting Officer)(Signature of person authorized to sign)

15A NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Jacob J. Burns Contracting Officer

The purpose of this amendment (#2) to RFP #70B01C21R00000007 is to make the following corrections:

1. Provides updates to RFP 70B01C21R00000007 continuation pages dated 3-29-21.

2. This Amendment adds the following documents:

• ATTACHMENT 1 -- SOW EPT BBT North TI Maintenance IDIQ Rev 03292021

• ATTACHMENT 2 -- Line Item Summary EPT BBN 3-28-21

• ATTACHMENT 4 -- Notional Work Plan 3-29-21

• ATTACHMENT 5 -- PAST PERFORMANCE INFORMATION SURVEY 3-29-21

• ATTACHMENT 7 - Work Order Form

• ATTACHMENT 8 - Estimate Form 70B01C21R00000007 3-29-21

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT - Continuation

1. CONTRACT ID CODE

PAGE OF PAGES2. AMENDMENT/MODIFICATION NO. 3. EFF. DATE 4. REQUISITION/PURCHASE REQ. NO.

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

2 2A0002 03/29/2021 0020122341

STANDARD FORM 30 (REV. 11/2016)

• ATTACHMENT 9 - PM Checklist

• TI Maintenance Work Plan Development Process Flowchart_3-19-21

3. Reponses to the Contractors submitted questions are uploaded with this Amendment.

• 70B01C21R00000007 IT Maintenance Contractor Questions Resp 03292021

4. The Site Visit Attendance Sheet is also posted.

5. All other solicitation terms and conditions remain unchanged.

File details come from the government source that posted it. Updated .