ATTACHMENT 7 Work Order Form.xlsx
XLSX spreadsheet 39 KB Posted
- Attached to
- Tactical Infrastructure (TI) Maintenance for Big Bend Sector and El Paso Sector in Texas
- Solicitation number
- 70B01C21R00000007
About this file
This document contains a federal contract solicitation and related work order form. The solicitation seeks contractor services to perform maintenance, repair, and improvement of Tactical Infrastructure assets in the Big Bend and El Paso Sectors in Texas. Asset categories include roads and bridges, fence and gates, vegetation control, debris removal, border lighting and electrical, drainage and grate systems, and tunnel remediation. Interested offerors are to complete and submit the attached site visit form by March 11, 2021 via email. The work order form provides a template for work activity reports, detailing asset descriptions, locations, work standards, estimated and actual costs, and sign-off sections for prime and subcontractor representatives.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Inspection Report Form
| Work Activity (WA) Number: | Date(s): | REV: | 0 | |
| WORK DESCRIPTION | ||||
| TI Asset Description: | Work Category: |
Work Category Sub Type:
| Asset Objective(s): | Damage Extent: | ||||||
| Work Category: | Location: | ||||||
| Work Classification: | Sector: | ||||||
| Work Subdivisions: | GPS: | BEG | N: | ||||
| W: | END | N: |
W:
| Prime Lead Contact: | Name: | Ph: | Email: | |
| SUB Lead Contact: | Name: | Ph: | Email: | |
| GOV Lead Contact: | Name: | Ph: | Email: | |
| WORK PERFORMANCE | ||||
| Inspection: | Frequency: | |||
| Scope of Work: |
Work Standards/ QC Metrics:
| Work Duration: | Days: ## | WAR STATUS: | Initial | |
| ACCESS | ||||
| Access Issues (including any expiration dates): | Access Stakeholder(s): |
| Stakeholder Type: | ||||||
| ENVIRONMENTAL | ||||||
| Applicable | ||||||
| Environmental Regulations and Sources (_): | Applicable Environmental BMPs: | BMP’s reviewed and implemented? | Yes | |||
| Survey by Biologist if required? | No |
| COST | ||
| Est. Labor Costs: | Act. Labor Costs: | Other Notes/Photos |
| Est. Travel Costs: | Act. Travel Costs: | Other Notes/Photos |
Nearest CBP facility: xxx Avg. travel time to TI asset: #.# HRS Work Classification: [routine/urgent]
POC:
| Est. Equip Costs | Act. Equip Costs |
| Est. Material Costs: | Act. Material Costs: |
| Est. Mobilization: | Act. Mobilization: |
| Est. Other Costs: | Act. Other Costs: |
| Est. Total Costs: | Act. Total Costs: |
| Prime Representative: | Date: | ||
| Name, Signature | DD/MM/YYYY | ||
| Subcontractor: | Date: | ||
| Name, Signature | DD/MM/YYYY |
| Photographs: |
| Before: |
After:
&"Times New Roman,Bold"&24Work Activity Report
&"Times New Roman,Regular"&10 Contract # xxxxx &"Times New Roman,Regular"&10Page &P of &N &"Times New Roman,Regular"&10Revised: 04/04/2019
File details come from the government source that posted it. Updated .